Search results for: developmental coordination delay
1946 Optimal Protection Coordination in Distribution Systems with Distributed Generations
Authors: Abdorreza Rabiee, Shahla Mohammad Hoseini Mirzaei
Abstract:
The advantages of distributed generations (DGs) based on renewable energy sources (RESs) leads to high penetration level of DGs in distribution network. With incorporation of DGs in distribution systems, the system reliability and security, as well as voltage profile, is improved. However, the protection of such systems is still challenging. In this paper, at first, the related papers are reviewed and then a practical scheme is proposed for coordination of OCRs in distribution system with DGs. The coordination problem is formulated as a nonlinear programming (NLP) optimization problem with the object function of minimizing total operating time of OCRs. The proposed method is studied based on a simple test system. The optimization problem is solved by General Algebraic Modeling System (GAMS) to calculate the optimal time dial setting (TDS) and also pickup current setting of OCRs. The results show the effectiveness of the proposed method and its applicability.Keywords: distributed generation, DG, distribution network, over current relay, OCR, protection coordination, pickup current, time dial setting, TDS
Procedia PDF Downloads 1381945 EEG and ABER Abnormalities in Children with Speech and Language Delay
Authors: Bharati Mehta, Manish Parakh, Bharti Bhandari, Sneha Ambwani
Abstract:
Speech and language delay (SLD) is seen commonly as a co-morbidity in children having severe resistant focal and generalized, syndromic and symptomatic epilepsies. It is however not clear whether epilepsy contributes to or is a mere association in the pathogenesis of SLD. Also, it is acknowledged that Auditory Brainstem Evoked Responses (ABER), besides used for evaluating hearing threshold, also aid in prognostication of neurological disorders and abnormalities in the hearing pathway in the brainstem. There is no circumscribed or surrogate neurophysiologic laboratory marker to adjudge the extent of SLD. The current study was designed to evaluate the abnormalities in Electroencephalography (EEG) and ABER in children with SLD who do not have an overt hearing deficit or autism. 94 children of age group 2-8 years with predominant SLD and without any gross motor developmental delay, head injury, gross hearing disorder, cleft lip/palate and autism were selected. Standard video Electroencephalography using the 10:20 international system and ABER after click stimulus with intensities 110 db until 40 db was performed in all children. EEG was abnormal in 47.9% (n= 45; 36 boys and 9 girls) children. In the children with abnormal EEG, 64.5% (n=29) had an abnormal background, 57.8% (n=27) had presence of generalized interictal epileptiform discharges (IEDs), 20% (n=9) had focal epileptiform discharges exclusively from left side and 33.3% (n=15) had multifocal IEDs occurring both in isolation or associated with generalised abnormalities. In ABER, surprisingly, the peak latencies for waves I, III & V, inter-peak latencies I-III & I-V, III-V and wave amplitude ratio V/I, were found within normal limits in both ears of all the children. Thus in the current study it is certain that presence of generalized IEDs in EEG are seen in higher frequency with SLD and focal IEDs are seen exclusively in left hemisphere in these children. It may be possible that even with generalized EEG abnormalities present in these children, left hemispheric abnormalities as a part of this generalized dysfunction may be responsible for the speech and language dysfunction. The current study also emphasizes that ABER may not be routinely recommended as diagnostic or prognostic tool in children with SLD without frank hearing deficit or autism, thus reducing the burden on electro physiologists, laboratories and saving time and financial resources.Keywords: ABER, EEG, speech, language delay
Procedia PDF Downloads 5351944 Application of Optimization Techniques in Overcurrent Relay Coordination: A Review
Authors: Syed Auon Raza, Tahir Mahmood, Syed Basit Ali Bukhari
Abstract:
In power system properly coordinated protection scheme is designed to make sure that only the faulty part of the system will be isolated when abnormal operating condition of the system will reach. The complexity of the system as well as the increased user demand and the deregulated environment enforce the utilities to improve system reliability by using a properly coordinated protection scheme. This paper presents overview of over current relay coordination techniques. Different techniques such as Deterministic Techniques, Meta Heuristic Optimization techniques, Hybrid Optimization Techniques, and Trial and Error Optimization Techniques have been reviewed in terms of method of their implementation, operation modes, nature of distribution system, and finally their advantages as well as the disadvantages.Keywords: distribution system, relay coordination, optimization, Plug Setting Multiplier (PSM)
Procedia PDF Downloads 3991943 Examining Procrastination and Delay among Individuals with and without Attention Deficit Hyperactivity Disorder
Authors: S. J. Taylor, S. Chowdhury, T. A. Pychyl
Abstract:
Attention Deficit Hyperactivity Disorder (ADHD) and procrastination are often discussed in relation to problems with self-regulation and executive functioning (EF). The small body of extant research that has explored the relations between these variables has many limitations particularly in terms of the samples used and the measurement of procrastination. In this study, we recruited a sample of undergraduate students with a confirmed clinical diagnosis of ADHD (n = 48, 66.7% females) as well as a sample of student volunteers without ADHD (n = 68, 75.8% females) to investigate the relations between ADHD subtypes, EF, procrastination and other forms of delay. We used the newly developed Multidimensional Measure of Academic Procrastination and Delay Questionnaire. As hypothesized, the results revealed that individuals with ADHD displayed significantly more irrational delay, general procrastination and academic procrastination compared to individuals without ADHD. This study contributed to the research literature indicating that individuals with ADHD struggle with procrastination as a result of symptoms of ADHD and EF deficits. Theses results provide support for adopting a new language when describing procrastination problems among individuals with ADHD, and they have implications for the nature of academic accommodations and interventions for individuals with ADHD.Keywords: ADHD, delay, executive functioning, procrastination, self-regulation
Procedia PDF Downloads 2301942 Maturity Status of Male Boys in Punjab - India
Authors: Parminder K. Laroiya, Sukhdeep S. Kang
Abstract:
The Present cross-sectional study was conducted on 610 boys (ranging in age bracket of 11 to 17 years) to assess their developmental age to check percentage of early, normal and late maturity among them, and to check whether there is any significant difference in their calendar age and developmental age. Developmental age of these subjects has been accessed by TW2 method (using hand wrist X-rays) and their chronological age was checked from their date of birth certificate. Developmental status of subjects i.e. early, normal or late mature was considered with +2 years or -2 years from their calendar age. Results of this study shows that 50% boys were normal in their maturity status in all age brackets and rest of subjects were either early maturers 24.92% or late maturers 25.08%. When pattern of maturity was studied in each age group it has been found that till the age of 15 years, percentage of normal maturity was less than 50 % whereas in 16 and 17 years age groups, this percentage of normal maturity increased to 60% - 65 % ( this may be because at this age mostly boys attain adolescence) Further investigation of each age group showed that till the age of 14 years percentage of late maturity among these boys were approximately 35% to 40% whereas early maturity lies between 15% to 20%. It has been found from the present study that at the age of 15 years, there is a twist among percentage of late and early maturity among boys-early maturers are 38.61% and late maturers are 16.84%. At the age of 16 and 17 years percentage of late maturity has been decreased to 3% to 6%, whereas percentage of early maturity increased to 35.64 % and 30.69 % respectively.Keywords: maturity status, developmental age, chronological age, X-rays
Procedia PDF Downloads 841941 Static Balance in the Elderly: Comparison Between Elderly Performing Physical Activity and Fine Motor Coordination Activity
Authors: Andreia Guimaraes Farnese, Mateus Fernandes Reu Urban, Leandro Procopio, Renato Zangaro, Regiane Albertini
Abstract:
Senescence changes include postural balance, inferring the risk of falls, and can lead to fractures, bedridden, and the risk of death. Physical activity, e.g., cardiovascular exercises, is notable for improving balance due to brain cell stimulations, but fine coordination exercises also elevate cell brain metabolism. This study aimed to verify whether the elderly person who performs fine motor activity has a balance similar to that of those who practice physical activity. The subjects were divided into three groups according to the activity practice: control group (CG) with seven participants for the sedentary individuals, motor coordination group (MCG) with six participants, and activity practitioner group (PAG) with eight participants. Data comparisons were from the Berg balance scale, Time up and Go test, and stabilometric analysis. Descriptive statistical and ANOVA analyses were performed for data analysis. The results reveal that including fine motor activities can improve the balance of the elderly and indirectly decrease the risk of falls.Keywords: balance, barapodometer, coordination, elderly
Procedia PDF Downloads 1681940 Distributed Coordination of Connected and Automated Vehicles at Multiple Interconnected Intersections
Authors: Zhiyuan Du, Baisravan Hom Chaudhuri, Pierluigi Pisu
Abstract:
In connected vehicle systems where wireless communication is available among the involved vehicles and intersection controllers, it is possible to design an intersection coordination strategy that leads the connected and automated vehicles (CAVs) travel through the road intersections without the conventional traffic light control. In this paper, we present a distributed coordination strategy for the CAVs at multiple interconnected intersections that aims at improving system fuel efficiency and system mobility. We present a distributed control solution where in the higher level, the intersection controllers calculate the road desired average velocity and optimally assign reference velocities of each vehicle. In the lower level, every vehicle is considered to use model predictive control (MPC) to track their reference velocity obtained from the higher level controller. The proposed method has been implemented on a simulation-based case with two-interconnected intersection network. Additionally, the effects of mixed vehicle types on the coordination strategy has been explored. Simulation results indicate the improvement on vehicle fuel efficiency and traffic mobility of the proposed method.Keywords: connected vehicles, automated vehicles, intersection coordination systems, multiple interconnected intersections, model predictive control
Procedia PDF Downloads 3561939 Patient Progression at Discharge: A Communication, Coordination, and Accountability Gap among Hospital Teams
Authors: Nana Benma Osei
Abstract:
Patient discharge can be a hectic process. Patients are sometimes sent to the wrong location or forgotten in lounges in the waiting room. This ends up compromising patient care because the delay in picking the patients can affect how they adhere to medication. Patients may fail to take their medication, and this will lead to negative outcomes. The situation highlights the demands of modern-day healthcare, and the use of technology can help in reducing such challenges and in enhancing the patient’s experience, leading to greater satisfaction with the care provided. The paper contains the proposed changes to a healthcare facility by introducing the clinical decision support system, which will be needed to improve coordination and communication during patient discharge. This will be done under Kurt Lewin’s Change Management Model, which recognizes the different phases in the change process. A pilot program is proposed initially before the program can be implemented in the entire organization. This allows for the identification of challenges and ways of managing them. The paper anticipates some of the possible challenges that may arise during implementation, and a multi-disciplinary approach is considered the most effective. Opposition to the change is likely to arise because staff members may lack information on how the changes will affect them and the skills they will need to learn to use the new system. Training will occur before the technology can be implemented. Every member will go for training, and adequate time is allocated for training purposes. A comparison of data will determine whether the project has succeeded.Keywords: patient discharge, clinical decision support system, communication, collaboration
Procedia PDF Downloads 1031938 Controller Design for Active Suspension System of 1/4 Car with Unknown Mass and Time-Delay
Authors: Ali Al-Zughaibi
Abstract:
The purpose of this paper is to present a modeling and control of the quarter car active suspension system with unknown mass, unknown time-delay and road disturbance. The objective of designing the controller by deriving a control law to achieve stability of the system and convergence that can considerably improve the ride comfort and road disturbance handling. Thus is accomplished by using Routh-Herwitz criterion and based on some assumptions. A mathematical proof is given to show the ability of the designed controller to ensure stability and convergence of the active suspension system and dispersion oscillation of system with unknown mass, time-delay and road disturbances. Simulations were also performed for controlling quarter car suspension, where the results obtained from these simulations verify the validity of the proposed design.Keywords: active suspension system, time-delay, disturbance rejection, dynamic uncertainty
Procedia PDF Downloads 3191937 An Online Master's Degree Program for the Preparation of Adapted Physical Education Teachers for Children with Significant Developmental Disabilities
Authors: Jiabei Zhang
Abstract:
Online programs developed for preparing qualified teachers have significantly increased over the years in the United States of America (USA). However, no online graduate programs for training adapted physical education (APE) teachers for children with significant developmental disabilities are currently available in the USA. The purpose of this study was to develop an online master’s degree program for the preparation of APE teachers to serve children with significant developmental disabilities. The characteristics demonstrated by children with significant developmental disabilities, the competencies required for certified APE teachers, and the evidence-based positive behavioral interventions (PBI) documented for teaching children with significant developmental disabilities were fully reviewed in this study. An online graduate program with 14 courses for 42 credit hours (3 credit hours per course) was then developed for training APE teachers to serve children with significant developmental disabilities. Included in this online program are five components: (a) 2 capstone courses, (b) 4 APE courses, (c) 4 PBI course, (d) 2 elective courses, and (e) 2 capstone courses. All courses will be delivered online through Desire2Learn administered by the Extended University Programs at Western Michigan University (WMU). An applicant who has a bachelor’s degree in physical education or special education is eligible for this proposed program. A student enrolled in this program is expected to complete all courses in 2.5 years while staying in their local area. This program will be submitted to the WMU curriculum committee for approval in the fall of 2018.Keywords: adapted physical education, online program, teacher preparation, and significant disabilities
Procedia PDF Downloads 1481936 Synthesis of a Serie of Metallic Complexes Derived from bis(4-Amino-5-Mercapto-1,2,4-Triazol-3-yl)butane with First Raw Transition Metals
Authors: I. Belbachir, T. Benabdallah, N. Belhadj
Abstract:
The present research work describes the synthesis, through a multi-step strategy, as well as the structural characterization of a polydentate organic ligand, namely the bis(4-amino-5-mercapto-1,2,4-triazole-3-yl)butane (BAMT). The bis-triazolic ligand was characterized by different spectroscopic studies, in order to enlighten its coordination mode, in the neutral and deprotonated forms, towards cobalt(II), nickel(II) and copper(II) sulfates, in both solution and solid state. The stoichiometry of the complexes [neutral BAMT-metal] and [deprotonated BAMT-metal] was first established in a solution of DMF with each of the three metallic cations and their complexation constants calculated, allowing us to compare the stability of the various prepared complexes. The various complexes were finally isolated in the solid state and the coordination mode of neutral and deprotonated BAMT explored towards each of the three metallic sulfates. The establishment of some ligand field parameters (Dq, B, β…) by electronic spectroscopy finally allowed to compare the coordination modes of BAMT towards each of the three metals and to highlight the influence of the deprotonation on the complexing properties of the bis-triazolic ligand.Keywords: 1, 2, 4-triazol, bis-1, 2, 4-triazol, metallic complexes, coordination in solution and solid state
Procedia PDF Downloads 1801935 Impact Position Method Based on Distributed Structure Multi-Agent Coordination with JADE
Authors: YU Kaijun, Liang Dong, Zhang Yarong, Jin Zhenzhou, Yang Zhaobao
Abstract:
For the impact monitoring of distributed structures, the traditional positioning methods are based on the time difference, which includes the four-point arc positioning method and the triangulation positioning method. But in the actual operation, these two methods have errors. In this paper, the Multi-Agent Blackboard Coordination Principle is used to combine the two methods. Fusion steps: (1) The four-point arc locating agent calculates the initial point and records it to the Blackboard Module.(2) The triangulation agent gets its initial parameters by accessing the initial point.(3) The triangulation agent constantly accesses the blackboard module to update its initial parameters, and it also logs its calculated point into the blackboard.(4) When the subsequent calculation point and the initial calculation point are within the allowable error, the whole coordination fusion process is finished. This paper presents a Multi-Agent collaboration method whose agent framework is JADE. The JADE platform consists of several agent containers, with the agent running in each container. Because of the perfect management and debugging tools of the JADE, it is very convenient to deal with complex data in a large structure. Finally, based on the data in Jade, the results show that the impact location method based on Multi-Agent coordination fusion can reduce the error of the two methods.Keywords: impact monitoring, structural health monitoring(SHM), multi-agent system(MAS), black-board coordination, JADE
Procedia PDF Downloads 1781934 Contribution to Energy Management in Hybrid Energy Systems Based on Agents Coordination
Authors: Djamel Saba, Fatima Zohra Laallam, Brahim Berbaoui
Abstract:
This paper presents a contribution to the design of a multi-agent for the energy management system in a hybrid energy system (SEH). The multi-agent-based energy-coordination management system (MA-ECMS) is based mainly on coordination between agents. The agents share the tasks and exchange information through communications protocols to achieve the main goal. This intelligent system can fully manage the consumption and production or simply to make proposals for action he thinks is best. The initial step is to give a presentation for the system that we want to model in order to understand all the details as much as possible. In our case, it is to implement a system for simulating a process control of energy management.Keywords: communications protocols, control process, energy management, hybrid energy system, modelization, multi-agents system, simulation
Procedia PDF Downloads 3321933 Transcriptome Analysis of Protestia brevitarsis seulensis with Focus On Wing Development and Metamorphosis in Developmental Stages
Authors: Jihye Hwang, Eun Hwa Choi, Su Youn Baek, Bia Park, Gyeongmin Kim, Chorong Shin, Joon Ha Lee, Jae-Sam Hwang, Ui Wook Hwang
Abstract:
White-spotted flower chafers are widely distributed in Asian countries and traditionally used for the treatment of chronic fatigue, blood circulation, and paralysis in the oriental medicine field. The evolution and development of insect wings and metamorphosis remain under-discovered subjects in arthropod evolutionary researches. Gene expression abundance analyses along with developmental stages based on the large-scale RNA-seq data are also still rarely done. Here we report the de novo assembly of a Protestia brevitarsis seulensis transcriptome along four different developmental stages (egg, larva, pupa, and adult) to explore its development and evolution of wings and metamorphosis. The de novo transcriptome assembly consists of 23,551 high-quality transcripts and is approximately 96.7% complete. Out of 8,545 transcripts, 5,183 correspond to the possible orthologs with Drosophila melanogaster. As a result, we could found 265 genes related to wing development and 19 genes related to metamorphosis. The comparison of transcript expression abundance with different developmental stages revealed developmental stage-specific transcripts especially working at the stage of wing development and metamorphosis of P. b. seulensis. This transcriptome quantification along the developmental stages may provide some meaningful clues to elucidate the genetic modulation mechanism of wing development and metamorphosis obtained during the insect evolution.Keywords: white-spotted flower chafers, transcriptomics, RNA-seq, network biology, wing development, metamorphosis
Procedia PDF Downloads 2291932 Effects of Intensive Rehabilitation Therapy on Sleep in Children with Developmental Disorders
Authors: Sung Hyun Kim
Abstract:
Introduction: Sleep disturbance is common in children with developmental disorders (D.D.). Sleep disturbance has a variety of negative effects, such as behavior problems, medical problems, and even developmental problems in children with D.D. However, to our best knowledge, there has been no proper treatment for sleep disorders in children with D.D. Therefore, we conduct this study to know the positive effects of intensive rehabilitation therapy in children with D.D. on the degree of sleep disturbance. Method: We prospectively recruited 22 patients with a diagnosis of D.D. during the period of January 2022 through May 2022. The inclusion criteria were as follows: 1) a patient who would participate in the intensive rehabilitation therapy of our institution; 2) the age participant under 18 years at the time of assessment; 3) a child who has consented to participate in the study by signing the consent form by the legal guardian. We investigated the clinical characteristics of participants by the medical record, including sex, age, underlying diagnosis of D.D., and Gross Motor Function Measures (GMFM). Before starting the intensive rehabilitation therapy, we conducted a Sleep disturbance scale for children (SDSC). It contains 26 questions about children’s sleep, and those questions are grouped into six subscales, such as Disorders of initiating and maintaining sleep (DIMS), Sleep Breathing Disorders(SBD), Disorders of arousal(DOA), Sleep-Wake Transition Disorders(SWTD), Disorders of excessive somnolence(DOES) and Sleep Hyperhydrosis(SHY). We used the t-score, which was calculated by comparing the scores of normal children. Twenty two patients received 8 weeks of intensive rehabilitation, including daily physical and occupational therapy. After that, we did follow up with SDSC. The comparison between SDSC before and after intensive rehabilitation was calculated using the paired t-test, and P< 0.05 was considered statistically significant. Results: Demographic data and clinical characteristics of 22 patients are enrolled. Patients were 4.03 ± 2.91 years old, and of the total 22 patients, 14 (64%) were male, and 8 (36%) were female. Twelve patients(45%) were diagnosed with Cerebral palsy(C.P.), and the mean value of participants’ GMFM was 47.82 ± 20.60. Each mean value of SDSC’s subscales was also calculated. DIMS was 62.36 ± 13.72, SBD was 54.18 ± 8.39, DOA was 49.59 ± 7.01, SWTD was 58.95 ± 9.20, DOES was 53.09 ± 15.15, SHY was 52.14 ± 8.82, and the total was 59.86 ± 13.18. These values suggest that children with D.D. have sleep disorders. After 8 weeks of intensive rehabilitation treatment, the score of DIMS showed improvement(p=0.016), but not the other subscale and total score of SDSC. Conclusion: This result showed that intensive rehabilitation could be helpful to patients of D.D. with sleep disorders. Especially intensive rehabilitation therapy itself can be a meaningful treatment in inducing and maintaining sleep.Keywords: sleep disorder, developmental delay, intensive rehabilitation therapy, cerebral palsy
Procedia PDF Downloads 861931 Travel Delay and Modal Split Analysis: A Case Study
Authors: H. S. Sathish, H. S. Jagadeesh, Skanda Kumar
Abstract:
Journey time and delay study is used to evaluate the quality of service, the travel time and study can also be used to evaluate the quality of traffic movement along the route and to determine the location types and extent of traffic delays. Components of delay are boarding and alighting, issue of tickets, other causes and distance between each stops. This study investigates the total journey time required to travel along the stretch and the influence the delays. The route starts from Kempegowda Bus Station to Yelahanka Satellite Station of Bangalore City. The length of the stretch is 16.5 km. Modal split analysis has been done for this stretch. This stretch has elevated highway connecting to Bangalore International Airport and the extension of metro transit stretch. From the regression analysis of total journey time it is affected by delay due to boarding and alighting moderately, Delay due to issue of tickets affects the journey time to a higher extent. Some of the delay factors affecting significantly the journey time are evident from F-test at 10 percent level of confidence. Along this stretch work trips are more prevalent as indicated by O-D study. Modal shift analysis indicates about 70 percent of commuters are ready to shift from current system to Metro Rail System. Metro Rail System carries maximum number of trips compared to private mode. Hence Metro is a highly viable choice of mode for Bangalore Metropolitan City.Keywords: delay, journey time, modal choice, regression analysis
Procedia PDF Downloads 4961930 Synthesis, Characterization and Catalytic Applications of Divalent Schiff Base Metal Complexes Derived from Amino Coumarins and Substituted Benzaldehydes and Acetophenones
Authors: Srinivas Nerella
Abstract:
A series of new heterodentate N, O-donor ligands derived from condensing 3-amino Coumarins with hydroxy benzaldehydes and acetophenones were used to afford new mononuclear Mn(II), Co(II), Ni(II), Cu(II), Zn(II) and Pd(II) coordination compounds. All the complexes were characterized by IR, 1H-NMR, 13C-NMR, Mass, ESR, Electronic spectra, Conductance, Magnetic and Thermal studies. The ligands show hexa coordination in Mn(II), Co(II), Ni(II), and Pd(II) complexes resulting octahedral geometries, while the ligands in Zn(II) and Cu(II) complexes show tetra coordination resulting tetrahedral and square planar geometries respectively. These mononuclear complexes were investigated as catalysts in the hydrothiolation of aromatic and aliphatic alkynes with thiols. These metal complexes were acted as versatile catalysts and gave good yields.Keywords: schiff bases, divalent metal complexes of schiff bases, Catalytic activity, hydrothiolation
Procedia PDF Downloads 4151929 Network Functions Virtualization-Based Virtual Routing Function Deployment under Network Delay Constraints
Authors: Kenichiro Hida, Shin-Ichi Kuribayashi
Abstract:
NFV-based network implements a variety of network functions with software on general-purpose servers, and this allows the network operator to select any capabilities and locations of network functions without any physical constraints. In this paper, we evaluate the influence of the maximum tolerable network delay on the virtual routing function deployment guidelines which the authors proposed previously. Our evaluation results have revealed the following: (1) the more the maximum tolerable network delay condition becomes severe, the more the number of areas where the route selection function is installed increases and the total network cost increases, (2) the higher the routing function cost relative to the circuit bandwidth cost, the increase ratio of total network cost becomes larger according to the maximum tolerable network delay condition.Keywords: NFV (Network Functions Virtualization), resource allocation, virtual routing function, minimum total network cost
Procedia PDF Downloads 2471928 Multi-Agent Coverage Control with Bounded Gain Forgetting Composite Adaptive Controller
Authors: Mert Turanli, Hakan Temeltas
Abstract:
In this paper, we present an adaptive controller for decentralized coordination problem of multiple non-holonomic agents. The performance of the presented Multi-Agent Bounded Gain Forgetting (BGF) Composite Adaptive controller is compared against the tracking error criterion with a Feedback Linearization controller. By using the method, the sensor nodes move and reconfigure themselves in a coordinated way in response to a sensed environment. The multi-agent coordination is achieved through Centroidal Voronoi Tessellations and Coverage Control. Also, a consensus protocol is used for synchronization of the parameter vectors. The two controllers are given with their Lyapunov stability analysis and their stability is verified with simulation results. The simulations are carried out in MATLAB and ROS environments. Better performance is obtained with BGF Adaptive Controller.Keywords: adaptive control, centroidal voronoi tessellations, composite adaptation, coordination, multi robots
Procedia PDF Downloads 3481927 Interface Problems in Construction Projects
Authors: Puti F. Marzuki, Adrianto Oktavianus, Almerinda Regina
Abstract:
Interface problems among interacting parties in Indonesian construction projects have most often led to low productivity and completion delay. In the midst of this country’s needs to accelerate construction of public infrastructure providing connectivity among regions and supporting economic growth as well as better living quality, project delays have to be seriously addressed. This paper identifies potential causes factors of interface problems experienced by construction projects in Indonesia. Data are collected through a survey involving the main actors of six important public infrastructure construction projects including railway, LRT, sports stadiums, apartment, and education building construction projects. Five of these projects adopt the design-build project delivery method and one applies the design-bid-build scheme. Interface problems’ potential causes are categorized into contract, management, technical experience, coordination, financial, and environmental factors. Research results reveal that, especially in railway and LRT projects, potential causes of interface problems are mainly technical and managerial in nature. These relate to complex construction execution in highly congested areas. Meanwhile, coordination cause factors are mainly found in the education building construction project with loan from a foreign donor. All of the six projects have to resolve interface problems caused by incomplete or low-quality contract documents. This research also shows that the design-bid-build delivery method involving more parties in construction projects tends to induce more interface problem cause factors than the design-build scheme.Keywords: cause factors, construction delays, project delivery method, contract documents
Procedia PDF Downloads 2551926 Disruption Coordination of Supply Chain with Loss-Averse Retailer Under Buy-Back Contract
Abstract:
This paper aims to investigate a two stage supply chain of one leading supplier and one following retailer that experiences two factors perturbation out of supplier's production cost, retailer's marginal cost and retail price in stochastic demand environment. Granted that risk neutral condition has long been discussed, little attention has been given to disruptions under the premise of risk neutral supplier and risk aversion retailer. We establish the optimal order quantity and revealed the profit distribution coefficient in risk-neutral static model, make adjustment under disruption scenario, and then select utility function method for risk aversion model. Using buy-back contract policy, the improvement of parameters can achieve channel coordination where Pareto optimal is realized.Keywords: supply chain coordination, disruption management, buy-back contract, lose aversion
Procedia PDF Downloads 3271925 Use of Social Support for Fathers with Developmental Disabilities in Japan
Authors: Shiori Ishida, Hiromi Okuno, Hisato Igarashi, Akemi Yamazaki, Hiroko Takahashi
Abstract:
The purpose of this study was to clarify the differences and similarities regarding the social support of fathers and mothers towards considering increased assistance for the paternity of children with developmental disabilities. Written questionnaires were completed by fathers (n=85) and mothers (n=101) of children using rehabilitation facilities between infancy and 5 years of age. The survey contained multiple-choice questions on four categories: information support (6 items), emotional support (7 items), evaluation support (3 items), and daily living support (3 items). Regarding information support, fathers answered ‘spouse’ as the provider in over 50% of cases for all 6 items, which was significantly different compared with mothers (all p < 0.001). For emotional support, fathers were significantly more likely to get support from the workplace (p < 0.001) and from spouse (p < 0.001). The ‘evaluation support’ did not have significant differences for fathers in all the items, but the most frequent support providers were ‘spouses’. ‘Daily living support’ was significantly different from fathers in the workplace (p < 0.000) in terms of make allowances for work and duties. Thus, it appeared that fathers had fewer social support sources as compared with mothers and limited non-spouse support. The understanding of developmental disabilities, acquisition of methods of rehabilitation, and sources of support might have been inadequately addressed among fathers, which could be a hindrance to the involvement of fathers in the rearing of children with developmental disabilities. On the other hand, we also observed that some fathers were involved in the care of developmentally troubled children while providing mental support for their spouse, cooperating with housework, and adjusting their work life. However, the results on the external and social backgrounds of fathers indicated a necessity for greater empowerment and peer support to improve the paternal care of children with developmental disabilities in the family survey.Keywords: children with developmental disabilities, family support, father, social support
Procedia PDF Downloads 1321924 A One Dimensional Cdᴵᴵ Coordination Polymer: Synthesis, Structure and Properties
Authors: Z. Derikvand, M. Dusek, V. Eigner
Abstract:
One dimensional coordination polymer of Cdᴵᴵ based on pyrazine (pz) and 3-nitrophthalic acid (3-nphaH₂), namely poly[[diaqua bis(3-nitro-2-carboxylato-1-carboxylic acid)(µ₂-pyrazine) cadmium(II)]dihydrate], {[Cd(3-nphaH)2(pz)(H₂O)₂]. 2H₂O}ₙ was prepared and characterized. The asymmetric unit consists of one Cdᴵᴵ center, two (3-nphaH)– anions, two halves of two crystallographically distinct pz ligands, two coordinated and two uncoordinated water molecules. The Cdᴵᴵ cation is surrounded by four oxygen atoms from two (3-nphaH)– and two water molecules as well as two nitrogen atoms from two pz ligands in distorted octahedral geometry. Complicated hydrogen bonding network accompanied with N–O···π and C–O···π stacking interactions leads to formation of a 3D supramolecular network. Commonly, this kind of C–O–π and N–O···π interaction is detected in electron-rich CO/NO groups of (3-nphaH)– ligand and electron-deficient π-system of pyrazine.Keywords: supramolecular chemistry, Cd coordination polymer, crystal structure, 3-nithrophethalic acid
Procedia PDF Downloads 4011923 Spelling Errors in Persian Children with Developmental Dyslexia
Authors: Mohammad Haghighi, Amineh Akhondi, Leila Jahangard, Mohammad Ahmadpanah, Masoud Ansari
Abstract:
Background: According to the recent estimation, approximately 4%-12% percent of Iranians have difficulty in learning to read and spell possibly as a result of developmental dyslexia. The study was planned to investigate spelling error patterns among Persian children with developmental dyslexia and compare that with the errors exhibited by control groups Participants: 90 students participated in this study. 30 students from Grade level five, diagnosed as dyslexics by professionals, 30 normal 5th Grade readers and 30 younger normal readers. There were 15 boys and 15 girls in each of the groups. Qualitative and quantitative methods for analysis of errors were used. Results and conclusion: results of this study indicate similar spelling error profiles among dyslexics and the reading level matched groups, and these profiles were different from age-matched group. However, performances of dyslexic group and reading level matched group were different and inconsistent in some cases.Keywords: spelling, error types, developmental dyslexia, Persian, writing system, learning disabilities, processing
Procedia PDF Downloads 4271922 A Unique Exact Approach to Handle a Time-Delayed State-Space System: The Extraction of Juice Process
Authors: Mohamed T. Faheem Saidahmed, Ahmed M. Attiya Ibrahim, Basma GH. Elkilany
Abstract:
This paper discusses the application of Time Delay Control (TDC) compensation technique in the juice extraction process in a sugar mill. The objective is to improve the control performance of the process and increase extraction efficiency. The paper presents the mathematical model of the juice extraction process and the design of the TDC compensation controller. Simulation results show that the TDC compensation technique can effectively suppress the time delay effect in the process and improve control performance. The extraction efficiency is also significantly increased with the application of the TDC compensation technique. The proposed approach provides a practical solution for improving the juice extraction process in sugar mills using MATLAB Processes.Keywords: time delay control (TDC), exact and unique state space model, delay compensation, Smith predictor.
Procedia PDF Downloads 921921 Measuring Delay Using Software Defined Networks: Limitations, Challenges, and Suggestions for Openflow
Authors: Ahmed Alutaibi, Ganti Sudhakar
Abstract:
Providing better Quality-of-Service (QoS) to end users has been a challenging problem for researchers and service providers. Building applications relying on best effort network protocols hindered the adoption of guaranteed service parameters and, ultimately, Quality of Service. The introduction of Software Defined Networking (SDN) opened the door for a new paradigm shift towards a more controlled programmable configurable behavior. Openflow has been and still is the main implementation of the SDN vision. To facilitate better QoS for applications, the network must calculate and measure certain parameters. One of those parameters is the delay between the two ends of the connection. Using the power of SDN and the knowledge of application and network behavior, SDN networks can adjust to different conditions and specifications. In this paper, we use the capabilities of SDN to implement multiple algorithms to measure delay end-to-end not only inside the SDN network. The results of applying the algorithms on an emulated environment show that we can get measurements close to the emulated delay. The results also show that depending on the algorithm, load on the network and controller can differ. In addition, the transport layer handshake algorithm performs best among the tested algorithms. Out of the results and implementation, we show the limitations of Openflow and develop suggestions to solve them.Keywords: software defined networking, quality of service, delay measurement, openflow, mininet
Procedia PDF Downloads 1651920 Step Method for Solving Nonlinear Two Delays Differential Equation in Parkinson’s Disease
Authors: H. N. Agiza, M. A. Sohaly, M. A. Elfouly
Abstract:
Parkinson's disease (PD) is a heterogeneous disorder with common age of onset, symptoms, and progression levels. In this paper we will solve analytically the PD model as a non-linear delay differential equation using the steps method. The step method transforms a system of delay differential equations (DDEs) into systems of ordinary differential equations (ODEs). On some numerical examples, the analytical solution will be difficult. So we will approximate the analytical solution using Picard method and Taylor method to ODEs.Keywords: Parkinson's disease, step method, delay differential equation, two delays
Procedia PDF Downloads 2051919 Building Information Modelling for Construction Delay Management
Authors: Essa Alenazi, Zulfikar Adamu
Abstract:
The Kingdom of Saudi Arabia (KSA) is not an exception in relying on the growth of its construction industry to support rapid population growth. However, its need for infrastructure development is constrained by low productivity levels and cost overruns caused by factors such as delays to project completion. Delays in delivering a construction project are a global issue and while theories such as Optimism Bias have been used to explain such delays, in KSA, client-related causes of delays are also significant. The objective of this paper is to develop a framework-based approach to explore how the country’s construction industry can manage and reduce delays in construction projects through building information modelling (BIM) in order to mitigate the cost consequences of such delays. It comprehensively and systematically reviewed the global literature on the subject and identified gaps, critical delay factors and the specific benefits that BIM can deliver for the delay management. A case study comprising of nine hospital projects that have experienced delay and cost overruns was also carried out. Five critical delay factors related to the clients were identified as candidates that can be mitigated through BIM’s benefits. These factors are: Ineffective planning and scheduling of the project; changes during construction by the client; delay in progress payment; slowness in decision making by the client; and poor communication between clients and other stakeholders. In addition, data from the case study projects strongly suggest that optimism bias is present in many of the hospital projects. Further validation via key stakeholder interviews and documentations are planned.Keywords: building information modelling (BIM), clients perspective, delay management, optimism bias, public sector projects
Procedia PDF Downloads 3241918 An Indoor Positioning System in Wireless Sensor Networks with Measurement Delay
Authors: Pyung Soo Kim, Eung Hyuk Lee, Mun Suck Jang
Abstract:
In the current paper, an indoor positioning system is proposed with consideration of measurement delay. Firstly, an estimation filter with a measurement delay is designed for the indoor positioning mechanism under a weighted least square criterion, which utilizes only finite measurements on the most recent window. The proposed estimation filtering based scheme gives the filtered estimates for position, velocity and acceleration of moving target in real-time, while removing undesired noisy effects and preserving desired moving positions. Secondly, the proposed scheme is shown to have good inherent properties such as unbiasedness, efficiency, time-invariance, deadbeat, and robustness due to the finite memory structure. Finally, computer simulations shows that the performance of the proposed estimation filtering based scheme can outperform to the existing infinite memory filtering based mechanism.Keywords: indoor positioning system, wireless sensor networks, measurement delay
Procedia PDF Downloads 4821917 Motor Coordination and Body Mass Index in Primary School Children
Authors: Ingrid Ruzbarska, Martin Zvonar, Piotr Oleśniewicz, Julita Markiewicz-Patkowska, Krzysztof Widawski, Daniel Puciato
Abstract:
Obese children will probably become obese adults, consequently exposed to an increased risk of comorbidity and premature mortality. Body weight may be indirectly determined by continuous development of coordination and motor skills. The level of motor skills and abilities is an important factor that promotes physical activity since early childhood. The aim of the study is to thoroughly understand the internal relations between motor coordination abilities and the somatic development of prepubertal children and to determine the effect of excess body weight on motor coordination by comparing the motor ability levels of children with different body mass index (BMI) values. The data were collected from 436 children aged 7–10 years, without health limitations, fully participating in school physical education classes. Body height was measured with portable stadiometers (Harpenden, Holtain Ltd.), and body mass—with a digital scale (HN-286, Omron). Motor coordination was evaluated with the Kiphard-Schilling body coordination test, Körperkoordinationstest für Kinder. The normality test by Shapiro-Wilk was used to verify the data distribution. The correlation analysis revealed a statistically significant negative association between the dynamic balance and BMI, as well as between the motor quotient and BMI (p<0.01) for both boys and girls. The results showed no effect of gender on the difference in the observed trends. The analysis of variance proved statistically significant differences between normal weight children and their overweight or obese counterparts. Coordination abilities probably play an important role in preventing or moderating the negative trajectory leading to childhood overweight and obesity. At this age, the development of coordination abilities should become a key strategy, targeted at long-term prevention of obesity and the promotion of an active lifestyle in adulthood. Motor performance is essential for implementing a healthy lifestyle in childhood already. Physical inactivity apparently results in motor deficits and a sedentary lifestyle in children, which may be accompanied by excess energy intake and overweight.Keywords: childhood, KTK test, physical education, psychomotor competence
Procedia PDF Downloads 342