Search results for: asset quality
10155 Asset Pricing Model: A Quality Paradigm
Authors: Urmi Khatri
Abstract:
Capital asset pricing model (CAPM) draws a direct relationship between the risk and the expected rate of return. There was a criticism on the beta and the assumptions of CAPM, as they are not applicable in the real world. Fama French Three Factor Model and Fama French Five Factor Model have given different factors, which have an impact on the return of any asset like size, value, investment and profitability. This study proposes to see Capital Asset pricing Model through the lenses of the quality aspect. In the study, the six factors are studied. The Fama French Five Factor Model and addition of the quality dimension are studied. Here, Graham’s seven quality and quantity criteria are measured to determine the score of the sample firms. Thus, this study tries to check the model fit. The beta coefficient of the quality dimension and the R square value is seen to determine validity of the proposed model. The sample is drawn from the firms listed on Indian Stock Exchange (BSE). For the study, only nonfinancial firms are been selected. The time period of the study is from January 1999 to December 2019. Hence, the primary objective of the study is to check how robust the model becomes after giving the quality dimension to the capital asset pricing model in addition to the size, value, profitability and investment.Keywords: asset pricing model, CAPM, Graham’s score, G-score, multifactor model, quality
Procedia PDF Downloads 16010154 An Approach to Manage and Evaluate Asset Performance
Authors: Mohammed Saif Al-Saidi, John P. T. Mo
Abstract:
Modern engineering assets are complex and very high in value. They are expected to function for years to come, with ability to handle the change in technology and ageing modification. The aging of an engineering asset and continues increase of vendors and contractors numbers forces the asset operation management (or Owner) to design an asset system which can capture these changes. Furthermore, an accurate performance measurement and risk evaluation processes are highly needed. Therefore, this paper explores the nature of the asset management system performance evaluation for an engineering asset based on the System Support Engineering (SSE) principles. The research work explores the asset support system from a range of perspectives, interviewing managers from across a refinery organisation. The factors contributing to complexity of an asset management system are described in context which clusters them into several key areas. It is proposed that SSE framework may then be used as a tool for analysis and management of asset. The paper will conclude with discussion of potential application of the framework and opportunities for future research.Keywords: asset management, performance, evaluation, modern engineering, System Support Engineering (SSE)
Procedia PDF Downloads 68010153 Board of Directors Characteristics and Credit Union Financial Performance
Authors: Luisa Unda, Kamran Ahmed, Paul Mather
Abstract:
We examine the effect of board characteristics on the performance and asset quality of credit unions in Australia, using a large sample covering the period 2004-2012. Credit unions are unique in that they are customer-owned financial institutions and directors are democratically elected by members, which is distinctly different from other financial institutions, such as commercial banks. We find that board remuneration, board expertise, and attendance at board meetings have significantly positive impacts on credit union performance and asset quality, while board members who hold multiple directorships (busy directors), have a significant negative impact on credit union performance. Financial performance also improves with larger boards and long-tenured directors in credit unions. All of these relations hold after we control for alternative measures of performance, credit union characteristics and endogeneity problem.Keywords: credit unions, corporate governance, board of directors, financial performance, Australia, asset quality
Procedia PDF Downloads 52110152 Whether Asset Growth is Systematic Risk: Evidence from Thailand
Authors: Thitima Chaiyakul
Abstract:
The number of previous literature regarding to the effect of asset growth and equity returns is small. Furthermore, those literature are mainly focus in the developed markets. According to my knowledge, there is no published paper examining the effect of asset growth and equity returns in the Stock Exchange of Thailand in different industry groups. The main objective in this research is the testing the effect of asset growth to equity returns in different industry groups. This study employs the data of the listed companies in the Stock Exchange of Thailand during January 1996 and December 2014. The data of financial industry are exclude from this study due to the different meaning of accounting terms. The results show the supported evidence that the asset growth positively affects the equity returns at a statistically significance level of at least 5% in Agro& Food Industry, Industrials, and Services Industry Groups. These results are inconsistent with the previous research testing in developed markets. Nevertheless, the statistically significances of the effect of asset growth to equity returns appear in some cases. In summary, the asset growth is a non-systematic risk and it is a mispricing factor.Keywords: asset growth, asset pricing, equity returns, Thailand
Procedia PDF Downloads 35310151 Condition Assessment of State-Owned Immovable Assets in South Africa
Authors: Collen Maseloane, Chris Cloete
Abstract:
The study investigated the status of building condition assessments of state-owned immovable assets in South Africa. A stratified random sample of 200 (out of 372) personnel was drawn from the eight rele-vant business units of the Department of Public Works (DPW). A questionnaire comprising open-ended questions was distributed to the sampled participants and a total of 139 completed questionnaires were received. A significant number of state asset properties were found to be in poor condition owing to the asset managers’ inability to access automated information on the conditions of assets. It is recommended that the immovable asset register of the Department requires constant enhancement to update information on the condition of each state-owned immovable asset under its custodianship. Implementation of the proposals should contribute to the maintenance of the value of state assets in South Africa.Keywords: building condition assessment, immovable asset register, life cycle asset management, public works, South Africa
Procedia PDF Downloads 14610150 A Data Mining Approach for Analysing and Predicting the Bank's Asset Liability Management Based on Basel III Norms
Authors: Nidhin Dani Abraham, T. K. Sri Shilpa
Abstract:
Asset liability management is an important aspect in banking business. Moreover, the today’s banking is based on BASEL III which strictly regulates on the counterparty default. This paper focuses on prediction and analysis of counter party default risk, which is a type of risk occurs when the customers fail to repay the amount back to the lender (bank or any financial institutions). This paper proposes an approach to reduce the counterparty risk occurring in the financial institutions using an appropriate data mining technique and thus predicts the occurrence of NPA. It also helps in asset building and restructuring quality. Liability management is very important to carry out banking business. To know and analyze the depth of liability of bank, a suitable technique is required. For that a data mining technique is being used to predict the dormant behaviour of various deposit bank customers. Various models are implemented and the results are analyzed of saving bank deposit customers. All these data are cleaned using data cleansing approach from the bank data warehouse.Keywords: data mining, asset liability management, BASEL III, banking
Procedia PDF Downloads 55510149 Performance Analysis of a Hybrid Channel for Foglet Assisted Smart Asset Reporting
Authors: Hasan Farahneh
Abstract:
Smart asset management along roadsides and in deserted areas is a topic of deprived attention. We find most of the work in emergency reporting services in intelligent transportation systems (ITS) and rural areas but not much in asset reporting. Currently, available asset management mechanisms are based on scheduled maintenance and do not effectively report any emergency situation in a timely manner. This paper is the continuation of our previous work, in which we proposed the usage of Foglets and VLC link between smart vehicles and road side assets. In this paper, we propose a hybrid communication system for asset management and emergency reporting architecture for smart transportation. We incorporate Foglets along with visible light communication (VLC) and radio frequency (RF) communication. We present the channel model and parameters of a hybrid model to support an intelligent transportation system (ITS) system. Simulations show high improvement in the system performance in terms of communication range and received data. We present a comparative analysis of a hybrid ITS system.Keywords: Internet of Things, Foglets, VLC, RF, smart vehicle, roadside asset management
Procedia PDF Downloads 13510148 Assets and Health: Examining the Asset-Building Theoretical Framework and Psychological Distress
Authors: Einav Srulovici, Michal Grinstein-Weiss, George Knafl, Linda Beeber, Shawn Kneipp, Barbara Mark
Abstract:
Background: The asset-building theoretical framework (ABTF) is acknowledged as the most complete framework thus far for depicting the relationships between asset accumulation (the stock of a household’s saved resources available for future investment) and health outcomes. Although the ABTF takes into consideration the reciprocal relationship between asset accumulation and health, no ABTF based study has yet examined this relationship. Therefore, the purpose of this study was to test the ABTF and psychological distress, focusing on the reciprocal relationship between assets accumulation and psychological distress. Methods: The study employed longitudinal data from 6,295 families from the 2001 and 2007 Panel Study of Income Dynamics data sets. Structural equation modeling (SEM) was used to test the reciprocal relationship between asset accumulation and psychological distress. Results: In general, the data displayed a good fit to the model. The longitudinal SEM found that asset accumulation significantly increased with a decreased in psychological distress over time, while psychological distress significantly increased with an increase in asset accumulation over time, confirming the existence of the hypothesized reciprocal relationship. Conclusions: Individuals who are less psychological distressed might have more energy to engage in activities, such as furthering their education or obtaining better jobs that are in turn associated with greater asset accumulation, while those who have greater assets may invest those assets in riskier investments, resulting in increased psychological distress. The confirmation of this reciprocal relationship highlights the importance of conducting longitudinal studies and testing the reciprocal relationship between asset accumulation and other health outcomes.Keywords: asset-building theoretical framework, psychological distress, structural equation modeling, reciprocal relationship
Procedia PDF Downloads 39510147 The Development of Asset Valuation Techniques for Government Business Enterprises in Australia
Authors: Malcolm Abbott, Angela Tan-Kantoor
Abstract:
The purpose of this paper is to look at the varieties of ways in which regulators have undertaken asset valuations in Australia of government business enterprises as part of utility regulation. Regulation of the monopoly elements, through use of a building block approach, led to a need to estimate regulated asset bases. This development has had an influence on the manner in which Australian companies (both government and privately owned ones) have valued assets for the purpose of financial reporting. As the regulators in Australia did not always use a consistent approach it had meant that a variety of ways have been used to value the assets of government owned enterprises, and meant a varied impact on asset valuation more generally.Keywords: sset valuation, regulation, government business enterprises
Procedia PDF Downloads 31010146 Exploring the Impact of Asset Diversification on Financial Performance: An Explanatory Study of Ethiopian Commercial Banks
Authors: Mitku Malede Ymer
Abstract:
The study was mainly intended to explore the impact of asset diversification on the financial performance of thirteen purposely selected Ethiopian commercial banks with seven consecutive years of data for the period 2011-2017, considering the availability of data. An explanatory research design has been employed to determine the impact of asset diversification on financial performance. In the meantime, a quantitative approach was used to construct the empirical model. Banks’ financial performance was measured using return on asset, and the four variables used to measure asset diversification were cash holding, fixed assets, foreign deposits, and NBE Bills, which were predictor variables. Again, the size of the bank was considered as a control variable. Then, a pooled panel regression model was employed to analyze the collected data. The result pretends that cash holding has a positive but marginally insignificant effect on financial performance, fixed assets, and foreign bank deposits have a positive and significant effect on financial performance, and NBE Bills have a negative and significant effect on banks' financial performance. Ultimately, it has been concluded that asset diversification has a significant effect on financial performance in the Ethiopian commercial banking sector. Hence, a researcher suggests that banks need to optimize their asset diversification so as to realize maximum profit and minimize the cost of funds based on the result of the study.Keywords: asset diversification, financial performance, role, commercial banks
Procedia PDF Downloads 2010145 Numerical Simulation of Wishart Diffusion Processes
Authors: Raphael Naryongo, Philip Ngare, Anthony Waititu
Abstract:
This paper deals with numerical simulation of Wishart processes for a single asset risky pricing model whose volatility is described by Wishart affine diffusion processes. The multi-factor specification of volatility will make the model more flexible enough to fit the stock market data for short or long maturities for better returns. The Wishart process is a stochastic process which is a positive semi-definite matrix-valued generalization of the square root process. The aim of the study is to model the log asset stock returns under the double Wishart stochastic volatility model. The solution of the log-asset return dynamics for Bi-Wishart processes will be obtained through Euler-Maruyama discretization schemes. The numerical results on the asset returns are compared to the existing models returns such as Heston stochastic volatility model and double Heston stochastic volatility modelKeywords: euler schemes, log-asset return, infinitesimal generator, wishart diffusion affine processes
Procedia PDF Downloads 37910144 Fair Value Implementation of Financial Asset: Evidence in Indonesia’s Banking Sector
Authors: Alhamdi Alfi Fajri
Abstract:
The purpose of this study is to analyze and to give empirical proof about the effect of fair value implementation on financial asset against information asymmetry in Indonesia’s banking sector. This research tested the effect of fair value implementation on financial asset based on Statement of Financial Accounting Standard (PSAK) No. 55 and the fair value reliability measurement based on PSAK No. 60 against level of information asymmetry. The scope of research is Indonesia’s banking sector. The test’s result shows that the use of fair value based on PSAK No. 55 is significantly associated with information asymmetry. This positive relation is higher than the amortized cost implementation on financial asset. In addition, the fair value hierarchy based on PSAK No. 60 is significantly associated with information asymmetry. This research proves that the more reliable measurement of fair value on financial asset, the more observable fair value measurement and reduces level of information asymmetry.Keywords: fair value, PSAK No. 55, PSAK No. 60, information asymmetry, bank
Procedia PDF Downloads 35510143 GIS Data Governance: GIS Data Submission Process for Build-in Project, Replacement Project at Oman electricity Transmission Company
Authors: Rahma Saleh Hussein Al Balushi
Abstract:
Oman Electricity Transmission Company's (OETC) vision is to be a renowned world-class transmission grid by 2025, and one of the indications of achieving the vision is obtaining Asset Management ISO55001 certification, which required setting out a documented Standard Operating Procedures (SOP). Hence, documented SOP for the Geographical information system data process has been established. Also, to effectively manage and improve OETC power transmission, asset data and information need to be governed as such by Asset Information & GIS department. This paper will describe in detail the current GIS data submission process and the journey for developing it. The methodology used to develop the process is based on three main pillars, which are system and end-user requirements, Risk evaluation, data availability, and accuracy. The output of this paper shows the dramatic change in the used process, which results subsequently in more efficient, accurate, and updated data. Furthermore, due to this process, GIS has been and is ready to be integrated with other systems as well as the source of data for all OETC users. Some decisions related to issuing No objection certificates (NOC) for excavation permits and scheduling asset maintenance plans in Computerized Maintenance Management System (CMMS) have been made consequently upon GIS data availability. On the Other hand, defining agreed and documented procedures for data collection, data systems update, data release/reporting and data alterations has also contributed to reducing the missing attributes and enhance data quality index of GIS transmission data. A considerable difference in Geodatabase (GDB) completeness percentage was observed between the years 2017 and year 2022. Overall, concluding that by governance, asset information & GIS department can control the GIS data process; collect, properly record, and manage asset data and information within the OETC network. This control extends to other applications and systems integrated with/related to GIS systems.Keywords: asset management ISO55001, standard procedures process, governance, CMMS
Procedia PDF Downloads 12510142 Requirements for a Shared Management of State-Owned Building in the Archaeological Park of Pompeii
Authors: Maria Giovanna Pacifico
Abstract:
Maintenance, in Italy, is not yet a consolidated practice despite the benefits that could come from. Among the main reasons, there are the lack of financial resources and personnel in the public administration and a general lack of knowledge about how to activate and to manage a prevented and programmed maintenance. The experimentation suggests that users and tourists could be involved in the maintenance process from the knowledge phase to the monitoring ones by using mobile devices. The goal is to increase the quality of Facility Management for cultural heritage, prioritizing usage needs, and limiting interference between the key stakeholders. The method simplifies the consolidated procedures for the Information Systems, avoiding a loss in terms of quality and amount of information by focusing on the users' requirements: management economy, user safety, accessibility, and by receiving feedback information to define a framework that will lead to predictive maintenance. This proposal was designed to be tested in the Archaeological Park of Pompeii on the state property asset.Keywords: asset maintenance, key stakeholders, Pompeii, user requirement
Procedia PDF Downloads 12710141 Maintenance Objective-Based Asset Maintenance Maturity Model
Authors: James M. Wakiru, Liliane Pintelon, Peter Muchiri, Peter Chemweno
Abstract:
The fast-changing business and operational environment are forcing organizations to adopt asset performance management strategies, not only to reduce costs but also maintain operational and production policies while addressing demand. To attain optimal asset performance management, a framework that ensures a continuous and systematic approach to analyzing an organization’s current maturity level and expected improvement regarding asset maintenance processes, strategies, technologies, capabilities, and systems is essential. Moreover, this framework while addressing maintenance-intensive organizations should consider the diverse business, operational and technical context (often dynamic) an organization is in and realistically prescribe or relate to the appropriate tools and systems the organization can potentially employ in the respective level, to improve and attain their maturity goals. This paper proposes an asset maintenance maturity model to assess the current capabilities, strength and weaknesses of maintenance processes an organization is using and analyze gaps for improvement via structuring set levels of achievement. At the epicentre of the proposed framework is the utilization of maintenance objective selected by an organization for various maintenance optimization programs. The framework adapts the Capability Maturity Model of assessing the maintenance process maturity levels in the organization.Keywords: asset maintenance, maturity models, maintenance objectives, optimization
Procedia PDF Downloads 22810140 Zero-Knowledge Proof-of-Reserve: A Confidential Approach to Cryptocurrency Asset Verification
Authors: Sam Ng, Lewis Leighton, Sam Atkinson, Carson Yan, Landan Hu, Leslie Cheung, Brian Yap, Kent Lung, Ketat Sarakune
Abstract:
This paper introduces a method for verifying cryptocurrency reserves that balances the need for both transparency and data confidentiality. Our methodology employs cryptographic techniques, including Merkle Trees, Bulletproof, and zkSnark, to verify that total assets equal or exceed total liabilities, represented by customer funds. Importantly, this verification is achieved without disclosing sensitive information such as the total asset value, customer count, or cold wallet addresses. We delve into the construction and implementation of this methodology. While the system is robust and scalable, we also identify areas for potential enhancements to improve its efficiency and versatility. As the digital asset landscape continues to evolve, our approach provides a solid foundation for ensuring continued trust and security in digital asset platforms.Keywords: cryptocurrency, crypto-currency, proof-of-reserve, por, zero-knowledge, ZKP
Procedia PDF Downloads 7210139 Implementation of Enterprise Asset Management (E-AM) System at Oman Electricity Transmission Company
Authors: Omran Al Balushi, Haitham Al Rawahi
Abstract:
Enterprise Asset Management (eAM) has been implemented across different Generation, Transmission and Distribution subsidiaries in Nama Group companies. As part of Nama group, Oman Electricity Transmission Company (OETC) was the first company to implement this system. It was very important for OETC to implement and maintain such a system to achieve its business objectives and for effective operations, which will also support the delivery of the asset management strategy. Enterprise Asset Management (eAM) addresses the comprehensive asset maintenance requirements of Oman Electricity Transmission Company (OETC). OETC needs to optimize capacity and increase utilization, while lowering unit production. E-AM will enable OETC to adopt this strategy. Implementation of e-AM has improved operation performance with preventive and scheduled maintenance as well as it increased safety. Implementation of e-AM will also enable OETC to create optimal asset management strategy which will increase revenue and decrease cost by effectively monitoring operational data such as maintenance history and operation conditions. CMMS (Computerised Maintenance Management System) is the main software and the back-bone of e-AM system. It is used to provide an improved working practice to properly establish information and data flow related to maintenance activities. Implementation of e-AM system was one of the factors that supported OETC to achieve ISO55001 Certificate on fourth quarter of 2016. Also, full implementation of e-AM system will result in strong integration between CMMS and Geographical Information Systems (GIS) application and it will improve OETC to build a reliable maintenance strategy for all asset classes in its Transmission network. In this paper we will share our experience and knowledge of implementing such a system and how it supported OETC’s management to make decisions. Also we would highlight the challenges and difficulties that we encountered during the implementation of e-AM. Also, we will list some features and advantages of e-AM in asset management, preventive maintenance and maintenance cost management.Keywords: CMMS, Maintenance Management, Asset Management, Maintenance Strategy
Procedia PDF Downloads 14710138 Development of an Index for Asset Class in Ex-Ante Portfolio Management
Authors: Miang Hong Ngerng, Noor Diyana Jasme, May Jin Theong
Abstract:
Volatile market environment is inevitable. Fund managers are struggling to choose the right strategy to survive and overcome uncertainties and adverse market movement. Therefore, finding certainty in the mist of uncertainty future is one of the key performance objectives for fund managers. Current available theoretical results are not practical due to strong reliance on the investment assumption made. This paper is to identify the component that can be forecasted in Ex-ante setting which is the realistic situation facing a fund manager in the actual execution of asset allocation in portfolio management. Partial lease square method was used to generate an index with 10 years accounting data from 191 companies listed in KLSE. The result shows that the index reflects the inner nature of the business and up to 30% of the stock return can be explained by the index.Keywords: active portfolio management, asset allocation ex-ante investment, asset class, partial lease square
Procedia PDF Downloads 27110137 Fama French Four Factor Model: A Study of Nifty Fifty Companies
Authors: Deeksha Arora
Abstract:
The study aims to explore the applicability of the widely used asset pricing models, namely, Capital Asset Pricing Model (CAPM) and the Fama-French Four Factor Model in the Indian equity market. The study will be based on the companies that form part of the Nifty Fifty Index for a period of five years: 2011 to 2016. The asset pricing model is examined by forming portfolios on the basis of three variables – market capitalization (size effect), book-to-market equity ratio (value effect) and profitability. The study provides a basis to test the presence of the Fama-French Four factor model in Indian stock market. This study may provide a basis for future research in the generalized asset pricing model comprising of multiple risk factors.Keywords: book to market equity, Fama French four factor model, market capitalization, profitability, size effect, value effect
Procedia PDF Downloads 26310136 Degradation Model for UK Railway Drainage System
Authors: Yiqi Wu, Simon Tait, Andrew Nichols
Abstract:
Management of UK railway drainage assets is challenging due to the large amounts of historical assets with long asset life cycles. A major concern for asset managers is to maintain the required performance economically and efficiently while complying with the relevant regulation and legislation. As the majority of the drainage assets are buried underground and are often difficult or costly to examine, it is important for asset managers to understand and model the degradation process in order to foresee the upcoming reduction in asset performance and conduct proactive maintenance accordingly. In this research, a Markov chain approach is used to model the deterioration process of rail drainage assets. The study is based on historical condition scores and characteristics of drainage assets across the whole railway network in England, Scotland, and Wales. The model is used to examine the effect of various characteristics on the probabilities of degradation, for example, the regional difference in probabilities of degradation, and how material and shape can influence the deterioration process for chambers, channels, and pipes.Keywords: deterioration, degradation, markov models, probability, railway drainage
Procedia PDF Downloads 22410135 A Theoretical Framework of Multifactor Systematic Risks in Equity Market: Behavioral Finance Paradigm
Authors: Jasman Tuyon, Zamri Ahmad
Abstract:
Behavioral asset pricing research has been gaining momentum since in 1990s. However, it is still incomplete and has been criticized for some philosophical, theoretical and model specification limitations. Due to these drawbacks, investors’ behaviors as a source of risk in behavioral asset pricing modeling still remains disputable. This paper aims to address these issues with an alternative perspective based on behavioral finance paradigm. Specifically, this paper proposes a theoretical linkages of both fundamental and behavioral risks on stock prices formation and an extension of the multifactor stock pricing model by combining multi-factor fundamentals and behavioral risks factors.Keywords: behavioral finance, multifactor asset pricing, behavioral risks, fundamental risks
Procedia PDF Downloads 49910134 GIS Data Governance: GIS Data Submission Process for Build-in Project, Replacement Project at Oman Electricity Transmission Company
Authors: Rahma Al Balushi
Abstract:
Oman Electricity Transmission Company's (OETC) vision is to be a renowned world-class transmission grid by 2025, and one of the indications of achieving the vision is obtaining Asset Management ISO55001 certification, which required setting out a documented Standard Operating Procedures (SOP). Hence, documented SOP for the Geographical information system data process has been established. Also, to effectively manage and improve OETC power transmission, asset data and information need to be governed as such by Asset Information & GIS dept. This paper will describe in detail the GIS data submission process and the journey to develop the current process. The methodology used to develop the process is based on three main pillars, which are system and end-user requirements, Risk evaluation, data availability, and accuracy. The output of this paper shows the dramatic change in the used process, which results subsequently in more efficient, accurate, updated data. Furthermore, due to this process, GIS has been and is ready to be integrated with other systems as well as the source of data for all OETC users. Some decisions related to issuing No objection certificates (NOC) and scheduling asset maintenance plans in Computerized Maintenance Management System (CMMS) have been made consequently upon GIS data availability. On the Other hand, defining agreed and documented procedures for data collection, data systems update, data release/reporting, and data alterations salso aided to reduce the missing attributes of GIS transmission data. A considerable difference in Geodatabase (GDB) completeness percentage was observed between the year 2017 and the year 2021. Overall, concluding that by governance, asset information & GIS department can control GIS data process; collect, properly record, and manage asset data and information within OETC network. This control extends to other applications and systems integrated with/related to GIS systems.Keywords: asset management ISO55001, standard procedures process, governance, geodatabase, NOC, CMMS
Procedia PDF Downloads 20810133 Who Save for Children’s Future Education in China: A Research Note
Authors: Jin Huang
Abstract:
Research shows that asset-building policies have positive financial and non-financial impacts on children and families. To promote the development of asset-building policies for children in China, it is important to understand the current status of family savings for children. We use the data from the 2016 China Family Panel Studies and show only 16% of families have savings designated for children’s future education. Families with advantaged socioeconomic backgrounds are more likely to save and also save more for their children than their counterparts with disadvantaged backgrounds. Without large-scale and progressive policy interventions, families with disadvantaged backgrounds are less likely to build assets for children. Policy and practice implications for family social workers are discussed.Keywords: assets, asset building, child, china, education, family, savings
Procedia PDF Downloads 8610132 Addressing the Gap in Health and Wellbeing Evidence for Urban Real Estate Brownfield Asset Management Social Needs and Impact Analysis Using Systems Mapping Approach
Authors: Kathy Pain, Nalumino Akakandelwa
Abstract:
The study explores the potential to fill a gap in health and wellbeing evidence for purposeful urban real estate asset management to make investment a powerful force for societal good. Part of a five-year programme investigating the root causes of unhealthy urban development funded by the United Kingdom Prevention Research Partnership (UKPRP), the study pilots the use of a systems mapping approach to identify drivers and barriers to the incorporation of health and wellbeing evidence in urban brownfield asset management decision-making. Urban real estate not only provides space for economic production but also contributes to the quality of life in the local community. Yet market approaches to urban land use have, until recently, insisted that neo-classical technology-driven efficient allocation of economic resources should inform acquisition, operational, and disposal decisions. Buildings in locations with declining economic performance have thus been abandoned, leading to urban decay. Property investors are recognising the inextricable connection between sustainable urban production and quality of life in local communities. The redevelopment and operation of brownfield assets recycle existing buildings, minimising embodied carbon emissions. It also retains established urban spaces with which local communities identify and regenerate places to create a sense of security, economic opportunity, social interaction, and quality of life. Social implications of urban real estate on health and wellbeing and increased adoption of benign sustainability guidance in urban production are driving the need to consider how they affect brownfield real estate asset management decisions. Interviews with real estate upstream decision-makers in the study, find that local social needs and impact analysis is becoming a commercial priority for large-scale urban real estate development projects. Evidence of the social value-added of proposed developments is increasingly considered essential to secure local community support and planning permissions, and to attract sustained inward long-term investment capital flows for urban projects. However, little is known about the contribution of population health and wellbeing to socially sustainable urban projects and the monetary value of the opportunity this presents to improve the urban environment for local communities. We report early findings from collaborations with two leading property companies managing major investments in brownfield urban assets in the UK to consider how the inclusion of health and wellbeing evidence in social valuation can inform perceptions of brownfield development social benefit for asset managers, local communities, public authorities and investors for the benefit of all parties. Using holistic case studies and systems mapping approaches, we explore complex relationships between public health considerations and asset management decisions in urban production. Findings indicate a strong real estate investment industry appetite and potential to include health as a vital component of sustainable real estate social value creation in asset management strategies.Keywords: brownfield urban assets, health and wellbeing, social needs and impact, social valuation, sustainable real estate, systems mapping
Procedia PDF Downloads 7010131 In Search of Zero Beta Assets: Evidence from the Sukuk Market
Authors: Andrea Paltrinieri, Alberto Dreassi, Stefano Miani, Alex Sclip
Abstract:
The financial crises caused a collapse in prices of most asset classes, raising the attention on alternative investments such as Sukuk, a smaller, fast growing but often misunderstood market. We study diversification benefits of Sukuk, their correlation with other asset classes and the effects of their inclusion in investment portfolios of institutional and retail investors, through a comprehensive comparison of their risk/return profiles during and after the financial crisis. We find a beneficial performance adjusted for the specific volatility together with a lower correlation especially during the financial crisis. The distribution of Sukuk returns is positively skewed and leptokurtic, with a risk/return profile similarly to high yield bonds. Overall, our results suggest that Sukuk present diversification opportunities, a significant volatility-adjusted performance and lower correlations especially during the financial crisis. Our findings are relevant for a number of institutional investors. Long term investors, such as life insurers would benefit from Sukuk’s protective features during financial crisis yet keeping return and growth opportunities, whereas banks would gain due to their role of placers, advisors, market makers or underwriters.Keywords: sukuk, zero beta asset, asset allocation, sukuk market
Procedia PDF Downloads 47910130 Accounting for Cryptocurrency: Urgent Need for an Accounting Standard
Authors: Fatima Ali Abbass, Hassan Ibrahim Rkein
Abstract:
The number of entities worldwide that currently accept digital currency as payment is increasing; however, digital currency still is not widely accepted as a medium of exchange, nor they represent legal tender. At the same time, this makes accounting for cryptocurrency, as cash (Currency) is not possible under IAS 7 and IAS 32, Cryptocurrency also cannot be accounted for as Financial Assets at fair value through profit or loss under IFRS 9. Therefore, this paper studies the possible means to account for Cryptocurrency, since, as of today, there is not yet an accounting standard that deals with cryptocurrency. The request to have a specific accounting standard is increasing from top accounting firms and from professional accounting bodies. This study uses a mixture of qualitative and quantitative analysis in its quest to explore the best possible way to account for cryptocurrency. Interviews and surveys were conducted targeting accounting professionals. This study highlighted the deficiencies in the current way of accounting for Cryptocurrency as intangible Assets with an indefinite life. The deficiency becomes well highlighted, as the asset will then be subject to impairment, where under GAAP, only depreciation in the value of the intangible asset is recognized. On the other hand, appreciation in the value of the asset is ignored, and this prohibits the reporting entity from showing the true value of the cryptocurrency asset. This research highlights the gap that arises due to using accounting standards that are not specific for Cryptocurrency and this study confirmed that there is an urgent need to call upon the accounting standards setters (IASB and FASB) to issue accounting standards specifically for Cryptocurrency.Keywords: cryptocurrency, accounting, IFRS, GAAP, classification, measurement
Procedia PDF Downloads 9710129 Municipal Asset Management Planning 2.0 – A New Framework For Policy And Program Design In Ontario
Authors: Scott R. Butler
Abstract:
Ontario, Canada’s largest province, is in the midst of an interesting experiment in mandated asset management planning for local governments. At the beginning of 2021, Ontario’s 444 municipalities were responsible for the management of 302,864 lane kilometers of roads that have a replacement cost of $97.545 billion CDN. Roadways are by far the most complex, expensive, and extensive assets that a municipality is responsible for overseeing. Since adopting Ontario Regulation 588/47: Asset Management Planning for Municipal Infrastructure in 2017, the provincial government has established prescriptions for local road authorities regarding asset category and levels of service being provided. This provincial regulation further stipulates that asset data such as extent, condition, and life cycle costing are to be captured in manner compliant with qualitative descriptions and technical metrics. The Ontario Good Roads Association undertook an exercise to aggregate the road-related data contained within the 444 asset management plans that municipalities have filed with the provincial government. This analysis concluded that collectively Ontario municipal roadways have a $34.7 billion CDN in deferred maintenance. The ill-state of repair of Ontario municipal roads has lasting implications for province’s economic competitiveness and has garnered considerable political attention. Municipal efforts to address the maintenance backlog are stymied by the extremely limited fiscal parameters municipalities must operate within in Ontario. Further exacerbating the program are provincially designed programs that are ineffective, administratively burdensome, and not necessarily aligned with local priorities or strategies. This paper addresses how municipal asset management plans – and more specifically, the data contained in these plans – can be used to design innovative policy frameworks, flexible funding programs, and new levels of service that respond to these funding challenges, as well as emerging issues such as local economic development and climate change. To fully unlock the potential that Ontario Regulation 588/17 has imposed will require a resolute commitment to data standardization and horizontal collaboration between municipalities within regions.Keywords: transportation, municipal asset management, subnational policy design, subnational funding program design
Procedia PDF Downloads 9510128 Non Performing Asset Variations across Indian Commercial Banks: Some Findings
Authors: Sanskriti Singh, Ankit Tomar
Abstract:
Banks are the instrument of growth of a country. Banks mobilize the savings of the public in the form of deposits and channelize it as advances for various activities required for the development of society at large. The advance which becomes unpaid for a certain period is called Non Performing Asset of the bank. The study makes an attempt to bring out the magnitude of NPA and its impact on profit, advances. An attempt is also made to bring out the challenges NPA poses to the banks and suggestions to overcome and to manage NPA effectively.Keywords: India, NPAs, private banks, public banks
Procedia PDF Downloads 28710127 Board of Directors' Structure and Corporate Restructuring: A Preliminary Evidences
Authors: Norazlan Alias, Mohd. Hasimi Yaacob
Abstract:
This study examines the impact of governance structure via corporate restructuring decision on selected firm characteristics and performance. Results of selected ratios that represent corporate decision, governance structure and performance in pre and post restructuring are analyzed for some conclusions. This study uses annual data of companies that are consistently listed on the Main Board of Bursa Malaysia and announced completed corporate restructuring. The results show that only debt ratio is significantly different before and after asset restructuring. This study concludes that firms do not view corporate restructuring namely asset restructuring as an opportunity to simultaneous enhance governance structure that could also contribute enhance firm performance and board of directors’ structure subsequent to asset restructuring only has significantly influence on changing capital structure but not on firm performance.Keywords: board of directors, capital structure, corporate restructuring, performance
Procedia PDF Downloads 40310126 Universiti Sains Malaysia
Authors: Eisa A. Alsafran, Francis T. Edum-Fotwe, Wayne E. Lord
Abstract:
The degree to which a public client actively participates in Public Private Partnership (PPP) schemes, is seen as a determinant of the success of the arrangement, and in particular, efficiency in the delivery of the assets of any infrastructure development. The asset delivery is often an early barometer for judging the overall performance of the PPP. Currently, there are no defined descriptors for the degree of such participation. The lack of defined descriptors makes the association between the degree of participation and efficiency of asset delivery, difficult to establish. This is particularly so if an optimum effect is desired. In addition, such an association is important for the strategic decision to embark on any PPP initiative. This paper presents a conceptual model of different levels of participation that characterise PPP schemes. The modelling was achieved by a systematic review of reported sources that address essential aspects and structures of PPP schemes, published from 2001 to 2015. As a precursor to the modelling, the common areas of Public Client Participation (PCP) were investigated. Equity and risk emerged as two dominant factors in the common areas of PCP, and were therefore adopted to form the foundation of the modelling. The resultant conceptual model defines the different states of combined PCP. The defined states provide a more rational basis for establishing how the degree of PCP affects the efficiency of asset delivery in PPP schemes.Keywords: asset delivery, infrastructure development, public private partnership, public client participation
Procedia PDF Downloads 267