Search results for: construction site safety
8212 Social Implementation of Information Sharing Road Safety Measure in South-East Asia
Authors: Hiroki Kikuchi, Atsushi Fukuda, Hirokazu Akahane, Satoru Kobayakawa, Tuenjai Fukuda, Takeru Miyokawa
Abstract:
According to WHO reports, fatalities by road traffic accidents in many countries of South-East Asia region especially Thailand and Malaysia are increasing year by year. In order to overcome these serious problems, both governments are focusing on road safety measures. In response, the Ministry of Land, Infrastructure, Transport and Tourism (MLIT) of Japan and Japan International Cooperation Agency (JICA) have begun active support based on the experiences to reduce the number of fatalities in road accidents in Japan in the past. However, even if the successful road safety measures in Japan is adopted in South-East Asian countries, it is not sure whether it will work well or not. So, it is necessary to clarify the issues and systematize the process for the implementation of road safety measures in South-East Asia. On the basis of the above, this study examined the applicability of "information sharing traffic safety measure" which is one of the successful road safety measures in Japan to the social implementation of road safety measures in South-East Asian countries. The "Information sharing traffic safety measure" is carried out traffic safety measures by stakeholders such as residents, administration, and experts jointly. In this study, we extracted the issues of implementation of road safety measures under local context firstly. This is clarifying the particular issues with its implementation in South-East Asian cities. Secondly, we considered how to implement road safety measures for solving particular issues based on the method of "information sharing traffic safety measure". In the implementation method, the location of the occurrence of a dangerous event was extracted based on the “HIYARI-HATTO” data which were obtained from the residents. This is because it is considered that the implementation of the information sharing traffic safety measure focusing on the location where the dangerous event occurs leads to the reduction of traffic accidents. Also, the target locations for the implementation of measures differ for each city. In Penang, we targeted the intersections in the downtown, while in Suphan Buri, we targeted mainly traffic control on the intercity highway. Finally, we proposed a method for implementing traffic safety measures. For Penang, we proposed a measure to improve the signal phase and showed the effect of the measure on the micro traffic simulation. For Suphan Buri, we proposed the suitable measures for the danger points extracted by collecting the “HIYARI-HATTO” data of residents to the administration. In conclusion, in order to successfully implement the road safety measure based on the "information sharing traffic safety measure", the process for social implementation of the road safety measures should be consistent and carried out repeatedly. In particular, by clarifying specific issues based on local context in South-East Asian countries, the stakeholders, not only such as government sectors but also local citizens can share information regarding road safety and select appropriate countermeasures. Finally, we could propose this approach to the administration that had the authority.Keywords: information sharing road safety measure, social implementation, South-East Asia, HIYARI-HATTO
Procedia PDF Downloads 1518211 Sustainability in Retaining Wall Construction with Geosynthetics
Authors: Sateesh Kumar Pisini, Swetha Priya Darshini, Sanjay Kumar Shukla
Abstract:
This paper seeks to present a research study on sustainability in construction of retaining wall using geosynthetics. Sustainable construction is a way for the building and infrastructure industry to move towards achieving sustainable development, taking into account environmental, socioeconomic and cultural issues. Geotechnical engineering, being very resource intensive, warrants an environmental sustainability study, but a quantitative framework for assessing the sustainability of geotechnical practices, particularly at the planning and design stages, does not exist. In geotechnical projects, major economic issues to be addressed are in the design and construction of stable slopes and retaining structures within space constraints. In this paper, quantitative indicators for assessing the environmental sustainability of retaining wall with geosynthetics are compared with conventional concrete retaining wall through life cycle assessment (LCA). Geosynthetics can make a real difference in sustainable construction techniques and contribute to development in developing countries in particular. Their imaginative application can result in considerable cost savings over the use of conventional designs and materials. The acceptance of geosynthetics in reinforced retaining wall construction has been triggered by a number of factors, including aesthetics, reliability, simple construction techniques, good seismic performance, and the ability to tolerate large deformations without structural distress. Reinforced retaining wall with geosynthetics is the best cost-effective and eco-friendly solution as compared with traditional concrete retaining wall construction. This paper presents an analysis of the theme of sustainability applied to the design and construction of traditional concrete retaining wall and presenting a cost-effective and environmental solution using geosynthetics.Keywords: sustainability, retaining wall, geosynthetics, life cycle assessment
Procedia PDF Downloads 20668210 Influence of Mooring Conditions on Side-By-Side Offloading System Safety Performance
Authors: Liu Shengnan, Sun Liping, Zhu Jianxun
Abstract:
Based on three dimensional potential flow theory, hydrodynamic response analysis is carried on the multi floating bodies system composed of FPSO moored with yoke and shuttle tanker. It considered hydrodynamic interaction between FPSO and shuttle tanker, interaction between the hull and yoke mooring systems, hawsers, fenders, and then focuses on hawsers of the side-by-side offloading system. The influence of hawsers parameters on system safety is studied in respects of hawser stiffness, length and arrangement. Through analysis in different environment conditions and two typical loading conditions, it can be found that a better safety performance can be achieved through these three ways including enlarging the number of hawsers as well as the stiffness of hawsers, changing the length and arrangement of hawsers.Keywords: yoke mooring, side-by-side offloading, multi floating body, hawser, safety
Procedia PDF Downloads 4338209 Vision Zero for the Caribbean Using the Systemic Approach for Road Safety: A Case Study Analyzing Jamaican Road Crash Data (Ongoing)
Authors: Rachelle McFarlane
Abstract:
The Second Decade of Action Road Safety has begun with increased focus on countries who are disproportionately affected by road fatalities. Researchers highlight the low effectiveness of road safety campaigns in Latin America and the Caribbean (LAC) still reporting approximately 130,000 deaths and six million injuries annually. The regional fatality rate 19.2 per 100,000 with heightened concern for persons 15 to 44 years. In 2021, 483 Jamaicans died in 435 crashes, with 33% of these fatalities occurring during Covid-19 curfew hours. The study objective is to conduct a systemic safety review of Jamaican road crashes and provide a framework for its use in complementing traditional methods. The methodology involves the use of the FHWA Systemic Safety Project Selection Tool for analysis. This tool reviews systemwide data in order to identify risk factors across the network associated with severe and fatal crashes, rather that only hotspots. A total of 10,379 crashes with 745 fatalities and serious injuries were reviewed. Of the focus crash types listed, 50% of ‘Pedestrian Accidents’ resulted in fatalities and serious injuries, followed by 32% ‘Bicycle’, 24% ‘Single’ and 12% of ‘Head-on’. This study seeks to understand the associated risk factors with these priority crash types across the network and recommend cost-effective countermeasures across common sites. As we press towards Vision Zero, the inclusion of the systemic safety review method, complementing traditional methods, may create a wider impact in reducing road fatalities and serious injury by targeting issues across network with similarities; focus crash types and contributing factors.Keywords: systemic safety review, risk factors, road crashes, crash types
Procedia PDF Downloads 938208 Assessing Project Performance through Work Sampling and Earned Value Analysis
Authors: Shobha Ramalingam
Abstract:
The majority of the infrastructure projects are affected by time overrun, resulting in project delays and subsequently cost overruns. Time overrun may vary from a few months to as high as five or more years, placing the project viability at risk. One of the probable reasons noted in the literature for this outcome in projects is due to poor productivity. Researchers contend that productivity in construction has only marginally increased over the years. While studies in the literature have extensively focused on time and cost parameters in projects, there are limited studies that integrate time and cost with productivity to assess project performance. To this end, a study was conducted to understand the project delay factors concerning cost, time and productivity. A case-study approach was adopted to collect rich data from a nuclear power plant project site for two months through observation, interviews and document review. The data were analyzed using three different approaches for a comprehensive understanding. Foremost, a root-cause analysis was performed on the data using Ishikawa’s fish-bone diagram technique to identify the various factors impacting the delay concerning time. Based on it, a questionnaire was designed and circulated to concerned executives, including project engineers and contractors to determine the frequency of occurrence of the delay, which was then compiled and presented to the management for a possible solution to mitigate. Second, a productivity analysis was performed on select activities, including rebar bending and concreting through a time-motion study to analyze product performance. Third, data on cost of construction for three years allowed analyzing the cost performance using earned value management technique. All three techniques allowed to systematically and comprehensively identify the key factors that deter project performance and productivity loss in the construction of the nuclear power plant project. The findings showed that improper planning and coordination between multiple trades, concurrent operations, improper workforce and material management, fatigue due to overtime were some of the key factors that led to delays and poor productivity. The findings are expected to act as a stepping stone for further research and have implications for practitioners.Keywords: earned value analysis, time performance, project costs, project delays, construction productivity
Procedia PDF Downloads 998207 Affordable and Sustainable Housing Construction: Case Studies
Authors: Tony Rizk
Abstract:
Recent material advances and cost efficiencies are transforming the housing industry away from traditional lumber and gypsum material to alternate fiberboard material that is workable and resistant to fire, mold, and pest infestation. The use of these materials may add to the initial cost of construction. However, the life cycle (cradle to grave) cost of houses using these construction materials and methods are lower than the life cycle costs using traditional housing construction materials and methods. This paper will present four (4) case studies of sustainable house projects. Each project was designed and constructed using earthen-based, sustainable fiberboard material that is resistant to fire, mold, and infestation and fabricated at a very low material calorific value. These house projects have a living space ranging from 625 sq. ft. for an accessory dwelling unit and up to 3,200 sq. ft. 1-story and 2-story homes. For each case study, we will present the house engineering design and construction method, the initial construction costs, a summary of the life cycle costs, and a comparison to the life cycle cost of traditional housing available in the literature.Keywords: residential housing, sustainable housing, life cycle cost, fire resistance, mold, infestation resistance
Procedia PDF Downloads 1308206 Scoring Approach to Identify High-Risk Corridors for Winter Safety Measures in the Iranian Roads Network
Authors: M. Mokhber, J. Hedayati
Abstract:
From the managerial perspective, it is important to devise an operational plan based on top priorities due to limited resources, diversity of measures and high costs needed to improve safety in infrastructure. Dealing with the high-risk corridors across Iran, this study prioritized the corridors according to statistical data on accidents involving fatalities, injury or damage over three consecutive years. In collaboration with the Iranian Police Department, data were collected and modified. Then, the prioritization criteria were specified based on the expertise opinions and international standards. In this study, the prioritization criteria included accident severity and accident density. Finally, the criteria were standardized and weighted (equal weights) to score each high-risk corridor. The prioritization phase involved the scoring and weighting procedure. The high-risk corridors were divided into twelve groups out of 50. The results of data analysis for a three-year span suggested that the first three groups (150 corridors) along with a quarter of Iranian road network length account for nearly 60% of traffic accidents. In the next step, according to variables including weather conditions particular roads for the purpose of winter safety measures were extracted from the abovementioned categories. According to the results ranking, 9 roads with the overall length of about 1000 Km of high-risk corridors are considered as preferences of safety measures.Keywords: high-risk corridors, HRCs, road safety rating, road scoring, winter safety measures
Procedia PDF Downloads 1808205 Development of Intelligent Smart Multi Tracking Agent System to Support of Logistics Safety
Authors: Umarov Jamshid, Ju-Su Kim, Hak-Jun Lee, Man-Kyo Han, Ryum-Duck Oh
Abstract:
Recently, it becomes convenient to identify the location information of cargos by using GPS and wireless communication technologies. The development of IoT technologies and tracking system allows us to confirm site situation on an ad hoc basis in all the industries and social environments. Moreover, it allows us to apply IT technologies to a manageable extent. However, there have been many limitations for using the system due to the difficulty of identifying location information in real time and also due to the simple features. To globalize the logistics related tracking system, it is required to conduct a study to resolve the aforementioned problem. On that account, this paper designed and developed the IoT and RTLS based intelligent multi tracking agent system for more secure, accurate and reliable transportation in relation to logistics.Keywords: GPS, tracking agent system, IoT, RTLS, Logistics
Procedia PDF Downloads 6508204 Assessment of Post-surgical Donor-Site Morbidity in Vastus lateralis Free Flap for Head and Neck Reconstructive Surgery: An Observational Study
Authors: Ishith Seth, Lyndel Hewitt, Takako Yabe, James Wykes, Jonathan Clark, Bruce Ashford
Abstract:
Background: Vastus lateralis (VL) can be used to reconstruct defects of the head and neck. Whilst the advantages are documented, donor-site morbidity is not well described. This study aimed to assess donor-site morbidity after VL flap harvest. The results will determine future directions for preventative and post-operative care to improve patient health outcomes. Methods: Ten participants (mean age 55 years) were assessed for the presence of donor-site morbidity after VL harvest. Musculoskeletal (pain, muscle strength, muscle length, tactile sensation), quality of life (SF-12), and lower limb function (lower extremity function, gait (function and speed), sit to stand were assessed using validated and standardized procedures. Outcomes were compared to age-matched healthy reference values or the non-operative side. Analyses were conducted using descriptive statistics and non-parametric tests. Results: There was no difference in muscle strength (knee extension), muscle length, ability to sit-to-stand, or gait function (all P > 0.05). Knee flexor muscle strength was significantly less on the operated leg compared to the non-operated leg (P=0.02) and walking speed was slower than age-matched healthy values (P<0.001). Thigh tactile sensation was impaired in 89% of participants. Quality of life was significantly less for the physical health component of the SF-12 (P<0.001). The mental health component of the SF-12 was similar to healthy controls (P=0.26). Conclusion: There was no effect on donor site morbidity with regards to knee extensor strength, pain, walking function, ability to sit-to-stand, and muscle length. VL harvest affected donor-site knee flexion strength, walking speed, tactile sensation, and physical health-related quality of life.Keywords: vastus lateralis, morbidity, head and neck, surgery, donor-site morbidity
Procedia PDF Downloads 2438203 Coping with Geological Hazards during Construction of Hydroelectric Projects in Himalaya
Authors: B. D. Patni, Ashwani Jain, Arindom Chakraborty
Abstract:
The world’s highest mountain range has been forming since the collision of Indian Plate with Asian Plate 40-50 million years ago. The Indian subcontinent has been deeper and deeper in to the rest of Asia resulting upliftment of Himalaya & Tibetan Plateau. The complex domain has become a major challenge for construction of hydro electric projects. The Himalayas are geologically complex & seismically active. Shifting of Indian Plate northwardly and increasing the amount of stresses in the fragile domain which leads to deformation in the form of several fold, faults and upliftment. It is difficult to undergo extensive geological investigation to ascertain the geological problems to be encountered during construction. Inaccessibility of the terrain, high rock cover, unpredictable ground water condition etc. are the main constraints. The hydroelectric projects located in Himalayas have faced many geological and geo-hydrological problems while construction of surface and subsurface works. Based on the experience, efforts have been made to identify the expected geological problems during and after construction of the projects. These have been classified into surface and subsurface problems which include existence of inhomogeneous deep overburden in the river bed or buried valley, abrupt change in bed rock profile, Occurrences of fault zones/shear zones/fractured rock in dam foundation and slope instability in the abutments. The tunneling difficulties are many such as squeezing ground condition, popping, rock bursting, high temperature gradient, heavy ingress of water, existence of shear seams/shear zones and emission of obnoxious gases. However, these problems were mitigated by adopting suitable remedial measures as per site requirement. The support system includes shotcrete, wire mesh, rock bolts, steel ribs, fore-poling, pre-grouting, pipe-roofing, MAI anchors, toe wall, retaining walls, reinforced concrete dowels, drainage drifts, anchorage cum drainage shafts, soil nails, concrete cladding and shear keys. Controlled drilling & blasting, heading & benching, proper drainage network and ventilation system are other remedial measures adopted to overcome such adverse situations. The paper highlights the geological uncertainties and its remedial measures in Himalaya, based on the analysis and evaluation of 20 hydroelectric projects during construction.Keywords: geological problems, shear seams, slope, drilling & blasting, shear zones
Procedia PDF Downloads 4058202 Association of Extremity Injuries with Safety Gear and Clothing of Hospitalized Motorcycle Riders: A Prospective Study
Authors: Sanjaya N. Munasinghe, R. Gnanasekeram, Dimuthu Tennakoon
Abstract:
During the last few years there has been a dramatic increase in the number of motorcyclists in Sri Lankan roads and thus an increase of motorcycle accidents (MCAs) with a heavy death and casualty toll. Extremity injuries due to MCAs cause a heavy burden on government hospitals. However, data on MCA injuries are limited. This study tries to determine the relationship between extremity injuries with protective gears and clothing motorcycle riders were wearing at the time of the accident. Data were collected from 410 motorcycle riders and passengers involved with MCAs and admitted to orthopedic and emergency observation wards in Teaching Hospital Kurunegala with extremity injuries between 1st February 2015 and 31st July 2015 using an interviewer administered questioner. Data were analyzed using SPSS version 17.0. Distal radial fracture is the most common upper extremity injury (12%), and Tibial fracture is the most common and severe lower extremity injury (23%). Very few participants were wearing safety gloves (2%) and jackets (10%). Most of the participants were wearing slippers (66%), short sleeved upper clothing (96%) and light cloth trousers (49%). According to Chi-square test associations were found between footwear and foot injuries (p-value - 0.001, Cramer's v-value - 0.203) and safety jacket and upper extremity injuries (p-value - 0.002, Cramer's v-value - 0.177). The results indicate that using safety gear can minimize the number of injuries in MCA victims. Thus it is necessary to ensure that motorcycle riders and pillion riders use proper safety gear.Keywords: extremity injuries, fractures, motorcycle accidents, safety gear
Procedia PDF Downloads 2968201 Cement-Based Composites with Carbon Nanofillers for Smart Structural Health Monitoring Sensors
Authors: Antonella D'Alessandro, Filippo Ubertini, Annibale Luigi Materazzi
Abstract:
The progress of nanotechnology resulted in the development of new instruments in the field of civil engineering. In particular, the introduction of carbon nanofillers into construction materials can enhance their mechanical and electrical properties. In construction, concrete is among the most used materials. Due to the characteristics of its components and its structure, concrete is suitable for modification, at the nanometer level too. Moreover, to guarantee structural safety, it is desirable to achieve a widespread monitoring of structures. The ideal thing would be to realize structures able to identify their behavior modifications, states of incipient damage or conditions of possible risk for people. This paper presents a research work about novel cementitious composites with conductive carbon nanoinclusions able of monitoring their state of deformation, with particular attention to concrete. The self-sensing ability is achieved through the correlation between the variation of stress or strain and that of electrical resistance. Carbon nanofillers appear particularly suitable for such applications. Nanomodified concretes with different carbon nanofillers has been tested. The samples have been subjected to cyclic and dynamic loads. The experimental campaign shows the potentialities of this new type of sensors made of nanomodified concrete for diffuse Structural Health Monitoring.Keywords: carbon nanofillers, cementitious nanocomposites, smart sensors, structural health monitoring.
Procedia PDF Downloads 3378200 An Integrated Framework for Engaging Stakeholders in the Circular Economy Processes Using Building Information Modeling and Virtual Reality
Authors: Erisasadat Sahebzamani, Núria Forcada, Francisco Lendinez
Abstract:
Global climate change has become increasingly problematic over the past few decades. The construction industry has contributed to greenhouse gas emissions in recent decades. Considering these issues and the high demand for materials in the construction industry, Circular Economy (CE) is considered necessary to keep materials in the loop and extend their useful lives. By providing tangible benefits, Construction 4.0 facilitates the adoption of CE by reducing waste, updating standard work, sharing knowledge, and increasing transparency and stability. This study aims to present a framework for integrating CE and digital tools like Building Information Modeling (BIM) and Virtual Reality (VR) to examine the impact on the construction industry based on stakeholders' perspectives.Keywords: circular economy, building information modeling, virtual reality, stakeholder engagement
Procedia PDF Downloads 1138199 Evaluation of European Surveys in the Area of Health and Safety at Work and Identification of New Risks in the Labor Environment
Authors: Alena Dadova, Katarina Holla, Anna Cidlinova, Linda Makovicka Osvaldova, Jiri Vala, Samuel Kockar
Abstract:
Occupational health and safety (ASH) is an area in which procedures and applications are constantly evolving and changing through legislation and new directives and guidelines. In this way, the relevant organizations strive to ensure continuous progress and the advantage of up-to-date information to ensure safety and prevent occupational accidents. Three ESENER surveys have been carried out in the European Union, led by the Agency for Safety and Health at Work (EU-OSHA). On the basis of surveys, it was determined how European workplaces manage risks and how they manage the field of safety and health protection at work. Thousands of companies and organizations in the European Union were involved in the surveys. Organizations and businesses were presented with a questionnaire that focused on the following topics: the impact of general risks on the field of OSH and the possibility of their management, psychosocial risks and other factors such as stress, harassment and bullying, and employee participation in OSH procedures. The article is dedicated to the fundamental conclusions from these surveys and their subsequent connection with the strategic intent of the Strategic Framework of European Union for the years 2021 - 2027. In the conclusion, emerging risks are identified and EU will soon have to deal with them.Keywords: ESENER, emerging risks, strategic framework in OSH, EU
Procedia PDF Downloads 1168198 Micro-Hydrokinetic for Remote Rural Electrification
Authors: S. P. Koko, K. Kusakana, H. J. Vermaak
Abstract:
Standalone micro-hydrokinetic river (MHR) system is one of the promising technologies to be used for remote rural electrification. It simply requires the flow of water instead of elevation or head, leading to expensive civil works. This paper demonstrates an economic benefit offered by a standalone MHR system when compared to the commonly used standalone systems such as solar, wind and diesel generator (DG) at the selected study site in Kwazulu Natal. Wind speed and solar radiation data of the selected rural site have been taken from national aeronautics and space administration (NASA) surface meteorology database. The hybrid optimization model for electric renewable (HOMER) software was used to determine the most feasible solution when using MHR, solar, wind or DG system to supply 5 rural houses. MHR system proved to be the best cost-effective option to consider at the study site due to its low cost of energy (COE) and low net present cost (NPC).Keywords: economic analysis, micro-hydrokinetic, rural-electrification, cost of energy (COE), net present cost (NPC)
Procedia PDF Downloads 4348197 Preliminary Study on the Factors Affecting Safety Parameters of (Th, U)O₂ Fuel Cycle: The Basis for Choosing Three Fissile Enrichment Zones
Authors: E. H. Uguru, S. F. A. Sani, M. U. Khandaker, M. H. Rabir
Abstract:
The beginning of cycle transient safety parameters is paramount for smooth reactor operation. The enhanced operational safety of UO₂ fuelled AP1000 reactor being the first using three fissile enrichment zones motivated this research for (Th, U)O₂ fuel. This study evaluated the impact of fissile enrichment, soluble boron, and gadolinia on the transient safety parameters to determine the basis for choosing the three fissile enrichment zones. Fuel assembly and core model of Westinghouse small modular reactor were investigated using different fuel and reactivity control arrangements. The Monte Carlo N-Particle eXtended (MCNPX) integrated with CINDER90 burn-up code was used for the calculations. The results show that the moderator temperature coefficient of reactivity (MTC) and the fuel temperature coefficient of reactivity (FTC) were respectively negative and decreased with increasing fissile enrichment. Soluble boron significantly decreased the MTC but slightly increased FTC while gadolinia followed the same trend with a minor impact. However, the MTC and FTC respectively decreased significantly with increasing change in temperature. These results provide a guide on the considerable factors in choosing the three fissile enrichment zones for (Th, U)O₂ fuel in anticipation of their impact on safety parameters. Therefore, this study provides foundational results on the factors that must be considered in choosing three fissile arrangement zones for (Th, U)O₂ fuel.Keywords: reactivity, safety parameters, small modular reactor, soluble boron, thorium fuel cycle
Procedia PDF Downloads 1348196 Slope Stability Analysis and Evaluation of Road Cut Slope in Case of Goro to Abagada Road, Adama
Authors: Ezedin Geta Seid
Abstract:
Slope failures are among the common geo-environmental natural hazards in the hilly and mountainous terrain of the world causing damages to human life and destruction of infrastructures. In Ethiopia, the demand for the construction of infrastructures, especially highways and railways, has increased to connect the developmental centers. However, the failure of roadside slopes formed due to the difficulty of geographical locations is the major difficulty for this development. As a result, a comprehensive site-specific investigation of destabilizing agents and a suitable selection of slope profiles are needed during design. Hence, this study emphasized the stability analysis and performance evaluation of slope profiles (single slope, multi-slope, and benched slope). The analysis was conducted for static and dynamic loading conditions using limit equilibrium (slide software) and finite element method (Praxis software). The analysis results in selected critical sections show that the slope is marginally stable, with FS varying from 1.2 to 1.5 in static conditions, and unstable with FS below 1 in dynamic conditions. From the comparison of analysis methods, the finite element method provides more valuable information about the failure surface of a slope than limit equilibrium analysis. Performance evaluation of geometric profiles shows that geometric modification provides better and more economical slope stability. Benching provides significant stability for cut slopes (i.e., the use of 2m and 3m bench improves the factor of safety by 7.5% and 12% from a single slope profile). The method is more effective on steep slopes. Similarly, the use of a multi-slope profile improves the stability of the slope in stratified soil with varied strength. The performance is more significant when it is used in combination with benches. The study also recommends drainage control and slope reinforcement as a remedial measure for cut slopes.Keywords: slope failure, slope profile, bench slope, multi slope
Procedia PDF Downloads 368195 Classification of Construction Projects
Authors: M. Safa, A. Sabet, S. MacGillivray, M. Davidson, K. Kaczmarczyk, C. T. Haas, G. E. Gibson, D. Rayside
Abstract:
To address construction project requirements and specifications, scholars and practitioners need to establish a taxonomy according to a scheme that best fits their need. While existing characterization methods are continuously being improved, new ones are devised to cover project properties which have not been previously addressed. One such method, the Project Definition Rating Index (PDRI), has received limited consideration strictly as a classification scheme. Developed by the Construction Industry Institute (CII) in 1996, the PDRI has been refined over the last two decades as a method for evaluating a project's scope definition completeness during front-end planning (FEP). The main contribution of this study is a review of practical project classification methods, and a discussion of how PDRI can be used to classify projects based on their readiness in the FEP phase. The proposed model has been applied to 59 construction projects in Ontario, and the results are discussed.Keywords: project classification, project definition rating index (PDRI), risk, project goals alignment
Procedia PDF Downloads 6818194 Sustainable Renovation of Cultural Buildings Case Study: Red Bay National Historic Site, Canada
Authors: Richard Briginshaw, Hana Alaojeli, Javaria Ahmad, Hamza Gaffar, Nourtan Murad
Abstract:
Sustainable renovations to cultural buildings and sites require a high level of competency in the sometimes conflicting areas of social/historical demands, environmental concerns, and the programmatic and technical requirements of the project. A detailed analysis of the existing site, building and client program are critical to reveal both challenges and opportunities. This forms the starting point for the design process – empirical explorations that search for a balanced and inspired architectural solution to the project. The Red Bay National Historic Site on the Labrador Coast of eastern Canada is a challenging project to explore and resolve these ideas. Originally the site of a 16ᵗʰ century whaling station occupied by Basque sailors from France and Spain, visitors now experience this history at the interpretive center, along with the unique geography, climate, local culture and vernacular architecture of the area. Working with our client, Parks Canada, the project called for significant alterations and expansion to the existing facility due to an increase in the number of annual visitors. Sustainable aspects of the design are focused on sensitive site development, passive energy strategies such as building orientation and building envelope efficiency, active renewable energy systems, carefully considered material selections, water efficiency, and interiors that respond to human comfort and a unique visitor experience.Keywords: sustainability, renovations and expansion, cultural project, architectural design, green building
Procedia PDF Downloads 1718193 Identification of Social Responsibility Factors within Mega Construction Projects
Authors: Ali Alotaibi, Francis Edum-Fotwe, Andrew Price /
Abstract:
Mega construction projects create buildings and major infrastructure to respond to work and life requirements while playing a vital role in promoting any nation’s economy. However, the industry is often criticised for not balancing economic, environmental and social dimensions of their projects, with emphasis typically on one aspect to the detriment of the others. This has resulted in many negative impacts including environmental pollution, waste throughout the project lifecycle, low productivity, and avoidable accidents. The identification of comprehensive Social Responsibility (SR) indicators, which combine social, environmental and economic aspects, is urgently needed. This is particularly the case in the context of the Kingdom of Saudi Arabia (KSA), which often has mega public construction projects. The aim of this paper is to develop a set of wide-ranging SR indicators which encompass social, economic and environmental aspects unique to the KSA. A qualitative approach was applied to explore relevant indicators through a review of the existing literature, international standards and reports. A list of appropriate indicators was developed, and its comprehensiveness was corroborated by interviews with experts on mega construction projects working with SR concepts in the KSA. The findings present 39 indicators and their metrics, covering 10 economic, 12 environmental and 17 social aspects of SR mapped against their references. These indicators are a valuable reference for decision-makers and academics in the KSA to understand factors related to SR in mega construction projects. The indicators are related to mega construction projects within the KSA and require validation in a real case scenario or within a different industry to demonstrate their generalisability.Keywords: social responsibility, construction projects, economic, social, environmental, indicators
Procedia PDF Downloads 1708192 Team-Theatre as a Tool of Occupational Safety Awareness
Authors: Fiorenza Misale
Abstract:
The painful phenomenon of so-called white deaths and accidents at work, unfortunately, is always current. The key is to act on the culture of security through effective measures of attitudes and behaviors that go far beyond the knowledge and the know-how. It is necessary that there is an ‘introjection’ of safety culture through the conscious involvement of all workers. The legislation on work safety identifies the main tool to promote the culture of safety at work and prevention within the workplace. In law the term education is used to distinguish itself from the information with which they will simply theoretically transmit, and from the training with which they will provide the practical skills. The new decree fact fills several gaps in previous legislation and stresses the importance of training in the workplace, that is, the main activity through which it is possible to achieve the active participation of all workers in the company’s prevention system. This system is built only through the dissemination of risk information, the circulation of information, comparison and dialogue between all actors involved that are the necessary elements for a correct transmission of the culture of worker safety. Training activity should put the focus on work experience in order to bring out all the knowledge needed to identify and assess the risks in the work place, and especially the action to eliminate or control them, integrating, when necessary, the missing knowledge. In addition to traditional training and information systems can be utilized for the purpose of training that are able to affect both one emotionally and aesthetically, team-theatre is one of them. Among the methods of company theater that can be used in work safety we have: Lesson show, theater workshop, improvised theater, forum theater, theater playback. The theater can represent a complementary approach to traditional training and give information on safety measures, demonstrating that there are more engaging outreach tools. Team-theatre allows identification with the characters, a transmission of emotions and moods and it is through the staging of a story that the individual processes new information. It’ also s a means of experiential training that allows you to work with your mind, body, emotions.The aim of one work is the use of corporate theater on the personnel working in the health sector. Through a questionnaire we are able to analyze the knowledge of occupational safety and current risks; in particular in health care which is to be administered before and after the play.Keywords: theater, training, occupational health, safety
Procedia PDF Downloads 2758191 Factors Constraining the Utilization of Risk Management Strategies in the Execution of Public Construction Projects in North East Nigeria
Authors: S. U. Kunya, S. A. Mohammad
Abstract:
Construction projects in Nigeria are characterized with risks emanating from delays and accompanying cost-overruns. The aim of the study was to identify and assess factors constraining the utilization of risk management strategies in the execution of public construction project in North-East Nigeria. Data was collected with the aid of a well-structured questionnaire administered to three identified projects in the North-east. Data collected were analysed using the severity index. Findings revealed political involvement, selection of inexperienced contractors and lack of coordinated public sector strategy as the most severe factors constraining the utilization of risk management strategies. The study recommended that: formulation of laws to prevent negative political meddling in construction projects; selection of experienced, risk-informed contractors; and comprehensive risk assessment and planning on all public construction projects.Keywords: factors, Nigeria, north-east, public projects, risk management, strategies, utilization
Procedia PDF Downloads 5368190 A Study of Food Safety Perception of Undergraduate Students in Taiwan
Authors: K. Y. Shih, H. M. Lin, S. Y. Lee, T. L. Hong
Abstract:
Recently a number of food safety scandals have been on the news. In view of the fact that in Taiwan the majority of undergraduate college students reside in the dorms and dine out, the problem of restaurant sanitation is of utmost importance in their lives. The purpose of this study is to analyze students' dining habit and their perception of food safety. Four universities in the city of Tainan were randomly selected, and from each selected university a class was then chosen to receive 50 questionnaires. The total of 200 questionnaires yielded 144 usable returns. Students were asked to respond to questions, and each question was graded on a scale from 1 to 5 according to the importance. There were 32 questions ranging over various aspects: cleanliness of surroundings, washroom, food sanitation, serving temperature, kitchen sanitation, and service personnel cleanliness. It is found that the food sanitation received the highest score, while the service personnel ranked the lowest. An incidental finding is that the students tend to dine out in groups and as such their choice of restaurants are mostly dictated by consensus.Keywords: food safety, restaurant, risk perception, sanitation
Procedia PDF Downloads 1628189 A New Type Safety-Door for Earthquake Disaster Prevention: Part I
Authors: Daniel Y. Abebe, Jaehyouk Choi
Abstract:
From the past earthquake events, many people get hurt at the exit while they are trying to go out of the buildings because of the exit doors are unable to be opened. The door is not opened because it deviates from its the original position. The aim of this research is to develop and evaluate a new type safety door that keeps the door frame in its original position or keeps its edge angles perpendicular during and post-earthquake. The proposed door is composed of three components: outer frame joined to the wall, inner frame (door frame) and circular hollow section connected to the inner and outer frame which is used as seismic energy dissipating device.Keywords: safety-door, earthquake disaster, low yield point steel, passive energy dissipating device, FE analysis
Procedia PDF Downloads 5278188 Seafarers Safety, Watch-Keeping and Navigation
Authors: Sunday Moses Ojelabi
Abstract:
Safety is the protection of the crew, passenger and equipment itself, as well as those living and working near bodies of water, from hazardous situations. To assure safety, watch keeping is paramount because neglecting your watchkeeping can lead to hazardous situations. Navigation is the assignment of a sailor to a specific route on a vessel to operate. Navigation is the process of planning, managing, and directing a vessel safely to the desired destination with the aid of intense and efficient watch keeping. Safety, i,e, all measures done to preserve the welfare of marine life, maritime infrastructure, facilities, ships, offshore installations, crew, and passengers, as well as the preservation of navigation and the ease of maritime trade, are referred to as safety measures;. When it comes to health, the absence of a proper first aid kit will affect injured sailors and passengers. Not using goggles while shipping, ear muffs, etc., in the course of maintenance can be hazardous. Watchkeeping: i.e the specific dutiies assigned to a personnel in a vessel to see to its continous smooth functionality. Your lookout or watch officer [officer on navigational duty] must be active at all times in the course of duty. Navigation refers to the technique of precisely determining a craft or vehicle's position and directing its motion along a particular course. The seafarers are not being put through regular seminars, training, and orientations. In parts of West Africa, sailors go to school without being able to secure jobs until their papers expire. For that, they won’t go for another Standard Trainning Certification and Watch keeping for Seafarers to upgrade their certificate. In light of this, they are not familiar with the new vessels in the country, and for this, they can`t meet the safety, watch keeping, and navigation standards. Also, shipping companies and ship owners are being selfish by not putting the proper things needed onboard regarding safety, watchkeeping, and navigational equipment. The questions raised in these presentations are the breakdown of the safety activities, watch keeping effectiveness, and navigational accuracy. All safety and watch keeping regulations should be applied efficiently. The problem identified includes a lack of safety instruments onboard vessels in African waters. Also, inadequate proper watchkeeping due to the excess workload on the seafarers can lead to an improper lookout, which gives room to collision, hijacking, and piracy. The impact of this research is to inform African seafarers, shipping companies, and ship owners of the necessary information concerning the safety of their lives and that of their passengers, cargo, and equipment.Keywords: standard of training, certification, watch keeping for seafarers, navigation, safety, watchkeeping
Procedia PDF Downloads 798187 Gas Monitoring and Soil Control at the Natural Gas Storage Site (Minerbio, Italy)
Authors: Ana Maria Carmen Ilie, Carmela Vaccaro
Abstract:
Gas migration through wellbore failure, in particular from abandoned wells, is repeatedly identified as the highest risk mechanism. The vadose zone was subject to monitoring system close to the wellbore in Minerbio, methane storage site. The new technology has been well-developed and used with the purpose to provide reliable estimates of leakage parameters. Of these techniques, soil flux sampling at the soil surface, via the accumulation chamber method and soil flux sampling at the depths of 100cm below the ground surface, have been an important technique for characterizing the gas concentrations at the gas storage site. We present results of soil Radon Bq/m3, CO2%, CH4% and O2% concentration gases. Measurements have been taken for radon concentrations with an Durridge RAD7 Company, Inc., USA, instrument. We used for air and soil quality an Biogas ETG instrument monitoring system, with NDIR CO2, CH4 gas sensor and electrochemical O2 gas sensor. The measurements started in September-October 2015, where no outliers have been identified. The measurements have continued in March-April-July-August-September 2016, almost at the same time in the same place around the gas storage site, values measured 15 minutes for each sampling, to determine their concentration, their distribution and to understand the relationship among gases and atmospheric conditions. At a depth of 100 cm, the maximum soil radon gas concentrations were found to be 1770 ±±582 Bq/m3, the soil consists of 64.31% sand, 20.75% silt and 14.94% clay, and with 0.526 ppm of Uranium. The maximum concentration (September 2016), in soil at 100cm below the ground surface, with 83% sand, 8.96% silt and 7.89% clay, was about 0.06% CH4, and in atmosphere 0.06% CH4 at 40°C (T). In the other months the values have been on the range of 0.01% to 0.03% CH4. Since we did not have outliers in the gas storage site, soil-gas samples for isotopic analysis have not been done.Keywords: leakage gas monitoring, lithology, soil gas, methane
Procedia PDF Downloads 4448186 Supply Chain Management Strategies of the Private Residential Construction Sector in South Africa
Authors: R. Khoza, K. K. Govender
Abstract:
The aim of the study was to review and critically evaluate the supply chain management (SCM) strategies and challenges in the private residential construction sector in South Africa. The study was grounded in three theories, namely, theory of constraints, principal-agency theory, and stakeholder theory. A quantitative approach was used to survey 320 private residential construction companies which registered with the National Homebuilders Registration Council (NHBRC) within the Gauteng province. The data from 250 questionnaires returned were analysed using SPSS (Versions 23) and Smart PLS. It became evident that the SCM challenges included lack of trust between the supplier and the organization; lack of adoption of SCM system; lack of a sufficiently skilled SCM workforce; and poor implementation of contract management. The findings also indicate that there is a significant positive relationship between the performance of the private residential construction sector in South Africa and SCM challenges, SCM strategies and SCM processes. A framework is proposed comprising SCM practices and strategies of private residential construction sector in South Africa, which will enable them to enhance performance.Keywords: management challenges, residential housing, South Africa, supply chain management
Procedia PDF Downloads 858185 Recovery of the Demolition and Construction Waste, Casablanca (Morocco)
Authors: Morsli Mourad, Tahiri Mohamed, Samdi Azzeddine
Abstract:
Casablanca is the biggest city in Morocco. It concentrates more than 60% of the economic and industrial activity of the kingdom. Its building and public works (BTP) sector is the leading source of inert waste scattered in open areas. This inert waste is a major challenge for the city of Casablanca, as it is not properly managed, thus causing a significant nuisance for the environment and the health of the population. Hence the vision of our project is to recycle and valorize concrete waste. In this work, we present concrete results in the exploitation of this abundant and permanent deposit. Typical wastes are concrete, clay and concrete bricks, ceramic tiles, marble panels, gypsum, scrap metal, wood . The work performed included: geolocation with a combination of artificial intelligence and Google Earth, estimation of the amount of waste per site, sorting, crushing, grinding, and physicochemical characterization of the samples. Then, we proceeded to the exploitation of the types of substrates to be developed: light cement, coating, and glue for ceramics... The said products were tested and characterized by X-ray fluorescence, specific surface, resistance to bending and crushing, etc. We will present in detail the main results of our research work and also describe the specific properties of each material developed.Keywords: déchets de démolition et des chantiers de construction, logiciels de combinaison SIG, valorisation de déchets inertes, enduits, ciment leger, casablanca
Procedia PDF Downloads 1168184 Assessment of the Impact of Traffic Safety Policy in Barcelona, 2010-2019
Authors: Lluís Bermúdez, Isabel Morillo
Abstract:
Road safety involves carrying out a determined and explicit policy to reduce accidents. In the city of Barcelona, through the Local Road Safety Plan 2013-2018, in line with the framework that has been established at the European and state level, a series of preventive, corrective and technical measures are specified, with the priority objective of reducing the number of serious injuries and fatalities. In this work, based on the data from the accidents managed by the local police during the period 2010-2019, an analysis is carried out to verify whether the measures established in the Plan to reduce the accident rate have had an effect or not and to what extent. The analysis focuses on the type of accident and the type of vehicles involved. Different count regression models have been fitted, from which it can be deduced that the number of serious and fatal victims of the accidents that have occurred in the city of Barcelona has been reduced as the measures approved by the authorities.Keywords: accident reduction, count regression models, road safety, urban traffic
Procedia PDF Downloads 1368183 The Feasibility of a Protected Launch Site near Melkbosstrand for a Public Transport Ferry across Table Bay, Cape Town
Authors: Mardi Falck, André Theron
Abstract:
Traffic congestion on the Northern side of Table Bay is a major problem. In Gauteng, the implementation of the Gautrain between Pretoria and Johannesburg, solved their traffic congestion. In 2002 two entrepreneurs endeavoured to implement a hovercraft ferry service across the bay from Table View to the Port of Cape Town. However, the EIA process proved that disgruntled residents from the area did not agree with their location for a launch site. 17 years later the traffic problem has not gone away, but instead the congestion has increased. While property prices in the City Bowl of Cape Town are ever increasing, people tend to live more on the outskirts of the CBD and commute to work. This means more vehicles on the road every day and the public transport services cannot keep up with the demand. For this reason, the study area of the previous hovercraft plans is being extended further North. The study’s aim is thus to determine the feasibility of a launch site North of Bloubergstrand to launch and receive a public transport ferry across Table Bay. The feasibility is being established by researching ferry services across the world and on what makes them successful. Different types of ferries and their operational capacities in terms of weather and waves are researched and by establishing the offshore and nearshore wind and wave climate for the area, an appropriate protected launch site is determined. It was concluded that travel time could potentially be halved. A hovercraft proved to be the most feasible ferry type, because it does not require a conventional harbour. Other types of vessels require a protected launch site because of the wave climate. This means large breakwaters that influence the cost substantially. The Melkbos Cultural Centre proved to be the most viable option for the location of the launch site, because it already has buildings and infrastructure. It is recommended that, if a harbour is chosen for the proposed ferry service, it could be used for more services like fishing, eco-tourism and leisure. Further studies are recommended to optimise the feasibility of such a harbour.Keywords: Cape Town, ferry, public, Table Bay
Procedia PDF Downloads 153