Search results for: wait time
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 17627

Search results for: wait time

17477 Basic Calibration and Normalization Techniques for Time Domain Reflectometry Measurements

Authors: Shagufta Tabassum

Abstract:

The study of dielectric properties in a binary mixture of liquids is very useful to understand the liquid structure, molecular interaction, dynamics, and kinematics of the mixture. Time-domain reflectometry (TDR) is a powerful tool for studying the cooperation and molecular dynamics of the H-bonded system. In this paper, we discuss the basic calibration and normalization procedure for time-domain reflectometry measurements. Our approach is to explain the different types of error occur during TDR measurements and how these errors can be eliminated or minimized.

Keywords: time domain reflectometry measurement techinque, cable and connector loss, oscilloscope loss, and normalization technique

Procedia PDF Downloads 179
17476 An excessive Screen Time of High School Students in Their Free Time Promotes Our Young People’s Risk of Obesity

Authors: Susana Aldaba Yaben, Marga Echauri Ozcoidi, Rosario Osinaga Cenoz

Abstract:

It was decided to make a diagnosis with students of Berriozar High School between 12 and 15 years (both included) for their lifestyles in relation to eating habits, BMI (Body Mass Index), physical activity, drugs, interpersonal relationships and screen time. The aim of this survey is identifying needs of this population and depending on the results, we could program socio-educational activities. This action is part of the Community Health Promotion Programme and healthy lifestyles in childhood and youth of Berriozar. The eating habits, a lack of physical activity and an excessive screen time are causes of 26,75% of obese or overweight young people. First of all, many of them have got a diet enriched in saturated fats and sugars. Secondly, most of them do not practise physical exercise daily and finally, their screen time are higher than the recommendation (until 2 hours a day).

Keywords: lifestyle, diet, BMI, physical activity, screen time, education, youth

Procedia PDF Downloads 544
17475 A Reinforcement Learning Approach for Evaluation of Real-Time Disaster Relief Demand and Network Condition

Authors: Ali Nadi, Ali Edrissi

Abstract:

Relief demand and transportation links availability is the essential information that is needed for every natural disaster operation. This information is not in hand once a disaster strikes. Relief demand and network condition has been evaluated based on prediction method in related works. Nevertheless, prediction seems to be over or under estimated due to uncertainties and may lead to a failure operation. Therefore, in this paper a stochastic programming model is proposed to evaluate real-time relief demand and network condition at the onset of a natural disaster. To address the time sensitivity of the emergency response, the proposed model uses reinforcement learning for optimization of the total relief assessment time. The proposed model is tested on a real size network problem. The simulation results indicate that the proposed model performs well in the case of collecting real-time information.

Keywords: disaster management, real-time demand, reinforcement learning, relief demand

Procedia PDF Downloads 274
17474 Designing Electronic Kanban in Assembly Line Tailboom at XYZ Corp to Reducing Lead Time

Authors: Nadhifah A. Nugraha, Dida D. Damayanti, Widia Juliani

Abstract:

Airplanes manufacturing is growing along with the increasing demand from consumers. The helicopter's tail called Tailboom is a product of the helicopter division at XYZ Corp, where the Tailboom assembly line is a pull system. Based on observations of existing conditions that occur at XYZ Corp, production is still unable to meet the demands of consumers; lead time occurs greater than the plan agreed upon by the consumers. In the assembly process, each work station experiences a lack of parts and components needed to assemble components. This happens because of the delay in getting the required part information, and there is no warning about the availability of parts needed, it makes some parts unavailable in assembly warehouse. The lack of parts and components from the previous work station causes the assembly process to stop, and the assembly line also stops at the next station. In its completion, the production time was late and not on the schedule. In resolving these problems, the controlling process is needed, which is controlling the assembly line to get all components and subassembly in the right amount and at the right time. This study applies one of Just In Time tools, namely Kanban and automation, should be added as efficiently and effectively communication line becomes electronic Kanban. The problem can be solved by reducing non-value added time, such as waiting time and idle time. The proposed results of controlling the assembly line of Tailboom result in a smooth assembly line without waiting, reduced lead time, and achieving production time according to the schedule agreed with the consumers.

Keywords: kanban, e-Kanban, lead time, pull system

Procedia PDF Downloads 79
17473 Project Time Prediction Model: A Case Study of Construction Projects in Sindh, Pakistan

Authors: Tauha Hussain Ali, Shabir Hussain Khahro, Nafees Ahmed Memon

Abstract:

Accurate prediction of project time for planning and bid preparation stage should contain realistic dates. Constructors use their experience to estimate the project duration for the new projects, which is based on intuitions. It has been a constant concern to both researchers and constructors to analyze the accurate prediction of project duration for bid preparation stage. In Pakistan, such study for time cost relationship has been lacked to predict duration performance for the construction projects. This study is an attempt to explore the time cost relationship that would conclude with a mathematical model to predict the time for the drainage rehabilitation projects in the province of Sindh, Pakistan. The data has been collected from National Engineering Services (NESPAK), Pakistan and regression analysis has been carried out for the analysis of results. Significant relationship has been found between time and cost of the construction projects in Sindh and the generated mathematical model can be used by the constructors to predict the project duration for the upcoming projects of same nature. This study also provides the professionals with a requisite knowledge to make decisions regarding project duration, which is significantly important to win the projects at the bid stage.

Keywords: BTC Model, project time, relationship of time cost, regression

Procedia PDF Downloads 355
17472 Subjective Temporal Resources: On the Relationship Between Time Perspective and Chronic Time Pressure to Burnout

Authors: Diamant Irene, Dar Tamar

Abstract:

Burnout, conceptualized within the framework of stress research, is to a large extent a result of a threat on resources of time or a feeling of time shortage. In reaction to numerous tasks, deadlines, high output, management of different duties encompassing work-home conflicts, many individuals experience ‘time pressure’. Time pressure is characterized as the perception of a lack of available time in relation to the amount of workload. It can be a result of local objective constraints, but it can also be a chronic attribute in coping with life. As such, time pressure is associated in the literature with general stress experience and can therefore be a direct, contributory burnout factor. The present study examines the relation of chronic time pressure – feeling of time shortage and of being rushed, with another central aspect in subjective temporal experience - time perspective. Time perspective is a stable personal disposition, capturing the extent to which people subjectively remember the past, live the present and\or anticipate the future. Based on Hobfoll’s Conservation of Resources Theory, it was hypothesized that individuals with chronic time pressure would experience a permanent threat on their time resources resulting in relatively increased burnout. In addition, it was hypothesized that different time perspective profiles, based on Zimbardo’s typology of five dimensions – Past Positive, Past Negative, Present Hedonistic, Present Fatalistic, and Future, would be related to different magnitudes of chronic time pressure and of burnout. We expected that individuals with ‘Past Negative’ or ‘Present Fatalist’ time perspectives would experience more burnout, with chronic time pressure being a moderator variable. Conversely, individuals with a ‘Present Hedonistic’ - with little concern with the future consequences of actions, would experience less chronic time pressure and less burnout. Another temporal experience angle examined in this study is the difference between the actual distribution of time (as in a typical day) versus desired distribution of time (such as would have been distributed optimally during a day). It was hypothesized that there would be a positive correlation between the gap between these time distributions and chronic time pressure and burnout. Data was collected through an online self-reporting survey distributed on social networks, with 240 participants (aged 21-65) recruited through convenience and snowball sampling methods from various organizational sectors. The results of the present study support the hypotheses and constitute a basis for future debate regarding the elements of burnout in the modern work environment, with an emphasis on subjective temporal experience. Our findings point to the importance of chronic and stable temporal experiences, as time pressure and time perspective, in occupational experience. The findings are also discussed with a view to the development of practical methods of burnout prevention.

Keywords: conservation of resources, burnout, time pressure, time perspective

Procedia PDF Downloads 145
17471 Keyloggers Prevention with Time-Sensitive Obfuscation

Authors: Chien-Wei Hung, Fu-Hau Hsu, Chuan-Sheng Wang, Chia-Hao Lee

Abstract:

Nowadays, the abuse of keyloggers is one of the most widespread approaches to steal sensitive information. In this paper, we propose an On-Screen Prompts Approach to Keyloggers (OSPAK) and its analysis, which is installed in public computers. OSPAK utilizes a canvas to cue users when their keystrokes are going to be logged or ignored by OSPAK. This approach can protect computers against recoding sensitive inputs, which obfuscates keyloggers with letters inserted among users' keystrokes. It adds a canvas below each password field in a webpage and consists of three parts: two background areas, a hit area and a moving foreground object. Letters at different valid time intervals are combined in accordance with their time interval orders, and valid time intervals are interleaved with invalid time intervals. It utilizes animation to visualize valid time intervals and invalid time intervals, which can be integrated in a webpage as a browser extension. We have tested it against a series of known keyloggers and also performed a study with 95 users to evaluate how easily the tool is used. Experimental results made by volunteers show that OSPAK is a simple approach.

Keywords: authentication, computer security, keylogger, privacy, information leakage

Procedia PDF Downloads 90
17470 Pregnancy Rate and Outcomes after Uterine Fibroid Embolization Single Centre Experience in the Middle East from the United Arab Emirates at Alain Hospital

Authors: Jamal Alkoteesh, Mohammed Zeki, Mouza Alnaqbi

Abstract:

Objective: To evaluate pregnancy outcomes, complications and neonatal outcomes in women who had previously undergone uterine arterial embolization. Design: Retrospective study. In this study, most women opted for UFE as a fertility treatment after failure of myomectomy or in vitro fertilization, or because hysterectomy was the only suggested option. Background. Myomectomy is the standard approach in patients with fibroids desiring a future pregnancy. However, myomectomy may be difficult in cases of numerous interstitial and/or submucous fibroids.In these cases, UFE has the advantage of embolizing all fibroids in one procedure. This procedure is an accepted nonsurgical treatment for symptomatic uterine fibroids. Study Methods: A retrospective study of 210 patients treated with UFE for symptomatic uterine fibroids between 2011-2016 was performed. UFE was performed using ((PVA; Embozen, Beadblock) (500-900 µm in diameter). Pregnancies were identified using screening questionnaires and the study database. Of the 210 patients who received UFE treatment, 35 women younger than the age of 40 wanted to conceive and had been unable. All women in our study were advised to wait six months or more after UFE before attempting to become pregnant, of which the reported time range before attempting to conceive was seven to 33 months (average 20 months). RESULTS: In a retrospective chart review of patients younger than the age of 40 (35 patients,18 patients reported 23 pregnancies, of which five were miscarriages. Two more pregnancies were complicated by premature labor. Of the 23 pregnancies, 16 were normal full-term pregnancies, 15 women had conceived once, and four had become pregnant twice. The remaining patients did not conceive. In the study, there was no reported intrauterine growth retardation in the prenatal period, fetal distress during labor, or problems related to uterine integrity. Two patients reported minor problems during pregnancy that were borderline oligohydramnios and low-lying placenta. In the cohort of women who did conceive, overall, 16 out of 18 births proceeded normally without any complications (86%). Eight women delivered by cesarean section, and 10 women had normal vaginal delivery. In this study of 210 women, UFE had a fertility rate of 47%. Our group of 23 pregnancies was small, but did confirm successful pregnancy after UFE. The 45.7% pregnancy rate in women below the age of 40 years old who completed a term pregnancy compares favorably with women who underwent myomectomy via other method. Of the women in the cohort who did conceive, subsequent birth proceeded normally (86%). Conclusion: Pregnancy after UFE is well-documented. The risks of infertility following embolization, premature menopause, and hysterectomy are small, as is the radiation exposure during embolization. Fertility rates appear similar to patients undergoing myomectomy.UFE should not be contraindicated in patients who want to conceive and they should be able to choose between surgical options and UFE.

Keywords: fibroid, pregnancy, therapeutic embolization, uterine artery

Procedia PDF Downloads 207
17469 The Use of Electrical Resistivity Measurement, Cracking Test and Ansys Simulation to Predict Concrete Hydration Behavior and Crack Tendency

Authors: Samaila Bawa Muazu

Abstract:

Hydration process, crack potential and setting time of concrete grade C30, C40 and C50 were separately monitored using non-contact electrical resistivity apparatus, a novel plastic ring mould and penetration resistance method respectively. The results show highest resistivity of C30 at the beginning until reaching the acceleration point when C50 accelerated and overtaken the others, and this period corresponds to its final setting time range, from resistivity derivative curve, hydration process can be divided into dissolution, induction, acceleration and deceleration periods, restrained shrinkage crack and setting time tests demonstrated the earliest cracking and setting time of C50, therefore, this method conveniently and rapidly determines the concrete’s crack potential. The highest inflection time (ti), the final setting time (tf) were obtained and used with crack time in coming up with mathematical models for the prediction of concrete’s cracking age for the range being considered. Finally, ANSYS numerical simulations supports the experimental findings in terms of the earliest crack age of C50 and the crack location that, highest stress concentration is always beneath the artificially introduced expansion joint of C50.

Keywords: concrete hydration, electrical resistivity, restrained shrinkage crack, setting time, simulation

Procedia PDF Downloads 185
17468 An Attempt to Measure Afro-Polychronism Empirically

Authors: Aïda C. Terblanché-Greeff

Abstract:

Afro-polychronism is a unique amalgamated cultural value of social self-construal and time orientation. As such, the construct Afro-polychronism is conceptually analysed by focusing on the aspects of Ubuntu as collectivism and African time as polychronism. It is argued that these cultural values have a reciprocal and thus inseparable relationship. As it is general practice to measure cultural values empirically, the author conducted empirically engaged philosophy and aimed to develop a scale to measure Afro-polychronism based on its two dimensions of Ubuntu as social self-construal and African time as time orientation. From the scale’s psychometric properties, it was determined that the scale was, in fact, not reliable and valid. It was found that the correlation between the Ubuntu dimension and the African time is moderate (albeit statistically significant). In conclusion, the author abduced why this cultural value cannot be empirically measured based on its theoretical definition and indicated which different path would be more promising.

Keywords: African time, Afro-polychronism, empirically engaged African philosophy, Ubuntu

Procedia PDF Downloads 118
17467 Converting Scheduling Time into Calendar Date Considering Non-Interruptible Construction Tasks

Authors: Salman Ali Nisar, Suzuki Koji

Abstract:

In this paper we developed a new algorithm to convert the project scheduling time into calendar date in order to handle non-interruptible activities not to be split by non-working days (such as weekend and holidays). In a construction project some activities might require not to be interrupted even on non-working days, or to be finished on the end day of business days. For example, concrete placing work might be required to be completed by the end day of weekdays i.e. Friday, and curing in the weekend. This research provides an algorithm that imposes time constraint for start and finish times of non-interruptible activities. The algorithm converts working days, which is obtained by Critical Path Method (CPM), to calendar date with consideration of the start date of a project. After determining the interruption by non-working days, the start time of a certain activity should be postponed, if there is enough total float value. Otherwise, the duration is shortened by hiring additional resources capacity or/and using overtime work execution. Then, time constraints are imposed to start time and finish time of the activity. The algorithm is developed in Excel Spreadsheet for microcomputer and therefore we can easily get a feasible, calendared construction schedule for such a construction project with some non-interruptible activities.

Keywords: project management, scheduling, critical path method, time constraint, non-interruptible tasks

Procedia PDF Downloads 470
17466 Investigation on Performance of Change Point Algorithm in Time Series Dynamical Regimes and Effect of Data Characteristics

Authors: Farhad Asadi, Mohammad Javad Mollakazemi

Abstract:

In this paper, Bayesian online inference in models of data series are constructed by change-points algorithm, which separated the observed time series into independent series and study the change and variation of the regime of the data with related statistical characteristics. variation of statistical characteristics of time series data often represent separated phenomena in the some dynamical system, like a change in state of brain dynamical reflected in EEG signal data measurement or a change in important regime of data in many dynamical system. In this paper, prediction algorithm for studying change point location in some time series data is simulated. It is verified that pattern of proposed distribution of data has important factor on simpler and smother fluctuation of hazard rate parameter and also for better identification of change point locations. Finally, the conditions of how the time series distribution effect on factors in this approach are explained and validated with different time series databases for some dynamical system.

Keywords: time series, fluctuation in statistical characteristics, optimal learning, change-point algorithm

Procedia PDF Downloads 398
17465 Barriers towards Effective Participation in Physically Oriented Leisure Time Activities: A Case Study of Federal College of Education, Pankshin Plateau State, Nigeria

Authors: Mulak Moses Yokdi

Abstract:

Correct use of leisure time has suffered neglect in our society and the people ignorantly think that the trend does not matter. The researcher felt concerned about the issue and went on to find out why using FCE, Pankshin workers as a case study. Four hypotheses were used, considering such variables as leadership, traditional activities, stress due to work pressure and time constraint. The participants selected for the study were one hundred and ten members of FCE, Pankshin staff. A self-developed questionnaire was the instrument used. Chi-square (x2) was employed to test the hypotheses at P = 0.005; df = 3. The statistics of percentages was also used to describe the situation as implicated by the data. The results showed that all hypotheses were significant (P = 0.05). It was concluded that the four variables were impediments to effective participation in physically oriented leisure time activities among the FCE, Staff. Based on the findings, it was recommended that the FCE should get good leadership, create good awareness for people to understand why they should be effectively involved in physically oriented leisure time activities.

Keywords: barriers, effective participation, leisure time, physically oriented, work pressure, time constraint

Procedia PDF Downloads 333
17464 Lead-Time Estimation Approach Using the Process Capability Index

Authors: Abdel-Aziz M. Mohamed

Abstract:

This research proposes a methodology to estimate the customer order lead time in the supply chain based on the process capability index. The cases when the process output is normally distributed and when it is not are considered. The relationships between the system capability indices in both service and manufacturing applications, delivery system reliability and the percentages of orders delivered after their promised due dates are presented. The proposed method can be used to examine the current process capability to deliver the orders before the promised lead-time. If the system was found to be incapable, the method can be used to help revise the current lead-time to a proper value according to the service reliability level selected by the management. Numerical examples and a case study describing the lead time estimation methodology and testing the system capability of delivering the orders before their promised due date are illustrated.

Keywords: lead-time estimation, process capability index, delivery system reliability, statistical analysis, service achievement index, service quality

Procedia PDF Downloads 533
17463 Modification Encryption Time and Permutation in Advanced Encryption Standard Algorithm

Authors: Dalal N. Hammod, Ekhlas K. Gbashi

Abstract:

Today, cryptography is used in many applications to achieve high security in data transmission and in real-time communications. AES has long gained global acceptance and is used for securing sensitive data in various industries but has suffered from slow processing and take a large time to transfer data. This paper suggests a method to enhance Advance Encryption Standard (AES) Algorithm based on time and permutation. The suggested method (MAES) is based on modifying the SubByte and ShiftRrows in the encryption part and modification the InvSubByte and InvShiftRows in the decryption part. After the implementation of the proposal and testing the results, the Modified AES achieved good results in accomplishing the communication with high performance criteria in terms of randomness, encryption time, storage space, and avalanche effects. The proposed method has good randomness to ciphertext because this method passed NIST statistical tests against attacks; also, (MAES) reduced the encryption time by (10 %) than the time of the original AES; therefore, the modified AES is faster than the original AES. Also, the proposed method showed good results in memory utilization where the value is (54.36) for the MAES, but the value for the original AES is (66.23). Also, the avalanche effects used for calculating diffusion property are (52.08%) for the modified AES and (51.82%) percentage for the original AES.

Keywords: modified AES, randomness test, encryption time, avalanche effects

Procedia PDF Downloads 217
17462 Repair Workshop Queue System Modification Using Priority Scheme

Authors: C. Okonkwo Ugochukwu, E. Sinebe Jude, N. Odoh Blessing, E. Okafor Christian

Abstract:

In this paper, a modification on repair workshop queuing system using multi priority scheme was carried out. Chi square goodness of fit test was used to determine the random distribution of the inter arrival time and service time of crankshafts that come for maintenance in the workshop. The chi square values obtained for all the prioritized classes show that the distribution conforms to Poisson distribution. The mean waiting time in queue results of non-preemptive priority for 1st, 2nd and 3rd classes show 0.066, 0.09, and 0.224 day respectively, while preemptive priority show 0.007, 0.036 and 0.258 day. However, when non priority is used, which obviously has no class distinction it amounts to 0.17 days. From the results, one can observe that the preemptive priority system provides a very dramatic improvement over the non preemptive priority as it concerns arrivals that are of higher priority. However, the improvement has a detrimental effect on the low priority class. The trend of the results is similar to the mean waiting time in the system as a result of addition of the actual service time. Even though the mean waiting time for the queue and that of the system for no priority takes the least time when compared with the least priority, urgent and semi-urgent jobs will terribly suffer which will most likely result in reneging or balking of many urgent jobs. Hence, the adoption of priority scheme in this type of scenario will result in huge profit to the Company and more customer satisfaction.

Keywords: queue, priority class, preemptive, non-preemptive, mean waiting time

Procedia PDF Downloads 351
17461 Parallelizing the Hybrid Pseudo-Spectral Time Domain/Finite Difference Time Domain Algorithms for the Large-Scale Electromagnetic Simulations Using Massage Passing Interface Library

Authors: Donggun Lee, Q-Han Park

Abstract:

Due to its coarse grid, the Pseudo-Spectral Time Domain (PSTD) method has advantages against the Finite Difference Time Domain (FDTD) method in terms of memory requirement and operation time. However, since the efficiency of parallelization is much lower than that of FDTD, PSTD is not a useful method for a large-scale electromagnetic simulation in a parallel platform. In this paper, we propose the parallelization technique of the hybrid PSTD-FDTD (HPF) method which simultaneously possesses the efficient parallelizability of FDTD and the quick speed and low memory requirement of PSTD. Parallelization cost of the HPF method is exactly the same as the parallel FDTD, but still, it occupies much less memory space and has faster operation speed than the parallel FDTD. Experiments in distributed memory systems have shown that the parallel HPF method saves up to 96% of the operation time and reduces 84% of the memory requirement. Also, by combining the OpenMP library to the MPI library, we further reduced the operation time of the parallel HPF method by 50%.

Keywords: FDTD, hybrid, MPI, OpenMP, PSTD, parallelization

Procedia PDF Downloads 114
17460 Real-Time Online Tracking Platform

Authors: Denis Obrul, Borut Žalik

Abstract:

We present an extendable online real-time tracking platform that can be used to track a wide variety of location-aware devices. These can range from GPS devices mounted inside a vehicle, closed and secure systems such as Teltonika and to mobile phones running multiple platforms. Special consideration is given to decentralized approach, security and flexibility. A number of different use cases are presented as a proof of concept.

Keywords: real-time, online, gps, tracking, web application

Procedia PDF Downloads 318
17459 Real Time Detection, Prediction and Reconstitution of Rain Drops

Authors: R. Burahee, B. Chassinat, T. de Laclos, A. Dépée, A. Sastim

Abstract:

The purpose of this paper is to propose a solution to detect, predict and reconstitute rain drops in real time – during the night – using an embedded material with an infrared camera. To prevent the system from needing too high hardware resources, simple models are considered in a powerful image treatment algorithm reducing considerably calculation time in OpenCV software. Using a smart model – drops will be matched thanks to a process running through two consecutive pictures for implementing a sophisticated tracking system. With this system drops computed trajectory gives information for predicting their future location. Thanks to this technique, treatment part can be reduced. The hardware system composed by a Raspberry Pi is optimized to host efficiently this code for real time execution.

Keywords: reconstitution, prediction, detection, rain drop, real time, raspberry, infrared

Procedia PDF Downloads 383
17458 Design of Real Time Early Response Systems for Natural Disaster Management Based on Automation and Control Technologies

Authors: C. Pacheco, A. Cipriano

Abstract:

A new concept of response system is proposed for filling the gap that exists in reducing vulnerability during immediate response to natural disasters. Real Time Early Response Systems (RTERSs) incorporate real time information as feedback data for closing control loop and for generating real time situation assessment. A review of the state of the art works that fit the concept of RTERS is presented, and it is found that they are mainly focused on manmade disasters. At the same time, in response phase of natural disaster management many works are involved in creating early warning systems, but just few efforts have been put on deciding what to do once an alarm is activated. In this context a RTERS arises as a useful tool for supporting people in their decision making process during natural disasters after an event is detected, and also as an innovative context for applying well-known automation technologies and automatic control concepts and tools.

Keywords: disaster management, emergency response system, natural disasters, real time

Procedia PDF Downloads 419
17457 The Effect of Temperature, Contact Time and Agitation Speed During Pre-Treatment on Elution of Gold

Authors: T. P. Oladele, C. A. Snyders, S. M. Bradshaw, G. Akdogan

Abstract:

The effect of temperature, contact time and agitation during pre-treatment was investigated on the elution of gold from granular activated carbon at fixed caustic-cyanide concentration and elution conditions. It was shown that there are interactions between parameters during pre-treatment. At 80oC, recovery is independent of the contact time while the maximum recovery is obtained in the absence of agitation (0rpm). Increase in agitation speed from 0 rev/min to 1200 rev/min showed a decrease in recovery of approximately 20 percent at 80°C. Recovery with increased time from 15 minutes to 45 minutes is only pronounced at 25°C with approximately 4 percent increase at all agitation speeds. The results from elution recovery are aimed to give insight into the mechanisms of pre-treatment under the combinations of the chosen parameters.

Keywords: gold, temperature, contact time, agitation speed, recovery

Procedia PDF Downloads 446
17456 A Posteriori Trading-Inspired Model-Free Time Series Segmentation

Authors: Plessen Mogens Graf

Abstract:

Within the context of multivariate time series segmentation, this paper proposes a method inspired by a posteriori optimal trading. After a normalization step, time series are treated channelwise as surrogate stock prices that can be traded optimally a posteriori in a virtual portfolio holding either stock or cash. Linear transaction costs are interpreted as hyperparameters for noise filtering. Trading signals, as well as trading signals obtained on the reversed time series, are used for unsupervised channelwise labeling before a consensus over all channels is reached that determines the final segmentation time instants. The method is model-free such that no model prescriptions for segments are made. Benefits of proposed approach include simplicity, computational efficiency, and adaptability to a wide range of different shapes of time series. Performance is demonstrated on synthetic and real-world data, including a large-scale dataset comprising a multivariate time series of dimension 1000 and length 2709. Proposed method is compared to a popular model-based bottom-up approach fitting piecewise affine models and to a recent model-based top-down approach fitting Gaussian models and found to be consistently faster while producing more intuitive results in the sense of segmenting time series at peaks and valleys.

Keywords: time series segmentation, model-free, trading-inspired, multivariate data

Procedia PDF Downloads 106
17455 Graphene Oxide Fiber with Different Exfoliation Time and Activated Carbon Particle

Authors: Nuray Uçar, Mervin Ölmez, Özge Alptoğa, Nilgün K. Yavuz, Ayşen Önen

Abstract:

In recent years, research on continuous graphene oxide fibers has been intensified. Therefore, many factors of production stages are being studied. In this study, the effect of exfoliation time and presence of activated carbon particle (ACP) on graphene oxide fiber’s properties has been analyzed. It has been seen that cross-sectional appearance of sample with ACP is harsh and porous because of ACP. The addition of ACP did not change the electrical conductivity. However, ACP results in an enormous decrease of mechanical properties. Longer exfoliation time results to higher crystallinity degree, C/O ratio and less d space between layers. The breaking strength and electrical conductivity of sample with less exfoliation time is some higher than sample with high exfoliation time.

Keywords: activated carbon, coagulation by wet spinning, exfoliation, graphene oxide fiber

Procedia PDF Downloads 315
17454 Assessment of a Rapid Detection Sensor of Faecal Pollution in Freshwater

Authors: Ciprian Briciu-Burghina, Brendan Heery, Dermot Brabazon, Fiona Regan

Abstract:

Good quality bathing water is a highly desirable natural resource which can provide major economic, social, and environmental benefits. Both in Ireland and Europe, such water bodies are managed under the European Directive for the management of bathing water quality (BWD). The BWD aims mainly: (i) to improve health protection for bathers by introducing stricter standards for faecal pollution assessment (E. coli, enterococci), (ii) to establish a more pro-active approach to the assessment of possible pollution risks and the management of bathing waters, and (iii) to increase public involvement and dissemination of information to the general public. Standard methods for E. coli and enterococci quantification rely on cultivation of the target organism which requires long incubation periods (from 18h to a few days). This is not ideal when immediate action is required for risk mitigation. Municipalities that oversee the bathing water quality and deploy appropriate signage have to wait for laboratory results. During this time, bathers can be exposed to pollution events and health risks. Although forecasting tools exist, they are site specific and as consequence extensive historical data is required to be effective. Another approach for early detection of faecal pollution is the use of marker enzymes. β-glucuronidase (GUS) is a widely accepted biomarker for E. coli detection in microbiological water quality control. GUS assay is particularly attractive as they are rapid, less than 4 h, easy to perform and they do not require specialised training. A method for on-site detection of GUS from environmental samples in less than 75 min was previously demonstrated. In this study, the capability of ColiSense as an early warning system for faecal pollution in freshwater is assessed. The system successfully detected GUS activity in all of the 45 freshwater samples tested. GUS activity was found to correlate linearly with E. coli (r2=0.53, N=45, p < 0.001) and enterococci (r2=0.66, N=45, p < 0.001) Although GUS is a marker for E. coli, a better correlation was obtained for enterococci. For this study water samples were collected from 5 rivers in the Dublin area over 1 month. This suggests a high diversity of pollution sources (agricultural, industrial, etc) as well as point and diffuse pollution sources were captured in the sample size. Such variety in the source of E. coli can account for different GUS activities/culturable cell and different ratios of viable but not culturable to viable culturable bacteria. A previously developed protocol for the recovery and detection of E. coli was coupled with a miniaturised fluorometer (ColiSense) and the system was assessed for the rapid detection FIB in freshwater samples. Further work will be carried out to evaluate the system’s performance on seawater samples.

Keywords: faecal pollution, β-glucuronidase (GUS), bathing water, E. coli

Procedia PDF Downloads 250
17453 Application of Generalized Autoregressive Score Model to Stock Returns

Authors: Katleho Daniel Makatjane, Diteboho Lawrence Xaba, Ntebogang Dinah Moroke

Abstract:

The current study investigates the behaviour of time-varying parameters that are based on the score function of the predictive model density at time t. The mechanism to update the parameters over time is the scaled score of the likelihood function. The results revealed that there is high persistence of time-varying, as the location parameter is higher and the skewness parameter implied the departure of scale parameter from the normality with the unconditional parameter as 1.5. The results also revealed that there is a perseverance of the leptokurtic behaviour in stock returns which implies the returns are heavily tailed. Prior to model estimation, the White Neural Network test exposed that the stock price can be modelled by a GAS model. Finally, we proposed further researches specifically to model the existence of time-varying parameters with a more detailed model that encounters the heavy tail distribution of the series and computes the risk measure associated with the returns.

Keywords: generalized autoregressive score model, South Africa, stock returns, time-varying

Procedia PDF Downloads 475
17452 Time-Series Load Data Analysis for User Power Profiling

Authors: Mahdi Daghmhehci Firoozjaei, Minchang Kim, Dima Alhadidi

Abstract:

In this paper, we present a power profiling model for smart grid consumers based on real time load data acquired smart meters. It profiles consumers’ power consumption behaviour using the dynamic time warping (DTW) clustering algorithm. Due to the invariability of signal warping of this algorithm, time-disordered load data can be profiled and consumption features be extracted. Two load types are defined and the related load patterns are extracted for classifying consumption behaviour by DTW. The classification methodology is discussed in detail. To evaluate the performance of the method, we analyze the time-series load data measured by a smart meter in a real case. The results verify the effectiveness of the proposed profiling method with 90.91% true positive rate for load type clustering in the best case.

Keywords: power profiling, user privacy, dynamic time warping, smart grid

Procedia PDF Downloads 104
17451 Rumination Time and Reticuloruminal Temperature around Calving in Eutocic and Dystocic Dairy Cows

Authors: Levente Kovács, Fruzsina Luca Kézér, Ottó Szenci

Abstract:

Prediction of the onset of calving and recognizing difficulties at calving has great importance in decreasing neonatal losses and reducing the risk of health problems in the early postpartum period. In this study, changes of rumination time, reticuloruminal pH and temperature were investigated in eutocic (EUT, n = 10) and dystocic (DYS, n = 8) dairy cows around parturition. Rumination time was continuously recorded using an acoustic biotelemetry system, whereas reticuloruminal pH and temperature were recorded using an indwelling and wireless data transmitting system. The recording period lasted from 3 d before calving until 7 days in milk. For the comparison of rumination time and reticuloruminal characteristics between groups, time to return to baseline (the time interval required to return to baseline from the delivery of the calf) and area under the curve (AUC, both for prepartum and postpartum periods) were calculated for each parameter. Rumination time decreased from baseline 28 h before calving both for EUT and DYS cows (P = 0.023 and P = 0.017, respectively). After 20 h before calving, it decreased onwards to reach 32.4 ± 2.3 and 13.2 ± 2.0 min/4 h between 8 and 4 h before delivery in EUT and DYS cows, respectively, and then it decreased below 10 and 5 min during the last 4 h before calving (P = 0.003 and P = 0.008, respectively). Until 12 h after delivery rumination time reached 42.6 ± 2.7 and 51.0 ± 3.1 min/4 h in DYS and EUT dams, respectively, however, AUC and time to return to baseline suggested lower rumination activity in DYS cows than in EUT dams for the 168-h postpartum observational period (P = 0.012 and P = 0.002, respectively). Reticuloruminal pH decreased from baseline 56 h before calving both for EUT and DYS cows (P = 0.012 and P = 0.016, respectively), but did not differ between groups before delivery. In DYS cows, reticuloruminal temperature decreased from baseline 32 h before calving by 0.23 ± 0.02 °C (P = 0.012), whereas in EUT cows such a decrease was found only 20 h before delivery (0.48 ± 0.05 °C, P < 0.01). AUC of reticuloruminal temperature calculated for the prepartum period was greater in EUT cows than in DYS cows (P = 0.042). During the first 4 h after calving, it decreased from 39.7 ± 0.1 to 39.00 ± 0.1 °C and from 39.8 ± 0.1 to 38.8 ± 0.1 °C in EUT and DYS cows, respectively (P < 0.01 for both groups) and reached baseline levels after 35.4 ± 3.4 and 37.8 ± 4.2 h after calving in EUT and DYS cows, respectively. Based on our results, continuous monitoring of changes in rumination time and reticuloruminal temperature seems to be promising in the early detection of cows with a higher risk of dystocia. Depressed postpartum rumination time of DYS cows highlights the importance of the monitoring of cows experiencing difficulties at calving.

Keywords: reticuloruminal pH, reticuloruminal temperature, rumination time, dairy cows, dystocia

Procedia PDF Downloads 291
17450 Reducing the Cooking Time of Bambara Groundnut (BGN)

Authors: Auswell Amfo-Antiri, Esther Eshun, Theresa A. Amu

Abstract:

Cooking Bambara groundnut (Bambara beans) is time and energy-consuming. Over time, some substances have been used to help reduce cooking time and save energy. This experimental study was carried out to find ways of reducing the cooking time of Bambara groundnut using selected organic substances. Twenty grams (20g) each of fresh pawpaw leaves, guava leaves, ginger, onion, and palm kernel were cooked with five samples of 200g of the creamy variety of raw Bambara groundnut. A control was cooked without any organic substance added. All six samples were cooked with equal quantities of water (4L); the gas mark used for cooking the samples was marked 5, the highest for the largest burner, using the same cooking pot. Gas matter. The control sample used 192 minutes to cook thoroughly. The ginger-treated sample (AET02) had the shortest cooking time of 145 minutes, followed by the onion-treated sample (AET05), with a cooking time of 157 minutes. The sample cooked with Palm kernel (AET06) and Pawpaw (AET04) used 172 minutes and 174 minutes, respectively, while sample AET03, cooked with Guava, used 185 minutes for cooking. The difference in cooking time for the sample treated with ginger (AET02) and onion (AET05) was 47 minutes and 35 minutes, respectively, as compared with the control. The comparison between Control and Pawpaw produced [p=0.163>0.05]; Control and Ginger yielded [p=0.006<0.05]; Control and Kernel resulted in [p=0.128>0.05]; Control and Guava resulted in [p=0.560>0.05]. The study concluded that ginger and onions comparatively reduced the cooking time for Bambara ground nut appreciably. The study recommended that ginger and onions could be used to reduce the cooking time of Bambara groundnut.

Keywords: cooking time, organic substances, ginger, onions, pawpaw leaves, guava leaves, bambara groundnut

Procedia PDF Downloads 51
17449 Formation Control for Linear Multi-Robot System with Switched Directed Topology and Time-Varying Delays

Authors: Yaxiao Zhang, Yangzhou Chen

Abstract:

This study investigate the formation problem for high-order continuous-time multi-robot with bounded symmetric time-varying delay protocol under switched directed communication topology. By using a linear transformation, the formation problem is transformed to stability analysis of a switched delay system. Under the assumption that each communication topology has a directed spanning tree, sufficient conditions are presented in terms of linear matrix inequalities (LMIs) that the multi-robot system can achieve a desired formation by the trade-off among the pre-exist topologies with the help of the scheme of average dwell time. A numeral example is presented to illustrate the effectiveness of the obtained results.

Keywords: multi-robot systems, formation, switched directed topology, symmetric time-varying delay, average dwell time, linear matrix inequalities (lmis)

Procedia PDF Downloads 496
17448 Design of a Real Time Closed Loop Simulation Test Bed on a General Purpose Operating System: Practical Approaches

Authors: Pratibha Srivastava, Chithra V. J., Sudhakar S., Nitin K. D.

Abstract:

A closed-loop system comprises of a controller, a response system, and an actuating system. The controller, which is the system under test for us, excites the actuators based on feedback from the sensors in a periodic manner. The sensors should provide the feedback to the System Under Test (SUT) within a deterministic time post excitation of the actuators. Any delay or miss in the generation of response or acquisition of excitation pulses may lead to control loop controller computation errors, which can be catastrophic in certain cases. Such systems categorised as hard real-time systems that need special strategies. The real-time operating systems available in the market may be the best solutions for such kind of simulations, but they pose limitations like the availability of the X Windows system, graphical interfaces, other user tools. In this paper, we present strategies that can be used on a general purpose operating system (Bare Linux Kernel) to achieve a deterministic deadline and hence have the added advantages of a GPOS with real-time features. Techniques shall be discussed how to make the time-critical application run with the highest priority in an uninterrupted manner, reduced network latency for distributed architecture, real-time data acquisition, data storage, and retrieval, user interactions, etc.

Keywords: real time data acquisition, real time kernel preemption, scheduling, network latency

Procedia PDF Downloads 107