Search results for: housing and construction
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 4272

Search results for: housing and construction

4062 Land, History and Housing: Colonial Legacies and Land Tenure in Kuala Lumpur

Authors: Nur Fareza Mustapha

Abstract:

Solutions to policy problems need to be curated to the local context, taking into account the trajectory of the local development path to ensure its efficacy. For Kuala Lumpur, rapid urbanization and migration into the city for the past few decades have increased the demand for housing to accommodate a growing urban population. As a critical factor affecting housing affordability, land supply constraints have been attributed to intensifying market pressures, which grew in tandem with the demands of urban development, along with existing institutional constraints in the governance of land. While demand-side pressures are inevitable given the fixed supply of land, supply-side constraints in regulations distort markets and if addressed inappropriately, may lead to mistargeted policy interventions. Given Malaysia’s historical development, regulatory barriers for land may originate from the British colonial period, when many aspects of the current laws governing tenure were introduced and formalized, and henceforth, became engrained in the system. This research undertakes a postcolonial institutional analysis approach to uncover the causal mechanism driving the evolution of land tenure systems in post-colonial Kuala Lumpur. It seeks to determine the sources of these shifts, focusing on the incentives and bargaining positions of actors during periods of institutional flux/change. It aims to construct a conceptual framework to further this understanding and to elucidate how this historical trajectory affects current access to urban land markets for housing. Archival analysis is used to outline and analyse the evolution of land tenure systems in Kuala Lumpur while stakeholder interviews are used to analyse its impact on the current urban land market, with a particular focus on the provision of and access to affordable housing in the city. Preliminary findings indicate that many aspects of the laws governing tenure that were introduced and formalized during the British colonial period have endured until the present day. Customary rules of tenure were displaced by rules following a European tradition, which found legitimacy through a misguided interpretation of local laws regarding the ownership of land. Colonial notions of race and its binary view of native vs. non-natives have also persisted in the construction and implementation of current legislation regarding land tenure. More concrete findings from this study will generate a more nuanced understanding of the regulatory land supply constraints in Kuala Lumpur, taking into account both the long and short term spatial and temporal processes that affect how these rules are created, implemented and enforced.

Keywords: colonial discourse, historical institutionalism, housing, land policy, post-colonial city

Procedia PDF Downloads 101
4061 Urban Renewal, Social Housing, Relocation, and Violence in Algiers

Authors: Kahina Amal Djiar, Mouna Gharbi, Maha Messaoudene, Oumelkheir Chareb

Abstract:

Over the last decade, Algerian authorities have implemented an ambitious program of urban renewal, which includes important relocation operations. The objectives behind such strategic interventions are on the one hand, to carry out an incremental approach aiming at eradicating precarious housing and on the other hand, to diversify alternative housing options for families requiring better living spaces. It is precisely for these same purposes that the Djenan el-Hassan and Carrières Jaubert estates, which are both located in Algiers, have undergone major urban transformations. These dwelling sites were built as part of the famous "Battle of Housing", which was launched by French colonial administration in the 1950s just before the independence of Algeria in 1962. Today, the Djenan el-Hassan estate is almost entirely demolished following the relocation of 171 families. The Carrières Jaubert estate, for its part, has seen two kinds of operations. The first has been shaped by a process of urban requalification and redevelopment, which allowed some of the residents to stay on site after the transformation of most housing cells into larger apartments. The second operation has required the relocation of over 300 families to entirely newly built dwellings. Such projects of urban renewal are supposed to create new opportunities, not only in terms of local urban development, but also in terms of social perspectives for those families who are involved, either directly or indirectly, in the process of relocation. In fact, the percentage of urban violence in Algiers has increased instead. Recent events in the newly built estates show that residents are repeatedly experiencing and even instigating episodes of brutality, hostility and aggression. The objective of this paper is to examine the causes that have engendered such rise in urban violence in newly built housing estates in Algiers. This paper aims to present the findings of a recent qualitative research and highlight the way that poorly designed neighbourhood, combined with a relocation process that leaves little room for community participation, create inevitably severe social tensions.

Keywords: relocation, social housing, violence, Algiers

Procedia PDF Downloads 502
4060 A Comparative Study on the Influencing Factors of Urban Residential Land Prices Among Regions

Authors: Guo Bingkun

Abstract:

With the rapid development of China's social economy and the continuous improvement of urbanization level, people's living standards have undergone tremendous changes, and more and more people are gathering in cities. The demand for urban residents' housing has been greatly released in the past decade. The demand for housing and related construction land required for urban development has brought huge pressure to urban operations, and land prices have also risen rapidly in the short term. On the other hand, from the comparison of the eastern and western regions of China, there are also great differences in urban socioeconomics and land prices in the eastern, central and western regions. Although judging from the current overall market development, after more than ten years of housing market reform and development, the quality of housing and land use efficiency in Chinese cities have been greatly improved. However, the current contradiction between land demand for urban socio-economic development and land supply, especially the contradiction between land supply and demand for urban residential land, has not been effectively alleviated. Since land is closely linked to all aspects of society, changes in land prices will be affected by many complex factors. Therefore, this paper studies the factors that may affect urban residential land prices and compares them among eastern, central and western cities, and finds the main factors that determine the level of urban residential land prices. This paper provides guidance for urban managers in formulating land policies and alleviating land supply and demand. It provides distinct ideas for improving urban planning and improving urban planning and promotes the improvement of urban management level. The research in this paper focuses on residential land prices. Generally, the indicators for measuring land prices mainly include benchmark land prices, land price level values, parcel land prices, etc. However, considering the requirements of research data continuity and representativeness, this paper chooses to use residential land price level values. Reflects the status of urban residential land prices. First of all, based on the existing research at home and abroad, the paper considers the two aspects of land supply and demand and, based on basic theoretical analysis, determines some factors that may affect urban housing, such as urban expansion, taxation, land reserves, population, and land benefits. Factors of land price and correspondingly selected certain representative indicators. Secondly, using conventional econometric analysis methods, we established a model of factors affecting urban residential land prices, quantitatively analyzed the relationship and intensity of influencing factors and residential land prices, and compared the differences in the impact of urban residential land prices between the eastern, central and western regions. Compare similarities. Research results show that the main factors affecting China's urban residential land prices are urban expansion, land use efficiency, taxation, population size, and residents' consumption. Then, the main reason for the difference in residential land prices between the eastern, central and western regions is the differences in urban expansion patterns, industrial structures, urban carrying capacity and real estate development investment.

Keywords: urban housing, urban planning, housing prices, comparative study

Procedia PDF Downloads 14
4059 Methodology of Construction Equipment Optimization for Earthwork

Authors: Jaehyun Choi, Hyunjung Kim, Namho Kim

Abstract:

Earthwork is one of the critical civil construction operations that require large-quantities of resources due to its intensive dependency upon construction equipment. Therefore, efficient construction equipment management can highly contribute to productivity improvements and cost savings. Earthwork operation utilizes various combinations of construction equipment in order to meet project requirements such as time and cost. Identification of site condition and construction methods should be performed in advance in order to develop a proper execution plan. The factors to be considered include capacity of equipment assigned, the method of construction, the size of the site, and the surrounding condition. In addition, optimal combination of various construction equipment should be selected. However, in real world practice, equipment utilization plan is performed based on experience and intuition of management. The researchers evaluated the efficiency of various alternatives of construction equipment combinations by utilizing the process simulation model, validated the model from a case study project, and presented a methodology to find optimized plan among alternatives.

Keywords: earthwork operation, construction equipment, process simulation, optimization

Procedia PDF Downloads 401
4058 Enhancing Seismic Resilience in Colombia's Informal Housing: A Low-cost Retrofit Strategy with Buckling-restrained Braces to Protect Vulnerable Communities in Earthquake-prone Regions

Authors: Luis F. Caballero-castro, Dirsa Feliciano, Daniela Novoa, Orlando Arroyo, Jesús D. Villalba-morales

Abstract:

Colombia faces a critical challenge in seismic resilience due to the prevalence of informal housing, which constitutes approximately 70% of residential structures. More than 10 million Colombians (20% of the population), live in homes susceptible to collapse in the event of an earthquake. This, combined with the fact that 83% of the population is in intermediate and high seismic hazard areas, has brought serious consequences to the country. These consequences became evident during the 1999 Armenia earthquake, which affected nearly 100,000 properties and represented economic losses equivalent to 1.88% of that year's Gross Domestic Product (GDP). Despite previous efforts to reinforce informal housing through methods like externally reinforced masonry walls, alternatives related to seismic protection systems (SPDs), such as Buckling-Restrained Braces (BRB), have not yet been explored in the country. BRBs are reinforcement elements capable of withstanding both compression and tension, making them effective in enhancing the lateral stiffness of structures. In this study, the use of low-cost and easily installable BRBs for the retrofit of informal housing in Colombia was evaluated, considering the economic limitations of the communities. For this purpose, a case study was selected involving an informally constructed dwelling in the country, from which field information on its structural characteristics and construction materials was collected. Based on the gathered information, nonlinear models with and without BRBs were created, and their seismic performance was analyzed and compared through incremental static (pushover) and nonlinear dynamic analyses. In the first analysis, the capacity curve was identified, showcasing the sequence of failure events occurring from initial yielding to structural collapse. In the second case, the model underwent nonlinear dynamic analyses using a set of seismic records consistent with the country's seismic hazard. Based on the results, fragility curves were calculated to evaluate the probability of failure of the informal housings before and after the intervention with BRBs, providing essential information about their effectiveness in reducing seismic vulnerability. The results indicate that low-cost BRBs can significantly increase the capacity of informal housing to withstand earthquakes. The dynamic analysis revealed that retrofit structures experienced lower displacements and deformations, enhancing the safety of residents and the seismic performance of informally constructed houses. In other words, the use of low-cost BRBs in the retrofit of informal housing in Colombia is a promising strategy for improving structural safety in seismic-prone areas. This study emphasizes the importance of seeking affordable and practical solutions to address seismic risk in vulnerable communities in earthquake-prone regions in Colombia and serves as a model for addressing similar challenges of informal housing worldwide.

Keywords: buckling-restrained braces, fragility curves, informal housing, incremental dynamic analysis, seismic retrofit

Procedia PDF Downloads 62
4057 Adaptable Buildings for More Sustainable Housing: Energy Life Cycle Analysis

Authors: Rafael Santos Fischer, Aloísio Leoni Schmid, Amanda Dalla-Bonna

Abstract:

The life cycle analysis and the energy life cycle analysis are useful design support tools when sustainability becomes imperative. The final phase of buildings life cycle is probably the least known, on which less knowledge is available. In the Brazilian building industry, the lifespan of a building design rarely is treated as a definite design parameter. There is rather a common sense attitude to take any building demands as permanent, and to take for granted that buildings solutions are durable and solid. Housing, being a permanent issue in any society, presents a real challenge to the choice of a design lifespan. In Brazilian history, there was a contrast of the native solutions of collective, non-durable houses built by several nomadic tribes, and the stone and masonry buildings introduced by the sedentary Portuguese conquerors. Durable buildings are commonly associated with welfare. However, social dynamics makes traditional families of both parents and children be just one of several possible arrangements. In addition, a more liberal attitude towards family leads to an increase in the number of people living in alternative arrangements. Japan is an example of country where houses have been made intentionally ephemeral since the half of 20th century. The present article presents the development of a flexible housing design solution on the basis of the Design Science Research approach. A comparison in terms of energy life cycle shows how flexibility and dematerialization may point at a feasible future for housing policies in Brazil.

Keywords: adaptability, adaptable building, embodied energy, life cyclce analysis, social housing

Procedia PDF Downloads 568
4056 Poverty and Environmental Degeneration in Central City of Ibadan, Nigeria

Authors: Funmilayo Lanrewaju Amao, Amos Olusegun Amao, Odetoye Adeola Sunday, Joseph Joshua Olu

Abstract:

There is a high magnitude of housing inadequacy in urban centers in Nigeria. This is manifested in quantitative and qualitative terms. Severe overcrowding and insanitary physical environment characterize the housing in the urban centers. The culminating effect of this is the growth of slum areas. This paper takes a critical look at inter-allia history and anatomy, general characteristic, present condition, root causes, official responses and reactions, possible solution and advocacy housing in central city slum of Ibadan. It also examines slum development and consequent deviant behaviors in the inner-city neighborhoods of Ibadan, the capital city of Oyo State, Nigeria. Residing there are many underemployed and unemployed individuals, these are miscreants who are generally socially frustrated. The activities of this group of people are a cause of concern. Deleterious and anti-social behaviors such as prostitution and house burglary are commonplace in the neighborhoods. The paper examines building conditions in the neighborhoods and the nexus with the deviant behavior of the inhabitants. The paper affirms that there is monumental deficiency in housing quality, while the design and the arrangement of the buildings into spatial units significantly influence the behavior of the residents. The paper suggests a two-prong approach in dealing with the situation. This involves urban renewal and slum upgrading programmes on the one hand, and an improvement in the socio-economic circumstances of the inhabitants, especially an increase in employment opportunity on the other.

Keywords: slum, behavior, housing, poverty, environmental degeneration

Procedia PDF Downloads 377
4055 Identifying Project Delay Factors in the Australian Construction Industry

Authors: Syed Sohaib Bin Hasib, Hiyam Al-Kilidar

Abstract:

Meeting project deadlines is a major challenge for most construction projects. In this study, perceptions of contractors, clients, and consultants are compared relative to a list of factors derived from the review of the extant literature on project delay. 59 causes (categorized into 8 groups) of project delays were identified from the literature. A survey was devised to get insights and ranking of these factors from clients, consultants & contractors in the Australian construction industry. Findings showed that project delays in the Australian construction industry are mainly the result of skill shortages, interference in execution, and poor coordination and communication between the project stakeholders.

Keywords: construction, delay factors, time delay, australian construction industry

Procedia PDF Downloads 140
4054 Abating the Barriers to the Deployment of RFID for Construction Project Delivery in South Africa

Authors: Matthew O. Ikuabe, Ayodeji E. Oke, Clinton O. Aigbavboa, Douglas O. Aghimien

Abstract:

The use of technological innovations have been touted to be beneficial in the delivery of construction projects. Particularly, Radio Frequency Identification (RFID) technology is widely regarded to be of immense advantage for the management of construction projects. This study focused on evaluating the barriers to the use of Radio Frequency Identification (RFID) technology for the delivery of construction projects. Using Gauteng Provincein South Africa as the study area, questionnaire was used in eliciting responses from construction professionals, which made up the population of the study. Retrieved data was analysed using Mean Item Score and One-Sample t-test. Findings from the study showed that the most significant barriers to the deployment of RFID for construction project delivery are high cost and lack of awareness. Conclusively, the study made recommendations that would aid in the abatement of the barriers to the use of RFID technology for construction project delivery.

Keywords: barriers, construction, project delivery, RFID

Procedia PDF Downloads 160
4053 Development of Risk Assessment and Occupational Safety Management Model for Building Construction Projects

Authors: Preeda Sansakorn, Min An

Abstract:

In order to be capable of dealing with uncertainties, subjectivities, including vagueness arising in building construction projects, the application of fuzzy reasoning technique based on fuzzy set theory is proposed. This study contributes significantly to the development of a fuzzy reasoning safety risk assessment model for building construction projects that could be employed to assess the risk magnitude of each hazardous event identified during construction, and a third parameter of probability of consequence is incorporated in the model. By using the proposed safety risk analysis methodology, more reliable and less ambiguities, which provide the safety risk management project team for decision-making purposes.

Keywords: safety risk assessment, building construction safety, fuzzy reasoning, construction risk assessment model, building construction projects

Procedia PDF Downloads 455
4052 Residencial Inclusion Strategies for Homeless Immigrants: The Case of Spain

Authors: Raluca Cosmina Budian

Abstract:

The homeless population in Spain, particularly among immigrants, has been a persistent and multifaceted issue. The government has implemented various housing public policies over the years to address homelessness, ranging from shelter programs to initiatives promoting permanent housing solutions. However, understanding the effectiveness of these policies requires insight from the very individuals and professionals directly impacted by or involved in their execution. This research sheds light on national strategies (The 2015-2020 Comprehensive National Strategy for the Homeless and National Strategy to Combat Homelessness in Spain 2023-2030) aimed at tackling homelessness in Spain, with a focus on the evolving landscape of housing public policies and their relationship with the homeless population. We investigate how these strategies have transformed over time and their impact on the inclusion of this vulnerable group. Furthermore, we explore the perspectives of homeless immigrants, distinguishing between those with an extended residency in Spain and those who have more recently arrived (less than 2 years); and distinguishing between women and men. Additionally, we incorporate insights from 13 interviews with professionals dedicated to serving the homeless population. These insights offer a deeper understanding of the intricacies of current homelessness service provision. Our findings reveal the complex dynamics of providing services to homeless individuals, and the importance of aligning these efforts with the broader national strategies for tackling homelessness. Drawing on a comprehensive dataset, we offer a nuanced view of the challenges and successes in implementing inclusive housing policies in the Spanish context. Our research highlights the importance of collaboration between policy makers, service providers and advocates to create a cohesive and effective approach. By fostering such collaboration, we aim to create a more inclusive and comprehensive strategy to address homelessness in Spain and possible affordable housing proposals for this vulnerable group. It´s only underscores the importance of tailored approaches but also contributes to the broader discourse on housing public policies' ability to address homelessness and foster integration. We suggest that a more comprehensive approach, considering the unique needs of immigrants and working in collaboration with professionals in the field, is essential for the development of effective strategies to combat homelessness and ensure the right to adequate housing for all.

Keywords: housing, homeless, public policy, Spain

Procedia PDF Downloads 42
4051 An Assessment of the Factors Affecting Green Building Technology (GBT) Adoption

Authors: Nuruddeen Usman, Usman Mohammed Gidado

Abstract:

A construction and post construction activity in buildings contributes to environmental degradation, because of the generation of solid waste during construction to the production of carbon dioxide by the occupants during utilization. These problems were caused as a result of lack of adopting green building technology during and after construction. However, this study aims at conceptualizing the factors that are affecting the adoption of green building technology with a view to suggest better ways for its successful adoption in the construction industry through developing a green building technology model. Thus, the research findings show that: Economic, social, cultural, and technological progresses are the factors affecting Green Building Technology Adoption. Therefore, identifying these factors and developing the model might help in the successful adoption of green building technology.

Keywords: green building technology, construction, post construction, degradation

Procedia PDF Downloads 621
4050 Investigations into Transition from Traditional Construction to Industrial Construction in Afghanistan

Authors: A. Latif Karimi

Abstract:

Since 2001, construction works, especially the construction of new homes and residential buildings, witnessed a dramatic boom across Afghanistan. More so, the construction industry and house builders are relied upon as important players in the country’s job market, economy and infrastructural development schemes. However, a lack of innovation, quality assurance mechanism, substandard construction and market dominance by traditional methods push all the parties in house building sector to shift for more advanced construction techniques and mass production technologies to meet the rising demands for proper accommodation. Meanwhile, rapid population growth and urbanization are widening the gap between the demand and supply of new and modern houses in urban areas like Kabul, Herat, etc. This paper investigates about current condition of construction practices in house building projects, the associated challenges, and the outcomes of transition to more reasonable and sustainable building methods. It is obvious, the introduction and use of Modern Methods of Construction (MMC) can help construction industry and house builders in Afghanistan to tackle the challenges and meet the desired standards for modern houses. This paper focuses on prefabrication, a popular MMC that is becoming more common, improving in quality and available in a variety of budgets. It is revealed that this method is the way forward to improving house building practices as it has been proven to reduce construction time, minimize waste and improve environmental performance of construction developments.

Keywords: modern houses, traditional construction, modern methods of construction, prefabrication, sustainable building

Procedia PDF Downloads 252
4049 Dwelling in the Built Environment: The Resilience by Design in Modular Thinking toward an Adaptive Alternatives

Authors: Tzen-Ying Ling

Abstract:

Recently, the resilience of dwellings in urban areas has been deliberated, as to accommodate the growing demand for changing the demography and rapid urbanization. The need to incorporate sustainability and cleaner production thinking have intensified to mitigate climate risks and satisfy the demand for housing. The modular thinking satisfies both the pressing call for fast-tracked housing stocks; while meeting the goal of more sustainable production. In the other side, the importance of the dwelling as a podium for well-being and social connectedness are sought to explore the key human/environment design thinking for the modular system in dwelling. We argue the best practice incorporates the concept of systemic components thinking. The fieldwork reported in this paper illustrates the process of the case study in a modular dwelling unit prototype development; focusing on the systemic frame system design process and adjustment recommendation hereafter. Using a case study method, the study identified that: (1) inclusive human dimensional factoring through systemic design thinking results in affordable implementations possibilities. (2) The environmental dimension encourages the place-based solution suited for the locality and the increasing demand for dwelling in the urban system. (3) Prototype design consideration avails module system component as dwelling construction alternative. (4) Building code often acts as an inhibitor for such dwelling units by the restriction in lot sizes and units placement. The demand for fast-track dwelling construction and cleaner production decisively outweighs the code inhibition; we further underscored the sustainability implication of the alternative prototype as the core of this study. The research suggests that modular thinking results in a resilient solution suited for the locality and the increasing demand for dwelling in the urban system.

Keywords: system prototype, urban resilience, human/environment dimension, modular thinking, dwelling alternative

Procedia PDF Downloads 144
4048 BIM Application and Construction Schedule Simulation for the Horizontal Work Area

Authors: Hyeon-Seong Kim, Sang-Mi Park, Seul-Gi Kim, Seon-Ju Han, Leen-Seok Kang

Abstract:

The use of BIM, including 4D CAD system, in a construction project is gradually increasing. Since the building construction works repeatedly in the vertical space, it is relatively easy to confirm the interference effect when applying the BIM, but the interference effect for the civil engineering project is relatively small because the civil works perform non-repetitive processes in the horizontal space. For this reason, it is desirable to apply BIM to the construction phase when applying BIM to the civil engineering project, and the most active BIM tool applied to the construction phase is the 4D CAD function for the schedule management. This paper proposes the application procedure of BIM by the construction phase of civil engineering project and a linear 4D CAD construction methodology suitable for the civil engineering project in which linear work is performed.

Keywords: BIM, 4D CAD, linear 4D simulation, VR

Procedia PDF Downloads 369
4047 A Sociological Investigation on the Population and Public Spaces of Nguyen Cong Tru, a Soviet-Style Collective Housing Complex in Hanoi in Regards to Its New Community-Focused Architectural Design

Authors: Duy Nguyen Do, Bart Julien Dewancker

Abstract:

Many Soviet-style collective housing complexes (also known as KTT) were built since the 1960s in Hanoi to support the post-war population growth. Those low-rise buildings have created well-knitted, robust communities, so much to the point that in most complexes, all families in one housing block would know each other, occasionally interact and provide supports in need. To understand how the community of collective housing complexes have developed and maintained in order to adapt their advantages into modern housing designs, the study is executed on the site of Nguyen Cong Tru KTT. This is one of the oldest KTT in Hanoi, completed in 1954. The complex also has an unique characteristic that is closely related to its community: the symbiotic relationship with Hom – a flea market that has been co-developing with Nguyen Cong Tru KTT since its beginning. The research consists of three phases: the first phase is a sociological investigation with Nguyen Cong Tru KTT’s current residents and a site survey on the complex’s economic and architectural characteristics. In the second phase, the collected data is analyzed to find out people’s opinions with the KTT’s concerning their satisfaction with the current housing status, floor plan organization, community, the relationship between the KTT’s dedicated public spaces with the flea market and their usage. Simultaneously, the master plan and gathered information regarding current architectural characteristics of the complex are also inspected. On the third phase, the analyses’ results will provide information regarding the issues, positive trends and significant historical features of the complex’s architecture in order to generate suitable proposals for the redesigning project of Nguyen Cong Tru KTT, a design focused on vitalizing modern apartments’ communities.

Keywords: collective house community, collective house public space, community-focused, redesigning Nguyen Cong Tru KTT, sociological investigation

Procedia PDF Downloads 330
4046 Managing Projects in Practice. A Perspective of Stakeholder Management in Managing Stakeholders within the UK Construction Projects

Authors: Faraz Ali Memon

Abstract:

Stakeholders are a vital part of any organisation. It includes working on the demands of different stakeholders within the projects. However, the reality of construction projects is slightly different when it comes to practice. The UK construction projects have a history of failing to complete projects on time and within the budget. The purpose of this qualitative study is to enhance knowledge of stakeholder engagement. Semi-structured interviews will be carried out using a purposive sampling technique. It includes interviewing and getting knowledge from industry practitioners from top UK construction firms on how to manage stakeholders effectively. The findings from this study will help in understanding stakeholders' impact and how the engagement of stakeholders can affect construction projects. The conclusions of this study add value to the existing body of knowledge on stakeholder management, especially in the UK, where academic studies on construction projects are few. As a contribution, this study will provide a practical guide for the practitioners to engage stakeholders within the scope of the project. In addition, this study is limited to UK construction projects. Therefore, the outcome may not be generalised to other developing and underdeveloped countries.

Keywords: stakeholders, UK construction, project management, cost and time

Procedia PDF Downloads 59
4045 Lean Construction Techniques in Construction Projects of Pakistan

Authors: Aftab Hameed Memon, Shadab Noor, Muhammad Akram Akhund

Abstract:

Lean construction is a philosophy adopted in the construction industry to increase the value of a project by reducing waste and improving construction productivity. Lean emphasizes on maximizing the value of a project with less expenditure. Globally, lean philosophy has received wider popularity in construction sector. Lean construction has supported the practitioners with several tools and techniques to implement at various stages of a construction project. Following the global trends, this study has investigated the lean practice in Pakistan. The level of implementation of different lean tools and techniques altogether with potential benefits experienced by its implementation in construction projects of Pakistan is analyzed. To achieve the targets, the opinion was sought by the practitioners involved in handling construction projects representing four stakeholders that are a client, consultant, contractors and material suppliers through a structured questionnaire. A total of 34 completed questionnaires were collected and then statistically analyzed. The findings of the analysis have highlighted that pull approach, work standardization, just in time, increase visualization tools, integrated project delivery method and fail-safe for quality are common lean techniques implemented in the local construction industry. While reduction in waste, client’s satisfaction, improved communication, visual control and proper task management are major benefits of the lean construction application.

Keywords: lean construction, lean tools and techniques, lean benefits, waste reduction, Pakistan

Procedia PDF Downloads 261
4044 Planning of Construction Material Flow Using Hybrid Simulation Modeling

Authors: A. M. Naraghi, V. Gonzalez, M. O'Sullivan, C. G. Walker, M. Poshdar, F. Ying, M. Abdelmegid

Abstract:

Discrete Event Simulation (DES) and Agent Based Simulation (ABS) are two simulation approaches that have been proposed to support decision-making in the construction industry. Despite the wide use of these simulation approaches in the construction field, their applications for production and material planning is still limited. This is largely due to the dynamic and complex nature of construction material supply chain systems. Moreover, managing the flow of construction material is not well integrated with site logistics in traditional construction planning methods. This paper presents a hybrid of DES and ABS to simulate on-site and off-site material supply processes. DES is applied to determine the best production scenarios with information of on-site production systems, while ABS is used to optimize the supply chain network. A case study of a construction piling project in New Zealand is presented illustrating the potential benefits of using the proposed hybrid simulation model in construction material flow planning. The hybrid model presented can be used to evaluate the impact of different decisions on construction supply chain management.

Keywords: construction supply-chain management, simulation modeling, decision-support tools, hybrid simulation

Procedia PDF Downloads 175
4043 Stress Variation of Underground Building Structure during Top-Down Construction

Authors: Soo-yeon Seo, Seol-ki Kim, Su-jin Jung

Abstract:

In the construction of a building, it is necessary to minimize construction period and secure enough work space for stacking of materials during the construction especially in city area. In this manner, various top-down construction methods have been developed and widely used in Korea. This paper investigates the stress variation of underground structure of a building constructed by using SPS (Strut as Permanent System) known as a top-down method in Korea through an analytical approach. Various types of earth pressure distribution related to ground condition were considered in the structural analysis of an example structure at each step of the excavation. From the analysis, the most high member force acting on beams was found when the ground type was medium sandy soil and a stress concentration was found in corner area.

Keywords: construction of building, top-down construction method, earth pressure distribution, member force, stress concentration

Procedia PDF Downloads 267
4042 A Review of the Major Factors of Cost Overrun in Construction Projects

Authors: Hassan Abdelgadir

Abstract:

Cost overruns have harmed the economies and reputations of several construction companies around the world. Many project management systems have been developed to keep track of a project's budget. However, due to several cost overrun difficulties in the construction industry, cost management is still deemed inadequate. As a result, the goal of this term paper is to identify and group prospective construction project cost overrun reasons based on their origin groups.Basically, all potential cost overrun elements were rigorously checked through 1iterature analysis before being divided into seven (7) groups of originating components, including project, contract, client, contractor, consultant, labor, and external. Each potential factor was completely defined with examples.

Keywords: construction projects, cost overruns, construction company, factors effect costoverruns

Procedia PDF Downloads 39
4041 Environmental Issues in Construction Projects in India

Authors: Gurbir Singh Khaira, Anmoldeep Singh Kang

Abstract:

Exposures to environmental pollution remain a major source of health risk throughout the world, though risks are generally higher in developing countries, where poverty, lack of investment in modern technology and weak environmental legislation combine to cause high pollution levels. This paper will tell us about the environment is threatened severely by so many problems, some of which are caused by the activities of Construction Projects. The research reveals major environmental impacts of building construction projects to include environmental pollution, resource depletion and habitat destruction causing Destruction of ecosystem, Desertification, Soil Erosion and increasing Material Wastage. Construction is considered as one of the main sources of environmental pollution in the world, the level of knowledge and awareness of project participants, especially project managers, with regards to environmental impacts of construction processes needs to be enhanced. It was found that ‘Transportation Resource’, ‘Noise Pollution’, and ‘Dust Generation with Construction Machinery’ are the greatest environmental impacts in INDIA respectively. The results of this study are useful for construction managers and other participants in construction sites to become aware of construction processes impacts on the environment.

Keywords: construction projects, environmental impacts, material waste age, awareness

Procedia PDF Downloads 336
4040 Labor Productivity in the Construction Industry: Factors Influencing the Spanish Construction Labor Productivity

Authors: G. Robles, A. Stifi, José L. Ponz-Tienda, S. Gentes

Abstract:

This research paper aims to identify, analyze and rank factors affecting labor productivity in Spain with respect to their relative importance. Using a selected set of 35 factors, a structured questionnaire survey was utilized as the method to collect data from companies. Target population is comprised by a random representative sample of practitioners related with the Spanish construction industry. Findings reveal the top five ranked factors are as follows: (1) shortage or late supply of materials; (2) clarity of the drawings and project documents; (3) clear and daily task assignment; (4) tools or equipment shortages; (5) level of skill and experience of laborers. Additionally, this research also pretends to provide simple and comprehensive recommendations so that they could be implemented by construction managers for an effective management of construction labor forces.

Keywords: construction management, factors, improvement, labor productivity, lean construction

Procedia PDF Downloads 264
4039 From De Soto’s Solution to Urban Disaster: The Effects of Land Titling Policies on the Development of Cities of the Global South in the Case of Lima Peru

Authors: Jitka Molnarova

Abstract:

Based on De Soto’s idea that a formal land title can provide a secure home and access to credit to poor urban families, a large number of developing countries accepted the formalization of informal settlements as the ultimate solution for their housing crises and struggles with poverty. After two decades of implementation, very little is known about the effects this policy has on the quality of the neighborhoods it produces and on the development of cities in general. Using the capital of Peru -where the solution originated- as a case study, this paper illustrates the negative outcomes this policy has on urban development arguing that land titling encourages 1) expansion of the city often to areas of high physical risk, 2) production of precarious housing on unserviced land, and 3) practices of illegal land trafficking. The evidence is based on interviews with community leaders and officials working at the Cooperation for Formalization of Informal Property (COFOPRI), comparison of satellite images documenting the expansion of Lima in the past twenty years, and a technical evaluation of dozens of houses that have been or are in the process of being granted a land title.

Keywords: COFOPRI, De Soto, housing policies, land titling, land trafficking, Lima, Peru, precarious housing, urban expansion

Procedia PDF Downloads 152
4038 Exploring the Relationship between Building Construction Activity and Road-Related Expenditure in Victoria

Authors: Md. Aftabuzzaman, Md. Kamruzzaman

Abstract:

Road-related expenditure and building construction activity are two significant drivers of the Victorian economy. This paper investigates the relationship between building construction activity and road-related expenditure. Data for construction activities were collected from Victorian Building Authority, and road-related expenditure data were explored by the Bureau of Infrastructure and Transport Research Economics. The trend between these two sectors was compared. The analysis found a strong relationship between road-related expenditure and the volume of construction activity, i.e., the more construction activities, the greater the requirement of road-related expenditure, or vice-versa. The road-related expenditure has a two-year lag period, suggesting that the road sector requires two years to respond to the growth in the building sector.

Keywords: building construction activity, infrastructure, road expenditure, Victorian Building Authority

Procedia PDF Downloads 100
4037 Examples from a Traditional Sismo-Resistant Architecture

Authors: Amira Zatir, Abderahmane Mokhtari, Amina Foufa, Sara Zatir

Abstract:

It exists in several regions in the world, of numerous historic monuments, buildings and housing environment, built in traditional ways which survive for earthquakes, even in zones where the seismic risk is particularly raised. These constructions, stemming from vernacular architecture, allow, through their resistances in the time earthquakes, to identify the various sismo-resistant "local" techniques. Through the examples and the experiences presented, the remark which can be made, is that in the traditional built, two major principles in a way opposite, govern the constructions in earthquake-resistant. It is about the very big flexibility, whom answer very light constructions, like the Japanese wooden constructions, Turkish and even Chinese; that of the very big rigidity to which correspond constructions in masonry in particular stone, more or less heavy and massive, which we meet in particular in the Mediterranean Basin, and in the historic sanctuary of Machu Pacchu. In it sensible and well-reflected techniques of construction are added, of which the use of the humble materials such as the earth and the adobe. The ancient communities were able to face the seismic risks, thanks to them know-how reflected in their intelligently designed constructions, testifying of a local seismic culture.

Keywords: earthquake, architecture, traditional, construction, resistance

Procedia PDF Downloads 386
4036 Conflict Causes within Construction Projects; Conflict Interaction across Project Phases

Authors: Abdullah Mohammed Alshehri

Abstract:

The projects in the construction industry have significantly increased, given its contribution to the overall Gross Domestic Product (GDP) of the countries. Reflecting upon the complex nature and involvement of various agents, the study aims to analyze the conflicts cause within construction projects. Therefore, the study strived to come out with understanding the levels of conflict interaction across project phases. However, this conducted by investigating the association between antecedents and apparent conflicts inherent in. The study used a qualitative approach for collecting the data through a quantitative, semi-structured method. Formation of a questionnaire survey has been conducted for over 30 respondents. However, the survey came out with the identification of 25 conflict cause categories, which can take place in different construction project phases, including pre-design phase, pre-construction phase, construction phase, commissioning, and completion phase. For example, conflicts associated with inconsistencies or discrepancies within or between project documents, which took place at tendering time in the pre-construction phase were relatable with the selection of material specifications that should be supplied or used in the construction projects at the construction phase. Its analysis can provide comprehensive understanding, trace the root of the problem, which offers a roadmap to deepen the understanding of the conflict conditions and ‘course of action’ necessary for project management strategy actions toward avoiding or minimizing conflict causes at project life.

Keywords: construction, conflict causes, levels, interaction, phases

Procedia PDF Downloads 147
4035 Addressing Housing Issue at Regional Level Planning: A Case Study of Mumbai Metropolitan Region

Authors: Bhakti Chitale

Abstract:

Mumbai city, which is the business capital of India and one of the most crowded cities in the world, holds the biggest slum in Asia. The Mumbai Metropolitan Region (MMR) occupies an area of 4035 sq.km. with a population of 22.8 million people. This population is mostly urban with 91% of this population living in areas of Municipal Corporations and Councils. Another 3% live in Census Towns. The region has 9 Municipal Corporations, 8 Municipal councils, and around 1000 villages. On the one hand MMR reflects the highest contribution to the Nations overall economy and on the other hand it shows the horrible and intolerable picture of about 2 million people, who are living in slums/without even slum with totally unhygienic conditions and with total loss of hope. The generations are about to get affected adversely if the solution is not worked out. This study is an attempt towards working out the solution. Mumbai Metropolitan Region Development Authority (MMRDA) is state government's authority, specially formed to govern the development of MMR. MMRDA is engaged in long term planning, promotion of new growth centres, implementation of strategic projects and financing infrastructure development. While preparing the master plan for MMR for next 20 years MMRDA conducted a detail study regarding Housing scenario in MMR and possible options for improvement. The author was the in charge officer for the said assignment. This paper puts light on the interesting outcomes of the research study, which ranges from the adverse effects of government policies, automatic responses of housing market, effects on planning processes, and overall changing needs of housing patterns in the world due to changes in the social mechanism. It alarms the urban planners who usually focus on smart infrastructure development, about allied future dangers. This housing study will explain the complexities, realities and needs of innovations in the housing policies all over the world. The paper will explain further few success stories and failure stories of government initiatives with reasons. It gives the clear idea about the differences in needs of housing for people from different economic groups and direct and indirect market pressures on low cost housing. Magical phenomenon came in front like a large percentage of vacant houses is present in spite of the huge need. Housing market gets affected by the developments or any other physical and financial changes taking place in the nearby areas or cities, also by changes in cities which are located far from the region and also by the international investments or policy changes. Instead of just depending on governments actions in case of generation of affordable housing, it becomes equally important to make the housing markets automatically generate such stock and still make them sustainable is the aim of all the movement. In summary, we may say that the paper will sequentially elaborate the complete dynamics of housing in one of the most crowded urban area in the world that is Mumbai Metropolitan Region, with a lot of data, analysis, case studies, and recommendations.

Keywords: Mumbai India, slum housing, region planning, market recommendations

Procedia PDF Downloads 251
4034 Building a Lean Construction Body of Knowledge

Authors: Jyoti Singh, Ahmed Stifi, Sascha Gentes

Abstract:

The process of construction significantly contributes to high level of risks, complexity and uncertainties leading to cost and time overrun, customer dissatisfaction etc. lean construction is important as it is a comprehensive system of tools and concepts focusing on moving closer to customer satisfaction by understanding the process, identifying the waste and eliminating it. The proposed work includes identification of knowledge areas from lean perspective, lean tools/concepts used in lean construction and establishing a relationship matrix between knowledge areas and lean tools/concepts, thus developing and building up a lean construction body of knowledge (LCBOK), i.e. a guide to lean construction, aiming to provide guidelines to manage individual projects and also helping construction industry to minimise waste and maximize value to the customer. In this study, we identified 8 knowledge areas and 62 lean tools/concepts from lean perspective and also one tool can help to manage two or more knowledge areas.

Keywords: knowledge areas, lean body matrix, lean construction, lean tools

Procedia PDF Downloads 406
4033 Housing Recovery in Heavily Damaged Communities in New Jersey after Hurricane Sandy

Authors: Chenyi Ma

Abstract:

Background: The second costliest hurricane in U.S. history, Sandy landed in southern New Jersey on October 29, 2012, and struck the entire state with high winds and torrential rains. The disaster killed more than 100 people, left more than 8.5 million households without power, and damaged or destroyed more than 200,000 homes across the state. Immediately after the disaster, public policy support was provided in nine coastal counties that constituted 98% of the major and severely damaged housing units in NJ overall. The programs include Individuals and Households Assistance Program, Small Business Loan Program, National Flood Insurance Program, and the Federal Emergency Management Administration (FEMA) Public Assistance Grant Program. In the most severely affected counties, additional funding was provided through Community Development Block Grant: Reconstruction, Rehabilitation, Elevation, and Mitigation Program, and Homeowner Resettlement Program. How these policies individually and as a whole impacted housing recovery across communities with different socioeconomic and demographic profiles has not yet been studied, particularly in relation to damage levels. The concept of community social vulnerability has been widely used to explain many aspects of natural disasters. Nevertheless, how communities are vulnerable has been less fully examined. Community resilience has been conceptualized as a protective factor against negative impacts from disasters, however, how community resilience buffers the effects of vulnerability is not yet known. Because housing recovery is a dynamic social and economic process that varies according to context, this study examined the path from community vulnerability and resilience to housing recovery looking at both community characteristics and policy interventions. Sample/Methods: This retrospective longitudinal case study compared a literature-identified set of pre-disaster community characteristics, the effects of multiple public policy programs, and a set of time-variant community resilience indicators to changes in housing stock (operationally defined by percent of building permits to total occupied housing units/households) between 2010 and 2014, two years before and after Hurricane Sandy. The sample consisted of 51 municipalities in the nine counties in which between 4% and 58% of housing units suffered either major or severe damage. Structural equation modeling (SEM) was used to determine the path from vulnerability to the housing recovery, via multiple public programs, separately and as a whole, and via the community resilience indicators. The spatial analytical tool ArcGIS 10.2 was used to show the spatial relations between housing recovery patterns and community vulnerability and resilience. Findings: Holding damage levels constant, communities with higher proportions of Hispanic households had significantly lower levels of housing recovery while communities with households with an adult >age 65 had significantly higher levels of the housing recovery. The contrast was partly due to the different levels of total public support the two types of the community received. Further, while the public policy programs individually mediated the negative associations between African American and female-headed households and housing recovery, communities with larger proportions of African American, female-headed and Hispanic households were “vulnerable” to lower levels of housing recovery because they lacked sufficient public program support. Even so, higher employment rates and incomes buffered vulnerability to lower housing recovery. Because housing is the "wobbly pillar" of the welfare state, the housing needs of these particular groups should be more fully addressed by disaster policy.

Keywords: community social vulnerability, community resilience, hurricane, public policy

Procedia PDF Downloads 338