Search results for: river linking project
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 6113

Search results for: river linking project

6113 Trans-Boundary Water Disputes between India and Bangladesh and the Policy Responses

Authors: Aditaya Narayan Mishra

Abstract:

Unequal distribution of environmental resources as a possible cause of conflict has been the topic of substantial research, and these connections have ruled the post-Cold War attention in the discourse of environmental security. In this category, considerable concentration has been given to water resources, on account of their important standing for human existence. Thus, water is considered to be one of the most important non-conventional security issues. As per this consideration, the case of India-Bangladesh is one of the most critical examples of disputes over transboundary water sharing. The concern regarding sharing of trans-boundary rivers has been the main focus of Bangladesh and India‘s relationship for the last forty-five years. Both countries share fifty-four rivers, most of which have originated in the Himalayan range. The main causes for problems in the sharing of the waters of trans-boundary rivers between India and Bangladesh include the: Farakka Barrage, Teesta river sharing issue, River linking project and Tipaimukh Dam. The construction of Farakka barrage across the Ganga River was the beginning of water dispute. Attempts at unilateral exploitation of the trans-boundary water resources led to inter-state conflicts that spilled over into other areas of bilateral disputes between India and Bangladesh. Apart from Farakka, Barrage, the disputes over Teesta River sharing, River linking project and Tipaimukh Dam are also vital contents for the both countries bilateral diplomacy. Till date, India and Bangladesh have signed five treaties regarding water sharing. However, all these treaties have been rendered worthless due to mistrust and political upheaval in both countries. The current paper would address all these water sharing disputes between India and Bangladesh with focus on the various policy responses (both bilateral and multilateral initiatives) to deal with these water sharing disputes. It will try to analyze the previous agreements and their drawbacks and loopholes. In addition, it will mention the reasons for water sharing cooperation between India and Bangladesh.

Keywords: India and Bangladesh relations, water disputes, Teesta, river linking project, Tipaimukh Dam, Farakka, policy responses

Procedia PDF Downloads 204
6112 Science and Monitoring Underpinning River Restoration: A Case Study

Authors: Geoffrey Gilfillan, Peter Barham, Lisa Smallwood, David Harper

Abstract:

The ‘Welland for People and Wildlife’ project aimed to improve the River Welland’s ecology and water quality, and to make it more accessible to the community of Market Harborough. A joint monitoring project by the Welland Rivers Trust & University of Leicester was incorporated into the design. The techniques that have been used to measure its success are hydrological, geomorphological, and water quality monitoring, species and habitat surveys, and community engagement. Early results show improvements to flow and habitat diversity, water quality and biodiversity of the river environment. Barrier removal has increased stickleback mating activity, and decreased parasitically infected fish in sample catches. The habitats provided by the berms now boast over 25 native plant species, and the river is clearer, cleaner and with better-oxygenated water.

Keywords: community engagement, ecological monitoring, river restoration, water quality

Procedia PDF Downloads 205
6111 Numerical Simulation of the Remaining Life of Ramshir Bridge over the Karoon River

Authors: M. Jalali Azizpour, V.Tavvaf, E. Akhlaghi, H. Mohammadi Majd, A. Shirani, S. M. Moravvej, M. Kazemi, A. R. Aboudi Asl, A. Jaderi

Abstract:

The static and corrosion behavior of the bridge using for pipelines in the south of country have been evaluated. The bridge was constructed more than 40 years ago on the Karoon River. Mentioned bridge is located in Khuzestan province and at a distance of 15 km east from the suburbs of Ahwaz. In order to determine the mechanical properties, the experimental tools such as measuring the thickness and static simulations based on the actual load were used. In addition, the metallurgical studies were used to achieve a rate of corrosion of pipes in the river and in the river bed. The aim of this project is to determine the remaining life of the bridge using mechanical and metallurgical studies.

Keywords: FEM, stress, corrosion, bridge

Procedia PDF Downloads 444
6110 In Support of Sustainable Water Resources Development in the Lower Mekong River Basin: Development of Guidelines for Transboundary Environmental Impact Assessment

Authors: Kongmeng Ly

Abstract:

The management of transboundary river basins across developing countries, such as the Lower Mekong River Basin (LMB), is frequently challenging given the development and conservation divergences of the basin countries. Driven by needs to sustain economic performance and reduce poverty, the LMB countries (Cambodia, Lao PDR, Thailand, Viet Nam) are embarking on significant land use changes in the form hydropower dam, to fulfill their energy requirements. This pathway could lead to irreversible changes to the ecosystem of the Mekong River, if not properly managed. Given the uncertain trade-offs of hydropower development and operation, the Lower Mekong River Basin Countries through the technical support of the Mekong River Commission (MRC) Secretariat embarked on decade long the development of Technical Guidelines for Transboundary Environmental Impact Assessment. Through a series of workshops, seminars, national and regional consultations, and pilot studies and further development following the recommendations generated through legal and institutional reviews undertaken over two decades period, the LMB Countries jointly adopted the MRC Technical Guidelines for Transboundary Environmental Impact Assessment (TbEIA Guidelines). These guidelines were developed with particular regard to the experience gained from MRC supported consultations and technical reviews of the Xayaburi Dam Project, Don Sahong Hydropower Project, Pak Beng Hydropower Project, and lessons learned from the Srepok River and Se San River case studies commissioned by the MRC under the generous supports of development partners around the globe. As adopted, the TbEIA Guidelines have been designed as a supporting mechanism to the national EIA legislation, processes and systems in each Member Country. In recognition of the already agreed mechanisms, the TbEIA Guidelines build on and supplement the agreements stipulated in the 1995 Agreement on the Cooperation for the Sustainable Development of the Mekong River Basin and its Procedural Rules, in addressing potential transboundary environmental impacts of development projects and ensuring mutual benefits from the Mekong River and its resources. Since its adoption in 2022, the TbEIA Guidelines have already been voluntary implemented by Lao PDR on its underdevelopment Sekong A Downstream Hydropower Project, located on the Sekong River – a major tributary of the Mekong River. While this implementation is ongoing with results expected in early 2024, the implementation thus far has strengthened cooperation among concerned Member Countries with multiple successful open dialogues organized at national and regional levels. It is hope that lessons learnt from this application would lead to a wider application of the TbEIA Guidelines for future water resources development projects in the LMB.

Keywords: transboundary, EIA, lower mekong river basin, mekong river

Procedia PDF Downloads 11
6109 River's Bed Level Changing Pattern Due to Sedimentation, Case Study: Gash River, Kassala, Sudan

Authors: Faisal Ali, Hasssan Saad Mohammed Hilmi, Mustafa Mohamed, Shamseddin Musa

Abstract:

The Gash rivers an ephemeral river, it usually flows from July to September, it has a braided pattern with high sediment content, of 15200 ppm in suspension, and 360 kg/sec as bed load. The Gash river bed has an average slope of 1.3 m/Km. The objectives of this study were: assessing the Gash River bed level patterns; quantifying the annual variations in Gash bed level; and recommending a suitable method to reduce the sediment accumulation on the Gash River bed. The study covered temporally the period 1905-2013 using datasets included the Gash river flows, and the cross sections. The results showed that there is an increasing trend in the river bed of 5 cm3 per year. This is resulted in changing the behavior of the flood routing and consequently the flood hazard is tremendously increased in Kassala city.

Keywords: bed level, cross section, gash river, sedimentation

Procedia PDF Downloads 503
6108 Overuse Equals to Low Proficiency Level in English: A Corpus-Based Study on the Use of Linking Adverbials between Male and Female Speakers

Authors: Tsungming Wu

Abstract:

The present paper investigates the use of linking adverbials between native male speakers and female speakers in their presentation. From previous studies, overuse of linking adverbials may be an indicator of the low proficiency level in English. In this study, female speakers are found to use more linking adverbials in general. However, the overuse of linking adverbials found in female speakers’ speeches does not imply female speakers’ lower English proficiency, but imply different approaches that male and female speakers adopt in dealing with their presentation tasks. Female speakers are found to be more interactional, leading to their more uses of interactive devices in the presenting process. On the other hand, male speakers take different approaches in dealing with their tasks. Male speakers try to be authoritative and amicable at the same time, resulting in the uses of both interactive devices and distancing devices in their speeches. The paper specifically presents and compares the use of the linking adverbial items, actually and so, in male speakers’ and female speakers’ speeches.

Keywords: LAs, linking adverbial, low proficiency, overuse

Procedia PDF Downloads 285
6107 Digital Storytelling for Community Culture

Authors: Sariyapa Kantawan, Muanfun Kongsomsawaeng

Abstract:

Chanthaburi River community is an old mixed-culture village established in the 16th century. The town advanced more rapidly than others due to the ease of transportation at the time, which used the river as a road. Therefore, the province's first road begins here, propelling it to become an important commercial and trading center for almost a century. As a result of diverse culture, the architecture has been affected by Western, Thai, Chinese, and Vietnamese, resulting in a new and distinctive style. To share the realm of memory, digital media enable the city to communicate its history and culture. This article describes a project that combines the concepts of digital storytelling and augmented reality and connects them to Chanthaburi River Community Culture by using QR codes as makers to display 3D models on mobile screens.

Keywords: digital storytelling, community culture, river community, cultural heritage, augmented reality

Procedia PDF Downloads 23
6106 Linking Excellence in Biomedical Knowledge and Computational Intelligence Research for Personalized Management of Cardiovascular Diseases within Personal Health Care

Authors: T. Rocha, P. Carvalho, S. Paredes, J. Henriques, A. Bianchi, V. Traver, A. Martinez

Abstract:

The main goal of LINK project is to join competences in intelligent processing in order to create a research ecosystem to address two central scientific and technical challenges for personal health care (PHC) deployment: i) how to merge clinical evidence knowledge in computational decision support systems for PHC management and ii) how to provide achieve personalized services, i.e., solutions adapted to the specific user needs and characteristics. The final goal of one of the work packages (WP2), designated Sustainable Linking and Synergies for Excellence, is the definition, implementation and coordination of the necessary activities to create and to strengthen durable links between the LiNK partners. This work focuses on the strategy that has been followed to achieve the definition of the Research Tracks (RT), which will support a set of actions to be pursued along the LiNK project. These include common research activities, knowledge transfer among the researchers of the consortium, and PhD student and post-doc co-advisement. Moreover, the RTs will establish the basis for the definition of concepts and their evolution to project proposals.

Keywords: LiNK Twin European Project, personal health care, cardiovascular diseases, research tracks

Procedia PDF Downloads 197
6105 Time Series Modelling and Prediction of River Runoff: Case Study of Karkheh River, Iran

Authors: Karim Hamidi Machekposhti, Hossein Sedghi, Abdolrasoul Telvari, Hossein Babazadeh

Abstract:

Rainfall and runoff phenomenon is a chaotic and complex outcome of nature which requires sophisticated modelling and simulation methods for explanation and use. Time Series modelling allows runoff data analysis and can be used as forecasting tool. In the paper attempt is made to model river runoff data and predict the future behavioural pattern of river based on annual past observations of annual river runoff. The river runoff analysis and predict are done using ARIMA model. For evaluating the efficiency of prediction to hydrological events such as rainfall, runoff and etc., we use the statistical formulae applicable. The good agreement between predicted and observation river runoff coefficient of determination (R2) display that the ARIMA (4,1,1) is the suitable model for predicting Karkheh River runoff at Iran.

Keywords: time series modelling, ARIMA model, river runoff, Karkheh River, CLS method

Procedia PDF Downloads 310
6104 Economic Activities Associated with Extraction of Riverbed Materials in the Tinau River, Nepal

Authors: Khet Raj Dahal, Dhruva Dhital, Chhatra Mani Sharma

Abstract:

A study was conducted during 2012 to 2013 in the selected reach of Tinau River, Nepal. The main objective of the study was to quantify employment and income generation from the extraction of construction materials from the river. A 10 km stretch of the river was selected for the study. Sample survey with a semi-structured questionnaire and field observation were the main tools used during field investigation. Extraction of riverbed materials from the banks, beds and floodplain areas of the river has provided many kinds of job opportunities for the people living in the vicinity of the river. It has also generated an adequate amount of revenues. The collected revenue has been invested for many kinds of social and infrastructures development for years. Though extraction of riverbed materials is beneficial for income and employment generation, it has also negative environmental impacts in and around the river. Furthermore, the study concluded that river bed extraction should be continued with special monitoring and evaluation in the areas where there is still room for extraction.

Keywords: extraction, crusher plants, economic activities, Tinau River

Procedia PDF Downloads 671
6103 Development of Total Maximum Daily Load Using Water Quality Modelling as an Approach for Watershed Management in Malaysia

Authors: S. A. Che Osmi, W. M. F. Wan Ishak, H. Kim, M. A. Azman, M. A. Ramli

Abstract:

River is one of important water sources for many activities including industrial and domestic usage such as daily usage, transportation, power supply and recreational activities. However, increasing activities in a river has grown the sources of pollutant enters the water bodies, and degraded the water quality of the river. It becomes a challenge to develop an effective river management to ensure the water sources of the river are well managed and regulated. In Malaysia, several approaches for river management have been implemented such as Integrated River Basin Management (IRBM) program for coordinating the management of resources in a natural environment based on river basin to ensure their sustainability lead by Department of Drainage and Irrigation (DID), Malaysia. Nowadays, Total Maximum Daily Load (TMDL) is one of the best approaches for river management in Malaysia. TMDL implementation is regulated and implemented in the United States. A study on the development of TMDL in Malacca River has been carried out by doing water quality monitoring, the development of water quality model by using Environmental Fluid Dynamic Codes (EFDC), and TMDL implementation plan. The implementation of TMDL will help the stakeholders and regulators to control and improve the water quality of the river. It is one of the good approaches for river management in Malaysia.

Keywords: EFDC, river management, TMDL, water quality modelling

Procedia PDF Downloads 305
6102 Judging Restoration Success of Kamisaigo River Japan

Authors: Rita Lopa, Yukihiro Shimatani

Abstract:

The focus of this research is 880m extension development along the Kamisaigo River. The river is flowing tributary of grade 2 rivers Fukutsu City, Fukuoka Prefecture. This river is a small-scale urban river and the river was formerly a straight concrete sea wall construction. The river runs through National Highway No. 3 from the confluence of Saigo River. The study covers the river basin about 326 ha with a catchment area of 20.63 ha and 4,700 m3 capacity regulating pond. The river is not wide, shallow, and has a straight alignment with active (un-vegetated) river channel sinuosity (ratio of river length to valley length) ranging between 1 and 1.3. However, the alignment of the low-flow river channel does have meandering or sinuous characteristics. Flooding is likely to occur. It has become difficult to live in the environment for organisms of the river. Hydrophilic is very low (children cannot play). There is little connection with the local community. Overall, the Kamisaigo River watershed is heavily urbanized and from a morphological, biological and habitat perspective, Kamisaigo River functions marginally not well. For river improvement and maintenance of the Kamisaigo River, the workshop was conducted in the form of planning for the proposed model is presented by the Watershed Management Laboratory. This workshop showed the relationship between citizens, City Government, and University of mutual trust has been established, that have been made landscape, environment, usage, etc.: retaining wall maintenance, hydrophilic zone, landscape zone, nature walks zone: adjacent medical facilities and adjacent to large commercial facilities. Propose of Nature walks zone with point of the design: provide slope that the wheelchair can access and walking paths to enjoy the scenery, and summary of the Kamisaigo River workshop: creating a multi-model study and creation of natural rivers.

Keywords: river restoration, river improvement, natural rivers, Saigo River

Procedia PDF Downloads 327
6101 Applications of the Morphological Variability in River Management: A Study of West Rapti River

Authors: Partha Sarathi Mondal, Srabani Sanyal

Abstract:

Different geomorphic agents produce a different landforms pattern. Similarly rivers also have a distinct and diverse landforms pattern. And even, within a river course different and distinct assemblage of landforms i.e. morphological variability are seen. These morphological variability are produced by different river processes. Channel and floodplain morphology helps to interpret river processes. Consequently morphological variability can be used as an important tool for assessing river processes, hydrological connectivity and river health, which will help us to draw inference about river processes and therefore, management of river health. The present study is documented on West Rapti river, a trans-boundary river flowing through Nepal and India, from its source to confluence with Ghaghra river in India. The river shows a significant morphological variability throughout its course. The present study tries to find out factors and processes responsible for the morphological variability of the river and in which way it can be applied in river management practices. For this purpose channel and floodplain morphology of West Rapti river was mapped as accurately as possible and then on the basis of process-form interactions, inferences are drawn to understand factors of morphological variability. The study shows that the valley setting of West Rapti river, in the Himalayan region, is confined and somewhere partly confined whereas, channel of the West Rapti river is single thread in most part of Himalayan region and braided in valley region. In the foothill region valley is unconfined and channel is braided, in middle part channel is meandering and valley is unconfined, whereas, channel is anthropogenically altered in the lower part of the course. Due to this the morphology of West Rapti river is highly diverse. These morphological variability are produced by different geomorphic processes. Therefore, for any river management it is essential to sustain these morphological variability so that the river could not cross the geomorphic threshold and environmental flow of the river along with the biodiversity of riparian region is maintained.

Keywords: channel morphology, environmental flow, floodplain morphology, geomorphic threshold

Procedia PDF Downloads 340
6100 Installation of an Inflatable Bladder and Sill Walls for Riverbank Erosion Protection and Improved Water Intake Zone Smokey Hill River – Salina, Kansas

Authors: Jeffrey A. Humenik

Abstract:

Environmental, Limited Liability Corporation (EMR) provided civil construction services to the U.S. Army Corps of Engineers, Kansas City District, for the placement of a protective riprap blanket on the west bank of the Smoky Hill River, construction of 2 shore abutments and the construction of a 140 foot long sill wall spanning the Smoky Hill River in Salina, Kansas. The purpose of the project was to protect the riverbank from erosion and hold back water to a specified elevation, creating a pool to ensure adequate water intake for the municipal water supply. Geotextile matting and riprap were installed for streambank erosion protection. An inflatable bladder (AquaDam®) was designed to the specific river dimension and installed to divert the river and allow for dewatering during the construction of the sill walls and cofferdam. AquaDam® consists of water filled polyethylene tubes to create aqua barriers and divert water flow or prevent flooding. A challenge of the project was the fact that 100% of the sill wall was constructed within an active river channel. The threat of flooding of the work area, damage to the aqua dam by debris, and potential difficulty of water removal presented a unique set of challenges to the construction team. Upon completion of the West Sill Wall, floating debris punctured the AquaDam®. The manufacturing and delivery of a new AquaDam® would delay project completion by at least 6 weeks. To keep the project ahead of schedule, the decision was made to construct an earthen cofferdam reinforced with rip rap for the construction of the East Abutment and East Sill Wall section. During construction of the west sill wall section, a deep scour hole was encountered in the wall alignment that prevented EMR from using the natural rock formation as a concrete form for the lower section of the sill wall. A formwork system was constructed, that allowed the west sill wall section to be placed in two horizontal lifts of concrete poured on separate occasions. The first sectional lift was poured to fill in the scour hole and act as a footing for the second sectional lift. Concrete wall forms were set on the first lift and anchored to the surrounding riverbed in a manner that the second lift was poured in a similar fashion as a basement wall. EMR’s timely decision to keep the project moving toward completion in the face of changing conditions enabled project completion two (2) months ahead of schedule. The use of inflatable bladders is an effective and cost-efficient technology to divert river flow during construction. However, a secondary plan should be part of project design in the event debris transported by river punctures or damages the bladders.

Keywords: abutment, AquaDam®, riverbed, scour

Procedia PDF Downloads 119
6099 Uranium and Thorium Measurements in the Water along Oum Er-Rabia River (Morocco)

Authors: L. Oufni, M. Amrane

Abstract:

In this work, different river water samples have been collected and analyzed from different locations along Oum Er-Rabia River in Morocco. The uranium (238U) and thorium (232Th) concentrations were investigated in the studied river and dam water samples using Solid State Nuclear Track Detector (SSNTD). Mean activity concentrations of uranium and thorium in water were found to be between 12 – 37 Bq m^-3 and 2-10 Bq m^-3, respectively. The pH measured at all river water samples was slightly alkaline and ranged from 7.5 to 8.75. The electrical conductivity ranged from 2790 to 794 µS cm^-1. It was found that uranium and thorium concentrations were correlated with some chemical parameters in Oum Er-Rabia River water. The uranium concentrations found in river water are insignificant from the radiological point of view. The recommended value for uranium in drinking water based on its toxicity given by the Federal Environment Agency. This corresponds to an activity concentration of 238U of 123.5 mBq L^-1. In none of the samples, the uranium activity exceeds this value.

Keywords: uranium, thorium, conductivity, water, SSNTD

Procedia PDF Downloads 334
6098 Simulation of Flood Inundation in Kedukan River Using HEC-RAS and GIS

Authors: Reini S. Ilmiaty, Muhammad B. Al Amin, Sarino, Muzamil Jariski

Abstract:

Kedukan River is an artificial river which serves as a Watershed Boang drainage channel in Palembang. The river has upstream and downstream connected to Musi River, that often overflowing and flooding caused by the huge runoff discharge and high tide water level of Musi River. This study aimed to analyze the flood water surface profile on Kedukan River continued with flood inundation simulation to determine flooding prone areas in research area. The analysis starts from the peak runoff discharge calculations using rational method followed by water surface profile analysis using HEC-RAS program controlled by manual calculations using standard stages. The analysis followed by running flood inundation simulation using ArcGIS program that has been integrated with HEC-GeoRAS. Flood inundation simulation on Kedukan River creates inundation characteristic maps with depth, area, and circumference of inundation as the parameters. The inundation maps are very useful in providing an overview of flood prone areas in Kedukan River.

Keywords: flood modelling, HEC-GeoRAS, HEC-RAS, inundation map

Procedia PDF Downloads 480
6097 Heilong-Amur River: From Disputed Border to Brigde of Cooperation

Authors: Wan Wang, Xing Li

Abstract:

With the international river playing an increasingly important role in international relations, the border river between China and Russia has attracted more attention. During the history of Sino-Russian relations, Heilong-Amur River used to be a disputed border. The Sino-Russian transboundary water cooperation regarding the Heilong-Amur River started in 1950s and has obtained rapid improvement. In the 21st century, this cooperation has made substantial progress, which is worthy of a further study. However, this cooperation is facing with obstacles in aspects of economy, policy, implementation and mutual understandings. Under this circumstance, from the perspective of China, it is of necessity to realize these problems and take appropriate measures to promote the cooperation. The current Sino-Russian relations is conducive to transboundary water resources cooperation regarding the Heilong-Amur River and some measures adopted by China are already ongoing.

Keywords: China, cooperation, Heilong-Amur River, Russia

Procedia PDF Downloads 350
6096 Pressure Surge Analysis for Al Gardabiya Pump Station Phase III of the Man-Made River Project

Authors: Ahmed Bensreti, Mohamed Gouarsha

Abstract:

This paper presents a review of the pressure surge simulations carried out for Phase III of the Man Made River project in Libya with particular emphasis on the transient generated by simultaneous pump trips at Al Gardabiya Pump Station. The omission of the surge vessel check valve and bypass system on the grounds of cost, ease of design, and construction will result in, as expected, increased surge fluctuations as the damping effect in the form was removed. From the hydraulic and control requirements, it is recommended for Al Gardabiya Pump station that the check valve and check valve bypass be included in the final surge vessel design.

Keywords: computational fluid dynamics, surge vessel design, transient surge analysis, water pipe hydraulics

Procedia PDF Downloads 40
6095 Interaction between River and City Morphology

Authors: Ehsan Abshirini

Abstract:

Rivers as one of the most important topographic factors have played a strategic role not only on the appearance of cities but they also affect the structure and morphology of cities. In this paper author intends to find out how a city in its physical network interacts with a river flowing inside. The pilot study is Angers, a city in western France, in which it is influenced by the Maine River. To this purpose space syntax method integrating with GIS is used to extract the properties of physical form of cities in terms of global and local integration value, accessibility and choice value. Simulating the state of absence of river in this city and comparing the result to the current state of city according to the effect of river on the morphology of areas located in different banks of river is also part of interest in this paper. The results show that although a river is not comparable to the city based on size and the area occupied by, it has a significant effect on the form of the city in both global and local properties. In addition, this study endorses that tracking the effect of river-cities and their interaction to rivers in a hybrid of space syntax and GIS may lead researchers to improve their interpretation of physical form of these types of cities.

Keywords: river-cities, Physical form, space syntax properties, GIS, topographic factor

Procedia PDF Downloads 402
6094 Technical, Environmental and Financial Assessment for Optimal Sizing of Run-of-River Small Hydropower Project: Case Study in Colombia

Authors: David Calderon Villegas, Thomas Kaltizky

Abstract:

Run-of-river (RoR) hydropower projects represent a viable, clean, and cost-effective alternative to dam-based plants and provide decentralized power production. However, RoR schemes cost-effectiveness depends on the proper selection of site and design flow, which is a challenging task because it requires multivariate analysis. In this respect, this study presents the development of an investment decision support tool for assessing the optimal size of an RoR scheme considering the technical, environmental, and cost constraints. The net present value (NPV) from a project perspective is used as an objective function for supporting the investment decision. The tool has been tested by applying it to an actual RoR project recently proposed in Colombia. The obtained results show that the optimum point in financial terms does not match the flow that maximizes energy generation from exploiting the river's available flow. For the case study, the flow that maximizes energy corresponds to a value of 5.1 m3/s. In comparison, an amount of 2.1 m3/s maximizes the investors NPV. Finally, a sensitivity analysis is performed to determine the NPV as a function of the debt rate changes and the electricity prices and the CapEx. Even for the worst-case scenario, the optimal size represents a positive business case with an NPV of 2.2 USD million and an IRR 1.5 times higher than the discount rate.

Keywords: small hydropower, renewable energy, RoR schemes, optimal sizing, objective function

Procedia PDF Downloads 105
6093 Antioxidant Responses and Malondialdehyde Levels in African Cat Fish (Clarias gariepinus) from Eleyele River in Nigeria

Authors: Oluwatosin Adetola Arojojoye, Olajumoke Olufunlayo Alao, Philip Odigili

Abstract:

This study investigated the extent of pollution in Eleyele River in Oyo State, Nigeria by investigating the antioxidant status and malondialdehyde levels (index of lipid peroxidation) in the organs of African Catfish, Clarias gariepinus from the river. Clarias gariepinus weighing between 250g-400g were collected from Eleyele River (a suspected polluted river) and Clarias gariepinus from a clean fish farm (Durantee fisheries) were used as the control. Levels of malondialdehyde, glutathione concentration (GSH) and activities of antioxidant enzymes - superoxide dismutase, catalase and glutathione-S-transferase (GST) were evaluated in the post-mitochondrial fractions of the liver, kidney and gills of the fishes. From the results, there were increases in malondialdehyde level and GSH concentration in the liver, kidney and gills of Clarias gariepinus from Eleyele River when compared with control. Glutathione-S-transferase activity was induced in the liver and kidney of Clarias gariepinus from Eleyele River when compared with control. However, the activity of this enzyme was depleted in the gills of fishes from Eleyele River compared with control. Also there was an induction in SOD activity in the liver of Clarias gariepinus from Eleyele River when compared with control but there was a decrease in the activity of this enzyme in the kidney and gills of fishes from Eleyele River compared with control. Increase in lipid peroxidation and alterations in antioxidant system in Clarias gariepinus from Eleyele River show that the fishes were under oxidative stress. These suggest that the river is polluted probably as a result of industrial, domestic and agricultural wastes frequently discharged into the river. This could pose serious health risks to consumers of water and aquatic organisms from the river.

Keywords: antioxidant, lipid peroxidation, Clarias gariepinus, Eleyele River

Procedia PDF Downloads 498
6092 Flow Duration Curve Method to Evaluate Environmental Flow: Case Study of Gharasou River, Ardabil, Iran

Authors: Mehdi Fuladipanah, Mehdi Jorabloo

Abstract:

Water flow management is one of the most important parts of river engineering. Non-uniformity distribution of rainfall and various flow demand with unreasonable flow management will be caused destroyed of river ecosystem. Then, it is very serious to determine ecosystem flow requirement. In this paper, flow duration curve indices method which has hydrological based was used to evaluate environmental flow in Gharasou River, Ardabil, Iran. Using flow duration curve, Q90 and Q95 for different return periods were calculated. Their magnitude were determined as 1-day, 3-day, 7-day, and 30 day. According the second method, hydraulic alteration indices often had low and medium range. In order to maintain river at an acceptable ecological condition, minimum daily discharge of index Q95 is 0.7 m3.s-1.

Keywords: ardabil, environmental flow, flow duration curve, Gharasou river

Procedia PDF Downloads 650
6091 Monitoring the Change of Padma River Bank at Faridpur, Bangladesh Using Remote Sensing Approach

Authors: Ilme Faridatul, Bo Wu

Abstract:

Bangladesh is often called as a motherland of rivers. It contains about 700 rivers among all these the Padma River is one of the largest rivers of Bangladesh. The change of river bank and erosion has become a common environmental natural hazard in Bangladesh. The river banks are under intense pressure from natural processes such as erosion and accretion as well as anthropogenic processes such as urban growth and pollution. The Padma River is flowing along ten districts of Bangladesh among all these Faridpur district is most vulnerable to river bank erosion. The severity of the river erosion is so high that each year a thousand of populations become homeless and lose their agricultural lands. Though the Faridpur district is most vulnerable to river bank erosion no specific research has been conducted to identify the changing pattern of river bank along this district. The outcome of the research may serve as guidance to prepare river bank monitoring program and management. This research has utilized integrated techniques of remote sensing and geographic information system to monitor the changes from 1995 to 2015 at Faridpur district. To discriminate the land water interface Modified Normalized Difference Water Index (MNDWI) algorithm is applied and on screen digitization approach is used over MNDWI images of 1995, 2002 and 2015 for river bank line extraction. The extent of changes in the river bank along Faridpur district is estimated through overlaying the digitized maps of all three years. The river bank lines are highlighted to infer the erosion and accretion and the changes are calculated. The result shows that the middle of the river is gaining land through sedimentation and the both side river bank is shifting causing severe erosion that consequently resulting the loss of farmland and homestead. Over the study period from 1995 to 2015 it witnessed huge erosion and accretion that played an active role in the changes of the river bank.

Keywords: river bank, erosion and accretion, change monitoring, remote sensing

Procedia PDF Downloads 298
6090 Impacts of Climate Change on Water Resources of Greater Zab and Lesser Zab Basins, Iraq, Using Soil and Water Assessment Tool Model

Authors: Nahlah Abbas, Saleh A. Wasimi, Nadhir Al-Ansari

Abstract:

The Greater Zab and Lesser Zab are the major tributaries of Tigris River contributing the largest flow volumes into the river. The impacts of climate change on water resources in these basins have not been well addressed. To gain a better understanding of the effects of climate change on water resources of the study area in near future (2049-2069) as well as in distant future (2080-2099), Soil and Water Assessment Tool (SWAT) was applied. The model was first calibrated for the period from 1979 to 2004 to test its suitability in describing the hydrological processes in the basins. The SWAT model showed a good performance in simulating streamflow. The calibrated model was then used to evaluate the impacts of climate change on water resources. Six general circulation models (GCMs) from phase five of the Coupled Model Intercomparison Project (CMIP5) under three Representative Concentration Pathways (RCPs) RCP 2.6, RCP 4.5, and RCP 8.5 for periods of 2049-2069 and 2080-2099 were used to project the climate change impacts on these basins. The results demonstrated a significant decline in water resources availability in the future.

Keywords: Tigris River, climate change, water resources, SWAT

Procedia PDF Downloads 176
6089 Two-Dimensional Modeling of Seasonal Freeze and Thaw in an Idealized River Bank

Authors: Jiajia Pan, Hung Tao Shen

Abstract:

Freeze and thaw occurs seasonally in river banks in northern countries. Little is known on how the riverbank soil temperature responds to air temperature changes and how freeze and thaw develops in a river bank seasonally. This study presents a two-dimensional heat conduction model for numerical investigations of seasonal freeze and thaw processes in an idealized river bank. The model uses the finite difference method and it is convenient for applications. The model is validated with an analytical solution and a field case with soil temperature distributions. It is then applied to the idealized river bank in terms of partially and fully saturated conditions with or without ice cover influence. Simulated results illustrate the response processes of the river bank to seasonal air temperature variations. It promotes the understanding of freeze and thaw processes in river banks and prepares for further investigation of frost and thaw impacts on riverbank stability.

Keywords: freeze and thaw, riverbanks, 2D model, heat conduction

Procedia PDF Downloads 105
6088 Geological and Geotechnical Approach for Stabilization of Cut-Slopes in Power House Area of Luhri HEP Stage-I (210 MW), India

Authors: S. P. Bansal, Mukesh Kumar Sharma, Ankit Prabhakar

Abstract:

Luhri Hydroelectric Project Stage-I (210 MW) is a run of the river type development with a dam toe surface powerhouse (122m long, 50.50m wide, and 65.50m high) on the right bank of river Satluj in Himachal Pradesh, India. The project is located in the inner lesser Himalaya between Dhauladhar Range in the south and higher Himalaya in the north in the seismically active region. At the project, the location river is confined within narrow V-shaped valleys with little or no flat areas close to the river bed. Nearly 120m high cut slopes behind the powerhouse are proposed from the powerhouse foundation level of 795m to ± 915m to accommodate the surface powerhouse. The stability of 120m high cut slopes is a prime concern for the reason of risk involved. The slopes behind the powerhouse will be excavated in mainly in augen gneiss, fresh to weathered in nature, and biotite rich at places. The foliation joints are favorable and dipping inside the hill. Two valleys dipping steeper joints will be encountered on the slopes, which can cause instability during excavation. Geological exploration plays a vital role in designing and optimization of cut slopes. SWEDGE software has been used to analyze the geometry and stability of surface wedges in cut slopes. The slopes behind powerhouse have been analyzed in three zones for stability analysis by providing a break in the continuity of cut slopes, which shall provide quite substantial relief for slope stabilization measure. Pseudo static analysis has been carried out for the stabilization of wedges. The results indicate that many large wedges are forming, which have a factor of safety less than 1. The stability measures (support system, bench width, slopes) have been planned so that no wedge failure may occur in the future.

Keywords: cut slopes, geotechnical investigations, Himalayan geology, surface powerhouse, wedge failure

Procedia PDF Downloads 94
6087 Hydrological Revival Possibilities for River Assi: A Tributary of the River Ganga in the Middle Ganga Basin

Authors: Anurag Mishra, Prabhat Kumar Singh, Anurag Ohri, Shishir Gaur

Abstract:

Streams and rivulets are crucial in maintaining river networks and their hydrology, influencing downstream ecosystems, and connecting different watersheds of urban and rural areas. The river Assi, an urban river, once a lifeline for the locals, has degraded over time. Evidence, such as the presence of paleochannels and patterns of water bodies and settlements, suggests that the river Assi was initially an alluvial stream or rivulet that originated near Rishi Durvasha Ashram near Prayagraj, flowing approximately 120 km before joining the river Ganga at Assi ghat in Varanasi. Presently, a major challenge is that nearly 90% of its original channel has been silted and disappeared, with only the last 8 km retaining some semblance of a river. It is possible that initially, the river Assi branched off from the river Ganga and functioned as a Yazoo stream. In this study, paleochannels of the river Assi were identified using Landsat 5 imageries and SRTM DEM. The study employed the Normalized Difference Vegetation Seasonality Index (NDVSI) and Principal Component Analysis (PCA) of the Normalized Difference Vegetation Index (NDVI) to detect these paleochannels. The average elevation of the sub-basin at the Durvasha Rishi Ashram of river Assi is 96 meters, while it reduces to 80 meters near its confluence with the Ganga in Varanasi, resulting in a 16-meter elevation drop along its course. There are 81 subbasins covering an area of 83,241 square kilometers. It is possible that due to the increased resistance in the flow of river Assi near urban areas of Varanasi, a new channel, Morwa, has originated at an elevation of 87 meters, meeting river Varuna at an elevation of 79 meters. The difference in elevation is 8 meters. Furthermore, the study explored the possibility of restoring the paleochannel of the river Assi and nearby ponds and water bodies to improve the river's base flow and overall hydrological conditions.

Keywords: River Assi, small river restoration, paleochannel identification, remote sensing, GIS

Procedia PDF Downloads 29
6086 Study on Ecological Water Demand Evaluation of Typical Mountainous Rivers in Zhejiang Province: Taking Kaihua River as an Example

Authors: Kaiping Xu, Aiju You, Lei Hua

Abstract:

In view of the ecological environmental problems and protection needs of mountainous rivers in Zhejiang province, a suitable ecological water demand evaluation system was established based on investigation and monitoring. Taking the Kaihua river as an example, the research on ecological water demand and the current situation evaluation were carried out. The main types of ecological water demand in Majin River are basic ecological flow and lake wetland outside the river, and instream flow and water demands for water quality in Zhongcun river. In the wet season, each ecological water demand is 18.05m3/s and 2.56m3 / s, and in the dry season is 3.00m3/s and 0.61m3/s. Three indexes of flow, duration and occurrence time are used to evaluate the ecological water demand. The degree of ecological water demand in the past three years is low level of satisfaction. Meanwhile, the existing problems are analyzed, and put forward reasonable and operable safeguards and suggestions.

Keywords: Zhejiang province, mountainous river, ecological water demand, Kaihua river, evaluation

Procedia PDF Downloads 197
6085 Impact of Project Leader's Style on the Success of the Projects

Authors: Saadia Khalid

Abstract:

This paper discusses the various leadership styles of project manager which lead to the success of a project since it is important for a project manager to understand and adopt the skills required to cope up with the modern challenges of any project. A project manager must be able to handle a project effectively and efficiently and be ready to assess the factors effecting success or failure of the project. A project manager must be capable of handling a project by managing, directing and leading the projects with requisite knowledge and skills. In this paper a project manager’s characteristics linkage to project success have been developed and analyzed for three different projects/industries. A web-based survey has also been carried out which revealed that specific leadership styles/traits can lead to better performance and success of organizations. Some basic factors like project complexity, the age, gender and nationality of the project manager and type of project also play a vital role in success of a project.

Keywords: leadership style, project success, project management, project manager

Procedia PDF Downloads 395
6084 Metal (Loids) Speciation Using HPLC-ICP-MS Technique in Klodnica River, Upper Silesia, Poland

Authors: Magdalena Jabłońska-Czapla

Abstract:

The work allowed gaining knowledge about redox and speciation changes of As, Cr, and Sb ionic forms in Klodnica River water. This kind of studies never has been conducted in this region of Poland. In study optimized and validated previously HPLC-ICP-MS methods for determination of As, Sb and Cr was used. Separation step was done using high-performance liquid chromatograph equipped with ion-exchange column followed by ICP-MS spectrometer detector. Preliminary studies included determination of the total concentration of As, Sb and Cr, pH, Eh, temperature and conductivity of the water samples. The study was conducted monthly from March to August 2014, at six points on the Klodnica River. The results indicate that exceeded at acceptable concentration of total Cr and Sb was observed in Klodnica River and we should qualify Klodnica River waters below the second purity class. In Klodnica River waters dominates oxidized antimony and arsenic forms, as well as the two forms of chromium Cr(VI) and Cr(III). Studies have also shown the methyl derivative of arsenic's presence.

Keywords: antimony, arsenic, chromium, HPLC-ICP-MS, river water, speciation

Procedia PDF Downloads 391