Search results for: project managers underutilization
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 6020

Search results for: project managers underutilization

5930 Navigating through Uncertainty: An Explorative Study of Managers’ Experiences in China-foreign Cooperative Higher Education

Authors: Qian Wang, Haibo Gu

Abstract:

To drive practical interpretations and applications of various policies in building the transnational education joint-ventures, middle managers learn to navigate through uncertainties and ambiguities. However, the current literature views very little about those middle managers’ experiences, perceptions, and practices. This paper takes the empirical approach and aims to uncover the middle managers’ experiences by conducting interviews, campus visits, and document analysis. Following the qualitative research method approach, the researchers gathered information from a mixture of fourteen foreign and Chinese managers. Their perceptions of the China-foreign cooperation in higher education and their perceived roles have offered important, valuable insights to this group of people’s attitudes and management performances. The diverse cultural and demographic backgrounds contributed to the significance of the study. There are four key findings. One, middle managers’ immediate micro-contexts and individual attitudes are the top two influential factors in managers’ performances. Two, the foreign middle managers showed a stronger sense of self-identity in risk-taking. Three, the Chinese middle managers preferred to see difficulties as part of their assigned responsibilities. Four, middle managers in independent universities demonstrated a stronger sense of belonging and fewer frustrations than middle managers in secondary institutes. The researchers propose that training for managers in a transnational educational setting should consider these discoveries when select fitting topics and content. In particular, middle managers should be better prepared to anticipate their everyday jobs in the micro-environment; hence, information concerning sponsor organizations’ working culture is as essential as knowing the national and local regulations, and socio-culture. Different case studies can help the managers to recognize and celebrate the diversity in transnational education. Situational stories can help them to become aware of the diverse and wide range of work contexts so that they will not feel to be left alone when facing challenges without relevant previous experience or training. Though this research is a case study based in the Chinese transnational higher education setting, the implications could be relevant and comparable to other transnational higher education situations and help to continue expanding the potential applications in this field.

Keywords: educational management, middle manager performance, transnational higher education

Procedia PDF Downloads 142
5929 Langerian Mindfulness and School Manager’s Competencies: A Comprehensive Model in Khorasan Razavi Educational Province

Authors: Reza Taherian, Naziasadat Naseri, Elham Fariborzi, Faride Hashmiannejad

Abstract:

Effective management plays a crucial role in the success of educational institutions and training organizations. This study aims to develop and validate a professional competency model for managers in the education and training sector of Khorasan Razavi Province using a mindfulness approach based on Langerian theory. Employing a mixed exploratory design, the research involved qualitative data collection from experts and top national and provincial managers, as well as quantitative data collection using a researcher-developed questionnaire. The findings revealed that 81% of the competency of education and training managers is influenced by the dimensions of Langerian mindfulness, including engagement, seeking, producing, and flexibility. These dimensions were found to be predictive of the competencies of education and training managers, which encompass specialized knowledge, professional skills, pedagogical knowledge, commitment to Islamic values, personal characteristics, and creativity. This research provides valuable insights into the essential role of mindfulness in shaping the competencies of education and training managers, shedding light on the specific dimensions that significantly contribute to managerial success in Khorasan Razavi province.

Keywords: school managers, school manager’s competencies, mindfulness, Langerian mindfulness

Procedia PDF Downloads 36
5928 Competencies and Training Needs for School Sport Managers in the North West Province, South Africa

Authors: Elriena Eksteen, Yolandi Willemse, Dawie D. J. Malan, Suria Ellis

Abstract:

It is important to understand which competencies are needed for managerial and administrative effectiveness of school sport managers with regard to the design, delivery and direction of school sport programmes. The purpose of this study was to determine the competencies and training needs for secondary school sport managers in the North West Province. Data were gathered from 79 school sport managers in the North West Province by means of a validated self-compiled questionnaire. Descriptive statistics, factor analysis and a dependent t-test were used to compare which competencies school sport managers perceive as important in their work with the competencies they actually perform. Functional competencies and core competencies were both found to be important for managing school sport effectively. There were statistically significant differences between the perceived importance of competencies and the frequency with which competencies were actually performed. Respondents attached greater importance to functional and core competencies than the proportion of time spent actually performing them. Furthermore, results indicated the need to train teachers in managing sport finance, sport facilities and human resources, as well as presenting workshops in public relations, sport marketing and sport organisation.

Keywords: competencies, functional competencies, core competencies, school sport manager, training needs

Procedia PDF Downloads 409
5927 Managing the Local Manager: A Comparative Study of Core HRM Functions in Multinationals

Authors: Maria Khan

Abstract:

Framing good core Human Resource Management (HRM) functions like recruitment, selection, training and development, which if executed effectively, can become a strategic advantage for a company. HRM policies related to mid-level managers can depend on the type of top management. This may be due to the difference in perception of effective HRM policies of an expatriate and local leadership. This comparative case study assesses how local mid-level managers are managed in leading multinational telecom companies in Pakistan. Core HRM functions related to managers were analysed through field research based on semi-structured interviews with relevant Human Resource Managers. Results suggest that recruitment and selection practices are not too different and are in compliance with best HRM practices. However, there is a difference in the effective implementation of Training and Development policies. Changing global management trends and skill development dictate that MNCs continuously develop the local talent effectively for local and international success.

Keywords: recruitment, selection, training, development, core HRM, human resource management, subsidiary, international staffing, managers, MNC, expatriate

Procedia PDF Downloads 305
5926 Attitudes of Resort Hotel Managers toward Climate Change Adaptation and Mitigation Practices, Bishoftu, Ethiopia

Authors: Mohammed Aman Kassim

Abstract:

This study explored the attitudes of hotel managers toward climate change adaption and mitigation practices in resort hotels located in Bishoftu town, Ethiopia. Weak resource management in the area causes serious environmental problems. So sustainable way forward is needed for the destination in order to reduce environmental damage. Six resorts were selected out of twelve resort hotels in Bishoftu City by using the systematic sampling method, and a total of fifty-six managers were taken for the study. The data analyzed came from self-administered questionnaires, site observation, and a short face-to-face interview with general managers. The results showed that 99% of hotel managers possess positive attitudes toward climate change adaptation and mitigation practices. But they did not show a high commitment to adopting all adaptation and mitigation practices in their hotel’s actions and day-to-day operation. Key adoption influencing factors identified were: owners' commitment toward sustainability, the applicability of government rules and regulations, and incentives for good achievement. The findings also revealed that the attitudes of resort hotel managers toward climate change adaption and mitigation practices are more significantly influenced by their social factors, such as level of education and age, in this study. The study demonstrated that in order to increase managers' commitment and hotels become green: government led-education and training programs, green certification actions, and application of government environmental regulation are important.

Keywords: climate change, climate change adaptation and mitigation practices, environmental attitude, resort hotels

Procedia PDF Downloads 78
5925 Managerial Advice-Seeking and Supply Chain Resilience: A Social Capital Perspective

Authors: Ethan Nikookar, Yalda Boroushaki, Larissa Statsenko, Jorge Ochoa Paniagua

Abstract:

Given the serious impact that supply chain disruptions can have on a firm's bottom-line performance, both industry and academia are interested in supply chain resilience, a capability of the supply chain that enables it to cope with disruptions. To date, much of the research has focused on the antecedents of supply chain resilience. This line of research has suggested various firm-level capabilities that are associated with greater supply chain resilience. A consensus has emerged among researchers that supply chain flexibility holds the greatest potential to create resilience. Supply chain flexibility achieves resilience by creating readiness to respond to disruptions with little cost and time by means of reconfiguring supply chain resources to mitigate the impacts of the disruption. Decisions related to supply chain disruptions are made by supply chain managers; however, the role played by supply chain managers' reference networks has been overlooked in the supply chain resilience literature. This study aims to understand the impact of supply chain managers on their firms' supply chain resilience. Drawing on social capital theory and social network theory, this paper proposes a conceptual model to explore the role of supply chain managers in developing the resilience of supply chains. Our model posits that higher level of supply chain managers' embeddedness in their reference network is associated with increased resilience of their firms' supply chain. A reference network includes individuals from whom supply chain managers seek advice on supply chain related matters. The relationships between supply chain managers' embeddedness in reference network and supply chain resilience are mediated by supply chain flexibility.

Keywords: supply chain resilience, embeddedness, reference networks, social capitals

Procedia PDF Downloads 211
5924 Simulating the Interaction of Strategy Development and Project Delivery

Authors: Nipun Agarwal, David Paul, Fareed Un Din

Abstract:

Every organization develops a strategy that needs to be implemented and is undertaken through project delivery. In essence, project requirements should exactly replicate an organization’s strategy. In reality this does not happen, and behavioral factors deviate the project delivery from the strategic objectives. This occurs as project stakeholders can have competing objectives. Resultantly, requirements that are implemented through projects are less aligned to the strategy. This paper develops a game theoretic model to simulate why such deviations occur. That explains the difference between strategy development and implementation.

Keywords: strategy, simulation, project management, game theory

Procedia PDF Downloads 121
5923 Machine Learning Approach to Project Control Threshold Reliability Evaluation

Authors: Y. Kim, H. Lee, M. Park, B. Lee

Abstract:

Planning is understood as the determination of what has to be performed, how, in which sequence, when, what resources are needed, and their cost within the organization before execution. In most construction project, it is evident that the inherent nature of planning is dynamic, and initial planning is subject to be changed due to various uncertain conditions of construction project. Planners take a continuous revision process during the course of a project and until the very end of project. However, current practice lacks reliable, systematic tool for setting variance thresholds to determine when and what corrective actions to be taken. Rather it is heavily dependent on the level of experience and knowledge of the planner. Thus, this paper introduces a machine learning approach to evaluate project control threshold reliability incorporating project-specific data and presents a method to automate the process. The results have shown that the model improves the efficiency and accuracy of the monitoring process as an early warning.

Keywords: machine learning, project control, project progress monitoring, schedule

Procedia PDF Downloads 233
5922 Construction Project Planning Using Fuzzy Critical Path Approach

Authors: Omar M. Aldenali

Abstract:

Planning is one of the most important phases of the management science and network planning, which represents the project activities relationship. Critical path is one of the project management techniques used to plan and control the execution of a project activities. The objective of this paper is to implement a fuzzy logic approach to arrange network planning on construction projects. This method is used to finding out critical path in the fuzzy construction project network. The trapezoidal fuzzy numbers are used to represent the activity construction project times. A numerical example that represents a house construction project is introduced. The critical path method is implemented on the fuzzy construction network activities, and the results showed that this method significantly affects the completion time of the construction projects.

Keywords: construction project, critical path, fuzzy network project, planning

Procedia PDF Downloads 127
5921 Neural Network Based Approach of Software Maintenance Prediction for Laboratory Information System

Authors: Vuk M. Popovic, Dunja D. Popovic

Abstract:

Software maintenance phase is started once a software project has been developed and delivered. After that, any modification to it corresponds to maintenance. Software maintenance involves modifications to keep a software project usable in a changed or a changing environment, to correct discovered faults, and modifications, and to improve performance or maintainability. Software maintenance and management of software maintenance are recognized as two most important and most expensive processes in a life of a software product. This research is basing the prediction of maintenance, on risks and time evaluation, and using them as data sets for working with neural networks. The aim of this paper is to provide support to project maintenance managers. They will be able to pass the issues planned for the next software-service-patch to the experts, for risk and working time evaluation, and afterward to put all data to neural networks in order to get software maintenance prediction. This process will lead to the more accurate prediction of the working hours needed for the software-service-patch, which will eventually lead to better planning of budget for the software maintenance projects.

Keywords: laboratory information system, maintenance engineering, neural networks, software maintenance, software maintenance costs

Procedia PDF Downloads 336
5920 Ergonomics Management and Sustainability: An Exploratory Study Applied to Automaker Industry in South of Brazil

Authors: Giles Balbinotti, Lucas Balbinotti, Paula Hembecker

Abstract:

The management of the productive process project activities, for the conception of future work and for the financial health of the companies, is an important condition in an organizational model that corroborates the management of the human aspects and their variabilities existing in the work. It is important to seek, at all levels of the organization, understanding and consequent cultural change, and so that factors associated with human aspects are considered and prioritized in the projects. In this scenario, the central question of research for this study is placed from the context of the work, in which the managers and project coordinators are inserted, as follows: How is the top management convinced, in the design stages, to take The ‘Ergonomics’ as strategy for the performance and sustainability of the business? In this perspective, this research has as general objective to analyze how the application of the management of the human aspects in a real project of productive process in the automotive industry, including the activity of the manager and coordinator of the project beyond the strategies of convincing to act in the ergonomics of design. For this, the socio-technical and ergonomic approach is adopted, given its anthropocentric premise in the sense of acting on the social system simultaneously to the technical system, besides the support of the Modapts system that measures the non-value-added times and the correlation with the Critical positions. The methodological approach adopted in this study is based on a review of the literature and the analysis of the activity of the project coordinators of an industry, including the management of human aspects in the context of work variability and the strategies applied in project activities. It was observed in the study that the loss of performance of the serial production lines reaches the important number of the order of 30%, which can make the operation with not value-added, and this loss has as one of the causes, the ergonomic problems present in the professional activity.

Keywords: human aspects in production process project, ergonomics in design, sociotechnical project management, sociotechnical, ergonomic principles, sustainability

Procedia PDF Downloads 241
5919 Statistical Analysis with Prediction Models of User Satisfaction in Software Project Factors

Authors: Katawut Kaewbanjong

Abstract:

We analyzed a volume of data and found significant user satisfaction in software project factors. A statistical significance analysis (logistic regression) and collinearity analysis determined the significance factors from a group of 71 pre-defined factors from 191 software projects in ISBSG Release 12. The eight prediction models used for testing the prediction potential of these factors were Neural network, k-NN, Naïve Bayes, Random forest, Decision tree, Gradient boosted tree, linear regression and logistic regression prediction model. Fifteen pre-defined factors were truly significant in predicting user satisfaction, and they provided 82.71% prediction accuracy when used with a neural network prediction model. These factors were client-server, personnel changes, total defects delivered, project inactive time, industry sector, application type, development type, how methodology was acquired, development techniques, decision making process, intended market, size estimate approach, size estimate method, cost recording method, and effort estimate method. These findings may benefit software development managers considerably.

Keywords: prediction model, statistical analysis, software project, user satisfaction factor

Procedia PDF Downloads 108
5918 Dilemmas of HRM in a Project-Oriented Organisation

Authors: Katarzyna Piwowar-Sulej

Abstract:

The functioning of a project-oriented organisation creates new and different, from the traditional ones, conditions for human resources management. In the analysed case HRM is primarily characterized by a double-track nature – on the one hand within the framework of permanent structures (departments) and, on the other, within the area of particular projects. The purpose of the article is to present the dilemmas associated with the development of selected HRM areas in project-oriented organisations. Theoretical discussion was supplemented by the results of empirical research.

Keywords: human resources management, tracks of HRM, project, project-oriented organisation

Procedia PDF Downloads 257
5917 Managing IT Departments in Higher Education Institutes: Coping with the Exponentially Growing Needs and Expectations

Authors: Balqees A. Al-Thuhli, Ali H. Al-Badi, Khamis Al-Gharbi

Abstract:

Information technology is changing rapidly and the users’ expectations are also growing. Dealing with these changes in information technology, while satisfying the users’ needs and expectations is a big challenge. IT managers need to explore new mechanisms/strategies to enable them to cope with such challenges. The objectives of this research are to identify the significant challenges that might face IT managers in higher education institutes in the face of the high and ever growing customer expectations and to propose possible solutions to cope with such high-speed changes in information technology. To achieve these objectives, interviews with the IT professionals from different higher education institutes in Oman were conducted. In addition, documentation (printed and online) related to these institutions were studied and an intensive literature review of published work was examined. The findings of this research are expected to give a better understanding of the challenges that might face the IT managers at higher education institutes. This acquired understanding is expected to highlight the importance of being adaptable and fast in keeping up with the ever-growing technological changes. Moreover, adopting different tools and technologies could assist IT managers in developing their organisations’ IT policies and strategies.

Keywords: information technology, rapid change, CIO roles, challenges, IT managers, coping mechanisms, users' expectations

Procedia PDF Downloads 252
5916 Analysis of Particle Reinforced Metal Matrix Composite Crankshaft

Authors: R. S. Vikaash, S. Vinodh, T. S. Sai Prashanth

Abstract:

Six sigma is a defect reduction strategy enabling modern organizations to achieve business prosperity. The practitioners are in need to select best six sigma project among the available alternatives to achieve customer satisfaction. In this circumstance, this article presents a study in which six sigma project selection is formulated as Multi-Criteria Decision-Making(MCDM) problem and the best project has been found using AHP. Five main governing criteria and 14 sub criteria are being formulated. The decision maker’s inputs were gathered and computations were performed. The project with the high values from the set of projects is selected as the best project. Based on calculations, Project “P1”is found to be the best and further deployment actions have been undertaken in the organization.

Keywords: six Sigma, project selection, MCDM, analytic hierarchy process, business prosperity

Procedia PDF Downloads 330
5915 Critical Path Segments Method for Scheduling Technique

Authors: Sherif M. Hafez, Remon F. Aziz, May S. A. Elalim

Abstract:

Project managers today rely on scheduling tools based on the Critical Path Method (CPM) to determine the overall project duration and the activities’ float times which lead to greater efficiency in planning and control of projects. CPM was useful for scheduling construction projects, but researchers had highlighted a number of serious drawbacks that limit its use as a decision support tool and lacks the ability to clearly record and represent detailed information. This paper discusses the drawbacks of CPM as a scheduling technique and presents a modified critical path method (CPM) model which is called critical path segments (CPS). The CPS scheduling mechanism addresses the problems of CPM in three ways: decomposing the activity duration of separated but connected time segments; all relationships among activities are converted into finish–to–start relationship; and analysis and calculations are made with forward path. Sample cases are included to illustrate the shortages in CPM, CPS full analysis and calculations are explained in details, and how schedules can be handled better with the CPS technique.

Keywords: construction management, scheduling, critical path method, critical path segments, forward pass, float, project control

Procedia PDF Downloads 342
5914 An Introduction to Critical Chain Project Management Methodology

Authors: Ranjini Ramanath, Nanjunda P. Swamy

Abstract:

Construction has existed in our lives since time immemorial. However, unlike any other industry, construction projects have their own unique challenges – project type, purpose and end use of the project, geographical conditions, logistic arrangements, largely unorganized manpower and requirement of diverse skill sets, etc. These unique characteristics bring in their own level of risk and uncertainties to the project, which cause the project to deviate from its planned objectives of time, cost, quality, etc. over the many years, there have been significant developments in the way construction projects are conceptualized, planned, and managed. With the rapid increase in the population, increased rate of urbanization, there is a growing demand for infrastructure development, and it is required that the projects are delivered timely, and efficiently. In an age where ‘Time is Money,' implementation of new techniques of project management is required in leading to successful projects. This paper proposes a different approach to project management, which if applied in construction projects, can help in the accomplishment of the project objectives in a faster manner.

Keywords: critical chain project management methodology, critical chain, project management, construction management

Procedia PDF Downloads 407
5913 A Study on How to Improve PMBOK (Project Management Body of Knowledge) Guidelines Performance by Simulation

Authors: Fatemeh Jaferi, Moslem Parsa, Seyed Mehdi Sajadi

Abstract:

The project-oriented organizations are more appropriate for sustainable environments. Any effective project-oriented organization should institutionalize its project management processes in such a manner to yield the greatest possible profits. The aim of this paper is to study the relationship between the project management PMBOK guideline (Project Management Body of Knowledge) and simulation technology in project-oriented organizations. The methodology involves using five steps for applying these two tools aimed at enhancing project management processes in the Lorestan Gas Corporation, as one of the project-oriented organization. Results show the implementation of such management approach leads to a 5% performance improvement and using PMBOK can be instrumental in effective delay management. The implementation of the aforementioned improvement package was effective in improving the efficiency of organizational processes; in terms of optimizing the resource utilization that has manifested itself in resource losses and cost reductions.

Keywords: project-orientation, processes, PMBOK, optimization, organization, management

Procedia PDF Downloads 385
5912 Career Anchors and Job Satisfaction of Managers: The Mediating Role of Person-job Fit

Authors: Azadeh Askari, Ali Nasery Mohamad Abadi

Abstract:

The present study was conducted to investigate the relationship between career anchors and job satisfaction with emphasis on the mediating role of person-job fit. 502 managers and supervisors of ten operational areas of a large energy Company were selected as a cluster sample appropriate to the volume. The instruments used in this study were Career Anchor Questionnaire, Job Satisfaction Questionnaire and Person-job fit Questionnaire. Pearson correlation coefficient was used to analyze the data and AMOS software was used to determine the effect of career anchor variables and person-job fit on job satisfaction. Anchors of service and dedication, pure challenge and security and stability increase the person-job fit among managers and also the person-job fit plays a mediating role in relation to the effect it has on job satisfaction through these anchors. In contrast, the anchors of independence and autonomy reduce the person-job fit. Considering the importance of positive organizational attitudes and in order to have an optimal fit between job and worker, it is better that in human resources processes such as hiring and employing, the career anchors of the person should be considered so that the person can have more job satisfaction; and thus bring higher productivity for themselves and the organization.

Keywords: career anchor, job satisfaction, person-job fit, energy company, managers

Procedia PDF Downloads 103
5911 The Egyptian eGovernment Journey

Authors: Ali Abdelsattar Elshabrawy

Abstract:

The Egyptian government is struggling to build it's eGovernment project. They succeeded to build the Egyptian digital portal, which contain links for number of services provided by different ministries. For achieving such success, their are requirements necessary to build such a project such as: internet dissemination, IT literacy, Strategy, disqualification of paper based services. This paper is going to clarify the main obstacles to the Egyptian eGovernment project from both the supply and demand sides. Also will clarify the most critical requirements in this phase of the project lifecycle. This paper should be in great value for the project team and also for many other developing countries that share the same obstacles.

Keywords: the egyptian egovernment project lifecycle, supply side barriers, demand side barriers, egovernment project requirements

Procedia PDF Downloads 138
5910 Influence of Branding and Consultancy Services on the Performance of Coaches, Athletes and Sports Managers in Nigeria

Authors: Yakubu Nkom Bityong, A. I. Kabido, K. Venkateswarlu

Abstract:

The influence of branding and consultancy services on sports development and marketing mix has been a matter of interest among coaches athletes and sports managers in Nigeria. Marketers use sports as a promotional vehicle towards attracting customers to their products and services. The use of images, names, and photographs of sports personalities to advertise beverages, cars, and a whole range of other products and services as it is clearly noticed all over the television, radio and print media has generated a lot of argument among consumers who have vested interest and are more drawn to their favorite teams and sports personalities than they are to many company products This paper examines the influence of branding and consultancy services on sports Performance of coaches, athletes and sports managers in Nigeria. From a population of 7,441 made up of coaches, athletes and sports managers, 372 respondents were sampled for the study. A self developed and standardized questionnaire was the instrument used for data collection. One-tailed t-test was used to test the hypothesis. Results revealed that branding and consultancy services influence the performances of coaches, athletes and sports managers in Nigeria. It was concluded that the establishment of the National Institute of Sports (NIS) in Lagos with affiliated sports training programmes in Nigerian Universities is responsible for boosting the performance of sports personalities in Nigeria. It was recommended that National Policy on Sports should be reviewed in order to inculcate new methods and strategies towards enhancing sports development initiatives in the country while stakeholders should intensify regular training and retraining programmes for coaches, athletes and sports managers to update their knowledge and skills.

Keywords: branding, consultancy, sports performance, sports development

Procedia PDF Downloads 369
5909 A Case Study of Al-Shifa: A Healthcare Information System in Oman

Authors: Khamis Al-Gharbi, Said M. Gattoufi, Ali H. Al-Badi, Ali Al-Hashmi

Abstract:

The case study presents the progression of a project management of Al-Shifa, a healthcare information system in Oman. The case study describes the evolution of the implementation of a healthcare information system tailored to meet the needs of the healthcare units under the supervision of the Ministry of Health (MOH) in Oman. A focus group methodology was used for collecting the relevant information from the main project's stakeholders. In addition reports about the project made available for the researchers. The case analysis is made based on the Project Management approach developed by the Project Management Institute (PMI). The main finding that there was no formal project management approach adopted by the MOH for the development and implementation of the herewith mentioned healthcare information system project. Furthermore, the project had suffered a scope creep in terms of features, cost and time-schedule. The recommendations of the authors, for the rescue of the project from its current dilemma, consist of technological, administrative and human resources development actions.

Keywords: project management, information system, healthcare, Al-Shifa, Oman

Procedia PDF Downloads 371
5908 Fuzzy Decision Making to the Construction Project Management: Glass Facade Selection

Authors: Katarina Rogulj, Ivana Racetin, Jelena Kilic

Abstract:

In this study, the fuzzy logic approach (FLA) was developed for construction project management (CPM) under uncertainty and duality. The focus was on decision making in selecting the type of the glass facade for a residential-commercial building in the main design. The adoption of fuzzy sets was capable of reflecting construction managers’ reliability level over subjective judgments, and thus the robustness of the system can be achieved. An α-cuts method was utilized for discretizing the fuzzy sets in FLA. This method can communicate all uncertain information in the optimization process, taking into account the values of this information. Furthermore, FLA provides in-depth analyses of diverse policy scenarios that are related to various levels of economic aspects when it comes to the construction projects' valid decision making. The developed approach is applied to CPM to demonstrate its applicability. Analyzing the materials of glass facades, variants were defined. The development of the FLA for the CPM included relevant construction projec'ts stakeholders that were involved in the criteria definition to evaluate each variant. Using fuzzy Decision-Making Trial and Evaluation Laboratory Method (DEMATEL) comparison of the glass facade was conducted. This way, a rank, according to the priorities for inclusion into the main design, of variants is obtained. The concept was tested on a residential-commercial building in the city of Rijeka, Croatia. The newly developed methodology was then compared with the existing one. The aim of the research was to define an approach that will improve current judgments and decisions when it comes to the material selection of buildings facade as one of the most important architectural and engineering tasks in the main design. The advantage of the new methodology compared to the old one is that it includes the subjective side of the managers’ decisions, as an inevitable factor in each decision making. The proposed approach can help construction projects managers to identify the desired type of glass facade according to their preference and practical conditions, as well as facilitate in-depth analyses of tradeoffs between economic efficiency and architectural design.

Keywords: construction projects management, DEMATEL, fuzzy logic approach, glass façade selection

Procedia PDF Downloads 123
5907 Models of Innovation Processes and Their Evolution: A Literature Review

Authors: Maier Dorin, Maier Andreea

Abstract:

Today, any organization - regardless of the specific activity - must be prepared to face continuous radical changes, innovation thus becoming a condition of survival in a globalized market. Not all managers have an overall view on the real size of necessary innovation potential. Unfortunately there is still no common (and correct) understanding of the term of innovation among managers. Moreover, not all managers are aware of the need for innovation. This article highlights and analyzes a series of models of innovation processes and their evolution. The models analyzed encompass both the strategic level and the operational one within an organization, indicating performance innovation on each landing. As the literature review shows, there are no easy answers to the innovation process as there are no shortcuts to great results. Successful companies do not have a silver innovative bullet - they do not get results by making one or few things better than others, they make everything better.

Keywords: innovation, innovation process, business success, models of innovation

Procedia PDF Downloads 382
5906 GIS Based Project Management Information System for Infrastructure Projects

Authors: Riki Panchal, Debasis Sarkar

Abstract:

This paper describes the work done for the GIS-based project management for different infrastructure projects. It is a review paper which gives the idea of the trends in the construction project management and various models adopted for the betterment of the project planning and execution. Traditional scheduling and progress control techniques such as bar charts and the critical path method fail to provide information pertaining to the spatial aspects of a construction project. An integrated system was developed to represent construction progress not only in terms of a CPM schedule but also in terms of a graphical representation of the construction that is synchronized with the work schedule. Hence, it is suggested to work on the common platform from where all the data can be shared and analyzed.

Keywords: GIS, project management, integrated model, infrastructure project

Procedia PDF Downloads 504
5905 The Role of Capital Budgeting in Nigeria Companies

Authors: Eworo David

Abstract:

It is dearly evident that a company which does not and will not innovate faces the grave danger of being pushed out of existence. The purpose of this study is to bring to knowledge of companies the significance of capital budgeting in viable project implementation and for proper investment appraisal as regards steps involved in effective investment strategies. The study examines investment policies of Nigeria companies. It deals with an overview of capital budgeting. The analysis covers the data gathered from two multi-national companies in Nigeria. The population of the study was the senior managers and the top management staff of the companies. The system of capital budgeting structure and project implementation styles were compared and contrasted to determine whether the system has MADE or MARRED the development of the organizations. The recommendations contribute towards Nigeria companies to remain and survive in business through the use of capital budgeting.

Keywords: appraisal, budgeting structure, capital budgeting, effective investment strategies

Procedia PDF Downloads 351
5904 Empirical Study on Causes of Project Delays

Authors: Khan Farhan Rafat, Riaz Ahmed

Abstract:

Renowned offshore organizations are drifting towards collaborative exertion to win and implement international projects for business gains. However, devoid of financial constraints, with the availability of skilled professionals, and despite improved project management practices through state-of-the-art tools and techniques, project delays have become a norm these days. This situation calls for exploring the factor(s) affecting the bonding between project management performance and project success. In the context of the well-known 3M’s of project management (that is, manpower, machinery, and materials), machinery and materials are dependent upon manpower. Because the body of knowledge inveterate on the influence of national culture on men, hence, the realization of the impact on the link between project management performance and project success need to be investigated in detail to arrive at the possible cause(s) of project delays. This research initiative was, therefore, undertaken to fill the research gap. The unit of analysis for the proposed research excretion was the individuals who had worked on skyscraper construction projects. In reverent studies, project management is best described using construction examples. It is due to this reason that the project oriented city of Dubai was chosen to reconnoiter on causes of project delays. A structured questionnaire survey was disseminated online with the courtesy of the Project Management Institute local chapter to carry out the cross-sectional study. The Construction Industry Institute, Austin, of the United States of America along with 23 high-rise builders in Dubai were also contacted by email requesting for their contribution to the study and providing them with the online link to the survey questionnaire. The reliability of the instrument was warranted using Cronbach’s alpha coefficient of 0.70. The appropriateness of sampling adequacy and homogeneity in variance was ensured by keeping Kaiser–Meyer–Olkin (KMO) and Bartlett’s test of sphericity in the range ≥ 0.60 and < 0.05, respectively. Factor analysis was used to verify construct validity. During exploratory factor analysis, all items were loaded using a threshold of 0.4. Four hundred and seventeen respondents, including members from top management, project managers, and project staff, contributed to the study. The link between project management performance and project success was significant at 0.01 level (2-tailed), and 0.05 level (2-tailed) for Pearson’s correlation. Before initiating the moderator analysis test for linearity, multicollinearity, outliers, leverage points and influential cases, test for homoscedasticity and normality were carried out which are prerequisites for conducting moderator review. The moderator analysis, using a macro named PROCESS, was performed to verify the hypothesis that national culture has an influence on the said link. The empirical findings, when compared with Hofstede's results, showed high power distance as the cause of construction project delays in Dubai. The research outcome calls for the project sponsors and top management to reshape their project management strategy and allow for low power distance between management and project personnel for timely completion of projects.

Keywords: causes of construction project delays, construction industry, construction management, power distance

Procedia PDF Downloads 205
5903 A Model Approach of Good Practice Based on the Project Management Body of Knowledge® Guide in the Project Owner

Authors: Claudia Marcela Munoz Gonzalez, Diego Fernando Hernandez Losada, Hugo Alberto Herrera Fonseca

Abstract:

The project owner's role in the public-private investment consists of controlling and verifying the correct execution of the project's objectives and resources. Likewise, it is a discipline little explored in the academic field, whereby this work wishes to contribute with a model of good practices based on the project management methodology proposed by the Project Management Body of Knowledge® Guide. In the same way, highlight what are the controls that an integral project owner should take into account in its exercise and application, through the stages in which its contract runs. This proposal aims to structure its practice and integrate its functions according to a project management methodology. In addition, these practices will be applied in a case study of projects in the agricultural sector, particularly in the construction of irrigation district in Cundinamarca, Colombia.

Keywords: controls, construction of irrigation district, PMBOK®, project owner

Procedia PDF Downloads 441
5902 Infrastructure Project Management and Implementation: A Case Study Of the Mokolo-Crocodile Water Augmentation Project in South Africa

Authors: Elkington Sibusiso Mnguni

Abstract:

The Mokolo-Crocodile Water Augmentation Project (MCWAP) is located in the Limpopo Province in the northern-western part of South Africa. Its purpose is to increase water supply by 30 million cubic meters per year to meet current and future demand for users, including power stations, mining houses, and the local municipality in the Lephalale area. This paper documents the planning and implementation aspects of the MCWAP infrastructure project. The study will add to the body of knowledge with respect to bulk water infrastructure development in water-scarce regions. The method used to gather and collate relevant data and information was the desktop study. The key finding was that the project was successfully completed in 2015 using conventional project management and construction methods. The project is currently being operated and maintained by the National Department of Water and Sanitation.

Keywords: construction, contract management, infrastructure project, project management

Procedia PDF Downloads 285
5901 Classification of Construction Projects

Authors: M. Safa, A. Sabet, S. MacGillivray, M. Davidson, K. Kaczmarczyk, C. T. Haas, G. E. Gibson, D. Rayside

Abstract:

To address construction project requirements and specifications, scholars and practitioners need to establish a taxonomy according to a scheme that best fits their need. While existing characterization methods are continuously being improved, new ones are devised to cover project properties which have not been previously addressed. One such method, the Project Definition Rating Index (PDRI), has received limited consideration strictly as a classification scheme. Developed by the Construction Industry Institute (CII) in 1996, the PDRI has been refined over the last two decades as a method for evaluating a project's scope definition completeness during front-end planning (FEP). The main contribution of this study is a review of practical project classification methods, and a discussion of how PDRI can be used to classify projects based on their readiness in the FEP phase. The proposed model has been applied to 59 construction projects in Ontario, and the results are discussed.

Keywords: project classification, project definition rating index (PDRI), risk, project goals alignment

Procedia PDF Downloads 662