5641 Contractor Selection by Using Analytical Network Process

Authors: Badr A. Al-Jehani

Abstract:

Nowadays, contractor selection is a critical activity of the project owner. Selecting the right contractor is essential to the project manager for the success of the project, and this cab happens by using the proper selecting method. Traditionally, the contractor is being selected based on his offered bid price. This approach focuses only on the price factor and forgetting other essential factors for the success of the project. In this research paper, the Analytic Network Process (ANP) method is used as a decision tool model to select the most appropriate contractor. This decision-making method can help the clients who work in the construction industry to identify contractors who are capable of delivering satisfactory outcomes. Moreover, this research paper provides a case study of selecting the proper contractor among three contractors by using ANP method. The case study identifies and computes the relative weight of the eight criteria and eleven sub-criteria using a questionnaire.

Keywords: contractor selection, project management, decision-making, bidding

Procedia PDF Downloads 69
5640 A Comparative Analysis of Safety Orientation and Safety Performance in Organizations: A Project Management Perspective

Authors: Dina Alfreahat, Zoltan Sebestyen

Abstract:

Safety is considered as one of the project’s success factors. Poor safety management may result in accidents that impact human, economic, and legal issues. Therefore, it is necessary to consider safety and health as a project success factor along with other project success factors, such as time, cost, and quality. Organizations have a knowledge deficit of the implementation of long-term safety practices, and due to cost control, safety problems tend to receive the least priority. They usually assume that safety management involves expenditures unrelated to production goals, thereby considering it unnecessary for profitability and competitiveness. The purpose of this study is to introduce, analysis and identify the correlation between the orientation of the public safety procedures of an organization and the public safety standards applied in the project. Therefore, the authors develop the process and collect the possible mathematical-statistical tools supporting the previously mentioned goal. The result shows that the adoption of management to safety is a major factor in implementing the safety standard in the project and thereby improving safety performance. It may take time and effort to adopt the mindset of safety orientation service development, but at the same time, the higher organizational investment in safety and health programs will contribute to the loyalty of staff to safety compliance.

Keywords: project management perspective, safety orientation, safety performance, safety standards

Procedia PDF Downloads 146
5639 Project Time Prediction Model: A Case Study of Construction Projects in Sindh, Pakistan

Authors: Tauha Hussain Ali, Shabir Hussain Khahro, Nafees Ahmed Memon

Abstract:

Accurate prediction of project time for planning and bid preparation stage should contain realistic dates. Constructors use their experience to estimate the project duration for the new projects, which is based on intuitions. It has been a constant concern to both researchers and constructors to analyze the accurate prediction of project duration for bid preparation stage. In Pakistan, such study for time cost relationship has been lacked to predict duration performance for the construction projects. This study is an attempt to explore the time cost relationship that would conclude with a mathematical model to predict the time for the drainage rehabilitation projects in the province of Sindh, Pakistan. The data has been collected from National Engineering Services (NESPAK), Pakistan and regression analysis has been carried out for the analysis of results. Significant relationship has been found between time and cost of the construction projects in Sindh and the generated mathematical model can be used by the constructors to predict the project duration for the upcoming projects of same nature. This study also provides the professionals with a requisite knowledge to make decisions regarding project duration, which is significantly important to win the projects at the bid stage.

Keywords: BTC Model, project time, relationship of time cost, regression

Procedia PDF Downloads 356
5638 The Academic Achievement of Writing via Project-Based Learning

Authors: Duangkamol Thitivesa

Abstract:

This paper focuses on the use of project work as a pretext for applying the conventions of writing, or the correctness of mechanics, usage, and sentence formation, in a content-based class in a Rajabhat University. Its aim was to explore to what extent the student teachers’ academic achievement of the basic writing features against the 70% attainment target after the use of project is. The organization of work around an agreed theme in which the students reproduce language provided by texts and instructors is expected to enhance students’ correct writing conventions. The sample of the study comprised of 38 fourth-year English major students. The data was collected by means of achievement test and student writing works. The scores in the summative achievement test were analyzed by mean score, standard deviation, and percentage. It was found that the student teachers do more achieve of practicing mechanics and usage, and less in sentence formation. The students benefited from the exposure to texts during conducting the project; however, their automaticity of how and when to form phrases and clauses into simple/complex sentences had room for improvement.

Keywords: project-based learning, project work, writing conventions, academic achievement

Procedia PDF Downloads 305
5637 Enhancing Construction Project Management through Cognitive Science and Neuroimaging: A Comprehensive Literature Review

Authors: Krishna Kisi, Tulio Sulbaran

Abstract:

This literature review offers valuable insights into integrating cognitive science and neuroimaging with project management practices, presenting a crucial resource for leadership within the construction industry. This paper highlights the significant benefits of applying interdisciplinary approaches to enhance project management effectiveness and project outcomes by exploring the intricate connections between cognitive processes, decision-making, and project management. Key findings emphasize the critical role of cognitive status in determining the performance and project outcomes of construction workers, underlining the necessity for leadership to prioritize cognitive well-being and mental health as central components of project management strategies. The review identifies a gap in current practices, particularly the need for more objective tools for assessing cognitive status within the construction sector, and proposes the adoption of neuroimaging technologies to bridge this gap. The study highlights how integrating cognitive psychology and neuroscience clarifies decision-making processes, aiding leaders in comprehending the mental constraints and biases that influence project decisions. By integrating neuroscientific insights with traditional management practices, leaders can enhance their strategies for training, team dynamics, and risk assessment, ultimately leading to more informed, efficient, and productive construction project management. This comprehensive literature review underscores the importance of adopting an interdisciplinary approach to leadership and management within high-risk industries. It provides a foundation for construction project managers to leverage cognitive science and neuroimaging advancements to improve efficiency, productivity, and decision-making in construction projects' complex and dynamic environments.

Keywords: decision making, literature review, neuroimaging, project management

Procedia PDF Downloads 13
5636 Sustainable Framework Integration for Construction Project Management: A Multi-Dimensional Analysis

Authors: Tharaki S. Hettiarachchi

Abstract:

Sustainable construction has gained massive attention in the present world as the construction industry is highly responsible for carbon emissions and other types of unsustainable practices. Yet, the construction industry has not been able to completely attain sustainable goals. Therefore, the present study aims to identify the extent to which sustainability has been considered within the scope of construction project management and to analyze the challenges, gaps, and constraints associated. Accordingly, this study develops a sustainable framework to integrate in construction project management. In accomplishing the research aim, this research integrates a qualitative approach while relying on secondary data sources. The data shall be then analyzed with the use of a systematic literature review (SLR) method while following the PRISMA (2020) guideline and represented in a statistical form. The outcomes of this study may become highly significant in identifying the nature of the existing sustainable frameworks associated with construction project management scopes and to develop a new framework to integrate in order to enhance the effectiveness of sustainable applications in construction management. The outcomes of this research may benefit present and future construction professionals and academicians to organize sustainable construction-related knowledge in a useful way to apply in practical implementation for effective project management. Overall, this study directs present and future construction professionals toward an advanced construction project management mechanism.

Keywords: construction, framework development, project management, sustainability

Procedia PDF Downloads 30
5635 Cost Overruns in Mega Projects: Project Progress Prediction with Probabilistic Methods

Authors: Yasaman Ashrafi, Stephen Kajewski, Annastiina Silvennoinen, Madhav Nepal

Abstract:

Mega projects either in construction, urban development or energy sectors are one of the key drivers that build the foundation of wealth and modern civilizations in regions and nations. Such projects require economic justification and substantial capital investment, often derived from individual and corporate investors as well as governments. Cost overruns and time delays in these mega projects demands a new approach to more accurately predict project costs and establish realistic financial plans. The significance of this paper is that the cost efficiency of megaprojects will improve and decrease cost overruns. This research will assist Project Managers (PMs) to make timely and appropriate decisions about both cost and outcomes of ongoing projects. This research, therefore, examines the oil and gas industry where most mega projects apply the classic methods of Cost Performance Index (CPI) and Schedule Performance Index (SPI) and rely on project data to forecast cost and time. Because these projects are always overrun in cost and time even at the early phase of the project, the probabilistic methods of Monte Carlo Simulation (MCS) and Bayesian Adaptive Forecasting method were used to predict project cost at completion of projects. The current theoretical and mathematical models which forecast the total expected cost and project completion date, during the execution phase of an ongoing project will be evaluated. Earned Value Management (EVM) method is unable to predict cost at completion of a project accurately due to the lack of enough detailed project information especially in the early phase of the project. During the project execution phase, the Bayesian adaptive forecasting method incorporates predictions into the actual performance data from earned value management and revises pre-project cost estimates, making full use of the available information. The outcome of this research is to improve the accuracy of both cost prediction and final duration. This research will provide a warning method to identify when current project performance deviates from planned performance and crates an unacceptable gap between preliminary planning and actual performance. This warning method will support project managers to take corrective actions on time.

Keywords: cost forecasting, earned value management, project control, project management, risk analysis, simulation

Procedia PDF Downloads 361
5634 Through Integrated Project Management and Systems Engineering to Support System Design Development: A Project Management-based Systems Engineering Approach

Authors: Xiaojing Gao, James Njuguna

Abstract:

This paper emphasizes the importance of integrating project management and systems engineering for innovative system design and production development. The research highlights the need for a flexible approach that unifies these disciplines, as their isolation often leads to communication challenges and complexity within multidisciplinary teams. The paper aims to elucidate the intricate relationship between project management and systems engineering, recommending the consolidation of engineering disciplines into a single lifecycle for improved support of the design and development process. The research identifies a synergy between these disciplines, focusing on streamlining information communication during product design and development. The insights gained from this process can lead to product design optimization. Additionally, the paper introduces a proposed Project Management-Based Systems Engineering (PMBSE) framework, emphasizing effective communication, efficient processes, and advanced tools to enhance product development outcomes within the product lifecycle.

Keywords: system engineering, product design and development, project management, cross-disciplinary

Procedia PDF Downloads 40
5633 Enhancing Project Success: A Case Study of Investment Strategies and Planning Practices in Rwanda’s Housing Projects Managed by Rwanda Social Security Board

Authors: Amina Umulisa

Abstract:

Background: Despite efforts to enhance profitability and project planning, Rwanda has experienced a decline in project success rates, notably in housing projects managed by the Rwanda Social Security Board (RSSB). This study aims to assess the impact of investment strategies and project planning practices on the performance of pension funds projects in Rwanda, focusing on housing projects by RSSB. Methods: Using descriptive and correlational research designs, this study surveyed 109 randomly selected respondents from a pool of 148 workers. Data analysis was conducted using descriptive and inferential statistics in STATA version 18. Results: Findings revealed that 54% of respondents acknowledged the importance of personnel generation. Additionally, 61% agreed with the effectiveness of training programs, and 79% supported the cost of human resource utilization. In terms of project management practices, 65.7% could determine when a project needed adjustments, 65.7% agreed with the approved budget, and 73% supported forecasted expenses. Furthermore, 68% agreed with order placement, 76.0% with using the right materials, and 64.4% with defining project scope. The study found significant associations between order placement and project quality outcomes (r=0.711, P-value <0.001), as well as with time management (Pearson was 0.701 and sing was 0.00) and cost management (r=0.885, P-value <0.001). Moreover, project time targets were found to significantly affect quality management (Pearson was 0.798, sing was 0.000), time management, and cost management (r=0.740, P-value <0.001). Conclusion: The findings highlight the positive association between the project implementation stage and quality management, indicating effective project planning practices among senior staff. However, there is a need to enhance project team collaboration and coordination to improve the performance of constructed houses.

Keywords: project success rates, investment strategies, training programs, cost management

Procedia PDF Downloads 17
5632 A Review of the Major Factors of Cost Overrun in Construction Projects

Authors: Hassan Abdelgadir

Abstract:

Cost overruns have harmed the economies and reputations of several construction companies around the world. Many project management systems have been developed to keep track of a project's budget. However, due to several cost overrun difficulties in the construction industry, cost management is still deemed inadequate. As a result, the goal of this term paper is to identify and group prospective construction project cost overrun reasons based on their origin groups.Basically, all potential cost overrun elements were rigorously checked through 1iterature analysis before being divided into seven (7) groups of originating components, including project, contract, client, contractor, consultant, labor, and external. Each potential factor was completely defined with examples.

Keywords: construction projects, cost overruns, construction company, factors effect costoverruns

Procedia PDF Downloads 39
5631 Power Line Communication Integrated in a Wireless Power Transfer System: Feasibility of Surveillance Movement

Authors: M. Hemnath, S. Kannan, R. Kiran, K. Thanigaivelu

Abstract:

This paper is based on exploring the possible opportunities and applications using Power Line Communication (PLC) for security and surveillance operations. Various research works are done for introducing PLC into onboard vehicle communication and networking (CAN, LIN etc.) and various international standards have been developed. Wireless power transfer (WPT) is also an emerging technology which is studied and tested for recharging purposes. In this work we present a system which embeds the detection and the response into one which eliminates the need for dedicated network for data transmission. Also we check the feasibility for integrating wireless power transfer system into this proposed security system for transmission of power to detection unit wirelessly from the response unit.

Keywords: power line communication, wireless power transfer, surveillance

Procedia PDF Downloads 496
5630 A Knowledge-Based Development of Risk Management Approaches for Construction Projects

Authors: Masoud Ghahvechi Pour

Abstract:

Risk management is a systematic and regular process of identifying, analyzing and responding to risks throughout the project's life cycle in order to achieve the optimal level of elimination, reduction or control of risk. The purpose of project risk management is to increase the probability and effect of positive events and reduce the probability and effect of unpleasant events on the project. Risk management is one of the most fundamental parts of project management, so that unmanaged or untransmitted risks can be one of the primary factors of failure in a project. Effective risk management does not apply to risk regression, which is apparently the cheapest option of the activity. However, the main problem with this option is the economic sensitivity, because what is potentially profitable is by definition risky, and what does not pose a risk is economically interesting and does not bring tangible benefits. Therefore, in relation to the implemented project, effective risk management is finding a "middle ground" in its management, which includes, on the one hand, protection against risk from a negative direction by means of accurate identification and classification of risk, which leads to analysis And it becomes a comprehensive analysis. On the other hand, management using all mathematical and analytical tools should be based on checking the maximum benefits of these decisions. Detailed analysis, taking into account all aspects of the company, including stakeholder analysis, will allow us to add what will become tangible benefits for our project in the future to effective risk management. Identifying the risk of the project is based on the theory that which type of risk may affect the project, and also refers to specific parameters and estimating the probability of their occurrence in the project. These conditions can be divided into three groups: certainty, uncertainty, and risk, which in turn support three types of investment: risk preference, risk neutrality, specific risk deviation, and its measurement. The result of risk identification and project analysis is a list of events that indicate the cause and probability of an event, and a final assessment of its impact on the environment.

Keywords: risk, management, knowledge, risk management

Procedia PDF Downloads 29
5629 Feasibility Study of the Quadcopter Propeller Vibrations for the Energy Production

Authors: Nneka Osuchukwu, Leonid Shpanin

Abstract:

The concept of converting the kinetic energy of quadcopter propellers into electrical energy is considered in this contribution following the feasibility study of the propeller vibrations, theoretical energy conversion, and simulation techniques. Analysis of the propeller vibration performance is presented via graphical representation of calculated and simulated parameters, in order to demonstrate the possibility of recovering the harvested energy from the propeller vibrations of the quadcopter while the quadcopter is in operation. Consideration of using piezoelectric materials in such concept, converting the mechanical energy of the propeller into the electrical energy, is given. Photographic evidence of the propeller in operation is presented and discussed together with experimental results to validate the theoretical concept.

Keywords: energy harvesting, piezoelectric material, propeller vibration, unmanned aerial vehicle

Procedia PDF Downloads 444
5628 Project Management Tools within SAP S/4 Hana Program Environment

Authors: Jagoda Bruni, Jan Müller-Lucanus, Gernot Stöger-Knes

Abstract:

The purpose of this article is to demonstrate modern project management approaches in the SAP S/R Hana surrounding a programming environment composed of multiple focus-diversified projects. We would like to propose innovative and goal-oriented management standards based on the specificity of the SAP transformations and customer-driven expectations. Due to the regular sprint-based controlling and management tools' application, it has been data-proven that extensive analysis of productive hours of the employees as much as a thorough review of the project progress (per GAP, per business process, and per Lot) within the whole program, can have a positive impact on customer satisfaction and improvement for projects' budget. This has been a collaborative study based on real-life experience and measurements in collaboration with our customers.

Keywords: project management, program management, SAP, controlling

Procedia PDF Downloads 52
5627 A Strategic Partner Evaluation Model for the Project Based Enterprises

Authors: Woosik Jang, Seung H. Han

Abstract:

The optimal partner selection is one of the most important factors to pursue the project’s success. However, in practice, there is a gaps in perception of success depending on the role of the enterprises for the projects. This frequently makes a relations between the partner evaluation results and the project’s final performances, insufficiently. To meet this challenges, this study proposes a strategic partner evaluation model considering the perception gaps between enterprises. A total 3 times of survey was performed; factor selection, perception gap analysis, and case application. After then total 8 factors are extracted from independent sample t-test and Borich model to set-up the evaluation model. Finally, through the case applications, only 16 enterprises are re-evaluated to “Good” grade among the 22 “Good” grade from existing model. On the contrary, 12 enterprises are re-evaluated to “Good” grade among the 19 “Bad” grade from existing model. Consequently, the perception gaps based evaluation model is expected to improve the decision making quality and also enhance the probability of project’s success.

Keywords: partner evaluation model, project based enterprise, decision making, perception gap, project performance

Procedia PDF Downloads 127
5626 Detailed Feasibility and Design of a Grid-Tied PV and Building Integrated Photovoltaic System for a Commercial Healthcare Building

Authors: Muhammad Ali Tariq

Abstract:

Grid-connected PV systems have drawn tremendous attention of researchers in the past recent years. The report elucidates the development of efficient and stable solar PV energy conversion systems after thorough analysis at various facets like PV module characteristics, its arrangement, power electronics and MPPT topologies, the stability of the grid, and economic viability over its lifetime. This report and feasibility study will try to bring all optimizing approaches and design calculations which are required for generating energy from BIPV and roof-mounted solar PV in a convenient, sustainable, and user-friendly way.

Keywords: building integrated photovoltaic system, grid integration, solar resource assessment, return on investment, multi MPPT-inverter, levelised cost of electricity

Procedia PDF Downloads 105
5625 An Investigation of Project-Based Learning: A Case Study of Tourism Students

Authors: Benjaporn Yaemjamuang

Abstract:

The purposes of this study were to investigate the success of project-based learning and to evaluate the performance and level of satisfaction of tourism students who participated in the study. This paper drew upon a data collection from a senior tourism students survey conducted in Rajamangala University during summer 2013. The purposive sampling was utilized to obtain the sample which included 45 tourism students. The pretest and posttest method was utilized. The findings revealed that the majority of respondents had gained higher knowledge after the posttest significantly. The respondents’ knowledge increased about 53.33 percent from pretest to posttest. Also, the findings revealed the top three highest level of satisfaction as follows: 1) the role of teacher and students, 2) the research activities of the project-based learning, 3) the learning methods of the project-based learning. Moreover, the mean score of all categories was 3.98 with a standard deviation of 0.88 which indicated that the average level of satisfaction was high.

Keywords: performance, project-based learning, satisfaction, tourism

Procedia PDF Downloads 265
5624 Cross Project Software Fault Prediction at Design Phase

Authors: Pradeep Singh, Shrish Verma

Abstract:

Software fault prediction models are created by using the source code, processed metrics from the same or previous version of code and related fault data. Some company do not store and keep track of all artifacts which are required for software fault prediction. To construct fault prediction model for such company, the training data from the other projects can be one potential solution. The earlier we predict the fault the less cost it requires to correct. The training data consists of metrics data and related fault data at function/module level. This paper investigates fault predictions at early stage using the cross-project data focusing on the design metrics. In this study, empirical analysis is carried out to validate design metrics for cross project fault prediction. The machine learning techniques used for evaluation is Naïve Bayes. The design phase metrics of other projects can be used as initial guideline for the projects where no previous fault data is available. We analyze seven data sets from NASA Metrics Data Program which offer design as well as code metrics. Overall, the results of cross project is comparable to the within company data learning.

Keywords: software metrics, fault prediction, cross project, within project.

Procedia PDF Downloads 310
5623 Feasibility of Leukemia Cancer Treatment (K562) by Atmospheric Pressure Plasma Jet

Authors: Mashayekh Amir Shahriar, Akhlaghi Morteza, Rajaee Hajar, Khani Mohammad Reza, Shokri Babak

Abstract:

A new and novel approach in medicine is the use of cold plasma for various applications such as sterilization blood coagulation and cancer cell treatment. In this paper a pin-to-hole plasma jet suitable for biological applications is investigated, characterized and the possibility and feasibility of cancer cell treatment is evaluated. The characterization includes power consumption via Lissajous method, thermal behavior of plasma using Infra-red camera as a novel method, Optical Emission Spectroscopy (OES) to determine the species that are generated. Treatment of leukemia cancer cells is also implemented and MTT assay is used to evaluate viability.

Keywords: Atmospheric Pressure Plasma Jet (APPJ), Plasma Medicine, Cancer cell treatment, leukemia, Optical Emission

Procedia PDF Downloads 622
5622 Cultural Snapshot: A Reflection on Project-Based Model of Cross-Cultural Understanding in Teaching and Learning

Authors: Kunto Nurcahyoko

Abstract:

The fundamental perception used in this study is that teaching and learning activities in Indonesian classroom have potentially generated individual’s sensitivity on cross-cultural understanding. This study aims at investigating Indonesian university students’ perception on cross-cultural understanding after doing Cultural Snapshot Project. The data was critically analyzed through multicultural ideology and diversity theories. The subjects were 30 EFL college students in one of colleges in Indonesia. Each student was assigned to capture a photo which depicted the existence of any cultural manifestation in their surrounding such as discrimination, prejudice and stereotype. Students were then requested asked to reflect on the picture by writing a short description on the picture and make an exhibition using their pictures. In the end of the project, students were instructed to fill in questionnaires to show their perception before and after the project. The result reveals that Cultural Snapshot Project has given the opportunity for the students to better realize cross-cultural understanding in their environment. In conclusion, the study shows that Cultural Snapshot Project has specifically enhanced students’ perception of multiculturalism in three major areas: cultural sensitivity and empathy, social tolerance, and understanding of diversity.

Keywords: cultural snapshot, cross-cultural understanding, students’ perception, multiculturalism

Procedia PDF Downloads 285
5621 Strategic Leadership and Sustainable Project Management in Enugu, Nigeria

Authors: Nnadi Ezekiel Ejiofor

Abstract:

In Enugu, Nigeria, this study investigates the connection between strategic leadership and project management sustainability, with an emphasis on building projects in the State. The study set out to accomplish two specific goals: first, it sought to establish a link between creative project management and resource efficiency in construction projects in Enugu State, Nigeria; and second, it sought to establish a link between innovative thinking and waste minimization in those same projects. A structured questionnaire was used to collect primary data from 45 registered construction enterprises in the study area as part of the study's descriptive research approach. Due to the nonparametric nature of the data, Spearman Rank Order Correlation was used to evaluate the acquired data. The findings demonstrate that creative project management had a significant positive impact on resource efficiency in construction projects carried out by architecture firms in Enugu State, Nigeria (r =.849; p.001), and that innovative thinking had a significant impact on waste reduction in those same projects (r =.849; p.001). It was determined that strategic leadership had a significant impact on the sustainability of project management, and it was thus advised that project managers should foresee, prepare for, and effectively communicate present and future developments to project staff in order to ensure that the objective of sustainable initiatives, such as recycling and reuse, is implemented in construction projects.

Keywords: construction, project management, strategic leadership, sustainability, waste reduction

Procedia PDF Downloads 23
5620 Identifying Barriers of Implementing Building Information Modelling in Construction

Authors: Kasra HosseinMostofi, Mohamadamin Oyar Hossein, Reza Mehdizadeh Anvigh

Abstract:

BIM is an innovative concept for the majority of firms operating in industry. BIM offers a new paradigm to design, construct, operate, and maintain a facility. However, even with the most conscientious use, stakeholders can run into trouble during its implementation on a project or within an organization. At times, project stakeholders are unaware of the challenges that they can face with the implementation at the project level or an organizational level. Therefore, the study aimed to identify and compile barriers associated with the BIM implementation at the project and organizational level, as per the literature. Despite the fact that innumerable advantageous involved in exploiting BIM, there are some barriers to implement it properly. These barriers have been proved as impediments for academicians and members of construction team project to take the maximum advantage of its utilization. Although some research has been conducted to identify these barriers regarding BIM implementation in construction industry, more research is needed to be carried out among academicians to identify these barriers in institutions, and most importantly, to make suggestions for eliminating these obstacles.

Keywords: building information modelling, construction, design and construction, designers

Procedia PDF Downloads 147
5619 Projectification: Using Project Management Methodology to Manage the Academic Program Review

Authors: Adam Marks, Munir Majdalawieh, Maytha Al Ali

Abstract:

While research is rich with what criteria could be included in the academic program review processes, there is rarely any mention of how this significant and complex process should be managed. This paper proposes using project management methodology in alignment with the program review criteria of the Dickeson’s Prioritizing Academic Programs model. Project management and academic program review share two distinct characteristics; one is their life cycle, and the second is the core knowledge areas they use. This aligned and structured approach offers academic administrators a step-by-step guide that can help them manage this process and effectively assess academic programs.

Keywords: project management, academic program, program review, education, higher education institution, strategic management

Procedia PDF Downloads 340
5618 Project and Module Based Teaching and Learning

Authors: Jingyu Hou

Abstract:

This paper proposes a new teaching and learning approach-project and Module Based Teaching and Learning (PMBTL). The PMBTL approach incorporates the merits of project/problem based and module based learning methods, and overcomes the limitations of these methods. The correlation between teaching, learning, practice, and assessment is emphasized in this approach, and new methods have been proposed accordingly. The distinct features of these new methods differentiate the PMBTL approach from conventional teaching approaches. Evaluation of this approach on practical teaching and learning activities demonstrates the effectiveness and stability of the approach in improving the performance and quality of teaching and learning. The approach proposed in this paper is also intuitive to the design of other teaching units.

Keywords: computer science education, project and module based, software engineering, module based teaching and learning

Procedia PDF Downloads 460
5617 Creative Applications for Socially Assistive Robots to Support Mental Health: A Patient-Centered Feasibility Study

Authors: Andreas Kornmaaler Hansen, Carlos Gomez Cubero, Elizabeth Jochum

Abstract:

The use of the arts in therapy and rehabilitation is well established, and there is growing recognition of the value of the arts for improving health and well-being across diverse populations. Combining arts with socially assistive robots is a relatively under-explored research area. This paper presents the results of a feasibility study conducted within an existing arts and health program to scope the possibility of combining visual arts with socially assistive robots to promote mental health and well-being. Using a participatory research design with participant-led perspectives, we present the results of our feasibility study with a collaborative drawing robot among an adult population with mild to severe mental illness. We identify key methodological challenges and advantages of working with participatory and human-centered approaches. Based on the results of three pilot workshops with participants and lay health workers, we outline suggestions for authentic engagement with real stakeholders toward the development of socially assistive robots in community health contexts. Working closely with a patient population at all levels of the research process is key for developing tools and interventions that center patient experience and priorities while minimizing the risks of alienating patients and communities.

Keywords: arts and health, visual art, health promotion, mental health, collaborative robots, creativity, socially assistive robots

Procedia PDF Downloads 35
5616 A Data Driven Methodological Approach to Economic Pre-Evaluation of Reuse Projects of Ancient Urban Centers

Authors: Pietro D'Ambrosio, Roberta D'Ambrosio

Abstract:

The upgrading of the architectural and urban heritage of the urban historic centers almost always involves the planning for the reuse and refunctionalization of the structures. Such interventions have complexities linked to the need to take into account the urban and social context in which the structure and its intrinsic characteristics such as historical and artistic value are inserted. To these, of course, we have to add the need to make a preliminary estimate of recovery costs and more generally to assess the economic and financial sustainability of the whole project of re-socialization. Particular difficulties are encountered during the pre-assessment of costs since it is often impossible to perform analytical surveys and structural tests for both structural conditions and obvious cost and time constraints. The methodology proposed in this work, based on a multidisciplinary and data-driven approach, is aimed at obtaining, at very low cost, reasonably priced economic evaluations of the interventions to be carried out. In addition, the specific features of the approach used, derived from the predictive analysis techniques typically applied in complex IT domains (big data analytics), allow to obtain as a result indirectly the evaluation process of a shared database that can be used on a generalized basis to estimate such other projects. This makes the methodology particularly indicated in those cases where it is expected to intervene massively across entire areas of historical city centers. The methodology has been partially tested during a study aimed at assessing the feasibility of a project for the reuse of the monumental complex of San Massimo, located in the historic center of Salerno, and is being further investigated.

Keywords: evaluation, methodology, restoration, reuse

Procedia PDF Downloads 151
5615 Relationship among Teams' Information Processing Capacity and Performance in Information System Projects: The Effects of Uncertainty and Equivocality

Authors: Ouafa Sakka, Henri Barki, Louise Cote

Abstract:

Uncertainty and equivocality are defined in the information processing literature as two task characteristics that require different information processing responses from managers. As uncertainty often stems from a lack of information, addressing it is thought to require the collection of additional data. On the other hand, as equivocality stems from ambiguity and a lack of understanding of the task at hand, addressing it is thought to require rich communication between those involved. Past research has provided weak to moderate empirical support to these hypotheses. The present study contributes to this literature by defining uncertainty and equivocality at the project level and investigating their moderating effects on the association between several project information processing constructs and project performance. The information processing constructs considered are the amount of information collected by the project team, and the richness and frequency of formal communications among the team members to discuss the project’s follow-up reports. Data on 93 information system development (ISD) project managers was collected in a questionnaire survey and analyzed it via the Fisher Test for correlation differences. The results indicate that the highest project performance levels were observed in projects characterized by high uncertainty and low equivocality in which project managers were provided with detailed and updated information on project costs and schedules. In addition, our findings show that information about user needs and technical aspects of the project is less useful to managing projects where uncertainty and equivocality are high. Further, while the strongest positive effect of interactive use of follow-up reports on performance occurred in projects where both uncertainty and equivocality levels were high, its weakest effect occurred when both of these were low.

Keywords: uncertainty, equivocality, information processing model, management control systems, project control, interactive use, diagnostic use, information system development

Procedia PDF Downloads 262
5614 Conflict Causes within Construction Projects; Conflict Interaction across Project Phases

Authors: Abdullah Mohammed Alshehri

Abstract:

The projects in the construction industry have significantly increased, given its contribution to the overall Gross Domestic Product (GDP) of the countries. Reflecting upon the complex nature and involvement of various agents, the study aims to analyze the conflicts cause within construction projects. Therefore, the study strived to come out with understanding the levels of conflict interaction across project phases. However, this conducted by investigating the association between antecedents and apparent conflicts inherent in. The study used a qualitative approach for collecting the data through a quantitative, semi-structured method. Formation of a questionnaire survey has been conducted for over 30 respondents. However, the survey came out with the identification of 25 conflict cause categories, which can take place in different construction project phases, including pre-design phase, pre-construction phase, construction phase, commissioning, and completion phase. For example, conflicts associated with inconsistencies or discrepancies within or between project documents, which took place at tendering time in the pre-construction phase were relatable with the selection of material specifications that should be supplied or used in the construction projects at the construction phase. Its analysis can provide comprehensive understanding, trace the root of the problem, which offers a roadmap to deepen the understanding of the conflict conditions and ‘course of action’ necessary for project management strategy actions toward avoiding or minimizing conflict causes at project life.

Keywords: construction, conflict causes, levels, interaction, phases

Procedia PDF Downloads 147
5613 Feasibility Study of Distributed Lightless Intersection Control with Level 1 Autonomous Vehicles

Authors: Bo Yang, Christopher Monterola

Abstract:

Urban intersection control without the use of the traffic light has the potential to vastly improve the efficiency of the urban traffic flow. For most proposals in the literature, such lightless intersection control depends on the mass market commercialization of highly intelligent autonomous vehicles (AV), which limits the prospects of near future implementation. We present an efficient lightless intersection traffic control scheme that only requires Level 1 AV as defined by NHTSA. The technological barriers of such lightless intersection control are thus very low. Our algorithm can also accommodate a mixture of AVs and conventional vehicles. We also carry out large scale numerical analysis to illustrate the feasibility, safety and robustness, comfort level, and control efficiency of our intersection control scheme.

Keywords: intersection control, autonomous vehicles, traffic modelling, intelligent transport system

Procedia PDF Downloads 428
5612 A Construction Scheduling Model by Applying Pedestrian and Vehicle Simulation

Authors: Akhmad F. K. Khitam, Yi Tai, Hsin-Yun Lee

Abstract:

In the modern research of construction management, the goals of scheduling are not only to finish the project within the limited duration, but also to improve the impact of people and environment. Especially for the impact to the pedestrian and vehicles, the considerable social cost should be estimated in the total performance of a construction project. However, the site environment has many differences between projects. These interactions affect the requirement and goal of scheduling. It is difficult for schedule planners to quantify these interactions. Therefore, this study use 3D dynamic simulation technology to plan the schedule of the construction engineering projects that affect the current space users (i.e., the pedestrians and vehicles). The proposed model can help the project manager find out the optimal schedule to minimize the inconvenience brought to the space users. Besides, a roadwork project and a building renovation project were analyzed for the practical situation of engineering and operations. Then this study integrates the proper optimization algorithms and computer technology to establish a decision support model. The proposed model can generate a near-optimal schedule solution for project planners.

Keywords: scheduling, simulation, optimization, pedestrian and vehicle behavior

Procedia PDF Downloads 107