Search results for: factors influencing project selection
16623 Achieving Design-Stage Elemental Cost Planning Accuracy: Case Study of New Zealand
Authors: Johnson Adafin, James O. B. Rotimi, Suzanne Wilkinson, Abimbola O. Windapo
Abstract:
An aspect of client expenditure management that requires attention is the level of accuracy achievable in design-stage elemental cost planning. This has been a major concern for construction clients and practitioners in New Zealand (NZ). Pre-tender estimating inaccuracies are significantly influenced by the level of risk information available to estimators. Proper cost planning activities should ensure the production of a project’s likely construction costs (initial and final), and subsequent cost control activities should prevent unpleasant consequences of cost overruns, disputes and project abandonment. If risks were properly identified and priced at the design stage, observed variance between design-stage elemental cost plans (ECPs) and final tender sums (FTS) (initial contract sums) could be reduced. This study investigates the variations between design-stage ECPs and FTS of construction projects, with a view to identifying risk factors that are responsible for the observed variance. Data were sourced through interviews, and risk factors were identified by using thematic analysis. Access was obtained to project files from the records of study participants (consultant quantity surveyors), and document analysis was employed in complementing the responses from the interviews. Study findings revealed the discrepancies between ECPs and FTS in the region of -14% and +16%. It is opined in this study that the identified risk factors were responsible for the variability observed. The values obtained from the analysis would enable greater accuracy in the forecast of FTS by Quantity Surveyors. Further, whilst inherent risks in construction project developments are observed globally, these findings have important ramifications for construction projects by expanding existing knowledge on what is needed for reasonable budgetary performance and successful delivery of construction projects. The findings contribute significantly to the study by providing quantitative confirmation to justify the theoretical conclusions generated in the literature from around the world. This therefore adds to and consolidates existing knowledge.Keywords: accuracy, design-stage, elemental cost plan, final tender sum
Procedia PDF Downloads 26816622 Understanding the Endogenous Impact of Tropical Cyclones Floods and Sustainable Landscape Management Innovations on Farm Productivity in Malawi
Authors: Innocent Pangapanga, Eric Mungatana
Abstract:
Tropical cyclones–related floods (TCRFs) in Malawi have devastating effects on smallholder agriculture, thereby threatening the food security agenda, which is already constrained by poor agricultural innovations, low use of improved varieties, and unaffordable inorganic fertilizers, and fragmenting landholding sizes. Accordingly, households have engineered and indigenously implemented sustainable landscape management (SLM) innovations to contain the adverse effects of TCRFs on farm productivity. This study, therefore, interrogated the efficacy of SLM adoption on farm productivity under varying TCRFs, while controlling for the potential selection bias and unobservable heterogeneity through the application of the Endogenous Switching Regression Model. In this study, we further investigated factors driving SLM adoption. Substantively, we found TCRFs reducing farm productivity by 31 percent, on the one hand, and influencing the adoption of SLM innovations by 27 percent, on the other hand. The study also observed that households that interacted SLM with TCRFs were more likely to enhance farm productivity by 24 percent than their counterparts. Interestingly, the study results further demonstrated that multiple adoptions of SLM-related innovations, including intercropping, agroforestry, and organic manure, enhanced farm productivity by 126 percent, suggesting promoting SLM adoption as a package to appropriately inform existing sustainable development goals’ agricultural productivity initiatives under intensifying TCRFs in the country.Keywords: tropical cyclones–related floods, sustainable landscape management innovations, farm productivity, endogeneity, endogenous switching regression model, panel data, smallholder agriculture
Procedia PDF Downloads 11616621 Images Selection and Best Descriptor Combination for Multi-Shot Person Re-Identification
Authors: Yousra Hadj Hassen, Walid Ayedi, Tarek Ouni, Mohamed Jallouli
Abstract:
To re-identify a person is to check if he/she has been already seen over a cameras network. Recently, re-identifying people over large public cameras networks has become a crucial task of great importance to ensure public security. The vision community has deeply investigated this area of research. Most existing researches rely only on the spatial appearance information from either one or multiple person images. Actually, the real person re-id framework is a multi-shot scenario. However, to efficiently model a person’s appearance and to choose the best samples to remain a challenging problem. In this work, an extensive comparison of descriptors of state of the art associated with the proposed frame selection method is studied. Specifically, we evaluate the samples selection approach using multiple proposed descriptors. We show the effectiveness and advantages of the proposed method by extensive comparisons with related state-of-the-art approaches using two standard datasets PRID2011 and iLIDS-VID.Keywords: camera network, descriptor, model, multi-shot, person re-identification, selection
Procedia PDF Downloads 27816620 Mobile Cloud Application in Design Build Bridge Construction
Abstract:
In the past decades, design-build has become a more popular project delivery system especially for the large scaled infrastructure project in North America. It provides a one-stop shopping system for the client therefore improves the efficiency of construction, and reduces the risks and overall cost for the clients. Compared to the project with traditional delivery method, design-build project requires contractor and designer to work together efficiently to deliver the best-value solutions through the construction process. How to facilitate a solid integration and efficient interaction between contractor and designer often affects the schedule, budget and quality of the construction therefore becomes a key factor to the success of a design-build project. This paper presents a concept of using modern mobile cloud technology to provide an integrated solution during the design-build construction. It uses mobile cloud architecture to provide a platform for real-time field progress, change request approval, job progress log, and project time entry with devices integration for field information and communications. The paper uses a real filed change notice as an example to demonstrate how mobile cloud technology applies in a design-build project and how it can improve the project efficiency.Keywords: cloud, design-build, field change notice, mobile application
Procedia PDF Downloads 24816619 Evaluation and Selection of Elite Jatropha Genotypes for Biofuel
Authors: Bambang Heliyanto, Rully Dyah Purwati, Hasnam, Fadjry Djufry
Abstract:
Jatropha curcas L., a drought tolerant and monoecious perennial shrub, has received attention worldwide during the past decade. Realizing the facts, the Indonesian government has decided to option for Jatropha and palm oil for in country biofuel production. To support the program development of high yielding jatropha varieties is necessary. This paper reviews Jatropha improvement program in Indonesia using mass selection and hybrid development. To start with, at the end of 2005, in-country germplasm collection was mobilized to Lampung and Nusa Tenggara Barat (NTB) provinces and successfully collected 15 provenances/sub-provenances which serves as a base population for selection. A significant improvement has been achieved through a simple recurrent breeding selection during 2006 to 2007. Seed yield productivity increased more than double, from 0.36 to 0.97 ton dry seed per hectare during the first selection cycle (IP-1), and then increased to 2.2 ton per hectare during the second cycles (IP-2) in Lampung provenance. Similar result was also observed in NTB provenance. Seed yield productivity increased from 0.43 ton to 1 ton dry seed per hectare in the first cycle (IP-1), and then 1.9 ton in the second cycle (IP-2). In 2008, the population IP-3 resulted from the third cycle of selection have been identified which were capable of producing 2.2 to 2.4 ton seed yield per hectare. To improve the seed yield per hectare, jatropha hybrid varieties was developed involving superior provenances. As a result a Jatropha Energy Terbarukan (JET) variety-2 was released in 2017 with seed yield potential of 2.6 ton per hectare. The use of this high yielding genotypes for biofuel is discussed.Keywords: Jatropha curcas, provenance, biofuel, improve population, hybrid
Procedia PDF Downloads 17116618 Effect of Building Construction Sizes on Project Delivery Methods in Nigeria
Authors: Nuruddeen Usman, Mohammad Sani
Abstract:
The performance of project delivery methods has been an issue of concern to various stakeholders in the construction industry. The contracting system of project delivery is the traditional system used in the delivery of most public projects in Nigeria. The direct labor system is used most times as an alternative to the traditional system. There were so many complain about the performance of contracting system and the suitability of direct labor as an alternative to the delivery of public projects. Therefore, this paper is aimed at investigating the effect of project size on the project delivery methods in the completed public buildings. Questionnaires were self-administered to managerial staff in the study area and analyzed using descriptive statistics. The findings reveals that contracting system was choosing for large size building construction project delivery with higher frequency (F) of 40 (76.9%) against direct labor with 12 (23.1%). While the small size project, the result revealed a frequency (F) of 26 (50%) for contracting system and direct labor system respectively. Base on the research findings, the contracting system, was recommended for all sizes of building construction project delivery while direct labor system can only use as an alternative for small size building construction projects delivery.Keywords: construction size, contracting system, direct labour, effect
Procedia PDF Downloads 45716617 Influencing Factors for Job Satisfaction and Turnover Intention of Surgical Team in the Operating Rooms
Authors: Shu Jiuan Chen, Shu Fen Wu, I. Ling Tsai, Chia Yu Chen, Yen Lin Liu, Chen-Fuh Lam
Abstract:
Background: Increased emotional stress in workplace and depressed job satisfaction may significantly affect the turnover intention and career life of personnel. However, very limited studies have reported the factors influencing the turnover intention of the surgical team members in the operating rooms, where extraordinary stress is normally exit in this isolated medical care unit. Therefore, this study aimed to determine the environmental and personal characteristic factors that might be associated with job satisfaction and turnover intention in the non-physician staff who work in the operating rooms. Methods: This was a cross-sectional, descriptive study performed in a metropolitan teaching hospital in southern Taiwan between May 2017 to July 2017. A structured self-administered questionnaire, modified from the Practice Environment Scale of the Nursing Work Index (PES-NWI), Occupational Stress Indicator-2 (OSI-2) and Maslach Burnout Inventory (MBI) manual was collected from the operating room nurses, nurse anesthetists, surgeon assistants, orderly and other non-physician staff. Numerical and categorical data were analyzed using unpaired t-test and Chi-square test, as appropriate (SPSS, version 20.0). Results: A total of 167 effective questionnaires were collected from 200 eligible, non-physician personnel who worked in the operating room (response rate 83.5%). The overall satisfaction of all responders was 45.64 ± 7.17. In comparison to those who had more than 4-year working experience in the operating rooms, the junior staff ( ≤ 4-year experience) reported to have significantly higher satisfaction in workplace environment and job contentment, as well as lower intention to quit (t = 6.325, P =0.000). Among the different specialties of surgical team members, nurse anesthetists were associated with significantly lower levels of job satisfaction (P=0.043) and intention to stay (x² = 8.127, P < 0.05). Multivariate regression analysis demonstrates job title, seniority, working shifts and job satisfaction are the significant independent predicting factors for quit jobs. Conclusion: The results of this study highlight that increased work seniorities ( > 4-year working experience) are associated with significantly lower job satisfaction, and they are also more likely to leave their current job. Increased workload in supervising the juniors without appropriate job compensation (such as promotions in job title and work shifts) may precipitate their intention to quit. Since the senior staffs are usually the leaders and core members in the operating rooms, the retention of this fundamental manpower is essential to ensure the safety and efficacy of surgical interventions in the operating rooms.Keywords: surgical team, job satisfaction, resignation intention, operating room
Procedia PDF Downloads 25516616 Technical, Environmental and Financial Assessment for Optimal Sizing of Run-of-River Small Hydropower Project: Case Study in Colombia
Authors: David Calderon Villegas, Thomas Kaltizky
Abstract:
Run-of-river (RoR) hydropower projects represent a viable, clean, and cost-effective alternative to dam-based plants and provide decentralized power production. However, RoR schemes cost-effectiveness depends on the proper selection of site and design flow, which is a challenging task because it requires multivariate analysis. In this respect, this study presents the development of an investment decision support tool for assessing the optimal size of an RoR scheme considering the technical, environmental, and cost constraints. The net present value (NPV) from a project perspective is used as an objective function for supporting the investment decision. The tool has been tested by applying it to an actual RoR project recently proposed in Colombia. The obtained results show that the optimum point in financial terms does not match the flow that maximizes energy generation from exploiting the river's available flow. For the case study, the flow that maximizes energy corresponds to a value of 5.1 m3/s. In comparison, an amount of 2.1 m3/s maximizes the investors NPV. Finally, a sensitivity analysis is performed to determine the NPV as a function of the debt rate changes and the electricity prices and the CapEx. Even for the worst-case scenario, the optimal size represents a positive business case with an NPV of 2.2 USD million and an IRR 1.5 times higher than the discount rate.Keywords: small hydropower, renewable energy, RoR schemes, optimal sizing, objective function
Procedia PDF Downloads 13216615 Chaos Fuzzy Genetic Algorithm
Authors: Mohammad Jalali Varnamkhasti
Abstract:
The genetic algorithms have been very successful in handling difficult optimization problems. The fundamental problem in genetic algorithms is premature convergence. This paper, present a new fuzzy genetic algorithm based on chaotic values instead of the random values in genetic algorithm processes. In this algorithm, for initial population is used chaotic sequences and then a new sexual selection proposed for selection mechanism. In this technique, the population is divided such that the male and female would be selected in an alternate way. The layout of the male and female chromosomes in each generation is different. A female chromosome is selected by tournament selection size from the female group. Then, the male chromosome is selected, in order of preference based on the maximum Hamming distance between the male chromosome and the female chromosome or The highest fitness value of male chromosome (if more than one male chromosome is having the maximum Hamming distance existed), or Random selection. The selections of crossover and mutation operators are achieved by running the fuzzy logic controllers, the crossover and mutation probabilities are varied on the basis of the phenotype and genotype characteristics of the chromosome population. Computational experiments are conducted on the proposed techniques and the results are compared with some other operators, heuristic and local search algorithms commonly used for solving p-median problems published in the literature.Keywords: genetic algorithm, fuzzy system, chaos, sexual selection
Procedia PDF Downloads 38516614 Project Time and Quality Management during Construction
Authors: Nahed Al-Hajeri
Abstract:
Time and cost is an integral part of every construction plan and can affect each party’s contractual obligations. The performance of both time and cost are usually important to the client and contractor during the project. Almost all construction projects are experiencing time overrun. These time overruns always contributed as expensive to both client and contractor. Construction of any project inside the gathering centers involves complex management skills related to work force, materials, plant, machineries, new technologies etc. It also involves many agencies interdependent on each other like the vendors, structural and functional designers including various types of specialized engineers and it includes support of contractors and specialized contractors. This paper mainly highlights the types of construction delays due to which project suffer time and cost overrun. This paper also speaks about the delay causes and factors that contribute to the construction sequence delay for the oil and gas projects. Construction delay is supposed to be one of the repeated problems in the construction projects and it has an opposing effect on project success in terms of time, cost and quality. Some effective methods are identified to minimize delays in construction projects such as: 1. Site management and supervision, 2. Effective strategic planning, 3. Clear information and communication channel. Our research paper studies the types of delay with some real examples with statistic results and suggests solutions to overcome this problem.Keywords: non-compensable delay, delays caused by force majeure, compensable delay, delays caused by the owner or the owner’s representative, non-excusable delay, delay caused by the contractor or the contractor’s representative, concurrent delay, delays resulting from two separate causes at the same time
Procedia PDF Downloads 24216613 Critical Activity Effect on Project Duration in Precedence Diagram Method
Authors: Salman Ali Nisar, Koshi Suzuki
Abstract:
Precedence Diagram Method (PDM) with its additional relationships i.e., start-to-start, finish-to-finish, and start-to-finish, between activities provides more flexible schedule than traditional Critical Path Method (CPM). But, changing the duration of critical activities in PDM network will have anomalous effect on critical path. Researchers have proposed some classification of critical activity effects. In this paper, we do further study on classifications of critical activity effect and provide more information in detailed. Furthermore, we determine the maximum amount of time for each class of critical activity effect by which the project managers can control the dynamic feature (shortening/lengthening) of critical activities and project duration more efficiently.Keywords: construction project management, critical path method, project scheduling, precedence diagram method
Procedia PDF Downloads 51116612 Unhealthy Food Consumption Behavior in Suan Sunandha Rajabhat Universities
Authors: Narumon Piaseu
Abstract:
This survey research was aimed to describe and compare consumption behavior of health risk food among students in Suan Sunandha Rajabhat University. Sample included 400 undergraduate students enrolled in the first semester of 2008 academic year. Data were collected by using self reported questionnaire developed by the researcher. Data were then analyzed by descriptive statistics including frequency, percentage, mean, standard deviation, and inferential statistics including independent t-test, and Oneway ANOVA. Results revealed that most of the sample were women (67%), enrolled in social related programs (74%). Approximately half of them (45.5%) stayed in dormitory. The mean of monthly income was 5,164 Baht and daily food expenditure was 114.55 Baht. Majority of them (83%) had ready-to-eat food. A major factor influencing their food selection was their parents (61%). A main reason for their food selection was food that looks good (70.75%). Almost half of them (46.25%) had heavy exercise less than 3 times per week. Regarding knowledge on health risk food, 43.5% of the sample had good knowledge. The followings were moderate (41%) and poor (41%). Most of the sample (60.75%) had consumption behavior at low risk. The following was at moderate risk (37.25%). Only 2% were at high risk. Among the sample, consumption behavior of health risk food were significantly different in years of study (F = 3.168, p = .024), daily food expenditure (F = 8.950, p <.001), and knowledge on health risk food (F = 37.856, p <.001), while no significant difference in consumption behavior of health risk food was found in those with a difference in gender, program of study, living place, and monthly income. Results indicate the importance of providing knowledge regarding health risk food for students and their parents in order to promote appropriate food consumption behavior among the students.Keywords: food consumption, risky behavior, Suan Sunandha Rajabhat University, health risk
Procedia PDF Downloads 47316611 Behavior of the RC Slab Subjected to Impact Loading According to the DIF
Authors: Yong Jae Yu, Jae-Yeol Cho
Abstract:
In the design of structural concrete for impact loading, design or model codes often employ a dynamic increase factor (DIF) to impose dynamic effect on static response. Dynamic increase factors that are obtained from laboratory material test results and that are commonly given as a function of strain rate only are quite different from each other depending on the design concept of design codes like ACI 349M-06, fib Model Code 2010 and ACI 370R-14. Because the dynamic increase factors currently adopted in the codes are too simple and limited to consider a variety of strength of materials, their application in practical design is questionable. In this study, the dynamic increase factors used in the three codes were validated through the finite element analysis of reinforced concrete slab elements which were tested and reported by other researcher. The test was intended to simulate a wall element of the containment building in nuclear power plants that is assumed to be subject to impact scenario that the Pentagon experienced on September 11, 2001. The finite element analysis was performed using the ABAQAUS 6.10 and the plasticity models were employed for the concrete, reinforcement. The dynamic increase factors given in the three codes were applied to the stress-strain curves of the materials. To estimate the dynamic increase factors, strain rate was adopted as a parameter. Comparison of the test and analysis was done with regard to perforation depth, maximum deflection, and surface crack area of the slab. Consequently, it was found that DIF has so great an effect on the behavior of the reinforced concrete structures that selection of DIF should be very careful. The result implies that DIF should be provided in design codes in more delicate format considering various influence factors.Keywords: impact, strain rate, DIF, slab elements
Procedia PDF Downloads 29516610 Promoting Physical Activity through Urban Active Environments: Learning from Practice and Policy Implementation in the EU Space Project
Authors: Rosina U. Ndukwe, Diane Crone, Nick Cavill
Abstract:
Active transport (i.e. walking to school, cycle to work schemes etc.) is an effective approach with multiple social and environmental benefits for transforming urban environments into active urban environments. Although walking and cycling often remain on the margins of urban planning and infrastructure, there are new approaches emerging, along with policy intervention relevant for the creation of sustainable urban active environments conductive to active travel, increasing physical activity levels of involved communities and supporting social inclusion through more active participation. SPAcE - Supporting Policy and Action for Active Environments is a 3 year Erasmus+ project that aims to integrate active transport programmes into public policy across the EU. SPAcE focuses on cities/towns with recorded low physical activity levels to support the development of active environments in 5 sites: Latvia [Tukums], Italy [Palermo], Romania [Brasov], Spain [Castilla-La Mancha] and Greece [Trikala]. The first part of the project involved a review of good practice including case studies from across the EU and project partner countries. This has resulted in the first output from the project, an evidence of good practice summary with case study examples. In the second part of the project, working groups across the 5 sites have carried out co-production to develop Urban Active Environments (UActivE) Action Plans aimed at influencing policy and practice for increasing physical activity primarily through the use of cycling and walking. Action plans are based on international evidence and guidance for healthy urban planning. Remaining project partners include Universities (Gloucestershire, Oxford, Zurich, Thessaly) and Fit for Life programme (National physical activity promotion program, Finland) who provide support and advice incorporating current evidence, healthy urban planning and mentoring. Cooperation and co-production with public health professionals, local government officers, education authorities and transport agencies has been a key approach of the project. The third stage of the project has involved training partners in the WHO HEAT tool to support the implementation of the Action Plans. Project results show how multi-agency, transnational collaboration can produce real-life Action Plans in five EU countries, based on published evidence, real-life experience, consultation and collaborative working with other organisations across the EU. Learning from the processes adopted within this project will demonstrate how public health, local government and transport agencies across the EU, can work together to create healthy environments that have the aim of facilitating active behaviour, even in times of constrained public budgets. The SPAcE project has captured both the challenges and solutions for increasing population physical activity levels, health and wellness in urban spaces and translating evidence into policy and practice ensuring innovation at policy level. Funding acknowledgment: SPAcE (www.activeenvironments.eu) is co-funded by the Sport action of the ERASMUS+ programme.Keywords: action plans, active transport, SPAcE, UActivE urban active environments, walking and cycling
Procedia PDF Downloads 26416609 National Directorate of Employment Training and Agricultural-Small and Medium Enterprises Performance in Nigeria
Authors: Festus M. Epetimehin
Abstract:
This study was conducted to identify the effect of National Directorate of Employment (NDE) training on the profit of Agricultural-Small and Medium Enterprises (SMEs) and to evaluate the factors that influenced farmers' participation in NDE training, as well as the type and frequency of training farmers and other agro-allied entrepreneurs in Nigeria. Using a multi-stage sampling procedure, a total of 384 respondents were sampled, including 192 beneficiaries and 192 non-beneficiaries in Oyo and Lagos States, respectively. Data were analysed using Binary Logit regression and Propensity Score Matching techniques. According to the binary logit analysis, respondents’ gender, availability to extension services, and the location of respondent’s operation were determinant factors influencing NDE training enrolment. All identified factors are related to the probability of respondents’ involvement in a positive way. Propensity score matching revealed that Agricultural-SMEs who participated in the NDE program boosted their profit by N341,072.18. The positive outcome of the effect implies that NDE training enhances Agri-SME performance in Nigeria. The study concluded that greater funding should be provided for the NDE for performance-enhancing training of the Agri-SMEs.Keywords: PSM, binary logit model, Agri-SME
Procedia PDF Downloads 9716608 Assessment of Pull Mechanism at Enhancing Maize Farmers’ Utilisation of Aflasafe Bio-Control Measures in Oyo State, Nigeria
Authors: Jonathan A. Akinwale, Ibukun J. Agotola
Abstract:
There is a need to rethink how technology is being disseminated to end users in order to ensure wide adoption and utilisation. Aflasafe bio-control was developed to combat aflatoxin in maize to ensure food safety for the end users. This study was designed to assess how the pull mechanism is enhancing the utilisation of this proven technology among maize farmers in Oyo State, Nigeria. The study determines the awareness of farmers on Aflasafe, sources of purchase of Aflasafe, incentives towards the usage of Aflasafe, constraints to farmers’ utilisation and factors influencing farmers’ utilisation of Aflasafe bio-control measures. Respondents were selected using a multi-stage sampling procedure. Data were collected from respondents through interview schedule and analyzed using descriptive statistics (means, frequencies, and percentages) and inferential statistics (Pearson Product Moment Correlation and regression analysis). The result showed that 89% of the farmers indicated implementers as the outlet for the purchase of Aflasafe. Also, premium payment and provision of technical assistance were the highly ranked incentives to the utilisation of Aflasafe among the farmers. The study also revealed that the major constraints face by respondents were low access to credit facility, inadequate sources of purchase, and lack of storage facilities. A little above half (54%) of the farmers were found to have fully utilized Aflasafe in maize production. Pearson Product Moment Correlation (PPMC) analysis revealed that there was a significant correlation between incentives and utilisation of Aflasafe (r-value=0.274; p ≤ 0.01). The result of the regression analysis indicated maize production experience (β=0.572), output (β=0.531), years of formal education (β=0.404) and household size (β=0.391) as the leading factors influencing farmers utilisation of Aflasafe bio-control in maize production. The study, therefore, recommends that governments and non-governmental organisations should be interested in making Aflasafe available to the maize farmers either through loan provision or price subsidy.Keywords: Aflasafe bio-control, maize production, production incentives, pull mechanism, utilisation
Procedia PDF Downloads 12516607 Development of Verification System of Workspace Clashes Between Construction Activities
Authors: Hyeon-Seung Kim, Sang-Mi Park, Min-Seo Kim, Jong-Myeung Shin, Leen-Seok Kang
Abstract:
Recently, the use of Building Information Modeling (BIM) in public construction works has become mandatory in some countries and it is anticipated that BIM will be applied to the actual field of civil engineering projects. However, the BIM system is still focused on the architectural project and the design phase. Because the civil engineering project is linear type project and is focused on the construction phase comparing with architectural project, 3D simulation is difficult to visualize them. This study suggests a method and a prototype system to solve workspace conflictions among construction activities using BIM simulation tool.Keywords: BIM, workspace, confliction, visualization
Procedia PDF Downloads 40816606 Preharvest and Postharvest Factors Influencing Resveratrol, Myricetin and Quercetin Content of Wine
Authors: Mariam Khomasuridze, Nino Chkhartishvili, Irma Chanturia
Abstract:
The influence of preharvest and postharvest factors on resveratrol, myricetin and quercetin content of wine was studied during the experiment. The content of cis and trans resveratrol, myricetin and quercetin were analyzed by HPLC. In frame of experiment, the various factors affecting on wine composition were researched: variety, climate, viticulture practices, grape maturity, harvesting methods and wine making techniques. The results have shown that varietal potential and amount of yield play the most important role in formation of antioxidant compounds. Based on achieved results, the usage of medium roast oak chips protects resveratrol, myricetin, and quercetin from coagulation and precipitation. Compared to the control samples, the wines, produced by addition of oak chips were approximately four times richer with these antioxidant compounds. The retention of resveratrol was lowered with 45 % in wines, producing in Qvevri by Georgian traditional technology without controlling temperature during fermentation. The opposite effects in case of myricetin, quercetin and total phenolics content were determined. Their concentrations were higher with 56-78%, then in the fermented tank at 22 -25 °C. As the result of the experiment, the optimal technology scheme of wine was worked out, reached by biologically active compounds: resveratrol, myricetin, and quercetin.Keywords: resveratrol, miricetin, quercetin, wine
Procedia PDF Downloads 18616605 Macroeconomic Measure of Projectification: An Empirical Study of Pakistani Economy
Authors: Shafaq Rana, Hina Ansar
Abstract:
Projectification is an emerging phenomenon in Western economies. The projects have become the key driver of the economic actions. The impact of projectification is understudy for over a decade. A methodology was developed to measure the degree of projectification at economical level, which was later adapted to measure the degree of projectification in Germany, Norway, and Iceland; and compared the differences in these project societies, considering their industrial structure, organizational size, and the share of project work. Using the same methodology, this study aims to provide empirical evidence of the project work in the context of Pakistan –a developing nation, keeping into consideration the macroeconomic measures, qualitative and quantitative measures of the project i/c GDP, monetary measures, and project success. The research includes a qualitative pre-study to define these macro-measures in the country-specific context and a quantitative study to measure the project work w.r.t hours working in the organizations on projects. The outcome of this study provides the key data on the projectification in a developing economy, which will help industry practitioners and decision-makers to examine the consequences of projectification and strategize, respectively. This study also provides a foundation for further research in individual sectors of the country while exploring different macroeconomic questions, including the effect of projectification on project productivity, income effects, and labor market.Keywords: developing economy, Pakistan, project work, projectification
Procedia PDF Downloads 11516604 Adult Learners’ Code-Switching in the EFL Classroom: An Analysis of Frequency and Type of Code-Switching
Authors: Elizabeth Patricia Beck
Abstract:
Stepping into various English as foreign language classrooms, one will see some fundamental similarities. There will likely be groups of students working collaboratively, possibly sitting at tables together. They will be using a set coursebook or photocopies of materials developed by publishers or the teacher. The teacher will be carefully monitoring students’ behaviour and progress. The teacher will also likely be insisting that the students only speak English together, possibly having implemented a complex penalty and award systems to encourage this. This is communicative language teaching and it is commonly how foreign languages are taught around the world. Recently, there has been much interest in the codeswitching behaviour of learners in foreign or second language classrooms. It is a significant topic as it relates to second language acquisition theory, language teaching training and policy, and student expectations and classroom practice. Generally in an English as a foreign language context, an ‘English Only’ policy is the norm. This is based on historical factors, socio-political influence and theories surrounding language learning. The trend, however, is shifting and, based on these same factors, a re-examination of language use in the foreign language classroom is taking place. This paper reports the findings of an examination into the codeswitching behaviour of learners with a shared native language in an English classroom. Specifically, it addresses the question of classroom code-switching by adult learners in the EFL classroom during student-to-student, spoken interaction. Three generic categories of code switching are proposed based on published research and classroom practice. Italian adult learners at three levels were observed and patterns of language use were identified, recorded and analysed using the proposed categories. After observations were completed, a questionnaire was distributed to the students focussing on attitudes and opinions around language choice in the EFL classroom, specifically, the usefulness of L1 for specific functions in the classroom. The paper then investigates the relationship between learners’ foreign language proficiency and the frequency and type of code-switching that they engaged in, and the relationship between learners’ attitudes to classroom code-switching and their behaviour. Results show that code switching patterns underwent changes as the students’ level of English language proficiency improved, and that students’ attitudes towards code-switching generally correlated with their behaviour with some exceptions, however. Finally, the discussion focusses on the details of the language produced in observation, possible influencing factors that may affect the frequency and type of code switching that took place, and additional influencing factors that may affect students’ attitudes towards code switching in the foreign language classroom. An evaluation of the limitations of this study is offered and some suggestions are made for future research in this field of study.Keywords: code-switching, EFL, second language aquisition, adult learners
Procedia PDF Downloads 27616603 A Risk Management Framework for Selling a Mega Power Plant Project in a New Market
Authors: Negar Ganjouhaghighi, Amirali Dolatshahi
Abstract:
The origin of most risks of a mega project usually takes place in the phases before closing the contract. As a practical point of view, using project risk management techniques for preparing a proposal is not a total solution for managing the risks of a contract. The objective of this paper is to cover all those activities associated with risk management of a mega project sale’s processes; from entrance to a new market to awarding activities and the review of contract performance. In this study, the risk management happens in six consecutive steps that are divided into three distinct but interdependent phases upstream of the award of the contract: pre-tendering, tendering and closing. In the first step, by preparing standard market risk report, risks of the new market are identified. The next step is the bid or no bid decision making based on the previous gathered data. During the next three steps in tendering phase, project risk management techniques are applied for determining how much contingency reserve must be added or reduced to the estimated cost in order to put the residual risk to an acceptable level. Finally, the last step which happens in closing phase would be an overview of the project risks and final clarification of residual risks. The sales experience of more than 20,000 MW turn-key power plant projects alongside this framework, are used to develop a software that assists the sales team to have a better project risk management.Keywords: project marketing, risk management, tendering, project management, turn-key projects
Procedia PDF Downloads 33016602 Integrated Information System on Human Resource Management in Project-Based Organizations
Authors: Akbar Farahani, Afsaneh Hassani, Peyman M. Farkhondeh
Abstract:
Human Resource Management as one of the core processes of the project-based companies, despite its key role in the success and competitive advantage, is relatively unknown. In the project-based companies, due to the accelerated movement of knowledge in the work activities and the temporary nature of the project, the need to develop mechanisms for achieving optimal management of this issues is very challenging. Approach to human resource management in these companies evolves with goals, strategies, and operational processes. Therefore, the need for appropriate tools to facilitate implementation of the optimized human resource management in the project is more than before,Which currently with the development of information technology and modern communication, appropriate to address the optimal approach for dynamic management of human resources in the project have been provided.This is done by using the referral system implemented in Mahab GCE that provides 1: the ability to use humans in projects without geographic limitation and 2:information on the activities and outcomes of referrals.Furthermore, by using this system, recording the lessons learned after any particular activity on projects,accessing quantitative information, procedures, documentation of learned practices that have been stored in the data base as well as using them in future projects is provided.Keywords: human resource management, project base company, ERP, referrals system
Procedia PDF Downloads 47716601 Mapping Interrelationships among Key Sustainability Drivers: A Strategic Framework for Enhanced Entrepreneurial Sustainability among MSME
Authors: Akriti Chandra, Gourav Dwivedi, Seema Sharma, Shivani
Abstract:
This study investigates the adoption of green business (GB) models within a circular economy framework (CEBM) for Micro Small and Medium Enterprise (MSME), given the rising importance of sustainable practices. The research begins by exploring the shift from linear business models towards resource-efficient, sustainable models, emphasizing the benefits of the circular economy. The study's literature review identifies 60 influential factors impacting the shift to green businesses, grouped as internal and external drivers. However, there is a research gap in examining these factors' interrelationships and operationalizing them within MSMEs. To address this gap, the study employs Total Interpretive Structural Modelling (TISM) to establish a hierarchical structure of factors influencing GB and circular economy business model (CEBM) adoption. Findings reveal that factors like green innovation and market competitiveness are particularly impactful. Using Systems Theory, which views organizations as complex adaptive systems, the study contextualizes these drivers within MSMEs, proposing a framework for a sustainable business model adoption. The study concludes with significant implications for policymakers, suggesting that the identified factors and their hierarchical relationships can guide policy formulation for a broader transition to green business practices. This work also invites further research, recommending larger, quantitative studies to empirically validate these factors and explore practical challenges in implementing CEBMs.Keywords: green business (GB), circular economy business model (CEBM), micro small and medium enterprise (MSME), total interpretive structural modelling (TISM), systems theory
Procedia PDF Downloads 1416600 Bahasa Melayu Hand Coded and Malaysian Sign Language Acquisition of Hearing Impaired Students at Early Intervention
Authors: Abdul Rahim Razalli, Nordin Mamat, Lee Kean Low
Abstract:
The objective of the study is to examine the acquisition of Bahasa Melayu hand coded and Malaysian Sign Language of hearing impaired children and the factors that influencing the acquisition of Malay language at early intervention. A qualitative research design was chosen to answer two research questions. Two sets of instruments have been used to obtain information of proficiency and factors that influence it. Five children with hearing problems, four teachers and three parents were selected as the respondents through purposive sampling technique. The findings show that pupils with hearing problems who mastered Bahasa Melayu hand coded have better acquisition of Bahasa Melayu as compared to those who acquired Malaysian Sign Language. The study also found that the parents, pupils, teachers and environmental factors have an impact on the acquisition of Bahasa Melayu hand coded. The implications of this study show that early intervention of Bahasa Melayu hand coded and the parents, pupils, teachers and environmental factors do help in the language proficiency of children with hearing problems. A more comprehensive study should be undertaken at a higher level to see the impact on an early intervention program for Malay language acquisition of hearing impaired children.Keywords: Bahasa Melayu hand coded, Malaysian sign Language, hearing impaired children, early intervention
Procedia PDF Downloads 24916599 Engaging Mature Learners through Video Case Studies
Authors: Jacqueline Mary Jepson
Abstract:
This article provides a case study centred on the development of 13 video episodes which have been created to enhance student engagement with a post graduate online course in Project Management. The student group was unique as their online course needed to provide for asynchronistic learning and an adult learning pedagogy. In addition, students had come from a wide range professional backgrounds, with some having no Project Management experience, while others had 20 years or more. Students had to gain an understanding of an advanced body of knowledge and the course needed to achieve the academic requirements to qualify individuals to apply their learning in a range of contexts for professional practice and scholarship. To achieve this, a 13 episode case study was developed along with supportive learning materials based on the relocation of a zoo. This unique project provided a learning environment where the project could evolve over each video episode demonstrating the application of Project Management methodology which was then tied into the learning outcomes for the course and the assessment tasks. Discussion forums provided a way for students to converse and demonstrate their own understanding of content and how Project Management methodology can be applied.Keywords: project management, adult learning, video case study, asynchronistic education
Procedia PDF Downloads 33816598 BIM Application and Construction Schedule Simulation for the Horizontal Work Area
Authors: Hyeon-Seong Kim, Sang-Mi Park, Seul-Gi Kim, Seon-Ju Han, Leen-Seok Kang
Abstract:
The use of BIM, including 4D CAD system, in a construction project is gradually increasing. Since the building construction works repeatedly in the vertical space, it is relatively easy to confirm the interference effect when applying the BIM, but the interference effect for the civil engineering project is relatively small because the civil works perform non-repetitive processes in the horizontal space. For this reason, it is desirable to apply BIM to the construction phase when applying BIM to the civil engineering project, and the most active BIM tool applied to the construction phase is the 4D CAD function for the schedule management. This paper proposes the application procedure of BIM by the construction phase of civil engineering project and a linear 4D CAD construction methodology suitable for the civil engineering project in which linear work is performed.Keywords: BIM, 4D CAD, linear 4D simulation, VR
Procedia PDF Downloads 40016597 Exploratory Study of the Influencing Factors for Hotels' Competitors
Authors: Asma Ameur, Dhafer Malouche
Abstract:
Hotel competitiveness research is an essential phase of the marketing strategy for any hotel. Certainly, knowing the hotels' competitors helps the hotelier to grasp its position in the market and the citizen to make the right choice in picking a hotel. Thus, competitiveness is an important indicator that can be influenced by various factors. In fact, the issue of competitiveness, this ability to cope with competition, remains a difficult and complex concept to define and to exploit. Therefore, the purpose of this article is to make an exploratory study to calculate a competitiveness indicator for hotels. Further on, this paper makes it possible to determine the criteria of direct or indirect effect on the image and the perception of a hotel. The actual research is used to look into the right model for hotel ‘competitiveness. For this reason, we exploit different theoretical contributions in the field of machine learning. Thus, we use some statistical techniques such as the Principal Component Analysis (PCA) to reduce the dimensions, as well as other techniques of statistical modeling. This paper presents a survey covering of the techniques and methods in hotel competitiveness research. Furthermore, this study allows us to deduct the significant variables that influence the determination of hotel’s competitors. Lastly, the discussed experiences in this article found that the hotel competitors are influenced by several factors with different rates.Keywords: competitiveness, e-reputation, hotels' competitors, online hotel’ review, principal component analysis, statistical modeling
Procedia PDF Downloads 11916596 Navigating the Future: Evaluating the Market Potential and Drivers for High-Definition Mapping in the Autonomous Vehicle Era
Authors: Loha Hashimy, Isabella Castillo
Abstract:
In today's rapidly evolving technological landscape, the importance of precise navigation and mapping systems cannot be understated. As various sectors undergo transformative changes, the market potential for Advanced Mapping and Management Systems (AMMS) emerges as a critical focus area. The Galileo/GNSS-Based Autonomous Mobile Mapping System (GAMMS) project, specifically targeted toward high-definition mapping (HDM), endeavours to provide insights into this market within the broader context of the geomatics and navigation fields. With the growing integration of Autonomous Vehicles (AVs) into our transportation systems, the relevance and demand for sophisticated mapping solutions like HDM have become increasingly pertinent. The research employed a meticulous, lean, stepwise, and interconnected methodology to ensure a comprehensive assessment. Beginning with the identification of pivotal project results, the study progressed into a systematic market screening. This was complemented by an exhaustive desk research phase that delved into existing literature, data, and trends. To ensure the holistic validity of the findings, extensive consultations were conducted. Academia and industry experts provided invaluable insights through interviews, questionnaires, and surveys. This multi-faceted approach facilitated a layered analysis, juxtaposing secondary data with primary inputs, ensuring that the conclusions were both accurate and actionable. Our investigation unearthed a plethora of drivers steering the HD maps landscape. These ranged from technological leaps, nuanced market demands, and influential economic factors to overarching socio-political shifts. The meteoric rise of Autonomous Vehicles (AVs) and the shift towards app-based transportation solutions, such as Uber, stood out as significant market pull factors. A nuanced PESTEL analysis further enriched our understanding, shedding light on political, economic, social, technological, environmental, and legal facets influencing the HD maps market trajectory. Simultaneously, potential roadblocks were identified. Notable among these were barriers related to high initial costs, concerns around data quality, and the challenges posed by a fragmented and evolving regulatory landscape. The GAMMS project serves as a beacon, illuminating the vast opportunities that lie ahead for the HD mapping sector. It underscores the indispensable role of HDM in enhancing navigation, ensuring safety, and providing pinpoint, accurate location services. As our world becomes more interconnected and reliant on technology, HD maps emerge as a linchpin, bridging gaps and enabling seamless experiences. The research findings accentuate the imperative for stakeholders across industries to recognize and harness the potential of HD mapping, especially as we stand on the cusp of a transportation revolution heralded by Autonomous Vehicles and advanced geomatic solutions.Keywords: high-definition mapping (HDM), autonomous vehicles, PESTEL analysis, market drivers
Procedia PDF Downloads 8416595 Attribute Selection for Preference Functions in Engineering Design
Authors: Ali E. Abbas
Abstract:
Industrial Engineering is a broad multidisciplinary field with intersections and applications in numerous areas. When designing a product, it is important to determine the appropriate attributes of value and the preference function for which the product is optimized. This paper provides some guidelines on appropriate selection of attributes for preference and value functions for engineering design.Keywords: decision analysis, industrial engineering, direct vs. indirect values, engineering management
Procedia PDF Downloads 30616594 Study of Causes and Effects of Road Projects Abandonment in Nigeria
Authors: Monsuru Oyenola Popoola, Oladapo Samson Abiola, Wusamotu Alao Adeniji
Abstract:
The prevalent and incessant abandonment of road construction projects are alarming that it creates several negative effects to social, economic and environmental values of the project. The purpose of this paper is to investigate and determined the various causes and effects of abandoning road construction projects in Nigeria. Likert Scale questionnaire design was used to administered and analysed the data obtained for the stydy. 135 (Nr) questionnaires were completed and retrieved from the respondents, out of 200 (Nr) questionnaires sent out, representing a response rate of 67.5%. The analysis utilized the Relative Importance Index (R.I.I.) method and the results are presented in tabular form. The findings confirms that at least 20 factors were the causes of road projects abandonment in Nigeria with most including Leadership Instability, Improper Project Planning, Inconsistence in government policies and Design, Contractor Incompetence, Economy Instability and Inflation, Delay in remittance of money, Improper financial analysis, Poor risk management, Climatic Conditions, Improper Project Estimates etc. The findings also show that at least eight (8) effect were identified on the system, and these include; Waste of Financial Resources, Loss of economic value, Environmental degradation, Loss of economic value, Reduction in standard of living, Litigation and Arbitration, etc. The reflection is that allocating reasonable finance, developing appropriate and effective implementation plans and monitoring, evaluation and reporting on development project activities by key actors should enhance in resolving the problem of road projects abandonment.Keywords: road construction, abandonment of road projects, climatic condition, project planning, contractor
Procedia PDF Downloads 299