38820 Applications of Building Information Modeling (BIM) in Knowledge Sharing and Management in Construction

Authors: Shu-Hui Jan, Shih-Ping Ho, Hui-Ping Tserng

Abstract:

Construction knowledge can be referred to and reused among involved project managers and job-site engineers to alleviate problems on a construction job-site and reduce the time and cost of solving problems related to constructability. This paper proposes a new methodology to provide sharing of construction knowledge by using the Building Information Modeling (BIM) approach. The main characteristics of BIM include illustrating 3D CAD-based presentations and keeping information in a digital format, and facilitation of easy updating and transfer of information in the 3D BIM environment. Using the BIM approach, project managers and engineers can gain knowledge related to 3D BIM and obtain feedback provided by job-site engineers for future reference. This study addresses the application of knowledge sharing management in the construction phase of construction projects and proposes a BIM-based Knowledge Sharing Management (BIMKSM) system for project managers and engineers. The BIMKSM system is then applied in a selected case study of a construction project in Taiwan to verify the proposed methodology and demonstrate the effectiveness of sharing knowledge in the BIM environment. The combined results demonstrate that the BIMKSM system can be used as a visual BIM-based knowledge sharing management platform by utilizing the BIM approach and web technology.

Keywords: construction knowledge management, building information modeling, project management, web-based information system

Procedia PDF Downloads 316
38819 Cultural Snapshot: A Reflection on Project-Based Model of Cross-Cultural Understanding in Teaching and Learning

Authors: Kunto Nurcahyoko

Abstract:

The fundamental perception used in this study is that teaching and learning activities in Indonesian classroom have potentially generated individual’s sensitivity on cross-cultural understanding. This study aims at investigating Indonesian university students’ perception on cross-cultural understanding after doing Cultural Snapshot Project. The data was critically analyzed through multicultural ideology and diversity theories. The subjects were 30 EFL college students in one of colleges in Indonesia. Each student was assigned to capture a photo which depicted the existence of any cultural manifestation in their surrounding such as discrimination, prejudice and stereotype. Students were then requested asked to reflect on the picture by writing a short description on the picture and make an exhibition using their pictures. In the end of the project, students were instructed to fill in questionnaires to show their perception before and after the project. The result reveals that Cultural Snapshot Project has given the opportunity for the students to better realize cross-cultural understanding in their environment. In conclusion, the study shows that Cultural Snapshot Project has specifically enhanced students’ perception of multiculturalism in three major areas: cultural sensitivity and empathy, social tolerance, and understanding of diversity.

Keywords: cultural snapshot, cross-cultural understanding, students’ perception, multiculturalism

Procedia PDF Downloads 289
38818 Conflict of the Thai-Malaysian Gas Pipeline Project

Authors: Nopadol Burananuth

Abstract:

This research was aimed to investigate (1) the relationship among local social movements, non-governmental Organization activities and state measures deployment; and (2) the effects of local social movements, non-governmental Organization activities, and state measures deployment on conflict of local people towards the Thai-Malaysian gas pipeline project. These people included 1,000 residents of the four districts in Songkhla province. The methods of data analysis consist of multiple regression analysis. The results of the analysis showed that: (1) local social movements depended on information, and mass communication; deployment of state measures depended on compromise, coordination, and mass communication; and (2) the conflict of local people depended on mobilization, negotiation, and campaigning for participation of people in the project. Thus, it is recommended that to successfully implement any government policy, consideration must be paid to the conflict of local people, mobilization, negotiation, and campaigning for people’s participation in the project.

Keywords: conflict, NGO activities, social movements, state measures

Procedia PDF Downloads 296
38817 Strategic Leadership and Sustainable Project Management in Enugu, Nigeria

Authors: Nnadi Ezekiel Ejiofor

Abstract:

In Enugu, Nigeria, this study investigates the connection between strategic leadership and project management sustainability, with an emphasis on building projects in the State. The study set out to accomplish two specific goals: first, it sought to establish a link between creative project management and resource efficiency in construction projects in Enugu State, Nigeria; and second, it sought to establish a link between innovative thinking and waste minimization in those same projects. A structured questionnaire was used to collect primary data from 45 registered construction enterprises in the study area as part of the study's descriptive research approach. Due to the nonparametric nature of the data, Spearman Rank Order Correlation was used to evaluate the acquired data. The findings demonstrate that creative project management had a significant positive impact on resource efficiency in construction projects carried out by architecture firms in Enugu State, Nigeria (r =.849; p.001), and that innovative thinking had a significant impact on waste reduction in those same projects (r =.849; p.001). It was determined that strategic leadership had a significant impact on the sustainability of project management, and it was thus advised that project managers should foresee, prepare for, and effectively communicate present and future developments to project staff in order to ensure that the objective of sustainable initiatives, such as recycling and reuse, is implemented in construction projects.

Keywords: construction, project management, strategic leadership, sustainability, waste reduction

Procedia PDF Downloads 26
38816 Identifying Barriers of Implementing Building Information Modelling in Construction

Authors: Kasra HosseinMostofi, Mohamadamin Oyar Hossein, Reza Mehdizadeh Anvigh

Abstract:

BIM is an innovative concept for the majority of firms operating in industry. BIM offers a new paradigm to design, construct, operate, and maintain a facility. However, even with the most conscientious use, stakeholders can run into trouble during its implementation on a project or within an organization. At times, project stakeholders are unaware of the challenges that they can face with the implementation at the project level or an organizational level. Therefore, the study aimed to identify and compile barriers associated with the BIM implementation at the project and organizational level, as per the literature. Despite the fact that innumerable advantageous involved in exploiting BIM, there are some barriers to implement it properly. These barriers have been proved as impediments for academicians and members of construction team project to take the maximum advantage of its utilization. Although some research has been conducted to identify these barriers regarding BIM implementation in construction industry, more research is needed to be carried out among academicians to identify these barriers in institutions, and most importantly, to make suggestions for eliminating these obstacles.

Keywords: building information modelling, construction, design and construction, designers

Procedia PDF Downloads 150
38815 Projectification: Using Project Management Methodology to Manage the Academic Program Review

Authors: Adam Marks, Munir Majdalawieh, Maytha Al Ali

Abstract:

While research is rich with what criteria could be included in the academic program review processes, there is rarely any mention of how this significant and complex process should be managed. This paper proposes using project management methodology in alignment with the program review criteria of the Dickeson’s Prioritizing Academic Programs model. Project management and academic program review share two distinct characteristics; one is their life cycle, and the second is the core knowledge areas they use. This aligned and structured approach offers academic administrators a step-by-step guide that can help them manage this process and effectively assess academic programs.

Keywords: project management, academic program, program review, education, higher education institution, strategic management

Procedia PDF Downloads 343
38814 Project and Module Based Teaching and Learning

Authors: Jingyu Hou

Abstract:

This paper proposes a new teaching and learning approach-project and Module Based Teaching and Learning (PMBTL). The PMBTL approach incorporates the merits of project/problem based and module based learning methods, and overcomes the limitations of these methods. The correlation between teaching, learning, practice, and assessment is emphasized in this approach, and new methods have been proposed accordingly. The distinct features of these new methods differentiate the PMBTL approach from conventional teaching approaches. Evaluation of this approach on practical teaching and learning activities demonstrates the effectiveness and stability of the approach in improving the performance and quality of teaching and learning. The approach proposed in this paper is also intuitive to the design of other teaching units.

Keywords: computer science education, project and module based, software engineering, module based teaching and learning

Procedia PDF Downloads 464
38813 A Prediction of Electrical Cost for High-Rise Building Construction

Authors: Picha Sriprachan

Abstract:

The increase in electricity prices affects the cost of high-rise building construction. The objectives of this research are to study the electrical cost, trend of electrical cost and to forecast electrical cost of high-rise building construction. The methods of this research are: 1) to study electrical payment formats, cost data collection methods, and the factors affecting electrical cost of high-rise building construction, 2) to study the quantity and trend of cumulative percentage of the electrical cost, and 3) to forecast the electrical cost for different types of high-rise buildings. The results of this research show that the average proportion between electrical cost and the value of the construction project is 0.87 percent. The proportion of electrical cost for residential, office and commercial, and hotel buildings are closely proportional. If construction project value increases, the proportion of electrical cost and the value of the construction project will decrease. However, there is a relationship between the amount of electrical cost and the value of the construction project. During the structural construction phase, the amount of electrical cost will increase and during structural and architectural construction phase, electrical cost will be maximum. The cumulative percentage of the electrical cost is related to the cumulative percentage of the high-rise building construction cost in the same direction. The amount of service space of the building, number of floors and the duration of the construction affect the electrical cost of construction. The electrical cost of construction forecasted by using linear regression equation is close to the electrical cost forecasted by using the proportion of electrical cost and value of the project.

Keywords: high-rise building construction, electrical cost, construction phase, architectural phase

Procedia PDF Downloads 359
38812 Conflict Causes within Construction Projects; Conflict Interaction across Project Phases

Authors: Abdullah Mohammed Alshehri

Abstract:

The projects in the construction industry have significantly increased, given its contribution to the overall Gross Domestic Product (GDP) of the countries. Reflecting upon the complex nature and involvement of various agents, the study aims to analyze the conflicts cause within construction projects. Therefore, the study strived to come out with understanding the levels of conflict interaction across project phases. However, this conducted by investigating the association between antecedents and apparent conflicts inherent in. The study used a qualitative approach for collecting the data through a quantitative, semi-structured method. Formation of a questionnaire survey has been conducted for over 30 respondents. However, the survey came out with the identification of 25 conflict cause categories, which can take place in different construction project phases, including pre-design phase, pre-construction phase, construction phase, commissioning, and completion phase. For example, conflicts associated with inconsistencies or discrepancies within or between project documents, which took place at tendering time in the pre-construction phase were relatable with the selection of material specifications that should be supplied or used in the construction projects at the construction phase. Its analysis can provide comprehensive understanding, trace the root of the problem, which offers a roadmap to deepen the understanding of the conflict conditions and ‘course of action’ necessary for project management strategy actions toward avoiding or minimizing conflict causes at project life.

Keywords: construction, conflict causes, levels, interaction, phases

Procedia PDF Downloads 151
38811 Project Management and International Development: Competencies for International Assignment

Authors: M. P. Leroux, C. Coulombe

Abstract:

Projects are popular vehicles through which international aid is delivered in developing countries. To achieve their objectives, many northern organizations develop projects with local partner organizations in the developing countries through technical assistance projects. International aid and international development projects precisely have long been criticized for poor results although billions are spent every year. Little empirical research in the field of project management has the focus on knowledge transfer in international development context. This paper focuses particularly on personal dimensions of international assignees participating in project within local team members in the host country. We propose to explore the possible links with a human resource management perspective in order to shed light on the less research problematic of knowledge transfer in development cooperation projects. The process leading to capacity building being far complex, involving multiple dimensions and far from being linear, we propose here to assess if traditional research on expatriate in multinational corporations pertain to the field of project management in developing countries. The following question is addressed: in the context of international development project cooperation, what personal determinants should the selection process focus when looking to fill a technical assistance position in a developing country? To answer that question, we first reviewed the literature on expatriate in the context of inter organizational knowledge transfer. Second, we proposed a theoretical framework combining perspectives of development studies and management to explore if parallels can be draw between traditional international assignment and technical assistance project assignment in developing countries. We conducted an exploratory study using case studies from technical assistance initiatives led in Haiti, a country in Central America. Data were collected from multiple sources following qualitative study research methods. Direct observations in the field were allowed by local leaders of six organization; individual interviews with present and past international assignees, individual interview with local team members, and focus groups were organized in order to triangulate information collected. Contrary from empirical research on knowledge transfer in multinational corporations, results tend to show that technical expertise rank well behind many others characteristics. Results tend to show the importance of soft skills, as a prerequisite to succeed in projects where local team have to collaborate. More importantly, international assignees who were talking knowledge sharing instead of knowledge transfer seemed to feel more satisfied at the end of their mandate than the others. Reciprocally, local team members who perceived to have participated in a project with an expat looking to share instead of aiming to transfer knowledge seemed to describe the results of project in more positive terms than the others. Results obtained from this exploratory study open the way for a promising research agenda in the field of project management. It emphasises the urgent need to achieve a better understanding on the complex set of soft skills project managers or project chiefs would benefit to develop, in particular, the ability to absorb knowledge and the willingness to share one’s knowledge.

Keywords: international assignee, international project cooperation, knowledge transfer, soft skills

Procedia PDF Downloads 116
38810 A Construction Scheduling Model by Applying Pedestrian and Vehicle Simulation

Authors: Akhmad F. K. Khitam, Yi Tai, Hsin-Yun Lee

Abstract:

In the modern research of construction management, the goals of scheduling are not only to finish the project within the limited duration, but also to improve the impact of people and environment. Especially for the impact to the pedestrian and vehicles, the considerable social cost should be estimated in the total performance of a construction project. However, the site environment has many differences between projects. These interactions affect the requirement and goal of scheduling. It is difficult for schedule planners to quantify these interactions. Therefore, this study use 3D dynamic simulation technology to plan the schedule of the construction engineering projects that affect the current space users (i.e., the pedestrians and vehicles). The proposed model can help the project manager find out the optimal schedule to minimize the inconvenience brought to the space users. Besides, a roadwork project and a building renovation project were analyzed for the practical situation of engineering and operations. Then this study integrates the proper optimization algorithms and computer technology to establish a decision support model. The proposed model can generate a near-optimal schedule solution for project planners.

Keywords: scheduling, simulation, optimization, pedestrian and vehicle behavior

Procedia PDF Downloads 112
38809 A Transition Towards Sustainable Feed Production Using Algae: The Development of Algae Biotechnology in the Kingdom of Saudi Arabia (DAB-KSA Project)

Authors: Emna Mhedhbi, Claudio Fuentes Grunewald

Abstract:

According to preliminary results of DAB-KSA project and considering the current 0.09-ha microalgae pilot plant facilities, we can produce 2.6 tons/year of microalgae biomass for proteins applications in animal feeds in KSA. By 2030, our projections are to reach 65,940,593.4 tons deploying 100.000 ha's production plants. We also have assessed the energy cost (industrial) in KSA (€0.061/kWh) and compared to (€0.32/kWh)in Germany, we can argue a clear lower OPEX for microalgae biomass production cost in KSA.

Keywords: microalgae, feed production, bioprocess, fishmeal

Procedia PDF Downloads 144
38808 Environmental Impact Assessment Methodology of the Tirana–Elbasan Road Project

Authors: Aurora Cerri, Niko Pollojani

Abstract:

The Tirana – Elbasan Road project is the most important highway project in Albania, constructed in the period May 2011 - ongoing. This project included construction of 38 km highway category road including 2.6 km of tunnel. It serves as a corridor connecting the Tirana, Capital of Albania and South-East area, and in the near future it is expected to continue in the direction of Macedonian border. Environmental Impact Assesment procedure for this project is provided by the Albanian Environmental Law No. 10431. This law establishes the regulation of procedures for identifying, assessment and reporting on the effects of certain projects on the environment, and the associated administrative procedures, during the decision-making process by the Ministry of Environment and Tourism for issuing environmental permit, and ensures that all relevant information concerning the environment are provided and considered. Due to the nature and size of the project, during the environmental impact assessment process, the European Union legislation, namely the EIA Directive 85/337 / EEC is considered. Moreover, in some cases, due to the lack of national standards and practical guidelines, when necessary those of EU member countries are considered. This paper presents an analysis of the EIA procedure followed on ‘Tirana – Elbasan’ Road project, with a focus on the application of the main stages of the procedure such as: screening, scoping, review, the EIA report; and consideration of alternatives, measures for impact prevention and reduction, and the public hearing T/discussion.

Keywords: highway, environmental impact assesment, Tirana, prevention

Procedia PDF Downloads 287
38807 Creation of Greenhouses by Students, Using the Own Installations of the University and Increasing the Growth of Plants

Authors: Espinosa-Garza G., Loera-Hernandez I., Antonyan N.

Abstract:

To innovate, it is necessary to perform projects directed towards the search of improvement. The agricultural technique and the design of greenhouses have been studied by undergraduate engineering students from the Tecnológico de Monterrey using the campus areas. The purpose of this project was to incite students to create innovations and help rural populations of the state to solve one of the problems that they are dealing with nowadays. The main objective of the project was to search for an alternative technique that will allow the planting of the “chile piquín” plant, also known as Capsicum annuum, to grow quicker as it germinates. The “chile piquín” is one of the original crops of Mexico and forms the basis of the Mesoamerican cultures’ diet since the pre-hispanic era. To fulfill with today’s demand, it is required to implement new alternative methods to increase the “chile piquín’s” growth. The project lasted one semester with the participation of engineering students from multiple majors. The most important results from this academic experience were that, from the proposed goal, the students could analyze the needs of their town and were capable of introducing new and innovative ideas with the aim of resolving them. In the present article the pedagogic methodologies that allowed to carry out this project will be discussed.

Keywords: academic experience, chile piquín, engineering education, greenhouse design, innovation

Procedia PDF Downloads 125
38806 Environmental Impact Assessment of OMI Irrigation Scheme, Nigeria

Authors: Olumuyiwa I. Ojo, Kola Amao, Josiah A. Adeyemo, Fred A. O. Otieno

Abstract:

A study was carried out to assess the environmental impact of Kampe (Omi) irrigation scheme with respect to public health hazards, the rising water table, salinity and alkalinity problems on the project site. A structured questionnaire was used as the main tool to gather information on the effect of the irrigation project on the various communities around the project site. The different sections of the questionnaire enabled the gathering of information ranging from general to more specific information. The results obtained from the study showed that the two effects are obvious: the 'positive effects' which include increasing the socioeconomic development of the entire communities, resulting in an increase in employment opportunities and better lifestyle and the 'negative effects' in which malaria (100% occurrence) and schistosomiasis (66.7%) were found to be active diseases caused by irrigation activities. Increase in height of water table and salinity is eminent in the irrigation site unless adequate drainage is provided. The collection and experimental analyses of representation soil and water samples from each scheme were used to assess the current status of each receptor. Results obtained indicate the absence of soil with sodium adsorption ration (SAR) values ranging from 3.0 to 3.89, exchangeable sodium percentage (ESP) ranged from 3.8% to 5.5% while pH values ranged from 6.60 to 7.00. Drainage facilities of the project site are inadequate, therefore making it difficult to leach the soil and flood history is occasional.

Keywords: irrigation, impact, soil analysis, Nigeria

Procedia PDF Downloads 260
38805 Modeling and Simulating Productivity Loss Due to Project Changes

Authors: Robert Pellerin, Michel Gamache, Remi Trudeau, Nathalie Perrier

Abstract:

The context of large engineering projects is particularly favorable to the appearance of engineering changes and contractual modifications. These elements are potential causes for claims. In this paper, we investigate one of the critical components of the claim management process: the calculation of the impacts of changes in terms of losses of productivity due to the need to accelerate some project activities. When project changes are initiated, delays can arise. Indeed, project activities are often executed in fast-tracking in an attempt to respect the completion date. But the acceleration of project execution and the resulting rework can entail important costs as well as induce productivity losses. In the past, numerous methods have been proposed to quantify the duration of delays, the gains achieved by project acceleration, and the loss of productivity. The calculation related to those changes can be divided into two categories: direct cost and indirect cost. The direct cost is easily quantifiable as opposed to indirect costs which are rarely taken into account during the calculation of the cost of an engineering change or contract modification despite several research projects have been made on this subject. However, proposed models have not been accepted by companies yet, nor they have been accepted in court. Those models require extensive data and are often seen as too specific to be used for all projects. These techniques are also ignoring the resource constraints and the interdependencies between the causes of delays and the delays themselves. To resolve this issue, this research proposes a simulation model that mimics how major engineering changes or contract modifications are handled in large construction projects. The model replicates the use of overtime in a reactive scheduling mode in order to simulate the loss of productivity present when a project change occurs. Multiple tests were conducted to compare the results of the proposed simulation model with statistical analysis conducted by other researchers. Different scenarios were also conducted in order to determine the impact the number of activities, the time of occurrence of the change, the availability of resources, and the type of project changes on productivity loss. Our results demonstrate that the number of activities in the project is a critical variable influencing the productivity of a project. When changes occur, the presence of a large number of activities leads to a much lower productivity loss than a small number of activities. The speed of reducing productivity for 30-job projects is about 25 percent faster than the reduction speed for 120-job projects. The moment of occurrence of a change also shows a significant impact on productivity. Indeed, the sooner the change occurs, the lower the productivity of the labor force. The availability of resources also impacts the productivity of a project when a change is implemented. There is a higher loss of productivity when the amount of resources is restricted.

Keywords: engineering changes, indirect costs overtime, productivity, scheduling, simulation

Procedia PDF Downloads 219
38804 Major Causes of Delay in Construction Projects

Authors: Y. Gholipour, E. Rezazadeh

Abstract:

Delay is one of the most serious and common problems of construction project that can affect project delivery unfavorably. This research presents the most important causes of delay in large dam projects based on a survey on some executed dam construction in Iran. In this survey a randomly selected samples of owners, consultants and contractors have been involved. The outcome of this survey revealed that scheduled payments, site management, shop drawing review process, unforeseen ground conditions and contractor experience as the most important factors affecting on delay in dam construction projects.

Keywords: delay, dam construction, project management, Iran

Procedia PDF Downloads 415
38803 The Study of Strength and Weakness Points of Various Techniques for Calculating the Volume of Done Work in Civil Projects

Authors: Ali Fazeli Moslehabadi

Abstract:

One of the topics discussed in civil projects, during the execution of the project, which the continuous change of work volumes is usually the characteristics of these types of projects, is how to calculate the volume of done work. The difference in volumes announced by the execution unit with the estimated volume by the technical office unit, has direct effect on the announced progress of the project. This issue can show the progress of the project more or less than actual value and as a result making mistakes for stakeholders and project managers and misleading them. This article intends to introduce some practical methods for calculating the volume of done work in civil projects. It then reviews the strengths and weaknesses of each of them, in order to resolve these contradictions and conflicts.

Keywords: technical skills, systemic skills, communication skills, done work volume calculation techniques

Procedia PDF Downloads 132
38802 Text2Time: Transformer-Based Article Time Period Prediction

Authors: Karthick Prasad Gunasekaran, B. Chase Babrich, Saurabh Shirodkar, Hee Hwang

Abstract:

Construction preparation is crucial for the success of a construction project. By involving project participants early in the construction phase, project managers can plan ahead and resolve issues early, resulting in project success and satisfaction. This study uses quantitative data from construction management projects to determine the relationship between the pre-construction phase, construction schedule, and customer satisfaction. This study examined a total of 65 construction projects and 93 clients per job to (a) identify the relationship between the pre-construction phase and program reduction and (b) the pre-construction phase and customer retention. Based on a quantitative analysis, this study found a negative correlation between pre-construction status and project schedule in 65 construction projects. This finding means that the more preparatory work done on a particular project, the shorter the total construction time. The Net Promoter Score of 93 clients from 65 projects was then used to determine the relationship between construction preparation and client satisfaction. The pre-construction status and the projects were further analyzed, and a positive correlation between them was found. This shows that customers are happier with projects with a higher ready-to-build ratio than projects with less ready-to-build.

Keywords: NLP, BERT, LLM, deep learning, classification

Procedia PDF Downloads 64
38801 Exploring the Critical Success Factors of Construction Stakeholders Team Effectiveness

Authors: Olusegun Akinsiku, Olukayode Oyediran, Koleola Odusami

Abstract:

A construction project is usually made up of a variety of stakeholders whose interests may positively or negatively impact on the outcome of the project execution. The variability of project stakeholders is apparent in their cultural differences, professional background and ethics, and differences in ideas. The need for the effectiveness of construction teams has been investigated as this is an important aspect to meeting client’s expectations in the construction industry. This study adopts a cross-sectional descriptive survey with the purpose of identifying the critical success factors (CSFs) associated with the team effectiveness of construction projects stakeholders, their relationship and the effects on construction project performance. The instrument for data collection was a designed questionnaire which was administered to construction professionals in the construction industry in Lagos State, Nigeria using proportionate stratified sampling. The highest ranked identified CSFs include “team trust”, “esprit de corps among members” and “team cohesiveness”. Using factor analysis and considering the effects of team cohesiveness on project performance, the identified CSFs were categorized into three groups namely cognitive attributes, behavior and processes attributes and affective attributes. All the three groups were observed to have a strong correlation with project performance. The findings of this study are useful in helping construction stakeholders benchmark the team effectiveness factors that will guarantee project success.

Keywords: construction, critical success factors, performance, stakeholders, team effectiveness

Procedia PDF Downloads 106
38800 Analysis of Delays during Initial Phase of Construction Projects and Mitigation Measures

Authors: Sunaitan Al Mutairi

Abstract:

A perfect start is a key factor for project completion on time. The study examined the effects of delayed mobilization of resources during the initial phases of the project. This paper mainly highlights the identification and categorization of all delays during the initial construction phase and their root cause analysis with corrective/control measures for the Kuwait Oil Company oil and gas projects. A relatively good percentage of the delays identified during the project execution (Contract award to end of defects liability period) attributed to mobilization/preliminary activity delays. Data analysis demonstrated significant increase in average project delay during the last five years compared to the previous period. Contractors had delays/issues during the initial phase, which resulted in slippages and progressively increased, resulting in time and cost overrun. Delays/issues not mitigated on time during the initial phase had very high impact on project completion. Data analysis of the delays for the past five years was carried out using trend chart, scatter plot, process map, box plot, relative importance index and Pareto chart. Construction of any project inside the Gathering Centers involves complex management skills related to work force, materials, plant, machineries, new technologies etc. Delay affects completion of projects and compromises quality, schedule and budget of project deliverables. Works executed as per plan during the initial phase and start-up duration of the project construction activities resulted in minor slippages/delays in project completion. In addition, there was a good working environment between client and contractor resulting in better project execution and management. Mainly, the contractor was on the front foot in the execution of projects, which had minimum/no delays during the initial and construction period. Hence, having a perfect start during the initial construction phase shall have a positive influence on the project success. Our research paper studies each type of delay with some real example supported by statistic results and suggests mitigation measures. Detailed analysis carried out with all stakeholders based on impact and occurrence of delays to have a practical and effective outcome to mitigate the delays. The key to improvement is to have proper control measures and periodic evaluation/audit to ensure implementation of the mitigation measures. The focus of this research is to reduce the delays encountered during the initial construction phase of the project life cycle.

Keywords: construction activities delays, delay analysis for construction projects, mobilization delays, oil & gas projects delays

Procedia PDF Downloads 288
38799 MOOCs (E-Learning) Project Personnel Competency Analysis

Authors: Shang-Hua Wu, Rong-Chi Chang, Horng–Twu Liaw

Abstract:

Nowadays, competencies of e-learning project personnel are very important in assisting them in offering courses, serving students in an effective way, leveraging advantages, strengthen their relationships with potential students, etc. among e-learning platforms, MOOCs has recently attracted increasing focuses in distance education since it can be conducted for a large numbers of virtual learners. Nonetheless, since MOOCs is a relatively new e-learning platform, top concerns have been paid to what competencies are important for e-learning personnel to consider. Taking this need, this research aimed to carry out an in-depth exploration of competency requirements of MOOCs (e-learning) project personnel in Taiwan vocational schools. Data were collected through thorough literature reviews and discussions and competency analysis was carried out using Delphi technique questionnaires. The results show that that MOOCs (e-learning) project personnel’ professional competency lie in three main dimensions, among which ‘demand analysis competency’ (i.e., containing 10 major competences and 48 subordinate capabilities) is the most important competency, followed by ‘project management competency’ (i.e., comprising 6 major competences and 31 secondary capabilities), and finally ‘digital content production competency’ (i.e., including 12 major competences and 79 secondary capabilities). As such, in Taiwan context with different organizational scales and market sizes, the e-learning competency items and unique experience/ achievements throughout the promotion process obtained in this research will provide useful references for academic institutions in promoting e-learning.

Keywords: competency analysis, Delphi technique questionnaire, e-learning, massive open online courses

Procedia PDF Downloads 257
38798 Relevance of the Tokyo Trial: A Comparative Perspective

Authors: Nalanda Roy

Abstract:

The project will offer a fresh and critical perspective into the Tokyo Trial judgment led by the Indian Jurist Dr. Radha Binod Pal. The project will focus on the Third World Approach to International Law (TWAIL) methodology to examine the relevance of international law from the post-colonial perspectives. The project will analyze Pal’s dissenting arguments from a new and comparative perspective, apply for work from other disciplines, and create an understanding of the significance of the historic judgment considering its contemporary relevance, and fill in the gaps that exist in the call for global justice.

Keywords: Tokyo trial, third world, judgment, international law

Procedia PDF Downloads 65
38797 Extraction of Grapefruit Essential Oil from Grapefruit Peels

Authors: Adithya Subramanian, S. Ananthan, T. Prasanth, S. P. Selvabharathi

Abstract:

This project involves extraction of grapefruit essential oil from grapefruit peels using various oils like castor oil, gingelly oil, olive oil as carrier oils. The main aim of this project is to extract the oil which has numerous medicinal uses. The extraction can be performed by two methods. Project involves extraction of the oil with various carrier oil in a view to reduce the cost of production and the physical properties of the extracted oil are examined.

Keywords: essential oil, carrier oil, medicinal uses, cost of production

Procedia PDF Downloads 404
38796 Efficacy of Remote Sensing Application in Monitoring the Effectiveness of Afforestation Project in Northern Nigeria

Authors: T. Garba, Y. Y. Babanyara, K. G. Ilellah, M. A. Modibbo, T. O. Quddus, M. J. Sani

Abstract:

After the United Nation Convention on Desertification (UNCD) in 1977 which was preceded by extensive, regional, and local studies, and consultations with numerous scientists, decision-makers, and relevant institutions. Global Plan of Action to Combat Desertification (PACD) was formulated, endorsed by member Countries. The role of implementing PACD was vested with Governments of countries affected by desertification. The Federal Government of Nigeria as a signatory and World Bank funded and implement afforestation project aimed at combating desertification between 1988 and 1999. This research, therefore, applied remote sensing techniques to assess the effectiveness of the project. To achieve that a small portion of about 143,609 hectares was curved out from the project area. Normalized Difference of the Vegetative Index (NDVI) and Land Use Land Cover were derived from Landsat TM 1986, Landsat ETM 1999 and Nigeria Sat 1, 2007 of the project area. The findings show that there was an increase in cultivated area due to the project from 1986 through 1999 and 2007. This is further buttressed by the three NDVI imageries due to their high positive pixel value from 0.04 in 1986 to 0.22 in 1999 and to 0.32 in 2007 These signifies the gradual physical development of Afforestation project in the area. In addition, it was also verified by histograms of changes in vegetation which indicated an increased vegetative cover from 60,192 in 1986, to 102,476 in 1999 and then to 88,343 in 2007. The study concluded that Remote Sensing approach has actually confirmed that the project was indeed successful and effective.

Keywords: afforestation, desertification, landsat, vegetative index, remote sensing

Procedia PDF Downloads 295
38795 Analyze and Improve Project Delivery Time Enhancing Business Management System of Review and Approval Process for Project Design Submittals

Authors: Abdulaziz Alnajem, Amit Sharma

Abstract:

Business Case: Project delivery and enhancing activities' completion in the shortest possible time is critical during execution to proceed with the subsequent phases of Procurement, C & C phases of Contracts to have the required Production facilities/Infrastructure in place to achieve the Company strategic objective of 4.0 MBOPD oil production. SOR (Statement of requirement): Design and Engineering phase of Projects execution takes a long time. It is observed that, in most of the cases, company has crossed the Project Design Submittals review time as per the Contract/Company Standards, resulting into delays in projects completion, and cost impact to the company. Study Scope: Scope of the study covers the process from date of first submission of D & E documents by the contractor to final approval by the controlling team to proceed with the procurement of materials. This scope covers projects handled by the company’s project management teams and includes only the internal review process by the company.

Keywords: business management system, project management, oil and gas, analysis, improvement, design, delays

Procedia PDF Downloads 189
38794 Kiira EV Project Transition from Student to Professional Team through Project-Based Skills Development

Authors: Doreen Orishaba, Paul Isaac Musasizi, Richard Madanda, Sandy Stevens Tickodri-Togboa

Abstract:

The world of academia tends to be a very insular place. Consequently, scholars who successfully completed their undergraduate and graduate studies are unpleasantly surprised at how challenging the transition to corporate life can get. This is a global trend even as the students who juggle work with attending some of the most demanding and best graduate programs may not easily adjust to and confirm to the professionalism required for corporate management of the industry. This paper explores the trends in the transition of Kiira EV Project from a predominantly student team to a professional team of a national pride program through mentorship and apprenticeship. The core disciplines within the Kiira EV Project include Electrical and Electronics Engineering, Mechanical Engineering, and Industrial Design.

Keywords: mentorship, apprenticeship, professional, development

Procedia PDF Downloads 377
38793 Effects of Main Contractors’ Service Quality on Subcontractors’ Behaviours and Project Outcomes

Authors: Zhuoyuan Wang, Benson T. H. Lim, Imriyas Kamardeen

Abstract:

Effective service quality management has long been touted as a means of improving project and organisational performance. Particularly, in construction projects, main contractors are often seen as a broker between clients and subcontractors, and their service quality is thus associated with the overall project affinity and outcomes. While a considerable amount of research has focused on the aspect of clients-main contractors, very little research has been done to explore the effect of contractors’ service quality on subcontractors’ behaviours and so project outcomes. In addressing this gap, this study surveyed 97 subcontractors in the Chinese Construction industry and data was analysed using the Partial Least Square (PLS) Structural Equation Modelling (SEM) technique. The overall findings reveal that subcontractors categorised main contractors’ service quality into three dimensions: assurance; responsiveness; reliability and empathy. Of these, it is found that main contractors’ ‘assurance’ and ‘responsiveness’ positively influence subcontractors’ intention to engage in contractual behaviours. The results further show that the subcontractors’ intention to engage in organizational citizenship behaviours is associated with how flexible and committed the main contractors are in reliability and empathy. Collectively, both subcontractors’ contractual and organizational citizenship behaviours positively influence the overall project outcomes. In conclusion, the findings inform contractors different strategies towards managing and gaining subcontractors’ behaviour commitment in a socially connected, yet complex and uncertain, business environment.

Keywords: construction firms, organisational citizenship behaviour, service quality, social exchange theory

Procedia PDF Downloads 169
38792 Implementation of Social Network Analysis to Analyze the Dependency between Construction Bid Packages

Authors: Kawalpreet Kaur, Panagiotis Mitropoulos

Abstract:

The division of the project scope into work packages is the most important step in the preconstruction phase of construction projects. The work division determines the scope and complexity of each bid package, resulting in dependencies between project participants performing these work packages. The coordination between project participants is necessary because of these dependencies. Excessive dependencies between the bid packages create coordination difficulties, leading to delays, added costs, and contractual friction among project participants. However, the literature on construction provides limited knowledge regarding work structuring approaches, issues, and challenges. Manufacturing industry literature provides a systematic approach to defining the project scope into work packages, and the implementation of social network analysis (SNA) in manufacturing is an effective approach to defining and analyzing the divided scope of work at the dependencies level. This paper presents a case study of implementing a similar approach using SNA in construction bid packages. The study uses SNA to analyze the scope of bid packages and determine the dependency between scope elements. The method successfully identifies the bid package with the maximum interaction with other trade contractors and the scope elements that are crucial for project performance. The analysis provided graphical and quantitative information on bid package dependencies. The study can be helpful in performing an analysis to determine the dependencies between bid packages and their scope elements and how these scope elements are critical for project performance. The study illustrates the potential use of SNA as a systematic approach to analyzing bid package dependencies in construction projects, which can guide the division of crucial scope elements to minimize negative impacts on project performance.

Keywords: work structuring, bid packages, work breakdown, project participants

Procedia PDF Downloads 56
38791 Escalation of Commitment and Turnover in Top Management Teams

Authors: Dmitriy V. Chulkov

Abstract:

Escalation of commitment is defined as continuation of a project after receiving negative information about it. While literature in management and psychology identified various factors contributing to escalation behavior, this phenomenon has received little analysis in economics, potentially due to the apparent irrationality of escalation. In this study, we present an economic model of escalation with asymmetric information in a principal-agent setup where the agents are responsible for a project selection decision and discover the outcome of the project before the principal. Our theoretical model complements the existing literature on several accounts. First, we link the incentive to escalate commitment to a project with the turnover decision by the manager. When a manager learns the outcome of the project and stops it that reveals that a mistake was made. There is an incentive to continue failing projects and avoid admitting the mistake. This incentive is enhanced when the agent may voluntarily resign from the firm before the outcome of the failing project is revealed, and thus not bear the full extent of reputation damage due to project failure. As long as some successful managers leave the firm for extraneous reasons, outside firms find it difficult to link failing projects with certainty to managers that left a firm. Second, we demonstrate that non-CEO managers have reputation concerns separate from those of the CEO, and thus may escalate commitment to projects they oversee, when such escalation can attenuate damage to reputation from impending project failure. Such incentive for escalation will be present for non-CEO managers if the CEO delegates responsibility for a project to a non-CEO executive. If reputation matters for promotion to the CEO, the incentive for a rising executive to escalate in order to protect reputation is distinct from that of a CEO. Third, our theoretical model is supported by empirical analysis of changes in the firm’s operations measured by the presence of discontinued operations at the time of turnover among the top four members of the top management team. Discontinued operations are indicative of termination of failing projects at a firm. The empirical results demonstrate that in a large dataset of over three thousand publicly traded U.S. firms for a period from 1993 to 2014 turnover by top executives significantly increases the likelihood that the firm discontinues operations. Furthermore, the type of turnover matters as this effect is strongest when at least one non-CEO member of the top management team leaves the firm and when the CEO departure is due to a voluntary resignation and not to a retirement or illness. Empirical results are consistent with the predictions of the theoretical model and suggest that escalation of commitment is primarily observed in decisions by non-CEO members of the top management team.

Keywords: discontinued operations, escalation of commitment, executive turnover, top management teams

Procedia PDF Downloads 344