Search results for: construction project
7854 Optimizing Recycling and Reuse Strategies for Circular Construction Materials with Life Cycle Assessment
Authors: Zhongnan Ye, Xiaoyi Liu, Shu-Chien Hsu
Abstract:
Rapid urbanization has led to a significant increase in construction and demolition waste (C&D waste), underscoring the need for sustainable waste management strategies in the construction industry. Aiming to enhance the sustainability of urban construction practices, this study develops an optimization model to effectively suggest the optimal recycling and reuse strategies for C&D waste, including concrete and steel. By employing Life Cycle Assessment (LCA), the model evaluates the environmental impacts of adopted construction materials throughout their lifecycle. The model optimizes the quantity of materials to recycle or reuse, the selection of specific recycling and reuse processes, and logistics decisions related to the transportation and storage of recycled materials with the objective of minimizing the overall environmental impact, quantified in terms of carbon emissions, energy consumption, and associated costs, while adhering to a range of constraints. These constraints include capacity limitations, quality standards for recycled materials, compliance with environmental regulations, budgetary limits, and temporal considerations such as project deadlines and material availability. The strategies are expected to be both cost-effective and environmentally beneficial, promoting a circular economy within the construction sector, aligning with global sustainability goals, and providing a scalable framework for managing construction waste in densely populated urban environments. The model is helpful in reducing the carbon footprint of construction projects, conserving valuable resources, and supporting the industry’s transition towards a more sustainable future.Keywords: circular construction, construction and demolition waste, material recycling, optimization modeling
Procedia PDF Downloads 577853 Causes and Impacts of Rework Costs in Construction Projects
Authors: Muhammad Ejaz1
Abstract:
Rework has been defined as: "The unnecessary effort of re-doing a process or activity that was incorrectly implemented the first time." A great threat to the construction industry is rework. By and large due attention has not been given to avoid the causes of reworks, resulting time and cost over runs, in civil engineering projects. Besides these direct consequences, there might also be indirect consequences, such as stress, de-motivation or loss of future clients. When delivered products do not meet the requirements or expectations, work often has to be redone. Rework occurs in various phases of the construction process or in various divisions of a company. Rework can occur on the construction site or in a management department due to for example bad materials management. Rework can also have internal or external origins. Changes in clients’ expectations are an example of an external factor that might lead to rework. Rework can cause many costs to be higher than calculated at the start of the project. Rework events can have many different origins and for this research they have been categorized into four categories; changes, errors, omissions, and damages. The research showed that the major source of reworks were non professional attitude from technical hands and ignorance of total quality management principals by stakeholders. It also revealed that sources of reworks have not major differences among project categories. The causes were further analyzed by interviewing employees. Based on existing literature an extensive list of rework causes was made and during the interviews the interviewees were asked to confirm or deny statements regarding rework causes. The causes that were most frequently confirmed can be grouped into the understanding categories. 56% (max) of the causes are change-related, 30% (max) is error-related and 18% (max) falls into another category. Therefore, by recognizing above mentioned factors, reworks can be reduced to a great extent.Keywords: total quality management, construction industry, cost overruns, rework, material management, client’s expectations
Procedia PDF Downloads 2937852 Optimizing Recycling and Reuse Strategies for Circular Construction Materials with Life Cycle Assessment
Authors: Zhongnan Ye, Xiaoyi Liu, Shu-Chien Hsu
Abstract:
Rapid urbanization has led to a significant increase in construction and demolition waste (C&D waste), underscoring the need for sustainable waste management strategies in the construction industry. Aiming to enhance the sustainability of urban construction practices, this study develops an optimization model to effectively suggest the optimal recycling and reuse strategies for C&D waste, including concrete and steel. By employing Life Cycle Assessment (LCA), the model evaluates the environmental impacts of adopted construction materials throughout their lifecycle. The model optimizes the quantity of materials to recycle or reuse, the selection of specific recycling and reuse processes, and logistics decisions related to the transportation and storage of recycled materials with the objective of minimizing the overall environmental impact, quantified in terms of carbon emissions, energy consumption, and associated costs, while adhering to a range of constraints. These constraints include capacity limitations, quality standards for recycled materials, compliance with environmental regulations, budgetary limits, and temporal considerations such as project deadlines and material availability. The strategies are expected to be both cost-effective and environmentally beneficial, promoting a circular economy within the construction sector, aligning with global sustainability goals, and providing a scalable framework for managing construction waste in densely populated urban environments. The model is helpful in reducing the carbon footprint of construction projects, conserving valuable resources, and supporting the industry’s transition towards a more sustainable future.Keywords: circular construction, construction and demolition waste, life cycle assessment, material recycling
Procedia PDF Downloads 827851 Research Inspiration for Urban Renewal in Regions with Historical Value in Developed Areas of China: A Case Study of the Hubei Ancient Village
Authors: Qingxiang Zeng
Abstract:
Since the beginning of the 21st century, China's urbanization process has rapidly progressed. Since 2005, China's developed regions have gradually entered the stage of urban conservation and updating. The over-pursuit of economic market benefits in urban construction in China has led to issues such as disrespect for residents' rights, neglect of historical context protection, and gentlemanization, which hinder urban social development in some developed urban areas. This article takes the Hubei Ancient Village renewal project in Shenzhen, China, as an example. The project took eight years to obtain government approval and implementation since its renewal proposal was launched, which has attracted attention from society and urban planning circles. Through an introduction to the project's general situation and renewal process, this article reflects on the issues of planning systems, historical context protection, conflicts between multiple values, and neglect of vulnerable groups in the Hubei Ancient Village renewal and protection project. Based on this reflection, this article summarizes the corresponding experience and provides theoretical help for urban renewal in developed regions in China, providing case references for urban renewal and construction in other developing countries and offering critical thinking and valuable experience for urban planning practitioners and policymakers.Keywords: urban renewal, Hubei Ancient Village, historical context, public participation
Procedia PDF Downloads 747850 Factors Constraining the Utilization of Risk Management Strategies in the Execution of Public Construction Projects in North East Nigeria
Authors: S. U. Kunya, S. A. Mohammad
Abstract:
Construction projects in Nigeria are characterized with risks emanating from delays and accompanying cost-overruns. The aim of the study was to identify and assess factors constraining the utilization of risk management strategies in the execution of public construction project in North-East Nigeria. Data was collected with the aid of a well-structured questionnaire administered to three identified projects in the North-east. Data collected were analysed using the severity index. Findings revealed political involvement, selection of inexperienced contractors and lack of coordinated public sector strategy as the most severe factors constraining the utilization of risk management strategies. The study recommended that: formulation of laws to prevent negative political meddling in construction projects; selection of experienced, risk-informed contractors; and comprehensive risk assessment and planning on all public construction projects.Keywords: factors, Nigeria, north-east, public projects, risk management, strategies, utilization
Procedia PDF Downloads 5347849 Exploring Weld Rejection Rate Limits and Tracers Effects in Construction Projects
Authors: Abdalaziz M. Alsalhabi, Loai M. Alowa
Abstract:
This paper investigates Weld Rejection Rate (WRR) limits and tracer effects in construction projects, with a specific focus on a Gas Plant Project, a mega-project held by Saudi Aramco (SA) in Saudi Arabia. The study included a comprehensive examination of various factors impacting WRR limits. It commenced by comparing the Company practices with ASME standards, followed by an in-depth analysis of both weekly and cumulative projects' historical WRR data, evaluation of Radiographic Testing (RT) reports for rejected welds, and proposal of mitigation methods to eliminate future rejections. Additionally, the study revealed the causes of fluctuation in WRR data and benchmarked with the industry practices. Furthermore, a case study was conducted to explore the impact of tracers on WRR, providing insights into their influence on the welding process. This paper aims to achieve three primary objectives. Firstly, it seeks to validate the existing practices of WRR limits and advocate for their inclusion within relevant International Industry Standards. Secondly, it aims to validate the effectiveness of the WRR formula that incorporates tracer effects, ensuring its reliability in assessing weld quality. Lastly, this study aims to identify opportunities for process improvement in WRR control, with the ultimate goal of enhancing project processes and ensuring the integrity, safety, and efficiency of constructed assets.Keywords: weld rejection rate, weld repair rate in joint and linear basis, tracers effects, construction projects
Procedia PDF Downloads 457848 Integration of Building Information Modeling Framework for 4D Constructability Review and Clash Detection Management of a Sewage Treatment Plant
Authors: Malla Vijayeta, Y. Vijaya Kumar, N. Ramakrishna Raju, K. Satyanarayana
Abstract:
Global AEC (architecture, engineering, and construction) industry has been coined as one of the most resistive domains in embracing technology. Although this digital era has been inundated with software tools like CAD, STADD, CANDY, Microsoft Project, Primavera etc. the key stakeholders have been working in siloes and processes remain fragmented. Unlike the yesteryears’ simpler project delivery methods, the current projects are of fast-track, complex, risky, multidisciplinary, stakeholder’s influential, statutorily regulative etc. pose extensive bottlenecks in preventing timely completion of projects. At this juncture, a paradigm shift surfaced in construction industry, and Building Information Modeling, aka BIM, has been a panacea to bolster the multidisciplinary teams’ cooperative and collaborative work leading to productive, sustainable and leaner project outcome. Building information modeling has been integrative, stakeholder engaging and centralized approach in providing a common platform of communication. A common misconception that BIM can be used for building/high rise projects in Indian Construction Industry, while this paper discusses of the implementation of BIM processes/methodologies in water and waste water industry. It elucidates about BIM 4D planning and constructability reviews of a Sewage Treatment Plant in India. Conventional construction planning and logistics management involves a blend of experience coupled with imagination. Even though the excerpts or judgments or lessons learnt gained from veterans might be predictive and helpful, but the uncertainty factor persists. This paper shall delve about the case study of real time implementation of BIM 4D planning protocols for one of the Sewage Treatment Plant of Dravyavati River Rejuvenation Project in India and develops a Time Liner to identify logistics planning and clash detection. With this BIM processes, we shall find that there will be significant reduction of duplication of tasks and reworks. Also another benefit achieved will be better visualization and workarounds during conception stage and enables for early involvement of the stakeholders in the Project Life cycle of Sewage Treatment Plant construction. Moreover, we have also taken an opinion poll of the benefits accrued utilizing BIM processes versus traditional paper based communication like 2D and 3D CAD tools. Thus this paper concludes with BIM framework for Sewage Treatment Plant construction which will achieve optimal construction co-ordination advantages like 4D construction sequencing, interference checking, clash detection checking and resolutions by primary engagement of all key stakeholders thereby identifying potential risks and subsequent creation of risk response strategies. However, certain hiccups like hesitancy in adoption of BIM technology by naïve users and availability of proficient BIM trainers in India poses a phenomenal impediment. Hence the nurture of BIM processes from conception, construction and till commissioning, operation and maintenance along with deconstruction of a project’s life cycle is highly essential for Indian Construction Industry in this digital era.Keywords: integrated BIM workflow, 4D planning with BIM, building information modeling, clash detection and visualization, constructability reviews, project life cycle
Procedia PDF Downloads 1227847 An Investigation on Opportunities and Obstacles on Implementation of Building Information Modelling for Pre-fabrication in Small and Medium Sized Construction Companies in Germany: A Practical Approach
Authors: Nijanthan Mohan, Rolf Gross, Fabian Theis
Abstract:
The conventional method used in the construction industries often resulted in significant rework since most of the decisions were taken onsite under the pressure of project deadlines and also due to the improper information flow, which results in ineffective coordination. However, today’s architecture, engineering, and construction (AEC) stakeholders demand faster and accurate deliverables, efficient buildings, and smart processes, which turns out to be a tall order. Hence, the building information modelling (BIM) concept was developed as a solution to fulfill the above-mentioned necessities. Even though BIM is successfully implemented in most of the world, it is still in the early stages in Germany, since the stakeholders are sceptical of its reliability and efficiency. Due to the huge capital requirement, the small and medium-sized construction companies are still reluctant to implement BIM workflow in their projects. The purpose of this paper is to analyse the opportunities and obstacles to implementing BIM for prefabrication. Among all other advantages of BIM, pre-fabrication is chosen for this paper because it plays a vital role in creating an impact on time as well as cost factors of a construction project. The positive impact of prefabrication can be explicitly observed by the project stakeholders and participants, which enables the breakthrough of the skepticism factor among the small scale construction companies. The analysis consists of the development of a process workflow for implementing prefabrication in building construction, followed by a practical approach, which was executed with two case studies. The first case study represents on-site prefabrication, and the second was done for off-site prefabrication. It was planned in such a way that the first case study gives a first-hand experience for the workers at the site on the BIM model so that they can make much use of the created BIM model, which is a better representation compared to the traditional 2D plan. The main aim of the first case study is to create a belief in the implementation of BIM models, which was succeeded by the execution of offshore prefabrication in the second case study. Based on the case studies, the cost and time analysis was made, and it is inferred that the implementation of BIM for prefabrication can reduce construction time, ensures minimal or no wastes, better accuracy, less problem-solving at the construction site. It is also observed that this process requires more planning time, better communication, and coordination between different disciplines such as mechanical, electrical, plumbing, architecture, etc., which was the major obstacle for successful implementation. This paper was carried out in the perspective of small and medium-sized mechanical contracting companies for the private building sector in Germany.Keywords: building information modelling, construction wastes, pre-fabrication, small and medium sized company
Procedia PDF Downloads 1137846 Non-Chronological Approach in Crane Girder and Composite Steel Beam Installation: Case Study
Authors: Govindaraj Ramanathan
Abstract:
The time delay and the structural stability are major issues in big size projects due to several factors. Improper planning and poor coordination lead to delay in construction, which sometimes result in reworking or rebuilding. This definitely increases the cost and time of project. This situation stresses the structural engineers to plan out of the limits of contemporary technology utilizing non-chronological approach with creative ideas. One of the strategies to solve this issue is through structural integrity solutions in a cost-effective way. We have faced several problems in a project worth 470 million USD, and one such issue is crane girder installation with composite steel beams. We have applied structural integrity approach with the proper and revised planning schedule to solve the problem efficiently with minimal expenses.Keywords: construction management, delay, non-chronological approach, composite beam, structural integrity
Procedia PDF Downloads 2377845 Review of the Model-Based Supply Chain Management Research in the Construction Industry
Authors: Aspasia Koutsokosta, Stefanos Katsavounis
Abstract:
This paper reviews the model-based qualitative and quantitative Operations Management research in the context of Construction Supply Chain Management (CSCM). Construction industry has been traditionally blamed for low productivity, cost and time overruns, waste, high fragmentation and adversarial relationships. The construction industry has been slower than other industries to employ the Supply Chain Management (SCM) concept and develop models that support the decision-making and planning. However the last decade there is a distinct shift from a project-based to a supply-based approach of construction management. CSCM comes up as a new promising management tool of construction operations and improves the performance of construction projects in terms of cost, time and quality. Modeling the Construction Supply Chain (CSC) offers the means to reap the benefits of SCM, make informed decisions and gain competitive advantage. Different modeling approaches and methodologies have been applied in the multi-disciplinary and heterogeneous research field of CSCM. The literature review reveals that a considerable percentage of CSC modeling accommodates conceptual or process models which discuss general management frameworks and do not relate to acknowledged soft OR methods. We particularly focus on the model-based quantitative research and categorize the CSCM models depending on their scope, mathematical formulation, structure, objectives, solution approach, software used and decision level. Although over the last few years there has been clearly an increase of research papers on quantitative CSC models, we identify that the relevant literature is very fragmented with limited applications of simulation, mathematical programming and simulation-based optimization. Most applications are project-specific or study only parts of the supply system. Thus, some complex interdependencies within construction are neglected and the implementation of the integrated supply chain management is hindered. We conclude this paper by giving future research directions and emphasizing the need to develop robust mathematical optimization models for the CSC. We stress that CSC modeling needs a multi-dimensional, system-wide and long-term perspective. Finally, prior applications of SCM to other industries have to be taken into account in order to model CSCs, but not without the consequential reform of generic concepts to match the unique characteristics of the construction industry.Keywords: construction supply chain management, modeling, operations research, optimization, simulation
Procedia PDF Downloads 5037844 Portfolio Management for Construction Company during Covid-19 Using AHP Technique
Authors: Sareh Rajabi, Salwa Bheiry
Abstract:
In general, Covid-19 created many financial and non-financial damages to the economy and community. Level and severity of covid-19 as pandemic case varies over the region and due to different types of the projects. Covid-19 virus emerged as one of the most imperative risk management factors word-wide recently. Therefore, as part of portfolio management assessment, it is essential to evaluate severity of such risk on the project and program in portfolio management level to avoid any risky portfolio. Covid-19 appeared very effectively in South America, part of Europe and Middle East. Such pandemic infection affected the whole universe, due to lock down, interruption in supply chain management, health and safety requirements, transportations and commercial impacts. Therefore, this research proposes Analytical Hierarchy Process (AHP) to analyze and assess such pandemic case like Covid-19 and its impacts on the construction projects. The AHP technique uses four sub-criteria: Health and safety, commercial risk, completion risk and contractual risk to evaluate the project and program. The result will provide the decision makers with information which project has higher or lower risk in case of Covid-19 and pandemic scenario. Therefore, the decision makers can have most feasible solution based on effective weighted criteria for project selection within their portfolio to match with the organization’s strategies.Keywords: portfolio management, risk management, COVID-19, analytical hierarchy process technique
Procedia PDF Downloads 1107843 The Effects of Land Grabbing on Livelihood Assets and Its Implication on Food Production in Ghana: A Case Study of Bui Dam Construction Project
Authors: Charles Kwaku Oppong
Abstract:
This study examined the effects of the agricultural land grabbed for the Bui Dam project on the livelihoods assets of the affected people and its implication on food production. Both quantitative and qualitative data were collected through the use of focus group discussions, questionnaire administration, interview guide, and observations. It was found that the land grabbing incident in the study communities as a result of the Bui Dam construction has resulted in the improvements in the physical assets of the affected people. The findings also indicated that local food crop production and the quantity of fish catch have dwindled after the land grabs. Contrary to this, the local people’s access to the natural capital, particularly the local land for agricultural activities has been worsened. The study recommends alternative sustainable livelihood for the affected people by the local government.Keywords: land grabbing, livelihood, asset, food production
Procedia PDF Downloads 1667842 Project Abandonment and Its Effect on Host Community: Case Study of Ajaokuta Steel Project, Nigeria
Authors: A. A. Omonori, K. T. Alade, A. F. Lawal
Abstract:
This research was conducted to identify the causes of project abandonment in Nigeria and the effect it has on the host community. The aim of the research was to identify the causes and effects of project failure and abandonment. Project abandonment is a major course of concern in the country as different projects fail and are abandoned at various levels. These projects do not fulfill the purpose for which they were initiated. This is the absolute definition of failure and hence the selection of the Ajaokuta Steel Project as an interesting case study and a typical example of project failure and abandonment. This has been done by conducting field study through the administration of questionnaires. This study was carried out on the Ajaokuta Steel Project to investigate the causes of the abandonment of the project and the effects it has had on the people of Ajaokuta community. Qualitative method of data analysis was used to analyze the findings through frequency tables and ranking. This study brought to light the major factors that led to the abandonment of the Ajaokuta Steel Project. The effects the abandonment of the project has had on the immediate community were identified and recommendations made to prevent the menace of Project abandonment.Keywords: abandonment, case-study, Nigeria, project
Procedia PDF Downloads 3647841 Contributing Factors to Building Failures and Defects in the Nigerian Construction Industry
Authors: Ndibarafinia Tobin
Abstract:
Building defect and failure are common phenomena in the Nigerian construction industry. The activities of the inexperienced labor force in the Nigerian construction industry have tarnished the image of practicing construction professionals in recent past. Defects and collapse can cause unnecessary expenditure, delays, loss of lives, property and left many people injured. They are also generating controversies among parties involved. Also, if this situation is left unanswered and untreated, it will lead to more serious problems in the future upcoming construction projects in Nigeria. Quite a number of factors are responsible for collapse of high-rise, reinforced concrete buildings in Nigeria. Government, professional bodies and stakeholders are asking countless questions as to who should be responsible and how solutions could be proffered. Therefore this study is aimed to identify the contributing factors to high-rise buildings defects and failures in Nigeria, which frequently occur in construction project in order to minimize time and cost and also the roles of professionals and other participants play in the industry in terms of the use of building materials, placement and curing of concrete, modification in the use of a building, collapse of building induced by fire and other causes. The data is collected from questionnaire from various players in construction industry in Nigeria. This study is succeeds in identifying the causes of building failure and also suggesting possible measures to be taken by government and other regulatory bodies in the building industry to avert this and also improve the effectiveness of managing appraisal process of failures and defects in the future.Keywords: building defects, building failures, Nigerian construction industry, professionals
Procedia PDF Downloads 3007840 Production and Recycling of Construction and Demolition Waste
Authors: Vladimira Vytlacilova
Abstract:
Recycling of construction and demolition waste (C&DW) and their new reuse in structures is one of the solutions of environmental problems. Construction and demolition waste creates a major portion of total solid waste production in the world and most of it is used in landfills all the time. The paper deals with the situation of the recycling of the building and demolition waste in the Czech Republic during the recent years. The paper is dealing with questions of C&D waste recycling, it also characterizes construction and demolition waste in general, furthermore it analyses production of construction waste and subsequent production of recycled materials.Keywords: Recycling, Construction and demolition waste, Recycled rubble, Waste management
Procedia PDF Downloads 3047839 Affordable and Sustainable Housing Construction: Case Studies
Authors: Tony Rizk
Abstract:
Recent material advances and cost efficiencies are transforming the housing industry away from traditional lumber and gypsum material to alternate fiberboard material that is workable and resistant to fire, mold, and pest infestation. The use of these materials may add to the initial cost of construction. However, the life cycle (cradle to grave) cost of houses using these construction materials and methods are lower than the life cycle costs using traditional housing construction materials and methods. This paper will present four (4) case studies of sustainable house projects. Each project was designed and constructed using earthen-based, sustainable fiberboard material that is resistant to fire, mold, and infestation and fabricated at a very low material calorific value. These house projects have a living space ranging from 625 sq. ft. for an accessory dwelling unit and up to 3,200 sq. ft. 1-story and 2-story homes. For each case study, we will present the house engineering design and construction method, the initial construction costs, a summary of the life cycle costs, and a comparison to the life cycle cost of traditional housing available in the literature.Keywords: residential housing, sustainable housing, life cycle cost, fire resistance, mold, infestation resistance
Procedia PDF Downloads 1287838 An Explorative Study of the Application of Project Management in German Research Projects
Authors: Marcel Randermann, Roland Jochem
Abstract:
Research activities are mostly conducted in form of projects. In fact, research projects take the highest share of all project forms combined. However, project management is very rarely applied purposefully by researchers and scientists. More specifically no project management frameworks, methods or tools are not being used to plan, execute or control research project to ensure research success or improve project quality. In this qualitative study, several interviews were conducted with scientists and research managers from German institutions to gain insights into project management activities, to determine challenges and barriers, and to evaluate premises for successful project management. The analyses show that conventional project management is not easily applicable in scientific environments and researchers’ mindsets prevent a reasonable application.Keywords: academics, project management methods, research and science projects, scientist's mindset
Procedia PDF Downloads 1987837 Application of GIS-Based Construction Engineering: An Electronic Document Management System
Authors: Mansour N. Jadid
Abstract:
This paper describes the implementation of a GIS to provide decision support for successfully monitoring the movements and storage of materials, hence ensuring that finished products travel from the point of origin to the destination construction site through the supply-chain management (SCM) system. This system ensures the efficient operation of suppliers, manufacturers, and distributors by determining the shortest path from the point of origin to the final destination to reduce construction costs, minimize time, and enhance productivity. These systems are essential to the construction industry because they reduce costs and save time, thereby improve productivity and effectiveness. This study describes a typical supply-chain model and a geographical information system (GIS)-based SCM that focuses on implementing an electronic document management system, which maps the application framework to integrate geodetic support with the supply-chain system. This process provides guidance for locating the nearest suppliers to fill the information needs of project members in different locations. Moreover, this study illustrates the use of a GIS-based SCM as a collaborative tool in innovative methods for implementing Web mapping services, as well as aspects of their integration by generating an interactive GIS for the construction industry platform.Keywords: construction, coordinate, engineering, GIS, management, map
Procedia PDF Downloads 3037836 Environmental Impact Assessment Methodology of the Tirana–Elbasan Road Project
Authors: Aurora Cerri, Niko Pollojani
Abstract:
The Tirana – Elbasan Road project is the most important highway project in Albania, constructed in the period May 2011 - ongoing. This project included construction of 38 km highway category road including 2.6 km of tunnel. It serves as a corridor connecting the Tirana, Capital of Albania and South-East area, and in the near future it is expected to continue in the direction of Macedonian border. Environmental Impact Assesment procedure for this project is provided by the Albanian Environmental Law No. 10431. This law establishes the regulation of procedures for identifying, assessment and reporting on the effects of certain projects on the environment, and the associated administrative procedures, during the decision-making process by the Ministry of Environment and Tourism for issuing environmental permit, and ensures that all relevant information concerning the environment are provided and considered. Due to the nature and size of the project, during the environmental impact assessment process, the European Union legislation, namely the EIA Directive 85/337 / EEC is considered. Moreover, in some cases, due to the lack of national standards and practical guidelines, when necessary those of EU member countries are considered. This paper presents an analysis of the EIA procedure followed on ‘Tirana – Elbasan’ Road project, with a focus on the application of the main stages of the procedure such as: screening, scoping, review, the EIA report; and consideration of alternatives, measures for impact prevention and reduction, and the public hearing T/discussion.Keywords: highway, environmental impact assesment, Tirana, prevention
Procedia PDF Downloads 3257835 Creating Database and Building 3D Geological Models: A Case Study on Bac Ai Pumped Storage Hydropower Project
Authors: Nguyen Chi Quang, Nguyen Duong Tri Nguyen
Abstract:
This article is the first step to research and outline the structure of the geotechnical database in the geological survey of a power project; in the context of this report creating the database that has been carried out for the Bac Ai pumped storage hydropower project. For the purpose of providing a method of organizing and storing geological and topographic survey data and experimental results in a spatial database, the RockWorks software is used to bring optimal efficiency in the process of exploiting, using, and analyzing data in service of the design work in the power engineering consulting. Three-dimensional (3D) geotechnical models are created from the survey data: such as stratigraphy, lithology, porosity, etc. The results of the 3D geotechnical model in the case of Bac Ai pumped storage hydropower project include six closely stacked stratigraphic formations by Horizons method, whereas modeling of engineering geological parameters is performed by geostatistical methods. The accuracy and reliability assessments are tested through error statistics, empirical evaluation, and expert methods. The three-dimensional model analysis allows better visualization of volumetric calculations, excavation and backfilling of the lake area, tunneling of power pipelines, and calculation of on-site construction material reserves. In general, the application of engineering geological modeling makes the design work more intuitive and comprehensive, helping construction designers better identify and offer the most optimal design solutions for the project. The database always ensures the update and synchronization, as well as enables 3D modeling of geological and topographic data to integrate with the designed data according to the building information modeling. This is also the base platform for BIM & GIS integration.Keywords: database, engineering geology, 3D Model, RockWorks, Bac Ai pumped storage hydropower project
Procedia PDF Downloads 1697834 The Efficacy of Contractual Governance on Task and Relationship Conflict in Construction Projects
Authors: Jingya You, Yongqiang Chen, Yuanyuan Hua, Wenqian Wang
Abstract:
Conflict is commonplace in construction projects, and construction projects always involve designing contracts between the owner and the contractor. However, how the contract affects the level of conflict between the owner and the contractor has not been elaborated. The purpose of this paper is to explain the effects of contractual complexity on the level of conflict, including task conflict and relationship conflict, and then to demonstrate the moderating role played by the interdependence between the owner and the contractor. Using data from owners and general contractors in the Chinese construction industry, this research reveals that contractual control will reduce relationship conflict. Contractual coordination will also reduce relationship conflict by the mediating effect of task conflict. Besides, under high joint interdependence, the positive relationship between task conflict and relationship conflict is strengthened, while high interdependence asymmetry has effects on weakening the relationship between task conflict and relationship conflict. The findings provide guidance for contract designers to draft suitable contracts in order to effectively deal with conflict. Additionally, this research implies that project managers should highlight the importance of contract in conflict management.Keywords: construction projects, contract governance, interdependence, relationship conflict, task conflict
Procedia PDF Downloads 2187833 Saudi Arabian Aviation Construction Projects: Risks and Their Assessments
Authors: Ahmad Baghdadi, Mohammed Kishk
Abstract:
Construction projects are unique and involve different level of complexity. Airports projects, among other construction projects, are considered to be very complex as they face a number of challenges which make them inevitably exposed to risks. However, in Saudi Arabia, the sector of aviation is considered an important sector owing to the fact that it is the first destination for Muslims on an annual basis. As a result the Saudi government has allocated a huge amount of their general budget to this sector through the General Authority of Civil Aviation (GACA). However, it has been found that the projects are still delivered with a significant number of time and cost overruns. These consequences are typically generated from the risks involved in the projects. Thus, there is a need to identify the number of risks thought to cause such overruns in project times and costs, as well as to assess their significances in terms of their likelihoods of occurrence and their impacts. Accordingly, this paper aims to identify risks associated with aviation construction projects in Saudi Arabia, as well as to assess their likelihoods of occurrence and impacts on such projects. In total, forty four risks have been identified through a critical literature review of common risks in similar projects, as well as thirteen semi-structured interviews with expert project managers involved in GACA’s projects. However, the assessment of the identified risks in term of their likelihoods of occurrence and impacts was obtained through the analysis of forty five questionnaires. Respondents of questionnaires include clients, contractors and consultants. The results show the risks of design changes by the client, labour issue, and setting a tight schedule by the client have the highest likelihoods of occurrence in GACA projects, while the risks of earthquakes, design constructability, and corruption have the greatest impacts.Keywords: aviation construction projects, GACA, risks, risk assessment, Saudi Arabia
Procedia PDF Downloads 5447832 Modern Methods of Construction (MMC): The Potentials and Challenges of Using Prefabrication Technology for Building Modern Houses in Afghanistan
Authors: Latif Karimi, Yasuhide Mochida
Abstract:
The purpose of this paper is to study Modern Methods of Construction (MMC); specifically, the prefabrication technology and check the applicability, suitability, and benefits of this construction technique over conventional methods for building new houses in Afghanistan. Construction industry and house building sector are a key contributor to Afghanistan’s economy. However, this sector is challenged with lack of innovation and severe impacts that it has on the environment due to huge amount of construction waste from building, demolition and or renovation activities. This paper studies the prefabrication technology, a popular MMC that is becoming more common, improving in quality and being available in a variety of budgets. Several feasibility studies worldwide have revealed that this method is the way forward in improving construction industry performance as it has been proven to reduce construction time, construction wastes and improve the environmental performance of the construction processes. In addition, this study emphasizes on 'sustainability' in-house building, since it is a common challenge in housing construction projects on a global scale. This challenge becomes more severe in the case of under-developed countries, like Afghanistan. Because, most of the houses are being built in the absence of a serious quality control mechanism and dismissive to basic requirements of sustainable houses; well-being, cost-effectiveness, minimization - prevention of wastes production during construction and use, and severe environmental impacts in view of a life cycle assessment. Methodology: A literature review and study of the conventional practices of building houses in urban areas of Afghanistan. A survey is also being completed to study the potentials and challenges of using prefabrication technology for building modern houses in the cities across the country. A residential housing project is selected for case study to determine the drawbacks of current construction methods vs. prefabrication technique for building a new house. Originality: There are little previous research available about MMC considering its specific impacts on sustainability related to house building practices. This study will be specifically of interest to a broad range of people, including planners, construction managers, builders, and house owners.Keywords: modern methods of construction (MMC), prefabrication, prefab houses, sustainable construction, modern houses
Procedia PDF Downloads 2437831 Analysis of Causality between Defect Causes Using Association Rule Mining
Authors: Sangdeok Lee, Sangwon Han, Changtaek Hyun
Abstract:
Construction defects are major components that result in negative impacts on project performance including schedule delays and cost overruns. Since construction defects generally occur when a few associated causes combine, a thorough understanding of defect causality is required in order to more systematically prevent construction defects. To address this issue, this paper uses association rule mining (ARM) to quantify the causality between defect causes, and social network analysis (SNA) to find indirect causality among them. The suggested approach is validated with 350 defect instances from concrete works in 32 projects in Korea. The results show that the interrelationships revealed by the approach reflect the characteristics of the concrete task and the important causes that should be prevented.Keywords: causality, defect causes, social network analysis, association rule mining
Procedia PDF Downloads 3687830 Challenges in the Construction of a 6M Diameter and 1.6km Long Tunnel Under Crossing a Channel in the West of Singapore
Authors: David Loh, Wan Chee Wai, Pei Nan, Chen Zhe
Abstract:
To increase the conveyance capacity to Western Singapore and to meet Singapore’s long-term water needs in a more cost-effective manner, four new transmission pipelines consisting of two 2200 mm diameter water pipes and two 1200mm diameter water pipes will be needed by 2024 to convey water from a Water Reclamation Plant to existing networks in the west region of Singapore. Out of the several possible routes studied, the most cost-effective and technically feasible route was selected to lay the proposed 1.6km-long pipelines that cross a channel via a 6m diameter subsea tunnel. This paper outlines the challenges the team faced throughout the project thus far. It also examined the difficulties such as (1) construction of a 56m-deep launching shaft near a highly sensitive 700mm diameter Gas Transmission Pipeline (GTP) and at a location with high groundwater; (2) manpower and supply disruptions caused by the COVID-19 pandemic situation.Keywords: underwater tunnel, subsea engineering, subsea tunnel construction, waterpipe construction
Procedia PDF Downloads 287829 Sewer Culvert Installation Method to Accommodate Underground Construction in an Urban Area with Narrow Streets
Authors: Osamu Igawa, Hiroshi Kouchiwa, Yuji Ito
Abstract:
In recent years, a reconstruction project for sewer pipelines has been progressing in Japan with the aim of renewing old sewer culverts. However, it is difficult to secure a sufficient base area for shafts in an urban area because many streets are narrow with a complex layout. As a result, construction in such urban areas is generally very demanding. In urban areas, there is a strong requirement for a safe, reliable and economical construction method that does not disturb the public’s daily life and urban activities. With this in mind, we developed a new construction method called the 'shield switching type micro-tunneling method' which integrates the micro-tunneling method and shield method. In this method, pipeline is constructed first for sections that are gently curved or straight using the economical micro-tunneling method, and then the method is switched to the shield method for sections with a sharp curve or a series of curves without establishing an intermediate shaft. This paper provides the information, features and construction examples of this newly developed method.Keywords: micro-tunneling method, secondary lining applied RC segment, sharp curve, shield method, switching type
Procedia PDF Downloads 4067828 A Systematic Review on Development of a Cost Estimation Framework: A Case Study of Nigeria
Authors: Babatunde Dosumu, Obuks Ejohwomu, Akilu Yunusa-Kaltungo
Abstract:
Cost estimation in construction is often difficult, particularly when dealing with risks and uncertainties, which are inevitable and peculiar to developing countries like Nigeria. Direct consequences of these are major deviations in cost, duration, and quality. The fundamental aim of this study is to develop a framework for assessing the impacts of risk on cost estimation, which in turn causes variabilities between contract sum and final account. This is very important, as initial estimates given to clients should reflect the certain magnitude of consistency and accuracy, which the client builds other planning-related activities upon, and also enhance the capabilities of construction industry professionals by enabling better prediction of the final account from the contract sum. In achieving this, a systematic literature review was conducted with cost variability and construction projects as search string within three databases: Scopus, Web of science, and Ebsco (Business source premium), which are further analyzed and gap(s) in knowledge or research discovered. From the extensive review, it was found that factors causing deviation between final accounts and contract sum ranged between 1 and 45. Besides, it was discovered that a cost estimation framework similar to Building Cost Information Services (BCIS) is unavailable in Nigeria, which is a major reason why initial estimates are very often inconsistent, leading to project delay, abandonment, or determination at the expense of the huge sum of money invested. It was concluded that the development of a cost estimation framework that is adjudged an important tool in risk shedding rather than risk-sharing in project risk management would be a panacea to cost estimation problems, leading to cost variability in the Nigerian construction industry by the time this ongoing Ph.D. research is completed. It was recommended that practitioners in the construction industry should always take into account risk in order to facilitate the rapid development of the construction industry in Nigeria, which should give stakeholders a more in-depth understanding of the estimation effectiveness and efficiency to be adopted by stakeholders in both the private and public sectors.Keywords: cost variability, construction projects, future studies, Nigeria
Procedia PDF Downloads 2117827 Stabilized Earth Roads Construction and Its Challenges
Authors: Mokhtar Nikgoo
Abstract:
Road definition and road construction: in engineering literature, a road is defined as a means of communication between two different places by air, land, and sea. In this way, all sea, land, and air routes are considered as roads. Road construction is an operation to create a road on the ground between 2 points with a specified width, which includes works such as subgrade, paving, placing tables, and traffic signs on the road. In this article, the stages of road construction are explained from the beginning to the end. Road construction is generally done in the construction of rural, urban, and inter-city roads, and according to the special conditions of this area, the precision of engineers in its design and calculations is very important. For example, if the design of a road does not pay enough attention to the way the road curves, there will undoubtedly be countless accidents. Also, adjusting the road surface and its durability and uniformity are among the things that engineers solve according to the upcoming obstacles.Keywords: road construction, surveying, freeway, pavement, excavator
Procedia PDF Downloads 957826 Modern Work Modules in Construction Practice
Authors: Robin Becker, Nane Roetmann, Manfred Helmus
Abstract:
Construction companies lack junior staff for construction management. According to a nationwide survey of students, however, the profession lacks attractiveness. The conflict between the traditional job profile and the current desires of junior staff for contemporary and flexible working models must be resolved. Increasing flexibility is essential for the future viability of small and medium-sized enterprises. The implementation of modern work modules can help here. The following report will present the validation results of the developed work modules in construction practice.Keywords: modern construction management, construction industry, work modules, shortage of junior staff, sustainable personnel management, making construction management more attractive, working time model
Procedia PDF Downloads 867825 Quantitative Analysis of Contract Variations Impact on Infrastructure Project Performance
Authors: Soheila Sadeghi
Abstract:
Infrastructure projects often encounter contract variations that can significantly deviate from the original tender estimates, leading to cost overruns, schedule delays, and financial implications. This research aims to quantitatively assess the impact of changes in contract variations on project performance by conducting an in-depth analysis of a comprehensive dataset from the Regional Airport Car Park project. The dataset includes tender budget, contract quantities, rates, claims, and revenue data, providing a unique opportunity to investigate the effects of variations on project outcomes. The study focuses on 21 specific variations identified in the dataset, which represent changes or additions to the project scope. The research methodology involves establishing a baseline for the project's planned cost and scope by examining the tender budget and contract quantities. Each variation is then analyzed in detail, comparing the actual quantities and rates against the tender estimates to determine their impact on project cost and schedule. The claims data is utilized to track the progress of work and identify deviations from the planned schedule. The study employs statistical analysis using R to examine the dataset, including tender budget, contract quantities, rates, claims, and revenue data. Time series analysis is applied to the claims data to track progress and detect variations from the planned schedule. Regression analysis is utilized to investigate the relationship between variations and project performance indicators, such as cost overruns and schedule delays. The research findings highlight the significance of effective variation management in construction projects. The analysis reveals that variations can have a substantial impact on project cost, schedule, and financial outcomes. The study identifies specific variations that had the most significant influence on the Regional Airport Car Park project's performance, such as PV03 (additional fill, road base gravel, spray seal, and asphalt), PV06 (extension to the commercial car park), and PV07 (additional box out and general fill). These variations contributed to increased costs, schedule delays, and changes in the project's revenue profile. The study also examines the effectiveness of project management practices in managing variations and mitigating their impact. The research suggests that proactive risk management, thorough scope definition, and effective communication among project stakeholders can help minimize the negative consequences of variations. The findings emphasize the importance of establishing clear procedures for identifying, assessing, and managing variations throughout the project lifecycle. The outcomes of this research contribute to the body of knowledge in construction project management by demonstrating the value of analyzing tender, contract, claims, and revenue data in variation impact assessment. However, the research acknowledges the limitations imposed by the dataset, particularly the absence of detailed contract and tender documents. This constraint restricts the depth of analysis possible in investigating the root causes and full extent of variations' impact on the project. Future research could build upon this study by incorporating more comprehensive data sources to further explore the dynamics of variations in construction projects.Keywords: contract variation impact, quantitative analysis, project performance, claims analysis
Procedia PDF Downloads 42