Search results for: the egyptian egovernment project lifecycle
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 5277

Search results for: the egyptian egovernment project lifecycle

5097 Cone Beam Computed Tomography: A Useful Diagnostic Tool to Determine Root Canal Morphology in a Sample of Egyptian Population

Authors: H. El-Messiry, M. El-Zainy, D. Abdelkhalek

Abstract:

Cone-beam computed tomography (CBCT) provides high-quality 3-dimensional images of dental structures because of its high spatial resolution. The study of dental morphology is important in research as it provides information about diversities within a population. Many studies have shown different shapes and numbers of roots canals among different races, especially in molars. The aim of this study was to determine the morphology of root canals of mandibular first and third molars in a sample of Egyptian population using CBCT scanning. Fifty mandibular first Molars (M1) and fifty mandibular third (M3) extracted molars were collected. Thick rectangular molds were made using pink wax to hold the samples. Molars were embedded in the wax mold by aligning them in rows leaving arbitrary 0.5cm space between them. The molds with the samples in were submitted for CBCT scan. The number and morphology of root canals were assessed and classified according to Vertucci's classification. The mesial and the distal roots were examined separately. Finally, data was analyzed using Fisher exact test. The most prevalent mesial root canal frequency in M1 was type IV (60%) and type II (40 %), while M3 showed prevalence of type I (40%) and II (40%). Distal root canal morphology showed prevalence of type I in both M1 (66%) and M3 (86%). So, it can be concluded that CBCT scanning provides supplemental information about the root canal configurations of mandibular molars in a sample of Egyptian population. This study may help clinicians in the root canal treatment of mandibular molars.

Keywords: cone beam computed tomography, mandibular first molar, mandibular third molar, root canal morphology

Procedia PDF Downloads 288
5096 Methods Employed to Mitigate Wind Damage on Ancient Egyptian Architecture

Authors: Hossam Mohamed Abdelfattah Helal Hegazi

Abstract:

Winds and storms are considered crucial weathering factors, representing primary causes of destruction and erosion for all materials on the Earth's surface. This naturally includes historical structures, with the impact of winds and storms intensifying their deterioration, particularly when carrying high-hardness sand particles during their passage across the ground. Ancient Egyptians utilized various methods to prevent wind damage to their ancient architecture throughout the ancient Egyptian periods . One of the techniques employed by ancient Egyptians was the use of clay or compacted earth as a filling material between opposing walls made of stone, bricks, or mud bricks. The walls made of reeds or woven tree branches were covered with clay to prevent the infiltration of winds and rain, enhancing structural integrity, this method was commonly used in hollow layers . Additionally, Egyptian engineers innovated a type of adobe brick with uniformly leveled sides, manufactured from dried clay. They utilized stone barriers, constructed wind traps, and planted trees in rows parallel to the prevailing wind direction. Moreover, they employed receptacles to drain rainwater resulting from wind-loaded rain and used mortar to fill gaps in roofs and structures. Furthermore, proactive measures such as the removal of sand from around historical and archaeological buildings were taken to prevent adverse effects

Keywords: winds, storms, weathering, destruction, erosion, materials, Earth's surface, historical structures, impact

Procedia PDF Downloads 17
5095 Prognostic Implication of Nras Gene Mutations in Egyptian Adult Acute Myeloid Leukemia

Authors: Doaa M. Elghannam, Nashwa Khayrat Abousamra, Doaa A. Shahin, Enas F. Goda, Hanan Azzam, Emad Azmy, Manal Salah El-Din

Abstract:

Background: The pathogenesis of acute myeloid leukemia (AML) involves the cooperation of mutations promoting proliferation/survival and those impairing differentiation. Point mutations of the NRAS gene are the most frequent somatic mutations causing aberrant signal-transduction in acute myeloid leukemia (AML). Aim: The present work was conducted to study the frequency and prognostic significance of NRAS gene mutations (NRASmut) in de novo Egyptian adult AML. Material and methods: Bone marrow specimens from 150 patients with de novo acute myeloid leukemia and controls were analyzed by genomic PCR-SSCP at codons 12, 13 (exon 1), and 61 (exon 2) for NRAS mutations. Results: NRAS gene mutations was found in 19/150 (12.7%) AML cases, represented more frequently in the FAB subtype M4eo (P = 0.028), and at codon 12, 13 (14of 19; 73.7%). Patients with NRASmut had a significant lower peripheral marrow blasts (P = 0.004, P=0.03) and non significant improved clinical outcome than patients without the mutation. Complete remission rate was (63.2% vs 56.5%; p=0.46), resistant disease (15.8% vs 23.6%; p=0.51), three years overall survival (44% vs 42%; P = 0.85) and disease free survival (42.1% vs 38.9%, P = 0.74). Multivariate analysis showed that age was the strongest unfavorable factor for overall survival (relative risk [RR], 1.9; P = .002), followed by cytogenetics (P = .004). FAB types, NRAS mutation, and leukocytosis were less important. Conclusions: NRAS gene mutation frequency and spectrum differ between biologically distinct subtypes of AML but do not significantly influence prognosis and clinical outcome.

Keywords: NRAS Gene, egyptian adult, acute myeloid leukemia, cytogenetics

Procedia PDF Downloads 64
5094 An Improved GA to Address Integrated Formulation of Project Scheduling and Material Ordering with Discount Options

Authors: Babak H. Tabrizi, Seyed Farid Ghaderi

Abstract:

Concurrent planning of the resource constraint project scheduling and material ordering problems have received significant attention within the last decades. Hence, the issue has been investigated here with the aim to minimize total project costs. Furthermore, the presented model considers different discount options in order to approach the real world conditions. The incorporated alternatives consist of all-unit and incremental discount strategies. On the other hand, a modified version of the genetic algorithm is applied in order to solve the model for larger sizes, in particular. Finally, the applicability and efficiency of the given model is tested by different numerical instances.

Keywords: genetic algorithm, material ordering, project management, project scheduling

Procedia PDF Downloads 273
5093 Feasibility Study of Potential and Economic of Rice Straw VSPP Power Plant in Thailand

Authors: Sansanee Sansiribhan, Anusorn Rattanathanaophat, Chirapan Nuengchaknin

Abstract:

The potential feasibility of a 9.5 MWe capacity rice straw power plant project in Thailand was studied by evaluating the rice straw resource. The result showed that Thailand had a high rice straw biomass potential at the provincial level, especially, the provinces in the central, northeastern and western Thailand, which could feasibly develop plants. The economic feasibility of project was also investigated. The financial feasibility is also evaluated based on two important factors in the project, i.e., NPV ≥ 0 and IRR ≥ 11%. It was found that the rice straw power plant project at 9.5 MWe was financially feasible with the cost of fuel in the range of 30.6-47.7 USD/t.

Keywords: power plant, project feasibility, rice straw, Thailand

Procedia PDF Downloads 311
5092 CDIO-Based Teaching Reform for Software Project Management Course

Authors: Liping Li, Wenan Tan, Na Wang

Abstract:

With the rapid development of information technology, project management has gained more and more attention recently. Based on CDIO, this paper proposes some teaching reform ideas for software project management curriculum. We first change from Teacher-centered classroom to Student-centered and adopt project-driven, scenario animation show, teaching rhythms, case study and team work practice to improve students' learning enthusiasm. Results showed these attempts have been well received and very effective; as well, students prefer to learn with this curriculum more than before the reform.

Keywords: CDIO, teaching reform, engineering education, project-driven, scenario animation simulation

Procedia PDF Downloads 404
5091 A Novel Algorithm for Parsing IFC Models

Authors: Raninder Kaur Dhillon, Mayur Jethwa, Hardeep Singh Rai

Abstract:

Information technology has made a pivotal progress across disparate disciplines, one of which is AEC (Architecture, Engineering and Construction) industry. CAD is a form of computer-aided building modulation that architects, engineers and contractors use to create and view two- and three-dimensional models. The AEC industry also uses building information modeling (BIM), a newer computerized modeling system that can create four-dimensional models; this software can greatly increase productivity in the AEC industry. BIM models generate open source IFC (Industry Foundation Classes) files which aim for interoperability for exchanging information throughout the project lifecycle among various disciplines. The methods developed in previous studies require either an IFC schema or MVD and software applications, such as an IFC model server or a Building Information Modeling (BIM) authoring tool, to extract a partial or complete IFC instance model. This paper proposes an efficient algorithm for extracting a partial and total model from an Industry Foundation Classes (IFC) instance model without an IFC schema or a complete IFC model view definition (MVD).

Keywords: BIM, CAD, IFC, MVD

Procedia PDF Downloads 271
5090 The Artificial Intelligence (AI) Impact on Project Management: A Destructive or Transformative Agent

Authors: Kwame Amoah

Abstract:

Artificial intelligence (AI) has the prospect of transforming project management, significantly improving efficiency and accuracy. By automating specific tasks with defined guidelines, AI can assist project managers in making better decisions and allocating resources efficiently, with possible risk mitigation. This study explores how AI is already impacting project management and likely future AI's impact on the field. The AI's reaction has been a divided opinion; while others picture it as a destroyer of jobs, some welcome it as an innovation advocate. Both sides agree that AI will be disruptive and revolutionize PM's functions. If current research is to go by, AI or some form will replace one-third of all learning graduate PM jobs by as early as 2030. A recent survey indicates AI spending will reach $97.9 billion by the end of 2023. Considering such a profound impact, the project management profession will also see a paradigm shift driven by AI. The study examines what the project management profession will look like in the next 5-10 years after this technological disruption. The research methods incorporate existing literature, develop trend analysis, and conduct structured interviews with project management stakeholders from North America to gauge the trend. PM professionals can harness the power of AI, ensuring a smooth transition and positive outcomes. AI adoption will maximize benefits, minimize adverse consequences, and uphold ethical standards, leading to improved project performance.

Keywords: project management, disruptive teacnologies, project management function, AL applications, artificial intelligence

Procedia PDF Downloads 48
5089 Proposal Evaluation of Critical Success Factors (CSF) in Lean Manufacturing Projects

Authors: Guilherme Gorgulho, Carlos Roberto Camello Lima

Abstract:

Critical success factors (CSF) are used to design the practice of project management that can lead directly or indirectly to the success of the project. This management includes many elements that have to be synchronized in order to ensure the project on-time delivery, quality and the lowest possible cost. The objective of this work is to develop a proposal for evaluation of the FCS in lean manufacturing projects, and apply the evaluation in a pilot project. The results show that the use of continuous improvement programs in organizations brings benefits as the process cost reduction and improve productivity.

Keywords: continuous improvement, critical success factors (csf), lean thinking, project management

Procedia PDF Downloads 330
5088 Multi-Objective Multi-Mode Resource-Constrained Project Scheduling Problem by Preemptive Fuzzy Goal Programming

Authors: Busaba Phurksaphanrat

Abstract:

This research proposes a pre-emptive fuzzy goal programming model for multi-objective multi-mode resource constrained project scheduling problem. The objectives of the problem are minimization of the total time and the total cost of the project. Objective in a multi-mode resource-constrained project scheduling problem is often a minimization of make-span. However, both time and cost should be considered at the same time with different level of important priorities. Moreover, all elements of cost functions in a project are not included in the conventional cost objective function. Incomplete total project cost causes an error in finding the project scheduling time. In this research, pre-emptive fuzzy goal programming is presented to solve the multi-objective multi-mode resource constrained project scheduling problem. It can find the compromise solution of the problem. Moreover, it is also flexible in adjusting to find a variety of alternative solutions.

Keywords: multi-mode resource constrained project scheduling problem, fuzzy set, goal programming, pre-emptive fuzzy goal programming

Procedia PDF Downloads 404
5087 Criminal Protection Objectivity of the Child's Right to Life and Physical and Psychological Safety

Authors: Hezha Hewa, Taher Sur

Abstract:

Nowadays, child affairs is a matter of both national and international interests. This issue is regarded a vital topic for various scientific fields across ages, and for all the communities without exception. However, the nature of child caring may vary due to the verities in science perspectives. So, considering child's affairs from different perspectives is helpful to have a complementary image about this matter. The purpose behind selecting this topic is to keep a balance between the victim on the one hand, and the guardian and the offender on the other hand, (i.e.) to avoid any kind of excessiveness either in the protection of the child and its rights not in the punishment of the offender. This is achieved through considering various legal materials in the Iraqi legislation and in the comparative legislations that are concerned with the child's issue and the extent to which the child makes use of these rights. The scope of this study involves the crimes that are considered as aggressions against the child's right to life, and the crimes that are dangerous to their physical and psychological safety. So, this study comprehensively considers the intentional murder of child, child murder to avoid disgrace, child kidnapping, child abandonment, physical abuse for the sake of punishment or not, child circumcision, verbal violence, and abstaining from leaving a child with a person who has the right of custody. This study ends with the most significant concluding points that have been derived throughout this study, which are: Unlike the Iraqi legislation, the Egyptian legislation defines the child in the Article 2 of the Child Law No. 12 of 1996 amended by the Law No. 126 of 2008 that the child is a person who does not exceed 18 years of age. Some legislation does not provide special criminal protection for child intentional murder, as in the Iraqi and the Egyptian legislation. However, some others have provided special criminal protection for a child, as in French and Syrian legislations. Child kidnapping is regarded as one of the most dangerous crimes that affects the child and the family as well, as it may expose the child's life to danger or to death. The most significant recommendations from the researcher are: The Iraqi legislation is recommended to take the necessary measures to establish a particular legislation for the child by including all the legal provisions that are associated with this weak creature, and make use of the Egyptian legislator’s experience as a pioneer in this respect. Both the Iraqi legislation and the Egyptian legislation are recommended to enact special laws to protect a child from the crimes of intentional murder, as the crime of child murder is currently subjected to the same provisions consider for adult murder.

Keywords: child, criminal, penal, law, safety

Procedia PDF Downloads 231
5086 Analysis on the Need of Engineering Drawing and Feasibility Study on 3D Model Based Engineering Implementation

Authors: Parthasarathy J., Ramshankar C. S.

Abstract:

Engineering drawings these days play an important role in every part of an industry. By and large, Engineering drawings are influential over every phase of the product development process. Traditionally, drawings are used for communication in industry because they are the clearest way to represent the product manufacturing information. Until recently, manufacturing activities were driven by engineering data captured in 2D paper documents or digital representations of those documents. The need of engineering drawing is inevitable. Still Engineering drawings are disadvantageous in re-entry of data throughout manufacturing life cycle. This document based approach is prone to errors and requires costly re-entry of data at every stage in the manufacturing life cycle. So there is a requirement to eliminate Engineering drawings throughout product development process and to implement 3D Model Based Engineering (3D MBE or 3D MBD). Adopting MBD appears to be the next logical step to continue reducing time-to-market and improve product quality. Ideally, by fully applying the MBD concept, the product definition will no longer rely on engineering drawings throughout the product lifecycle. This project addresses the need of Engineering drawing and its influence in various parts of an industry and the need to implement the 3D Model Based Engineering with its advantages and the technical barriers that must be overcome in order to implement 3D Model Based Engineering. This project also addresses the requirements of neutral formats and its realisation in order to implement the digital product definition principles in a light format. In order to prove the concepts of 3D Model Based Engineering, the screw jack body part is also demonstrated. At ZF Windpower Coimbatore Limited, 3D Model Based Definition is implemented to Torque Arm (Machining and Casting), Steel tube, Pinion shaft, Cover, Energy tube.

Keywords: engineering drawing, model based engineering MBE, MBD, CAD

Procedia PDF Downloads 405
5085 The Choosing the Right Projects With Multi-Criteria Decision Making to Ensure the Sustainability of the Projects

Authors: Saniye Çeşmecioğlu

Abstract:

The importance of project sustainability and success has become increasingly significant due to the proliferation of external environmental factors that have decreased project resistance in contemporary times. The primary approach to forestall the failure of projects is to ensure their long-term viability through the strategic selection of projects as creating judicious project selection framework within the organization. Decision-makers require precise decision contexts (models) that conform to the company's business objectives and sustainability expectations during the project selection process. The establishment of a rational model for project selection enables organizations to create a distinctive and objective framework for the selection process. Additionally, for the optimal implementation of this decision-making model, it is crucial to establish a Project Management Office (PMO) team and Project Steering Committee within the organizational structure to oversee the framework. These teams enable updating project selection criteria and weights in response to changing conditions, ensuring alignment with the company's business goals, and facilitating the selection of potentially viable projects. This paper presents a multi-criteria decision model for selecting project sustainability and project success criteria that ensures timely project completion and retention. The model was developed using MACBETH (Measuring Attractiveness by a Categorical Based Evaluation Technique) and was based on broadcaster companies’ expectations. The ultimate results of this study provide a model that endorses the process of selecting the appropriate project objectively by utilizing project selection and sustainability criteria along with their respective weights for organizations. Additionally, the study offers suggestions that may ascertain helpful in future endeavors.

Keywords: project portfolio management, project selection, multi-criteria decision making, project sustainability and success criteria, MACBETH

Procedia PDF Downloads 34
5084 A Bi-Objective Model to Address Simultaneous Formulation of Project Scheduling and Material Ordering

Authors: Babak H. Tabrizi, Seyed Farid Ghaderi

Abstract:

Concurrent planning of project scheduling and material ordering has been increasingly addressed within last decades as an approach to improve the project execution costs. Therefore, we have taken the problem into consideration in this paper, aiming to maximize schedules quality robustness, in addition to minimize the relevant costs. In this regard, a bi-objective mathematical model is developed to formulate the problem. Moreover, it is possible to utilize the all-unit discount for materials purchasing. The problem is then solved by the constraint method, and the Pareto front is obtained for a variety of robustness values. The applicability and efficiency of the proposed model is tested by different numerical instances, finally.

Keywords: e-constraint method, material ordering, project management, project scheduling

Procedia PDF Downloads 261
5083 Designing a Model for Preparing Reports on the Automatic Earned Value Management Progress by the Integration of Primavera P6, SQL Database, and Power BI: A Case Study of a Six-Storey Concrete Building in Mashhad, Iran

Authors: Hamed Zolfaghari, Mojtaba Kord

Abstract:

Project planners and controllers are frequently faced with the challenge of inadequate software for the preparation of automatic project progress reports based on actual project information updates. They usually make dashboards in Microsoft Excel, which is local and not applicable online. Another shortcoming is that it is not linked to planning software such as Microsoft Project, which lacks the database required for data storage. This study aimed to propose a model for the preparation of reports on automatic online project progress based on actual project information updates by the integration of Primavera P6, SQL database, and Power BI for a construction project. The designed model could be applicable to project planners and controller agents by enabling them to prepare project reports automatically and immediately after updating the project schedule using actual information. To develop the model, the data were entered into P6, and the information was stored on the SQL database. The proposed model could prepare a wide range of reports, such as earned value management, HR reports, and financial, physical, and risk reports automatically on the Power BI application. Furthermore, the reports could be published and shared online.

Keywords: primavera P6, SQL, Power BI, EVM, integration management

Procedia PDF Downloads 65
5082 Framework for Socio-Technical Issues in Requirements Engineering for Developing Resilient Machine Vision Systems Using Levels of Automation through the Lifecycle

Authors: Ryan Messina, Mehedi Hasan

Abstract:

This research is to examine the impacts of using data to generate performance requirements for automation in visual inspections using machine vision. These situations are intended for design and how projects can smooth the transfer of tacit knowledge to using an algorithm. We have proposed a framework when specifying machine vision systems. This framework utilizes varying levels of automation as contingency planning to reduce data processing complexity. Using data assists in extracting tacit knowledge from those who can perform the manual tasks to assist design the system; this means that real data from the system is always referenced and minimizes errors between participating parties. We propose using three indicators to know if the project has a high risk of failing to meet requirements related to accuracy and reliability. All systems tested achieved a better integration into operations after applying the framework.

Keywords: automation, contingency planning, continuous engineering, control theory, machine vision, system requirements, system thinking

Procedia PDF Downloads 169
5081 Analysis of Risks of Adopting Integrated Project Delivery: Application of Bayesian Theory

Authors: Shan Li, Qiuwen Ma

Abstract:

Integrated project delivery (IPD) is a project delivery method distinguished by a shared risk/rewards mechanism and multiparty agreement. IPD has drawn increasing attention from construction industry due to its reliability to deliver high-performing buildings. However, unavailable IPD specific insurance concerns the industry participants who are interested in IPD implementation. Even though the risk management capability can be enhanced using shared risk mechanism, some risks may occur when the partners do not commit themselves into the integrated practices in a desired manner. This is because the intense collaboration and close integration can not only create added value but bring new opportunistic behaviors and disputes. The study is aimed to investigate the risks of implementing IPD using Bayesian theory. IPD risk taxonomy is presented to identify all potential risks of implementing IPD and a risk network map is developed to capture the interdependencies between IPD risks. The conditional relations between risk occurrences and the impacts of IPD risks on project performances are evaluated and simulated based on Bayesian theory. The probability of project outcomes is predicted by simulation. In addition, it is found that some risks caused by integration are most possible occurred risks. This study can help the IPD project participants identify critical risks of adopting IPD to improve project performances. In addition, it is helpful to develop IPD specific insurance when the pertinent risks can be identified.

Keywords: Bayesian theory, integrated project delivery, project risks, project performances

Procedia PDF Downloads 267
5080 Designing a Method to Control and Determine the Financial Performance of the Real Cost Sub-System in the Information Management System of Construction Projects

Authors: Alireza Ghaffari, Hassan Saghi

Abstract:

Project management is more complex than managing the day-to-day affairs of an organization. When the project dimensions are broad and multiple projects have to be monitored in different locations, the integrated management becomes even more complicated. One of the main concerns of project managers is the integrated project management, which is mainly rooted in the lack of accurate and accessible information from different projects in various locations. The collection of dispersed information from various parts of the network, their integration and finally the selective reporting of this information is among the goals of integrated information systems. It can help resolve the main problem, which is bridging the information gap between executives and senior managers in the organization. Therefore, the main objective of this study is to design and implement an important subset of a project management information system in order to successfully control the cost of construction projects so that its results can be used to design raw software forms and proposed relationships between different project units for the collection of necessary information.

Keywords: financial performance, cost subsystem, PMIS, project management

Procedia PDF Downloads 77
5079 Lexical Collocations in Medical Articles of Non-Native vs Native English-Speaking Researchers

Authors: Waleed Mandour

Abstract:

This study presents multidimensional scrutiny of Benson et al.’s seven-category taxonomy of lexical collocations used by Egyptian medical authors and their peers of native-English speakers. It investigates 212 medical papers, all published during a span of 6 years (from 2013 to 2018). The comparison is held to the medical research articles submitted by native speakers of English (25,238 articles in total with over 103 million words) as derived from the Directory of Open Access Journals (a 2.7 billion-word corpus). The non-native speakers compiled corpus was properly annotated and marked-up manually by the researcher according to the standards of Weisser. In terms of statistical comparisons, though, deployed were the conventional frequency-based analysis besides the relevant criteria, such as association measures (AMs) in which LogDice is deployed as per the recommendation of Kilgariff et al. when comparing large corpora. Despite the terminological convergence in the subject corpora, comparison results confirm the previous literature of which the non-native speakers’ compositions reveal limited ranges of lexical collocations in terms of their distribution. However, there is a ubiquitous tendency of overusing the NS-high-frequency multi-words in all lexical categories investigated. Furthermore, Egyptian authors, conversely to their English-speaking peers, tend to embrace more collocations denoting quantitative rather than qualitative analyses in their produced papers. This empirical work, per se, contributes to the English for Academic Purposes (EAP) and English as a Lingua Franca in Academic settings (ELFA). In addition, there are pedagogical implications that would promote a better quality of medical research papers published in Egyptian universities.

Keywords: corpus linguistics, EAP, ELFA, lexical collocations, medical discourse

Procedia PDF Downloads 103
5078 An Integrated Mixed-Integer Programming Model to Address Concurrent Project Scheduling and Material Ordering

Authors: Babak H. Tabrizi, Seyed Farid Ghaderi

Abstract:

Concurrent planning of project scheduling and material ordering can provide more flexibility to the project scheduling problem, as the project execution costs can be enhanced. Hence, the issue has been taken into account in this paper. To do so, a mixed-integer mathematical model is developed which considers the aforementioned flexibility, in addition to the materials quantity discount and space availability restrictions. Moreover, the activities duration has been treated as decision variables. Finally, the efficiency of the proposed model is tested by different instances. Additionally, the influence of the aforementioned parameters is investigated on the model performance.

Keywords: material ordering, project scheduling, quantity discount, space availability

Procedia PDF Downloads 340
5077 Executing the Law: The Practical Absence of Law and Its Effects on Death Row Inmates and Their Families in Egypt

Authors: Amira M. Othman

Abstract:

Despite the massive array of literature that engages with the Egyptian legislative system on a theoretical level, very little attention has been dedicated to the comparison between the legislative clauses on the one hand, and the (absence of their) real-world implementation on the other. This paper starts with this discrepancy, focusing on the legal proceedings in some recent cases dubbed ‘political,’ in which defendants received death sentences. Then, it sheds light on the trend of practical disregard of the law on behalf of the criminal justice apparatuses (whether security forces, public prosecution offices, lawyers, judges, prison wardens, and executioners) through the examination of case files and the conduction of interviews with some defense lawyers in the cases in question. It also identifies the resultant state of confusion among prison staff, as manifest in their treatment of defendants even before the death sentences against them is pronounced; in other words, the application of some aspects of the law in certain cases, and their simultaneous disregard of others. Then, the paper explores the effects of such execution of the law on the death row inmates, as it identifies the different strategies through which defendants who are sentenced to death appropriate a number of legal clauses to their benefit, thereby embarrassing - or highly irritating - the judges that pronounce their death sentences. In addition to appropriation, other strategies include the contestation of the law and their presence before the courts in general, as well as the complete disregard and dismissal of the legal system altogether. Finally, the paper investigates the consequent conceptual effect on the first degree families of death row inmates, namely how their daily encounters with the Egyptian legislative system - particularly its emphasis on the absence of the otherwise binding local legislation - continue to shape their conceptions of the ‘law,’ of ‘justice,’ and their trust in the ‘state.’

Keywords: death penalty, Egyptian law absence, justice, political cases

Procedia PDF Downloads 148
5076 Benefits of Construction Management Implications and Processes by Projects Managers on Project Completion

Authors: Mamoon Mousa Atout

Abstract:

Projects managers in construction industry usually face a difficult organizational environment especially if the project is unique. The organization lacks the processes to practice construction management correctly, and the executive’s technical managers who have lack of experience in playing their role and responsibilities correctly. Project managers need to adopt best practices that allow them to do things effectively to make sure that the project can be delivered without any delay even though the executive’s technical managers should follow a certain process to avoid any factor might cause any delay during the project life cycle. The purpose of the paper is to examine the awareness level of projects managers about construction management processes, tools, techniques and implications to complete projects on time. The outcome and the results of the study are prepared based on the designed questionnaires and interviews conducted with many project managers. The method used in this paper is a quantitative study. A survey with a sample of 100 respondents was prepared and distributed in a construction company in Dubai, which includes nine questions to examine the level of their awareness. This research will also identify the necessary benefits of processes of construction management that has to be adopted by projects managers to mitigate the maximum potential problems which might cause any delay to the project life cycle.

Keywords: construction management, project objectives, resource planing and scheduling, project completion

Procedia PDF Downloads 369
5075 Surgical Imaging in Ancient Egypt

Authors: Ahmed Hefny Mohamed El-Badwy

Abstract:

This research aims to study of the surgery science and imaging in ancient Egypt, and how to diagnose the surgical cases, whether due to injuries or disease that requires surgical intervention, Medical diagnosis and how to treat it. The ancient Egyptian physician tried to change over from magic and theological thinking to become a stand-alone experimental science, they were able to distinguish between diseases, and they divide them into internal and external diseases even this division exists to date in modern medicine. There is no evidence to recognize the amount of human knowledge in the prehistoric knowledge of medicine and surgery except skeleton. It is not far from the human being in those times familiar with some means of treatment, Surgery in the Stone age was rudimentary, Flint stone was used after trimming in a certain way as a lancet to slit and open the skin. Wooden tree branches were used to make splints to treat bone fractures. Surgery developed further when copper was discovered, it led to the advancement of Egyptian civilization, then modern and advanced tools appeared in the operating theater, like a knife or a scalpel, there is evidence of surgery performed in ancient Egypt during the dynastic period (323 – 3200 BC). The climate and environmental conditions have preserved medical papyri and human remains that have confirmed their knowledge of surgical methods, including sedation. The ancient Egyptians reached a great importance in surgery, evidenced by the scenes that depict the pathological image and the surgical process, but the image alone is not sufficient to prove the pathology, its presence in ancient Egypt and its treatment method. As there are a number of medical papyri, especially Edwin Smith and Ebris, which prove the ancient Egyptian surgeon's knowledge of the pathological condition that It requires a surgical intervention, otherwise, its diagnosis and the method of treatment will not be described with such accuracy through these texts. Some surgeries are described in the department of surgery at Ebris papyrus (recipes from 863 to 877). The level of surgery in ancient Egypt was high, and they performed surgery such as hernias and Aneurysm, however, we have not received a lengthy explanation of the various surgeries, and the surgeon has usually only said “treated surgically”. It is evident in the Ebris papyrus that they used sharp surgical tools and cautery in operations where bleeding is expected, such as hernias, arterial sacs and tumors.

Keywords: ancientegypt, egypt, archaeology, the ancient egyptian

Procedia PDF Downloads 41
5074 Factors Contributing to Building Construction Project’s Cost Overrun in Jordan

Authors: Ghaleb Y. Abbasi, Sufyan Al-Mrayat

Abstract:

This study examined the contribution of thirty-six factors to building construction project’s cost overrun in Jordan. A questionnaire was distributed to a random sample of 350 stakeholders comprised of owners, consultants, and contractors, of which 285 responded. SPSS analysis was conducted to identify the top five causes of cost overrun, which were a large number of variation orders, inadequate quantities provided in the contract, misunderstanding of the project plan, incomplete bid documents, and choosing the lowest price in the contract bidding. There was an agreement among the study participants in ranking the factors contributing to cost overrun, which indicated that these factors were very commonly encountered in most construction projects in Jordan. Thus, it is crucial to enhance the collaboration among the different project stakeholders to understand the project’s objectives and set a realistic plan that takes into consideration all the factors that might influence the project cost, which might eventually prevent cost overrun.

Keywords: cost, overrun, building construction projects, Jordan

Procedia PDF Downloads 65
5073 Modeling Metrics for Monitoring Software Project Performance Based on the GQM Model

Authors: Mariayee Doraisamy, Suhaimi bin Ibrahim, Mohd Naz’ri Mahrin

Abstract:

There are several methods to monitor software projects and the objective for monitoring is to ensure that the software projects are developed and delivered successfully. A performance measurement is a method that is closely associated with monitoring and it can be scrutinized by looking at two important attributes which are efficiency and effectiveness both of which are factors that are important for the success of a software project. Consequently, a successful steering is achieved by monitoring and controlling a software project via the performance measurement criteria and metrics. Hence, this paper is aimed at identifying the performance measurement criteria and the metrics for monitoring the performance of a software project by using the Goal Question Metrics (GQM) approach. The GQM approach is utilized to ensure that the identified metrics are reliable and useful. These identified metrics are useful guidelines for project managers to monitor the performance of their software projects.

Keywords: component, software project performance, goal question metrics, performance measurement criteria, metrics

Procedia PDF Downloads 319
5072 Empirical Study of Correlation between the Cost Performance Index Stability and the Project Cost Forecast Accuracy in Construction Projects

Authors: Amin AminiKhafri, James M. Dawson-Edwards, Ryan M. Simpson, Simaan M. AbouRizk

Abstract:

Earned value management (EVM) has been introduced as an integrated method to combine schedule, budget, and work breakdown structure (WBS). EVM provides various indices to demonstrate project performance including the cost performance index (CPI). CPI is also used to forecast final project cost at completion based on the cost performance during the project execution. Knowing the final project cost during execution can initiate corrective actions, which can enhance project outputs. CPI, however, is not constant during the project, and calculating the final project cost using a variable index is an inaccurate and challenging task for practitioners. Since CPI is based on the cumulative progress values and because of the learning curve effect, CPI variation dampens and stabilizes as project progress. Although various definitions for the CPI stability have been proposed in literature, many scholars have agreed upon the definition that considers a project as stable if the CPI at 20% completion varies less than 0.1 from the final CPI. While 20% completion point is recognized as the stability point for military development projects, construction projects stability have not been studied. In the current study, an empirical study was first conducted using construction project data to determine the stability point for construction projects. Early findings have demonstrated that a majority of construction projects stabilize towards completion (i.e., after 70% completion point). To investigate the effect of CPI stability on cost forecast accuracy, the correlation between CPI stability and project cost at completion forecast accuracy was also investigated. It was determined that as projects progress closer towards completion, variation of the CPI decreases and final project cost forecast accuracy increases. Most projects were found to have 90% accuracy in the final cost forecast at 70% completion point, which is inlined with findings from the CPI stability findings. It can be concluded that early stabilization of the project CPI results in more accurate cost at completion forecasts.

Keywords: cost performance index, earned value management, empirical study, final project cost

Procedia PDF Downloads 130
5071 Ten Minutes Neighbourhood as a Basic PlanningUnit for Happiness in Egypt

Authors: Abeer Elshater

Abstract:

This paper pursues the relationship between the inhabitants’ happiness and the right to the city in an Egyptian neighbourhood status quo. Although the optimum of getting the services comes from ten mints walking in a suitable ambiance, the happiness is not acquired. The research objective is, first, to review the literature that get a guideline of 10 minutes neighbourhoods. Second make a comparative content analysis to recent online articles to the right to the city. Third is to test the concluded principles in Egyptian neighbourhood settings. The idea of ten minutes neighbourhood is manageable. The hypothesis concerns a compliant design. The logic of people who live close to within ten minutes’ walk to essential settings in their area can minimize several problems and maximize a healthy lifestyle. The supposed issue makes the right to the city affect the relationship between ten minutes neighbourhood and citizen happiness. This assumption can be intervention through site observation and oriented questionnaire. The contribution comes from presenting new planning units in away suits the current context of the old cities in MENA region based on ten-minute walking or less distance with a reference to the right to the city. This planning unit can find it way to citizens' happiness.

Keywords: happiness, ten-minute neighbourhood, urban design, well-being

Procedia PDF Downloads 365
5070 Collaborative Research between Malaysian and Australian Universities on Learning Analytics: Challenges and Strategies

Authors: Z. Tasir, S. N. Kew, D. West, Z. Abdullah, D. Toohey

Abstract:

Research on Learning Analytics is progressively developing in the higher education field by concentrating on the process of students' learning. Therefore, a research project between Malaysian and Australian Universities was initiated in 2015 to look at the use of Learning Analytics to support the development of teaching practice. The focal point of this article is to discuss and share the experiences of Malaysian and Australian universities in the process of developing the collaborative research on Learning Analytics. Three aspects of this will be discussed: 1) Establishing an international research project and team members, 2) cross-cultural understandings, and 3) ways of working in relation to the practicalities of the project. This article is intended to benefit other researchers by highlighting the challenges as well as the strategies used in this project to ensure such collaborative research succeeds.

Keywords: academic research project, collaborative research, cross-cultural understanding, international research project

Procedia PDF Downloads 216
5069 Knowledge Management Challenges within Traditional Procurement System

Authors: M. Takhtravanchi, C. Pathirage

Abstract:

In the construction industry, project members are conveyor of project knowledge which is, often, not managed properly to be used in future projects. As construction projects are temporary and unique, project members are willing to be recruited once a project is completed. Therefore, poor management of knowledge across construction projects will lead to a considerable amount of knowledge loss; the ignoring of which would be detrimental to project performance. This issue is more prominent in projects undertaken through the traditional procurement system, as this system does not incentives project members for integration. Thus, disputes exist between the design and construction phases based on the poor management of knowledge between those two phases. This paper aims to highlight the challenges of the knowledge management that exists within the traditional procurement system. Expert interviews were conducted and challenges were identified and analysed by the Interpretive Structural Modelling (ISM) approach in order to summarise the relationships among them. Two identified key challenges are the Culture of an Organisation and Knowledge Management Policies. A knowledge of the challenges and their relationships will help project manager and stakeholders to have a better understanding of the importance of knowledge management.

Keywords: challenges, construction industry, knowledge management, traditional procurement system

Procedia PDF Downloads 400
5068 Foreign Language Anxiety: Perceptions and Attitudes in the Egyptian ESL Classroom

Authors: Shaden S. Attia

Abstract:

This study investigated foreign language anxiety (FLA) and teachers’ awareness of its presence in the Egyptian ESL classrooms and how FLA correlates with different variables such as four language skills, students' sex, and activities used in class. A combination of quantitative and qualitative instruments was used in order to investigate the previously mentioned variables, which included five interviews with teachers, six classroom observations, a survey for teachers, and a questionnaire for students. The findings of the study revealed that some teachers were aware of the presence of FLA, with some of them believing that other teachers, however, are not aware of this phenomenon, and even when they notice anxiety, they do not always relate it to learning a foreign language. The results also showed that FLA was affected by students’ sex, different language skills, and affective anxieties; however, teachers were unaware of the effect of these variables. The results demonstrated that both teachers and students preferred group and pair work to individual activities as they were more relaxing and less anxiety-provoking. These findings contribute to raising teachers' awareness of FLA in ESL classrooms and how it is affected by different variables.

Keywords: foreign language anxiety, situation specific anxiety, skill-specific anxiety, teachers’ perceptions

Procedia PDF Downloads 121