Search results for: modern construction
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 6263

Search results for: modern construction

5843 Diversity of Microbial Ground Improvements

Authors: V. Ivanov, J. Chu, V. Stabnikov

Abstract:

Low cost, sustainable, and environmentally friendly microbial cements, grouts, polysaccharides and bioplastics are useful in construction and geotechnical engineering. Construction-related biotechnologies are based on activity of different microorganisms: urease-producing, acidogenic, halophilic, alkaliphilic, denitrifying, iron- and sulphate-reducing bacteria, cyanobacteria, algae, microscopic fungi. The bio-related materials and processes can be used for the bioaggregation, soil biogrouting and bioclogging, biocementation, biodesaturation of water-satured soil, bioencapsulation of soft clay, biocoating, and biorepair of the concrete surface. Altogether with the most popular calcium- and urea based biocementation, there are possible and often are more effective such methods of ground improvement as calcium- and magnesium based biocementation, calcium phosphate strengthening of soil, calcium bicarbonate biocementation, and iron- or polysaccharide based bioclogging. The construction-related microbial biotechnologies have a lot of advantages over conventional construction materials and processes.

Keywords: ground improvement, biocementation, biogrouting, microorganisms

Procedia PDF Downloads 201
5842 Globalization and English Literature: Explaining How Globalization Has Affected the Themes and Style of Modern English Literature

Authors: Irfan Mehmood, Tahir Mehmood

Abstract:

This article considers the far-reaching influence of globalization on the themes, styles, and influences that shape modern English literature. With globalization, the world is getting smaller and smaller through interdependent connections and cross-cultural sharing. In today's world, taking a walk and exploring nature is important. This paper reveals how globalization affected the narratives of English literature, where authors are allowed to write about universal topics while still honoring diversity and multiculturalism. English literature has a rich history, transcends borders, and encompasses various traditions. This research examines the history surrounding the various literary styles and how modern writers adapt and innovate in a fast-moving society. This study also examines how literature reflects on the interdependent world and becomes a testimony that English literature is flexible.

Keywords: globalization, contemporary literature, multiculturalism, narrative evolution, interconnectedness

Procedia PDF Downloads 50
5841 Comprehensive Studies on the Aerodynamic Characteristics of Subsonic Scarf Inlets

Authors: M. Jegannath, V. Akshaya, B. Arunkumar, G. Lakshmi Soundharya, V. Thenmozhi, S. Varun, V. R. S. Kumar

Abstract:

For scarf inlet design, the primary variable of interest is the circumferential extent over which the extended lower lip is formed. In this paper, an attempt has been made to optimize the aerodynamic shape of a subsonic scarf inlet with aerodynamically shaped center-body with a particular value of the circumferential extent. The parametric analytical studies have been carried out using a Spalart-Allmaras turbulence model. From our preliminary studies, we concluded that for a particular value of circumferential extent, there will be an exact shape of the center-body with certain geometric orientation for the existence of an aerodynamically efficient scarf inlet for modern aircraft engines. This numerical study is a pointer towards for the design optimization of scarf inlets for modern aircraft engines.

Keywords: aerodynamics of scarf inlets, inlet design, modern aircraft inlets, subsonic scarf inlet

Procedia PDF Downloads 287
5840 A Case Study: Social Network Analysis of Construction Design Teams

Authors: Elif D. Oguz Erkal, David Krackhardt, Erica Cochran-Hameen

Abstract:

Even though social network analysis (SNA) is an abundantly studied concept for many organizations and industries, a clear SNA approach to the project teams has not yet been adopted by the construction industry. The main challenges for performing SNA in construction and the apparent reason for this gap is the unique and complex structure of each construction project, the comparatively high circulation of project team members/contributing parties and the variety of authentic problems for each project. Additionally, there are stakeholders from a variety of professional backgrounds collaborating in a high-stress environment fueled by time and cost constraints. Within this case study on Project RE, a design & build project performed at the Urban Design Build Studio of Carnegie Mellon University, social network analysis of the project design team will be performed with the main goal of applying social network theory to construction project environments. The research objective is to determine a correlation between the network of how individuals relate to each other on one’s perception of their own professional strengths and weaknesses and the communication patterns within the team and the group dynamics. Data is collected through a survey performed over four rounds conducted monthly, detailed follow-up interviews and constant observations to assess the natural alteration in the network with the effect of time. The data collected is processed by the means of network analytics and in the light of the qualitative data collected with observations and individual interviews. This paper presents the full ethnography of this construction design team of fourteen architecture students based on an elaborate social network data analysis over time. This study is expected to be used as an initial step to perform a refined, targeted and large-scale social network data collection in construction projects in order to deduce the impacts of social networks on project performance and suggest better collaboration structures for construction project teams henceforth.

Keywords: construction design teams, construction project management, social network analysis, team collaboration, network analytics

Procedia PDF Downloads 178
5839 Militating Factors Against Building Information Modeling Adoption in Quantity Surveying Practice in South Africa

Authors: Kenneth O. Otasowie, Matthew Ikuabe, Clinton Aigbavboa, Ayodeji Oke

Abstract:

The quantity surveying (QS) profession is one of the professions in the construction industry, and it is saddled with the responsibility of measuring the number of materials as well as the workmanship required to get work done in the industry. This responsibility is vital to the success of a construction project as it determines if a project will be completed on time, within budget, and up to the required standard. However, the practice has been criticised severally for failure to accurately execute her responsibility. The need to reduce errors, inaccuracies and omissions has made the adoption of modern technologies such as building information modeling (BIM) inevitable in its practice. Nevertheless, there are barriers to the adoption of BIM in QS practice in South Africa (SA). Thus, this study aims to investigate these barriers. A survey design was adopted. A total number of one hundred and fifteen (115) questionnaires were administered to quantity surveyors in Guateng Province, SA, and ninety (90) were returned and found suitable for analysis. Collected data were analysed using percentage, mean item score, standard deviation, one-sample t-test, and Kruskal-Wallis. The findings show that lack of BIM expertise, lack of government enforcement, resistance to change, and no client demand for BIM are the most significant barriers to the adoption of BIM in QS practice. As a result, this study recommends that trainings on BIM technology be prioritised, and government must take the lead in BIM adoption in the country, particularly in public projects.

Keywords: barriers, BIM, quantity surveying practice, South Africa

Procedia PDF Downloads 78
5838 On the Construction of Some Optimal Binary Linear Codes

Authors: Skezeer John B. Paz, Ederlina G. Nocon

Abstract:

Finding an optimal binary linear code is a central problem in coding theory. A binary linear code C = [n, k, d] is called optimal if there is no linear code with higher minimum distance d given the length n and the dimension k. There are bounds giving limits for the minimum distance d of a linear code of fixed length n and dimension k. The lower bound which can be taken by construction process tells that there is a known linear code having this minimum distance. The upper bound is given by theoretic results such as Griesmer bound. One way to find an optimal binary linear code is to make the lower bound of d equal to its higher bound. That is, to construct a binary linear code which achieves the highest possible value of its minimum distance d, given n and k. Some optimal binary linear codes were presented by Andries Brouwer in his published table on bounds of the minimum distance d of binary linear codes for 1 ≤ n ≤ 256 and k ≤ n. This was further improved by Markus Grassl by giving a detailed construction process for each code exhibiting the lower bound. In this paper, we construct new optimal binary linear codes by using some construction processes on existing binary linear codes. Particularly, we developed an algorithm applied to the codes already constructed to extend the list of optimal binary linear codes up to 257 ≤ n ≤ 300 for k ≤ 7.

Keywords: bounds of linear codes, Griesmer bound, construction of linear codes, optimal binary linear codes

Procedia PDF Downloads 725
5837 Characterizing Compressive Strength of Compressed Stabilized Earth Blocks as a Function of Mix Design

Authors: Robert K. Hillyard, Jonathan Thomas, Brett A. Story

Abstract:

Compressed Stabilized Earth Blocks (CSEB) are masonry units that combine soil, sand, stabilizer, and water under pressure to form an earth block. These CSEB’s offer a cost-effective building solution for remote construction, using local resources and labor to minimize transportation and material costs. However, CSEB’s, and earthen construction generally have not been widely adopted as standardized construction materials. One shortcoming is the difficulty in standardizing strength values of CSEB units and systems due to the inherent variations in mix design, including production compression. This research presents findings on compressive strengths of full-scale CSEB’s from 60 different mix designs as a function of the amount of cement, sand, soil, and water added to the mixture. The full-scale results are compared with CSEB cylinder cores.

Keywords: CSEB, compressive strength, earth construction, mix design

Procedia PDF Downloads 69
5836 Modern Management Principles Enshrined in Ancient Vedic Texts

Authors: M. Kishore Kumar

Abstract:

The ancient Vedas and Upanishads are a treasure of knowledge gifted to the world by India. The four Vedas, a conglomerate of Hindu scriptures, contain many principles of modern management at organisation as well as at individual levels. It lays down the duties of a King and ministers as well as its citizens and cites values for leadership. Bhagawadgita (or ‘Gita’ in short), popularly cited as Pancham (Fifth) Veda, is stated to be sermoned about 5000 years ago by Lord Krishna. In the midst of the Kurukshetra battle, Gitopadesh was given various aspects such as dharma (duties), karma (action), stithaprajna (stable mind), nishkama (detachment from results) and ethics. Arjun was steered to victory by Lord Krishna as his charioteer, and the 700-odd-verse holy text Bhagawadgita can become a valuable guide for all of us to achieve success in business management. Many parallels exist between modern-day management theories and principles enshrined in Vedic texts.

Keywords: goal, motivation, leadership, mind, management

Procedia PDF Downloads 58
5835 Cost Overrun in Delivery of Public Projects in the Saudi Construction Industry: A Review

Authors: A. Aljohani, D. Moore, D. D. Ahiaga-Dagbui

Abstract:

Cost overruns are endemic in the delivery of construction projects. The problem is global. It occurs irrespective of type and size of the project, its location, procurement method or client. The size of overruns can be as high as 200% in some cases. Projects thus unfortunately often make the news headlines, not for their immense socio-economic contribution to society, but for being poorly procured. In Saudi Arabia, two-thirds of construction projects are publicly procured by the Saudi government, which has been invested Billions of dollars in infrastructure projects each year as part of an ambitious strategic development agenda to shift from mainly oil dependency to multi-source dependency. However, reports show that about 3,000 public projects face diverse issues related to time and cost overrun. As part of an on-going study to develop a framework for effective public procurement for the Saudi Arabian construction industry, this paper reports the initial findings of the causes of cost overruns in the context of the Gulf State. It also evaluates the interface between some of the front-end loading issues in public procurement in Saudi and their effects on project performance. A systematic review of the existing literature on construction cost overruns, with focus on the Saudi Arabian construction industry has been used. One of the initial findings is that a fixed-price contract is usually used by the client in an attempt to transfer all financial risks to the contractors. This has the unintended consequence of creating a turbulent environment for the delivery of the project which leads to project abandonment by contractors, poor quality of work and substantial rework. Further work is being undertaken to empirically verify the initial findings reported in this paper and their generalizability for the construction industry as a whole.

Keywords: cost overrun, public procurement, Saudi Arabia, construction projects

Procedia PDF Downloads 245
5834 Construction Time - Cost Trade-Off Analysis Using Fuzzy Set Theory

Authors: V. S. S. Kumar, B. Vikram, G. C. S. Reddy

Abstract:

Time and cost are the two critical objectives of construction project management and are not independent but intricately related. Trade-off between project duration and cost are extensively discussed during project scheduling because of practical relevance. Generally when the project duration is compressed, the project calls for an increase in labor and more productive equipments, which increases the cost. Thus, the construction time-cost optimization is defined as a process to identify suitable construction activities for speeding up to attain the best possible savings in both time and cost. As there is hidden tradeoff relationship between project time and cost, it might be difficult to predict whether the total cost would increase or decrease as a result of compressing the schedule. Different combinations of duration and cost for the activities associated with the project determine the best set in the time-cost optimization. Therefore, the contractors need to select the best combination of time and cost to perform each activity, all of which will ultimately determine the project duration and cost. In this paper, the fuzzy set theory is used to model the uncertainties in the project environment for time-cost trade off analysis.

Keywords: fuzzy sets, uncertainty, qualitative factors, decision making

Procedia PDF Downloads 625
5833 Optimizing Bridge Deck Construction: A deep Neural Network Approach for Limiting Exterior Grider Rotation

Authors: Li Hui, Riyadh Hindi

Abstract:

In the United States, bridge construction often employs overhang brackets to support the deck overhang, the weight of fresh concrete, and loads from construction equipment. This approach, however, can lead to significant torsional moments on the exterior girders, potentially causing excessive girder rotation. Such rotations can result in various safety and maintenance issues, including thinning of the deck, reduced concrete cover, and cracking during service. Traditionally, these issues are addressed by installing temporary lateral bracing systems and conducting comprehensive torsional analysis through detailed finite element analysis for the construction of bridge deck overhang. However, this process is often intricate and time-intensive, with the spacing between temporary lateral bracing systems usually relying on the field engineers’ expertise. In this study, a deep neural network model is introduced to limit exterior girder rotation during bridge deck construction. The model predicts the optimal spacing between temporary bracing systems. To train this model, over 10,000 finite element models were generated in SAP2000, incorporating varying parameters such as girder dimensions, span length, and types and spacing of lateral bracing systems. The findings demonstrate that the deep neural network provides an effective and efficient alternative for limiting the exterior girder rotation for bridge deck construction. By reducing dependence on extensive finite element analyses, this approach stands out as a significant advancement in improving safety and maintenance effectiveness in the construction of bridge decks.

Keywords: bridge deck construction, exterior girder rotation, deep learning, finite element analysis

Procedia PDF Downloads 35
5832 A Preliminary Study of the Subcontractor Evaluation System for the International Construction Market

Authors: Hochan Seok, Woosik Jang, Seung-Heon Han

Abstract:

The stagnant global construction market has intensified competition since 2008 among firms that aim to win overseas contracts. Against this backdrop, subcontractor selection is identified as one of the most critical success factors in overseas construction project. However, it is difficult to select qualified subcontractors due to the lack of evaluation standards and reliability. This study aims to identify the problems associated with existing subcontractor evaluations using a correlations analysis and a multiple regression analysis with pre-qualification and performance evaluation of 121 firms in six countries.

Keywords: subcontractor evaluation system, pre-qualification, performance evaluation, correlation analysis, multiple regression analysis

Procedia PDF Downloads 341
5831 Navigating Disruption: Key Principles and Innovations in Modern Management for Organizational Success

Authors: Ahmad Haidar

Abstract:

This research paper investigates the concept of modern management, concentrating on the development of managerial practices and the adoption of innovative strategies in response to the fast-changing business landscape caused by Artificial Intelligence (AI). The study begins by examining the historical context of management theories, tracing the progression from classical to contemporary models, and identifying key drivers of change. Through a comprehensive review of existing literature and case studies, this paper provides valuable insights into the principles and practices of modern management, offering a roadmap for organizations aiming to navigate the complexities of the contemporary business world. The paper examines the growing role of digital technology in modern management, focusing on incorporating AI, machine learning, and data analytics to streamline operations and facilitate informed decision-making. Moreover, the research highlights the emergence of new principles, such as adaptability, flexibility, public participation, trust, transparency, and digital mindset, as crucial components of modern management. Also, the role of business leaders is investigated by studying contemporary leadership styles, such as transformational, situational, and servant leadership, emphasizing the significance of emotional intelligence, empathy, and collaboration in fostering a healthy organizational culture. Furthermore, the research delves into the crucial role of environmental sustainability, corporate social responsibility (CSR), and corporate digital responsibility (CDR). Organizations strive to balance economic growth with ethical considerations and long-term viability. The primary research question for this study is: "What are the key principles, practices, and innovations that define modern management, and how can organizations effectively implement these strategies to thrive in the rapidly changing business landscape?." The research contributes to a comprehensive understanding of modern management by examining its historical context, the impact of digital technologies, the importance of contemporary leadership styles, and the role of CSR and CDR in today's business landscape.

Keywords: modern management, digital technology, leadership styles, adaptability, innovation, corporate social responsibility, organizational success, corporate digital responsibility

Procedia PDF Downloads 43
5830 Individual and Contextual Factors Associated with Modern Contraceptive Use among Sexually Active Adolescents and Young Women in Zambia: A Multilevel Analysis

Authors: Chinyama Lukama, Million Phiri, Namuunda Mutombo

Abstract:

Background: Improving access and utilization to high-quality sexual and reproductive health (SRH) information and services, including family planning (FP) commodities, is central to the global developmental agenda of sub-Saharan Africa (SSA). Despite the importance of family planning use in enhancing maternal health outcomes and fertility reduction, the prevalence of adolescents and young women using modern contraception is generally low in SSA. Zambia is one of the countries in Southern Africa with a high prevalence of teenage pregnancies and fertility rates. Despite many initiatives that have been implemented to improve access and demand for family planning commodities, utilization of FP, especially among adolescents and young women, has generally been low. The objective of this research agenda was to better understand the determinants of modern contraceptive use in adolescents and young women in Zambia. This analysis produced findings that will be critical for informing the strengthening of sexual and reproductive health policy strategies aimed at bolstering the provision and use of maternal health services in order to further improve maternal health outcomes in the country. Method: The study used the recent data from the Demographic and Health Survey of 2018. A sample of 3,513 adolescents and young women (ADYW) were included in the analysis. Multilevel logistic regression models were employed to examine the association of individual and contextual factors with modern contraceptive use among adolescents and young women. Results: The prevalence of modern contraception among sexually active ADYW in Zambia was 38.1% [95% CI, 35.9, 40.4]. ADYW who had secondary or higher level education [aOR = 2.16, 95% CI=1.35–3.47], those with exposure to listening to the radio or watching television [aOR = 1.26, 95% CI=1.01–1.57], and those who had decision-making power at household level [aOR = 2.18, 95% CI=1.71–2.77] were more likely to use modern contraceptives. Conversely, strong neighborhood desire for large family size among ADYW [aOR = 0.65 95% CI = 0.47–0.88] was associated with less likelihood to use modern contraceptives. Community access to family planning information through community health worker visits increased the likelihood [aOR = 1.48, 95% CI=1.16–1.91] of using modern contraception among ADYW. Conclusion: The study found that both individual and community factors were key in influencing modern contraceptive use among adolescents and young women in Zambia. Therefore, when designing family planning interventions, the Government of Zambia, through its policymakers and sexual reproductive health program implementers at the Ministry of Health, in collaboration with stakeholders, should consider the community context. There should also be deliberate actions to encourage family planning education through the media.

Keywords: adolescents, young women, modern contraception use, fertility, family planning

Procedia PDF Downloads 73
5829 Comparison Constructions in the Language of the Qur'an

Authors: Safiah Ahmed Yahya Madkhali

Abstract:

The aim of the present paper is to provide a characterization of the expression of comparison in the language of the Qur’an, the language of the Divine Book of the Muslim nation. It focuses on quantitative as well as qualitative comparisons. While works on comparison constructions in Arabic focus on a type(s) of the comparison construction and exclude another and investigate its behaviour in Standard Arabic, the paper aims to be inclusive of the varied instances that are scalar comparison constructions and describe its aspects in the language of the Qur’an. To the best of my knowledge, comparative constructions in the language of the Qur’an has not been tackled before and hence the characterization provided in the paper would be the contribution of the present work. The paper highlights the several rhetorical features of the construction as present in the different verses in the Qur’an which set them distinct from the ordinary use of the construction in the different verities of the Arabic language.

Keywords: comparison constructions, inequality, comparative, superlative, equality

Procedia PDF Downloads 52
5828 Reliability of the Estimate of Earthwork Quantity Based on 3D-BIM

Authors: Jaechoul Shin, Juhwan Hwang

Abstract:

In case of applying the BIM method to the civil engineering in the area of free formed structure, we can expect comparatively high rate of construction productivity as it is in the building engineering area. In this research, we developed quantity calculation error applying it to earthwork and bridge construction (e.g. PSC-I type segmental girder bridge amd integrated bridge of steel I-girders and inverted-Tee bent cap), NATM (New Austrian Tunneling Method) tunnel construction, retaining wall construction, culvert construction and implemented BIM based 3D modeling quantity survey. we confirmed high reliability of the BIM-based method in structure work in which errors occurred in range between -6% ~ +5%. Especially, understanding of the problem and improvement of the existing 2D-CAD based of quantity calculation through rock type quantity calculation error in range of -14% ~ +13% of earthwork quantity calculation. It is benefit and applicability of BIM method in civil engineering. In addition, routine method for quantity of earthwork has the same error tolerance negligible for that of structure work. But, rock type's quantity calculated as the error appears significantly to the reliability of 2D-based volume calculation shows that the problem could be. Through the estimating quantity of earthwork based 3D-BIM, proposed method has better reliability than routine method. BIM, as well as the design, construction, maintenance levels of information when you consider the benefits of integration, the introduction of BIM design in civil engineering and the possibility of applying for the effectiveness was confirmed.

Keywords: BIM, 3D modeling, 3D-BIM, quantity of earthwork

Procedia PDF Downloads 419
5827 The Micro-Activated Organic Regeneration in Rural Construction: A Case Study of Yangdun Village in Deqing County, Zhejiang Province

Authors: Chengyuan Zhu, Zhu Wang

Abstract:

With the strategy of Rural Rejuvenation proposed in China, the rural has become the focus of all works today. In addition to the support of industry and policy, the rural planning and construction which is the space dependence of Rural Rejuvenation are also very crucial. Based on an analysis of the case of Yangdun Village in Deqing County, this paper summarizes village existing resources and construction status quo. It tries to illuminate the micro-activated organic renewal strategies and methods, based on ecological landscape, history context, industry development and living life requirements. It takes advantage of industrial linkage and then asks for the coordination of both spatial and industrial planning, the revival and remodeling of the rural image can be achieved through shaping the of architectural and landscape nodes as well as the activation of street space.

Keywords: rural construction, rural human settlements, micro-activation, organic renewal

Procedia PDF Downloads 205
5826 Eco-Design of Construction Industrial Park in China with Selection of Candidate Tenants

Authors: Yang Zhou, Kaijian Li, Guiwen Liu

Abstract:

Offsite construction is an innovative alternative to conventional site-based construction, with wide-ranging benefits. It requires building components, elements or modules were prefabricated and pre-assembly before installed into their final locations. To improve efficiency and achieve synergies, in recent years, construction companies were clustered into construction industrial parks (CIPs) in China. A CIP is a community of construction manufacturing and service businesses located together on a common property. Companies involved in industrial clusters can obtain environment and economic benefits by sharing resources and information in a given region. Therefore, the concept of industrial symbiosis (IS) can be applied to the traditional CIP to achieve sustainable industrial development or redevelopment through the implementation of eco-industrial parks (EIP). However, before designing a symbiosis network between companies in a CIP, candidate support tenants need to be selected to complement the existing construction companies. In this study, an access indicator system and a linear programming model are established to select candidate tenants in a CIP while satisfying the degree of connectivity among the enterprises in the CIP, minimizing the environmental impact, and maximizing the annualized profit of the CIP. The access indicator system comprises three primary indicators and fifteen secondary indicators, is proposed from the perspective of park-based level. The fifteen indicators are classified as three primary indicators including industrial symbiosis, environment performance and economic benefit, according to the three dimensions of sustainability (environment, economic and social dimensions) and the three R's of the environment (reduce, reuse and recycle). The linear programming model is a method to assess the satisfactoriness of all the indicators and to make an optimal multi-objective selection among candidate tenants. This method provides a practical tool for planners of a CIP in evaluating which among the candidate tenants would best complement existing anchor construction tenants. The reasonability and validity of the indicator system and the method is worth further study in the future.

Keywords: construction industrial park, China, industrial symbiosis, offsite construction, selection of support tenants

Procedia PDF Downloads 244
5825 Faults in the Projects, Deviation in the Cost

Authors: S. Ahmed, P. Dlask, B. Hasan

Abstract:

There are several ways to estimate the cost of the construction project: simple and detailed. The process of estimating cost is usually done during the design stage, which should take long-time and the designer must give attention to all details. This paper explain the causes of the deviations occurring in the cost of the construction project, and determines the reasons of these differences between contractual cost and final cost of the construction project, through the study of literature review related to this field, and benefiting from the experience of workers in the field of building (owners, contractors) through designing a questionnaire, and finding the most ten important reasons and explain the relation between the contractual cost and the final cost according to these reasons. The difference between those values will be showed through diagrams drawn using the statistical program. In addition to studying the effects of overrun costs on the advancing of the project, and identify the most five important effects. According to the results, we can propose the right direction for the final cost evaluation and propose some measures that would help to control and adjust the deviation in the costs.

Keywords: construction projects, building, cost, estimating costs, delay, overrun

Procedia PDF Downloads 273
5824 Maturity Level of Knowledge Management in Whole Life Costing in the UK Construction Industry: An Empirical Study

Authors: Ndibarefinia Tobin

Abstract:

The UK construction industry has been under pressure for many years to produce economical buildings which offer value for money, not only during the construction phase, but more importantly, during the full life of the building. Whole life costing is considered as an economic analysis tool that takes into account the total investment cost in and ownership, operation and subsequent disposal of a product or system to which the whole life costing method is being applied. In spite of its importance, the practice is still crippled by the lack of tangible evidence, ‘know-how’ skills and knowledge of the practice i.e. the lack of professionals with the knowledge and training on the use of the practice in construction project, this situation is compounded by the absence of available data on whole life costing from relevant projects, lack of data collection mechanisms and so on. The aforementioned problems has forced many construction organisations to adopt project enhancement initiatives to boost their performance on the use of whole life costing techniques so as to produce economical buildings which offer value for money during the construction stage also the whole life of the building/asset. The management of knowledge in whole life costing is considered as one of the many project enhancement initiative and it is becoming imperative in the performance and sustainability of an organisation. Procuring building projects using whole life costing technique is heavily reliant on the knowledge, experience, ideas and skills of workers, which comes from many sources including other individuals, electronic media and documents. Due to the diversity of knowledge, capabilities and skills of employees that vary across an organisation, it is significant that they are directed and coordinated efficiently so as to capture, retrieve and share knowledge in order to improve the performance of the organisation. The implementation of knowledge management concept has different levels in each organisation. Measuring the maturity level of knowledge management in whole life costing practice will paint a comprehensible picture of how knowledge is managed in construction organisations. Purpose: The purpose of this study is to identify knowledge management maturity in UK construction organisations adopting whole life costing in construction project. Design/methodology/approach: This study adopted a survey method and conducted by distributing questionnaires to large construction companies that implement knowledge management activities in whole life costing practice in construction project. Four level of knowledge management maturity was proposed on this study. Findings: From the results obtained in the study shows that 34 contractors at the practiced level, 26 contractors at managed level and 12 contractors at continuously improved level.

Keywords: knowledge management, whole life costing, construction industry, knowledge

Procedia PDF Downloads 220
5823 The Grand Egyptian Museum as a Cultural Interface

Authors: Mahmoud Moawad Mohamed Osman

Abstract:

The Egyptian civilization was and still is an inspiration for many human civilizations and modern sciences. For this reason, there is still a passion for the ancient Egyptian civilization. Due to the breadth and abundance of the outputs of the ancient Egyptian civilization, many museums have been established that contribute to displaying and demonstrating the splendor of the ancient Egyptian civilization, and among those museums is the Grand Egyptian Museum (Egypt's gift to the whole world). The idea of establishing the Grand Egyptian Museum began in the nineties of the last century, and in 2002 the foundation stone was laid for the museum project to be built in a privileged location overlooking the eternal pyramids of Giza, where the Egyptian state was declared, and under the auspices of the United Nations Educational, Scientific and Cultural Organization (UNESCO) and the International Union of Architects. , for an international architectural competition for the best design for the museum. The current design submitted by Heneghan Peng Architects in Ireland won, and its design was based on the rays of the sun extending from the tops of the three pyramids when they meet to represent a conical mass, which is the Grand Egyptian Museum. The construction of the museum project began in May 2005, when the site was paved and prepared, and in 2006, the largest antiquities restoration center in the Middle East was established, dedicated to the restoration, preservation, maintenance and rehabilitation of the antiquities scheduled to be displayed in the museum halls, which was opened in 2010. The construction of the museum building, which has an area of more than 300,000 square meters, was completed during the year 2021, and includes a number of exhibition halls, each of which is considered larger than many current museums in Egypt and the world. The museum is considered one of the most important and greatest achievements of modern Egypt. It was created to be an integrated global civilizational, cultural and entertainment edifice, and to be the first destination for everyone interested in ancient Egyptian heritage, as the largest museum in the world that tells the story of the history of ancient Egyptian civilization, as it contains a large number of distinctive and unique artifacts, including the treasures of the golden king Tutankhamun, which... It is displayed for the first time in its entirety since the discovery of his tomb in November 1922, in addition to the collection of Queen Hetepheres, the guard of the mother of King Khufu, the builder of the Great Pyramid in Giza, as well as the Museum of King Khufu’s Boats, as well as various archaeological collectibles from the pre-dynastic era until the Greek and Roman eras.

Keywords: grand egyptian museum, egyptian civilization, education, museology

Procedia PDF Downloads 20
5822 Late Payment Issues Faced by Subcontractors in the Malaysian Construction Industry

Authors: Nur Emma Mustaffa, Hii Ping Ping

Abstract:

Late payment is a common issue in the construction industry and the subcontractors are not spared from it. This study has been carried out with the objectives to identify the implications of late payment issues toward the subcontractors and the strategies adopted by them to overcome the late payment issues. In terms of the strategies which can be adopted in overcoming the late payment, the subcontractors may suspend or slow down the construction process, making periodic follow up with the client, demand the rights to interest on late payment or the issuance of a promissory note by the client. The focus of the study is primarily on Grade 4 to Grade 7 contractors in Johor Bahru, Malaysia who carried out subcontracting works and registered under Construction Industry Development Board (CIDB). Employing survey as the main research method for data collection, the analysis would therefore mainly be adopting Likert Scale Analysis, Ranking Analysis and Frequency Distribution Analysis. This research showed the main implication of late payment issues towards subcontractors is created financial hardship to them. Besides, the most effective strategy adopted by the subcontractors to overcome the late payment issues is follow-up with client using formal procedure. From the findings, most of the subcontractors had low level of experiences and frequency in the adoption of Construction Industry Payment and Adjudication Act (CIPAA) 2012 to solve the payment disputes in the construction industry. In a nutshell, it is hoped that these findings will become guidance to the subcontractors to overcome the late payment issues in their future projects.

Keywords: subcontractors, implications, strategies, CIPAA 2012, payment

Procedia PDF Downloads 140
5821 Applications of Engineering Geology in Hydro Power Tunnel Projects in Himalayan Geological Regime

Authors: Rameh Chauhan

Abstract:

Tunnel construction in Himalayan rock is a challenging task due to fragile nature of the strata. Tunnel excavation carried out from lower Himalayas to high Himalayas in different metamorphic rock. Therefore application of engineering geology plays a vital role during various stage of the tunneling projects. Engineering geology is defined as application of geology to construction of civil structures through engineering practice. It is applied to the design, construction and performance aspects of engineering structure on the surface or sub-surface like dam, underground and surface power house, cut slopes, tunnels and underground storage cavern for nuclear material. But this paper emphasized mostly on underground structures like big caverns of Power house, desilting chambers, and tunnels of various sizes. Construction of these structures in the fragile rock conditions of Himalayan geology from Western Himalayas to Eastern Himalayas necessitated the application of the engineering geology on the micro-scale base for the stability, performance, and longevity of the civil structures. Number of hydropower projects have been constructed, some of them are under construction and under investigation stage. These projects are located in various parts of Himalayas under various seismic-tectonic zones. Tunneling works are involved in these projects. This paper represents the various engineering geological practices adopted in investigation and construction stage of various projects based on experiences gained during past construction histories in Himalayan geology of young mountains in very fragile geological conditions. Highlighting and sharing of use of these techniques on various platforms will definitely enhance the knowledge for carrying out the construction of various projects for the development of society. Construction of the tunnels, surface, and sub-surface caverns, dams, highway, metro, highway tunnels are all based on engineering geological parameters in combinations with other engineering considerations.

Keywords: cavern-power house, desilting chambers and tunnels, seismic-tectonic-zones, earthquake-prone zones based on intensities

Procedia PDF Downloads 198
5820 Assessing Suitability of Earthbag Technology for Temporary Housing: Sustainability Challenge

Authors: S. M. Amin Hosseini, Ana Blanco, Albert De La Fuente, Sergio Cavalaro

Abstract:

In emergency situations, it is fundamental to provide with a safe shelter to the population affected. However, the lack of resources and short time often represent a barrier difficult to overcome. A sustainable, rapid and low-cost construction technique is earthbag construction. This technique has spread as an alternative to the construction of emergency shelter, social housing, and even ecovillages. The earthbag construction consists of introducing soil in degradable bags that are stacked to form adobe structures. The present study aims to assess characteristics of the earthbag construction technique based on sustainability requirements and features of other methods used for temporary housing. In this case, after defining the sustainability criteria and emergency situation necessities, this study compares earthbag construction with other types of prefabricated temporary housing. Finally, the most suitable conditions for applying this technique based on the particular local properties and second life scenarios of superadobe temporary housing. The results of the study contribute to promote the earthbag and superadobe techniques as sustainable alternatives for temporary housing. However, the sustainability index of this technology highly depends on affected local conditions and characteristics. Consequently, in order to achieve a high sustainability index, emergency managers need to decide about this technology based on the highlighted results of this study, attention to the importance of specific local conditions and next functions of temporary housing.

Keywords: temporary housing, temporary shelter, earthbag, superadobe, sustainability, emergency

Procedia PDF Downloads 205
5819 Appraisal of Transaction Cost in South African Construction Projects

Authors: Kenneth O. Otasowie, Matthew Ikuabe, Clinton Aigbavboa, Ayodeji Oke

Abstract:

Construction project cost are not only made up of production costs. This cost comprises of many other elements such as the preparation of a bidding document, cost estimations, drafting contractual agreements and monitoring that contractual obligations are met. Several studies have stressed the need for transaction costs (TC) to be defined in a way that covers all phases of a project and not only the pre-contract phase. Hence, this study aims to appraise transaction cost in South African (SA) construction projects by assessing what constitutes transaction cost, influencing factors and possible optimisation measures. A survey design was adopted. A total number of eighty (80) questionnaires were administered to quantity surveyors, procurement managers and project managers in Guateng Province, SA and seventy-two (72) were returned and found suitable for analysis. Collected data was analysed using percentage, mean item score, standard deviation, one-sample t-test. The findings show that external technical interaction, uncertainty, human factors are the most significant constituents of TC in SA, while technical competency, experience in similar project type and project characteristics are the leading influencing factors. Furthermore, understanding project characteristics, clear communication and technically competent project teams are most of the significant measures for optimising TC in SA construction projects. Therefore, this study recommends that a competent project team and a clear communication are fundamental to proper management of TC in SA construction projects.

Keywords: construction projects, project cost, South Africa, transaction cost

Procedia PDF Downloads 76
5818 Strategic Orientation of Islamic Banks: A Review of Strategy Language

Authors: Imam Uddin, Imtiaz Ahmed Memon

Abstract:

This paper analyzes the ideological contextuality of market oriented strategy language used by Industry leaders to envision the future of Islamic financial Institutions (IFIs) in the light of Wittgenstein language-games and Foucault’s power-discourse framework. The analysis infers that the explicit market orientation of strategy language and modern knowledge of finance now defines various concepts related of Islamic finance, let alone Islamic finance theory itself. Theorizing and practicing Islamic finance therefore under the dominant influence of modern strategy discourse and modern knowledge of finance has significant implications for developing an ethical and spiritual orientation of Islamic banks. The concerned academia and scholarship therefore need to review such trends and work around the possible degradation to the public image of IFIs and resulting disappointments of religiously inspired customers.

Keywords: Islamic finance discourse, strategy discourse, language games, strategic intent, productive misunderstanding

Procedia PDF Downloads 355
5817 Sustainable Smart Contraction: China Eco-district Evolution Research and Future Exploration

Authors: Xincheng He, Weijun Gao, Gangwei Cai

Abstract:

In the process of rapid urbanization, large-scale industrial production, and unreasonable planning and construction have caused various ecological and environmental problems, while hindered the sustainable development of cities. The ecological district not only realizes the coordinated development of society, economy, and environment but also conforms to the trend of smart contraction of the development of cities in China from the periphery to the center. This paper reviews the development of China's ecological district, including the full life cycle process of policy, planning, implementation, and operation. Based on sorting out the concept, connotation, and development status of China’s ecological district, the relationship between the construction of the ecological district and the sustainable city is discussed. Summarizing the development trend of the ecological district, the ecological district should combine the construction of smart cities, actively respond to the digital information era, and improve the construction of the ecological district system. It proposes that the future direction of city's sustainable development needs to change from a thematic focus on ecology to the common urbanization of humanity, society, and nature. Focusing on people-oriented, ecological, and digital future communities will become an important construction method for the city's sustainable smart contraction.

Keywords: eco-district, smart contraction, sustainable development, future community

Procedia PDF Downloads 119
5816 Discourse Analysis of the Concept of Citizenship in Textbooks in Iran

Authors: Jafar Ahmadi

Abstract:

This research has been done as a discourse analysis of the concept of citizenship in textbooks in Iran. The purpose of this study is to identify the dominant citizenship discourse in textbooks in the content of textbooks. The research method in this research is qualitative and qualitative content analysis. The statistical sample was selected in a purposeful manner and according to the research topic of books related to Persian literature, religious education and social education. The selected theoretical framework of this research is the three theories of citizenship (pre-modern, modern and postmodern). For each of these discourses, components and indicators have been extracted that are the basis of data analysis. The research findings show that the dominant citizenship discourse on the content of Iranian textbooks is pre-modern discourse and is the basis of this type of religious citizenship discourse. Finally, the findings show that the government uses the institution of education to reproduce its power.

Keywords: citizenship, textbooks, discourse analysis, religious citizenship, representation

Procedia PDF Downloads 174
5815 Modern Tragic Substance in O’Neill’s Desire under the Elms and Mourning Becomes Electra

Authors: Azza Taha Zaki

Abstract:

The position Eugene O’Neill occupies in the history of American drama is undisputable. Critics have agreed that the American theatre was waiting for O’Neill to give it substance, character, and value. The American dramatist continues to be considered as a major influence on the body of dramatic repertoire across the globe. The American theatre before O’Neill knew playwrights who were mostly viewed as entertainers. The serious drama had to wait until O’Neill started his career with expressionistic and social drama. His breakthrough, however, came in 1925 when he published Desire Under the Elms, described as the first important tragedy to be written in America. Mourning Becomes Electra, published in 1931, further reinforced the reputation of Eugene O’Neill and was described as his 'magnum opus'. Aspiring to portray the essence of life and man’s innermost conflicts, O’Neill turned to the classical model, rather than to social realistic drama, to create modern tragedies with the aid of the then-new science of psychology. The present paper aims to undertake an in-depth study of how overtones from classical tragedies by the classical masters Aeschylus, Sophocles, and Euripides resonate through O’Neill’s two plays. The paper shows how leaning on classical themes and concepts interpreted in terms of psychological forces have added depth and tragic substance to a modern milieu and produced masterpieces of dramaturgy.

Keywords: classical, drama, O'Neill, modern, tragic

Procedia PDF Downloads 119
5814 Modern Contraceptives versus Traditional Contraceptives and Abortion: An Ethnography of Fertiliy Control Practices in Burkina Faso

Authors: Seydou Drabo

Abstract:

This paper examines how traditional contraceptives and abortion practices challenges the use of modern contraceptives in Burkina Faso. It demonstrates how fears and ‘superstitions’ interact with knowledge about modern contraceptives methods to determine use in a context where other way of controlling fertility (traditional contraceptives, abortion) are available to women in the public, private and traditional health sectors. Furthermore, these issues come at the time when Burkina Faso is among countries with a high fertility rate which (6.0 in 2010) and a very low used of contraceptives as only 16% of married women of childbearing age were using a contraceptive method in 2010. The country also has a young population since 33 % of the population is between 10-24 years old and this number is expected to increase by 2050, generating fears that a growing population of youth will put excessive pressure on available resources, including access to education, health services, and employment. Despite over two decades of dedicated policy attention, 24% of women of reproductive age (15-49) was estimated to have an unmet need for contraception in 2010. This paper draws on ethnographic fieldwork conducted since march 2016 (The research is still in progress) in Burkina Faso. Data were collected from 25 women (users and non-users of modern contraceptives and /or traditional contraceptives, post abortion care patients), 4 street drugs vendors and 3 traditional healers through formal and informal interviews, as well as direct observation. The findings show that a variety of contraceptives methods and abortion drugs or methods, both traditional and modern circulate and are available to women. Traditional contraceptives called African contraceptives by some of our participants refer to several birth control method including plants decoction, magical ring, waist necklace, a ritual done with a mixture of lay coming from termite mound and menses. Abortion is a practice that is done in secret through the use of abortion drugs or through intra uterine manoeuvres. Modern contraceptives include Oral contraceptive, implants, injectable. Stereotypes about modern contraceptives, having regular menstrual cycles and adopt of natural birth control methods, bad experience with modern contraceptives methods, the side effect of modern contraceptives, irregularity of sexual activities and the availability of emergency contraceptives are among factors that limit their use among women. In addition, a negative perception is built around modern contraceptives seen as the drug of ‘white people’. In general, the information on these drugs circulates in women’s social network (first line of information on contraceptive). Some women prefer using what they call African contraceptives or inducing an abortion over modern contraceptives because of their side effect. Furthermore, the findings show that women practices and attitudes in controlling birth varies throughout different phases of their lives. Beyond global discourses and technical solution, the issue of Family planning is all about social practices.

Keywords: abortion, Burkina Faso, contraception, culture, women

Procedia PDF Downloads 176