4742 Critical Terrain Slope Calculation for Locating Small Hydropower Plants

Authors: C. Vrekos, C. Evagelides, N. Samarinas, G. Arampatzis

Abstract:

As known, the water energy is a renewable and clean source of energy. Energy production from hydropower has been the first, and still is today a renewable source used to generate electricity. The optimal location and sizing of a small hydropower plant is a very important issue in engineering design which encourages investigation. The aim of this paper is to present a formula that can be utilized for locating the position of a small hydropower plant although there is a high dependence on economic, environmental, and social parameters. In this paper, the economic and technical side of the problem is considered. More specifically, there is a critical terrain slope that determines if the plant should be located at the end of the slope or not. Of course, this formula can be used for a first estimate and does not include detailed economic analysis. At the end, a case study is presented for the location of a small hydropower plant in order to demonstrate the validity of the proposed formula.

Keywords: critical terrain slope, economic analysis, hydropower plant locating, renewable energy

Procedia PDF Downloads 169
4741 A Case Study of Low Head Hydropower Opportunities at Existing Infrastructure in South Africa

Authors: Ione Loots, Marco van Dijk, Jay Bhagwan

Abstract:

Historically, South Africa had various small-scale hydropower installations in remote areas that were not incorporated in the national electricity grid. Unfortunately, in the 1960s most of these plants were decommissioned when Eskom, the national power utility, rapidly expanded its grid and capability to produce cheap, reliable, coal-fired electricity. This situation persisted until 2008, when rolling power cuts started to affect all citizens. This, together with the rising monetary and environmental cost of coal-based power generation, has sparked new interest in small-scale hydropower development, especially in remote areas or at locations (like wastewater treatment works) that could not afford to be without electricity for long periods at a time. Even though South Africa does not have the same, large-scale, hydropower potential as some other African countries, significant potential for micro- and small-scale hydropower is hidden in various places. As an example, large quantities of raw and potable water are conveyed daily under either pressurized or gravity conditions over large distances and elevations. Due to the relative water scarcity in the country, South Africa also has more than 4900 registered dams of varying capacities. However, institutional capacity and skills have not been maintained in recent years and therefore the identification of hydropower potential, as well as the development of micro- and small-scale hydropower plants has not gained significant momentum. An assessment model and decision support system for low head hydropower development has been developed to assist designers and decision makers with first-order potential analysis. As a result, various potential sites were identified and many of these sites were situated at existing infrastructure like weirs, barrages or pipelines. One reason for the specific interest in existing infrastructure is the fact that capital expenditure could be minimized and another is the reduced negative environmental impact compared to greenfield sites. This paper will explore the case study of retrofitting an unconventional and innovative hydropower plant to the outlet of a wastewater treatment works in South Africa.

Keywords: low head hydropower, retrofitting, small-scale hydropower, wastewater treatment works

Procedia PDF Downloads 215
4740 Estimation of Small Hydropower Potential Using Remote Sensing and GIS Techniques in Pakistan

Authors: Malik Abid Hussain Khokhar, Muhammad Naveed Tahir, Muhammad Amin

Abstract:

Energy demand has been increased manifold due to increasing population, urban sprawl and rapid socio-economic improvements. Low water capacity in dams for continuation of hydrological power, land cover and land use are the key parameters which are creating problems for more energy production. Overall installed hydropower capacity of Pakistan is more than 35000 MW whereas Pakistan is producing up to 17000 MW and the requirement is more than 22000 that is resulting shortfall of 5000 - 7000 MW. Therefore, there is a dire need to develop small hydropower to fulfill the up-coming requirements. In this regards, excessive rainfall, snow nurtured fast flowing perennial tributaries and streams in northern mountain regions of Pakistan offer a gigantic scope of hydropower potential throughout the year. Rivers flowing in KP (Khyber Pakhtunkhwa) province, GB (Gilgit Baltistan) and AJK (Azad Jammu & Kashmir) possess sufficient water availability for rapid energy growth. In the backdrop of such scenario, small hydropower plants are believed very suitable measures for more green environment and power sustainable option for the development of such regions. Aim of this study is to estimate hydropower potential sites for small hydropower plants and stream distribution as per steam network available in the available basins in the study area. The proposed methodology will focus on features to meet the objectives i.e. site selection of maximum hydropower potential for hydroelectric generation using well emerging GIS tool SWAT as hydrological run-off model on the Neelum, Kunhar and the Dor Rivers’ basins. For validation of the results, NDWI will be computed to show water concentration in the study area while overlaying on geospatial enhanced DEM. This study will represent analysis of basins, watershed, stream links, and flow directions with slope elevation for hydropower potential to produce increasing demand of electricity by installing small hydropower stations. Later on, this study will be benefitted for other adjacent regions for further estimation of site selection for installation of such small power plants as well.

Keywords: energy, stream network, basins, SWAT, evapotranspiration

Procedia PDF Downloads 189
4739 Opportunities of Clean Development Mechanism through Hydropower in Nepal

Authors: Usha Khatiwada

Abstract:

Nepal’s overall energy baseline: It has been proposed that hydropower projects for domestic consumption can earn CDM revenue in Nepal if a new methodology is established that takes into account not only consumption in Nepal of grid electricity but also other fuels such as kerosene, diesel, and firewood, used by a vast majority of the population for their lighting and other needs. However, this would mean that we would be trying to combine grid electricity supply and consumers not supplied from the grid into one methodology. Such a sweeping baseline may have a very small chance of success with the CDM Executive Board.

Keywords: environment, clean development mechanism, hydropower, Nepal

Procedia PDF Downloads 373
4738 Feasibility of Small Hydropower Plants Odisha

Authors: Sanoj Sahu, Ramakar Jha

Abstract:

Odisha (India) is in need of reliable, cost-effective power generation. A prolonged electricity crisis and increasing power demand have left over thousands of citizens without access to electricity, and much of the population suffers from sporadic outages. The purpose of this project is to build a methodology to evaluate small hydropower potential, which can be used to alleviate the Odisha’s energy problem among rural communities. This project has three major tasks: the design of a simple SHEP for a single location along a river in the Odisha; the development of water flow prediction equations through a linear regression analysis; and the design of an ArcGIS toolset to estimate the flow duration curves (FDCs) at locations where data do not exist. An explanation of the inputs to the tool, as well has how it produces a suitable output for SHEP evaluation will be presented. The paper also gives an explanation of hydroelectric power generation in the Odisha, SHEPs, and the technical and practical aspects of hydroelectric power. Till now, based on topographical and rainfall analysis we have located hundreds of sites. Further work on more number of site location and accuracy of location is to be done.

Keywords: small hydropower, ArcGIS, rainfall analysis, Odisha’s energy problem

Procedia PDF Downloads 410
4737 Future Optimization of the Xin’anjiang Hydropower

Authors: Muhammad Zaman, Guohua Fang, Muhammad Saifullah,

Abstract:

The presented study emphasize at an optimal model to compare past and future optimal hydropower generation. In order to get maximum benefits from the Xin’anjiang hydropower station a model is developed. A Particle Swarm Optimization (PSO) has purposed and past and future water flow is used to get the maximum benefits from future water resources in this study. The results revealed that the future hydropower generation is more than the past generation. This paper gives us idea that what could we get in the past using optimal method of electricity generation and what can we get in the future using this technique.

Keywords: PSO, future water resources, optimization, Xin’anjiang,

Procedia PDF Downloads 407
4736 Multi-Objective Optimization of Run-of-River Small-Hydropower Plants Considering Both Investment Cost and Annual Energy Generation

Authors: Amèdédjihundé H. J. Hounnou, Frédéric Dubas, François-Xavier Fifatin, Didier Chamagne, Antoine Vianou

Abstract:

This paper presents the techno-economic evaluation of run-of-river small-hydropower plants. In this regard, a multi-objective optimization procedure is proposed for the optimal sizing of the hydropower plants, and NSGAII is employed as the optimization algorithm. Annual generated energy and investment cost are considered as the objective functions, and number of generator units (n) and nominal turbine flow rate (QT) constitute the decision variables. Site of Yeripao in Benin is considered as the case study. We have categorized the river of this site using its environmental characteristics: gross head, and first quartile, median, third quartile and mean of flow. Effects of each decision variable on the objective functions are analysed. The results gave Pareto Front which represents the trade-offs between annual energy generation and the investment cost of hydropower plants, as well as the recommended optimal solutions. We noted that with the increase of the annual energy generation, the investment cost rises. Thus, maximizing energy generation is contradictory with minimizing the investment cost. Moreover, we have noted that the solutions of Pareto Front are grouped according to the number of generator units (n). The results also illustrate that the costs per kWh are grouped according to the n and rise with the increase of the nominal turbine flow rate. The lowest investment costs per kWh are obtained for n equal to one and are between 0.065 and 0.180 €/kWh. Following the values of n (equal to 1, 2, 3 or 4), the investment cost and investment cost per kWh increase almost linearly with increasing the nominal turbine flowrate while annual generated. Energy increases logarithmically with increasing of the nominal turbine flowrate. This study made for the Yeripao river can be applied to other rivers with their own characteristics.

Keywords: hydropower plant, investment cost, multi-objective optimization, number of generator units

Procedia PDF Downloads 134
4735 Technical, Environmental and Financial Assessment for Optimal Sizing of Run-of-River Small Hydropower Project: Case Study in Colombia

Authors: David Calderon Villegas, Thomas Kaltizky

Abstract:

Run-of-river (RoR) hydropower projects represent a viable, clean, and cost-effective alternative to dam-based plants and provide decentralized power production. However, RoR schemes cost-effectiveness depends on the proper selection of site and design flow, which is a challenging task because it requires multivariate analysis. In this respect, this study presents the development of an investment decision support tool for assessing the optimal size of an RoR scheme considering the technical, environmental, and cost constraints. The net present value (NPV) from a project perspective is used as an objective function for supporting the investment decision. The tool has been tested by applying it to an actual RoR project recently proposed in Colombia. The obtained results show that the optimum point in financial terms does not match the flow that maximizes energy generation from exploiting the river's available flow. For the case study, the flow that maximizes energy corresponds to a value of 5.1 m3/s. In comparison, an amount of 2.1 m3/s maximizes the investors NPV. Finally, a sensitivity analysis is performed to determine the NPV as a function of the debt rate changes and the electricity prices and the CapEx. Even for the worst-case scenario, the optimal size represents a positive business case with an NPV of 2.2 USD million and an IRR 1.5 times higher than the discount rate.

Keywords: small hydropower, renewable energy, RoR schemes, optimal sizing, objective function

Procedia PDF Downloads 103
4734 Concept, Modules and Objectives of the Syllabus Course: Small Power Plants and Renewable Energy Sources

Authors: Rade M. Ciric, Nikola L. J. Rajakovic

Abstract:

This paper presents a curriculum of the subject small power plants and renewable energy sources, dealing with the concept of distributed generation, renewable energy sources, hydropower, wind farms, geothermal power plants, cogeneration plants, biogas plants of agriculture and animal origin, solar power and fuel cells. The course is taught the manner of connecting small power plants to the grid, the impact of small generators on the distribution system, as well as economic, environmental and legal aspects of operation of distributed generators.

Keywords: distributed generation, renewable energy sources, energy policy, curriculum

Procedia PDF Downloads 327
4733 Development of National Scale Hydropower Resource Assessment Scheme Using SWAT and Geospatial Techniques

Authors: Rowane May A. Fesalbon, Greyland C. Agno, Jodel L. Cuasay, Dindo A. Malonzo, Ma. Rosario Concepcion O. Ang

Abstract:

The Department of Energy of the Republic of the Philippines estimates that the country’s energy reserves for 2015 are dwindling– observed in the rotating power outages in several localities. To aid in the energy crisis, a national hydropower resource assessment scheme is developed. Hydropower is a resource that is derived from flowing water and difference in elevation. It is a renewable energy resource that is deemed abundant in the Philippines – being an archipelagic country that is rich in bodies of water and water resources. The objectives of this study is to develop a methodology for a national hydropower resource assessment using hydrologic modeling and geospatial techniques in order to generate resource maps for future reference and use of the government and other stakeholders. The methodology developed for this purpose is focused on two models – the implementation of the Soil and Water Assessment Tool (SWAT) for the river discharge and the use of geospatial techniques to analyze the topography and obtain the head, and generate the theoretical hydropower potential sites. The methodology is highly coupled with Geographic Information Systems to maximize the use of geodatabases and the spatial significance of the determined sites. The hydrologic model used in this workflow is SWAT integrated in the GIS software ArcGIS. The head is determined by a developed algorithm that utilizes a Synthetic Aperture Radar (SAR)-derived digital elevation model (DEM) which has a resolution of 10-meters. The initial results of the developed workflow indicate hydropower potential in the river reaches ranging from pico (less than 5 kW) to mini (1-3 MW) theoretical potential.

Keywords: ArcSWAT, renewable energy, hydrologic model, hydropower, GIS

Procedia PDF Downloads 282
4732 A Feasibility and Implementation Model of Small-Scale Hydropower Development for Rural Electrification in South Africa: Design Chart Development

Authors: Gideon J. Bonthuys, Marco van Dijk, Jay N. Bhagwan

Abstract:

Small scale hydropower used to play a very important role in the provision of energy to urban and rural areas of South Africa. The national electricity grid, however, expanded and offered cheap, coal generated electricity and a large number of hydropower systems were decommissioned. Unfortunately, large numbers of households and communities will not be connected to the national electricity grid for the foreseeable future due to high cost of transmission and distribution systems to remote communities due to the relatively low electricity demand within rural communities and the allocation of current expenditure on upgrading and constructing of new coal fired power stations. This necessitates the development of feasible alternative power generation technologies. A feasibility and implementation model was developed to assist in designing and financially evaluating small-scale hydropower (SSHP) plants. Several sites were identified using the model. The SSHP plants were designed for the selected sites and the designs for the different selected sites were priced using pricing models (civil, mechanical and electrical aspects). Following feasibility studies done on the designed and priced SSHP plants, a feasibility analysis was done and a design chart developed for future similar potential SSHP plant projects. The methodology followed in conducting the feasibility analysis for other potential sites consisted of developing cost and income/saving formulae, developing net present value (NPV) formulae, Capital Cost Comparison Ratio (CCCR) and levelised cost formulae for SSHP projects for the different types of plant installations. It included setting up a model for the development of a design chart for a SSHP, calculating the NPV, CCCR and levelised cost for the different scenarios within the model by varying different parameters within the developed formulae, setting up the design chart for the different scenarios within the model and analyzing and interpreting results. From the interpretation of the develop design charts for feasible SSHP in can be seen that turbine and distribution line cost are the major influences on the cost and feasibility of SSHP. High head, short transmission line and islanded mini-grid SSHP installations are the most feasible and that the levelised cost of SSHP is high for low power generation sites. The main conclusion from the study is that the levelised cost of SSHP projects indicate that the cost of SSHP for low energy generation is high compared to the levelised cost of grid connected electricity supply; however, the remoteness of SSHP for rural electrification and the cost of infrastructure to connect remote rural communities to the local or national electricity grid provides a low CCCR and renders SSHP for rural electrification feasible on this basis.

Keywords: cost, feasibility, rural electrification, small-scale hydropower

Procedia PDF Downloads 196
4731 Gravitational Water Vortex Power Plant: Experimental-Parametric Design of a Hydraulic Structure Capable of Inducing the Artificial Formation of a Gravitational Water Vortex Appropriate for Hydroelectric Generation

Authors: Henrry Vicente Rojas Asuero, Holger Manuel Benavides Muñoz

Abstract:

Approximately 80% of the energy consumed worldwide is generated from fossil sources, which are responsible for the emission of a large volume of greenhouse gases. For this reason, the global trend, at present, is the widespread use of energy produced from renewable sources. This seeks safety and diversification of energy supply, based on social cohesion, economic feasibility and environmental protection. In this scenario, small hydropower systems (P ≤ 10MW) stand out due to their high efficiency, economic competitiveness and low environmental impact. Small hydropower systems, along with wind and solar energy, are expected to represent a significant percentage of the world's energy matrix in the near term. Among the various technologies present in the state of the art, relating to small hydropower systems, is the Gravitational Water Vortex Power Plant, a recent technology that excels because of its versatility of operation, since it can operate with jumps in the range of 0.70 m-2.00 m and flow rates from 1 m3/s to 20 m3/s. Its operating system is based on the utilization of the energy of rotation contained within a large water vortex artificially induced. This paper presents the study and experimental design of an optimal hydraulic structure with the capacity to induce the artificial formation of a gravitational water vortex trough a system of easy application and high efficiency, able to operate in conditions of very low head and minimum flow. The proposed structure consists of a channel, with variable base, vortex inductor, tangential flow generator, coupled to a circular tank with a conical transition bottom hole. In the laboratory test, the angular velocity of the water vortex was related to the geometric characteristics of the inductor channel, as well as the influence of the conical transition bottom hole on the physical characteristics of the water vortex. The results show angular velocity values of greater magnitude as a function of depth, in addition the presence of the conical transition in the bottom hole of the circular tank improves the water vortex formation conditions while increasing the angular velocity values. Thus, the proposed system is a sustainable solution for the energy supply of rural areas near to watercourses.

Keywords: experimental model, gravitational water vortex power plant, renewable energy, small hydropower

Procedia PDF Downloads 266
4730 Integration of Hydropower and Solar Photovoltaic Generation into Distribution System: Case of South Sudan

Authors: Ater Amogpai

Abstract:

Hydropower and solar photovoltaic (PV) generation are crucial in sustainability and transitioning from fossil fuel to clean energy. Integrating renewable energy sources such as hydropower and solar photovoltaic (PV) into the distributed networks contributes to achieving energy balance, pollution mitigation, and cost reduction. Frequent power outages and a lack of load reliability characterize the current South Sudan electricity distribution system. The country’s electricity demand is 300MW; however, the installed capacity is around 212.4M. Insufficient funds to build new electricity facilities and expand generation are the reasons for the gap in installed capacity. The South Sudan Ministry of Energy and Dams gave a contract to an Egyptian Elsewedy Electric Company that completed the construction of a solar PV plant in 2023. The plant has a 35 MWh battery storage and 20 MW solar PV system capacity. The construction of Juba Solar PV Park started in 2022 to increase the current installed capacity in Juba City to 53 MW. The plant will begin serving 59000 residents in Juba and save 10,886.2t of carbon dioxide (CO2) annually.

Keywords: renewable energy, hydropower, solar energy, photovoltaic, South Sudan

Procedia PDF Downloads 56
4729 Evaluation of a Hybrid System for Renewable Energy in a Small Island in Greece

Authors: M. Bertsiou, E. Feloni, E. Baltas

Abstract:

The proper management of the water supply and electricity is the key issue, especially in small islands, where sustainability has been combined with the autonomy and covering of water needs and the fast development in potential sectors of economy. In this research work a hybrid system in Fournoi island (Icaria), a small island of Aegean, has been evaluated in order to produce hydropower and cover water demands, as it can provide solutions to acute problems, such as the water scarcity or the instability of local power grids. The meaning and the utility of hybrid system and the cooperation with a desalination plant has also been considered. This kind of project has not yet been widely applied, so the consideration will give us valuable information about the storage of water and the controlled distribution of the generated clean energy. This process leads to the conclusions about the functioning of the system and the profitability of this project, covering the demand for water and electricity.

Keywords: hybrid system, water, electricity, island

Procedia PDF Downloads 296
4728 Investigating the Behavior of Water Shortage Indices for Performance Evaluation of a Water Resources System

Authors: Frederick N. F. Chou, Nguyen Thi Thuy Linh

Abstract:

The impact of water shortages has been increasingly severe as a consequence of population growth, urbanization, economic development, and climate change. The need for improvements in reliable water supply systems is urgent with the increasing living standards of regions. In this study, a suitable shortage index capable of multi-aspect description - frequency, magnitude, and duration - is adopted to more accurately describe the characteristics of a shortage situation. The values of the index were determined to cope with the increasing need for reliability. There are four reservoirs in series located on the Be River of the Dong Nai River Basin in Southern Vietnam. The primary purpose of the three upstream reservoirs is hydropower generation while the primary purpose of the fourth is water supply. A compromise between hydropower generation and water supply can be negotiated for these four reservoirs to reduce the severity of water shortages. A generalized water allocation model was applied to simulate the water supply, and hydropower generation of various management alternatives and the system’s reliability was evaluated using the adopted multiple shortage indices. Modifying management policies of water resources using data-based indexes can improve the reliability of water supply.

Keywords: cascade reservoirs, hydropower, shortage index, water supply

Procedia PDF Downloads 243
4727 A Review of Energy in the Democratic Republic of Congo

Authors: Kanzumba Kusakana

Abstract:

The Democratic Republic of Congo (DRC) is currently experiencing a general energy crisis due to lack of proper investment and management in the energy sector. 93, 6% of the country is highly dependent on wood fuels as main source of energy having severe impacts such as deforestation and general degradation of the environment. On the other hand, the major share of the electricity produced mainly from ill-conditioned hydro and thermal power stations is principally used to supply the industrial sector as well as very few urban areas. Nevertheless, DRC possesses huge potential in renewable resources such as hydropower, biomass, methane gas, solar geothermal and moderate wind potential that can be used for energy generation. Recently the country has initiated projects to build decentralized micro hydropower station to supply remotes and isolated areas; to rehabilitate its existent main hydropower plants and transmission lines as well as to extend its current generation capacity by building new hydropower stations able to respond to a major part of the African continent energy needs. This paper presents a comprehensive review of current energy resources as well as of the electricity situation in DRC. Recent energy projects, the energy policy as well as the energy challenges in the DRC are also presented.

Keywords: energy, biomass, hydro power, renewable energy, energy policy, Democratic Republic of Congo

Procedia PDF Downloads 302
4726 Application of Computational Flow Dynamics (CFD) Analysis for Surge Inception and Propagation for Low Head Hydropower Projects

Authors: M. Mohsin Munir, Taimoor Ahmad, Javed Munir, Usman Rashid

Abstract:

Determination of maximum elevation of a flowing fluid due to sudden rejection of load in a hydropower facility is of great interest to hydraulic engineers to ensure safety of the hydraulic structures. Several mathematical models exist that employ one-dimensional modeling for the determination of surge but none of these perfectly simulate real-time circumstances. The paper envisages investigation of surge inception and propagation for a Low Head Hydropower project using Computational Fluid Dynamics (CFD) analysis on FLOW-3D software package. The fluid dynamic model utilizes its analysis for surge by employing Reynolds’ Averaged Navier-Stokes Equations (RANSE). The CFD model is designed for a case study at Taunsa hydropower Project in Pakistan. Various scenarios have run through the model keeping in view upstream boundary conditions. The prototype results were then compared with the results of physical model testing for the same scenarios. The results of the numerical model proved quite accurate coherence with the physical model testing and offers insight into phenomenon which are not apparent in physical model and shall be adopted in future for the similar low head projects limiting delays and cost incurred in the physical model testing.

Keywords: surge, FLOW-3D, numerical model, Taunsa, RANSE

Procedia PDF Downloads 336
4725 Performance Analysis of Pumps-as-Turbine Under Cavitating Conditions

Authors: Calvin Stephen, Biswajit Basu, Aonghus McNabola

Abstract:

Market liberalization in the power sector has led to the emergence of micro-hydropower schemes that are dependent on the use of pumps-as-turbines in applications that were not suitable as potential hydropower sites in earlier years. These applications include energy recovery in water supply networks, sewage systems, irrigation systems, alcohol breweries, underground mining and desalination plants. As a result, there has been an accelerated adoption of pumpsas-turbine technology due to the economic advantages it presents in comparison to the conventional turbines in the micro-hydropower space. The performance of this machines under cavitation conditions, however, is not well understood as there is a deficiency of knowledge in literature focused on their turbine mode of operation. In hydraulic machines, cavitation is a common occurrence which needs to be understood to safeguard them and prolong their operation life. The overall purpose of this study is to investigate the effects of cavitation on the performance of a pumps-as-turbine system over its entire operating range. At various operating speeds, the cavitating region is identified experimentally while monitoring the effects this has on the power produced by the machine. Initial results indicate occurrence of cavitation at higher flow rates for lower operating speeds and at lower flow rates at higher operating speeds. This implies that for cavitation free operation, low speed pumps-as-turbine must be used for low flow rate conditions whereas for sites with higher flow rate conditions high speed turbines should be adopted. Such a complete understanding of pumps-as-turbine suction performance can aid avoid cavitation induced failures hence improved reliability of the micro-hydropower plant.

Keywords: cavitation, micro-hydropower, pumps-as-turbine, system design

Procedia PDF Downloads 74
4724 Risk Aversion and Dynamic Games between Hydroelectric Operators under Uncertainty

Authors: Abdessalem Abbassi, Ahlem Dakhlaoui, Lota D. Tamini

Abstract:

This article analyses management of hydropower dams within two different industrial structures: monopolistic and oligopolistic; when hydroelectricity producers are risk averse and face demand uncertainty. In each type of market structure we determine the water release path in closed-loop equilibrium. We show how a monopoly can manage its hydropower dams by additional pumping or storage depending on the relative abundance of water between different regions to smooth the effect of uncertainty on electricity prices. In the oligopolistic case with symmetric rates of risk aversion, we determine the conditions under which the relative scarcity (abundance) of water in the dam of a hydroelectric operator can favor additional strategic pumping (storage) in its competitor’s dams. When there is asymmetry of the risk aversion coefficient, the firm’s hydroelectricity production increases as its competitor’s risk aversion increases, if and only if the average recharge speed of the competitor’s dam exceeds a certain threshold, which is an increasing function of its average water inflows.

Keywords: asymmetric risk aversion, closed-loop Cournot competition, electricity wholesale market, hydropower dams

Procedia PDF Downloads 332
4723 Stability Evaluation on Accumulation Body of Reservoir Slope in Rumei Hydropower Station, China

Authors: Yaofei Jiang, Liangqing Wang, Yanjun Xu

Abstract:

In recent years, geological explorations have been carried out on the Rumei hydropower station, China. After preliminary analysis of results, the mainly problem of slope in reservoir area is about the stability of accumulation body. It is found that there are 23 accumulations in various sizes in the reservoir area, and most of them are unfavorable geological bodies. Three typical (No. 1, 7, 17) accumulation body slopes were selected as subjects to investigate the stability of the slopes. Take No. 1 accumulation body slope as an example and basic geological condition investigation and formation mechanism analysis were carried out to study the stability and geological analysis of engineering influence of the slope. The accumulation body in the research area distributes along the river with natural slope of 32° ~ 37° which is the natural angle of repose of gravel. The formation mechanism is analyzed based on the composition and structure of the accumulation body. The middle and lower part of the body is dense full of gravel soil mixed with a small amount of sand gravel which is stable. In the upper part, gravel soil is interbedded with bad cemented gravel which as a weak surface is not conducive to slope stability. Under the natural condition before storing water, the underground water level is deep buried, mainly distributed in the bedrock, and the surface and groundwater discharge conditions of the accumulation body are good, which is beneficial to the stability of slope. The safety coefficient calculated by the limit equilibrium method is 1.14, which indicates the slope is basically stable. However, the safety coefficient drops to 1.02 when the normal storage level is 2895m, which is in a dangerous state. The accumulation body will be destabilized by a small-area instability to large-scale or overall instability.

Keywords: accumulation body slope, stability evaluation, geological engineering investigation, effect of storing water

Procedia PDF Downloads 141
4722 Application of Homer Optimization to Investigate the Prospects of Hybrid Renewable Energy System in Rural Area: Case of Rwanda

Authors: Emile Niringiyimana, LI Ji Qing, Giovanni Dushimimana, Virginie Umwere

Abstract:

The development and utilization of renewable energy (RE) can not only effectively reduce carbon dioxide (CO2) emissions, but also became a solution to electricity shortage mitigation in rural areas. Hybrid RE systems are promising ways to provide consistent and continuous power for isolated areas. This work investigated the prospect and cost effectiveness of hybrid system complementarity between a 100kW solar PV system and a small-scale 200kW hydropower station in the South of Rwanda. In order to establish the optimal size of a RE system with adequate sizing of system components, electricity demand, solar radiation, hydrology, climate data are utilized as system input. The average daily solar radiation in Rukarara is 5.6 kWh/m2 and average wind speed is 3.5 m/s. The ideal integrated RE system, according to Homer optimization, consists of 91.21kW PV, 146kW hydropower, 12 x 24V li-ion batteries with a 20kW converter. The method of enhancing such hybrid systems control, sizing and choice of components is to reduce the Net present cost (NPC) of the system, unmet load, the cost of energy and reduction of CO2. The power consumption varies according to dominant source of energy in the system by controlling the energy compensation depending on the generation capacity of each power source. The initial investment of the RE system is $977,689.25, and its operation and maintenance expenses is $142,769.39 over a 25-year period. Although the investment is very high, the targeted profits in future are huge, taking into consideration of high investment in rural electrification structure implementations, tied with an increase of electricity cost and the 5 years payback period. The study outcomes suggest that the standalone hybrid PV-Hydropower system is feasible with zero pollution in Rukara community.

Keywords: HOMER optimization, hybrid power system, renewable energy, NPC and solar pv systems

Procedia PDF Downloads 27
4721 Creating Database and Building 3D Geological Models: A Case Study on Bac Ai Pumped Storage Hydropower Project

Authors: Nguyen Chi Quang, Nguyen Duong Tri Nguyen

Abstract:

This article is the first step to research and outline the structure of the geotechnical database in the geological survey of a power project; in the context of this report creating the database that has been carried out for the Bac Ai pumped storage hydropower project. For the purpose of providing a method of organizing and storing geological and topographic survey data and experimental results in a spatial database, the RockWorks software is used to bring optimal efficiency in the process of exploiting, using, and analyzing data in service of the design work in the power engineering consulting. Three-dimensional (3D) geotechnical models are created from the survey data: such as stratigraphy, lithology, porosity, etc. The results of the 3D geotechnical model in the case of Bac Ai pumped storage hydropower project include six closely stacked stratigraphic formations by Horizons method, whereas modeling of engineering geological parameters is performed by geostatistical methods. The accuracy and reliability assessments are tested through error statistics, empirical evaluation, and expert methods. The three-dimensional model analysis allows better visualization of volumetric calculations, excavation and backfilling of the lake area, tunneling of power pipelines, and calculation of on-site construction material reserves. In general, the application of engineering geological modeling makes the design work more intuitive and comprehensive, helping construction designers better identify and offer the most optimal design solutions for the project. The database always ensures the update and synchronization, as well as enables 3D modeling of geological and topographic data to integrate with the designed data according to the building information modeling. This is also the base platform for BIM & GIS integration.

Keywords: database, engineering geology, 3D Model, RockWorks, Bac Ai pumped storage hydropower project

Procedia PDF Downloads 134
4720 Electrolysis Ship for Green Hydrogen Production and Possible Applications

Authors: Julian David Hunt, Andreas Nascimento

Abstract:

Green hydrogen is the most environmental, renewable alternative to produce hydrogen. However, an important challenge to make hydrogen a competitive energy carrier is a constant supply of renewable energy, such as solar, wind and hydropower. Given that the electricity generation potential of these sources vary seasonally and interannually, this paper proposes installing an electrolysis hydrogen production plant in a ship and move the ship to the locations where electricity is cheap, or where the seasonal potential for renewable generation is high. An example of electrolysis ship application is to produce green hydrogen with hydropower from the North region of Brazil and then sail to the Northeast region of Brazil and generate hydrogen using excess electricity from offshore wind power. The electrolysis ship concept is interesting because it has the flexibility to produce green hydrogen using the cheapest renewable electricity available in the market.

Keywords: green hydrogen, electrolysis ship, renewable energies, seasonal variations

Procedia PDF Downloads 131
4719 Small Entrepreneurship Supporting Economic Policy in Georgia

Authors: G. Erkomaishvili

Abstract:

This paper discusses small entrepreneurship development strategy in Georgia and the tools and regulations that will encourage development of small entrepreneurship. The current situation in the small entrepreneurship sector, as well as factors affecting growth and decline in the sector and the priorities of state support, are studied and analyzed. The objective of this research is to assess the current situation of the sector to highlight opportunities and reveal the gaps. State support of small entrepreneurship should become a key priority in the country’s economic policy, as development of the sector will ensure social, economic and political stability. Based on the research, a small entrepreneurship development strategy is presented; corresponding conclusions are made and recommendations are developed.

Keywords: economic policy for small entrepreneurship development, small entrepreneurship, regulations, small entrepreneurship development strategy

Procedia PDF Downloads 446
4718 Optimal Tracking Control of a Hydroelectric Power Plant Incorporating Neural Forecasting for Uncertain Input Disturbances

Authors: Marlene Perez Villalpando, Kelly Joel Gurubel Tun

Abstract:

In this paper, we propose an optimal control strategy for a hydroelectric power plant subject to input disturbances like meteorological phenomena. The engineering characteristics of the system are described by a nonlinear model. The random availability of renewable sources is predicted by a high-order neural network trained with an extended Kalman filter, whereas the power generation is regulated by the optimal control law. The main advantage of the system is the stabilization of the amount of power generated in the plant. A control supervisor maintains stability and availability in hydropower reservoirs water levels for power generation. The proposed approach demonstrated a good performance to stabilize the reservoir level and the power generation along their desired trajectories in the presence of disturbances.

Keywords: hydropower, high order neural network, Kalman filter, optimal control

Procedia PDF Downloads 268
4717 Offline High Voltage Diagnostic Test Findings on 15MVA Generator of Basochhu Hydropower Plant

Authors: Suprit Pradhan, Tshering Yangzom

Abstract:

Even with availability of the modern day online insulation diagnostic technologies like partial discharge monitoring, the measurements like Dissipation Factor (tanδ), DC High Voltage Insulation Currents, Polarization Index (PI) and Insulation Resistance Measurements are still widely used as a diagnostic tools to assess the condition of stator insulation in hydro power plants. To evaluate the condition of stator winding insulation in one of the generators that have been operated since 1999, diagnostic tests were performed on the stator bars of 15 MVA generators of Basochhu Hydropower Plant. This paper presents diagnostic study done on the data gathered from the measurements which were performed in 2015 and 2016 as part of regular maintenance as since its commissioning no proper aging data were maintained. Measurement results of Dissipation Factor, DC High Potential tests and Polarization Index are discussed with regard to their effectiveness in assessing the ageing condition of the stator insulation. After a brief review of the theoretical background, the strengths of each diagnostic method in detecting symptoms of insulation deterioration are identified. The interesting results observed from Basochhu Hydropower Plant is taken into consideration to conclude that Polarization Index and DC High Voltage Insulation current measurements are best suited for the detection of humidity and contamination problems and Dissipation Factor measurement is a robust indicator of long-term ageing caused by oxidative degradation.

Keywords: dissipation Factor (tanδ), polarization Index (PI), DC High Voltage Insulation Current, insulation resistance (IR), Tan Delta Tip-Up, dielectric absorption ratio

Procedia PDF Downloads 271
4716 Familiarity with Flood and Engineering Solutions to Control It

Authors: Hamid Fallah

Abstract:

Undoubtedly, flood is known as a natural disaster, and in practice, flood is considered the most terrible natural disaster in the world both in terms of loss of life and financial losses. From 1988 to 1997, about 390,000 people were killed by natural disasters in the world, 58% of which were related to floods, 26% due to earthquakes, and 16% due to storms and other disasters. The total damages in these 10 years were about 700 billion dollars, which were 33, 29, 28% related to floods, storms and earthquakes, respectively. In this regard, the worrisome point has been the increasing trend of flood deaths and damages in the world in recent decades. The increase in population and assets in flood plains, changes in hydro systems and the destructive effects of human activities have been the main reasons for this increase. During rain and snow, some of the water is absorbed by the soil and plants. A percentage evaporates and the rest flows and is called runoff. Floods occur when the soil and plants cannot absorb the rainfall, and as a result, the natural river channel does not have the capacity to pass the generated runoff. On average, almost 30% of precipitation is converted into runoff, which increases with snow melting. Floods that occur differently create an area called flood plain around the river. River floods are often caused by heavy rains, which in some cases are accompanied by snow melt. A flood that flows in a river without warning or with little warning is called a flash flood. The casualties of these rapid floods that occur in small watersheds are generally more than the casualties of large river floods. Coastal areas are also subject to flooding caused by waves caused by strong storms on the surface of the oceans or waves caused by underground earthquakes. Floods not only cause damage to property and endanger the lives of humans and animals, but also leave other effects. Runoff caused by heavy rains causes soil erosion in the upstream and sedimentation problems in the downstream. The habitats of fish and other animals are often destroyed by floods. The high speed of the current increases the damage. Long-term floods stop traffic and prevent drainage and economic use of land. The supports of bridges, river banks, sewage outlets and other structures are damaged, and there is a disruption in shipping and hydropower generation. The economic losses of floods in the world are estimated at tens of billions of dollars annually.

Keywords: flood, hydrological engineering, gis, dam, small hydropower, suitablity

Procedia PDF Downloads 34
4715 In Support of Sustainable Water Resources Development in the Lower Mekong River Basin: Development of Guidelines for Transboundary Environmental Impact Assessment

Authors: Kongmeng Ly

Abstract:

The management of transboundary river basins across developing countries, such as the Lower Mekong River Basin (LMB), is frequently challenging given the development and conservation divergences of the basin countries. Driven by needs to sustain economic performance and reduce poverty, the LMB countries (Cambodia, Lao PDR, Thailand, Viet Nam) are embarking on significant land use changes in the form hydropower dam, to fulfill their energy requirements. This pathway could lead to irreversible changes to the ecosystem of the Mekong River, if not properly managed. Given the uncertain trade-offs of hydropower development and operation, the Lower Mekong River Basin Countries through the technical support of the Mekong River Commission (MRC) Secretariat embarked on decade long the development of Technical Guidelines for Transboundary Environmental Impact Assessment. Through a series of workshops, seminars, national and regional consultations, and pilot studies and further development following the recommendations generated through legal and institutional reviews undertaken over two decades period, the LMB Countries jointly adopted the MRC Technical Guidelines for Transboundary Environmental Impact Assessment (TbEIA Guidelines). These guidelines were developed with particular regard to the experience gained from MRC supported consultations and technical reviews of the Xayaburi Dam Project, Don Sahong Hydropower Project, Pak Beng Hydropower Project, and lessons learned from the Srepok River and Se San River case studies commissioned by the MRC under the generous supports of development partners around the globe. As adopted, the TbEIA Guidelines have been designed as a supporting mechanism to the national EIA legislation, processes and systems in each Member Country. In recognition of the already agreed mechanisms, the TbEIA Guidelines build on and supplement the agreements stipulated in the 1995 Agreement on the Cooperation for the Sustainable Development of the Mekong River Basin and its Procedural Rules, in addressing potential transboundary environmental impacts of development projects and ensuring mutual benefits from the Mekong River and its resources. Since its adoption in 2022, the TbEIA Guidelines have already been voluntary implemented by Lao PDR on its underdevelopment Sekong A Downstream Hydropower Project, located on the Sekong River – a major tributary of the Mekong River. While this implementation is ongoing with results expected in early 2024, the implementation thus far has strengthened cooperation among concerned Member Countries with multiple successful open dialogues organized at national and regional levels. It is hope that lessons learnt from this application would lead to a wider application of the TbEIA Guidelines for future water resources development projects in the LMB.

Keywords: transboundary, EIA, lower mekong river basin, mekong river

Procedia PDF Downloads 8
4714 Wireless Backhauling for 5G Small Cell Networks

Authors: Abdullah A. Al Orainy

Abstract:

Small cell backhaul solutions need to be cost-effective, scalable, and easy to install. This paper presents an overview of small cell backhaul technologies. Wireless solutions including TV white space, satellite, sub-6 GHz radio wave, microwave and mmWave with their backhaul characteristics are discussed. Recent research on issues like beamforming, backhaul architecture, precoding and large antenna arrays, and energy efficiency for dense small cell backhaul with mmWave communications is reviewed. Recent trials of 5G technologies are summarized.

Keywords: backhaul, small cells, wireless, 5G

Procedia PDF Downloads 466
4713 Changing the Dynamics of the Regional Water Security in the Mekong River Basin: An Explorative Study Understanding the Cooperation and Conflict from Critical Hydropolitical Perspective

Authors: Richard Grünwald, Wenling Wang, Yan Feng

Abstract:

The presented paper explores the changing dynamics of regional water security in the Mekong River Basin and examines the contemporary water-related challenges from a critical hydropolitical perspective. By drawing on the Lancang-Mekong Cooperation and Conflict Database (LMCCD) recording more than 3000 water-related events within the basin in the last 30 years, we identified several trends changing the dynamics of the regional water security in the Mekong River Basin. Firstly, there is growing politicization of water that is no longer interpreted as abundant. While some scientists blame the rapid basin development, particularly in upstream countries, other researchers consider climate change and cumulative environmental impacts of various water projects as the main culprit for changing the water flow. Secondly, there is an increasing securitization of large-scale hydropower dams with questionable outcomes. Despite hydropower dams raise many controversies, many riparian states push the development at all cost. Such water security dilemma can be especially traced to Laos and Cambodia, which highly invest in the hydropower sector even at the expense of the local environment and good relations with neighbouring countries situated lower on the river. Thirdly, there is a lack of accountable transboundary water governance that will effectively face a looming water crisis. To date, most of the existing cooperation mechanisms are undermined by the geopolitical interests of foreign donors and increasing mistrust to scientific approaches dealing with water insecurity. Our findings are beneficial for the policy-makers and other water experts who want to grasp the broader hydropolitical context in the Mekong River Basin and better understand the new water security threats, including misinterpretation of the hydrological data and legitimization of the pro-development narratives.

Keywords: critical hydropolitics, mekong river, politicization of science, water governance, water security

Procedia PDF Downloads 178