15119 Analysis of Delays during Initial Phase of Construction Projects and Mitigation Measures

Authors: Sunaitan Al Mutairi

Abstract:

A perfect start is a key factor for project completion on time. The study examined the effects of delayed mobilization of resources during the initial phases of the project. This paper mainly highlights the identification and categorization of all delays during the initial construction phase and their root cause analysis with corrective/control measures for the Kuwait Oil Company oil and gas projects. A relatively good percentage of the delays identified during the project execution (Contract award to end of defects liability period) attributed to mobilization/preliminary activity delays. Data analysis demonstrated significant increase in average project delay during the last five years compared to the previous period. Contractors had delays/issues during the initial phase, which resulted in slippages and progressively increased, resulting in time and cost overrun. Delays/issues not mitigated on time during the initial phase had very high impact on project completion. Data analysis of the delays for the past five years was carried out using trend chart, scatter plot, process map, box plot, relative importance index and Pareto chart. Construction of any project inside the Gathering Centers involves complex management skills related to work force, materials, plant, machineries, new technologies etc. Delay affects completion of projects and compromises quality, schedule and budget of project deliverables. Works executed as per plan during the initial phase and start-up duration of the project construction activities resulted in minor slippages/delays in project completion. In addition, there was a good working environment between client and contractor resulting in better project execution and management. Mainly, the contractor was on the front foot in the execution of projects, which had minimum/no delays during the initial and construction period. Hence, having a perfect start during the initial construction phase shall have a positive influence on the project success. Our research paper studies each type of delay with some real example supported by statistic results and suggests mitigation measures. Detailed analysis carried out with all stakeholders based on impact and occurrence of delays to have a practical and effective outcome to mitigate the delays. The key to improvement is to have proper control measures and periodic evaluation/audit to ensure implementation of the mitigation measures. The focus of this research is to reduce the delays encountered during the initial construction phase of the project life cycle.

Keywords: construction activities delays, delay analysis for construction projects, mobilization delays, oil & gas projects delays

Procedia PDF Downloads 296
15118 Evaluation of Critical Success Factors in Public-Private Partnership Projects Based on Structural Equation Model

Authors: Medya Fathi

Abstract:

Today, success in the construction industry is not merely about project completion in a timely manner within an established budget and meeting required quality considerations. Management practices and partnerships need to be emphasized as well. In this regard, critical success factors (CSFs) cover necessary considerations for a successful project beyond the traditional success definition, which vary depending on project outcomes, delivery methods, project types, and partnering processes. Despite the extensive research on CSFs, there is a paucity of studies that examine CSFs for public-private partnership (PPP); the delivery method, which has gained increasing attention from researchers and practitioners over the last decade with a slow but growing adoption in the transportation infrastructure, particularly, highway industry. To fill this knowledge gap, data are collected through questionnaire surveys among private and public parties involved in PPP transportation projects in the United States. Then, the collected data are analyzed to explore the causality relationships between CSFs and PPP project success using structural equation model and provide a list of factors with the greatest influence. This study advocates adopting a critical success factor approach to enhance PPP success in the U.S. transportation industry and identify elements essential for public and private organizations to achieve this success.

Keywords: project success, critical success factors, public-private partnership, transportation

Procedia PDF Downloads 71
15117 Documentation Project on Boat Models from Saqqara, in the Grand Egyptian Museum

Authors: Ayman Aboelkassem, Mohamoud Ali, Rezq Diab

Abstract:

This project aims to document and preserve boat models which were discovered in the Saqqara by Czech Institute of Egyptology archeological mission at Saqqara (GEM numbers, 46007, 46008, 46009). These boat models dates back to Egyptian Old Kingdom and have been transferred to the Conservation Center of the Grand Egyptian Museum, to be displayed at the new museum.The project objectives making such boat models more visible to visitors through the use of 3D reconstructed models and high resolution photos which describe the history of using the boats during the Ancient Egyptian history. Especially, The Grand Egyptian Museum is going to exhibit the second boat of King Khufu from Old kingdom. The project goals are to document the boat models and arrange an exhibition, where such Models going to be displayed next to the Khufu Second Boat. The project shows the importance of using boats in Ancient Egypt, and connecting their usage through Ancient Egyptian periods till now. The boat models had a unique Symbolized in ancient Egypt and connect the public with their kings. The Egyptian kings allowed high ranked employees to put boat models in their tombs which has a great meaning that they hope to fellow their kings in the journey of the afterlife.

Keywords: archaeology, boat models, 3D digital tools for heritage management, museums

Procedia PDF Downloads 108
15116 Youth Conflict-Related Trauma through Generations: An Ethnography on the Relationship between Health and Society in Post-Conflict Northern Ireland

Authors: Chiara Magliacane

Abstract:

This project aims to analyse the relationship between the post-conflict Northern Irish environment and youth trauma in deprived areas. Using an anthropological perspective and methodology, the study investigates the possible contribution that a socio-cultural perspective can give to the current research on the field, with a special focus on the role of transgenerational trauma. The recognition of the role that socio-economic determinants have on health is usually a challenge for social researchers. In post-conflict Northern Ireland, the overall lack of research about connections between the social context and youth trauma opens the way to the present project. Anthropological studies on social implications of mental disorders have achieved impressive results in many societies; they show how conditions of sufferance and poverty are not intrinsically given, but are the products of historical processes and events. The continuum of violence and the politics of victimhood sustains a culture of silence and fear in deprived areas; this implies the need of investigating the structural and symbolic violence that lies behind the diffusion of mental suffering. The project refers to these concepts from Medical Anthropology and looks at connections between trauma and social, political and economic structures. Accordingly, the study considers factors such as poverty, unemployment, social inequality and gender and class perspectives. At the same time, the project problematises categories such as youth and trauma. 'Trauma' is currently debated within the social sciences since the 'invention' of the Post-Traumatic Stress Disorder (PTSD) in 1980. Current critics made to its clinical conception show how trauma has been mainly analysed as a memory of the past. On the contrary, medical anthropological research focuses on wider perspectives on society and its structures; this is a new and original approach to the study of youth trauma considering that, to author’s best knowledge, there is no research of this kind regarding Northern Ireland. Methods: Qualitative interviews, participant observation. Expected Impact: Local Northern Ireland organizations, i.e. specific charities that provide mental health support. Ongoing and present connections will ensure they will hear about this research.

Keywords: health and social inequalities, Northern Ireland, structural violence, youth

Procedia PDF Downloads 177
15115 A Systems-Level Approach towards Transition to Electrical Vehicles

Authors: Mayuri Roy Choudhury, Deepti Paul

Abstract:

Many states in the United States are aiming for high renewable energy targets by the year 2045. In order to achieve this goal, they must do transition to Electrical Vehicles (EVS). We first applied the Multi-Level perspective framework to describe the inter-disciplinary complexities associated with the transition to EVs. Thereafter we addressed these complexities by creating an inter-disciplinary policy framework that uses data science algorithms to create evidence-based policies in favor of EVs. Our policy framework uses a systems level approach as it addresses transitions to EVs from a technology, economic, business and social perspective. By Systems-Level we mean approaching a problem from a multi-disciplinary perspective. Our systems-level approach could be a beneficial decision-making tool to a diverse number of stakeholders such as engineers, entrepreneurs, researchers, and policymakers. In addition, it will add value to the literature of electrical vehicles, sustainable energy, energy economics, and management as well as efficient policymaking.

Keywords: transition, electrical vehicles, systems-level, algorithms

Procedia PDF Downloads 205
15114 Seismic Preparedness Challenge in Ionian Islands (Greece) through 'Telemachus' Project

Authors: A. Kourou, M. Panoutsopoulou

Abstract:

Nowadays, disaster risk reduction requires innovative ways of working collaboratively, monitoring tools, management methods, risk communication, and knowledge, as key factors for decision-making actors. Experience has shown that the assessment of seismic risk and its effective management is still an important challenge. In Greece, Ionian Islands region is characterized as the most seismic area of the country and one of the most active worldwide. It is well known that in case of a disastrous earthquake the local authorities need to assess the situation in the affected area and coordinate the disaster response. In particular, the main outcomes of 'Telemachus' project are the development of an innovative operational system that hosts the needed data of seismic risk management in the Ionian Islands and the implementation of educational actions for the involved target groups. This project is funded in the Priority Axis 'Environmental Protection and Sustainable Development' of Operational Plan 'Ionian Islands 2014-2020'. EPPO is one of the partners of the project and it is responsible, among others, for the development of proper training material. This paper presents the training material of 'Telemachus' and its usage as a helpful, managerial tool in case of earthquake emergency. This material is addressed to different target groups, such as civil protection staff, people that involved with the tourism industry, educators of disabled people, etc. Very positive aspect of the project is the involvement of end-users that should evaluate the training products; test standards; clarify the personnel’s roles and responsibilities; improve interagency coordination; identify gaps in resources; improve individual performance; and identify opportunities for improvement. It is worth mentioning that even though the abovementioned material developed is useful for the training of specific target groups on emergency management issues within Ionian Islands Region, it could be used throughout Greece and other countries too.

Keywords: education of civil protection staff, Ionian Islands Region of Greece, seismic risk, training material

Procedia PDF Downloads 104
15113 Decision-Making Tool for Planning the Construction of Infrastructure Projects

Authors: Rolla Monib, Chris I. Goodier, Alistair Gibbs

Abstract:

The aim of this paper is to investigate the key drivers in planning the construction phase for infrastructure projects to reduce project delays. To achieve this aim, the research conducted three case studies using semi-structured and unstructured interviews (n=36). The results conclude that a lack of modularisation awareness is among the key factors attributed to project delays. The current emotive and ill-informed approach to decision-making, coupled with the lack of knowledge regarding appropriate construction method selection, prevents the potential benefits of modularisation being fully realised. To assist with decision-making for the best construction method, the research presents project management tools to help decision makers to choose the most appropriate construction approach through optimising the use of modularisation in EC. A decision-making checklist and diagram are presented in this paper. These checklist tools and diagrams assist the project team in determining the best construction method, taking into consideration the module type.

Keywords: infrastructure, modularization, decision support, decision-making

Procedia PDF Downloads 29
15112 Knowledge Management and Motivation Management: Important Constituents of Firm Performance

Authors: Yassir Mahmood, Nadia Ehsan

Abstract:

In current research stream, empirical work regarding knowledge and motivation management along their dimensions is sparse. This study partially filled this void by investigating the influence of knowledge management (tacit and explicit) and motivation management (intrinsic and extrinsic) on firm performance with the mediating effects of innovative performance. Based on the quantitative research method, data were collected through questionnaire from 284 employees working in 18 different firms across the citrus industry located in Sargodha region (Pakistan). The proposed relationships were tested through regression analysis while mediation relations were analyzed through Barron and Kenny (1986) technique. The results suggested that knowledge management (KM) and motivation management (MM) have significant positive impacts on innovative performance (IP). In addition, the role of IP as full mediator between KM and firm performance (FP) is confirmed. Also, IP proved to be a partial mediator between MM and FP. From the managerial perspective, the findings of the study are vital as some of the important constituents of FP have been highlighted. The study produced important underpinnings for managers. In last, implications for policymakers along with future research directions are discussed.

Keywords: innovative performance, firm performance, knowledge management, motivation management, Sargodha

Procedia PDF Downloads 134
15111 Teacher Education in a Bilingual Perspective: Brazilian Sign Language and Portuguese

Authors: Neuma Chaveiro, Juliana Guimarães Faria

Abstract:

Introduction: The thematic that guides this study is teacher training for the teaching of sign language in a perspective of bilingual education – specifically aimed at Brazilian public schools that offer inclusive education, and that have, among its students, deaf children who use Brazilian Sign Language as a means of communication and expression. In the Teacher Training Course for Letters/Libras at the Universidade Federal de Goiás/UFG, we developed a bilingual education project for the deaf, linked to PIBID (Institutional Scholarship for Teaching Initiation Program), funded by the Brazilian Federal Government through CAPES (Coordination for the Improvement of Higher Education Personnel). Goals: to provide the education of higher education teachers to work in public schools in basic education and to insert students from the UFG’s Letters/Libras course in the school’s daily life, giving them the opportunity for the creation and participation in methodological experiences and of teaching practices in order to overcome the problems identified in the teaching-learning process of deaf students, in a bilingual perspective, associating Libras (Brazilian Sign Language) and Portuguese. Methodology: qualitative approach and research-action, prioritizing action – reflection – action of the people involved. The Letters-Libras PIBID of the College of Letters/UFG, in this qualitative context, is guided by the assumptions of investigation-action to contribute to the education of the Libras teacher. Results: production of studies and researches in the area of education, professionalization and teaching practice for the degree holder in Letters: Libras; b) studies, research and training in bilingual education; c) clarification and discussion of the myths that permeate the reality of users of sign languages; d) involving students in the development of didactic materials for bilingual education. Conclusion: the PIBID Project Letters/Libras allows, both to the basic education school and to the teachers in training for the teaching of Libras, an integrated and collective work partnership, with discussions and changes in relation to bilingual education for the deaf and the teaching of Libras.

Keywords: deaf, sign language, teacher training, educacion

Procedia PDF Downloads 270
15110 Measurement of Project Success in Construction Using Performance Indices

Authors: Annette Joseph

Abstract:

Background: The construction industry is dynamic in nature owing to the increasing uncertainties in technology, budgets, and development processes making projects more complex. Thus, predicting project performance and chances of its likely success has become difficult. The goal of all parties involved in construction projects is to successfully complete it on schedule, within planned budget and with the highest quality and in the safest manner. However, the concept of project success has remained ambiguously defined in the mind of the construction professionals. Purpose: This paper aims to study the analysis of a project in terms of its performance and measure the success. Methodology: The parameters for evaluating project success and the indices to measure success/performance of a project are identified through literature study. Through questionnaire surveys aimed at the stakeholders in the projects, data is collected from two live case studies (an ongoing and completed project) on the overall performance in terms of its success/failure. Finally, with the help of SPSS tool, the data collected from the surveys are analyzed and applied on the selected performance indices. Findings: The score calculated by using the indices and models helps in assessing the overall performance of the project and interpreting it to find out whether the project will be a success or failure. This study acts as a reference for firms to carry out performance evaluation and success measurement on a regular basis helping projects to identify the areas which are performing well and those that require improvement. Originality & Value: The study signifies that by measuring project performance; a project’s deviation towards success/failure can be assessed thus helping in suggesting early remedial measures to bring it on track ensuring that a project will be completed successfully.

Keywords: project, performance, indices, success

Procedia PDF Downloads 166
15109 Decommissioning of Nuclear Power Plants: The Current Position and Requirements

Authors: A. Stifi, S. Gentes

Abstract:

Undoubtedly from construction's perspective, the use of explosives will remove a large facility such as a 40-storey building , that took almost 3 to 4 years for construction, in few minutes. Usually, the reconstruction or decommissioning, the last phase of life cycle of any facility, is considered to be the shortest. However, this is proved to be wrong in the case of nuclear power plant. Statistics says that in the last 30 years, the construction of a nuclear power plant took an average time of 6 years whereas it is estimated that decommissioning of such plants may take even a decade or more. This paper is all about the decommissioning phase of a nuclear power plant which needs to be given more attention and encouragement from the research institutes as well as the nuclear industry. Currently, there are 437 nuclear power reactors in operation and 70 reactors in construction. With around 139 nuclear facilities already been shut down and are in different decommissioning stages and approximately 347 nuclear reactors will be in decommissioning phase in the next 20 years (assuming the operation time of a reactor as 40 years), This fact raises the following two questions (1) How far is the nuclear and construction Industry ready to face the challenges of decommissioning project? (2) What is required for a safety and reliable decommissioning project delivery? The decommissioning of nuclear facilities across the global have severe time and budget overruns. Largely the decommissioning processes are being executed by the force of manual labour where the change in regulations is respectively observed. In term of research and development, some research projects and activities are being carried out in this area, but the requirement seems to be much more. The near future of decommissioning shall be better through a sustainable development strategy where all stakeholders agree to implement innovative technologies especially for dismantling and decontamination processes and to deliever a reliable and safety decommissioning. The scope of technology transfer from other industries shall be explored. For example, remotery operated robotic technologies used in automobile and production industry to reduce time and improve effecincy and saftey shall be tried here. However, the innovative technologies are highly requested but they are alone not enough, the implementation of creative and innovative management methodologies should be also investigated and applied. Lean Management with it main concept "elimination of waste within process", is a suitable example here. Thus, the cooperation between international organisations and related industries and the knowledge-sharing may serve as a key factor for the successful decommissioning projects.

Keywords: decommissioning of nuclear facilities, innovative technology, innovative management, sustainable development

Procedia PDF Downloads 451
15108 Information Technology (IT) Outsourcing and the Challenges of Implementation in Financial Industries: A Case Study of Guarantee Trust Assurance PLC

Authors: Salim Ahmad, Ahamed Sani Kazaure, Haruna Musa

Abstract:

Outsourcing had been the contractual relationship in which the responsibility for a function or task is handed over to an outside firm for a fixed period of time which is not the same as contracting where a specific one-off task is allocated to an external business; therefore in information technology a specialist area such as maintenance of web servers is controlled by an outside firm or if the department is not a critical factor the whole IT section may be outsourced. Organisation contracts is frequently a major area in successful outsourcing relationship, whereby the contracts specify the right, liability and expectation of the vendor and contracts are mostly of high value and last for very long. Therefore, in this research one particular project that is been outsourced for the financial industry (Guarantee Trust Assurance PlC) is been discussed along with the approach used and the various problems encountered, though Outsourcing is not necessarily a perfect and easy way out for business. It is extremely critical for a company to look at all the aspect of outsourcing before deciding to use it as an instrument for development. Moreover, critical analysis of the management issues encountered while implementing the outsourcing project have been fully discussed in the paper.

Keywords: outsourcing, techniques used in outsourcing, challenges of outsourcing implementation, management issues during implementation of outsourcing project

Procedia PDF Downloads 355
15107 An Estimation Process for Progress Rate Based on Labor-Quantity in Republic of Korea

Authors: Dong-Ho Kim, Zheng-Xun Jin, Yong-Woon Cha, Su-Sang Lim, Sang-Won Han, Chang-Taek Hyun

Abstract:

As construction is a labor-intensive industry, it is important to identify and manage labor quantities for accurate progress management of the construction project. However, the progress management that focuses on construction cost calculated based on materials rather than labor quantities has led to a difference in the implementation of cost and progress of the actual construction. In addition, since it is not easy to predict accurate labor quantities in the estimation of labor quantity-based progress rate, there have been limited researches into the progress rate estimation based on labor quantity. Accordingly, this study proposed a process for labor quantity-based progress rate estimation using a standard of estimate to predict accurate progress rate of the construction project in Republic Korea. It is expected that the utilization of the proposed process will help to identify the progress rate closer to that of the actual site management and adjust the workforce in each construction type, thereby contributing to improving construction efficiency.

Keywords: labor based, labor cost, progress management, progress rate, progress payment

Procedia PDF Downloads 315
15106 BIM Application Research Based on the Main Entrance and Garden Area Project of Shanghai Disneyland

Authors: Ying Yuken, Pengfei Wang, Zhang Qilin, Xiao Ben

Abstract:

Based on the main entrance and garden area (ME&G) project of Shanghai Disneyland, this paper introduces the application of BIM technology in this kind of low-rise comprehensive building with complex facade system, electromechanical system and decoration system. BIM technology is applied to the whole process of design, construction and completion of the whole project. With the construction of BIM application framework of the whole project, the key points of BIM modeling methods of different systems and the integration and coordination of BIM models are elaborated in detail. The specific application methods of BIM technology in similar complex low-rise building projects are sorted out. Finally, the paper summarizes the benefits of BIM technology application, and puts forward some suggestions for BIM management mode and practical application of similar projects in the future.

Keywords: BIM, complex low-rise building, BIM modeling, model integration and coordination, 3D scanning

Procedia PDF Downloads 143
15105 Critical Reflection in Teaching and Learning Mathematics towards Perspective Transformation: Practices in Public and Private Schools

Authors: Arturo Tobias Calizon Jr.

Abstract:

The study investigated the practices in critical reflection being employed in teaching and learning mathematics in public and private schools for students to achieve perspective transformation in psychological, convictional and behavioral dimensions. There were 1,969 senior high school and college student-respondents selected at random from 33 schools. Process reflection is most commonly practiced in both public and private schools. Convictional dimension of perspective transformation is most frequently achieved. There is no significant difference in practices of process reflection between senior high school and college students. However, there is a significant difference in perspective transformation in behavioral dimension achieved by students from public and private schools. Also, there are significant differences in psychological, convictional and behavioral dimensions of perspective transformation achieved by senior high school and college students. There is a high and significant relationship between critical reflection practices and perspective transformation of students. The researcher concludes that there are teaching strategies that facilitate critical thinking, and there are learning activities that alter perspective of students about mathematics as an abstract field. The researcher further concludes that consistent use of appropriate teaching and learning activities could bring about perspective transformation in students with success.

Keywords: critical reflection, perspective transformation, process reflection, convictional dimension, teaching and learning mathematics

Procedia PDF Downloads 134
15104 On-Site Management from Reactive to Proactive

Authors: Yu-Tzu Chen, Luh-Maan Chang

Abstract:

Construction is an inherently risky industry. The projects have been dominated by reactive actions owing to non-routine in nature. The on-site activities are especially crucial for successful project control. In order to alter actions from reactive to proactive, this paper presents an on-site data collection system utilizing advanced technology RFID and GPS in assisting on-site management with near real time progress monitoring.

Keywords: On-Site management, progress monitoring, RFID, GPS

Procedia PDF Downloads 543
15103 Project Risk Assessment of the Mining Industry of Ghana

Authors: Charles Amoatey

Abstract:

The issue of risk in the mining industry is a global phenomenon and the Ghanaian mining industry is not exempted. The main purpose of this study is to identify the critical risk factors affecting the mining industry. The study takes an integrated view of the mining industry by examining the contribution of various risk factors to mining project failure in Ghana. A questionnaire survey was conducted to solicit the critical risk factors from key mining practitioners. About 80 respondents from 11 mining firms participated in the survey. The study identified 22 risk factors contributing to mining project failure in Ghana. The five most critical risk factors based on both probability of occurrence and impact were: (1) unstable commodity prices, (2) inflation/exchange rate, (3) land degradation, (4) high cost of living and (5) government bureaucracy for obtaining licenses. Furthermore, the study found that risk assessment in the mining sector has a direct link with mining project sustainability. Mitigation measures for addressing the identified risk factors were discussed. The key findings emphasize the need for a comprehensive risk management culture in the entire mining industry.

Keywords: risk, assessment, mining, Ghana

Procedia PDF Downloads 421
15102 Project Management at University: Towards an Evaluation Process around Cooperative Learning

Authors: J. L. Andrade-Pineda, J.M. León-Blanco, M. Calle, P. L. González-R

Abstract:

The enrollment in current Master's degree programs usually pursues gaining the expertise required in real-life workplaces. The experience we present here concerns the learning process of "Project Management Methodology (PMM)", around a cooperative/collaborative mechanism aimed at affording students measurable learning goals and providing the teacher with the ability of focusing on the weaknesses detected. We have designed a mixed summative/formative evaluation, which assures curriculum engage while enriches the comprehension of PMM key concepts. In this experience we converted the students into active actors in the evaluation process itself and we endowed ourselves as teachers with a flexible process in which along with qualifications (score), other attitudinal feedback arises. Despite the high level of self-affirmation on their discussion within the interactive assessment sessions, they ultimately have exhibited a great ability to review and correct the wrong reasoning when that was the case.

Keywords: cooperative-collaborative learning, educational management, formative-summative assessment, leadership training

Procedia PDF Downloads 147
15101 Risk Management in Industrial Supervision Projects

Authors: Érick Aragão Ribeiro, George André Pereira Thé, José Marques Soares

Abstract:

Several problems in industrial supervision software development projects may lead to the delay or cancellation of projects. These problems can be avoided or contained by using identification methods, analysis and control of risks. These procedures can give an overview of the possible problems that can happen in the projects and what are the immediate solutions. Therefore, we propose a risk management method applied to the teaching and development of industrial supervision software. The method is developed through a literature review and previous projects can be divided into phases of management and have basic features that are validated with experimental research carried out by mechatronics engineering students and professionals. The management is conducted through the stages of identification, analysis, planning, monitoring, control and communication of risks. Programmers use a method of prioritizing risks considering the gravity and the possibility of occurrence of the risk. The outputs of the method indicate which risks occurred or are about to happen. The first results indicate which risks occur at different stages of the project and what risks have a high probability of occurring. The results show the efficiency of the proposed method compared to other methods, showing the improvement of software quality and leading developers in their decisions. This new way of developing supervision software helps students identify design problems, evaluate software developed and propose effective solutions. We conclude that the risk management optimizes the development of the industrial process control software and provides higher quality to the product.

Keywords: supervision software, risk management, industrial supervision, project management

Procedia PDF Downloads 329
15100 Project and Experiment-Based Fluid Dynamics Education

Authors: Etsuo Morishita

Abstract:

This paper presents the project and experiment-based fluid dynamics education in Meisei University, a private institution in Tokyo, Japan. We pay attention not only to the basic engineering courses but also to the practical aspect of engineering experience. So, we prepare courses called the Projects from I to VI. The Projects I and II are designed for the first year, III and IV are designated for the second year, V and VI are prepared for the third year, respectively. Each supervisor is responsible for two of these projects every year. When students take the Project V and VI at the third year, we automatically assume that these students will join the lab of the project for the graduation thesis. We would like to show our experience in the Project I in the summer term, 2016. In this project, we introduce a traction flight vehicle called Cat Flyer. This is a kind of a kite towed by a car for example. This is very similar to parasailing, but flight is possible even on the roads. Experiments in mechanical engineering education are also very important, and we would like to explain our course on centrifugal pump, venture, and orifice. Although these are described in detail in the text books of fluid dynamics, it is still crucial to have practical experiments as a student.

Keywords: aerodynamics, experiment, fluid dynamics, project

Procedia PDF Downloads 244
15099 Optimizing Productivity and Quality through the Establishment of a Learning Management System for an Agency-Based Graduate School

Authors: Maria Corazon Tapang-Lopez, Alyn Joy Dela Cruz Baltazar, Bobby Jones Villanueva Domdom

Abstract:

The requisite for an organization implementing quality management system to sustain its compliance to the requirements and commitment for continuous improvement is even higher. It is expected that the offices and units has high and consistent compliance to the established processes and procedures. The Development Academy of the Philippines has been operating under project management to which is has a quality management certification. To further realize its mandate as a think-tank and capacity builder of the government, DAP expanded its operation and started to grant graduate degree through its Graduate School of Public and Development Management (GSPDM). As the academic arm of the Academy, GSPDM offers graduate degree programs on public management and productivity & quality aligned to the institutional trusts. For a time, the documented procedures and processes of a project management seem to fit the Graduate School. However, there has been a significant growth in the operations of the GSPDM in terms of the graduate programs offered that directly increase the number of students. There is an apparent necessity to align the project management system into a more educational system otherwise it will no longer be responsive to the development that are taking place. The strongly advocate and encourage its students to pursue internal and external improvement to cope up with the challenges of providing quality service to their own clients and to our country. If innovation will not take roots in the grounds of GSPDM, then how will it serve the purpose of “walking the talk”? This research was conducted to assess the diverse flow of the existing internal operations and processes of the DAP’s project management and GSPDM’s school management that will serve as basis to develop a system that will harmonize into one, the Learning Management System. The study documented the existing process of GSPDM following the project management phases of conceptualization & development, negotiation & contracting, mobilization, implementation, and closure into different flow charts of the key activities. The primary source of information as respondents were the different groups involved into the delivery of graduate programs - the executive, learning management team and administrative support offices. The Learning Management System (LMS) shall capture the unique and critical processes of the GSPDM as a degree-granting unit of the Academy. The LMS is the harmonized project management and school management system that shall serve as the standard system and procedure for all the programs within the GSPDM. The unique processes cover the three important areas of school management – student, curriculum, and faculty. The required processes of these main areas such as enrolment, course syllabus development, and faculty evaluation were appropriately placed within the phases of the project management system. Further, the research shall identify critical reports and generate manageable documents and records to ensure accuracy, consistency and reliable information. The researchers had an in-depth review of the DAP-GSDPM’s mandate, analyze the various documents, and conducted series of focused group discussions. A comprehensive review on flow chart system prior and various models of school management systems were made. Subsequently, the final output of the research is a work instructions manual that will be presented to the Academy’s Quality Management Council and eventually an additional scope for ISO certification. The manual shall include documented forms, iterative flow charts and program Gantt chart that will have a parallel development of automated systems.

Keywords: productivity, quality, learning management system, agency-based graduate school

Procedia PDF Downloads 301
15098 Evolution of Performance Measurement Methods in Conditions of Uncertainty: The Implementation of Fuzzy Sets in Performance Measurement

Authors: E. A. Tkachenko, E. M. Rogova, V. V. Klimov

Abstract:

One of the basic issues of development management is connected with performance measurement as a prerequisite for identifying the achievement of development objectives. The aim of our research is to develop an improved model of assessing a company’s development results. The model should take into account the cyclical nature of development and the high degree of uncertainty in dealing with numerous management tasks. Our hypotheses may be formulated as follows: Hypothesis 1. The cycle of a company’s development may be studied from the standpoint of a project cycle. To do that, methods and tools of project analysis are to be used. Hypothesis 2. The problem of the uncertainty when justifying managerial decisions within the framework of a company’s development cycle can be solved through the use of the mathematical apparatus of fuzzy logic. The reasoned justification of the validity of the hypotheses made is given in the suggested article. The fuzzy logic toolkit applies to the case of technology shift within an enterprise. It is proven that some restrictions in performance measurement that are incurred to conventional methods could be eliminated by implementation of the fuzzy logic apparatus in performance measurement models.

Keywords: logic, fuzzy sets, performance measurement, project analysis

Procedia PDF Downloads 356
15097 The Need for Implementing Building Information Modelling (BIM) and Integrated Project Delivery (IPD) in the Construction Project: A Case Study in UAE

Authors: C. W. F. Che Wan Putra, M. Alshawi, M. S. Al Ahbabi, M. Jabakhanji

Abstract:

Much of the waste that is generated throughout the life-cycle of a building is mainly related to project stakeholders not having access to information that others have created. This results in waste and high costs. Over the past decade, however, the industry reacted to these challenges by adopting effective procurement approaches, such as partnering and design and build, to improve collaboration and communication among projects’ stakeholders. Most recently, there is a focus on creating and reusing digital project information of stakeholders throughout the life-cycle to facilitate the exchange of information among partners. This shift is based around BIM (Building Information Modelling) and collaborative environment (IPD). The power of collaborative BIM goes beyond improving efficiency. Sustainability, perhaps the most important challenge for the design and construction community, is at the intersection of BIM and collaborative project delivery, drawing strength from both. Due to these benefits, a research study has been carried out to investigate the need of BIM and IPD, on a large scale construction project which is procured on a traditional approach, i.e. design-bid-build. A qualitative research work including a semi-structured interview with project partners was conducted on a typical project in the UAE, whereby the selected project suffered from severe delays and cost overrun. This paper aims to bring about clear evidence to what most likely to happen to a typical construction project in spite of employing very good consultants, project manager and contractors and how these problems could have been avoided if BIM and IPD were deployed.

Keywords: building information modelling (BIM), integrated project delivery (IPD), collaborative environment, case study

Procedia PDF Downloads 379
15096 'Pacta Sunt Servanda': Which Form of Contract to Use in the Construction Industry

Authors: Ahmed Stifi, Sascha Gentes

Abstract:

The contract in its simplest definition is an agreement involving parties with a number of documents which may be as little as a marriage contract involving two parties or as big as a contract of construction and operation of a nuclear power plant involving companies and stakeholders with hundreds or even thousands of documents. All parties in the construction industry, not only the contract experts, agree that the success of a project is linked primarily to the form of contract regulating the relationship between stakeholders of the project. Therefore it is essential for the construction industry to study, analyze and improve its contracts forms continuously. However, it should be mentioned that different contract forms are developed to suit the construction evolution in term of its machinery, materials and construction process. There exist some similarities in some clauses and variations in many of these forms depending upon the type of project, the kind of clients and more importantly the laws and regulations governing the transaction in the country where the project is carried out. This paper will discuss the most important forms of construction contracts starting from national level, intended to the contract form in Germany and moving on to the international level introducing FIDIC contracts and its different forms, some newly developed contracts forms namely the integrated form of agreement, the new engineering contract and the project alliance agreement. The result of the study shows that many of the contract’s paragraphs are similar and the main difference comes in the approach of the relationship between the parties. Is it based on co-operation and mutual trust, or in some cases a load of responsibility for a particular party which increases the problems and disputes that affects the success of the project negatively. Thus we can say that the form of the contract, that plays an essential role in the approach of the project management, which is ultimately the key factor for the success of the project. So we advise to use a form of contract, which enhance the mutual trust between the project parties, contribute to support the cooperation between them, distribute responsibility and risks on an equitable basis and build on the principle “win-win". In additional to the conventional role of the contract it should integrate all parties into one team to achieve the target value of the project.

Keywords: contract, FIDIC, integrated form of agreement, new engineering contract, project alliance agreemen

Procedia PDF Downloads 346
15095 The Project Evaluation to Develop the Competencies, Capabilities, and Skills in Repairing Computers of People in Jompluak Local Municipality, Bang Khonthi District, Samut Songkram Province

Authors: Wilailuk Meepracha

Abstract:

The results of the study on the project evaluation to develop the competencies, capabilities, and skills in repairing computers of people in Jompluak Local Municipality, Bang Khonthi District, Samut Songkram Province showed that the overall result was good (4.33). When considering on each aspect, it was found that the highest one was on process evaluation (4.60) followed by product evaluation (4.50) and the least one was on feeding factor (3.97). When considering in details, it was found that: 1) the context aspect was high (4.23) with the highest item on the arrangement of the training situation (4.67) followed by the appropriateness of the target (4.30) and the least aspect was on the project cooperation (3.73). 2) The evaluation of average overall primary factor or feeding factor showed high value (4.23) while the highest aspect was on the capability of the trainers (4.47) followed by the suitable venue (4.33) while the least aspect was on the insufficient budget (3.47). 3) The average result of process evaluation was very high (4.60). The highest aspect was on the follow-op supervision (4.70) followed by responsibility of each project staffs (4.50) while the least aspect was on the present situation and the problems of the community (4.40). 4) The overall result of the product evaluation was very high (4.50). The highest aspect was on the diversity of the activities and the community integration (4.67) followed by project target achievement (4.63) while the least aspect was on continuation and regularity of the activities (4.33). The trainees reported high satisfaction on the project management at very high level (43.33%) while 40% reported high level and 16.67% reported moderate level. Suggestions for the project were on the additional number of the computer sets (37.78%) followed by longer training period especially on computer skills (43.48%).

Keywords: project evaluation, competency development, the capability on computer repairing and computer skills

Procedia PDF Downloads 285
15094 Feasibility Study of Potential and Economic of Rice Straw VSPP Power Plant in Thailand

Authors: Sansanee Sansiribhan, Anusorn Rattanathanaophat, Chirapan Nuengchaknin

Abstract:

The potential feasibility of a 9.5 MWe capacity rice straw power plant project in Thailand was studied by evaluating the rice straw resource. The result showed that Thailand had a high rice straw biomass potential at the provincial level, especially, the provinces in the central, northeastern and western Thailand, which could feasibly develop plants. The economic feasibility of project was also investigated. The financial feasibility is also evaluated based on two important factors in the project, i.e., NPV ≥ 0 and IRR ≥ 11%. It was found that the rice straw power plant project at 9.5 MWe was financially feasible with the cost of fuel in the range of 30.6-47.7 USD/t.

Keywords: power plant, project feasibility, rice straw, Thailand

Procedia PDF Downloads 317
15093 Applying the Underwriting Technique to Analyze and Mitigate the Credit Risks in Construction Project Management

Authors: Hai Chien Pham, Thi Phuong Anh Vo, Chansik Park

Abstract:

Risks management in construction projects is important to ensure the positive feasibility of the projects in which financial risks are most concerned while construction projects always run on a credit basis. Credit risks, therefore, require unique and technical tools to be well managed. Underwriting technique in credit risks, in its most basic sense, refers to the process of evaluating the risks and the potential exposure of losses. Risks analysis and underwriting are applied as a must in banks and financial institutions who are supporters for constructions projects when required. Recently, construction organizations, especially contractors, have recognized the significant increasing of credit risks which caused negative impacts to project performance and profit of construction firms. Despite the successful application of underwriting in banks and financial institutions for many years, there are few contractors who are applying this technique to analyze and mitigate the credit risks of their potential owners before signing contracts with them for delivering their performed services. Thus, contractors have taken credit risks during project implementation which might be not materialized due to the bankruptcy and/or protracted default made by their owners. With this regard, this study proposes a model using the underwriting technique for contractors to analyze and assess credit risks of their owners before making final decisions for the potential construction contracts. Contractor’s underwriters are able to analyze and evaluate the subjects such as owner, country, sector, payment terms, financial figures and their related concerns of the credit limit requests in details based on reliable information sources, and then input into the proposed model to have the Overall Assessment Score (OAS). The OAS is as a benchmark for the decision makers to grant the proper limits for the project. The proposed underwriting model is validated by 30 subjects in Asia Pacific region within 5 years to achieve their OAS, and then compare output OAS with their own practical performance in order to evaluate the potential of underwriting model for analyzing and assessing credit risks. The results revealed that the underwriting would be a powerful method to assist contractors in making precise decisions. The contribution of this research is to allow the contractors firstly to develop their own credit risk management model for proactively preventing the credit risks of construction projects and continuously improve and enhance the performance of this function during project implementation.

Keywords: underwriting technique, credit risk, risk management, construction project

Procedia PDF Downloads 190
15092 Multi-Objective Multi-Mode Resource-Constrained Project Scheduling Problem by Preemptive Fuzzy Goal Programming

Authors: Busaba Phurksaphanrat

Abstract:

This research proposes a pre-emptive fuzzy goal programming model for multi-objective multi-mode resource constrained project scheduling problem. The objectives of the problem are minimization of the total time and the total cost of the project. Objective in a multi-mode resource-constrained project scheduling problem is often a minimization of make-span. However, both time and cost should be considered at the same time with different level of important priorities. Moreover, all elements of cost functions in a project are not included in the conventional cost objective function. Incomplete total project cost causes an error in finding the project scheduling time. In this research, pre-emptive fuzzy goal programming is presented to solve the multi-objective multi-mode resource constrained project scheduling problem. It can find the compromise solution of the problem. Moreover, it is also flexible in adjusting to find a variety of alternative solutions.

Keywords: multi-mode resource constrained project scheduling problem, fuzzy set, goal programming, pre-emptive fuzzy goal programming

Procedia PDF Downloads 408
15091 A Case Study: Social Network Analysis of Construction Design Teams

Authors: Elif D. Oguz Erkal, David Krackhardt, Erica Cochran-Hameen

Abstract:

Even though social network analysis (SNA) is an abundantly studied concept for many organizations and industries, a clear SNA approach to the project teams has not yet been adopted by the construction industry. The main challenges for performing SNA in construction and the apparent reason for this gap is the unique and complex structure of each construction project, the comparatively high circulation of project team members/contributing parties and the variety of authentic problems for each project. Additionally, there are stakeholders from a variety of professional backgrounds collaborating in a high-stress environment fueled by time and cost constraints. Within this case study on Project RE, a design & build project performed at the Urban Design Build Studio of Carnegie Mellon University, social network analysis of the project design team will be performed with the main goal of applying social network theory to construction project environments. The research objective is to determine a correlation between the network of how individuals relate to each other on one’s perception of their own professional strengths and weaknesses and the communication patterns within the team and the group dynamics. Data is collected through a survey performed over four rounds conducted monthly, detailed follow-up interviews and constant observations to assess the natural alteration in the network with the effect of time. The data collected is processed by the means of network analytics and in the light of the qualitative data collected with observations and individual interviews. This paper presents the full ethnography of this construction design team of fourteen architecture students based on an elaborate social network data analysis over time. This study is expected to be used as an initial step to perform a refined, targeted and large-scale social network data collection in construction projects in order to deduce the impacts of social networks on project performance and suggest better collaboration structures for construction project teams henceforth.

Keywords: construction design teams, construction project management, social network analysis, team collaboration, network analytics

Procedia PDF Downloads 179
15090 The Language Use of Middle Eastern Freedom Activists' Speeches: A Gender Perspective

Authors: Sulistyaningtyas

Abstract:

Examining the role of Middle Eastern freedom activists’ speech based on gender perspective is considered noteworthy because the society in the Middle East is patriarchal. This research aims to examine the language use of the Middle Eastern freedom activists’ speeches through gender perspective. The data sources are from male and female Middle Eastern freedom activists’ speech videos. In analyzing the data, the theories employed are about Language Style from Gender Perspective and The Language for Speech. The result reveals that there are sets of spoken language differences between male and female speakers. In using the language for speech, both male and female speakers produce metaphor, euphemism, the ‘rule of three’, parallelism, and pronouns in random frequency of production, which cannot be separated by genders. Moreover, it cannot be concluded that one gender is more potential than the other to influence the audience in delivering speech. There are other factors, particularly non-verbal factors, existing to give impacts on how a speech can influence the audience.

Keywords: gender perspective, language use, Middle Eastern freedom activists, speech

Procedia PDF Downloads 402