Search results for: smart building facades
3666 Tracing a Timber Breakthrough: A Qualitative Study of the Introduction of Cross-Laminated-Timber to the Student Housing Market in Norway
Authors: Marius Nygaard, Ona Flindall
Abstract:
The Palisaden student housing project was completed in August 2013 and was, with its eight floors, Norway’s tallest timber building at the time of completion. It was the first time cross-laminated-timber (CLT) was utilized at this scale in Norway. The project was the result of a concerted effort by a newly formed management company to establish CLT as a sustainable and financially competitive alternative to conventional steel and concrete systems. The introduction of CLT onto the student housing market proved so successful that by 2017 more than 4000 individual student residences will have been built using the same model of development and construction. The aim of this paper is to identify the key factors that enabled this breakthrough for CLT. It is based on an in-depth study of a series of housing projects and the role of the management company who both instigated and enabled this shift of CLT from the margin to the mainstream. Specifically, it will look at how a new building system was integrated into a marketing strategy that identified a market potential within the existing structure of the construction industry and within the economic restrictions inherent to student housing in Norway. It will show how a key player established a project model that changed both the patterns of cooperation and the information basis for decisions. Based on qualitative semi-structured interviews with managers, contractors and the interdisciplinary teams of consultants (architects, structural engineers, acoustical experts etc.) this paper will trace the introduction, expansion and evolution of CLT-based building systems in the student housing market. It will show how the project management firm’s position in the value chain enabled them to function both as a liaison between contractor and client, and between contractor and producer. A position that allowed them to improve the flow of information. This ensured that CLT was handled on equal terms to other structural solutions in the project specifications, enabling realistic pricing and risk evaluation. Secondly, this paper will describe and discuss how the project management firm established and interacted with a growing network of contractors, architects and engineers to pool expertise and broaden the knowledge base across Norway’s regional markets. Finally, it will examine the role of the client, the building typology, and the industrial and technological factors in achieving this breakthrough for CLT in the construction industry. This paper gives an in-depth view of the progression of a single case rather than a broad description of the state of the art of large-scale timber building in Norway. However, this type of study may offer insights that are important to the understanding not only of specific markets but also of how new technologies should be introduced in big and well-established industries.Keywords: cross-laminated-timber (CLT), industry breakthrough, student housing, timber market
Procedia PDF Downloads 2233665 A Study on Factors Affecting (Building Information Modelling) BIM Implementation in European Renovation Projects
Authors: Fatemeh Daneshvartarigh
Abstract:
New technologies and applications have radically altered construction techniques in recent years. In order to anticipate how the building will act, perform, and appear, these technologies encompass a wide range of visualization, simulation, and analytic tools. These new technologies and applications have a considerable impact on completing construction projects in today's (architecture, engineering and construction)AEC industries. The rate of changes in BIM-related topics is different worldwide, and it depends on many factors, e.g., the national policies of each country. Therefore, there is a need for comprehensive research focused on a specific area with common characteristics. Therefore, one of the necessary measures to increase the use of this new approach is to examine the challenges and obstacles facing it. In this research, based on the Delphi method, at first, the background and related literature are reviewed. Then, using the knowledge obtained from the literature, a primary questionnaire is generated and filled by experts who are selected using snowball sampling. It covered the experts' attitudes towards implementing BIM in renovation projects and their view of the benefits and obstacles in this regard. By analyzing the primary questionnaire, the second group of experts is selected among the participants to be interviewed. The results are analyzed using Theme analysis. Six themes, including Management support, staff resistance, client willingness, Cost of software and implementation, the difficulty of implementation, and other reasons, are obtained. Then a final questionnaire is generated from the themes and filled by the same group of experts. The result is analyzed by the Fuzzy Delphi method, showing the exact ranking of the obtained themes. The final results show that management support, staff resistance, and client willingness are the most critical barrier to BIM usage in renovation projects.Keywords: building information modeling, BIM, BIM implementation, BIM barriers, BIM in renovation
Procedia PDF Downloads 1673664 Water Heating System with Solar Energy from Solar Panel as Absorber to Reduce the Reduction of Efficiency Solar Panel Use
Authors: Mas Aji Rizki Widjayanto, Rizka Yunita
Abstract:
The building which has an efficient and low-energy today followed by the developers. It’s not because trends on the building nowaday, but rather because of its positive effects in the long term, where the cost of energy per month to be much cheaper, along with the high price of electricity. The use of solar power (Photovoltaic System) becomes one source of electrical energy for the apartment so that will efficiently use energy, water, and other resources in the operations of the apartment. However, more than 80% of the solar radiation is not converted into electrical energy, but reflected and converted into heat energy. This causes an increase on the working temperature of solar panels and consequently decrease the efficiency of conversion to electrical energy. The high temperature solar panels work caused by solar radiation can be used as medium heat exchanger or heating water for the apartments, so that the working temperature of the solar panel can be lowered to reduce the reduction on the efficiency of conversion to electrical energy.Keywords: photovoltaic system, efficient, heat energy, heat exchanger, efficiency of conversion
Procedia PDF Downloads 3513663 Auditing of Building Information Modeling Application in Decoration Engineering Projects in China
Authors: Lan Luo
Abstract:
In China’s construction industry, it is a normal practice to separately subcontract the decoration engineering part from construction engineering, and Building Information Modeling (BIM) is also done separately. Application of BIM in decoration engineering should be integrated with other disciplines, but Chinese current practice makes this very difficult and complicated. Currently, there are three barriers in the auditing of BIM application in decoration engineering in China: heavy workload; scarcity of qualified professionals; and lack of literature concerning audit contents, standards, and methods. Therefore, it is significant to perform research on what (contents) should be evaluated, in which phase, and by whom (professional qualifications) in BIM application in decoration construction so that the application of BIM can be promoted in a better manner. Based on this consideration, four principles of BIM auditing are proposed: Comprehensiveness of information, accuracy of data, aesthetic attractiveness of appearance, and scheme optimization. In the model audit, three methods should be used: Collision, observation, and contrast. In addition, BIM auditing at six stages is discussed and a checklist for work items and results to be submitted is proposed. This checklist can be used for reference by decoration project participants.Keywords: audit, evaluation, dimensions, methods, standards, BIM application in decoration engineering projects
Procedia PDF Downloads 3433662 Clients’ Priorities in Delivery of Green Projects: South African Perspective
Authors: C. Mothobiso, D. Root
Abstract:
Purpose: This study attempts to identify the clients’ main priorities when delivering green projects. The aim is to compare if the clients have the same interest that are similar in delivery of convectional buildings as compared to green buildings. The main purpose is to find why other clients are investing in green buildings while others are reluctant and adopting green building at a slow pace. Design/methodology/approach: A sample of construction professional accredited by the Green Building Council of South Africa (GBCSA) was sent a questionnaire to participate in the research. Since GBSCSA accredited professionals have knowledge and experience about the green buildings, they are chosen as the sample. The research is qualitative because it evaluates the perceptions and knowledge around the subject matter. Research limitations: The research focuses only on the South African construction clients. Findings: Findings reveal that private clients invest more on green buildings as compared to government and parastatal entities. Private clients prioritise on maximising returns on investments and they mainly invest on buildings that save energies and have low life cycle costs. Private clients are perceived to be more knowledgeable about the benefits of green building project as compared to government and Parastatals clients. Shortage of expertise and managerial skill leads to low adaptation of green buildings in the government and parastatal projects. Other factors, which seem to disintegrate the adoption of green buildings, are the readiness of supply chain within the industry and inappropriate procurements strategies adopted by clients. The evaluation of the clients’ priorities will enable the design team to come up with innovative ways to approach the design process so that clients’ priorities and needs are identified and met. Practical implications: The findings are indicating that clients’ needs and priorities have a huge impact on the delivery of the project in terms of time, quality and cost of the project.Keywords: construction clients, design team, green construction and project deliver
Procedia PDF Downloads 2703661 An Enhanced AODV Routing Protocol for Wireless Sensor and Actuator Networks
Authors: Apidet Booranawong, Wiklom Teerapabkajorndet
Abstract:
An enhanced ad-hoc on-demand distance vector routing (E-AODV) protocol for control system applications in wireless sensor and actuator networks (WSANs) is proposed. Our routing algorithm is designed by considering both wireless network communication and the control system aspects. Control system error and network delay are the main selection criteria in our routing protocol. The control and communication performance is evaluated on multi-hop IEEE 802.15.4 networks for building-temperature control systems. The Gilbert-Elliott error model is employed to simulate packet loss in wireless networks. The simulation results demonstrate that the E-AODV routing approach can significantly improve the communication performance better than an original AODV routing under various packet loss rates. However, the control performance result by our approach is not much improved compared with the AODV routing solution.Keywords: WSANs, building temperature control, AODV routing protocol, control system error, settling time, delay, delivery ratio
Procedia PDF Downloads 3393660 Value Generation of Construction and Demolition Waste Originated in the Building Rehabilitation to Improve Energy Efficiency; From Waste to Resources
Authors: Mercedes Del Rio Merino, Jaime Santacruz Astorqui, Paola Villoria Saez, Carmen Viñas Arrebola
Abstract:
The lack of treatment of the waste from construction and demolition waste (CDW) is a problem that must be solved immediately. It is estimated that in the world not to use CDW generates an increase in the use of new materials close to 20% of the total value of the materials used. The problem is even greater in case these wastes are considered hazardous because the final deposition of them may also generate significant contamination. Therefore, the possibility of including CDW in the manufacturing of building materials, represents an interesting alternative to ensure their use and to reduce their possible risk. In this context and in the last years, many researches are being carried out in order to analyze the viability of using CDW as a substitute for the traditional raw material of high environmental impact. Even though it is true, much remains to be done, because these works generally characterize materials but not specific applications that allow the agents of the construction to have the guarantees required by the projects. Therefore, it is necessary the involvement of all the actors included in the life cycle of these new construction materials, and also to promote its use for, for example, definition of standards, tax advantages or market intervention is necessary. This paper presents the main findings reached in "Waste to resources (W2R)" project since it began in October 2014. The main goal of the project is to develop new materials, elements and construction systems, manufactured from CDW, to be used in improving the energy efficiency of buildings. Other objectives of the project are: to quantify the CDW generated in the energy rehabilitation works, specifically wastes from the building envelope; and to study the traceability of CDW generated and promote CDW reuse and recycle in order to get close to the life cycle of buildings, generating zero waste and reducing the ecological footprint of the construction sector. This paper determines the most important aspects to consider during the design of new constructive solutions, which improve the energy efficiency of buildings and what materials made with CDW would be the most suitable for that. Also, a survey to select best practices for reducing "close to zero waste" in refurbishment was done. Finally, several pilot rehabilitation works conform the parameters analyzed in the project were selected, in order to apply the results and thus compare the theoretical with reality. Acknowledgements: This research was supported by the Spanish State Secretariat for Research, Development and Innovation of the Ministry of Economy and Competitiveness under "Waste 2 Resources" Project (BIA2013-43061-R).Keywords: building waste, construction and demolition waste, recycling, resources
Procedia PDF Downloads 2503659 Wind Interference Effects on Various Plan Shape Buildings Under Wind Load
Authors: Ritu Raj, Hrishikesh Dubey
Abstract:
This paper presents the results of the experimental investigations carried out on two intricate plan shaped buildings to evaluate aerodynamic performance of the building. The purpose is to study the associated environment arising due to wind forces in isolated and interference conditions on a model of scale 1:300 with a prototype having 180m height. Experimental tests were carried out at the boundary layer wind tunnel considering isolated conditions with 0° to 180° isolated wind directions and four interference conditions of twin building (separately for both the models). The research has been undertaken in Terrain Category-II, which is the most widely available terrain in India. A comparative assessment of the two models is performed out in an attempt to comprehend the various consequences of diverse conditions that may emerge in real-life situations, as well as the discrepancies amongst them. Experimental results of wind pressure coefficients of Model-1 and Model-2 shows good agreement with various wind incidence conditions with minute difference in the magnitudes of mean Cp. On the basis of wind tunnel studies, it is distinguished that the performance of Model-2 is better than Model-1in both isolated as well as interference conditions for all wind incidences and orientations respectively.Keywords: interference factor, tall buildings, wind direction, mean pressure-coefficients
Procedia PDF Downloads 1283658 Reliability Analysis of Construction Schedule Plan Based on Building Information Modelling
Authors: Lu Ren, You-Liang Fang, Yan-Gang Zhao
Abstract:
In recent years, the application of BIM (Building Information Modelling) to construction schedule plan has been the focus of more and more researchers. In order to assess the reasonable level of the BIM-based construction schedule plan, that is whether the schedule can be completed on time, some researchers have introduced reliability theory to evaluate. In the process of evaluation, the uncertain factors affecting the construction schedule plan are regarded as random variables, and probability distributions of the random variables are assumed to be normal distribution, which is determined using two parameters evaluated from the mean and standard deviation of statistical data. However, in practical engineering, most of the uncertain influence factors are not normal random variables. So the evaluation results of the construction schedule plan will be unreasonable under the assumption that probability distributions of random variables submitted to the normal distribution. Therefore, in order to get a more reasonable evaluation result, it is necessary to describe the distribution of random variables more comprehensively. For this purpose, cubic normal distribution is introduced in this paper to describe the distribution of arbitrary random variables, which is determined by the first four moments (mean, standard deviation, skewness and kurtosis). In this paper, building the BIM model firstly according to the design messages of the structure and making the construction schedule plan based on BIM, then the cubic normal distribution is used to describe the distribution of the random variables due to the collecting statistical data of the random factors influencing construction schedule plan. Next the reliability analysis of the construction schedule plan based on BIM can be carried out more reasonably. Finally, the more accurate evaluation results can be given providing reference for the implementation of the actual construction schedule plan. In the last part of this paper, the more efficiency and accuracy of the proposed methodology for the reliability analysis of the construction schedule plan based on BIM are conducted through practical engineering case.Keywords: BIM, construction schedule plan, cubic normal distribution, reliability analysis
Procedia PDF Downloads 1473657 Study on the Demolition Waste Management in Malaysia Construction Industry
Authors: Gunalan Vasudevan
Abstract:
The Malaysia construction industry generates a large quantity of construction and demolition waste nowadays. In the handbook for demolition work only comprised small portion of demolition waste management. It is important to study and determine the ways to provide a practical guide for the professional in the building industry about handling the demolition waste. In general, demolition defined as tearing down or wrecking of structural work or architectural work of the building and other infrastructures work such as road, bridge and etc. It’s a common misconception that demolition is nothing more than taking down a structure and carrying the debris to a landfill. On many projects, 80-90% of the structure is kept for reuse or recycling which help the owner to save cost. Demolition contractors required a lot of knowledge and experience to minimize the impact of demolition work to the existing surrounding area. For data collecting method, postal questionnaires and interviews have been selected to collect data. Questionnaires have distributed to 80 respondents from the construction industry in Klang Valley. 67 of 80 respondents have replied the questionnaire while 4 people have interviewed. Microsoft Excel and Statistical Package for Social Science version 17.0 were used to analyze the data collected.Keywords: demolition, waste management, construction material, Malaysia
Procedia PDF Downloads 4443656 Development and Evaluation of a Portable Ammonia Gas Detector
Authors: Jaheon Gu, Wooyong Chung, Mijung Koo, Seonbok Lee, Gyoutae Park, Sangguk Ahn, Hiesik Kim, Jungil Park
Abstract:
In this paper, we present a portable ammonia gas detector for performing the gas safety management efficiently. The display of the detector is separated from its body. The display module is received the data measured from the detector using ZigBee. The detector has a rechargeable li-ion battery which can be use for 11~12 hours, and a Bluetooth module for sending the data to the PC or the smart devices. The data are sent to the server and can access using the web browser or mobile application. The range of the detection concentration is 0~100ppm.Keywords: ammonia, detector, gas, portable
Procedia PDF Downloads 4183655 Shear Surface and Localized Waves in Functionally Graded Piezoactive Electro-Magneto-Elastic Media
Authors: Karen B. Ghazaryan
Abstract:
Recently, the propagation of coupled electromagnetic and elastic waves in magneto-electro-elastic (MEE) structures attracted much attention due to the wide range of application of these materials in smart structures. MEE materials are a class of new artificial composites that consist of simultaneous piezoelectric and piezomagnetic phases. Magneto-electro-elastic composites are built up by combining piezoelectric and piezomagnetic phases to obtain a smart composite that presents not only the electromechanical and magneto-mechanical coupling but also a strong magnetoelectric coupling, which makes such materials highly valuable in technological usage. In the framework of quasi-static approach shear surface and localized waves are considered in magneto-electro-elastic piezo-active structure consisting of functionally graded 6mm hexagonal symmetry group crystals. Assuming that in a functionally graded material the elastic and electromagnetic properties vary in the same proportion in direction perpendicular to the MEE polling direction, special classes of inhomogeneity functions were found, admitting exact solutions for coupled electromagnetic and elastic wave fields. Based on these exact solutions, defining the coupled shear wave field in magneto-electro-elastic composites several modal problems are considered: shear surface waves propagation along surface of a MEE half-space, interfacial wave propagation in a MEE oppositely polarized bi-layer, Love type waves in a functionally graded MEE layer overlying a homogeneous elastic half-space. For the problems under consideration corresponding dispersion equations are deduced analytically in an explicit form and for the BaTiO₃–CoFe₂O₄ crystal numerical results estimating effects of inhomogeneity and piezo effect are carried out.Keywords: surface shear waves, magneto-electro-elastic composites, piezoactive crystals, functionally graded elastic materials
Procedia PDF Downloads 2153654 Factors Leading to Recividism
Authors: Maria Kralova, Michal Palecek
Abstract:
We have detected factors leading to recidivism (the Czech Republic data). The employment during imprisonment turned out to be the most significant predictor with a positive effect on reduction of a rate of recidivism. Accordingly, we mainly focus on this predictor and its economic consequences. Smart public policy can cut government costs dramatically as more than a half of prisoners in the Czech Republic are recidivists. The operating cost cut of the Czech prison service could be CZK 127,680,000 (USD 5,889,623) in 2013 if a public policy had been set smarter.Keywords: cost-cut, effective, optimal, public policy, reducing recidivism
Procedia PDF Downloads 5293653 Beggar-Thy-Neighbor's Beach: Pricing Adaptation to Sea-Level Rise
Authors: Arlan Zandro Brucal, John Lynham
Abstract:
With the accelerated sea-level rise (SLR) increasingly becoming a concern, demand for coastal management and protection is expected to grow. Among the coastal management and protection methods, building seawalls are among the most controversial due to the negative externalities they impose on beachgoers and neighboring properties. This paper provides estimates of the external cost associated with building seawalls on the island of Oahu in Hawaii. Using hedonic pricing approach on real properties sold between 1980-2010 and aerial photographs of seawalls in 1995, the paper finds that (1) while seawalls do increase the value of protected properties, the share of armored properties appear to be negatively correlated with property sale prices, suggesting that the positive effect of seawalls tend to decline as more and more rely on this coastal management method; and (2) the value of beachfront properties tend to decline as they get approach seawalls. Results suggest that policymakers should devise a policy that would internalize the externalities associated with private-sector adaptation to climate change.Keywords: private sector climate change adaptation, externalities, sea-level rise, hedonic pricing
Procedia PDF Downloads 2883652 Alternative Method of Determining Seismic Loads on Buildings Without Response Spectrum Application
Authors: Razmik Atabekyan, V. Atabekyan
Abstract:
This article discusses a new alternative method for determination of seismic loads on buildings, based on resistance of structures to deformations of vibrations. The basic principles for determining seismic loads by spectral method were developed in 40… 50ies of the last century and further have been improved to pursuit true assessments of seismic effects. The base of the existing methods to determine seismic loads is response spectrum or dynamicity coefficient β (norms of RF), which are not definitively established. To this day there is no single, universal method for the determination of seismic loads and when trying to apply the norms of different countries, significant discrepancies between the results are obtained. On the other hand there is a contradiction of the results of macro seismic surveys of strong earthquakes with the principle of the calculation based on accelerations. It is well-known, on soft soils there is an increase of destructions (mainly due to large displacements), even though the accelerations decreases. Obviously, the seismic impacts are transmitted to the building through foundation, but paradoxically, the existing methods do not even include foundation data. Meanwhile acceleration of foundation of the building can differ several times from the acceleration of the ground. During earthquakes each building has its own peculiarities of behavior, depending on the interaction between the soil and the foundations, their dynamic characteristics and many other factors. In this paper we consider a new, alternative method of determining the seismic loads on buildings, without the use of response spectrum. The following main conclusions: 1) Seismic loads are revealed at the foundation level, which leads to redistribution and reduction of seismic loads on structures. 2) The proposed method is universal and allows determine the seismic loads without the use of response spectrum and any implicit coefficients. 3) The possibility of taking into account important factors such as the strength characteristics of the soils, the size of the foundation, the angle of incidence of the seismic ray and others. 4) Existing methods can adequately determine the seismic loads on buildings only for first form of vibrations, at an average soil conditions.Keywords: seismic loads, response spectrum, dynamic characteristics of buildings, momentum
Procedia PDF Downloads 5053651 Strategic Shear Wall Arrangement in Buildings under Seismic Loads
Authors: Akram Khelaifia, Salah Guettala, Nesreddine Djafar Henni, Rachid Chebili
Abstract:
Reinforced concrete shear walls are pivotal in protecting buildings from seismic forces by providing strength and stiffness. This study highlights the importance of strategically placing shear walls and optimizing the shear wall-to-floor area ratio in building design. Nonlinear analyses were conducted on an eight-story building situated in a high seismic zone, exploring various scenarios of shear wall positioning and ratios to floor area. Employing the performance-based seismic design (PBSD) approach, the study aims to meet acceptance criteria such as inter-story drift ratio and damage levels. The results indicate that concentrating shear walls in the middle of the structure during the design phase yields superior performance compared to peripheral distributions. Utilizing shear walls that fully infill the frame and adopting compound shapes (e.g., Box, U, and L) enhances reliability in terms of inter-story drift. Conversely, the absence of complete shear walls within the frame leads to decreased stiffness and degradation of shorter beams. Increasing the shear wall-to-floor area ratio in building design enhances structural rigidity and reliability regarding inter-story drift, facilitating the attainment of desired performance levels. The study suggests that a shear wall ratio of 1.0% is necessary to meet validation criteria for inter-story drift and structural damage, as exceeding this percentage leads to excessive performance levels, proving uneconomical as structural elements operate near the elastic range.Keywords: nonlinear analyses, pushover analysis, shear wall, plastic hinge, performance level
Procedia PDF Downloads 503650 Study on Shape Coefficient of Large Statue Building Based on CFD
Authors: Wang Guangda, Ma Jun, Zhao Caiqi, Pan Rui
Abstract:
Wind load is the main control load of large statue structures. Due to the irregular plane and elevation and uneven outer contour, statues’ shape coefficient can not pick up from the current code. Currently a common practice is based on wind tunnel test. But this method is time-consuming and high cost. In this paper, based on the fundamental theory of CFD, using fluid dynamics software of Fluent 15.0, a few large statue structure of 40 to 70m high, which are located in china , including large fairy statues and large Buddha statues, are analyzed by numerical wind tunnel. The results are contrasted with the recommended values in load code and the wind tunnel test results respectively. Results show that the shape coefficient has a good reliability by the numerical wind tunnel method of this kind of building. This will has a certain reference value of wind load values for large statues’ structure.Keywords: large statue structure, shape coefficient, irregular structure, wind tunnel test, numerical wind tunnel simulation
Procedia PDF Downloads 3753649 A Life Cycle Assessment of Greenhouse Gas Emissions from the Traditional and Climate-smart Farming: A Case of Dhanusha District, Nepal
Authors: Arun Dhakal, Geoff Cockfield
Abstract:
This paper examines the emission potential of different farming practices that the farmers have adopted in Dhanusha District of Nepal and scope of these practices in climate change mitigation. Which practice is more climate-smarter is the question that this aims to address through a life cycle assessment (LCA) of greenhouse gas (GHG) emissions. The LCA was performed to assess if there is difference in emission potential of broadly two farming systems (agroforestry–based and traditional agriculture) but specifically four farming systems. The required data for this was collected through household survey of randomly selected households of 200. The sources of emissions across the farming systems were paddy cultivation, livestock, chemical fertilizer, fossil fuels and biomass (fuel-wood and crop residue) burning. However, the amount of emission from these sources varied with farming system adopted. Emissions from biomass burning appeared to be the highest while the source ‘fossil fuel’ caused the lowest emission in all systems. The emissions decreased gradually from agriculture towards the highly integrated agroforestry-based farming system (HIS), indicating that integrating trees into farming system not only sequester more carbon but also help in reducing emissions from the system. The annual emissions for HIS, Medium integrated agroforestry-based farming system (MIS), LIS (less integrated agroforestry-based farming system and subsistence agricultural system (SAS) were 6.67 t ha-1, 8.62 t ha-1, 10.75 t ha-1 and 17.85 t ha-1 respectively. In one agroforestry cycle, the HIS, MIS and LIS released 64%, 52% and 40% less GHG emission than that of SAS. Within agroforestry-based farming systems, the HIS produced 25% and 50% less emissions than those of MIS and LIS respectively. Our finding suggests that a tree-based farming system is more climate-smarter than a traditional farming. If other two benefits (carbon sequestered within the farm and in the natural forest because of agroforestry) are to be considered, a considerable amount of emissions is reduced from a climate-smart farming. Some policy intervention is required to motivate farmers towards adopting such climate-friendly farming practices in developing countries.Keywords: life cycle assessment, greenhouse gas, climate change, farming systems, Nepal
Procedia PDF Downloads 6193648 Marine Environmental Peace-Building Initiatives: Factors of Success and Failure
Authors: Yael Teff-Seker
Abstract:
More often than not, ecosystems do not follow anthropogenic political borders. Thus, transboundary environmental protection or rehabilitation initiatives can be beneficial and at times even vital for supporting healthy ecosystems. Marine areas demand unique considerations and challenges for such initiatives, as maritime borders tend to be less defined, less fortified and less visible. In areas of recent conflict, cross-border environmental initiatives can also improve relations between states and promote peace-building efforts, in addition to their environmental benefits. The current study reviews the current literature on transboundary marine environmental protection initiatives that take place in these areas and focuses on joint initiatives in Israel-Jordan and Croatia-Slovenia. In addition to factors described in the literature such as funding and third-party involvement, findings suggest that the peripheral location of marine environmental initiatives can be beneficial for the success of such initiatives, as well as facilitating border crossing and the extent to which such initiatives advance other governmental goals. A sense of urgency, environmental or other, has also been found to be highly relevant to project success.Keywords: environmental cooperation, environmental peacebuilding, marine environment, environmental conflict, environmental management
Procedia PDF Downloads 1803647 The Effect of Climate on Noble Houses of Siraf in the Early Islamic Centuries (Case Study: House N)
Authors: Mohadese Sukhtesaraii, Mohammad Esmail Esmaili Jelodar, Kosar Sookhtesaraii
Abstract:
Throughout history, humans have always wanted to have a shelter to live in, and this need and desire became the beginning of building and architecture. It was necessary to build a shelter and a building, dealing with the surrounding nature. The design and construction of architectural spaces are always influenced by nature, climate, and geographical location, and It is believed clearly see this influence even in the use of materials used in the construction of architectural buildings. The historical port of Siraf is located on the northern coast of the Persian Gulf in Bushehr province and 38 km from Kangan port. Geographically and climatically, Siraf is considered one of the hot and humid areas. The Zagros mountains, which continue from the Iranian plateau to the sea, end at Bandar Siraf; As a result, it creates a strip one kilometer wide by the sea. The location of Siraf in the restrictive conditions of the mountains and the sea has made it impossible to expand the city. The main goal of the current research is to investigate the climate of Siraf and the influence of the region's climate on the architecture and design of residential buildings in Siraf, known as noble houses, in the early Islamic centuries. In this research, it is looking for an answer to the question of how the climatic and geographical conditions have affected the architecture of Siraf buildings. The theoretical framework of this research can be expressed based on the influence of climate on the historical architecture of Bandar Seraf and the spatial analysis of archeology. Also, the research method will be analytical-descriptive and using field and library studies. The authors of the article believe that the architectural spaces of the early Islamic centuries of Siraf city were affected by the climate and geographical location, and the architects started building buildings by considering factors such as the sun's radiation, wind direction, and the position of the mountains and the sea. To use the regional and environmental potential for buildings.Keywords: hose N, noble hose, islamic era, siraf, climate
Procedia PDF Downloads 883646 Seismic Base Shear Force Depending on Building Fundamental Period and Site Conditions: Deterministic Formulation and Probabilistic Analysis
Authors: S. Dorbani, M. Badaoui, D. Benouar
Abstract:
The aim of this paper is to investigate the effect of the building fundamental period of reinforced concrete buildings of (6, 9, and 12-storey), with different floor plans: Symmetric, mono-symmetric, and unsymmetric. These structures are erected at different epicentral distances. Using the Boumerdes, Algeria (2003) earthquake data, we focused primarily on the establishment of the deterministic formulation linking the base shear force to two parameters: The first one is the fundamental period that represents the numerical fingerprint of the structure, and the second one is the epicentral distance used to represent the impact of the earthquake on this force. In a second step, with a view to highlight the effect of uncertainty in these parameters on the analyzed response, these parameters are modeled as random variables with a log-normal distribution. The variability of the coefficients of variation of the chosen uncertain parameters, on the statistics on the seismic base shear force, showed that the effect of uncertainty on fundamental period on this force statistics is low compared to the epicentral distance uncertainty influence.Keywords: base shear force, fundamental period, epicentral distance, uncertainty, lognormal variables, statistics
Procedia PDF Downloads 3203645 Positive Impact of Cartoon Movies on Adults
Authors: Yacoub Aljaffery
Abstract:
As much as we think negatively about social media such as TV and smart phones, there are many positive benefits our society can get from it. Cartoons, for example, are made specifically for children. However, in this paper, we will prove how cartoon videos can have a positive impact on adults, especially college students. Since cartoons are meant to be a good learning tool for children, as well as adults, we will show our audience how they can use cartoon in teaching critical thinking and other language skills.Keywords: social media, TV, teaching, learning, cartoon movies
Procedia PDF Downloads 3243644 Seismic Vulnerability Mitigation of Non-Engineered Buildings
Authors: Muhammad Tariq A. Chaudhary
Abstract:
The tremendous loss of life that resulted in the aftermath of recent earthquakes in developing countries is mostly due to the collapse of non-engineered and semi-engineered building structures. Such structures are used as houses, schools, primary healthcare centres and government offices. These building are classified structurally into two categories viz. non-engineered and semi-engineered. Non-engineered structures include: adobe, Unreinforced Masonry (URM) and wood buildings. Semi-engineered buildings are mostly low-rise (up to 3 story) light concrete frame structures or masonry bearing walls with reinforced concrete slab. This paper presents an overview of the typical damage observed in non-engineered structures and their most likely causes in the past earthquakes with specific emphasis on the performance of such structures in the 2005 Kashmir earthquake. It is demonstrated that seismic performance of these structures can be improved from life-safety viewpoint by adopting simple low-cost modifications to the existing construction practices. Incorporation of some of these practices in the reconstruction efforts after the 2005 Kashmir earthquake are examined in the last section for mitigating seismic risk hazard.Keywords: Kashmir earthquake, non-engineered buildings, seismic hazard, structural details, structural strengthening
Procedia PDF Downloads 2863643 Optimum Structural Wall Distribution in Reinforced Concrete Buildings Subjected to Earthquake Excitations
Authors: Nesreddine Djafar Henni, Akram Khelaifia, Salah Guettala, Rachid Chebili
Abstract:
Reinforced concrete shear walls and vertical plate-like elements play a pivotal role in efficiently managing a building's response to seismic forces. This study investigates how the performance of reinforced concrete buildings equipped with shear walls featuring different shear wall-to-frame stiffness ratios aligns with the requirements stipulated in the Algerian seismic code RPA99v2003, particularly in high-seismicity regions. Seven distinct 3D finite element models are developed and evaluated through nonlinear static analysis. Engineering Demand Parameters (EDPs) such as lateral displacement, inter-story drift ratio, shear force, and bending moment along the building height are analyzed. The findings reveal two predominant categories of induced responses: force-based and displacement-based EDPs. Furthermore, as the shear wall-to-frame ratio increases, there is a concurrent increase in force-based EDPs and a decrease in displacement-based ones. Examining the distribution of shear walls from both force and displacement perspectives, model G with the highest stiffness ratio, concentrating stiffness at the building's center, intensifies induced forces. This configuration necessitates additional reinforcements, leading to a conservative design approach. Conversely, model C, with the lowest stiffness ratio, distributes stiffness towards the periphery, resulting in minimized induced shear forces and bending moments, representing an optimal scenario with maximal performance and minimal strength requirements.Keywords: dual RC buildings, RC shear walls, modeling, static nonlinear pushover analysis, optimization, seismic performance
Procedia PDF Downloads 563642 Non-Contact Human Movement Monitoring Technique for Security Control System Based 2n Electrostatic Induction
Authors: Koichi Kurita
Abstract:
In this study, an effective non-contact technique for the detection of human physical activity is proposed. The technique is based on detecting the electrostatic induction current generated by the walking motion under non-contact and non-attached conditions. A theoretical model for the electrostatic induction current generated because of a change in the electric potential of the human body is proposed. By comparing the obtained electrostatic induction current with the theoretical model, it becomes obvious that this model effectively explains the behavior of the waveform of the electrostatic induction current. The normal walking motions are recorded using a portable sensor measurement located in a passageway of office building. The obtained results show that detailed information regarding physical activity such as a walking cycle can be estimated using our proposed technique. This suggests that the proposed technique which is based on the detection of the walking signal, can be successfully applied to the detection of human walking motion in a secured building.Keywords: human walking motion, access control, electrostatic induction, alarm monitoring
Procedia PDF Downloads 3573641 Digital Transformation in Developing Countries, A Study into Building Information Modelling Adoption in Thai Design and Engineering Small- and Medium-Sizes Enterprises
Authors: Prompt Udomdech, Eleni Papadonikolaki, Andrew Davies
Abstract:
Building information modelling (BIM) is the major technological trend amongst built environment organisations. Digitalising businesses and operations, BIM brings forth a digital transformation in any built environment industry. The adoption of BIM presents challenges for organisations, especially small- and medium-sizes enterprises (SMEs). The main problem for built-environment SMEs is the lack of project actors with adequate BIM competences. The research highlights learning in projects as the key and explores into the learning of BIM in projects of designers and engineers within Thai design and engineering SMEs. The study uncovers three impeding attributes, which are: a) lack of English proficiency; b) unfamiliarity with digital technologies; and c) absence of public standards. This research expands on the literature on BIM competences and adoption.Keywords: BIM competences and adoption, digital transformation, learning in projects, SMEs, and developing built environment industry
Procedia PDF Downloads 1453640 Collision Detection Algorithm Based on Data Parallelism
Authors: Zhen Peng, Baifeng Wu
Abstract:
Modern computing technology enters the era of parallel computing with the trend of sustainable and scalable parallelism. Single Instruction Multiple Data (SIMD) is an important way to go along with the trend. It is able to gather more and more computing ability by increasing the number of processor cores without the need of modifying the program. Meanwhile, in the field of scientific computing and engineering design, many computation intensive applications are facing the challenge of increasingly large amount of data. Data parallel computing will be an important way to further improve the performance of these applications. In this paper, we take the accurate collision detection in building information modeling as an example. We demonstrate a model for constructing a data parallel algorithm. According to the model, a complex object is decomposed into the sets of simple objects; collision detection among complex objects is converted into those among simple objects. The resulting algorithm is a typical SIMD algorithm, and its advantages in parallelism and scalability is unparalleled in respect to the traditional algorithms.Keywords: data parallelism, collision detection, single instruction multiple data, building information modeling, continuous scalability
Procedia PDF Downloads 2903639 Investigation of the Historical Background of Monumental Mosques in Kocaeli, Turkey by IRT Techniques
Authors: Emre Kishalı, Neslihan TürkmenoğLu Bayraktar
Abstract:
Historical buildings may face various impacts throughout their life cycle. There have been environmental, structural, public works actions on old monuments influencing sustainability and maintenance issues. As a result, ancient monuments can have been undergone various changes in the context of restoration and repair. Currently, these buildings face integrated conditions including city planning macro solutions, old intervention methods, modifications in building envelope and artefacts in terms of conservation. Moreover, documentation of phases is an essential for assessing the historical building, yet it can result in highly complicated and interwoven issues. Herein, two monuments constructed in the 16th century are selected as case studies in Kocaeli, Turkey which are located in different micro climatic conditions and/or exposed to different interventions and which are important for the city as cultural property. Pertev Paşa Mosque (also known as Yenicuma Mosque) -constructed by Architect Sinan-; Gebze Çoban Mustafa Paşa Mosque -constructed in 1523 and known as the work of Architect Sinan but various names asserted as the architect of building according to resources. Active water infiltration and damages, recent material interventions, hidden niches, and foundation techniques of the mosque are investigated via Infrared Thermography under the project of 114K284, “Non-Destructive Test Applications, in the Context of Planned Conservation, through Historical Mosques of Kocaeli: Coban Mustafa Pasa Mosque, Fevziye Mosque and Pertev Pasa Mosque” funded by TUBITAK. It is aimed to reveal active deteriorations on building elements generated by unwanted effects of structural and climatic conditions, historical interventions, and modifications by monitoring the variation of surface temperature and humidity by IRT visualization method which is an important non- destructive process for investigation of monuments in the conservation field in the context of planned conservation. It is also concluded that in-situ monitoring process via IRT through different climatic conditions give substantial information on the behaviour of the envelope to the physical environmental conditions by observation of thermal performance, degradations. However, it is obvious that monitoring of historical buildings cannot be pursued by implementing a single non-destructive technique to have complete data of the structure.Keywords: IRT, non-destructive test, planned conservation, mosque
Procedia PDF Downloads 3523638 Review of Vehicle to Grid Applications in Recent Years
Authors: Afsane Amiri
Abstract:
Electric Vehicle (EV) technology is expected to take a major share in the light-vehicle market in the coming decades. Charging of EVs will put an extra burden on the distribution grid and in some cases adjustments will need to be made. In this paper a review of different plug-in and vehicle to grid (V2G) capable vehicles are given along with their power electronics topologies. The economic implication of charging the vehicle or sending power back to the utility is described in brief.Keywords: energy storage system, battery unit, cost, optimal sizing, plug-in electric vehicles (PEVs), smart grid
Procedia PDF Downloads 6003637 Shaping the Image of Museum Events in the Digital Media Era: A Quantitative Analysis of the Cat-Themed ‘Night at the Museum’ Event
Authors: Shuyu Zhao
Abstract:
This study uses the cat-themed "Night at the Museum" event of the Shanghai Museum as a case to examine how museum events are portrayed across various digital news platforms. Grounded in communication and cultural creativity theories and employing a three-tier framing approach, this research provides an in-depth analysis of media strategies in cross-platform museum image building. Through a quantitative content analysis, it is investigated that how digital media employ specific narrative strategies to shape the public perception of museum events. The findings reveal a prevalent use of leadership framing, highlighting the museum's unique role in cultural dissemination. By combining elements of museum culture with a pet-friendly theme, the "catty Night at the Museum" event serves as a distinctive example in exploring museum image construction within digital media. This study sheds light on how museum events, as unique cultural arenas, are positioned in the public mind, offering a fresh perspective for the promotion and image-building of museum activities.Keywords: cultural communication, digital media, museum, framing theory
Procedia PDF Downloads 20