Search results for: integrated project delivery (IPD)
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 9033

Search results for: integrated project delivery (IPD)

8853 A Heuristic for the Integrated Production and Distribution Scheduling Problem

Authors: Christian Meinecke, Bernd Scholz-Reiter

Abstract:

The integrated problem of production and distribution scheduling is relevant in many industrial applications. Thus, many heuristics to solve this integrated problem have been developed in the last decade. Most of these heuristics use a sequential working principal or a single decomposition and integration approach to separate and solve sub-problems. A heuristic using a multi-step decomposition and integration approach is presented in this paper and evaluated in a case study. The result show significant improved results compared with sequential scheduling heuristics.

Keywords: production and outbound distribution, integrated planning, heuristic, decomposition, integration

Procedia PDF Downloads 395
8852 Genetic Algorithms Multi-Objective Model for Project Scheduling

Authors: Elsheikh Asser

Abstract:

Time and cost are the main goals of the construction project management. The first schedule developed may not be a suitable schedule for beginning or completing the project to achieve the target completion time at a minimum total cost. In general, there are trade-offs between time and cost (TCT) to complete the activities of a project. This research presents genetic algorithms (GAs) multi-objective model for project scheduling considering different scenarios such as least cost, least time, and target time.

Keywords: genetic algorithms, time-cost trade-off, multi-objective model, project scheduling

Procedia PDF Downloads 394
8851 Development of an Intelligent Decision Support System for Smart Viticulture

Authors: C. M. Balaceanu, G. Suciu, C. S. Bosoc, O. Orza, C. Fernandez, Z. Viniczay

Abstract:

The Internet of Things (IoT) represents the best option for smart vineyard applications, even if it is necessary to integrate the technologies required for the development. This article is based on the research and the results obtained in the DISAVIT project. For Smart Agriculture, the project aims to provide a trustworthy, intelligent, integrated vineyard management solution that is based on the IoT. To have interoperability through the use of a multiprotocol technology (being the future connected wireless IoT) it is necessary to adopt an agnostic approach, providing a reliable environment to address cyber security, IoT-based threats and traceability through blockchain-based design, but also creating a concept for long-term implementations (modular, scalable). The ones described above represent the main innovative technical aspects of this project. The DISAVIT project studies and promotes the incorporation of better management tools based on objective data-based decisions, which are necessary for agriculture adapted and more resistant to climate change. It also exploits the opportunities generated by the digital services market for smart agriculture management stakeholders. The project's final result aims to improve decision-making, performance, and viticulturally infrastructure and increase real-time data accuracy and interoperability. Innovative aspects such as end-to-end solutions, adaptability, scalability, security and traceability, place our product in a favorable situation over competitors. None of the solutions in the market meet every one of these requirements by a unique product being innovative.

Keywords: blockchain, IoT, smart agriculture, vineyard

Procedia PDF Downloads 165
8850 Identifying Project Delay Factors in the Australian Construction Industry

Authors: Syed Sohaib Bin Hasib, Hiyam Al-Kilidar

Abstract:

Meeting project deadlines is a major challenge for most construction projects. In this study, perceptions of contractors, clients, and consultants are compared relative to a list of factors derived from the review of the extant literature on project delay. 59 causes (categorized into 8 groups) of project delays were identified from the literature. A survey was devised to get insights and ranking of these factors from clients, consultants & contractors in the Australian construction industry. Findings showed that project delays in the Australian construction industry are mainly the result of skill shortages, interference in execution, and poor coordination and communication between the project stakeholders.

Keywords: construction, delay factors, time delay, australian construction industry

Procedia PDF Downloads 140
8849 Men's Decision Making: The Determinant of Home Delivery among Women in Khyber Pakhtunkhwa Pakistan

Authors: Hussain Ali, Ahmad Ali, Syed Rashid Ali

Abstract:

The maternal mortality is one of the basic health issues faced by rural women in Pakistan. There are various structural and socio-cultural determinants which confine women to domestic sphere. Such mobility restriction compels women for home delivery which causes high maternal mortality and morbidity. However, it is hard to find out the research findings and well-organized literature that explain the cultural factors act as determinant to home delivery among Pakhtun women. The overall objective of this research is to study men’s decision making within the household in Pakhtun society as determinant of home delivery among Pakhtun women in Khyber Pakhtunkhwa province of Pakistan. In the present study, researchers used the quantitative research design in which the data are collected through household survey technique from (n=503) ever-married women having reproductive age (15-49 years) by using interview schedule. The data are analyzed through SPSS, and binary logistic regression was applied to draw the association between home as a place of delivery and men’s decision making in the Pakhtun society. The results show that majority (76%) of the husbands are key decision makers about the home delivery due to their superior position within household. Similarly, majority (88%) Pakhtun women prefer to stay in home for their delivery due to their dependency on husband’s decision. The researcher concludes that men are key decision makers in Pakhtun society and their decisions affect women maternal health care. Similarly, the women are in subordinate position, and their limited decision making in the domestic sphere are greatly responsible for home delivery which causing high maternal mortality rate in the study area. In order to achieve Sustainable Development Goal No. 3, the study recommends empowering women in the decision making about accessing and utilizing maternal health care services and given financial autonomy to them.

Keywords: home delivery, men’s decision, Pakhtun women, subordinate position

Procedia PDF Downloads 112
8848 Improving Public Service Delivery by E-Governance

Authors: Aneri Mehta, Neeti Chaudhary

Abstract:

Governments of the countries around the world have started utilizing the potential of technology to deliver online information and services to their citizens. Using ICT in the form of e-governance could yield great benefits in the reform and modernization of the public sector. The experience of e-governance in a number of developed and developing countries has shown that ICT can be a tool for greater service delivery with the goal of improving service quality. E-governance can also promote ‘good governance’, greater civic engagement can increase opportunities for direct representation and voice, and support for increased democracy. This paper discusses and presents the survey findings that seek to test the role of e-governance in improving service delivery by altering the principal-agent relationship. It further seeks to elucidate the quality aspects of public service. Strong leadership is required to implement e-governance to capture and internalize the benefits of quality services and satisfied citizens.

Keywords: public service, service delivery, e-governance, good governance

Procedia PDF Downloads 441
8847 Building Information Management Advantages, Adaptation, and Challenges of Implementation in Kabul Metropolitan Area

Authors: Mohammad Rahim Rahimi, Yuji Hoshino

Abstract:

Building Information Management (BIM) at recent years has widespread consideration on the Architecture, Engineering and Construction (AEC). BIM has been bringing innovation in AEC industry and has the ability to improve the construction industry with high quality, reduction time and budget of project. Meanwhile, BIM support model and process in AEC industry, the process include the project time cycle, estimating, delivery and generally the way of management of project but not limited to those. This research carried the BIM advantages, adaptation and challenges of implementation in Kabul region. Capital Region Independence Development Authority (CRIDA) have responsibilities to implement the development projects in Kabul region. The method of study were considers on advantages and reasons of BIM performance in Afghanistan based on online survey and data. Besides that, five projects were studied, the reason of consideration were many times design revises and changes. Although, most of the projects had problems regard to designing and implementation stage, hence in canal project was discussed in detail with the main reason of problems. Which were many time changes and revises due to the lack of information, planning, and management. In addition, two projects based on BIM utilization in Japan were also discussed. The Shinsuizenji Station and Oita River dam projects. Those are implemented and implementing consequently according to the BIM requirements. The investigation focused on BIM usage, project implementation process. Eventually, the projects were the comparison with CRIDA and BIM utilization in Japan. The comparison will focus on the using of the model and the way of solving the problems based upon on the BIM. In conclusion, that BIM had the capacity to prevent many times design changes and revises. On behalf of achieving those objectives are required to focus on data management and sharing, BIM training and using new technology.

Keywords: construction information management, implementation and adaptation of BIM, project management, developing countries

Procedia PDF Downloads 94
8846 Management and Evaluation of the Importance of Porous Media in Biomedical Engineering as Associated with Magnetic Resonance Imaging Besides Drug Delivery

Authors: Fateme Nokhodchi Bonab

Abstract:

Studies related to magnetic resonance imaging (MRI) and drug delivery are reviewed in this study to demonstrate the role of transport theory in porous media in facilitating advances in biomedical applications. Diffusion processes are believed to be important in many therapeutic modalities such as: B. Delivery of drugs to the brain. We analyse the progress in the development of diffusion equations using the local volume average method and the evaluation of applications related to diffusion equations. Torsion and porosity have significant effects on diffusive transport. In this study, various relevant models of torsion are presented and mathematical modeling of drug release from biodegradable delivery systems is analysed. In this study, a new model of drug release kinetics from porous biodegradable polymeric microspheres under bulk and surface erosion of the polymer matrix is presented. Solute drug diffusion, drug dissolution from the solid phase, and polymer matrix erosion have been found to play a central role in controlling the overall drug release process. This work paves the way for MRI and drug delivery researchers to develop comprehensive models based on porous media theory that use fewer assumptions compared to other approaches.

Keywords: MRI, porous media, drug delivery, biomedical applications

Procedia PDF Downloads 57
8845 Work-Integrated Learning Practices: Comparative Case Studies across Three Countries

Authors: Shairn Hollis-Turner

Abstract:

The changing demands of workplace practice in the field of business information and administration have placed considerable pressure on educators to prepare students for the world of work. In this paper, we argue that appropriate forms of work-integrated learning (WIL) could enhance learning experiences in higher education and support educators to meet industry needs for changing times. The study aims to enhance business information and administration education from a practice perspective. The guiding research question is: How can a systematic understanding of work-integrated learning practices enhance learning experiences in higher education? The research design comprised comparative case studies across three countries and was framed by Activity Theory. Analysis of the findings highlighted the similarities across WIL systems for higher education practices and the differences within the activity systems. The findings showed similarities in program practice, content, placement, and in the struggles of students to find placements. The findings also showed misalignments between WIL preparation, delivery, and future focus of WIL at these institutions. The findings suggest that employment requirements vary across countries and that systems could be improved to meet the demands of workplace practice for changing times for the benefit of students’ learning and employability.

Keywords: business administration, business information, knowledge, post graduate diploma

Procedia PDF Downloads 24
8844 A Correlation Between Perceived Usage of Project Management Methodologies and Project Success in Horizon 2020 Projects

Authors: Aurelio Palacardo, Giulio Mangano, Alberto De Marco

Abstract:

Nowadays, the global economic framework is extremely competitive, and it consequently requires an efficient deployment of the resources provided by EU. In this context, Project management practices are intended to be one of the levers for increasing such an efficiency. The objective of this work is to explore the usage of Project Management methodologies and good practices in the European-wide research program “Horizon2020” and establish whether their maturity might impact the project's success. This allows to identify strengths in terms of application of PM methodologies and good practices and, in turn, to provide feedback and opportunities for improvements to be implemented in future programs. In order to achieve this objective, the present research makes use of a survey-based data retrieval and correlation analysis to investigate the level of perceived PM maturity in H2020 projects and the correlation of maturity with project success. The results show the Project Managers involved in H2020 to hold a high level of PM maturity, confirming PM standards, which are imposed by the EU commission as a binding process, are effectively enforced.

Keywords: project management, project management maturity, maturity models, project success

Procedia PDF Downloads 129
8843 The Exploitation of the MOSES Project Outcomes on Supply Chain Optimisation

Authors: Reza Karimpour

Abstract:

Ports play a decisive role in the EU's external and internal trade, as about 74% of imports and exports and 37% of exchanges go through ports. Although ports, especially Deep Sea Shipping (DSS) ports, are integral nodes within multimodal logistic flows, Short Sea Shipping (SSS) and inland waterways are not so well integrated. The automated vessels and supply chain optimisations for sustainable shortsea shipping (MOSES) project aims to enhance the short sea shipping component of the European supply chain by addressing the vulnerabilities and strains related to the operation of large containerships. The MOSES concept can be shortly described as a large containership (mother-vessel) approaching a DSS port (or a large container terminal). Upon her arrival, a combined intelligent mega-system consisting of the MOSES Autonomous tugboat swarm for manoeuvring and the MOSES adapted AutoMoor system. Then, container handling processes are ready to start moving containers to their destination via hinterland connections (trucks and/or rail) or to be shipped to destinations near small ports (on the mainland or island). For the first case, containers are stored in a dedicated port area (Storage area), waiting to be moved via trucks and/or rail. For the second case, containers are stacked by existing port equipment near-dedicated berths of the DSS port. They then are loaded on the MOSES Innovative Feeder Vessel, equipped with the MOSES Robotic Container-Handling System that provides (semi-) autonomous (un) feeding of the feeder. The Robotic Container-Handling System is remotely monitored through a Shore Control Centre. When the MOSES innovative Feeder vessel approaches the small port, where her docking is achieved without tugboats, she automatically unloads the containers using the Robotic Container-Handling System on the quay or directly on trucks. As a result, ports with minimal or no available infrastructure may be effectively integrated with the container supply chain. Then, the MOSES innovative feeder vessel continues her voyage to the next small port, or she returns to the DSS port. MOSES exploitation activity mainly aims to exploit research outcomes beyond the project, facilitate utilisation of the pilot results by others, and continue the pilot service after the project ends. By the mid-lifetime of the project, the exploitation plan introduces the reader to the MOSES project and its key exploitable results. It provides a plan for delivering the MOSES innovations to the market as part of the overall exploitation plan.

Keywords: automated vessels, exploitation, shortsea shipping, supply chain

Procedia PDF Downloads 77
8842 A Study of Factors Affecting the Elapsed Time of Housing Renewal Project Implementation in Seoul

Authors: In Su Na, Gunwon Lee, Seiyong Kim

Abstract:

This study analyzed the effect of area variables and economic variables on the length of each period of the project in order to analyze the effect of agreement rate on project implementation in housing renewal projects. In conclusion, as can be seen from these results, a low agreement rate may not translate into project promotion, and a higher agreement rate may not translate into project delay. The expectation of the policy is that the lower the agreement rate, the more projects would be promoted, but that is not the actual effect. From a policy consistency viewpoint, changing the agreement rate frequently, depending on the decision of the public, is not reasonable. The policy of using agreement rate as a necessary condition for project implementation should be reconsidered.

Keywords: Area and Economic Variables, Elapsed time, Housing Renewal Project

Procedia PDF Downloads 431
8841 Application of Sustainable Agriculture Based on LEISA in Landscape Design of Integrated Farming

Authors: Eduwin Eko Franjaya, Andi Gunawan, Wahju Qamara Mugnisjah

Abstract:

Sustainable agriculture in the form of integrated farming with its LEISA (Low External Input Sustainable Agriculture) concept has brought a positive impact on agriculture development and ambient amelioration. But, most of the small farmers in Indonesia did not know how to put the concept of it and how to combine agricultural commodities on the site effectively and efficiently. This research has an aim to promote integrated farming (agrofisheries, etc) to the farmers by designing the agricultural landscape to become integrated farming landscape as medium of education for the farmers. The method used in this research is closely related with the rule of design in the landscape architecture science. The first step is inventarization for the existing condition on the research site. The second step is analysis. Then, the third step is concept-making that consists of base concept, design concept, and developing concept. The base concept used in this research is sustainable agriculture with LEISA. The concept design is related with activity base on site. The developing concept consists of space concept, circulation, vegetation and commodity, production system, etc. The fourth step as the final step is planning and design. This step produces site plan of integrated farming based on LEISA. The result of this research is site plan of integrated farming with its explanation, including the energy flow of integrated farming system on site and the production calendar of integrated farming commodities for education and agri-tourism opportunity. This research become the right way to promote the integrated farming and also as a medium for the farmers to learn and to develop it.

Keywords: integrated farming, LEISA, planning and design, site plan

Procedia PDF Downloads 477
8840 Integrating Music on Construction Sites: Key Benefits and Cautions: A Literature Perspective

Authors: Oluwatayomi Daniel Fadumo, Chinyere Celestina Esimone

Abstract:

The construction industry, as a massive human capital-related sector, requires an always motivated workforce. The inability to maintain this state has been found to hamper productivity which ultimately leads to poor project delivery, infrastructural development decline, and low morale among citizens. The need to develop an approach to keep this set of people inspired before, during, and after work becomes a necessity; this paper aims to evaluate the key benefits and cautions in integrating music on construction sites in Nigeria to improve effective project delivery. In attaining this, the study identified the advantages of music on construction sites, evaluated the key considerations in introducing music on construction sites, and recommended measures for the effective integration of music on construction sites in Nigeria. The study is a descriptive research through the use of secondary data gleaned from relevant literature, journals, and research sites. The study concluded that different forms of music genres can be implemented ranging from Pop music, rock, metal, and classical music. Introducing music has the advantage of industrial branding, improving workers` morale, setting the pace for working, helping in information retention, and improving mental health and happiness. The key consideration, however, is to provide the right volume and music that doesn’t pose health and safety challenges. The study finally recommended that for effective integration of music on construction sites in Nigeria, policies should be drafted regulating its use, specific radio customized for the site be introduced and that research-based music, proven to have previously helped, should be given to a group of workers.

Keywords: music, construction sites, workers, construction industry, construction management practice

Procedia PDF Downloads 15
8839 Continuum of Maternal Care in Non Empowered Action Group States of India: Evidence from District Level Household Survey-IV

Authors: Rasikha Ramanand, Priyanka Dixit

Abstract:

Background: Continuum of maternal care which includes antenatal care, delivery care and postnatal care aids in averting maternal deaths. The objective of this paper is to identify the association between previous experiences of child death on Continuum of Care (CoC) of recent child. Further, the study aimed at understanding where the drop-out rate was high in the continuum. Methods: The study was based on the Nation-wide District Level Household and Facility Survey (DLHS-4) conducted during 2012-13, which provides information on antenatal care, delivery care, percentage of women who received JSY benefits, percentage of women who had any pregnancy, delivery, the place of delivery etc. The sample included women who were selected from the non-EAG states who delivered at least two children. The data were analyzed using SPSS 20.Binary Logistic regression was applied to the data in which the Continuum of Care (CoC) was the dependent variable while the independent variables were entered as the covariates. Results: A major finding of the study was the antenatal to delivery care period where the drop-out rates were high. Also, it was found that a large proportion of women did not receive any of the services along the continuum. Conclusions: This study has clearly established the relationship between previous history of child loss and continuum of maternal care.

Keywords: antenatal care, continuum of care, child loss, delivery care, India, maternal health care, postnatal care

Procedia PDF Downloads 382
8838 Performance Evaluation of Construction Projects by Earned Value Management Method, Using Primavera P6 – A Case Study in Istanbul, Turkey

Authors: Mohammad Lemar Zalmai, Osman Hurol Turkakin, Cemil Akcay, Ekrem Manisali

Abstract:

Most of the construction projects are exposed to time and cost overruns due to various factors and this is a major problem. As a solution to this, the Earned Value Management (EVM) method is considered. EVM is a powerful and well-known method used in monitoring and controlling the project. EVM is a technique that project managers use to track the performance of their project against project baselines. EVM gives an early indication that either project is delayed or not, and the project is either over budget or under budget at any particular day by tracking it. Thus, it helps to improve the management control system of a construction project, to detect and control the problems in potential risk areas and to suggest the importance and purpose of monitoring the construction work. This paper explains the main parameters of the EVM system involved in the calculation of time and cost for construction projects. In this study, the project management software Primavera P6 is used to deals with the project monitoring process of a seven-storeyed (G+6) faculty building whose construction is in progress at Istanbul, Turkey. A comparison between the planned progress of construction activities and actual progress is performed, and the analysis results are interpreted. This case study justifies the benefits of using EVM for project cash flow analysis and forecasting.

Keywords: earned value management (EVM), construction cost management, construction planning, primavera P6, project management, project scheduling

Procedia PDF Downloads 192
8837 The Effect of Critical Activity on Critical Path and Project Duration in Precedence Diagram Method

Authors: J. Nisar, S. Halim

Abstract:

The additional relationships i.e., start-to-start, finish-to-finish, and start-to-finish, between activity in Precedence Diagram Method (PDM) provides a more flexible schedule than traditional Critical Path Method (CPM). But, changing the duration of critical activities in the PDM network will have an anomalous effect on the critical path and the project completion date. In this study, we classified the critical activities in two groups i.e., 1. activity on single critical path and 2. activity on multi-critical paths, and six classes i.e., normal, reverse, neutral, perverse, decrease-reverse and increase-normal, based on their effects on project duration in PDM. Furthermore, we determined the maximum float of time by which the duration each type of critical activities can be changed without effecting the project duration. This study would help the project manager to clearly understand the behavior of each critical activity on critical path, and he/she would be able to change the project duration by shortening or lengthening activities based on project budget and project deadline.

Keywords: construction management, critical path method, project scheduling network, precedence diagram method

Procedia PDF Downloads 183
8836 Project Management Framework and Influencing Factors

Authors: Mehrnoosh Askarizadeh

Abstract:

The increasing variations of the business world correspond with a high diversity of theoretical perspectives used in project management research. This diversity is reflected by a variety of influencing factors, which have been the subject of empirical studies. This article aims to systemize the different streams of research on the basis of a literature review and at developing a research framework influencing factors. We will identify fundamental elements of a project management theory. The framework consists of three dimensions: design, context, and goal. Its purpose is to support the combination of different perspectives and the development of strategies for further research.

Keywords: project, goal, project management, influencing factors

Procedia PDF Downloads 512
8835 Historical Geotechnical Study and Evaluation of Project Progress for the Tafila City Center Development Project

Authors: Mohmd Sarireh

Abstract:

The geotechnical study can be employed successfully to assess and follow the expected development or delay in the project construction. The development project of city center or downtown was taken as a case study for the investigation of the project conditions that might support progress or cause delay. The project was proposed to build 7447 m2 by reinforced concrete mainly to serve and support the services provided to people in Tafila. The project construction had faced challenges and obstacles such as soil collapse because of excavation of the weak soil that found in the project site. In addition, the topography of the project area showed a high slope from South-West to North. The slope through the project footprint reached to 83.3% which is considered very high slope. One year and a half proposed to finish the project construction since the 1st of March 2013 and it was planned to be finished by the 31th of August 2014, but the project needs more than one year and a half as extension according to the consultant engineer. The collecting of data was conducted through the interviews with the engineers and officials, and by analyzing the soil reports and samples taken during design and excavation. The major findings came out to weak and fractured soil and construction waste that were found at project site. Also, soil was considered very fine according to the plasticity index (PI) values, in addition to the high depths required for foundation that contribute to the collapse of soil and the increase of project cost. The current project aims to present how the unseen conditions can delay the project construction and increase the cost of the project that rises to JD8.305 Million.

Keywords: geotechnical, management, progress, risk, soil unseen conditions management

Procedia PDF Downloads 192
8834 Sustainability Study of Government Procurement of Public Services in Guangzhou: a Perspective Based on the Resources Dependence of Social Work

Authors: Li Pan

Abstract:

The recently prevalent government procurement of public services in China boasts a new form of government’s provision of public service through the purchasing of social work from social organizations, a new measure of the transformation in governmental functions as well as an unprecedented opportunity for the development of social organizations. For the past few years, the phenomenon of a surge in the number of social work organizations and social work staff emerged right with the initiatives of energetically carrying out the purchase of public services by the government. Such efforts have presented the strong determination of the Chinese government in building a small government by streamlining administration and delegating part of the governmental power to social organizations. This paper is based on the 2012-2014 performance appraisal project of the Guangzhou municipal government’s purchasing of public services and the project was carried out in the summer of 2015. During the process of the appraisal, several general problems hindering the sustainable development of government purchasing of public service have been observed. As Guangzhou is among the rank of pioneer cities in the conduct of the reform, it is representative and imperative to study the sustainability of government purchasing of public service. In 2012, Guangzhou local government started contracting out public service to the community social organizations to provide general family services and special services to community residents, since when integrated family service centers and special service centers were established as platforms to provide public social service in a city-wide range. Consequently, taking an example of the current rapid development of government purchase of the integrated family services and special services in Guangzhou, this paper puts up several proposals for the sustainable development of Guangzhou municipal government’s procurement of public services on the perspective of social work’s resource dependence.

Keywords: government procurement of public services, Guangzhou, integrated family service center, social work, sustainability.

Procedia PDF Downloads 236
8833 Qualitative Evaluation of the Morris Collection Conservation Project at the Sainsbury Centre of Visual Arts in the Context of Agile, Lean and Hybrid Project Management Approaches

Authors: Maria Ledinskaya

Abstract:

This paper examines the Morris Collection Conservation Project at the Sainsbury Centre for Visual Arts in the context of Agile, Lean, and Hybrid project management. It is part case study and part literature review. To date, relatively little has been written about non-traditional project management approaches in heritage conservation. This paper seeks to introduce Agile, Lean, and Hybrid project management concepts from business, software development, and manufacturing fields to museum conservation, by referencing their practical application on a recent museum-based conservation project. The Morris Collection Conservation Project was carried out in 2019-2021 in Norwich, UK, and concerned the remedial conservation of around 150 Abstract Constructivist artworks bequeathed to the Sainsbury Centre for Visual Arts by private collectors Michael and Joyce Morris. The first part introduces the chronological timeline and key elements of the project. It describes a medium-size conservation project of moderate complexity, which was planned and delivered in an environment with multiple known unknowns – unresearched collection, unknown condition and materials, unconfirmed budget. The project was also impacted by the unknown unknowns of the COVID-19 pandemic, such as indeterminate lockdowns, and the need to accommodate social distancing and remote communications. The author, a staff conservator at the Sainsbury Centre who acted as project manager on the Morris Collection Conservation Project, presents an incremental, iterative, and value-based approach to managing a conservation project in an uncertain environment. Subsequent sections examine the project from the point of view of Traditional, Agile, Lean, and Hybrid project management. The author argues that most academic writing on project management in conservation has focussed on a Traditional plan-driven approach – also known as Waterfall project management – which has significant drawbacks in today’s museum environment, due to its over-reliance on prediction-based planning and its low tolerance to change. In the last 20 years, alternative Agile, Lean and Hybrid approaches to project management have been widely adopted in software development, manufacturing, and other industries, although their recognition in the museum sector has been slow. Using examples from the Morris Collection Conservation Project, the author introduces key principles and tools of Agile, Lean, and Hybrid project management and presents a series of arguments on the effectiveness of these alternative methodologies in museum conservation, as well as the ethical and practical challenges to their implementation. These project management approaches are discussed in the context of consequentialist, relativist, and utilitarian developments in contemporary conservation ethics, particularly with respect to change management, bespoke ethics, shared decision-making, and value-based cost-benefit conservation strategy. The author concludes that the Morris Collection Conservation Project had multiple Agile and Lean features which were instrumental to the successful delivery of the project. These key features are identified as distributed decision making, a co-located cross-disciplinary team, servant leadership, focus on value-added work, flexible planning done in shorter sprint cycles, light documentation, and emphasis on reducing procedural, financial, and logistical waste. Overall, the author’s findings point largely in favour of a Hybrid model which combines traditional and alternative project processes and tools to suit the specific needs of the project.

Keywords: project management, conservation, waterfall, agile, lean, hybrid

Procedia PDF Downloads 73
8832 Quality Management in Construction Project

Authors: Harsh Panchal, Saurabh Amrutkar

Abstract:

Quality management is an essential part of any project that has directly related to the performance of a project. Quality management is depended on multiple factors at different stages in a project, right from time management to construction logistics. A project is a mixture of various components that include iternary management, health and safety, crew productivity, and many more. From the survey conducted, we came to the conclusion that advancement in technology and indigenous approach to any project will result in maximum quality standards and better project performance. In this paper, we discuss various components of the factors above that lead to compromise the quality of a project and how it can be controlled in order to achieve maximum quality assurance using quality planning and total quality management. The paper also focuses on limitations and problems faced in each factor responsible for quality management and to tackle them using techniques and processes based on activities and identifying the sequence, approaching critical path, and duration. The project management concept that deals with the sequence of scope cost time give us an overview regarding the ongoing quality management, in a nutshell, giving us hints to regulate the current procedure for maximum achievable quality. It also deals with the problems faced by engineers that make the mundane work process slow, reducing the quality outcome drastically.

Keywords: management, performance, project, quality

Procedia PDF Downloads 126
8831 Poly(N-Vinylcaprolactam) Based Degradable Microgels for Controlled Drug Delivery

Authors: G. Agrawal, R. Agrawal, A. Pich

Abstract:

The pH and temperature responsive biodegradable poly(N-vinylcaprolactam) (PVCL) based microgels functionalized with itaconic acid (IA) units are prepared via precipitation polymerization for drug delivery applications. Volume phase transition temperature (VPTT) of the obtained microgels is influenced by both IA content and pH of the surrounding medium. The developed microgels can be degraded under acidic conditions due to the presence of hydrazone based crosslinking points inside the microgel network. The microgel particles are able to effectively encapsulate doxorubicin (DOX) drug and exhibit low drug leakage under physiological conditions. At low pH, rapid DOX release is observed due to the changes in electrostatic interactions along with the degradation of particles. The results of the cytotoxicity assay further display that the DOX-loaded microgel exhibit effective antitumor activity against HeLa cells demonstrating their great potential as drug delivery carriers for cancer therapy.

Keywords: degradable, drug delivery, hydrazone linkages, microgels, responsive

Procedia PDF Downloads 274
8830 The Urban Project and the Urban Improvement to the Test of the Participation, Case: Project of Modernization of Constantine

Authors: Mouhoubi Nedjima, Sassi Boudemagh Souad

Abstract:

In the framework of the modernization of the city of Constantine, and in order to restore its status as a regional metropolis and introduce it into the network of cities international metropolises, a major urban project was launched: project of modernization and of metropolitanization of the city of Constantine (PMMC). Our research project focuses on the management of the project for the modernization of the city of Constantine (PMMC) focusing on the management of some aspects of the urban project whose participation, with the objective assessment of the managerial approach business. Among the cases revealing taken into account in our research work on the question of participation of actors and their organizations, the operation relating to "the urban improvement in the city of the Brothers FERRAD in the district of Zouaghi". This operation with the objective of improving the living conditions of citizens has faced several challenges and obstacles that have been in major part the factors of its failure. Through this study, we examine the management process and the mode of organization of the actors of the project as well as the level of participation of the citizen to finally propose managerial solutions to conflict situations observed.

Keywords: the urban project, the urban improvement, participation, Constantine

Procedia PDF Downloads 374
8829 Integrated Models of Reading Comprehension: Understanding to Impact Teaching—The Teacher’s Central Role

Authors: Sally A. Brown

Abstract:

Over the last 30 years, researchers have developed models or frameworks to provide a more structured understanding of the reading comprehension process. Cognitive information processing models and social cognitive theories both provide frameworks to inform reading comprehension instruction. The purpose of this paper is to (a) provide an overview of the historical development of reading comprehension theory, (b) review the literature framed by cognitive information processing, social cognitive, and integrated reading comprehension theories, and (c) demonstrate how these frameworks inform instruction. As integrated models of reading can guide the interpretation of various factors related to student learning, an integrated framework designed by the researcher will be presented. Results indicated that features of cognitive processing and social cognitivism theory—represented in the integrated framework—highlight the importance of the role of the teacher. This model can aid teachers in not only improving reading comprehension instruction but in identifying areas of challenge for students.

Keywords: explicit instruction, integrated models of reading comprehension, reading comprehension, teacher’s role

Procedia PDF Downloads 57
8828 Improving Post Release Outcomes

Authors: Michael Airton

Abstract:

This case study examines the development of a new service delivery model for prisons that focuses on using NGO’s to provide more effective case management and post release support functions. The model includes the co-design of the service delivery model and innovative commercial agreements that encourage embedded service providers within the prison and continuity of services post release with outcomes based payment mechanisms. The collaboration of prison staff, probation and parole officers and NGO’s is critical to the success of the model and its ability to deliver value and positive outcomes in relation to desistance from offending.

Keywords: collaborative service delivery, desistance, non-government organisations, post release support services

Procedia PDF Downloads 361
8827 Drug Delivery to Solid Tumor: Effect of Dynamic Capillary Network Induced by Tumor

Authors: Mostafa Sefidgar, Kaamran Raahemifar, Hossein Bazmara, Madjid Soltani

Abstract:

The computational methods provide condition for investigation related to the process of drug delivery, such as convection and diffusion of drug in extracellular matrices, and drug extravasation from microvascular. The information of this process clarifies the mechanisms of drug delivery from the injection site to absorption by a solid tumor. In this study, an advanced numerical method is used to solve fluid flow and solute transport equations simultaneously to show how capillary network structure induced by tumor affects drug delivery. The effect of heterogeneous capillary network induced by tumor on interstitial fluid flow and drug delivery is investigated by this multi scale method. The sprouting angiogenesis model is used for generating capillary network induced by tumor. Fluid flow governing equations are implemented to calculate blood flow through the tumor-induced capillary network and fluid flow in normal and tumor tissues. The Starling’s law is used for closing this system of equations and coupling the intravascular and extravascular flows. Finally, convection-diffusion-reaction equation is used to simulate drug delivery. The dynamic approach which changes the capillary network structure based on signals sent by hemodynamic and metabolic stimuli is used in this study for more realistic assumption. The study indicates that drug delivery to solid tumors depends on the tumor induced capillary network structure. The dynamic approach generates the irregular capillary network around the tumor and predicts a higher interstitial pressure in the tumor region. This elevated interstitial pressure with irregular capillary network leads to a heterogeneous distribution of drug in the tumor region similar to in vivo observations. The investigation indicates that the drug transport properties have a significant role against the physiological barrier of drug delivery to a solid tumor.

Keywords: solid tumor, physiological barriers to drug delivery, angiogenesis, microvascular network, solute transport

Procedia PDF Downloads 284
8826 Smart BIM Documents - the Development of the Ontology-Based Tool for Employer Information Requirements (OntEIR), and its Transformation into SmartEIR

Authors: Shadan Dwairi

Abstract:

Defining proper requirements is one of the key factors for a successful construction projects. Although there have been many attempts put forward in assist in identifying requirements, but still this area is under developed. In Buildings Information Modelling (BIM) projects. The Employer Information Requirements (EIR) is the fundamental requirements document and a necessary ingredient in achieving a successful BIM project. The provision on full and clear EIR is essential to achieving BIM Level-2. As Defined by PAS 1192-2, EIR is a “pre-tender document that sets out the information to be delivered and the standards and processes to be adopted by the supplier as part of the project delivery process”. It also notes that “EIR should be incorporated into tender documentation to enable suppliers to produce an initial BIM Execution Plan (BEP)”. The importance of effective definition of EIR lies in its contribution to a better productivity during the construction process in terms of cost and time, in addition to improving the quality of the built asset. Proper and clear information is a key aspect of the EIR, in terms of the information it contains and more importantly the information the client receives at the end of the project that will enable the effective management and operation of the asset, where typically about 60%-80% of the cost is spent. This paper reports on the research done in developing the Ontology-based tool for Employer Information Requirements (OntEIR). OntEIR has proven the ability to produce a full and complete set of EIRs, which ensures that the clients’ information needs for the final model delivered by BIM is clearly defined from the beginning of the process. It also reports on the work being done into transforming OntEIR into a smart tool for Defining Employer Information Requirements (smartEIR). smartEIR transforms the OntEIR tool into enabling it to develop custom EIR- tailored for the: Project Type, Project Requirements, and the Client Capabilities. The initial idea behind smartEIR is moving away from the notion “One EIR fits All”. smartEIR utilizes the links made in OntEIR and creating a 3D matrix that transforms it into a smart tool. The OntEIR tool is based on the OntEIR framework that utilizes both Ontology and the Decomposition of Goals to elicit and extract the complete set of requirements needed for a full and comprehensive EIR. A new ctaegorisation system for requirements is also introduced in the framework and tool, which facilitates the understanding and enhances the clarification of the requirements especially for novice clients. Findings of the evaluation of the tool that was done with experts in the industry, showed that the OntEIR tool contributes towards effective and efficient development of EIRs that provide a better understanding of the information requirements as requested by BIM, and support the production of a complete BIM Execution Plan (BEP) and a Master Information Delivery Plan (MIDP).

Keywords: building information modelling, employer information requirements, ontology, web-based, tool

Procedia PDF Downloads 102
8825 Application of Agile Project Management to Construction Projects: Case Study

Authors: Ran Etgar, Sarit Freund

Abstract:

Agile project management (APM) has been developed originally for software development project. Construction projects seemed to be more apt to traditional water-fall approach than to APM. However, Construction project suffers from similar problems that necessitated the invention of APM, mainly the need to break down the project structure to small increments, thus minimizing the needed managerial planning and design. Since the classical structure of APM is not applicable the way it is to construction project, a modified version of APM was devised. This method, nicknamed 'The anchor method', exploits the fundamentals of APM (i.e., iterations, or sprints of short time frames or timeboxes, cross-functional teams, risk reduction and adaptation to changes) and adjust them to the construction world. The projects had to be structured appropriately to proactively and quickly adapt to change. The method aims to encompass human behavior and lean towards adaptivity rather than predictability. To enable smooth application of the method, a special project management software was developed, so as to provide solid administrational help and accurate data. The method is tested on a bunch of construction projects and some key performance indicators (KPIs) are collected. According to preliminary results the method is indeed very advantageous and with proper assimilation can radically change the construction project management paradigm.

Keywords: agile project management, construction, information systems, project management

Procedia PDF Downloads 100
8824 Preferred Service Delivery options for Female Sex Workers in the Riverine Area of lome, Togo

Authors: Gbone Akou Sophie

Abstract:

Lome state in Togo is considered to have the highest HIV prevalence in Togo according to NAIIS 2023, with the prevalence of 5.5%, Female Sex Workers (FSW) are one of the most vulnerable population, and they are vital in HIV programming. They have the highest HIV prevalence compared to others such as HRM, PWID and Transgender in lome State, Togo. Evidence from Integrated Biological Behavioral Surveillance Survey shows increasing burden of HIV infection from 13.7% in 20018 to 17.2% in 2020 and now 22.9% in 2021 among Female Sex Workers (FSW). This shows their HIV prevalence has been rising over time. The vulnerability status of the FSW in the riverine areas of lome is heightened because of cultural and economic issues where there is exchange of sex for commodities with cross border traders as well as limited access to HIV prevention information. Methods:A cross sectional study which recruited 120 FSW from two Riverine LGAs of Agoe and Kpehenou LGA of Lome State using both snowballing and simple random sampling technique. While semi-structured questionnaire was used as an instrument for data collection among the 120 FSW respondents. Additional information was also elicited from 10 FSW key opinion leaders and community members through in-depth interviews (IDI). Results: 44(36%) of respondents were willing to receive regular HIV care and services as well as visit for STI check-ups at any service point. However, 47(40%) were willing to receive services at private facilities alone, 10 (8%) were willing to receive services at public facilities, 6 (5%) were willing to access services in their homes rather than in the health facility. 13 (11%) were also willing to have peers assist in getting HIV testing services. Conclusion: integrated differentiated model of care for HIV services helps improve HIV services uptake among FSW community especially in the hard- to reach riverine areas which will further lead to epidemic control. Also targeted HIV information should be designed to suit the learning needs of the hard-to reach communities like the riverine areas. More peer educators should be engaged to ensure information and other HIV services reach the riverine communities.

Keywords: female sex workers ( FSW), human immuno-deficiency virus(HIV), prevanlence, service delivery

Procedia PDF Downloads 30