Search results for: modern methods of construction (MMC)
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 20193

Search results for: modern methods of construction (MMC)

19683 Limes Africanus: Tribes, Romans and Islamic Dynasties

Authors: Erika Mattio , Edoardo Casolo

Abstract:

This project studies in a complete and innovative way the lesser known southern roman border: the limes africanus. In this work, thanks to the comparison of archaeological, historical and epigraphic sources, the evolution and changes that occurred in the cities and areas around the limes were analysed. As of now, there are many studies relative to the roman imperial period, however there are not that many analysing the evolution of the limes from the Islamic conquest to the modern day, comparing the ancient, byzantine, islamic and contemporary periods, understanding the significance of the limes, it s role and the cities and commerce that were defined by it in north Africa. Using modern methods of remote sensing and landscape archaeology, a georeferencing of the area documented in the thirties of the last century by French military aviation colonel Jean Baradez was created, showing that the limes africanus had survived the fall of the roman empire and continued to be important also for the Islamic dynasties that came later, even until the italo-turkish war and the Italian conquest of Libya. With this research we wish to demonstrate the continuation through time of the limes africanus and whether today it exists still or not.

Keywords: Limes Tripolitanus, Muslim, North Africa, Romans

Procedia PDF Downloads 195
19682 Identification of Social Responsibility Factors within Mega Construction Projects

Authors: Ali Alotaibi, Francis Edum-Fotwe, Andrew Price /

Abstract:

Mega construction projects create buildings and major infrastructure to respond to work and life requirements while playing a vital role in promoting any nation’s economy. However, the industry is often criticised for not balancing economic, environmental and social dimensions of their projects, with emphasis typically on one aspect to the detriment of the others. This has resulted in many negative impacts including environmental pollution, waste throughout the project lifecycle, low productivity, and avoidable accidents. The identification of comprehensive Social Responsibility (SR) indicators, which combine social, environmental and economic aspects, is urgently needed. This is particularly the case in the context of the Kingdom of Saudi Arabia (KSA), which often has mega public construction projects. The aim of this paper is to develop a set of wide-ranging SR indicators which encompass social, economic and environmental aspects unique to the KSA. A qualitative approach was applied to explore relevant indicators through a review of the existing literature, international standards and reports. A list of appropriate indicators was developed, and its comprehensiveness was corroborated by interviews with experts on mega construction projects working with SR concepts in the KSA. The findings present 39 indicators and their metrics, covering 10 economic, 12 environmental and 17 social aspects of SR mapped against their references. These indicators are a valuable reference for decision-makers and academics in the KSA to understand factors related to SR in mega construction projects. The indicators are related to mega construction projects within the KSA and require validation in a real case scenario or within a different industry to demonstrate their generalisability.

Keywords: social responsibility, construction projects, economic, social, environmental, indicators

Procedia PDF Downloads 161
19681 Liberal Thoughts in the Modern Centuries

Authors: Siavash Soltani Hemmat

Abstract:

Although 21st-century humanity is at the height of technology and has stepped toward the endless boundaries of knowledge, there are still people in many parts of the world who are deprived of even the most fundamental freedoms. Whereas without freedom, no possible meaning can be imagined for human life, none of the human talents will have the chance to flourish, and that man will be reduced to the level of an animal, removing the obstacles to human freedom, especially from the viewpoint of thoughts, is of utmost importance, in which the liberal ideas of the modern centuries have played an incomparable role. The aim of the present study is to introduce and explain the liberal ideas in the modern centuries and their role in the expansion of human freedoms in order to weaken and discredit the ideological and intellectual barriers to restricting the freedom of individuals and to pave the way for the liberation of humanity. A descriptive method has been employed in order to achieve the objectives of the research. Besides, for data collection, a library method has been conducted. In this study, three ideological teachings of the social contract , resistance against unjust governance and natural law were recognized as the foundations of the realization of fundamental freedoms of the people in the modern centuries and their content was explained and examined.

Keywords: freedom, natural law, social contract, resistance

Procedia PDF Downloads 208
19680 Noise Measurement and Awareness at Construction Site: A Case Study

Authors: Feiruz Ab'lah, Zarini Ismail, Mohamad Zaki Hassan, Siti Nadia Mohd Bakhori, Mohamad Azlan Suhot, Mohd Yusof Md. Daud, Shamsul Sarip

Abstract:

The construction industry is one of the major sectors in Malaysia. Apart from providing facilities, services, and goods it also offers employment opportunities to local and foreign workers. In fact, the construction workers are exposed to a hazardous level of noises that generated from various sources including excavators, bulldozers, concrete mixer, and piling machines. Previous studies indicated that the piling and concrete work was recorded as the main source that contributed to the highest level of noise among the others. Therefore, the aim of this study is to obtain the noise exposure during piling process and to determine the awareness of workers against noise pollution at the construction site. Initially, the reading of noise was obtained at construction site by using a digital sound level meter (SLM), and noise exposure to the workers was mapped. Readings were taken from four different distances; 5, 10, 15 and 20 meters from the piling machine. Furthermore, a set of questionnaire was also distributed to assess the knowledge regarding noise pollution at the construction site. The result showed that the mean noise level at 5m distance was more than 90 dB which exceeded the recommended level. Although the level of awareness regarding the effect of noise pollution is satisfactory, majority of workers (90%) still did not wear ear protecting device during work period. Therefore, the safety module guidelines related to noise pollution controls should be implemented to provide a safe working environment and prevent initial occupational hearing loss.

Keywords: construction, noise awareness, noise pollution, piling machine

Procedia PDF Downloads 371
19679 Factors Constraining the Utilization of Risk Management Strategies in the Execution of Public Construction Projects in North East Nigeria

Authors: S. U. Kunya, S. A. Mohammad

Abstract:

Construction projects in Nigeria are characterized with risks emanating from delays and accompanying cost-overruns. The aim of the study was to identify and assess factors constraining the utilization of risk management strategies in the execution of public construction project in North-East Nigeria. Data was collected with the aid of a well-structured questionnaire administered to three identified projects in the North-east. Data collected were analysed using the severity index. Findings revealed political involvement, selection of inexperienced contractors and lack of coordinated public sector strategy as the most severe factors constraining the utilization of risk management strategies. The study recommended that: formulation of laws to prevent negative political meddling in construction projects; selection of experienced, risk-informed contractors; and comprehensive risk assessment and planning on all public construction projects.

Keywords: factors, Nigeria, north-east, public projects, risk management, strategies, utilization

Procedia PDF Downloads 518
19678 Teacher’s Role in the Process of Identity Construction in Language Learners

Authors: Gaston Bacquet

Abstract:

The purpose of this research is to explore how language and culture shape a learner’s identity as they immerse themselves in the world of second language learning and how teachers can assist in the process of identity construction within a classroom setting. The study will be conducted as an in-classroom ethnography, using a qualitative methods approach and analyzing students’ experiences as language learners, their degree of investment, inclusion/exclusion, and attitudes, both towards themselves and their social context; the research question the study will attempt to answer is: What kind of pedagogical interventions are needed to help language learners in the process of identity construction so they can offset unequal conditions of power and gain further social inclusion? The following methods will be used for data collection: i) Questionnaires to investigate learners’ attitudes and feelings in different areas divided into four strands: themselves, their classroom, learning English and their social context. ii) Participant observations, conducted in a naturalistic manner. iii) Journals, which will be used in two different ways: on the one hand, learners will keep semi-structured, solicited diaries to record specific events as requested by the researcher (event-contingent). On the other, the researcher will keep his journal to maintain a record of events and situations as they happen to reduce the risk of inaccuracies. iv) Person-centered interviews, which will be conducted at the end of the study to unearth data that might have been occluded or be unclear from the methods above. The interviews will aim at gaining further data on experiences, behaviors, values, opinions, feelings, knowledge and sensory, background and demographic information. This research seeks to understand issues of socio-cultural identities and thus make a significant contribution to knowledge in this area by investigating the type of pedagogical interventions needed to assist language learners in the process of identity construction to achieve further social inclusion. It will also have applied relevance for those working with diverse student groups, especially taking our present social context into consideration: we live in a highly mobile world, with migrants relocating to wealthier, more developed countries that pose their own particular set of challenges for these communities. This point is relevant because an individual’s insight and understanding of their own identity shape their relationship with the world and their ability to continue constructing this relationship. At the same time, because a relationship is influenced by power, the goal of this study is to help learners feel and become more empowered by increasing their linguistic capital, which we hope might result in a greater ability to integrate themselves socially. Exactly how this help will be provided will vary as data is unearthed through questionnaires, focus groups and the actual participant observations being carried out.

Keywords: identity construction, second-language learning, investment, second-language culture, social inclusion

Procedia PDF Downloads 100
19677 Supply Chain Management Strategies of the Private Residential Construction Sector in South Africa

Authors: R. Khoza, K. K. Govender

Abstract:

The aim of the study was to review and critically evaluate the supply chain management (SCM) strategies and challenges in the private residential construction sector in South Africa. The study was grounded in three theories, namely, theory of constraints, principal-agency theory, and stakeholder theory. A quantitative approach was used to survey 320 private residential construction companies which registered with the National Homebuilders Registration Council (NHBRC) within the Gauteng province. The data from 250 questionnaires returned were analysed using SPSS (Versions 23) and Smart PLS. It became evident that the SCM challenges included lack of trust between the supplier and the organization; lack of adoption of SCM system; lack of a sufficiently skilled SCM workforce; and poor implementation of contract management. The findings also indicate that there is a significant positive relationship between the performance of the private residential construction sector in South Africa and SCM challenges, SCM strategies and SCM processes. A framework is proposed comprising SCM practices and strategies of private residential construction sector in South Africa, which will enable them to enhance performance.

Keywords: management challenges, residential housing, South Africa, supply chain management

Procedia PDF Downloads 71
19676 Structural Behavior of Incomplete Box Girder Bridges Subjected to Unpredicted Loads

Authors: E. H. N. Gashti, J. Razzaghi, K. Kujala

Abstract:

In general, codes and regulations consider seismic loads only for completed structures of the bridges while, evaluation of incomplete structure of bridges, especially those constructed by free cantilever method, under these loads is also of great importance. Hence, this research tried to study the behavior of incomplete structure of common bridge type (box girder bridge), in construction phase under vertical seismic loads. Subsequently, the paper provided suitable guidelines and solutions to withstand this destructive phenomena. Research results proved that use of preventive methods can significantly reduce the stresses resulted from vertical seismic loads in box cross sections to an acceptable range recommended by design codes.

Keywords: box girder bridges, prestress loads, free cantilever method, seismic loads, construction phase

Procedia PDF Downloads 335
19675 The Integration and Practice of Indigenous Knowledge System and Sustainable Environmental Education Concept

Authors: Shih-Tsung Chen, Yenchin Hsiao

Abstract:

Evergreen Lily is a newly-built school after Morakot Typhoon took place. The school is located on Majia farm, which is surrounded by mountains. The fund in the construction of the school is solely sponsored by Chang Yung-Fa Foundation. There are 483 permanent houses near the school belonging to three tribes, Dashe, Majia, and Haocha. Due to the most ancient heritages of Paiwan and Rukai in these three tribes, the school is full of cultural atmosphere. From modern and traditional perspectives, Evergreen Lily strives to establish and develop a long-lasting educational model to meet the expectation of the tribes, parents, and the public. This study is a case study of how to develop indigenous education in newly established schools after the Morakot Hurricane disaster to meet the concept of environmental education. The systematic curriculum construction of education and cultural integration and the systematic practice of curriculum practice will be discussed, and the concept and practice of tribal education curriculum and sustainable environmental education will be understood. This study found that this school integrates the spirit of natural philosophy, democratic education, ethnic and experimental education, and constructs a knowledge system that includes three levels of spiritual culture, institutional culture, and material culture, as well as six dimensions of life philosophy, natural ecology, organizational system, tribal literature and history, song and dance, and technical and artistic methods. Adhering to the concept of harmonious education and the sustainable common good, the development of school-based tribal academic courses accounts for about one-third of the total number of teaching sessions, and there are different cultural themes in grades one to six, and there are clear teaching modules to effectively enhance students' potential inspiration. The complete curriculum implementation model can be described as a model for the development of indigenous schools to sustainable environmental education.

Keywords: environmental education, indigenous education, sustainable development, school-based curriculum

Procedia PDF Downloads 149
19674 Application of the Critical Decision Method for Monitoring and Improving Safety in the Construction Industry

Authors: Juan Carlos Rubio Romero, Francico Salguero Caparros, Virginia Herrera-Pérez

Abstract:

No one is in the slightest doubt about the high levels of risk involved in work in the construction industry. They are even higher in structural construction work. The Critical Decision Method (CDM) is a semi-structured interview technique that uses cognitive tests to identify the different disturbances that workers have to deal with in their work activity. At present, the vision of safety focused on daily performance and things that go well for safety and health management is facing the new paradigm known as Resilience Engineering. The aim of this study has been to describe the variability in formwork labour on concrete structures in the construction industry and, from there, to find out the resilient attitude of workers to unexpected events that they have experienced during their working lives. For this purpose, a series of semi-structured interviews were carried out with construction employees with extensive experience in formwork labour in Spain by applying the Critical Decision Method. This work has been the first application of the Critical Decision Method in the field of construction and, more specifically, in the execution of structures. The results obtained show that situations categorised as unthought-of are identified to a greater extent than potentially unexpected situations. The identification during these interviews of both expected and unexpected events provides insight into the critical decisions made and actions taken to improve resilience in daily practice in this construction work. From this study, it is clear that it is essential to gain more knowledge about the nature of the human cognitive process in work situations within complex socio-technical systems such as construction sites. This could lead to a more effective design of workplaces in the search for improved human performance.

Keywords: resilience engineering, construction industry, unthought-of situations, critical decision method

Procedia PDF Downloads 145
19673 On Copular Constructions in Yemeni Arabic and the Cartography of Subjects

Authors: Ameen Alahdal

Abstract:

This paper investigates copular constructions in Raimi Yemeni Arabic (RYA). The aim of the paper is actually twofold. First it explores the types of copular constructions in Raimi Yemeni Arabic, a variety of Arabic that has not attracted a lot of attention. In this connection, the paper shows that RYA manifests ‘bare’, verbal and pronominal/PRON copular constructions, just like other varieties of Arabic and indeed other Semitic languages like Hebrew. The sentences below from RYA represent the three constructions, respectively. (1) a. nada Hilwah Nada pretty.3sf ‘Nada is pretty’ b. kan al-banat hina was the-girls here ‘The girls were here c. ali hu-l mudiir Ali he-the manager ‘Ali is the manager’ Interestingly, in addition to these common types of copular constructions, RYA seems to exhibit dual copula sentences, a construction that features both a pronominal copula and a verbal copula. Such a construction is attested neither in Standard Arabic nor in other modern varieties of Arabic such as Lebanese, Moroccan, Egyptian, Jordanian. Remarkably, dual copular sentences do not appear even in other dialects of Yemeni Arabic such as Sanaani, Adeni and Tehami. (2) is an example. (2) maha kan-ih mudarrisah maha was-she teacher.3sf ‘Maha was a teacehr’ Second, the paper considers the cartography of subject positions in copular constructions proposed by Shlonsky and Rizzi (2018). Different copular constructions seem to involve different subject positions (which might eventually correlate with different interpretations – not our concern in this paper). Here, it is argued that in a bare copular sentence, as in (1a), RYA might exploit two criterial subject positions (in Rizzi’s sense), in addition to the canonical Spec,TP position. Under mainstream minimalist assumption, a copular sentence is analyzed as a PredP. Thus, in addition to the PredP-related thematic subject position, a criterial subject position is posited outside of PredP. (3) below represents the cartography of subject positions in a bare copular construction. (3) [……..DP subj PredP DP Pred DP/AP/PP ] In PRON sentences, as exemplified in (1c), another two subject positions are postulated high in the clause, particularly above PolP. (4) illustrates the hierarchy of the subject positions in a PRON copular construction. The subject resides in Spec,SUBJ2P. (4) …DP SUBJ2 …DP SUBJ1 … Pol … DP subj PredP Another related phenomenon in RYA which sets it apart from other languages like Hebrew is that of negative bare copular construction. This construction involves a PRON, which is not found in its affirmative counterpart. PRON, however, is hosted neither by SUBJ20 nor by SUBJ10. Rather, PRON occurs below Neg0 (Pol0 in the hierarchy). This situation raises interesting issues for the hierarchy of subjects in copular constructions as well as to the syntax of the left periphery in general. With regard to what causes the subject to move, there are different potential triggers. For instance, movement of the subject at the base, i.e., out of PredP is triggered by a labeling failure. Other movements of the subject can be driven by a formal feature like EPP, or a criterial feature like [subj].

Keywords: Yemeni Arabic, copular constructions, cartography of subjects, labeling, criterial positions

Procedia PDF Downloads 97
19672 Use of computer and peripherals in the Archaeological Surveys of Sistan in Eastern Iran

Authors: Mahyar Mehrafarin, Reza Mehrafarin

Abstract:

The Sistan region in eastern Iran is a significant archaeological area in Iran and the Middle East, encompassing 10,000 square kilometers. Previous archeological field surveys have identified 1662 ancient sites dating from prehistoric periods to the Islamic period. Research Aim: This article aims to explore the utilization of modern technologies and computers in archaeological field surveys in Sistan, Iran, and the benefits derived from their implementation. Methodology: The research employs a descriptive-analytical approach combined with field methods. New technologies and software, such as GPS, drones, magnetometers, equipped cameras, satellite images, and software programs like GIS, Map source, and Excel, were utilized to collect information and analyze data. Findings: The use of modern technologies and computers in archaeological field surveys proved to be essential. Traditional archaeological activities, such as excavation and field surveys, are time-consuming and costly. Employing modern technologies helps in preserving ancient sites, accurately recording archaeological data, reducing errors and mistakes, and facilitating correct and accurate analysis. Creating a comprehensive and accessible database, generating statistics, and producing graphic designs and diagrams are additional advantages derived from the use of efficient technologies in archaeology. Theoretical Importance: The integration of computers and modern technologies in archaeology contributes to interdisciplinary collaborations and facilitates the involvement of specialists from various fields, such as geography, history, art history, anthropology, laboratory sciences, and computer engineering. The utilization of computers in archaeology spanned across diverse areas, including database creation, statistical analysis, graphics implementation, laboratory and engineering applications, and even artificial intelligence, which remains an unexplored area in Iranian archaeology. Data Collection and Analysis Procedures: Information was collected using modern technologies and software, capturing geographic coordinates, aerial images, archeogeophysical data, and satellite images. This data was then inputted into various software programs for analysis, including GIS, Map source, and Excel. The research employed both descriptive and analytical methods to present findings effectively. Question Addressed: The primary question addressed in this research is how the use of modern technologies and computers in archeological field surveys in Sistan, Iran, can enhance archaeological data collection, preservation, analysis, and accessibility. Conclusion: The utilization of modern technologies and computers in archaeological field surveys in Sistan, Iran, has proven to be necessary and beneficial. These technologies aid in preserving ancient sites, accurately recording archaeological data, reducing errors, and facilitating comprehensive analysis. The creation of accessible databases, statistics generation, graphic designs, and interdisciplinary collaborations are further advantages observed. It is recommended to explore the potential of artificial intelligence in Iranian archaeology as an unexplored area. The research has implications for cultural heritage organizations, archaeology students, and universities involved in archaeological field surveys in Sistan and Baluchistan province. Additionally, it contributes to enhancing the understanding and preservation of Iran's archaeological heritage.

Keywords: archaeological surveys, computer use, iran, modern technologies, sistan

Procedia PDF Downloads 72
19671 Simulation Data Summarization Based on Spatial Histograms

Authors: Jing Zhao, Yoshiharu Ishikawa, Chuan Xiao, Kento Sugiura

Abstract:

In order to analyze large-scale scientific data, research on data exploration and visualization has gained popularity. In this paper, we focus on the exploration and visualization of scientific simulation data, and define a spatial V-Optimal histogram for data summarization. We propose histogram construction algorithms based on a general binary hierarchical partitioning as well as a more specific one, the l-grid partitioning. For effective data summarization and efficient data visualization in scientific data analysis, we propose an optimal algorithm as well as a heuristic algorithm for histogram construction. To verify the effectiveness and efficiency of the proposed methods, we conduct experiments on the massive evacuation simulation data.

Keywords: simulation data, data summarization, spatial histograms, exploration, visualization

Procedia PDF Downloads 171
19670 Life Cycle Assessment of Mass Timber Structure, Construction Process as System Boundary

Authors: Mahboobeh Hemmati, Tahar Messadi, Hongmei Gu

Abstract:

Today, life cycle assessment (LCA) is a leading method in mitigating the environmental impacts emerging from the building sector. In this paper, LCA is used to quantify the Green House Gas (GHG) emissions during the construction phase of the largest mass timber residential structure in the United States, Adohi Hall. This building is a 200,000 square foot 708-bed complex located on the campus of the University of Arkansas. The energy used for buildings’ operation is the most dominant source of emissions in the building industry. Lately, however, the efforts were successful at increasing the efficiency of building operation in terms of emissions. As a result, the attention is now shifted to the embodied carbon, which is more noticeable in the building life cycle. Unfortunately, most of the studies have, however, focused on the manufacturing stage, and only a few have addressed to date the construction process. Specifically, less data is available about environmental impacts associated with the construction of mass timber. This study presents, therefore, an assessment of the environmental impact of the construction processes based on the real and newly built mass timber building mentioned above. The system boundary of this study covers modules A4 and A5 based on building LCA standard EN 15978. Module A4 includes material and equipment transportation. Module A5 covers the construction and installation process. This research evolves through 2 stages: first, to quantify materials and equipment deployed in the building, and second, to determine the embodied carbon associated with running equipment for construction materials, both transported to, and installed on, the site where the edifice is built. The Global Warming Potential (GWP) of the building is the primary metric considered in this research. The outcomes of this study bring to the front a better understanding of hotspots in terms of emission during the construction process. Moreover, the comparative analysis of the mass timber construction process with that of a theoretically similar steel building will enable an effective assessment of the environmental efficiency of mass timber.

Keywords: construction process, GWP, LCA, mass timber

Procedia PDF Downloads 159
19669 Study on the Demolition Waste Management in Malaysia Construction Industry

Authors: Gunalan Vasudevan

Abstract:

The Malaysia construction industry generates a large quantity of construction and demolition waste nowadays. In the handbook for demolition work only comprised small portion of demolition waste management. It is important to study and determine the ways to provide a practical guide for the professional in the building industry about handling the demolition waste. In general, demolition defined as tearing down or wrecking of structural work or architectural work of the building and other infrastructures work such as road, bridge and etc. It’s a common misconception that demolition is nothing more than taking down a structure and carrying the debris to a landfill. On many projects, 80-90% of the structure is kept for reuse or recycling which help the owner to save cost. Demolition contractors required a lot of knowledge and experience to minimize the impact of demolition work to the existing surrounding area. For data collecting method, postal questionnaires and interviews have been selected to collect data. Questionnaires have distributed to 80 respondents from the construction industry in Klang Valley. 67 of 80 respondents have replied the questionnaire while 4 people have interviewed. Microsoft Excel and Statistical Package for Social Science version 17.0 were used to analyze the data collected.

Keywords: demolition, waste management, construction material, Malaysia

Procedia PDF Downloads 433
19668 Transformation of the Traditional Landscape of Kabul Old City: A Study for Its Conservation

Authors: Mohammad Umar Azizi, Tetsuya Ando

Abstract:

This study investigates the transformation of the traditional landscape of Kabul Old City through an examination of five case study areas. Based on physical observation, three types of houses are found: traditional, mixed and modern. Firstly, characteristics of the houses are described according to construction materials and the number of stories. Secondly, internal and external factors are considered in order to implement a conservation plan. Finally, an adaptive conservation plan is suggested to protect the traditional landscape of Kabul Old City.

Keywords: conservation, district 1, Kabul Old City, landscape, transformation, traditional houses

Procedia PDF Downloads 212
19667 A Quantitative and Exploratory Study of the Changing Ideals and Challenges Involving the Modern Olympic Movement

Authors: Ram Dayal

Abstract:

Since inception of the modern Olympic Games in 1896 in Athens, Greece, it has undergone a paradigm shift over a period of more than a century. It originated with the purpose of inculcating physical and moral qualities, sense of aesthetics, ethical and spiritual value and educating young people, through the spread of the philosophy of amateurism, which is free from the vices of racial discrimination, any country’s domination, corruption, doping menace and political interference. Now, it has metamorphosed into the arena where only professionalism matters and has been reduced to the show of strength for countries analogous to the cold war. Rather than spirit of sports, the economics of sports is the more relevant underpinning. Changes in medal tally over a period of time and its correlation with the changing geo-political structure have been evaluated quantitatively using regression analyses, which have yielded statistically significant relationship among variables. The present study also tries to explore this shift in Olympic spirit through historical approach, using books, thesis, dissertations, articles, related documents. The present study will help evaluate the Olympic ideals with modern perspective and the need to replace or reinstall the same in order to nurture and rejuvenate the modern Olympic movement.

Keywords: challenges, games, olympic, sports

Procedia PDF Downloads 218
19666 Geopolymer Stabilization of Earth Building Material for Construction 3D Printing

Authors: Timur Mukhametkaliyev

Abstract:

The earthen material possesses low compression strength, and it is highly sensitive to the water content. Different binders can be added (Portland cement or lime) to improve the durability and the mechanical characteristics of earthen material, but the production of these binders has high embodied energy and results in an increase in world CO₂ emission. Geopolymers are binders which can be synthesized at low temperature in alkaline solutions from raw materials consisting of amorphous aluminosilicates. Geopolymers are an attractive substitution of Portland cement and can be used as an excellent stabilization for earthen material. In this study, earthen material stabilized with geopolymer binder for use in construction 3D printing was developed. Construction 3D printing offers freedom of design, waste minimisation, customisation, reduced labour, and automation. For successful 3D printing, the properties of used material are the most important aspects because they require adaptability for extrusion and controlled time of hardening for the binder.

Keywords: 3D printing, building construction, geopolymer, architecture

Procedia PDF Downloads 145
19665 Modern Spectrum Sensing Techniques for Cognitive Radio Networks: Practical Implementation and Performance Evaluation

Authors: Antoni Ivanov, Nikolay Dandanov, Nicole Christoff, Vladimir Poulkov

Abstract:

Spectrum underutilization has made cognitive radio a promising technology both for current and future telecommunications. This is due to the ability to exploit the unused spectrum in the bands dedicated to other wireless communication systems, and thus, increase their occupancy. The essential function, which allows the cognitive radio device to perceive the occupancy of the spectrum, is spectrum sensing. In this paper, the performance of modern adaptations of the four most widely used spectrum sensing techniques namely, energy detection (ED), cyclostationary feature detection (CSFD), matched filter (MF) and eigenvalues-based detection (EBD) is compared. The implementation has been accomplished through the PlutoSDR hardware platform and the GNU Radio software package in very low Signal-to-Noise Ratio (SNR) conditions. The optimal detection performance of the examined methods in a realistic implementation-oriented model is found for the common relevant parameters (number of observed samples, sensing time and required probability of false alarm).

Keywords: cognitive radio, dynamic spectrum access, GNU Radio, spectrum sensing

Procedia PDF Downloads 237
19664 A Conceptual Framework and a Mathematical Equation for Managing Construction-Material Waste and Cost Overruns

Authors: Saidu Ibrahim, Winston M. W. Shakantu

Abstract:

The problem of construction material waste remains unresolved, as a significant percentage of the materials delivered to some project sites end up as waste which might result in additional project cost. Cost overrun is a problem which affects 90% of the completed projects in the world. The argument on how to eliminate it has been on-going for the past 70 years, but there is neither substantial improvement nor significant solution for mitigating its detrimental effects. Research evidence has proposed various construction cost overruns and material-waste management approaches; nonetheless, these studies failed to give a clear indication on the framework and the equation for managing construction material waste and cost overruns. Hence, this research aims to develop a conceptual framework and a mathematical equation for managing material waste and cost overrun in the construction industry. The paper adopts the desktop methodological approach. This involves comparing the causes of material waste and those of cost overruns from the literature to determine the possible relationship. The review revealed a relationship between material waste and cost overrun that; increase in material waste would result to a corresponding increase in the amount of cost overrun at both the pre-contract and the post contract stages of a project. It was found from the equation that achieving an effective construction material waste management must ensure a “Good Quality-of-Planning, Estimating, and Design Management” and a “Good Quality- of-Construction, Procurement and Site Management”; a decrease in “Design Complexity” which would reduce “Material Waste” and subsequently reduce the amount of cost overrun by 86.74%. The conceptual framework and the mathematical equation developed in this study are recommended to the professionals of the construction industry.

Keywords: conceptual framework, cost overrun, material waste, project stags

Procedia PDF Downloads 289
19663 Analysis of Environmental Sustainability in Post- Earthquake Reconstruction : A Case of Barpak, Nepal

Authors: Sudikshya Bhandari, Jonathan K. London

Abstract:

Barpak in northern Nepal represents a unique identity expressed through the local rituals, values, lifeways and the styles of vernacular architecture. The traditional residential buildings and construction practices adopted by the dominant ethnic groups: Ghales and Gurungs, reflect environmental, social, cultural and economic concerns. However, most of these buildings did not survive the Gorkha earthquake in 2015 that made many residents skeptical about their strength to resist future disasters. This led Barpak residents to prefer modern housing designs primarily for the strength but additionally for convenience and access to earthquake relief funds. Post-earthquake reconstruction has transformed the cohesive community, developed over hundreds of years into a haphazard settlement with the imposition of externally-driven building models. Housing guidelines provided for the community reconstruction and earthquake resilience have been used as a singular template, similar to other communities on different geographical locations. The design and construction of these buildings do not take into account the local, historical, environmental, social, cultural and economic context of Barpak. In addition to the physical transformation of houses and the settlement, the consequences continue to develop challenges to sustainability. This paper identifies the major challenges for environmental sustainability with the construction of new houses in post-earthquake Barpak. Mixed methods such as interviews, focus groups, site observation, and documentation, and analysis of housing and neighborhood design have been used for data collection. The discernible changing situation of this settlement due to the new housing has included reduced climatic adaptation and thermal comfort, increased consumption of agricultural land and water, minimized use of local building materials, and an increase in energy demand. The research has identified that reconstruction housing practices happening in Barpak, while responding to crucial needs for disaster recovery and resilience, are also leading this community towards an unsustainable future. This study has also integrated environmental, social, cultural and economic parameters into an assessment framework that could be used to develop place-based design guidelines in the context of other post-earthquake reconstruction efforts. This framework seeks to minimize the unintended repercussions of unsustainable reconstruction interventions, support the vitality of vernacular architecture and traditional lifeways and respond to context-based needs in coordination with residents.

Keywords: earthquake, environment, reconstruction, sustainability

Procedia PDF Downloads 111
19662 Contributing to Accuracy of Bid Cost Estimate in Construction Projects

Authors: Abdullah Alhomidan

Abstract:

This study is conducted to identify the main factors affecting accuracy of pretender cost estimate in building construction projects in Saudi Arabia from owners’ perspective. 44 factors affecting pretender cost estimate were identified through literature review and discussion with some construction experts. The results show that the top important factors affecting pretender cost estimate accuracy are: level of competitors in the tendering, material price changes, communications with suppliers, communications with client, and estimating method used.

Keywords: cost estimate, accuracy, pretender, estimating, bid estimate

Procedia PDF Downloads 552
19661 Effectiveness of Variable Speed Limit Signs in Reducing Crash Rates on Roadway Construction Work Zones in Alaska

Authors: Osama Abaza, Tanay Datta Chowdhury

Abstract:

As a driver's speed increases, so do the probability of an incident and likelihood of injury. The presence of equipment, personnel, and a changing landscape in construction zones create greater potential for incident. This is especially concerning in Alaska, where summer construction activity, coinciding with the peak annual traffic volumes, cannot be avoided. In order to reduce vehicular speeding in work zones, and therefore the probability of crash and incident occurrence, variable speed limit (VSL) systems can be implemented in the form of radar speed display trailers since the radar speed display trailers were shown to be effective at reducing vehicular speed in construction zones. Allocation of VSL not only help reduce the 85th percentile speed but also it will predominantly reduce mean speed as well. Total of 2147 incidents along with 385 crashes occurred only in one month around the construction zone in the Alaska which seriously requires proper attention. This research provided a thorough crash analysis to better understand the cause and provide proper countermeasures. Crashes were predominantly recoded as vehicle- object collision and sideswipe type and thus significant amount of crashes fall in the group of no injury to minor injury type in the severity class. But still, 35 major crashes with 7 fatal ones in a one month period require immediate action like the implementation of the VSL system as it proved to be a speed reducer in the construction zone on Alaskan roadways.

Keywords: speed, construction zone, crash, severity

Procedia PDF Downloads 240
19660 Predicting Costs in Construction Projects with Machine Learning: A Detailed Study Based on Activity-Level Data

Authors: Soheila Sadeghi

Abstract:

Construction projects are complex and often subject to significant cost overruns due to the multifaceted nature of the activities involved. Accurate cost estimation is crucial for effective budget planning and resource allocation. Traditional methods for predicting overruns often rely on expert judgment or analysis of historical data, which can be time-consuming, subjective, and may fail to consider important factors. However, with the increasing availability of data from construction projects, machine learning techniques can be leveraged to improve the accuracy of overrun predictions. This study applied machine learning algorithms to enhance the prediction of cost overruns in a case study of a construction project. The methodology involved the development and evaluation of two machine learning models: Random Forest and Neural Networks. Random Forest can handle high-dimensional data, capture complex relationships, and provide feature importance estimates. Neural Networks, particularly Deep Neural Networks (DNNs), are capable of automatically learning and modeling complex, non-linear relationships between input features and the target variable. These models can adapt to new data, reduce human bias, and uncover hidden patterns in the dataset. The findings of this study demonstrate that both Random Forest and Neural Networks can significantly improve the accuracy of cost overrun predictions compared to traditional methods. The Random Forest model also identified key cost drivers and risk factors, such as changes in the scope of work and delays in material delivery, which can inform better project risk management. However, the study acknowledges several limitations. First, the findings are based on a single construction project, which may limit the generalizability of the results to other projects or contexts. Second, the dataset, although comprehensive, may not capture all relevant factors influencing cost overruns, such as external economic conditions or political factors. Third, the study focuses primarily on cost overruns, while schedule overruns are not explicitly addressed. Future research should explore the application of machine learning techniques to a broader range of projects, incorporate additional data sources, and investigate the prediction of both cost and schedule overruns simultaneously.

Keywords: cost prediction, machine learning, project management, random forest, neural networks

Procedia PDF Downloads 36
19659 Health Post A Sustainable Prototype for the Third World

Authors: Chizzoniti Domenico, Beggiora Klizia, Cattani Letizia, Moscatelli Monica

Abstract:

This paper concerns the study of sustainable construction materials applied on the "Health Post", a prototype for the primary health care situated in alienated areas of the world. It's suitable for social and climatic Sub-Saharan context; however, it could be moved in other countries of the world with similar urgent needs. The idea is to create a Health Post with local construction materials that have a low environmental impact and promote the local workforce allowing reuse of traditional building techniques lowering production costs and transport. The aim of Primary Health Care Centre is to be a flexible and expandable structure identifying a modular form that can be repeated several times to expand its existing functions. In this way it could be not only a health care centre but also a socio-cultural facility.

Keywords: low costs building, sustainable construction materials, green construction system, prototype, health care, emergency

Procedia PDF Downloads 475
19658 Construction Sustainability Improvement through Using Recycled Aggregates in Concrete Production

Authors: Zhiqiang Zhu, Khalegh Barati, Xuesong Shen

Abstract:

Due to the energy consumption caused by the construction industry, the public is paying more and more attention to the sustainability of the buildings. With the advancement of research on recycled aggregates, it has become possible to replace natural aggregates with recycled aggregates and to achieve a reduction in energy consumption of materials during construction. The purpose of this paper is to quantitatively compare the emergy consumption of natural aggregate concrete (NAC) and recycled aggregate concrete (RAC). To do so, the emergy analysis method is adopted. Using this technique, it can effectively analyze different forms of energy and substance. The main analysis object is the direct and indirect emergy consumption of the stages in concrete production. Therefore, for indirect energy, consumption of production machinery and transportation vehicle also need to be considered. Finally, the emergy values required to produce the two concrete types are compared to analyze whether the RAC can reduce emergy consumption.

Keywords: sustainable construction, NAC, RAC, emergy, concrete

Procedia PDF Downloads 144
19657 A Machine Learning Approach for Efficient Resource Management in Construction Projects

Authors: Soheila Sadeghi

Abstract:

Construction projects are complex and often subject to significant cost overruns due to the multifaceted nature of the activities involved. Accurate cost estimation is crucial for effective budget planning and resource allocation. Traditional methods for predicting overruns often rely on expert judgment or analysis of historical data, which can be time-consuming, subjective, and may fail to consider important factors. However, with the increasing availability of data from construction projects, machine learning techniques can be leveraged to improve the accuracy of overrun predictions. This study applied machine learning algorithms to enhance the prediction of cost overruns in a case study of a construction project. The methodology involved the development and evaluation of two machine learning models: Random Forest and Neural Networks. Random Forest can handle high-dimensional data, capture complex relationships, and provide feature importance estimates. Neural Networks, particularly Deep Neural Networks (DNNs), are capable of automatically learning and modeling complex, non-linear relationships between input features and the target variable. These models can adapt to new data, reduce human bias, and uncover hidden patterns in the dataset. The findings of this study demonstrate that both Random Forest and Neural Networks can significantly improve the accuracy of cost overrun predictions compared to traditional methods. The Random Forest model also identified key cost drivers and risk factors, such as changes in the scope of work and delays in material delivery, which can inform better project risk management. However, the study acknowledges several limitations. First, the findings are based on a single construction project, which may limit the generalizability of the results to other projects or contexts. Second, the dataset, although comprehensive, may not capture all relevant factors influencing cost overruns, such as external economic conditions or political factors. Third, the study focuses primarily on cost overruns, while schedule overruns are not explicitly addressed. Future research should explore the application of machine learning techniques to a broader range of projects, incorporate additional data sources, and investigate the prediction of both cost and schedule overruns simultaneously.

Keywords: resource allocation, machine learning, optimization, data-driven decision-making, project management

Procedia PDF Downloads 28
19656 Utilization of Multi-Criteria Evaluation in Forensic Engineering and the Expertise outside Wall Subsystem

Authors: Tomas Barnak, Libor Matejka

Abstract:

The aim of this study is to create a standard application using multi-criteria evaluation in the field of forensic engineering. This situation can occur in the professional assessment in several cases such as when it is necessary to consider more criteria variant of the structural subsystems, more variants according to several criteria based on a court claim, which requires expert advice. A problematic situation arises when it is necessary to clearly determine the ranking of the options according to established criteria, and reduce subjective evaluation. For the procurement in the field of construction which is based on the prepared text of the law not only economic criteria but also technical, technological and environmental criteria will be determined. This fact substantially changes the style of evaluation of individual bids. For the above-mentioned needs of procurement, the unification of expert’s decisions and the use of multi-criteria assessment seem to be a reasonable option. In the case of experimental verification when using multi-criteria evaluation of alternatives construction subsystem the economic, technical, technological and environmental criteria will be compared. The core of the solution is to compare a selected number of set criteria, application methods and evaluation weighting based on the weighted values assigned to each of the criteria to use multi-criteria evaluation methods. The sequence of individual variations is determined by the evaluation of the importance of the values of corresponding criteria concerning expertise in the problematic of outside wall constructional subsystems.

Keywords: criteria, expertise, multi-criteria evaluation, outside wall subsystems

Procedia PDF Downloads 322
19655 Applying Resilience Engineering to improve Safety Management in a Construction Site: Design and Validation of a Questionnaire

Authors: M. C. Pardo-Ferreira, J. C. Rubio-Romero, M. Martínez-Rojas

Abstract:

Resilience Engineering is a new paradigm of safety management that proposes to change the way of managing the safety to focus on the things that go well instead of the things that go wrong. Many complex and high-risk sectors such as air traffic control, health care, nuclear power plants, railways or emergencies, have applied this new vision of safety and have obtained very positive results. In the construction sector, safety management continues to be a problem as indicated by the statistics of occupational injuries worldwide. Therefore, it is important to improve safety management in this sector. For this reason, it is proposed to apply Resilience Engineering to the construction sector. The Construction Phase Health and Safety Plan emerges as a key element for the planning of safety management. One of the key tools of Resilience Engineering is the Resilience Assessment Grid that allows measuring the four essential abilities (respond, monitor, learn and anticipate) for resilient performance. The purpose of this paper is to develop a questionnaire based on the Resilience Assessment Grid, specifically on the ability to learn, to assess whether a Construction Phase Health and Safety Plans helps companies in a construction site to implement this ability. The research process was divided into four stages: (i) initial design of a questionnaire, (ii) validation of the content of the questionnaire, (iii) redesign of the questionnaire and (iii) application of the Delphi method. The questionnaire obtained could be used as a tool to help construction companies to evolve from Safety-I to Safety-II. In this way, companies could begin to develop the ability to learn, which will serve as a basis for the development of the other abilities necessary for resilient performance. The following steps in this research are intended to develop other questions that allow evaluating the rest of abilities for resilient performance such as monitoring, learning and anticipating.

Keywords: resilience engineering, construction sector, resilience assessment grid, construction phase health and safety plan

Procedia PDF Downloads 134
19654 Comparative Analysis of Identity Semiotics in Iran’s Modern and Traditional House Design

Authors: Maryam Ghasemi

Abstract:

One of the most significant components that provide comfort and protection is having a shelter called a house. Even if components and regions are changed or restored to meet new functions, the house's identity must be preserved. In the contemporary era, houses are increasingly being built regardless of cultural identity. This misunderstanding caused a sense of unease. This study analyses archaic and modern architecture to find semiotic areas and qualities in the latter, using the former as a reference. This study's technique used an exploratory assessment of architectural components from both periods. The Abbasid residence and the Ekbatan architectural complex were used as case studies. The identity of Iranian architecture does not correlate with current buildings. The other part is privacy, which is a missing link between traditional and modern Iranian architecture because it is directly related to the identities of homes based on the cultures of their residents.

Keywords: housing, traditional, contemporary, privacy, semiotic

Procedia PDF Downloads 98