Search results for: construction project
7465 Integrating Best Practices for Construction Waste in Quality Management Systems
Authors: Paola Villoria Sáez, Mercedes Del Río Merino, Jaime Santa Cruz Astorqui, Antonio Rodríguez Sánchez
Abstract:
The Spanish construction industry generates large volumes of waste. However, despite the legislative improvements introduced for construction and demolition waste (CDW), construction waste recycling rate remains well below other European countries and also below the target set for 2020. This situation can be due to many difficulties. i.e.: The difficulty of onsite segregation or the estimation in advance of the total amount generated. Despite these difficulties, the proper management of CDW must be one of the main aspects to be considered by the construction companies. In this sense, some large national companies are implementing Integrated Management Systems (IMS) including not only quality and safety aspects, but also environment issues. However, although this fact is a reality for large construction companies still the vast majority of companies need to adopt this trend. In short, it is common to find in small and medium enterprises a decentralized management system: A single system of quality management, another for system safety management and a third one for environmental management system (EMS). In addition, the EMSs currently used address CDW superficially and are mainly focus on other environmental concerns such as carbon emissions. Therefore, this research determines and implements a specific best practice management system for CDW based on eight procedures in a Spanish Construction company. The main advantages and drawbacks of its implementation are highlighted. Results of this study show that establishing and implementing a CDW management system in building works, improve CDW quantification as the company obtains their own CDW generation ratio. This helps construction stakeholders when developing CDW Management Plans and also helps to achieve a higher adjustment of CDW management costs. Finally, integrating this CDW system with the EMS of the company favors the cohesion of the construction process organization at all stages, establishing responsibilities in the field of waste and providing a greater control over the process.Keywords: construction and demolition waste, waste management, best practices, waste minimization, building, quality management systems
Procedia PDF Downloads 5337464 Simulator Dynamic Positioning System with Azimuthal Thruster
Authors: Robson C. Santos, Christian N. Barreto, Gerson G. Cunha, Severino J. C. Neto
Abstract:
This paper aims to project the construction of a prototype azimuthal thruster, mounted with materials of low cost and easy access, testing in a controlled environment to measure their performance, characteristics and feasibility of future projects. The construction of the simulation of dynamic positioning software, responsible for simulating a vessel and reposition it when necessary . Tests for partial and full validation of the model were conducted, operates independently of the control system and executes the commands and commands of the helix of rotation azimuth. The system provides an interface to the user and simulates the conditions unfavorable positioning of a vessel, accurately calculates the azimuth angle, the direction of rotation of the helix and the time that this should be turned on so that the vessel back to position original. There is a serial communication that connects the Simulation Dynamic Positioning System with Embedded System causing the user-generated data to simulate the DP system arrives in the form of control signals to the motors of the propellant. This article addresses issues in the marine industry employees.Keywords: azimuthal thruster, dynamic positioning, embedded system, simulator dynamic positioning
Procedia PDF Downloads 4667463 Noise Measurement and Awareness at Construction Site: A Case Study
Authors: Feiruz Ab'lah, Zarini Ismail, Mohamad Zaki Hassan, Siti Nadia Mohd Bakhori, Mohamad Azlan Suhot, Mohd Yusof Md. Daud, Shamsul Sarip
Abstract:
The construction industry is one of the major sectors in Malaysia. Apart from providing facilities, services, and goods it also offers employment opportunities to local and foreign workers. In fact, the construction workers are exposed to a hazardous level of noises that generated from various sources including excavators, bulldozers, concrete mixer, and piling machines. Previous studies indicated that the piling and concrete work was recorded as the main source that contributed to the highest level of noise among the others. Therefore, the aim of this study is to obtain the noise exposure during piling process and to determine the awareness of workers against noise pollution at the construction site. Initially, the reading of noise was obtained at construction site by using a digital sound level meter (SLM), and noise exposure to the workers was mapped. Readings were taken from four different distances; 5, 10, 15 and 20 meters from the piling machine. Furthermore, a set of questionnaire was also distributed to assess the knowledge regarding noise pollution at the construction site. The result showed that the mean noise level at 5m distance was more than 90 dB which exceeded the recommended level. Although the level of awareness regarding the effect of noise pollution is satisfactory, majority of workers (90%) still did not wear ear protecting device during work period. Therefore, the safety module guidelines related to noise pollution controls should be implemented to provide a safe working environment and prevent initial occupational hearing loss.Keywords: construction, noise awareness, noise pollution, piling machine
Procedia PDF Downloads 3887462 A Project Screening System for Energy Enterprise Based on Dempster-Shafer Theory
Authors: Woosik Jang, Seung Heon Han, Seung Won Baek
Abstract:
Natural gas (NG) is an energy resource in a few countries, and most NG producers do business in politically unstable countries. In addition, as 90% of the LNG market is controlled by a small number of international oil companies (IOCs) and national oil companies (NOCs), entry of latecomers into the market is extremely limited. To meet these challenges, project viability needs to be assessed based on limited information from a project screening perspective. However, the early stages of the project have the following difficulties: (1) What are the factors to consider? (2) How many professionals do you need to decide? (3) How to make the best decision with limited information? To address this problem, this study proposes a model for evaluating LNG project viability based on the Dempster-Shafer theory (DST). A total of 11 indicators for analyzing the gas field, reflecting the characteristics of the LNG industry, and 23 indicators for analyzing the market environment, were identified. The proposed model also evaluates the LNG project based on the survey and provides uncertainty of the results based on DST as well as quantified results. Thus, the proposed model is expected to be able to support the decision-making process of the gas field project using quantitative results as a systematic framework, and it was developed as a stand-alone system to improve its usefulness in practice. Consequently, the amount of information and the mathematical approach are expected to improve the quality and opportunity of decision making for LNG projects for enterprises.Keywords: project screen, energy enterprise, decision support system, Dempster-Shafer theory
Procedia PDF Downloads 3447461 Supply Chain Management Strategies of the Private Residential Construction Sector in South Africa
Authors: R. Khoza, K. K. Govender
Abstract:
The aim of the study was to review and critically evaluate the supply chain management (SCM) strategies and challenges in the private residential construction sector in South Africa. The study was grounded in three theories, namely, theory of constraints, principal-agency theory, and stakeholder theory. A quantitative approach was used to survey 320 private residential construction companies which registered with the National Homebuilders Registration Council (NHBRC) within the Gauteng province. The data from 250 questionnaires returned were analysed using SPSS (Versions 23) and Smart PLS. It became evident that the SCM challenges included lack of trust between the supplier and the organization; lack of adoption of SCM system; lack of a sufficiently skilled SCM workforce; and poor implementation of contract management. The findings also indicate that there is a significant positive relationship between the performance of the private residential construction sector in South Africa and SCM challenges, SCM strategies and SCM processes. A framework is proposed comprising SCM practices and strategies of private residential construction sector in South Africa, which will enable them to enhance performance.Keywords: management challenges, residential housing, South Africa, supply chain management
Procedia PDF Downloads 847460 Implementation of an Economic – Probabilistic Model to Risk Analysis of ERP Project in Technological Innovation Firms – A Case Study of ICT Industry in Iran
Authors: Reza Heidari, Maryam Amiri
Abstract:
In a technological world, many countries have a tendency to fortifying their companies and technological infrastructures. Also, one of the most important requirements for developing technology is innovation, and then, all companies are struggling to consider innovation as a basic principle. Since, the expansion of a product need to combine different technologies, therefore, different innovative projects would be run in the firms as a base of technology development. In such an environment, enterprise resource planning (ERP) has special significance in order to develop and strengthen of innovations. In this article, an economic-probabilistic analysis was provided to perform an implementation project of ERP in the technological innovation (TI) based firms. The used model in this article assesses simultaneously both risk and economic analysis in view of the probability of each event that is jointly between economical approach and risk investigation approach. To provide an economic-probabilistic analysis of risk of the project, activities and milestones in the cash flow were extracted. Also, probability of occurrence of each of them was assessed. Since, Resources planning in an innovative firm is the object of this project. Therefore, we extracted various risks that are in relation with innovative project and then they were evaluated in the form of cash flow. This model, by considering risks affecting the project and the probability of each of them and assign them to the project's cash flow categories, presents an adjusted cash flow based on Net Present Value (NPV) and with probabilistic simulation approach. Indeed, this model presented economic analysis of the project based on risks-adjusted. Then, it measures NPV of the project, by concerning that these risks which have the most effect on technological innovation projects, and in the following measures probability associated with the NPV for each category. As a result of application of presented model in the information and communication technology (ICT) industry, provided an appropriate analysis of feasibility of the project from the point of view of cash flow based on risk impact on the project. Obtained results can be given to decision makers until they can practically have a systematically analysis of the possibility of the project with an economic approach and as moderated.Keywords: cash flow categorization, economic evaluation, probabilistic, risk assessment, technological innovation
Procedia PDF Downloads 4057459 Recovery of Local Materials in Pavements in Areas with an Arid Climate
Authors: Hocini Yousra, Medjnoun Amal, Khiatine Mohamed, Bahar Ramdane
Abstract:
The development of the regions of southern Algeria require the construction of numerous road, rail, and airport infrastructures. However, this development is very expensive given the very severe climatic conditions, the difficulty of reusing local materials, and the unavailability of water on the project sites; these regions are characterized by an arid or semi-arid climate, which means that water sources are very limited. The climatic conditions and the scarcity of water make soil compaction work very difficult and excessively expensive. These constraints related to the supply of water for irrigation of these construction sites make it necessary to examine the solution of compaction with low water content. This work studies the possibility of improving the compaction with a low water content of the soils of southern Algeria and this by using natural or recycled ecological materials. Local soils are first subjected to a series of laboratory characterization tests, then mixed with varying amounts of natural additives. The new materials are, in turn, subjected to road tests.Keywords: compaction, low water content, sand, natural materials
Procedia PDF Downloads 1217458 Adaptation Measures as a Response to Climate Change Impacts and Associated Financial Implications for Construction Businesses by the Application of a Mixed Methods Approach
Authors: Luisa Kynast
Abstract:
It is obvious that buildings and infrastructure are highly impacted by climate change (CC). Both, design and material of buildings need to be resilient to weather events in order to shelter humans, animals, or goods. As well as buildings and infrastructure are exposed to weather events, the construction process itself is generally carried out outdoors without being protected from extreme temperatures, heavy rain, or storms. The production process is restricted by technical limitations for processing materials with machines and physical limitations due to human beings (“outdoor-worker”). In future due to CC, average weather patterns are expected to change as well as extreme weather events are expected to occur more frequently and more intense and therefore have a greater impact on production processes and on the construction businesses itself. This research aims to examine this impact by analyzing an association between responses to CC and financial performance of businesses within the construction industry. After having embedded the above depicted field of research into the resource dependency theory, a literature review was conducted to expound the state of research concerning a contingent relation between climate change adaptation measures (CCAM) and corporate financial performance for construction businesses. The examined studies prove that this field is rarely investigated, especially for construction businesses. Therefore, reports of the Carbon Disclosure Project (CDP) were analyzed by applying content analysis using the software tool MAXQDA. 58 construction companies – located worldwide – could be examined. To proceed even more systematically a coding scheme analogous to findings in literature was adopted. Out of qualitative analysis, data was quantified and a regression analysis containing corporate financial data was conducted. The results gained stress adaptation measures as a response to CC as a crucial proxy to handle climate change impacts (CCI) by mitigating risks and exploiting opportunities. In CDP reports the majority of answers stated increasing costs/expenses as a result of implemented measures. A link to sales/revenue was rarely drawn. Though, CCAM were connected to increasing sales/revenues. Nevertheless, this presumption is supported by the results of the regression analysis where a positive effect of implemented CCAM on construction businesses´ financial performance in the short-run was ascertained. These findings do refer to appropriate responses in terms of the implemented number of CCAM. Anyhow, still businesses show a reluctant attitude for implementing CCAM, which was confirmed by findings in literature as well as by findings in CDP reports. Businesses mainly associate CCAM with costs and expenses rather than with an effect on their corporate financial performance. Mostly companies underrate the effect of CCI and overrate the costs and expenditures for the implementation of CCAM and completely neglect the pay-off. Therefore, this research shall create a basis for bringing CC to the (financial) attention of corporate decision-makers, especially within the construction industry.Keywords: climate change adaptation measures, construction businesses, financial implication, resource dependency theory
Procedia PDF Downloads 1457457 Application of the Critical Decision Method for Monitoring and Improving Safety in the Construction Industry
Authors: Juan Carlos Rubio Romero, Francico Salguero Caparros, Virginia Herrera-Pérez
Abstract:
No one is in the slightest doubt about the high levels of risk involved in work in the construction industry. They are even higher in structural construction work. The Critical Decision Method (CDM) is a semi-structured interview technique that uses cognitive tests to identify the different disturbances that workers have to deal with in their work activity. At present, the vision of safety focused on daily performance and things that go well for safety and health management is facing the new paradigm known as Resilience Engineering. The aim of this study has been to describe the variability in formwork labour on concrete structures in the construction industry and, from there, to find out the resilient attitude of workers to unexpected events that they have experienced during their working lives. For this purpose, a series of semi-structured interviews were carried out with construction employees with extensive experience in formwork labour in Spain by applying the Critical Decision Method. This work has been the first application of the Critical Decision Method in the field of construction and, more specifically, in the execution of structures. The results obtained show that situations categorised as unthought-of are identified to a greater extent than potentially unexpected situations. The identification during these interviews of both expected and unexpected events provides insight into the critical decisions made and actions taken to improve resilience in daily practice in this construction work. From this study, it is clear that it is essential to gain more knowledge about the nature of the human cognitive process in work situations within complex socio-technical systems such as construction sites. This could lead to a more effective design of workplaces in the search for improved human performance.Keywords: resilience engineering, construction industry, unthought-of situations, critical decision method
Procedia PDF Downloads 1487456 Life Cycle Assessment of Mass Timber Structure, Construction Process as System Boundary
Authors: Mahboobeh Hemmati, Tahar Messadi, Hongmei Gu
Abstract:
Today, life cycle assessment (LCA) is a leading method in mitigating the environmental impacts emerging from the building sector. In this paper, LCA is used to quantify the Green House Gas (GHG) emissions during the construction phase of the largest mass timber residential structure in the United States, Adohi Hall. This building is a 200,000 square foot 708-bed complex located on the campus of the University of Arkansas. The energy used for buildings’ operation is the most dominant source of emissions in the building industry. Lately, however, the efforts were successful at increasing the efficiency of building operation in terms of emissions. As a result, the attention is now shifted to the embodied carbon, which is more noticeable in the building life cycle. Unfortunately, most of the studies have, however, focused on the manufacturing stage, and only a few have addressed to date the construction process. Specifically, less data is available about environmental impacts associated with the construction of mass timber. This study presents, therefore, an assessment of the environmental impact of the construction processes based on the real and newly built mass timber building mentioned above. The system boundary of this study covers modules A4 and A5 based on building LCA standard EN 15978. Module A4 includes material and equipment transportation. Module A5 covers the construction and installation process. This research evolves through 2 stages: first, to quantify materials and equipment deployed in the building, and second, to determine the embodied carbon associated with running equipment for construction materials, both transported to, and installed on, the site where the edifice is built. The Global Warming Potential (GWP) of the building is the primary metric considered in this research. The outcomes of this study bring to the front a better understanding of hotspots in terms of emission during the construction process. Moreover, the comparative analysis of the mass timber construction process with that of a theoretically similar steel building will enable an effective assessment of the environmental efficiency of mass timber.Keywords: construction process, GWP, LCA, mass timber
Procedia PDF Downloads 1687455 Study on the Demolition Waste Management in Malaysia Construction Industry
Authors: Gunalan Vasudevan
Abstract:
The Malaysia construction industry generates a large quantity of construction and demolition waste nowadays. In the handbook for demolition work only comprised small portion of demolition waste management. It is important to study and determine the ways to provide a practical guide for the professional in the building industry about handling the demolition waste. In general, demolition defined as tearing down or wrecking of structural work or architectural work of the building and other infrastructures work such as road, bridge and etc. It’s a common misconception that demolition is nothing more than taking down a structure and carrying the debris to a landfill. On many projects, 80-90% of the structure is kept for reuse or recycling which help the owner to save cost. Demolition contractors required a lot of knowledge and experience to minimize the impact of demolition work to the existing surrounding area. For data collecting method, postal questionnaires and interviews have been selected to collect data. Questionnaires have distributed to 80 respondents from the construction industry in Klang Valley. 67 of 80 respondents have replied the questionnaire while 4 people have interviewed. Microsoft Excel and Statistical Package for Social Science version 17.0 were used to analyze the data collected.Keywords: demolition, waste management, construction material, Malaysia
Procedia PDF Downloads 4457454 Synchronous Versus Asynchronous Telecollaboration in Intercultural Communication
Authors: Vita Kalnberzina, Lauren Miller Anderson
Abstract:
The aim of the paper is to report on the results of the telecollaboration project results carried out between the students of the University of Latvia, National Louis University in the US, and Austral University in Chili during the Intercultural Communication course. The objectives of the study are 1) to compare different forms of student telecollaboration and virtual exchange, 2) to collect and analyse the student feedback on the telecollaboration project, 3) to evaluate the products (films) produced during the telecollaboration project. The methods of research used are as follows: Survey of the student feedback after the project, video text analysis of the films produced by the students, and interview of the students participating in the project. We would like to compare the results of a three-year collaboration project, where we tried out synchronous telecollaboration and asynchronous collaboration. The different variables that were observed were the impact of the different time zones, different language proficiency levels of students, and different curricula developed for collaboration. The main findings suggest that the effort spent by students to organize meetings in different time zones and to get to know each other diminishes the quality of the product developed and thus reduces the students' feeling of accomplishment. Therefore, we would like to propose that asynchronous collaboration where the national teams work on a film project specifically developed by the students of one university for the students of another university ends up with a better quality film, which in its turn appeals more to the students of the other university and creates a deeper intercultural bond between the collaborating students.Keywords: telecollaboration, intercultural communication, synchronous collaboration, asynchronous collaboration
Procedia PDF Downloads 1017453 Employing a Flipped Classroom Approach to Support Project-Based Learning
Authors: Kian Jon Chua, Islam Md Raisul
Abstract:
Findings on a research study conducted for a group of year-2 engineering students participating in a flipped classroom (FC) experience that is judiciously incorporated into project-based learning (PBL) module are presented. The chief purpose of the research is to identify whether if the incorporation of flipped classroom approach to project-based learning indeed yields a positive learning experience for engineering students. Results are presented and compared from the two classes of students – one is subjected to a traditional PBL learning mode while the other undergoes a hybrid PBL-FC learning format. Some themes related to active learning, problem-solving ability, teacher as facilitator, and degree of self-efficacy are also discussed. This paper hopes to provide new knowledge and insights relating to the introduction of flipped classroom learning to a project-based engineering module. Some potential study limitations and future directions to address them are also presented.Keywords: hybrid project-based learning, flipped classroom, problem-solving, active learning
Procedia PDF Downloads 1367452 Geopolymer Stabilization of Earth Building Material for Construction 3D Printing
Authors: Timur Mukhametkaliyev
Abstract:
The earthen material possesses low compression strength, and it is highly sensitive to the water content. Different binders can be added (Portland cement or lime) to improve the durability and the mechanical characteristics of earthen material, but the production of these binders has high embodied energy and results in an increase in world CO₂ emission. Geopolymers are binders which can be synthesized at low temperature in alkaline solutions from raw materials consisting of amorphous aluminosilicates. Geopolymers are an attractive substitution of Portland cement and can be used as an excellent stabilization for earthen material. In this study, earthen material stabilized with geopolymer binder for use in construction 3D printing was developed. Construction 3D printing offers freedom of design, waste minimisation, customisation, reduced labour, and automation. For successful 3D printing, the properties of used material are the most important aspects because they require adaptability for extrusion and controlled time of hardening for the binder.Keywords: 3D printing, building construction, geopolymer, architecture
Procedia PDF Downloads 1547451 Identification of Location Parameters for Different User Types of the Inner-City Building Stock: An Austrian Example
Authors: Bernhard Bauer, Thomas Meixner, Amir Dini, Detlef Heck
Abstract:
The inner city building stock is characterized by different types of buildings of different decades and centuries and different types of historical constructions. Depending on the natural growth of a city, those types are often located in downtown areas and the surrounding suburbs. Since the population is becoming older and the variation of the different social requirements spread with the so-called 'Silver Society', city quarters have to be seen alternatively. If an area is very attractive for young students to live there because of the busy nightlife, it might not be suitable for the older society. To identify 'Location Types A, B, C' for different user groups, qualitative interviews with 24 citizens of the city of Graz (Austria) have been carried out, in order to identify the most important values for making a location or city quarter 'A', 'B', or 'C'. Furthermore these acknowledgements have been put into a softwaretool for predicting locations that are the most suitable for certain user groups. On the other hands side, investors or owners of buildings can use the tool for determining the most suitable user group for the location of their building or construction project in order to adapt the project or building stock to the requirements of the users.Keywords: building stock, location parameters, inner city population, built environment
Procedia PDF Downloads 3137450 Contributing to Accuracy of Bid Cost Estimate in Construction Projects
Authors: Abdullah Alhomidan
Abstract:
This study is conducted to identify the main factors affecting accuracy of pretender cost estimate in building construction projects in Saudi Arabia from owners’ perspective. 44 factors affecting pretender cost estimate were identified through literature review and discussion with some construction experts. The results show that the top important factors affecting pretender cost estimate accuracy are: level of competitors in the tendering, material price changes, communications with suppliers, communications with client, and estimating method used.Keywords: cost estimate, accuracy, pretender, estimating, bid estimate
Procedia PDF Downloads 5577449 Effectiveness of Variable Speed Limit Signs in Reducing Crash Rates on Roadway Construction Work Zones in Alaska
Authors: Osama Abaza, Tanay Datta Chowdhury
Abstract:
As a driver's speed increases, so do the probability of an incident and likelihood of injury. The presence of equipment, personnel, and a changing landscape in construction zones create greater potential for incident. This is especially concerning in Alaska, where summer construction activity, coinciding with the peak annual traffic volumes, cannot be avoided. In order to reduce vehicular speeding in work zones, and therefore the probability of crash and incident occurrence, variable speed limit (VSL) systems can be implemented in the form of radar speed display trailers since the radar speed display trailers were shown to be effective at reducing vehicular speed in construction zones. Allocation of VSL not only help reduce the 85th percentile speed but also it will predominantly reduce mean speed as well. Total of 2147 incidents along with 385 crashes occurred only in one month around the construction zone in the Alaska which seriously requires proper attention. This research provided a thorough crash analysis to better understand the cause and provide proper countermeasures. Crashes were predominantly recoded as vehicle- object collision and sideswipe type and thus significant amount of crashes fall in the group of no injury to minor injury type in the severity class. But still, 35 major crashes with 7 fatal ones in a one month period require immediate action like the implementation of the VSL system as it proved to be a speed reducer in the construction zone on Alaskan roadways.Keywords: speed, construction zone, crash, severity
Procedia PDF Downloads 2537448 Health Post A Sustainable Prototype for the Third World
Authors: Chizzoniti Domenico, Beggiora Klizia, Cattani Letizia, Moscatelli Monica
Abstract:
This paper concerns the study of sustainable construction materials applied on the "Health Post", a prototype for the primary health care situated in alienated areas of the world. It's suitable for social and climatic Sub-Saharan context; however, it could be moved in other countries of the world with similar urgent needs. The idea is to create a Health Post with local construction materials that have a low environmental impact and promote the local workforce allowing reuse of traditional building techniques lowering production costs and transport. The aim of Primary Health Care Centre is to be a flexible and expandable structure identifying a modular form that can be repeated several times to expand its existing functions. In this way it could be not only a health care centre but also a socio-cultural facility.Keywords: low costs building, sustainable construction materials, green construction system, prototype, health care, emergency
Procedia PDF Downloads 4837447 Construction Sustainability Improvement through Using Recycled Aggregates in Concrete Production
Authors: Zhiqiang Zhu, Khalegh Barati, Xuesong Shen
Abstract:
Due to the energy consumption caused by the construction industry, the public is paying more and more attention to the sustainability of the buildings. With the advancement of research on recycled aggregates, it has become possible to replace natural aggregates with recycled aggregates and to achieve a reduction in energy consumption of materials during construction. The purpose of this paper is to quantitatively compare the emergy consumption of natural aggregate concrete (NAC) and recycled aggregate concrete (RAC). To do so, the emergy analysis method is adopted. Using this technique, it can effectively analyze different forms of energy and substance. The main analysis object is the direct and indirect emergy consumption of the stages in concrete production. Therefore, for indirect energy, consumption of production machinery and transportation vehicle also need to be considered. Finally, the emergy values required to produce the two concrete types are compared to analyze whether the RAC can reduce emergy consumption.Keywords: sustainable construction, NAC, RAC, emergy, concrete
Procedia PDF Downloads 1517446 A Constructionist View of Projects, Social Media and Tacit Knowledge in a College Classroom: An Exploratory Study
Authors: John Zanetich
Abstract:
Designing an educational activity that encourages inquiry and collaboration is key to engaging students in meaningful learning. Educational Information and Communications Technology (EICT) plays an important role in facilitating cooperative and collaborative learning in the classroom. The EICT also facilitates students’ learning and development of the critical thinking skills needed to solve real world problems. Projects and activities based on constructivism encourage students to embrace complexity as well as find relevance and joy in their learning. It also enhances the students’ capacity for creative and responsible real-world problem solving. Classroom activities based on constructivism offer students an opportunity to develop the higher–order-thinking skills of defining problems and identifying solutions. Participating in a classroom project is an activity for both acquiring experiential knowledge and applying new knowledge to practical situations. It also provides an opportunity for students to integrate new knowledge into a skill set using reflection. Classroom projects can be developed around a variety of learning objects including social media, knowledge management and learning communities. The construction of meaning through project-based learning is an approach that encourages interaction and problem-solving activities. Projects require active participation, collaboration and interaction to reach the agreed upon outcomes. Projects also serve to externalize the invisible cognitive and social processes taking place in the activity itself and in the student experience. This paper describes a classroom project designed to elicit interactions by helping students to unfreeze existing knowledge, to create new learning experiences, and then refreeze the new knowledge. Since constructivists believe that students construct their own meaning through active engagement and participation as well as interactions with others. knowledge management can be used to guide the exchange of both tacit and explicit knowledge in interpersonal interactions between students and guide the construction of meaning. This paper uses an action research approach to the development of a classroom project and describes the use of technology, social media and the active use of tacit knowledge in the college classroom. In this project, a closed group Facebook page becomes the virtual classroom where interaction is captured and measured using engagement analytics. In the virtual learning community, the principles of knowledge management are used to identify the process and components of the infrastructure of the learning process. The project identifies class member interests and measures student engagement in a learning community by analyzing regular posting on the Facebook page. These posts are used to foster and encourage interactions, reflect a student’s interest and serve as reaction points from which viewers of the post convert the explicit information in the post to implicit knowledge. The data was collected over an academic year and was provided, in part, by the Google analytic reports on Facebook and self-reports of posts by members. The results support the use of active tacit knowledge activities, knowledge management and social media to enhance the student learning experience and help create the knowledge that will be used by students to construct meaning.Keywords: constructivism, knowledge management, tacit knowledge, social media
Procedia PDF Downloads 2157445 The Study of Strength and Weakness Points of Various Techniques for Calculating the Volume of Done Work in Civil Projects
Authors: Ali Fazeli Moslehabadi
Abstract:
One of the topics discussed in civil projects, during the execution of the project, which the continuous change of work volumes is usually the characteristics of these types of projects, is how to calculate the volume of done work. The difference in volumes announced by the execution unit with the estimated volume by the technical office unit, has direct effect on the announced progress of the project. This issue can show the progress of the project more or less than actual value and as a result making mistakes for stakeholders and project managers and misleading them. This article intends to introduce some practical methods for calculating the volume of done work in civil projects. It then reviews the strengths and weaknesses of each of them, in order to resolve these contradictions and conflicts.Keywords: technical skills, systemic skills, communication skills, done work volume calculation techniques
Procedia PDF Downloads 1577444 Applying Resilience Engineering to improve Safety Management in a Construction Site: Design and Validation of a Questionnaire
Authors: M. C. Pardo-Ferreira, J. C. Rubio-Romero, M. Martínez-Rojas
Abstract:
Resilience Engineering is a new paradigm of safety management that proposes to change the way of managing the safety to focus on the things that go well instead of the things that go wrong. Many complex and high-risk sectors such as air traffic control, health care, nuclear power plants, railways or emergencies, have applied this new vision of safety and have obtained very positive results. In the construction sector, safety management continues to be a problem as indicated by the statistics of occupational injuries worldwide. Therefore, it is important to improve safety management in this sector. For this reason, it is proposed to apply Resilience Engineering to the construction sector. The Construction Phase Health and Safety Plan emerges as a key element for the planning of safety management. One of the key tools of Resilience Engineering is the Resilience Assessment Grid that allows measuring the four essential abilities (respond, monitor, learn and anticipate) for resilient performance. The purpose of this paper is to develop a questionnaire based on the Resilience Assessment Grid, specifically on the ability to learn, to assess whether a Construction Phase Health and Safety Plans helps companies in a construction site to implement this ability. The research process was divided into four stages: (i) initial design of a questionnaire, (ii) validation of the content of the questionnaire, (iii) redesign of the questionnaire and (iii) application of the Delphi method. The questionnaire obtained could be used as a tool to help construction companies to evolve from Safety-I to Safety-II. In this way, companies could begin to develop the ability to learn, which will serve as a basis for the development of the other abilities necessary for resilient performance. The following steps in this research are intended to develop other questions that allow evaluating the rest of abilities for resilient performance such as monitoring, learning and anticipating.Keywords: resilience engineering, construction sector, resilience assessment grid, construction phase health and safety plan
Procedia PDF Downloads 1397443 Multiple Identity Construction among Multilingual Minorities: A Quantitative Sociolinguistic Case Study
Authors: Stefanie Siebenhütter
Abstract:
This paper aims to reveal criterions involved in the process of identity-forming among multilingual minority language speakers in Northeastern Thailand and in the capital Bangkok. Using sociolinguistic interviews and questionnaires, it is asked which factors are important for speakers and how they define their identity by their interactions socially as well as linguistically. One key question to answer is how sociolinguistic factors may force or diminish the process of forming social identity of multilingual minority speakers. However, the motivation for specific language use is rarely overt to the speaker’s themselves as well as to others. Therefore, identifying the intentions included in the process of identity construction is to approach by scrutinizing speaker’s behavior and attitudes. Combining methods used in sociolinguistics and social psychology allows uncovering the tools for identity construction that ethnic Kui uses to range themselves within a multilingual setting. By giving an overview of minority speaker’s language use in context of the specific border near multilingual situation and asking how speakers construe identity within this spatial context, the results exhibit some of the subtle and mostly unconscious criterions involved in the ongoing process of identity construction.Keywords: social identity, identity construction, minority language, multilingualism, social networks, social boundaries
Procedia PDF Downloads 2687442 An Approach to Specify Software Requirements in Semantic Form
Authors: Deepa Vijay, Chellammal Surianarayanan, Gopinath Ganapathy
Abstract:
Requirements of a software project serve as a guideline for the entire project team which enable the team towards producing the right outcome. As requirements are the key in deciding the success of the project, it should be specified in an unambiguous manner. Also, the requirements should be complete and consistent. It should be interpreted in the same way by the entire software project team as the customer interprets. Specifying requirements in textual manner is common in software development. This leads to poor understanding of the requirements which results in more errors and degraded quality. There are some literatures which focus on semantic way of specifying functional requirement which ensure the consistency and completeness of requirements. Alternately in the work, a method is proposed to map the syntactic requirements with corresponding semantics in the form of ontologies. This improves the understanding of requirements, prevents errors and improves quality.Keywords: functional requirement, ontology, requirements management, semantics
Procedia PDF Downloads 3647441 Relevance of the Tokyo Trial: A Comparative Perspective
Authors: Nalanda Roy
Abstract:
The project will offer a fresh and critical perspective into the Tokyo Trial judgment led by the Indian Jurist Dr. Radha Binod Pal. The project will focus on the Third World Approach to International Law (TWAIL) methodology to examine the relevance of international law from the post-colonial perspectives. The project will analyze Pal’s dissenting arguments from a new and comparative perspective, apply for work from other disciplines, and create an understanding of the significance of the historic judgment considering its contemporary relevance, and fill in the gaps that exist in the call for global justice.Keywords: Tokyo trial, third world, judgment, international law
Procedia PDF Downloads 927440 Extraction of Grapefruit Essential Oil from Grapefruit Peels
Authors: Adithya Subramanian, S. Ananthan, T. Prasanth, S. P. Selvabharathi
Abstract:
This project involves extraction of grapefruit essential oil from grapefruit peels using various oils like castor oil, gingelly oil, olive oil as carrier oils. The main aim of this project is to extract the oil which has numerous medicinal uses. The extraction can be performed by two methods. Project involves extraction of the oil with various carrier oil in a view to reduce the cost of production and the physical properties of the extracted oil are examined.Keywords: essential oil, carrier oil, medicinal uses, cost of production
Procedia PDF Downloads 4367439 2D Numerical Analysis for Determination of the Effect of Bored Piles Constructed against the Landslide near Karabuk University Stadium
Authors: Dogan Cetin, Burak Turk, Mahmut Candan
Abstract:
Landslides cause remarkable damage and loss of human life every year around the world. They may be made more likely by factors such as earthquakes, heavy precipitation, and incorrect construction activities near or on slopes. The stadium of Karabük University is located at the bottom of a very high slope. After construction of the stadium, severe deformations were observed on the social activity area surrounding the stadium. Some inclinometers were placed behind the stadium to detect the possible landslide activity. According to measurements of the inclinometers, irregular soil movements were detected at depths between 20 m and 45 m. Also, significant heaves and settlements were observed behind the stadium walls located at the toe of the slope. The heaves indicate that the stadium walls were under threat of a significant landslide. After inclinometer readings and field observations, the potential failure geometry was estimated. The protection system was designed based on numerous numerical analysis performed by 2-D Plaxis software. After the design was completed, protective geotechnical work was started. Before the geotechnical work began, new inclinometers were installed to monitor earth movement during the work and afterward. The total horizontal length of the possible failure surface is 220 m. Geotechnical work included two-row-pile construction and three-row-pile construction on the slope. The bored piles were 120 cm in diameter for two-row-pile construction, and 150 cm in diameter for three-row-pile construction. Pile length is 31.30 m for two-row-pile construction and 31.40 m for three-row-pile construction. The distance between two-row-pile and three-row-pile construction is 60 m. With these bored piles, the landslide was divided into three parts. In this way, the earth's pressure was reduced. After a number of inclinometer readings, it was seen that deformation continued during the work, but after the work was done, the movement reversed, and total deformation stayed in mm dimension. It can be said that the protection work eliminated the possible landslide.Keywords: landslide, landslide protection, inclinometer measurement, bored piles
Procedia PDF Downloads 1467438 Factors Affecting the Formation of Architectural Space and Construction Systems in the Jordanian Vernacular Architecture
Authors: Mohannad Tarrad
Abstract:
The research deals with the beginnings of the vernacular Jordanian architecture since the establishment of the Jordanian state in the early nineteenth century until now, where the Jordanian architecture was based on the interactions of the Jordanian society with the surrounding environment, where the local materials available in the construction area were used, and the construction systems inherited from previous civilizations were used. The builders in Jordan relied on exchanging knowledge and transferring it from one generation to another, where they were able to formulate a construction style capable of responding to the requirement of architectural spaces, and each region of Jordan has its own way of building, as there are various geographical areas in Jordan, including agricultural, mountainous and desert areas. Then the research touched on a historical study of the architectural space and identifying the value of the architectural space in the Jordanian social life, which is related to the customs and traditions of a society influenced by the Arab Islamic civilization, and then the construction, the structural structure, its characteristics and the constituent elements of the building were defined in the vernacular l Jordanian architecture. From the structural point of view, and then to identify the structural materials used in the structural structure and the impact of the structural structure on the design from several aspects, leading to the interior space and the factors affecting it. The research aims to explain and clarify the interconnected design and construction solutions in the vernacular Jordanian architecture in a manner that respects the environmental context, taking into account the material cost of the building, where the financial situation of the home owner plays an important role in choosing the building material and construction method. Case studies from heritage buildings from several Jordanian regions will be analyzed to illustrate the idea of the research.Keywords: construction systems, architectural space, environmental context, Jordanian architecture
Procedia PDF Downloads 2037437 Analyzing Sociocultural Factors Shaping Architects’ Construction Material Choices: The Case of Jordan
Authors: Maiss Razem
Abstract:
The construction sector is considered a major consumer of materials that undergoes processes of extraction, processing, transportation, and maintaining when used in buildings. Several metrics have been devised to capture the environmental impact of the materials consumed during construction using lifecycle thinking. Rarely has the materiality of this sector been explored qualitatively and systemically. This paper aims to explore socio-cultural forces that drive the use of certain materials in the Jordanian construction industry, using practice theory as a heuristic method of analysis, more specifically Shove et al. three-element model. By conducting semi-structured interviews with architects, the results unravel contextually embedded routines when determining qualities of three materialities highlighted herein; stone, glass and spatial openness. The study highlights the inadequacy of only using efficiency as a quantitative metric of sustainable materials and argues for the need to link material consumption with socio-economic, cultural, and aesthetic driving forces. The operationalization of practice theory by tracing materials’ lifetimes as they integrate with competencies and meanings captures dynamic engagements through the analyzed routines of actors in the construction practice. This study can offer policymakers better-nuanced representation to green this sector beyond efficiency rhetoric and quantitative metrics.Keywords: architects' practices, construction materials, Jordan, practice theory
Procedia PDF Downloads 1707436 Carbon Accounting for Sustainable Design and Manufacturing in the Signage Industry
Authors: Prudvi Paresi, Fatemeh Javidan
Abstract:
In recent years, greenhouse gas, or in particular, carbon emissions, have received special attention from environmentalists and designers due to the fact that they significantly contribute to the temperature rise. The building industry is one of the top seven major industries contributing to embodied carbon emission. Signage systems are an integral part of the building industry and bring completeness to the space-building by providing the required information and guidance. A significant amount of building materials, such as steel, aluminium, acrylic, LED, etc., are utilized in these systems, but very limited information is available on their sustainability and carbon footprint. Therefore, there is an urgent need to assess the emissions associated with the signage industry and for controlling these by adopting different mitigation techniques without sacrificing the efficiency of the project. The present paper investigates the embodied carbon of two case studies in the Australian signage industry within the cradle – gate (A1-A3) and gate–site (A4-A5) stages. A material source-based database is considered to achieve more accuracy. The study identified that aluminium is the major contributor to embodied carbon in the signage industry compared to other constituents. Finally, an attempt is made to suggest strategies for mitigating embodied carbon in this industry.Keywords: carbon accounting, small-scale construction, signage industry, construction materials
Procedia PDF Downloads 117