Search results for: final tender sum
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 2340

Search results for: final tender sum

2340 The Principles of Clarifications during the Phase of Tender Preparation in a Public Procurement Procedure

Authors: Adelina Vrancianu

Abstract:

A public procurement procedure starts with the publication of the contract notice and the tender documentation. The documentation provides bidders with general guidelines and rules governing the tender process. At this stage, the interested economic operators start to prepare their bid. During this process, they may encounter unclear elements that, if are not clarified, may have a negative impact on the future bid with the ultimate sanction of exclusion. Until the opening of the bids, the potential bidders have the right to ask questions in order to clarify certain aspects of the tender documentation. In correlation, the contracting authorities have the obligation to answer these questions in a reasoned time and with clarity. In practice, the two conditions are not met due to a number of factors. This essay tries to outline the general principles regarding the clarifications during the phase of tender preparation. The provisions of the new directive on public procurement will be taken in consideration in this process in regard to the old directive.

Keywords: tender preparation, tender documentation, clarifications, contract notice

Procedia PDF Downloads 270
2339 A Process for Prevention of Browning in Fresh Cut Tender Jackfruit

Authors: Ramachandra Pradhan, Sandeep Singh Rama, Sabyasachi Mishra

Abstract:

Jackfruit (Artocarpus heterophyllus L.) in its tender form is consumed as a vegetable and popular for its flavour, colour and meat like texture. In South Asian countries like Bangladesh, India, Pakistan and Indonesia the market value for tender jackfruit is very high. However, due to lack of technology the marketing and transportation of the fruit is a challenge. The processing activities like washing, sorting, peeling and cutting enhances oxidative stress in fresh cut jackfruit. It is also having the ill effects on quality of fresh cut tender jackfruit by an increase in microbial contaminations, excessive tissue softening, and depletion of phytochemicals and browning. Hence, this study was conducted as a solution to the above problem. Fresh cut tender Jackfruit slices were processed by using the independent parameters such as concentration of CaCl2 (2-5%), concentration of citric acid (1-2.5%) and treatment time (4-10 min.) and the depended variables were Browning index (BI), colour change (ΔE), Firmness (F) and Overall all acceptability (OAA) after the treatment. From the response variables the best combination of independent variables was resulted as 3% concentration of CaCl2 and 2% concentration of citric acid for 6 minutes. At these optimised processing treatments, the browning can be prevented for fresh cut tender jackfruit. This technology can be used by the researcher, scientists, industries, etc. for further processing of tender jackfruit.

Keywords: tender jackfruit, browning index, firmness, texture

Procedia PDF Downloads 230
2338 Analyzing the Oil and Gas Exploration Opportunities in Poland: Five Prospective Areas Selected and Dedicated to the Tender

Authors: Krystian Wójcik, Sara Wróblewska, Marcin Łojek, Katarzyna Sobień

Abstract:

Polish Geological Survey selected five of the most prospective areas for oil and gas exploration in Poland. They are dedicated to the 6th international tender round for hydrocarbon concessions, planned in 2022. The main exploration target of these areas is related to conventional and unconventional accumulations of gas and oil in the Carpathian basement, Carpathian Foredeep and Outer Carpathians (Block 413 – 414), as well as in the Carboniferous, Rotliegend, Main Dolomite (Block 208, Cybinka – Torzym, Zielona Góra West), and in the Mesozoic of the Polish Lowlands (Koło).

Keywords: concession policy, international tender, oil and gas exploration horizons, prospective areas

Procedia PDF Downloads 172
2337 Barriers to Competitive Tenders in Building Conservation Works

Authors: Yoke-Mui Lim, Yahaya Ahmad

Abstract:

Conservation works in Malaysia that is procured by public organisation usually follow the traditional approach where the works are tendered based on Bills of Quantities (BQ). One of the purposes of tendering is to enable the selection of a competent contractor that offers a competitive price. While competency of the contractors are assessed by their technical knowledge, experience and track records, the assessment of pricing will be dependent on the tender amount. However, the issue currently faced by the conservation works sector is the difficulty in assessing the competitiveness and reasonableness of the tender amount due to the high variance between the tenders amount. Thus, this paper discusses the factors that cause difficulty to the tenderers in pricing competitively in a bidding exercise for conservation tenders. Data on tendering is collected from interviews with conservation works contractors to gain in-depth understanding of the barriers faced in pricing tenders of conservation works. Findings from the study lent support to the contention that the variance of tender amount is very high amongst tenderers. The factors identified in the survey are the format of BQ, hidden works, experience and labour and material costs.

Keywords: building conservation, Malaysia, bill of quantities, tender

Procedia PDF Downloads 343
2336 Achieving Design-Stage Elemental Cost Planning Accuracy: Case Study of New Zealand

Authors: Johnson Adafin, James O. B. Rotimi, Suzanne Wilkinson, Abimbola O. Windapo

Abstract:

An aspect of client expenditure management that requires attention is the level of accuracy achievable in design-stage elemental cost planning. This has been a major concern for construction clients and practitioners in New Zealand (NZ). Pre-tender estimating inaccuracies are significantly influenced by the level of risk information available to estimators. Proper cost planning activities should ensure the production of a project’s likely construction costs (initial and final), and subsequent cost control activities should prevent unpleasant consequences of cost overruns, disputes and project abandonment. If risks were properly identified and priced at the design stage, observed variance between design-stage elemental cost plans (ECPs) and final tender sums (FTS) (initial contract sums) could be reduced. This study investigates the variations between design-stage ECPs and FTS of construction projects, with a view to identifying risk factors that are responsible for the observed variance. Data were sourced through interviews, and risk factors were identified by using thematic analysis. Access was obtained to project files from the records of study participants (consultant quantity surveyors), and document analysis was employed in complementing the responses from the interviews. Study findings revealed the discrepancies between ECPs and FTS in the region of -14% and +16%. It is opined in this study that the identified risk factors were responsible for the variability observed. The values obtained from the analysis would enable greater accuracy in the forecast of FTS by Quantity Surveyors. Further, whilst inherent risks in construction project developments are observed globally, these findings have important ramifications for construction projects by expanding existing knowledge on what is needed for reasonable budgetary performance and successful delivery of construction projects. The findings contribute significantly to the study by providing quantitative confirmation to justify the theoretical conclusions generated in the literature from around the world. This therefore adds to and consolidates existing knowledge.

Keywords: accuracy, design-stage, elemental cost plan, final tender sum

Procedia PDF Downloads 232
2335 Development of Non-frozen Vegan Burger Patty Using Tender Jackfruit (Artocarpus Heterophyllus) as a Meat Substitute: Evaluation of Textural, Physico-Chemical, and Sensory Characteristics

Authors: O. D. A. N. Perera, H. G. Wanigasinghe

Abstract:

Tender jackfruit is an underutilized biomass, which still has a good consumer demand. Valorization of this ingredient into meat analog would obtain greater consumer acceptance due to concerns about health, the environment, and living sustainably of mankind have increased significantly in this decade, opening the market for meat substitutes. The objective of this research was to create a plant-based meat substitute with a structure similar to meat products. In this study, three different combinations of tender jackfruit were used to create vegan burger patties, which were then examined for their textural, physico-chemical, and sensory qualities. The developed burger patties have been compared with store-bought chicken patties. The developed vegan burger patties P1, P2, and P3 had a comparable flavor preference to the control and demonstrated considerable general acceptability (p >.05). P3 has a high quantity of protein (17.10 ± 0.02%) and fiber (6.40 ± 0.06%). At the same time, the vegan burger patty resulted in less fat, high fiber, and high protein which meets the vegan consumer requirements.

Keywords: underutilized, high fibre, soya protein isolate, cooking yield

Procedia PDF Downloads 29
2334 Tender Systems and Processes within the Mauritian Construction Industry: Investigating the Predominance of International Firms and the Lack of Absorptive Capacity in Local Firms

Authors: K. Appasamy, P. Paul

Abstract:

Mauritius, a developing small-island-state, is facing a recession which is having a considerable economic impact particularly on its construction sector. Further, the presence of foreign entities, both as companies and workers, within this sector is creating a very competitive environment for local firms. This study investigates the key drivers that allow foreign firms to participate in this sector, in particular looking at the international and local tender processes, and the capacity of local industry to participate. This study also looks at how the current set up may hinder the latter’s involvement. The methodology used included qualitative semi-structured interviews conducted with established foreign companies, local companies, and public bodies. Study findings indicate: there is an adequate availability of professional skills and expertise within the Mauritian construction industry but a lack of skilled labour especially at the operative level; projects awarded to foreign firms are either due to their uniqueness and hence lack of local knowledge, or due to foreign firms having lower tender bids; tendering systems and processes are weak, including monitoring and enforcement, which encourages corruption and favouritism; a high level of ignorance of this sector’s characteristics and opportunities exists amongst the local population; local entities are very profit oriented and have short term strategies that discourage long term investment in workforce training and development; but most importantly, stakeholders do not grasp the importance of encouraging youngsters to join this sector, they have no long term vision, and there is a lack of mutual involvement and collaboration between them. Although local industry is highly competent, qualified and experienced, the tendering and procurement systems in Mauritius are not conducive enough to allow for effective strategic planning and an equitable allocation of projects during an economic downturn so that the broadest spread of stakeholders’ benefit. It is of utmost importance that all sector and government entities collaborate to formulate strategies and reforms on tender processes and capacity building to ensure fairness and continuous growth of this sector in Mauritius.

Keywords: construction industry, tender process, international firms, local capacity, Mauritius

Procedia PDF Downloads 291
2333 Developing a Web-Based Tender Evaluation System Based on Fuzzy Multi-Attributes Group Decision Making for Nigerian Public Sector Tendering

Authors: Bello Abdullahi, Yahaya M. Ibrahim, Ahmed D. Ibrahim, Kabir Bala

Abstract:

Public sector tendering has traditionally been conducted using manual paper-based processes which are known to be inefficient, less transparent and more prone to manipulations and errors. The advent of the Internet and the World Wide Web has led to the development of numerous e-Tendering systems that addressed some of the problems associated with the manual paper-based tendering system. However, most of these systems rarely support the evaluation of tenders and where they do it is mostly based on the single decision maker which is not suitable in public sector tendering, where for the sake of objectivity, transparency, and fairness, it is required that the evaluation is conducted through a tender evaluation committee. Currently, in Nigeria, the public tendering process in general and the evaluation of tenders, in particular, are largely conducted using manual paper-based processes. Automating these manual-based processes to digital-based processes can help in enhancing the proficiency of public sector tendering in Nigeria. This paper is part of a larger study to develop an electronic tendering system that supports the whole tendering lifecycle based on Nigerian procurement law. Specifically, this paper presents the design and implementation of part of the system that supports group evaluation of tenders based on a technique called fuzzy multi-attributes group decision making. The system was developed using Object-Oriented methodologies and Unified Modelling Language and hypothetically applied in the evaluation of technical and financial proposals submitted by bidders. The system was validated by professionals with extensive experiences in public sector procurement. The results of the validation showed that the system called NPS-eTender has an average rating of 74% with respect to correct and accurate modelling of the existing manual tendering domain and an average rating of 67.6% with respect to its potential to enhance the proficiency of public sector tendering in Nigeria. Thus, based on the results of the validation, the automation of the evaluation process to support tender evaluation committee is achievable and can lead to a more proficient public sector tendering system.

Keywords: e-Tendering, e-Procurement, group decision making, tender evaluation, tender evaluation committee, UML, object-oriented methodologies, system development

Procedia PDF Downloads 232
2332 Flexible Development and Calculation of Contract Logistics Services

Authors: T. Spiegel, J. Siegmann, C. F. Durach

Abstract:

Challenges resulting from an international and dynamic business environment are increasingly being passed on from manufacturing companies to external service providers. Especially providers of complex, customer-specific industry services have to cope with continuously changing requirements. This is particularly true for contract logistics service providers. They are forced to develop efficient and highly flexible structures and strategies to meet their customer’s needs. One core element they have to focus on is the reorganization of their service development and sales process. Based on an action research approach, this study develops and tests a concept to streamline tender management for contract logistics service providers. The concept of modularized service architecture is deployed in order to derive a practice-oriented approach for the modularization of complex service portfolios and the design of customized quotes. These findings are evaluated regarding their applicability in other service sectors and practical recommendations are given.

Keywords: contract logistics, modularization, service development, tender management

Procedia PDF Downloads 385
2331 Improvement to Pedestrian Walkway Facilities to Enhance Pedestrian Safety-Initiatives in India

Authors: Basavaraj Kabade, K. T. Nagaraja, Swathi Ramanathan, A. Veeraragavan, P. S. Reashma

Abstract:

Deteriorating quality of the pedestrian environment and the increasing risk of pedestrian crashes are major concerns for most of the cities in India. The recent shift in the priority to motorized transport and the abating condition of existing pedestrian facilities can be considered as prime reasons for the increasing pedestrian related crashes in India. Bengaluru City – the IT capital hub of the nation is not much different from this. The increase in number of pedestrian crashes in Bengaluru reflects the same. To resolve this issue and to ensure safe, sustainable and pedestrian friendly sidewalks, Govt. of Karnataka, India has implemented newfangled pedestrian sidewalks popularized programme named Tender S.U.R.E. (Specifications for Urban Road Execution) projects. Tender SURE adopts unique urban street design guidelines where the pedestrians are given prime preference. The present study presents an assessment of the quality and performance of the pedestrian side walk and the walkability index of the newly built pedestrian friendly sidewalks. Various physical and environmental factors affecting pedestrian safety are identified and studied in detail. The pedestrian mobility is quantified through Pedestrian Level of Service (PLoS) and the pedestrian walking comfort is measured by calculating the Walkability Index (WI). It is observed that the new initiatives taken in reference to improving pedestrian safety have succeeded in Bengaluru by attaining a level of Service of ‘A’ and with a good WI score.

Keywords: pedestrian safety, pedestrian level of service (PLoS), Right of Way (RoW), Tender S.U.R.E (Specifications for Urban Road Execution), walkability index (WI), walkway facilities

Procedia PDF Downloads 156
2330 Improving Detection of Illegitimate Scores and Assessment in Most Advantageous Tenders

Authors: Hao-Hsi Tseng, Hsin-Yun Lee

Abstract:

The Most Advantageous Tender (MAT) has been criticized for its susceptibility to dictatorial situations and for its processing of same score, same rank issues. This study applies the four criteria from Arrow's Impossibility Theorem to construct a mechanism for revealing illegitimate scores in scoring methods. While commonly be used to improve on problems resulting from extreme scores, ranking methods hide significant defects, adversely affecting selection fairness. To address these shortcomings, this study relies mainly on the overall evaluated score method, using standardized scores plus normal cumulative distribution function conversion to calculate the evaluation of vender preference. This allows for free score evaluations, which reduces the influence of dictatorial behavior and avoiding same score, same rank issues. Large-scale simulations confirm that this method outperforms currently used methods using the Impossibility Theorem.

Keywords: Arrow’s impossibility theorem, cumulative normal distribution function, most advantageous tender, scoring method

Procedia PDF Downloads 433
2329 Seasonal Variation in Free Radical Scavenging Properties of Indian Moringa (Moringa Oleifera)

Authors: Awadhesh Kishore, Tushar Sharma

Abstract:

The goal of this study was to compare the free radical-scavenging (FRS) characteristics of four Indian moringa (Moringa oleifera) plant components: flowers, tender and mature leaves, and seeds that were collected from three Indian districts: Jaipur, Dehra Dun, and Gwalior; in every month of 2021–2022. The samples were collected from three randomly selected agroforest locations from each district. The samples were extracted, and antioxidant properties were determined following the DPPH method with minor modifications. The FRS properties were calculated as the non-absorbance values of the sample in percentage. The factorial ANOVA statistical analysis technique was implemented for comparing FRS properties, and an MS Office Excel 2016 analysis pack was used to compare data. The flowers from Dehra Dun had superior FRS properties (27.06±1.03%), while the seeds from the same location were inferior (8.64±0.17%). The FRS properties of flowers (26.27±0.61%) were not statistically different (P > 0.05) compared to those of tender (27.30±0.63%) and mature leaves (28.37±0.59%), but significantly higher (P < 0.05) than those of seeds (9.31±0.16%). However, the FRS properties in Indian moringa were significantly higher during the winter (Jan 28.67±1.48%) compared to that in the summer (Jun 14.03±0.79%) season, but collected from three locations, viz. Gwalior (22.35±0.70%), Jaipur (23.06±0.73%), and Dehra Dun (23.10±0.76%), were not significantly different (P > 0.05). Based on this study, it can be concluded that the FRS value of flowers during the winter season is superior.

Keywords: flowers, free radical-scavenging, leaves, moringa oleifera, seeds

Procedia PDF Downloads 27
2328 Smart BIM Documents - the Development of the Ontology-Based Tool for Employer Information Requirements (OntEIR), and its Transformation into SmartEIR

Authors: Shadan Dwairi

Abstract:

Defining proper requirements is one of the key factors for a successful construction projects. Although there have been many attempts put forward in assist in identifying requirements, but still this area is under developed. In Buildings Information Modelling (BIM) projects. The Employer Information Requirements (EIR) is the fundamental requirements document and a necessary ingredient in achieving a successful BIM project. The provision on full and clear EIR is essential to achieving BIM Level-2. As Defined by PAS 1192-2, EIR is a “pre-tender document that sets out the information to be delivered and the standards and processes to be adopted by the supplier as part of the project delivery process”. It also notes that “EIR should be incorporated into tender documentation to enable suppliers to produce an initial BIM Execution Plan (BEP)”. The importance of effective definition of EIR lies in its contribution to a better productivity during the construction process in terms of cost and time, in addition to improving the quality of the built asset. Proper and clear information is a key aspect of the EIR, in terms of the information it contains and more importantly the information the client receives at the end of the project that will enable the effective management and operation of the asset, where typically about 60%-80% of the cost is spent. This paper reports on the research done in developing the Ontology-based tool for Employer Information Requirements (OntEIR). OntEIR has proven the ability to produce a full and complete set of EIRs, which ensures that the clients’ information needs for the final model delivered by BIM is clearly defined from the beginning of the process. It also reports on the work being done into transforming OntEIR into a smart tool for Defining Employer Information Requirements (smartEIR). smartEIR transforms the OntEIR tool into enabling it to develop custom EIR- tailored for the: Project Type, Project Requirements, and the Client Capabilities. The initial idea behind smartEIR is moving away from the notion “One EIR fits All”. smartEIR utilizes the links made in OntEIR and creating a 3D matrix that transforms it into a smart tool. The OntEIR tool is based on the OntEIR framework that utilizes both Ontology and the Decomposition of Goals to elicit and extract the complete set of requirements needed for a full and comprehensive EIR. A new ctaegorisation system for requirements is also introduced in the framework and tool, which facilitates the understanding and enhances the clarification of the requirements especially for novice clients. Findings of the evaluation of the tool that was done with experts in the industry, showed that the OntEIR tool contributes towards effective and efficient development of EIRs that provide a better understanding of the information requirements as requested by BIM, and support the production of a complete BIM Execution Plan (BEP) and a Master Information Delivery Plan (MIDP).

Keywords: building information modelling, employer information requirements, ontology, web-based, tool

Procedia PDF Downloads 99
2327 Government Final Consumption Expenditure and Household Consumption Expenditure NPISHS in Nigeria

Authors: Usman A. Usman

Abstract:

Undeniably, unlike the Classical side, the Keynesian perspective of the aggregate demand side indeed has a significant position in the policy, growth, and welfare of Nigeria due to government involvement and ineffective demand of the population living with poor per capita income. This study seeks to investigate the effect of Government Final Consumption Expenditure, Financial Deepening on Households, and NPISHs Final consumption expenditure using data on Nigeria from 1981 to 2019. This study employed the ADF stationarity test, Johansen Cointegration test, and Vector Error Correction Model. The results of the study revealed that the coefficient of Government final consumption expenditure has a positive effect on household consumption expenditure in the long run. There is a long-run and short-run relationship between gross fixed capital formation and household consumption expenditure. The coefficients cpsgdp (financial deepening and gross fixed capital formation posit a negative impact on household final consumption expenditure. The coefficients money supply lm2gdp, which is another proxy for financial deepening, and the coefficient FDI have a positive effect on household final consumption expenditure in the long run. Therefore, this study recommends that Gross fixed capital formation stimulates household consumption expenditure; a legal framework to support investment is a panacea to increasing hoodmold income and consumption and reducing poverty in Nigeria. Therefore, this should be a key central component of policy.

Keywords: government final consumption expenditure, household consumption expenditure, vector error correction model, cointegration

Procedia PDF Downloads 17
2326 Enabling Participation of Deaf People in the Co-Production of Services: An Example in Service Design, Commissioning and Delivery in a London Borough

Authors: Stephen Bahooshy

Abstract:

Co-producing services with the people that access them is considered best practice in the United Kingdom, with the Care Act 2014 arguing that people who access services and their carers should be involved in the design, commissioning and delivery of services. Co-production is a way of working with the community, breaking down barriers of access and providing meaningful opportunity for people to engage. Unfortunately, owing to a number of reported factors such as time constraints, practitioner experience and departmental budget restraints, this process is not always followed. In 2019, in a south London borough, d/Deaf people who access services were engaged in the design, commissioning and delivery of an information and advice service that would support their community to access local government services. To do this, sensory impairment social workers and commissioners collaborated to host a series of engagement events with the d/Deaf community. Interpreters were used to enable communication between the commissioners and d/Deaf participants. Initially, the community’s opinions, ideas and requirements were noted. This was then summarized and fed back to the community to ensure accuracy. Subsequently, a service specification was developed which included performance metrics, inclusive of qualitative and quantitative indicators, such as ‘I statements’, whereby participants respond on an adapted Likert scale how much they agree or disagree with a particular statement in relation to their experience of the service. The service specification was reviewed by a smaller group of d/Deaf residents and social workers, to ensure that it met the community’s requirements. The service was then tendered using the local authority’s e-tender process. Bids were evaluated and scored in two parts; part one was by commissioners and social workers and part two was a presentation by prospective providers to an evaluation panel formed of four d/Deaf residents. The internal evaluation panel formed 75% of the overall score, whilst the d/Deaf resident evaluation panel formed 25% of the overall tender score. Co-producing the evaluation panel with social workers and the d/Deaf community meant that commissioners were able to meet the requirements of this community by developing evaluation questions and tools that were easily understood and use by this community. For example, the wording of questions were reviewed and the scoring mechanism consisted of three faces to reflect the d/Deaf residents’ scores instead of traditional numbering. These faces were a happy face, a neutral face and a sad face. By making simple changes to the commissioning and tender evaluation process, d/Deaf people were able to have meaningful involvement in the design and commissioning process for a service that would benefit their community. Co-produced performance metrics means that it is incumbent on the successful provider to continue to engage with people accessing the service and ensure that the feedback is utilized. d/Deaf residents were grateful to have been involved in this process as this was not an opportunity that they had previously been afforded. In recognition of their time, each d/Deaf resident evaluator received a £40 gift voucher, bringing the total cost of this co-production to £160.

Keywords: co-production, community engagement, deaf and hearing impaired, service design

Procedia PDF Downloads 237
2325 Evaluation of the Self-Efficacy and Learning Experiences of Final year Students of Computer Science of Southwest Nigerian Universities

Authors: Olabamiji J. Onifade, Peter O. Ajayi, Paul O. Jegede

Abstract:

This study aimed at investigating the preparedness of the undergraduate final year students of Computer Science as the next entrants into the workplace. It assessed their self-efficacy in computational tasks and examined the relationship between their self-efficacy and their learning experiences in Southwest Nigerian universities. The study employed a descriptive survey research design. The population of the study comprises all the final year students of Computer Science. A purposive sampling technique was adopted in selecting a representative sample of interest from the final year students of Computer Science. The Students’ Computational Task Self-Efficacy Questionnaire (SCTSEQ) was used to collect data. Mean, standard deviation, frequency, percentages, and linear regression were used for data analysis. The result obtained revealed that the final year students of Computer Science were averagely confident in performing computational tasks, and there is a significant relationship between the learning experiences of the students and their self-efficacy. The study recommends that the curriculum be improved upon to accommodate industry experts as lecturers in some of the courses, make provision for more practical sessions, and the learning experiences of the student be considered an important component in the undergraduate Computer Science curriculum development process.

Keywords: computer science, learning experiences, self-efficacy, students

Procedia PDF Downloads 110
2324 Effects of Analogy Method on Children's Learning: Practice of Rainbow Experiments

Authors: Hediye Saglam

Abstract:

This research has been carried out to bring in the 6 acquisitions in the 2014 Preschool Teaching Programme of the Turkish Ministry of Education through the method of analogy. This research is practiced based on the experimental pattern with pre-test and final test controlling groups. The working group of the study covers the group between 5-6 ages. The study takes 5 weeks including the 2 weeks spent for pre-test and the final test. It is conducted with the preschool teacher who gives the lesson along with the researcher in the in-class and out-of-class rainbow experiments of the students for 5 weeks. 'One Sample T Test' is used for the evaluation of the pre-test and final test. SPSS 17 programme is applied for the analysis of the data. Results: As an outcome of the study it is observed that analogy method affects children’s learning of the rainbow. For this very reason teachers should receive inservice training for different methods and techniques like analogy. This method should be included in preschool education programme and should be applied by teachers more often.

Keywords: acquisitions of preschool education programme, analogy method, pre-test/final test, rainbow experiments

Procedia PDF Downloads 468
2323 Empirical Study of Correlation between the Cost Performance Index Stability and the Project Cost Forecast Accuracy in Construction Projects

Authors: Amin AminiKhafri, James M. Dawson-Edwards, Ryan M. Simpson, Simaan M. AbouRizk

Abstract:

Earned value management (EVM) has been introduced as an integrated method to combine schedule, budget, and work breakdown structure (WBS). EVM provides various indices to demonstrate project performance including the cost performance index (CPI). CPI is also used to forecast final project cost at completion based on the cost performance during the project execution. Knowing the final project cost during execution can initiate corrective actions, which can enhance project outputs. CPI, however, is not constant during the project, and calculating the final project cost using a variable index is an inaccurate and challenging task for practitioners. Since CPI is based on the cumulative progress values and because of the learning curve effect, CPI variation dampens and stabilizes as project progress. Although various definitions for the CPI stability have been proposed in literature, many scholars have agreed upon the definition that considers a project as stable if the CPI at 20% completion varies less than 0.1 from the final CPI. While 20% completion point is recognized as the stability point for military development projects, construction projects stability have not been studied. In the current study, an empirical study was first conducted using construction project data to determine the stability point for construction projects. Early findings have demonstrated that a majority of construction projects stabilize towards completion (i.e., after 70% completion point). To investigate the effect of CPI stability on cost forecast accuracy, the correlation between CPI stability and project cost at completion forecast accuracy was also investigated. It was determined that as projects progress closer towards completion, variation of the CPI decreases and final project cost forecast accuracy increases. Most projects were found to have 90% accuracy in the final cost forecast at 70% completion point, which is inlined with findings from the CPI stability findings. It can be concluded that early stabilization of the project CPI results in more accurate cost at completion forecasts.

Keywords: cost performance index, earned value management, empirical study, final project cost

Procedia PDF Downloads 127
2322 Government Final Consumption Expenditure Financial Deepening and Household Consumption Expenditure NPISHs in Nigeria

Authors: Usman A. Usman

Abstract:

Undeniably, unlike the Classical side, the Keynesian perspective of the aggregate demand side indeed has a significant position in the policy, growth, and welfare of Nigeria due to government involvement and ineffective demand of the population living with poor per capita income. This study seeks to investigate the effect of Government Final Consumption Expenditure, Financial Deepening on Households, and NPISHs Final consumption expenditure using data on Nigeria from 1981 to 2019. This study employed the ADF stationarity test, Johansen Cointegration test, and Vector Error Correction Model. The results of the study revealed that the coefficient of Government final consumption expenditure has a positive effect on household consumption expenditure in the long run. There is a long-run and short-run relationship between gross fixed capital formation and household consumption expenditure. The coefficients cpsgdp financial deepening and gross fixed capital formation posit a negative impact on household final consumption expenditure. The coefficients money supply lm2gdp, which is another proxy for financial deepening, and the coefficient FDI have a positive effect on household final consumption expenditure in the long run. Therefore, this study recommends that Gross fixed capital formation stimulates household consumption expenditure; a legal framework to support investment is a panacea to increasing hoodmold income and consumption and reducing poverty in Nigeria. Therefore, this should be a key central component of policy.

Keywords: household, government expenditures, vector error correction model, johansen test

Procedia PDF Downloads 22
2321 Learning Model Applied to Cope with Professional Knowledge Gaps in Final Project of Information System Students

Authors: Ilana Lavy, Rami Rashkovits

Abstract:

In this study, we describe Information Systems students' learning model which was applied by students in order to cope with professional knowledge gaps in the context of their final project. The students needed to implement a software system according to specifications and design they have made beforehand. They had to select certain technologies and use them. Most of them decided to use programming environments that were learned during their academic studies. The students had to cope with various levels of knowledge gaps. For that matter they used learning strategies that were organized by us as a learning model which includes two phases each suitable for different learning tasks. We analyze the learning model, describing advantages and shortcomings as perceived by the students, and provide excerpts to support our findings.

Keywords: knowledge gaps, independent learner skills, self-regulated learning, final project

Procedia PDF Downloads 445
2320 Influence of Densification Process and Material Properties on Final Briquettes Quality from FastGrowing Willows

Authors: Peter Križan, Juraj Beniak, Ľubomír Šooš, Miloš Matúš

Abstract:

Biomass treatment through densification is very suitable and important technology before its effective energy recovery. Densification process of biomass is significantly influenced by various technological and also material parameters which are ultimately reflected on the final solid Biofuels quality. The paper deals with the experimental research of the relationship between technological and material parameters during densification of fast-growing trees, roundly fast-rowing willow. The main goal of presented experimental research is to determine the relationship between pressing pressure raw material fraction size from a final briquettes density point of view. Experimental research was realized by single-axis densification. The impact of fraction size with interaction of pressing pressure and stabilization time on the quality properties of briquettes was determined. These parameters interaction affects the final solid biofuels (briquettes) quality. From briquettes production point of view and also from densification machines constructions point of view is very important to know about mutual interaction of these parameters on final briquettes quality. The experimental findings presented here are showing the importance of mentioned parameters during the densification process.

Keywords: briquettes density, densification, fraction size, pressing pressure, stabilization time

Procedia PDF Downloads 325
2319 Optimal Rotor Design of an 150kW-Class IPMSM through the 3D Voltage-Inductance Map Analysis Method

Authors: Eung-Seok Park, Tae-Chul Jeong, Hyun-Jong Park, Hyun-Woo Jun, Dong-Woo Kang, Ju Lee

Abstract:

This presents a methodology to determine detail design directions of an 150kW-class IPMSM (interior permanent magnet synchronous motor) and its detail design. The basic design of the stator and rotor was conducted. After dividing the designed models into the best cases and the worst cases based on rotor shape parameters, Sensitivity analysis and 3D Voltage-Inductance Map (3D EL-Map) parameters were analyzed. Then, the design direction for the final model was predicted. Based on the prediction, the final model was extracted with Trend analysis. Lastly, the final model was validated with experiments.

Keywords: PMSM, optimal design, rotor design, voltage-inductance map

Procedia PDF Downloads 643
2318 Fiction and Reality in Animation: Taking Final Flight of the Osiris as an Example

Authors: Syong-Yang Chung, Xin-An Chen

Abstract:

This study aims to explore the less well-known animation “Final Flight of the Osiris”, consisting of an initial exploration of the film color, storyline, and the simulacrum meanings of the roles, which leads to a further exploration of the light-shadow contrast and the psychological images presented by the screen colors and the characters. The research is based on literature review, and all data was compiled for the analysis of the visual vocabulary evolution of the characters. In terms of the structure, the relational study of the animation and the historical background of that time came first, including The Wachowskis’ and Andy Jones’ impact towards the cinematographic version and the animation version of “The Matrix”. Through literature review, the film color, the meaning and the relevant points were clarified. It was found in this research that “Final Flight of the Osiris” separates the realistic and virtual spaces by the changing the color tones; the "self" of the audience gradually dissolves into the "virtual" in the simulacra world, and the "Animatrix" has become a virtual field for the audience to understand itself about "existence" and "self".

Keywords: the matrix, the final flight of Osiris, Wachowski brothers, simulacres

Procedia PDF Downloads 199
2317 Additional Method for the Purification of Lanthanide-Labeled Peptide Compounds Pre-Purified by Weak Cation Exchange Cartridge

Authors: K. Eryilmaz, G. Mercanoglu

Abstract:

Aim: Purification of the final product, which is the last step in the synthesis of lanthanide-labeled peptide compounds, can be accomplished by different methods. Among these methods, the two most commonly used methods are C18 solid phase extraction (SPE) and weak cation exchanger cartridge elution. SPE C18 solid phase extraction method yields high purity final product, while elution from the weak cation exchanger cartridge is pH dependent and ineffective in removing colloidal impurities. The aim of this work is to develop an additional purification method for the lanthanide-labeled peptide compound in cases where the desired radionuclidic and radiochemical purity of the final product can not be achieved because of pH problem or colloidal impurity. Material and Methods: For colloidal impurity formation, 3 mL of water for injection (WFI) was added to 30 mCi of 177LuCl3 solution and allowed to stand for 1 day. 177Lu-DOTATATE was synthesized using EZAG ML-EAZY module (10 mCi/mL). After synthesis, the final product was mixed with the colloidal impurity solution (total volume:13 mL, total activity: 40 mCi). The resulting mixture was trapped in SPE-C18 cartridge. The cartridge was washed with 10 ml saline to remove impurities to the waste vial. The product trapped in the cartridge was eluted with 2 ml of 50% ethanol and collected to the final product vial via passing through a 0.22μm filter. The final product was diluted with 10 mL of saline. Radiochemical purity before and after purification was analysed by HPLC method. (column: ACE C18-100A. 3µm. 150 x 3.0mm, mobile phase: Water-Acetonitrile-Trifluoro acetic acid (75:25:1), flow rate: 0.6 mL/min). Results: UV and radioactivity detector results in HPLC analysis showed that colloidal impurities were completely removed from the 177Lu-DOTATATE/ colloidal impurity mixture by purification method. Conclusion: The improved purification method can be used as an additional method to remove impurities that may result from the lanthanide-peptide synthesis in which the weak cation exchange purification technique is used as the last step. The purification of the final product and the GMP compliance (the final aseptic filtration and the sterile disposable system components) are two major advantages.

Keywords: lanthanide, peptide, labeling, purification, radionuclide, radiopharmaceutical, synthesis

Procedia PDF Downloads 129
2316 Classification of Sequential Sports Using Automata Theory

Authors: Aniket Alam, Sravya Gurram

Abstract:

This paper proposes a categorization of sport that is based on the system of rules that a sport must adhere to. We focus on these systems of rules to examine how a winner is produced in different sports. The rules of a sport dictate the game play and the direction it takes. We propose to break down the game play into events. At this junction, we observe two kinds of events that constitute the game play of a sport –ones that follow sequential logic and ones that do not. Our focus is pertained to sports that are comprised of sequential events. To examine these events further, to understand how a winner emerges, we take the help of finite-state automaton from the theory of computation (Automata theory). We showcase how sequential sports are eligible to be represented as finite state machines. We depict these finite state machines as state diagrams. We examine these state diagrams to observe how a team/player reaches the final states of the sport, with a special focus on one final state –the final state which determines the winner. This exercise has been carried out for the following sports: Hurdles, Track, Shot Put, Long Jump, Bowling, Badminton, Pacman and Weightlifting (Snatch). Based on our observations of how this final state of winning is achieved, we propose a categorization of sports.

Keywords: sport classification, sport modelling, ontology, automata theory

Procedia PDF Downloads 89
2315 The Analysis of Swales Model (Cars Model) in the UMT Final Year Engineering Students

Authors: Kais Amir Kadhim

Abstract:

Context: The study focuses on the rhetorical structure of chapters in engineering final year projects, specifically the Introduction chapter, written by UMT (University of Marine Technology) engineering students. Existing research has explored the use of genre-based approaches to analyze the writing of final year projects in various disciplines. Research Aim: The aim of this study is to investigate the rhetorical structure of Introduction chapters in engineering final year projects by UMT students. The study aims to identify the frequency of communicative moves and their constituent steps within the Introduction chapters, as well as understand how students justify their research projects. Methodology: The research design will utilize a mixed method approach, combining both quantitative and qualitative methods. Forty Introduction chapters from two different fields in UMT engineering undergraduate programs will be selected for analysis. Findings: The study intends to identify the types of moves present in the Introduction chapters of engineering final year projects by UMT students. Additionally, it aims to determine if these moves and steps are obligatory, conventional, or optional. Theoretical Importance: The study draws upon Bunton's modified CARS (Creating a Research Space) model, which is a conceptual framework used for analyzing the introduction sections of theses. By applying this model, the study contributes to the understanding of the rhetorical structure of Introduction chapters in engineering final year projects. Data Collection: The study will collect data from forty Introduction chapters of engineering final year projects written by UMT engineering students. These chapters will be selected from two different fields within UMT's engineering undergraduate programs. Analysis Procedures: The analysis will involve identifying and categorizing the communicative moves and their constituent steps within the Introduction chapters. The study will utilize both quantitative and qualitative analysis methods to examine the frequency and nature of these moves. Question Addressed: The study aims to address the question of how UMT engineering students structure and justify their research projects within the Introduction chapters of their final year projects. Conclusion: The study aims to contribute to the knowledge of rhetorical structure in engineering final year projects by investigating the Introduction chapters written by UMT engineering students. By using a mixed method research design and applying the modified CARS model, the study intends to identify the types of moves and steps employed by students and explore their justifications for their research projects. The findings have the potential to enhance the understanding of effective academic writing in engineering disciplines.

Keywords: cohesive markers, learning, meaning, students

Procedia PDF Downloads 43
2314 Faults in the Projects, Deviation in the Cost

Authors: S. Ahmed, P. Dlask, B. Hasan

Abstract:

There are several ways to estimate the cost of the construction project: simple and detailed. The process of estimating cost is usually done during the design stage, which should take long-time and the designer must give attention to all details. This paper explain the causes of the deviations occurring in the cost of the construction project, and determines the reasons of these differences between contractual cost and final cost of the construction project, through the study of literature review related to this field, and benefiting from the experience of workers in the field of building (owners, contractors) through designing a questionnaire, and finding the most ten important reasons and explain the relation between the contractual cost and the final cost according to these reasons. The difference between those values will be showed through diagrams drawn using the statistical program. In addition to studying the effects of overrun costs on the advancing of the project, and identify the most five important effects. According to the results, we can propose the right direction for the final cost evaluation and propose some measures that would help to control and adjust the deviation in the costs.

Keywords: construction projects, building, cost, estimating costs, delay, overrun

Procedia PDF Downloads 257
2313 On-Farm Evaluation of Fast and Slow Growing Genotypes for Organic and Pasture Poultry Production Systems

Authors: Komala Arsi, Terrel Spencer, Casey M. Owens, Dan J. Donoghue, Ann M. Donoghue

Abstract:

Organic poultry production is becoming increasingly popular in the United States with approximately 17% increase in the sales of organic meat and poultry in 2016. As per the National Organic Program (NOP), organic poultry production system should operate according to specific standards, including access to outdoors. In the United States, organic poultry farmers are raising both fast growing and slow growing genotypes for alternative productive systems. Even though heritage breed birds grow much slower compared to commercial breeds, many free range producers believe that they are better suited for outdoor production systems. We conducted an on-farm trial on a working pasture poultry farm to compare the performance and meat quality characteristics of a slow-growing heritage breed (Freedom Rangers, FR), and two commonly used fast growing types of chickens (Cornish cross, CC and Naked Neck, NN), raised on pasture, in side by side pens segregated by breed (n=70/breed). CC and NN group birds were reared for eight weeks whereas FR group birds were reared for 10 weeks and all the birds were commercially processed. By the end of the rearing period, the final body weight of FR group birds was significantly lower than both the fast growing genotypes (CC and NN). Both CC and NN birds showed significantly higher live weight, carcass weight as well as fillet, tender and leg yield (P < 0.05). There was no difference in the wing and rack yield among the different groups. Color of the meat was measured using CEILAB method and expressed as lightness (L), redness (a*) and yellowness (b*). The breast meat from FR birds was much redder (higher a* values) and less yellow (lesser b* values) compared to both the fast growing type of chickens (P < 0.05). Overall, fast growing genotypes produced higher carcass weight and meat yield compared to slow growing genotypes and appear to be an economical option for alternative production systems.

Keywords: fast growing chickens, meat quality, pasture, slow growing chickens

Procedia PDF Downloads 351
2312 Measuring the Level of Knowledge of Construction Contracts Procedures: A Case Study of Botswana

Authors: Babulayi B. Wilson

Abstract:

Unsatisfactory performance of construction projects in both the industrialised and developing countries indicate that there could be several defects in construction projects phases. Notwithstanding the fact that some project defects are often conceived at the initiation phase of construction projects, insufficient knowledge of contract procedures has been identified as one of the major sources of construction disputes. Contract procedures are a set of rules that outlines the primary obligations and liabilities of parties involved in the implementation of a construction project. Engineering professional bodies often codify contract procedures into standard forms of contract such as the Institution of Civil Engineers (ICE, UK) and Association of Consulting Engineers (ACE, UK) and keep them under constant review by updating any clause to reflect any change in case law or relevant piece of legislation. Even so, it is the responsibility of a professional body or conditions of contract draftsperson to introduce contract-specific clauses that may be necessary for business efficacy but not covered in the chosen standard conditions of contract. In Botswana, the use of clients’ drafted and/or un-adapted for environment of use international forms of contract in conjunction with client-drafted pricing schedules is common. The product of the latter often impact negatively upon contractors’ claims and payments, in that, tender rates and prices can only be deemed to be sufficient if the chosen conditions of contract compliment the pricing schedule (use of standardised procurement documents). In addition, client drafted and the use of borrowed forms of contract such as FIDIC often conflict with domicile law resulting in costly disputes on the part of the client. It is upon the preceding text that the object of the research is to measure the level of knowledge of contract procedures amongst key stakeholders in the Botswana construction industry by requesting a representative sample from the industry and academia to respond to tutorial questions prepared from two commonly used forms of contract for civil works, that is, FIDIC (International Form of Contract) and ICE (UK). The questions were prepared under the following captions: (a) preparation of tender documents (b) obligations of the parties (c) contract administration; and (d) claims, variations, and valuation of variations. After ascertaining that the level of knowledge of contract procedures is insufficient among most practitioners in the Botswana construction industry, major procurement entities, and engineering institutions of learning; a guide to drafting a condition of a construction contract was developed and then validated through seminars and workshops. In the present, the effectiveness of the guide is not yet measured but feedback from seminars and workshops conducted indicates an appreciation of the guide by the majority of major construction industry stakeholders.

Keywords: contract procedures, conditions of contract, professional practice, construction law, forms of contract

Procedia PDF Downloads 149
2311 On the End-of-Life Inventory Problem

Authors: Hans Frenk, Sonya Javadi, Semih Onur Sezer

Abstract:

We consider the so-called end of life inventory problem for the supplier of a product in its final phase of the service life cycle. This phase starts when the production of the items stops and continues until the warranty of the last sold item expires. At the beginning of this phase, the supplier places a final order for spare parts to serve customers coming with defective items. At any time during the final phase, the supplier may also decide to switch to an alternative and more cost-effective policy. This alternative policy may be in the form of replacing a defective item with a substitutable product or offering discounts / rebates on new generation products. In this setup, the objective is to find a final order quantity and also a switching time which will minimize the total expected discounted cost. We study this problem under a general cost structure in a continuous-time framework where arrivals of defective items are given by a non-homogeneous Poisson process. We consider four formulations which differ by the nature of the switching time. These formulations are studied in detail and properties of the objective function are derived in each case. Using these properties, we provide exact algorithms for efficient numerical implementations. Numerical examples are provided illustrating the application of these algorithms. In these examples, we also compare the costs associated with these different formulations.

Keywords: End-of-life inventory control, martingales, optimization, service parts

Procedia PDF Downloads 296