31434 Integrated Formulation of Project Scheduling and Material Procurement Considering Different Discount Options

Authors: Babak H. Tabrizi, Seyed Farid Ghaderi

Abstract:

On-time availability of materials in the construction sites plays an outstanding role in successful achievement of project’s deliverables. Thus, this paper has investigated formulation of project scheduling and material procurement at the same time, by a mixed-integer programming model, aiming to minimize/maximize penalty/reward to deliver the project and minimize material holding, ordering, and procurement costs, respectively. We have taken both all-units and incremental discount possibilities into consideration to address more flexibility from the procurement side with regard to real world conditions. Finally, the applicability and efficiency of the mathematical model is tested by different numerical examples.

Keywords: discount strategies, material purchasing, project planning, project scheduling

Procedia PDF Downloads 240
31433 Genetic Algorithms Multi-Objective Model for Project Scheduling

Authors: Elsheikh Asser

Abstract:

Time and cost are the main goals of the construction project management. The first schedule developed may not be a suitable schedule for beginning or completing the project to achieve the target completion time at a minimum total cost. In general, there are trade-offs between time and cost (TCT) to complete the activities of a project. This research presents genetic algorithms (GAs) multi-objective model for project scheduling considering different scenarios such as least cost, least time, and target time.

Keywords: genetic algorithms, time-cost trade-off, multi-objective model, project scheduling

Procedia PDF Downloads 399
31432 BIM Application Research Based on the Main Entrance and Garden Area Project of Shanghai Disneyland

Authors: Ying Yuken, Pengfei Wang, Zhang Qilin, Xiao Ben

Abstract:

Based on the main entrance and garden area (ME&G) project of Shanghai Disneyland, this paper introduces the application of BIM technology in this kind of low-rise comprehensive building with complex facade system, electromechanical system and decoration system. BIM technology is applied to the whole process of design, construction and completion of the whole project. With the construction of BIM application framework of the whole project, the key points of BIM modeling methods of different systems and the integration and coordination of BIM models are elaborated in detail. The specific application methods of BIM technology in similar complex low-rise building projects are sorted out. Finally, the paper summarizes the benefits of BIM technology application, and puts forward some suggestions for BIM management mode and practical application of similar projects in the future.

Keywords: BIM, complex low-rise building, BIM modeling, model integration and coordination, 3D scanning

Procedia PDF Downloads 145
31431 Empirical Study on Causes of Project Delays

Authors: Khan Farhan Rafat, Riaz Ahmed

Abstract:

Renowned offshore organizations are drifting towards collaborative exertion to win and implement international projects for business gains. However, devoid of financial constraints, with the availability of skilled professionals, and despite improved project management practices through state-of-the-art tools and techniques, project delays have become a norm these days. This situation calls for exploring the factor(s) affecting the bonding between project management performance and project success. In the context of the well-known 3M’s of project management (that is, manpower, machinery, and materials), machinery and materials are dependent upon manpower. Because the body of knowledge inveterate on the influence of national culture on men, hence, the realization of the impact on the link between project management performance and project success need to be investigated in detail to arrive at the possible cause(s) of project delays. This research initiative was, therefore, undertaken to fill the research gap. The unit of analysis for the proposed research excretion was the individuals who had worked on skyscraper construction projects. In reverent studies, project management is best described using construction examples. It is due to this reason that the project oriented city of Dubai was chosen to reconnoiter on causes of project delays. A structured questionnaire survey was disseminated online with the courtesy of the Project Management Institute local chapter to carry out the cross-sectional study. The Construction Industry Institute, Austin, of the United States of America along with 23 high-rise builders in Dubai were also contacted by email requesting for their contribution to the study and providing them with the online link to the survey questionnaire. The reliability of the instrument was warranted using Cronbach’s alpha coefficient of 0.70. The appropriateness of sampling adequacy and homogeneity in variance was ensured by keeping Kaiser–Meyer–Olkin (KMO) and Bartlett’s test of sphericity in the range ≥ 0.60 and < 0.05, respectively. Factor analysis was used to verify construct validity. During exploratory factor analysis, all items were loaded using a threshold of 0.4. Four hundred and seventeen respondents, including members from top management, project managers, and project staff, contributed to the study. The link between project management performance and project success was significant at 0.01 level (2-tailed), and 0.05 level (2-tailed) for Pearson’s correlation. Before initiating the moderator analysis test for linearity, multicollinearity, outliers, leverage points and influential cases, test for homoscedasticity and normality were carried out which are prerequisites for conducting moderator review. The moderator analysis, using a macro named PROCESS, was performed to verify the hypothesis that national culture has an influence on the said link. The empirical findings, when compared with Hofstede's results, showed high power distance as the cause of construction project delays in Dubai. The research outcome calls for the project sponsors and top management to reshape their project management strategy and allow for low power distance between management and project personnel for timely completion of projects.

Keywords: causes of construction project delays, construction industry, construction management, power distance

Procedia PDF Downloads 199
31430 Polish Police in the Fight against Terrorism and Cyberterrorism

Authors: Izabela Nowicka, Jacek Dworzecki

Abstract:

The paper will be presented to selected legal and organizational solutions for the prevention and combating of terrorism by the police in Poland. Development will include information on the organization and functioning of the police anti-terrorist sub-units, whose officers are on the front line of the fight against terrorism. They will be presented to the conditions and cases of use of firearms by police officers in the course of special operations aimed against organizations and terrorist groups, and the perpetrators of criminal acts of terrorism as well as the legal foundation for the Polish police to take immediate counterterrorism operations. Article will be prepared in the context of an international research project entitled. Understand the Dimensions of Organised Crime and Terrorist Networks for Developing Effective and Efficient Security Solutions for First-line-practitioners and Professionals [Project: H2020-FCT-2015, No: 700688].

Keywords: the fight against terrorism, police, Poland, takedown

Procedia PDF Downloads 313
31429 Project-Based Learning in Engineering Education

Authors: M. Greeshma, V. Ashvini, P. Jayarekha

Abstract:

Project based learning (PBL) is a student-driven educational framework and offers the student an opportunity for in-depth investigations of courses. This paper presents the need of PBL in engineering education for the student to graduate with a capacity to design and implement complex problems. The implementation strategy of PBL and its related challenges are presented. The case study that energizes the engineering curriculum with a relevance to the real-world of technology along with its benefits to the students is also included.

Keywords: PBL, engineering education, curriculum, implement complex

Procedia PDF Downloads 452
31428 Identifying Project Delay Factors in the Australian Construction Industry

Authors: Syed Sohaib Bin Hasib, Hiyam Al-Kilidar

Abstract:

Meeting project deadlines is a major challenge for most construction projects. In this study, perceptions of contractors, clients, and consultants are compared relative to a list of factors derived from the review of the extant literature on project delay. 59 causes (categorized into 8 groups) of project delays were identified from the literature. A survey was devised to get insights and ranking of these factors from clients, consultants & contractors in the Australian construction industry. Findings showed that project delays in the Australian construction industry are mainly the result of skill shortages, interference in execution, and poor coordination and communication between the project stakeholders.

Keywords: construction, delay factors, time delay, australian construction industry

Procedia PDF Downloads 159
31427 Sustainable Project Management Necessarily Implemented in the Chinese Wine Market Due to Climate Variation

Authors: Ruixin Zhang, Joel Carboni, Songchenchen Gong

Abstract:

Since the Sustainable Development Goals (SDGs) officially became the 17 development goals set by the United Nations in 2015, it has become an inevitable trend in project management development globally. Since Sustainability and glob-alization are the main focus and trends in the 21st century, project management contains system-based optimization, and or-ganizational humanities, environmental protection, and economic development. As a populous country globally, with the advanced development of economy and technology, China becomes one of the biggest markets in the wine industry. However, the develop-ment of society also brings specific environmental issues. Climate changes have already brought severe impacts on the Chinese wine market, including consumer behavior, wine production activities, and organizational humanities. Therefore, the implementation of sustainable project management in Chinese wine market is essential. Surveys based analysis is the primary method to interpret how the climate variation effect the Chinese wine market and the importance of sustainable project management implementation for green market growth in China. This paper proposes the CWW Conceptual model that can be used in the wine industry, the new 7 Drivers Model, and SPM Framework to interpret the main drivers that impact project management implementation in the wine industry and to offer the directions to wine companies in China which would help them to achieve the green growth.

Keywords: project management, sustainability, green growth, climate changes, Chinese wine market

Procedia PDF Downloads 107
31426 Complaint Management Mechanism: A Workplace Solution in Development Sector of Bangladesh

Authors: Nusrat Zabeen Islam

Abstract:

Partnership between local Non-Government organizations (NGO) and International development organizations has become an important feature in the development sector of Bangladesh. It is an important challenge for International development organizations to work with local NGOs with proper HR practice. Local NGOs have a lack of quality working environment and this affects the employee’s work experiences and overall performance at individual, partnership with International development organizations and organizational level. Many local development organizations due to the size of the organization and scope do not have a human resource (HR) unit. Inadequate Human Resource Policies, skills, leadership and lack of effective strategy is now a common scenario in Non-Government organization sector of Bangladesh. So corruption, nepotism, and fraud, risk of Political Contribution in office /work space, Sexual/ gender based abuse, insecurity take place in work place of development sector. The Complaint Management Mechanism (CMM) in human resource management could be one way to improve human resource competence in these organizations. The responsibility of Complaint Management Unit (CMU) of an International development organization is to make workplace maltreating, discriminating communities free. The information of impact of CMM was collected through case study of an International organization and some of its partner national organizations in Bangladesh who are engaged in different projects/programs. In this mechanism International development organizations collect complaints from beneficiaries/ staffs by complaint management unit and investigate by segregating the type and mood of the complaint and find out solution to improve the situation within a very short period. A complaint management committee is formed jointly with HR and management personnel. Concerned focal point collect complaints and share with CM unit. By conducting investigation, review of findings, reply back to CM unit and implementation of resolution through this mechanism, a successful bridge of communication and feedback can be established within beneficiaries, staffs and upper management. The overall result of Complaint management mechanism application indicates that by applying CMM accountability and transparency of workplace and workforce in development organization can be increased significantly. Evaluations based on outcomes, and measuring indicators such as productivity, satisfaction, retention, gender equity, proper judgment will guide organizations in building a healthy workforce, and will also clearly articulate the return on investment and justify any need for further funding.

Keywords: human resource management in NGOs, challenges in human resource, workplace environment, complaint management mechanism

Procedia PDF Downloads 303
31425 Youth and International Environmental Voluntary Initiatives: A Case Study of IGreen Project by AIESEC in Bandung

Authors: Yoel Agustheo Rinding

Abstract:

Globalization has made physical borders between countries become more obscure. Due to the free flow of information between countries, issue for instance, environment has become global concern. The concern has grown as the result of endless campaign made by most of the non-governmental organizations (NGOs). By means of this situation, international voluntary initiatives on environmental issues have appeared to be popular among world’s society today especially for youth. AIESEC as international non-governmental organization (INGO) through IGreen Project has initiated environmental international voluntary initiatives concerning in environmental awareness of Bandung’s citizen. Bandung itself is still struggling on solving flood as one of its major problems regardless the fact that Bandung is one of the most developed cities in Indonesia. This paper would like to discuss on how globalization affects AIESEC as an INGO in order to spread its influence and also on how it could build international voluntary initiatives networks. Afterwards, author would like to elaborate how both AIESEC and youth perceive the importance of international voluntary initiatives by using cosmopolitanism approach. In order to get a deep understanding of how this activity works, this paper also would like to explain regarding the management, expected outcomes, and the real impacts of IGreen project towards Bandung. In the end of this paper, author would like to propose solutions on how to utilize international voluntary initiatives as a solution for environmental issues nowadays.

Keywords: AIESEC, cosmopolitanism, environmental issues, globalization, IGreen project, international environmental voluntary initiatives, INGO, youth

Procedia PDF Downloads 204
31424 Challenges to Effective Public Sector Management in Developing Countries: The Networking and Communication Functions of Public Sector Managers in Nigeria and Ghana

Authors: Ethelbert Chinedu Nwokorie

Abstract:

This empirical study analyzes the impact of communication and networking functions of Nigerian and Ghanaian public sector managers’ on public sector effectiveness. The focus is on which of these management functions public sector managers’ in these countries perform most, why, how and how does it affect effectiveness of public sector organizations in the two countries. This qualitative analysis was done by interviewing middle and top level managers in some selected public sector organizations in the two countries on their practical experiences. Findings reveal that ineffectiveness of public sector organizations in Ghana persists because public sector managers perform more of networking functions to promote their individual carrier success and progression in their various organizations, rather than achieving the organizations goals and objectives. In Nigeria, though majority of the interviewed public sector managers perform more communication functions than networking, they do this mostly by treating files and correspondences, instead of face-to-face communication and interaction with employees’. Hence, they hardly relate directly with their employees’ to find out how they are performing their jobs, their challenges, where they are having problems and why. The findings and recommendations of this study will help in improving effectiveness, quality and service delivery in Nigerian and Ghanaian public sector organizations and beyond.

Keywords: effectiveness, communication, employees, management, networking, organization, public sector

Procedia PDF Downloads 433
31423 Marketing Social Innovation: Finding Competitive Advantage in Social Enterprise Methodology

Authors: Ted Gournelos

Abstract:

Marketing approaches in practice and academic literature usually foreground the importance of product and brand awareness in strategy. Decisions emphasize justifications and promotions of existing projects, which has the unintended consequence of pushing marketing, public relations, and other communications to secondary strategies and tactics rather than as inherent pieces of organizational development. In other words, marketers implement what others have already decided. This is a challenge not only for the communications field, but also for the organizations themselves, since integrated communications employees are often the primary, if not the only, touchpoints for client/customer/user research and interaction. Organizations thus become increasingly out of touch, raising the risk of public or human resources crisis and decreasing the focus on opportunities for development and growth. This paper will discuss the potential for social entrepreneurship to refocus marketing and communications professionals on primary strategy, and suggest best practices for developing initiatives not only to impact marketing efforts themselves, but also the guiding organizational approaches to project management, human resources, corporate social responsibility, and research. It will provide a comparative analysis of social media marketing efforts conducted by food security non-governmental organizations from several countries, pointing out both flaws and areas of opportunity for integration with for-profit organizational strategy, and discuss the implications of descriptive, proactive, and interactive messaging.

Keywords: social enterprise, strategy, innovation, social media

Procedia PDF Downloads 296
31422 Intellectual Capital, Knowledge Management, and the Leader Role in the Construction of Sustainability

Authors: Leandro da S. Nascimento, Maristela J. Melo

Abstract:

The increased competition in the globalization drives organizations to innovate in their products and services to remain competitive. Innovation and creativity are incorporated as key aspects to creating value for consumers and for the creation of competitive advantage in organizations. However, there are factors that contribute strong with development of innovation and creation in organizations. These factors are the intellectual capital and knowledge management, which together with sustainability, ensure the development of competitive strategies. However, it is understood that the role of the leader is essential to stimulate the development of human capital, because the human capital is essential for organizations of knowledge. It is the leader who drives the dissemination and sharing of knowledge, an essential aspect for the formation of intellectual capital and therefore should be managed. And it turns out that the management of knowledge through intellectual capital allows the development of environmental initiatives efficiently and effectively. Thus, the research demonstrates the importance of the role of leader / manager in organizations and seeks to analyze how managers can contribute to the adoption of sustainability through intellectual capital and knowledge management.

Keywords: intellectual capital, knowledge management, leadership role, sustainability

Procedia PDF Downloads 475
31421 NGO Social Entrepreneurship and Innovation Abroad: The Effects on Local Social Economies

Authors: Renee Nank

Abstract:

Nongovernmental organizations that operate in other countries are, under American law, permitted to apply for and receive special tax status even when their programs and services are situated in other countries. NGO's are lauded as incubators for innovation as they typically tackle difficult problems that public and private organizations are unable or uninterested in addressing. Little research has been undertaken that explores both the extent of these organizations in number and reach, their impact on addressing local issues they seek to resolve, and their effect on local social economies - namely job creation. This study explores the landscape of these NGOs that are afforded tax benefits in the U.S., but operate in other countries, the degree to which they are entrepreneurial and innovate, and their effect on local social economies. This applies this lens to particular cases by exploring in greater depth several American NGO's operating in Mexico.

Keywords: civil society, nongovernmental organizations, social entrepreneurship, social economy, NGO innovation

Procedia PDF Downloads 336
31420 Risk Based Building Information Modeling (BIM) for Urban Infrastructure Transportation Project

Authors: Debasis Sarkar

Abstract:

Building Information Modeling (BIM) is a holistic documentation process for operational visualization, design coordination, estimation and project scheduling. BIM software defines objects parametrically and it is a tool for virtual reality. Primary advantage of implementing BIM is the visual coordination of the building structure and systems such as Mechanical, Electrical and Plumbing (MEP) and it also identifies the possible conflicts between the building systems. This paper is an attempt to develop a risk based BIM model which would highlight the primary advantages of application of BIM pertaining to urban infrastructure transportation project. It has been observed that about 40% of the Architecture, Engineering and Construction (AEC) companies use BIM but primarily for their outsourced projects. Also, 65% of the respondents agree that BIM would be used quiet strongly for future construction projects in India. The 3D models developed with Revit 2015 software would reduce co-ordination problems amongst the architects, structural engineers, contractors and building service providers (MEP). Integration of risk management along with BIM would provide enhanced co-ordination, collaboration and high probability of successful completion of the complex infrastructure transportation project within stipulated time and cost frame.

Keywords: building information modeling (BIM), infrastructure transportation, project risk management, underground metro rail

Procedia PDF Downloads 288
31419 A Study of Factors Affecting the Elapsed Time of Housing Renewal Project Implementation in Seoul

Authors: In Su Na, Gunwon Lee, Seiyong Kim

Abstract:

This study analyzed the effect of area variables and economic variables on the length of each period of the project in order to analyze the effect of agreement rate on project implementation in housing renewal projects. In conclusion, as can be seen from these results, a low agreement rate may not translate into project promotion, and a higher agreement rate may not translate into project delay. The expectation of the policy is that the lower the agreement rate, the more projects would be promoted, but that is not the actual effect. From a policy consistency viewpoint, changing the agreement rate frequently, depending on the decision of the public, is not reasonable. The policy of using agreement rate as a necessary condition for project implementation should be reconsidered.

Keywords: Area and Economic Variables, Elapsed time, Housing Renewal Project

Procedia PDF Downloads 439
31418 DURAFILE: A Collaborative Tool for Preserving Digital Media Files

Authors: Santiago Macho, Miquel Montaner, Raivo Ruusalepp, Ferran Candela, Xavier Tarres, Rando Rostok

Abstract:

During our lives, we generate a lot of personal information such as photos, music, text documents and videos that link us with our past. This data that used to be tangible is now digital information stored in our computers, which implies a software dependence to make them accessible in the future. Technology, however, constantly evolves and goes through regular shifts, quickly rendering various file formats obsolete. The need for accessing data in the future affects not only personal users but also organizations. In a digital environment, a reliable preservation plan and the ability to adapt to fast changing technology are essential for maintaining data collections in the long term. We present in this paper the European FP7 project called DURAFILE that provides the technology to preserve media files for personal users and organizations while maintaining their quality.

Keywords: artificial intelligence, digital preservation, social search, digital preservation plans

Procedia PDF Downloads 426
31417 Gender-Based Violence Public Art Projects: An Analysis of the Value of Including Social Justice Topics in Tertiary Courses

Authors: F. Saptouw

Abstract:

This paper will examine the value of introducing social justice issues into the tertiary fine art curriculum at a first-year level. The paper will present detail of the conceptual impetus and the logistics related to the execution of a collaborative teaching project. The cohort of students was registered for the Fine Art Foundation course at the Michaelis School of Fine Art at the University of Cape Town. The course is dedicated to the development of critical thinking, communication skills, and varied approaches to knowledge construction within the first-year cohort. A core component of the course is the examination of the representation of gender, identity, politics, and power. These issues are examined within a range of public and private representations like art galleries, museum spaces, and contemporary popular culture. This particular project was a collaborative project with the Office of Inclusivity and Change, and the project leaders were Fabian Saptouw and Gabriel Khan. The paper will conclude by presenting an argument for the importance of such projects within the tertiary environment.

Keywords: art, education, gender-based violence, social responsiveness

Procedia PDF Downloads 120
31416 Internal Product Management: The Key to Achieving Digital Maturity and Business Agility for Manufacturing IT Organizations

Authors: Frederick Johnson

Abstract:

Product management has a long and well-established history within the consumer goods industry, despite being one of the most obscure aspects of brand management. Many global manufacturing organizations are now opting for external cloud-based Manufacturing Execution Systems (MES) to replace costly and outdated monolithic MES solutions. Other global manufacturing leaders are restructuring their organizations to support human-centered values, agile methodologies, and fluid operating principles. Still, industry-leading organizations struggle to apply the appropriate framework for managing evolving external MES solutions as internal "digital products." Product management complements these current trends in technology and philosophical thinking in the market. This paper discusses the central problems associated with adopting product management processes by analyzing its traditional theories and characteristics. Considering these ideas, the article then constructs a translated internal digital product management framework by combining new and existing approaches and principles. The report concludes by demonstrating the framework's capabilities and potential effectiveness in achieving digital maturity and business agility within a manufacturing environment.

Keywords: internal product management, digital transformation, manufacturing information technology, manufacturing execution systems

Procedia PDF Downloads 117
31415 Performance Evaluation of Construction Projects by Earned Value Management Method, Using Primavera P6 – A Case Study in Istanbul, Turkey

Authors: Mohammad Lemar Zalmai, Osman Hurol Turkakin, Cemil Akcay, Ekrem Manisali

Abstract:

Most of the construction projects are exposed to time and cost overruns due to various factors and this is a major problem. As a solution to this, the Earned Value Management (EVM) method is considered. EVM is a powerful and well-known method used in monitoring and controlling the project. EVM is a technique that project managers use to track the performance of their project against project baselines. EVM gives an early indication that either project is delayed or not, and the project is either over budget or under budget at any particular day by tracking it. Thus, it helps to improve the management control system of a construction project, to detect and control the problems in potential risk areas and to suggest the importance and purpose of monitoring the construction work. This paper explains the main parameters of the EVM system involved in the calculation of time and cost for construction projects. In this study, the project management software Primavera P6 is used to deals with the project monitoring process of a seven-storeyed (G+6) faculty building whose construction is in progress at Istanbul, Turkey. A comparison between the planned progress of construction activities and actual progress is performed, and the analysis results are interpreted. This case study justifies the benefits of using EVM for project cash flow analysis and forecasting.

Keywords: earned value management (EVM), construction cost management, construction planning, primavera P6, project management, project scheduling

Procedia PDF Downloads 201
31414 Project Management Framework and Influencing Factors

Authors: Mehrnoosh Askarizadeh

Abstract:

The increasing variations of the business world correspond with a high diversity of theoretical perspectives used in project management research. This diversity is reflected by a variety of influencing factors, which have been the subject of empirical studies. This article aims to systemize the different streams of research on the basis of a literature review and at developing a research framework influencing factors. We will identify fundamental elements of a project management theory. The framework consists of three dimensions: design, context, and goal. Its purpose is to support the combination of different perspectives and the development of strategies for further research.

Keywords: project, goal, project management, influencing factors

Procedia PDF Downloads 519
31413 Historical Geotechnical Study and Evaluation of Project Progress for the Tafila City Center Development Project

Authors: Mohmd Sarireh

Abstract:

The geotechnical study can be employed successfully to assess and follow the expected development or delay in the project construction. The development project of city center or downtown was taken as a case study for the investigation of the project conditions that might support progress or cause delay. The project was proposed to build 7447 m2 by reinforced concrete mainly to serve and support the services provided to people in Tafila. The project construction had faced challenges and obstacles such as soil collapse because of excavation of the weak soil that found in the project site. In addition, the topography of the project area showed a high slope from South-West to North. The slope through the project footprint reached to 83.3% which is considered very high slope. One year and a half proposed to finish the project construction since the 1st of March 2013 and it was planned to be finished by the 31th of August 2014, but the project needs more than one year and a half as extension according to the consultant engineer. The collecting of data was conducted through the interviews with the engineers and officials, and by analyzing the soil reports and samples taken during design and excavation. The major findings came out to weak and fractured soil and construction waste that were found at project site. Also, soil was considered very fine according to the plasticity index (PI) values, in addition to the high depths required for foundation that contribute to the collapse of soil and the increase of project cost. The current project aims to present how the unseen conditions can delay the project construction and increase the cost of the project that rises to JD8.305 Million.

Keywords: geotechnical, management, progress, risk, soil unseen conditions management

Procedia PDF Downloads 198
31412 Project Time Prediction Model: A Case Study of Construction Projects in Sindh, Pakistan

Authors: Tauha Hussain Ali, Shabir Hussain Khahro, Nafees Ahmed Memon

Abstract:

Accurate prediction of project time for planning and bid preparation stage should contain realistic dates. Constructors use their experience to estimate the project duration for the new projects, which is based on intuitions. It has been a constant concern to both researchers and constructors to analyze the accurate prediction of project duration for bid preparation stage. In Pakistan, such study for time cost relationship has been lacked to predict duration performance for the construction projects. This study is an attempt to explore the time cost relationship that would conclude with a mathematical model to predict the time for the drainage rehabilitation projects in the province of Sindh, Pakistan. The data has been collected from National Engineering Services (NESPAK), Pakistan and regression analysis has been carried out for the analysis of results. Significant relationship has been found between time and cost of the construction projects in Sindh and the generated mathematical model can be used by the constructors to predict the project duration for the upcoming projects of same nature. This study also provides the professionals with a requisite knowledge to make decisions regarding project duration, which is significantly important to win the projects at the bid stage.

Keywords: BTC Model, project time, relationship of time cost, regression

Procedia PDF Downloads 360
31411 Providing Open Access for Scholarly Information in Libya

Authors: Mohamed Abolgasem Arteimi, Ahlam Al-Tajori

Abstract:

This paper describes an ongoing project at the Libyan Academy. The project aims to build digital library for thesis and dissertations (ETD). The researchers developed a system based on Greenstone open source systems for building ETD digital library. A metadata for theses and dissertations was developed. The paper addresses issues related to project design, development and user satisfaction. Conclusions highlighted some important lessons learned to date.

Keywords: digital library, electronic theses and dissertations, open access, ETD, metadata

Procedia PDF Downloads 292
31410 Integrating Sustainable Development Goals in Teaching Mathematics Using Project Based Learning

Authors: S. Goel

Abstract:

In the current scenario, education should be realistic and nature-friendly. The earlier definition of education was restricted to the holistic development of the child which help them to increase their capacity and helps in social upliftment. But such definition gives a more individualistic aim of education. Due to that individualistic aim, we have become disconnected from nature. So, a school should be a place which provides students with an area to explore. They should get practical learning or learning from nature which is also propounded by Rousseau in the mid-eighteenth century. Integrating Sustainable development goals in the school curriculum will make it possible to connect the nature with the lives of the children in the classroom. Then, students will be more aware and sensitive towards their social and natural surroundings. The research attempts to examine the efficiency of project-based learning in mathematics to create awareness around sustainable development goals. The major finding of the research was that students are less aware of sustainable development goals, but when given time and an appropriate learning environment, students can be made aware of these goals. In this research, project-based learning was used to make students aware of sustainable development goals. Students were given pre test and post test which helped in analyzing their performance. After the intervention, post test result showed that mathematics projects can create an awareness of sustainable development goals.

Keywords: holistic development, natural learning, project based learning, sustainable development goals

Procedia PDF Downloads 162
31409 Applying the Underwriting Technique to Analyze and Mitigate the Credit Risks in Construction Project Management

Authors: Hai Chien Pham, Thi Phuong Anh Vo, Chansik Park

Abstract:

Risks management in construction projects is important to ensure the positive feasibility of the projects in which financial risks are most concerned while construction projects always run on a credit basis. Credit risks, therefore, require unique and technical tools to be well managed. Underwriting technique in credit risks, in its most basic sense, refers to the process of evaluating the risks and the potential exposure of losses. Risks analysis and underwriting are applied as a must in banks and financial institutions who are supporters for constructions projects when required. Recently, construction organizations, especially contractors, have recognized the significant increasing of credit risks which caused negative impacts to project performance and profit of construction firms. Despite the successful application of underwriting in banks and financial institutions for many years, there are few contractors who are applying this technique to analyze and mitigate the credit risks of their potential owners before signing contracts with them for delivering their performed services. Thus, contractors have taken credit risks during project implementation which might be not materialized due to the bankruptcy and/or protracted default made by their owners. With this regard, this study proposes a model using the underwriting technique for contractors to analyze and assess credit risks of their owners before making final decisions for the potential construction contracts. Contractor’s underwriters are able to analyze and evaluate the subjects such as owner, country, sector, payment terms, financial figures and their related concerns of the credit limit requests in details based on reliable information sources, and then input into the proposed model to have the Overall Assessment Score (OAS). The OAS is as a benchmark for the decision makers to grant the proper limits for the project. The proposed underwriting model is validated by 30 subjects in Asia Pacific region within 5 years to achieve their OAS, and then compare output OAS with their own practical performance in order to evaluate the potential of underwriting model for analyzing and assessing credit risks. The results revealed that the underwriting would be a powerful method to assist contractors in making precise decisions. The contribution of this research is to allow the contractors firstly to develop their own credit risk management model for proactively preventing the credit risks of construction projects and continuously improve and enhance the performance of this function during project implementation.

Keywords: underwriting technique, credit risk, risk management, construction project

Procedia PDF Downloads 190
31408 Effectiveness of Software Quality Assurance in Offshore Development Enterprises in Sri Lanka

Authors: Malinda Gayan Sirisena

Abstract:

The aim of this research is to evaluate the effectiveness of software quality assurance approaches of Sri Lankan offshore software development organizations, and to propose a framework which could be used across all offshore software development organizations. An empirical study was conducted using derived framework from popular software quality evaluation models. The research instrument employed was a questionnaire survey among thirty seven Sri Lankan registered offshore software development organizations. The findings demonstrate a positive view of Effectiveness of Software Quality Assurance – the stronger predictors of Stability, Installability, Correctness, Testability and Changeability. The present study’s recommendations indicate a need for much emphasis on software quality assurance for the Sri Lankan offshore software development organizations.

Keywords: software quality assurance (SQA), offshore software development, quality assurance evaluation models, effectiveness of quality assurance

Procedia PDF Downloads 402
31407 Understanding Complexity at Pre-Construction Stage in Project Planning of Construction Projects

Authors: Mehran Barani Shikhrobat, Roger Flanagan

Abstract:

The construction planning and scheduling based on using the current tools and techniques is resulted deterministic in nature (Gantt chart, CPM) or applying a very little probability of completion (PERT) for each task. However, every project embodies assumptions and influences and should start with a complete set of clearly defined goals and constraints that remain constant throughout the duration of the project. Construction planners continue to apply the traditional methods and tools of “hard” project management that were developed for “ideal projects,” neglecting the potential influence of complexity on the design and construction process. The aim of this research is to investigate the emergence and growth of complexity in project planning and to provide a model to consider the influence of complexity on the total project duration at the post-contract award pre-construction stage of a project. The literature review showed that complexity originates from different sources of environment, technical, and workflow interactions. They can be divided into two categories of complexity factors, first, project tasks, and second, project organisation management. Project tasks may originate from performance, lack of resources, or environmental changes for a specific task. Complexity factors that relate to organisation and management refer to workflow and interdependence of different parts. The literature review highlighted the ineffectiveness of traditional tools and techniques in planning for complexity. However, this research focus on understanding the fundamental causes of the complexity of construction projects were investigated through a questionnaire with industry experts. The results were used to develop a model that considers the core complexity factors and their interactions. System dynamics were used to investigate the model to consider the influence of complexity on project planning. Feedback from experts revealed 20 major complexity factors that impact project planning. The factors are divided into five categories known as core complexity factors. To understand the weight of each factor in comparison, the Analytical Hierarchy Process (AHP) analysis method is used. The comparison showed that externalities are ranked as the biggest influence across the complexity factors. The research underlines that there are many internal and external factors that impact project activities and the project overall. This research shows the importance of considering the influence of complexity on the project master plan undertaken at the post-contract award pre-construction phase of a project.

Keywords: project planning, project complexity measurement, planning uncertainty management, project risk management, strategic project scheduling

Procedia PDF Downloads 83
31406 Governance Commitment and Time Differences in Aspects of Sustainability Reporting in Nigerian Banks

Authors: Nwobu Obiamaka, Owolabi Akintola

Abstract:

This study examined the extent of statistical significant difference between the economic, environmental, governance and social aspects of sustainability reporting as a result of board committee on sustainability and time (year) of reporting for business organizations in the Nigerian banking sector. The years of reporting under consideration were 2010, 2011, 2012 and 2013. Content analysis methodology was employed through a reporting index used to score the amount of economic, environmental, governance and social indicators of sustainability reporting. The results of this study indicated that business organizations with board committee on sustainability had more indicators of sustainability reporting than those without board committees on sustainability issues. Also, sustainability reporting in 2013 was higher than that of prior years (2012, 2011 and 2010) for the economic, environmental and social indicators. The governance indicators of 2012 was highest compared to the other years (2013, 2011 and 2010) under consideration in this study. The implication of this finding is that business organizations that have board committees on sustainability are monitored by such boards to report more to their stakeholders. On the other hand, business organizations are appreciating the need to engage in sustainability reporting with each passing year. This could be due to the Central Bank of Nigeria (CBN) Sustainability Reporting framework that business organizations in the banking sector have to adhere to. When sustainability issues are monitored from the board of directors, business organizations are likely to increase and improve on their sustainability reporting.

Keywords: governance, organizations, reporting, sustainability

Procedia PDF Downloads 299
31405 The Role of Capital Budgeting in Nigeria Companies

Authors: Eworo David

Abstract:

It is dearly evident that a company which does not and will not innovate faces the grave danger of being pushed out of existence. The purpose of this study is to bring to knowledge of companies the significance of capital budgeting in viable project implementation and for proper investment appraisal as regards steps involved in effective investment strategies. The study examines investment policies of Nigeria companies. It deals with an overview of capital budgeting. The analysis covers the data gathered from two multi-national companies in Nigeria. The population of the study was the senior managers and the top management staff of the companies. The system of capital budgeting structure and project implementation styles were compared and contrasted to determine whether the system has MADE or MARRED the development of the organizations. The recommendations contribute towards Nigeria companies to remain and survive in business through the use of capital budgeting.

Keywords: appraisal, budgeting structure, capital budgeting, effective investment strategies