Search results for: facilities management
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 10852

Search results for: facilities management

10072 An Investigation of Customer Relationship Management of Tourism

Authors: Wanida Suwunniponth

Abstract:

This research paper aimed to developing a causal relationship model of success factors of customer relationship management of tourism in Thailand and to investigating relationships among the potential factors that facilitate the success of customer relationship management (CRM). The research was conducted in both quantitative and qualitative methods, by utilizing both questionnaire and in-depth interview. The questionnaire was used in collecting the data from 250 management staff in the hotels located within Bangkok area. Sampling techniques used in this research included cluster sampling according to the service quality and simple random sampling. The data input was analyzed by use of descriptive analysis and System Equation Model (SEM). The research findings demonstrated important factors accentuated by most respondents towards the success of CRM, which were organization, people, information technology and the process of CRM. Moreover, the customer relationship management of tourism business in Thailand was found to be successful at a very significant level. The hypothesis testing showed that the hypothesis was accepted, as the factors concerning with organization, people and information technology played an influence on the process and the success of customer relationship management, whereas the process of customer relationship management factor manipulated its success. The findings suggested that tourism business in Thailand with the implementation of customer relationship management should opt in improvement approach in terms of managerial structure, corporate culture building with customer- centralized approach accentuated, and investment of information technology and customer analysis, in order to capacitate higher efficiency of customer relationship management process that would result in customer satisfaction and retention of service.

Keywords: customer relationship management, casual relationship model, tourism, Thailand

Procedia PDF Downloads 330
10071 Experiences and Challenges of Menstruation Among Rural Schoolgirls in Ghana: A Case of Nadowli-Kaleo District in the Upper West Region of Ghana

Authors: Rosemond Mbii

Abstract:

Menstruation is a critical topic. However normal menstruation is, it has become a determinant in the education of young women today. The research focuses on Breaking the silence and accessing menstrual hygiene management's challenges and experiences among rural schoolgirls in Ghana. The study's goal was to examine the menstrual hygiene practices of female students. Participants described their menstrual hygiene practices, their problems, and how they coped with their menstrual symptoms. The research used a qualitative technique through group interviews, personal interviews, and open-ended questionnaires since it is easier to understand a phenomenon from the subject's viewpoint. Sen's capacities approach and Feminist Political Ecology (FPE) were used to analyze the data. Menstruation was known to girls even before their menarche. A mother or grandmother, friends, and teachers were the primary sources of menstrual knowledge. The study also found that most girls use sanitary products made of fabrics, pads, and cotton during menstruation. Among the difficulties the girls faced, the study found were emotional upset, physical discomfort (cramps in the stomach, fatigue), embarrassment, and inadequate sanitation hygiene facilities. The girls wore many garments to avoid leaks; checked their skirts continuously, went to the bathroom with their friends to act as spics while they changed; sat differently on the chairs, and took medicine to reduce period discomfort. Introduction of a health care teacher who supplies sanitary products and medications to girls during school time. Euphemisms as a form of communication amongst girls were all coping mechanisms girls and the school developed. Another finding was that some girls continued to go to school even while having their periods, while others did not. Discomfort and menstruation cramps hampered class participation. In addition, the study revealed insufficient sanitation and hygiene for females to change sanitary products in private and manage menstrual hygiene comfortably.

Keywords: MHM (menstrual hygiene management), rural area, sanitation, menstruation, water, schoolgirl, rural area, sanitation, menstruation, water

Procedia PDF Downloads 114
10070 Effective Emergency Response and Disaster Prevention: A Decision Support System for Urban Critical Infrastructure Management

Authors: M. Shahab Uddin, Pennung Warnitchai

Abstract:

Currently more than half of the world’s populations are living in cities, and the number and sizes of cities are growing faster than ever. Cities rely on the effective functioning of complex and interdependent critical infrastructures networks to provide public services, enhance the quality of life, and save the community from hazards and disasters. In contrast, complex connectivity and interdependency among the urban critical infrastructures bring management challenges and make the urban system prone to the domino effect. Unplanned rapid growth, increased connectivity, and interdependency among the infrastructures, resource scarcity, and many other socio-political factors are affecting the typical state of an urban system and making it susceptible to numerous sorts of diversion. In addition to internal vulnerabilities, urban systems are consistently facing external threats from natural and manmade hazards. Cities are not just complex, interdependent system, but also makeup hubs of the economy, politics, culture, education, etc. For survival and sustainability, complex urban systems in the current world need to manage their vulnerabilities and hazardous incidents more wisely and more interactively. Coordinated management in such systems makes for huge potential when it comes to absorbing negative effects in case some of its components were to function improperly. On the other hand, ineffective management during a similar situation of overall disorder from hazards devastation may make the system more fragile and push the system to an ultimate collapse. Following the quantum, the current research hypothesizes that a hazardous event starts its journey as an emergency, and the system’s internal vulnerability and response capacity determine its destination. Connectivity and interdependency among the urban critical infrastructures during this stage may transform its vulnerabilities into dynamic damaging force. An emergency may turn into a disaster in the absence of effective management; similarly, mismanagement or lack of management may lead the situation towards a catastrophe. Situation awareness and factual decision-making is the key to win a battle. The current research proposed a contextual decision support system for an urban critical infrastructure system while integrating three different models: 1) Damage cascade model which demonstrates damage propagation among the infrastructures through their connectivity and interdependency, 2) Restoration model, a dynamic restoration process of individual infrastructure, which is based on facility damage state and overall disruptions in surrounding support environment, and 3) Optimization model that ensures optimized utilization and distribution of available resources in and among the facilities. All three models are tightly connected, mutually interdependent, and together can assess the situation and forecast the dynamic outputs of every input. Moreover, this integrated model will hold disaster managers and decision makers responsible when it comes to checking all the alternative decision before any implementation, and support to produce maximum possible outputs from the available limited inputs. This proposed model will not only support to reduce the extent of damage cascade but will ensure priority restoration and optimize resource utilization through adaptive and collaborative management. Complex systems predictably fail but in unpredictable ways. System understanding, situation awareness, and factual decisions may significantly help urban system to survive and sustain.

Keywords: disaster prevention, decision support system, emergency response, urban critical infrastructure system

Procedia PDF Downloads 227
10069 Central African Republic Government Recruitment Agency Based on Identity Management and Public Key Encryption

Authors: Koyangbo Guere Monguia Michel Alex Emmanuel

Abstract:

In e-government and especially recruitment, many researches have been conducted to build a trustworthy and reliable online or application system capable to process users or job applicant files. In this research (Government Recruitment Agency), cloud computing, identity management and public key encryption have been used to management domains, access control authorization mechanism and to secure data exchange between entities for reliable procedure of processing files.

Keywords: cloud computing network, identity management systems, public key encryption, access control and authorization

Procedia PDF Downloads 358
10068 Return to Work after a Mental Health Problem: Analysis of Two Different Management Models

Authors: Lucie Cote, Sonia McFadden

Abstract:

Mental health problems in the workplace are currently one of the main causes of absences. Research work has highlighted the importance of a collaborative process involving the stakeholders in the return-to-work process and has established the best management practices to ensure a successful return-to-work. However, very few studies have specifically explored the combination of various management models and determined whether they could satisfy the needs of the stakeholders. The objective of this study is to analyze two models for managing the return to work: the ‘medical-administrative’ and the ‘support of the worker’ in order to understand the actions and actors involved in these models. The study also aims to explore whether these models meet the needs of the actors involved in the management of the return to work. A qualitative case study was conducted in a Canadian federal organization. An abundant internal documentation and semi-directed interviews with six managers, six workers and four human resources professionals involved in the management of records of employees returning to work after a mental health problem resulted in a complete picture of the return to work management practices used in this organization. The triangulation of this data facilitated the examination of the benefits and limitations of each approach. The results suggest that the actions of management for employee return to work from both models of management ‘support of the worker’ and ‘medical-administrative’ are compatible and can meet the needs of the actors involved in the return to work. More research is needed to develop a structured model integrating best practices of the two approaches to ensure the success of the return to work.

Keywords: return to work, mental health, management models, organizations

Procedia PDF Downloads 212
10067 Influence of Security on Fan Attendance during Nigeria Professional Football League Matches

Authors: B. O. Diyaolu

Abstract:

The stadium transcends a field of play to cultural heritage of a club especially when there is security of life and property and a conducive environment with exciting media facilities, CCTV and adequate field of play. Football fans love watching their clubs’ matches especially when nothing discourages their presence in the stadium. This study investigated the influence of security on fans’ attendance during Nigeria Professional Football League matches. Descriptive survey research design was used and the population consists of all Nigeria Professional Football League fans. Simple random sampling technique was used to pick a state from the six geo-political zones. 600 respondents comprising male and female fans were sampled from the ten selected vendors’ stands in each selected state. A structured questionnaire on Security and Fan attendance scale (SFAS) was used. The instrument consists of two sections. Section A seeks information on demographic data of the respondents, while section B was used to elicit information on security and fans’ attendance. The modified instrument which consists of 20 items has a reliability coefficient of 0.73. The hypothesis was tested at 0.05 significance level. The completed questionnaire was collated, coded and analyzed using descriptive statistics of frequency counts and percentage and inferential statistics of chi-square (X2). Findings of this study revealed that adequate security significantly influences fan attendance during Nigeria Professional Football League matches. There is no sport that can develop if the facilities in use are inadequate. Improving the condition of the stadium in Nigeria is paramount to the development of the Nigeria Professional Football League. All stakeholders in the organization of the League must put into consideration the need to improve the standard of the stadium as it will help to increase the attendance of fans during matches. Only the standard ones should be used during matches.

Keywords: adequate security, fans attendance, football fans, football stadium, Nigeria professional football league

Procedia PDF Downloads 116
10066 The Staff Performance Efficiency of the Faculty of Management Science, Suan Sunandha Rajabhat University

Authors: Nipawan Tharasak, Ladda Hirunyava

Abstract:

The objective of the research was to study factors affecting working efficiency and the relationship between working environment, satisfaction to human resources management and operation employees’ working efficiency of Faculty of Management Science, Suan Sunandha Rajabhat University. The sample size of the research was based on 33 employees of Faculty of Management Science. The researcher had classified the support employees into 4 divisions by using Stratified Random Sampling. Individual sample was randomized by using Simple Random Sampling. Data was collected through the instrument. The Statistical Package for the Windows was utilized for data processing. Percentage, mean, standard deviation, the t-test, One-way ANOVA, and Pearson product moment correlation coefficient were applied. The result found the support employees’ satisfaction in human resources management of Faculty of Management Science in following areas: remuneration; employee recruitment & selection; manpower planning; performance evaluation; staff training & developing; and spirit & fairness were overall in good level.

Keywords: faculty of management science, operational factors, practice performance, staff working

Procedia PDF Downloads 235
10065 Heritage Management of Wooden Monasteries in Mandalay

Authors: Mary Oo, Thet Oo

Abstract:

Mandalay is home to the last dynasty of Myanmar and is rich in cultural heritage. In Mandalay, cultural heritage is still being seen today, in not only intangible but also many tangible heritages. Intangible heritage, a religious structure such as mosques, churches, stupas, temples, Buddha libraries and monasteries, comprise over 80%. Among these religious structures, the authors aim to study the wooden monasteries built in the 19th century and then propose heritage management for them. Although some of the wooden monasteries are being conserved by the government, NGOs or inhabitants in those buildings, because of the unsystematic management plan and some of the inappropriate traditional methods, even their authentic architectural values have been lost today. In this paper, four aspects are explored: 1) the architectural features of 19th-century wooden monasteries 2) the condition of the problems and challenges, 3) the analysis of the problems of them and finally, based on these above analyses, recommend the appropriate heritage management proposal.

Keywords: Mandalay, wooden monasteries, challenges, problems, heritage management proposal

Procedia PDF Downloads 123
10064 A Knowledge-Based Development of Risk Management Approaches for Construction Projects

Authors: Masoud Ghahvechi Pour

Abstract:

Risk management is a systematic and regular process of identifying, analyzing and responding to risks throughout the project's life cycle in order to achieve the optimal level of elimination, reduction or control of risk. The purpose of project risk management is to increase the probability and effect of positive events and reduce the probability and effect of unpleasant events on the project. Risk management is one of the most fundamental parts of project management, so that unmanaged or untransmitted risks can be one of the primary factors of failure in a project. Effective risk management does not apply to risk regression, which is apparently the cheapest option of the activity. However, the main problem with this option is the economic sensitivity, because what is potentially profitable is by definition risky, and what does not pose a risk is economically interesting and does not bring tangible benefits. Therefore, in relation to the implemented project, effective risk management is finding a "middle ground" in its management, which includes, on the one hand, protection against risk from a negative direction by means of accurate identification and classification of risk, which leads to analysis And it becomes a comprehensive analysis. On the other hand, management using all mathematical and analytical tools should be based on checking the maximum benefits of these decisions. Detailed analysis, taking into account all aspects of the company, including stakeholder analysis, will allow us to add what will become tangible benefits for our project in the future to effective risk management. Identifying the risk of the project is based on the theory that which type of risk may affect the project, and also refers to specific parameters and estimating the probability of their occurrence in the project. These conditions can be divided into three groups: certainty, uncertainty, and risk, which in turn support three types of investment: risk preference, risk neutrality, specific risk deviation, and its measurement. The result of risk identification and project analysis is a list of events that indicate the cause and probability of an event, and a final assessment of its impact on the environment.

Keywords: risk, management, knowledge, risk management

Procedia PDF Downloads 66
10063 A Case Study on Blended Pedagogical Approach by Leveraging on Digital Marketing Concepts towards Inculcating Concepts of Sustainability in Management Education

Authors: Narendra Babu Bommenahalli Veerabhadrappa

Abstract:

Teaching sustainability concepts along with profit maximizing philosophy of business in management education is a challenge. This paper explores and evaluates various learning models to inculcate sustainability concepts in management education. The paper explains about a new pedagogy that was tested in a business management school (Indus Business Academy, Bangalore, India) to teach sustainability. The pedagogy was designed by intertwining concepts related to sustainability with digital marketing concepts. As part of this experimental method, students (in groups) were assigned with various topics of sustainability and were asked to work with concepts of digital marketing and thus market the concepts of sustainability. The paper explains as a case study as to how sustainability was integrated with digital marketing tools and how learning towards sustainability was facilitated. It also explains the outcomes of this pedagogical method, in terms of inculcating sustainability concepts amongst management students as well as marketing and proliferation of sustainability concepts to bring about the behavioral changes amongst target audience towards sustainability.

Keywords: management-education, pedagogy, sustainability, behavior

Procedia PDF Downloads 246
10062 Study on Water Level Management Criteria of Reservoir Failure Alert System

Authors: B. Lee, B. H. Choi

Abstract:

The loss of safety for reservoirs brought about by climate change and facility aging leads to reservoir failures, which results in the loss of lives and property damage in downstream areas. Therefore, it is necessary to provide a reservoir failure alert system for downstream residents to detect the early signs of failure (with sensors) in real-time and perform safety management to prevent and minimize possible damage. 10 case studies were carried out to verify the water level management criteria of four levels (attention, caution, alert, serious). Peak changes in water level data were analysed. The results showed that ‘Caution’ and ‘Alert’ were closed to 33% and 66% of difference in level between flood water level and full water level. Therefore, it is adequate to use initial water level management criteria of reservoir failure alert system for the first year. Acknowledgment: This research was supported by a grant (2017-MPSS31-002) from 'Supporting Technology Development Program for Disaster Management' funded by the Ministry of the Interior and Safety(MOIS)

Keywords: alert system, management criteria, reservoir failure, sensor

Procedia PDF Downloads 200
10061 Comprehensive Risk Analysis of Decommissioning Activities with Multifaceted Hazard Factors

Authors: Hyeon-Kyo Lim, Hyunjung Kim, Kune-Woo Lee

Abstract:

Decommissioning process of nuclear facilities can be said to consist of a sequence of problem solving activities, partly because there may exist working environments contaminated by radiological exposure, and partly because there may also exist industrial hazards such as fire, explosions, toxic materials, and electrical and physical hazards. As for an individual hazard factor, risk assessment techniques are getting known to industrial workers with advance of safety technology, but the way how to integrate those results is not. Furthermore, there are few workers who experienced decommissioning operations a lot in the past. Therefore, not a few countries in the world have been trying to develop appropriate counter techniques in order to guarantee safety and efficiency of the process. In spite of that, there still exists neither domestic nor international standard since nuclear facilities are too diverse and unique. In the consequence, it is quite inevitable to imagine and assess the whole risk in the situation anticipated one by one. This paper aimed to find out an appropriate technique to integrate individual risk assessment results from the viewpoint of experts. Thus, on one hand the whole risk assessment activity for decommissioning operations was modeled as a sequence of individual risk assessment steps, and on the other, a hierarchical risk structure was developed. Then, risk assessment procedure that can elicit individual hazard factors one by one were introduced with reference to the standard operation procedure (SOP) and hierarchical task analysis (HTA). With an assumption of quantification and normalization of individual risks, a technique to estimate relative weight factors was tried by using the conventional Analytic Hierarchical Process (AHP) and its result was reviewed with reference to judgment of experts. Besides, taking the ambiguity of human judgment into consideration, debates based upon fuzzy inference was added with a mathematical case study.

Keywords: decommissioning, risk assessment, analytic hierarchical process (AHP), fuzzy inference

Procedia PDF Downloads 424
10060 Marketing Management and Cultural Learning Center: The Case Study of Arts and Cultural Office, Suansunandha Rajabhat University

Authors: Pirada Techaratpong

Abstract:

This qualitative research has 2 objectives: to study marketing management of the cultural learning center in Suansunandha Rajabhat University and to suggest guidelines to improve its marketing management. This research is based on a case study of the Arts and Culture Office in Suansunandha Rajabhat University, Bangkok. This research found the Art and Culture Office has no formal marketing management. However, the marketing management is partly covered in the overall business plan, strategic plan, and action plan. The process can be divided into 5 stages. The marketing concept has long been introduced to its policy but not apparently put into action due to inflexible system. Some gaps are found in the process. The research suggests the Art and Culture Office implement the concept of marketing orientation, meeting the needs and wants of its target customers and adapt to the changing situation. Minor guidelines for improvement are provided.

Keywords: cultural learning center, marketing, management, museum

Procedia PDF Downloads 386
10059 Management Information System to Help Managers for Providing Decision Making in an Organization

Authors: Ajayi Oluwasola Felix

Abstract:

Management information system (MIS) provides information for the managerial activities in an organization. The main purpose of this research is, MIS provides accurate and timely information necessary to facilitate the decision-making process and enable the organizations planning control and operational functions to be carried out effectively. Management information system (MIS) is basically concerned with processing data into information and is then communicated to the various departments in an organization for appropriate decision-making. MIS is a subset of the overall planning and control activities covering the application of humans technologies, and procedures of the organization. The information system is the mechanism to ensure that information is available to the managers in the form they want it and when they need it.

Keywords: Management Information Systems (MIS), information technology, decision-making, MIS in Organizations

Procedia PDF Downloads 557
10058 Development of Total Maximum Daily Load Using Water Quality Modelling as an Approach for Watershed Management in Malaysia

Authors: S. A. Che Osmi, W. M. F. Wan Ishak, H. Kim, M. A. Azman, M. A. Ramli

Abstract:

River is one of important water sources for many activities including industrial and domestic usage such as daily usage, transportation, power supply and recreational activities. However, increasing activities in a river has grown the sources of pollutant enters the water bodies, and degraded the water quality of the river. It becomes a challenge to develop an effective river management to ensure the water sources of the river are well managed and regulated. In Malaysia, several approaches for river management have been implemented such as Integrated River Basin Management (IRBM) program for coordinating the management of resources in a natural environment based on river basin to ensure their sustainability lead by Department of Drainage and Irrigation (DID), Malaysia. Nowadays, Total Maximum Daily Load (TMDL) is one of the best approaches for river management in Malaysia. TMDL implementation is regulated and implemented in the United States. A study on the development of TMDL in Malacca River has been carried out by doing water quality monitoring, the development of water quality model by using Environmental Fluid Dynamic Codes (EFDC), and TMDL implementation plan. The implementation of TMDL will help the stakeholders and regulators to control and improve the water quality of the river. It is one of the good approaches for river management in Malaysia.

Keywords: EFDC, river management, TMDL, water quality modelling

Procedia PDF Downloads 328
10057 Time Management in the Public Sector in Nigeria

Authors: Sunny Ewankhiwimen Aigbomian

Abstract:

Time, is a scarce resource and in everything we do, time is required to accomplish any given task. The need for this presentation is predicated on the way majority of Nigerian especially in the public sector operators see “Time Management”. Time as resources cannot be regained if lost or managed badly. As a significant aspect of human life it should be handled with diligence and utmost seriousness if the public sector is to function as a coordinated entity. In our homes, private life and offices, we schedule different things to ensure that some things do not go the unexpected. When it comes to service delivery on the part of government, it ought to be more serious because government is all about effect and efficient service delivery and “Time” is a significant variable necessary to successful accomplishment. The need for Nigerian government to re-examine time management in her public sector with a view of repositioning the sector to be able to compete well with other public sectors in the world. The peculiarity of Time management in Public Sector in Nigerian context as examined and some useful recommendations of immerse assistance proffered.

Keywords: Nigeria, public sector, time management, task

Procedia PDF Downloads 99
10056 On-Site Management from Reactive to Proactive

Authors: Yu-Tzu Chen, Luh-Maan Chang

Abstract:

Construction is an inherently risky industry. The projects have been dominated by reactive actions owing to non-routine in nature. The on-site activities are especially crucial for successful project control. In order to alter actions from reactive to proactive, this paper presents an on-site data collection system utilizing advanced technology RFID and GPS in assisting on-site management with near real time progress monitoring.

Keywords: On-Site management, progress monitoring, RFID, GPS

Procedia PDF Downloads 568
10055 Accuracy of Peak Demand Estimates for Office Buildings Using Quick Energy Simulation Tool

Authors: Mahdiyeh Zafaranchi, Ethan S. Cantor, William T. Riddell, Jess W. Everett

Abstract:

The New Jersey Department of Military and Veteran’s Affairs (NJ DMAVA) operates over 50 facilities throughout the state of New Jersey, U.S. NJDMAVA is under a mandate to move toward decarbonization, which will eventually include eliminating the use of natural gas and other fossil fuels for heating. At the same time, the organization requires increased resiliency regarding electric grid disruption. These competing goals necessitate adopting the use of on-site renewables such as photovoltaic and geothermal power, as well as implementing power control strategies through microgrids. Planning for these changes requires a detailed understanding of current and future electricity use on yearly, monthly, and shorter time scales, as well as a breakdown of consumption by heating, ventilation, and air conditioning (HVAC) equipment. This paper discusses case studies of two buildings that were simulated using the QUick Energy Simulation Tool (eQUEST). Both buildings use electricity from the grid and photovoltaics. One building also uses natural gas. While electricity use data are available in hourly intervals and natural gas data are available in monthly intervals, the simulations were developed using monthly and yearly totals. This approach was chosen to reflect the information available for most NJ DMAVA facilities. Once completed, simulation results are compared to metrics recommended by several organizations to validate energy use simulations. In addition to yearly and monthly totals, the simulated peak demands are compared to actual monthly peak demand values. The simulations resulted in monthly peak demand values that were within 30% of the measured values. These benchmarks will help to assess future energy planning efforts for NJ DMAVA.

Keywords: building energy modeling, eQUEST, peak demand, smart meters

Procedia PDF Downloads 68
10054 Defect Management Life Cycle Process for Software Quality Improvement

Authors: Aedah Abd Rahman, Nurdatillah Hasim

Abstract:

Software quality issues require special attention especially in view of the demands of quality software product to meet customer satisfaction. Software development projects in most organisations need proper defect management process in order to produce high quality software product and reduce the number of defects. The research question of this study is how to produce high quality software and reducing the number of defects. Therefore, the objective of this paper is to provide a framework for managing software defects by following defined life cycle processes. The methodology starts by reviewing defects, defect models, best practices and standards. A framework for defect management life cycle is proposed. The major contribution of this study is to define a defect management road map in software development. The adoption of an effective defect management process helps to achieve the ultimate goal of producing high quality software products and contributes towards continuous software process improvement.

Keywords: defects, defect management, life cycle process, software quality

Procedia PDF Downloads 306
10053 About the Case Portfolio Management Algorithms and Their Applications

Authors: M. Chumburidze, N. Salia, T. Namchevadze

Abstract:

This work deal with case processing problems in business. The task of strategic credit requirements management of cases portfolio is discussed. The information model of credit requirements in a binary tree diagram is considered. The algorithms to solve issues of prioritizing clusters of cases in business have been investigated. An implementation of priority queues to support case management operations has been presented. The corresponding pseudo codes for the programming application have been constructed. The tools applied in this development are based on binary tree ordering algorithms, optimization theory, and business management methods.

Keywords: credit network, case portfolio, binary tree, priority queue, stack

Procedia PDF Downloads 150
10052 Urgent Care Centres in the United Kingdom

Authors: Mohammad Ansari, Satinder Mann, Ahmed Ismail

Abstract:

Primary care patients in Emergency Departments (ED) have been the topic of discussion since 1998 in the United Kingdom. Numerous studies have analysed attendances in EDs retrospectively and suggest that at least one third to fifty percent patients attending ED with problems which could be managed appropriately in General Practice or minor injuries units. The pattern of ED Usage seems to be International. In Australia and many departments in the United States include walk in facilities staffed by physicians on family practice residency programme. It clearly appears in the United Kingdom that EDs have to accept that such patients with primary care problems will attend the ED and facilities will have to be provided to see and treat such patients. Urgent care centres were introduced in the United Kingdom nearly a decade ago to reduce the pressure on EDs. Most of these were situated near pre-existing EDs. Unfortunately these centres failed to have the desired effect of reducing the number of patients visiting EDs, it has been noticed that when more patients were seen in Urgent Care centres there were increased attendances in ED as well. A new model of Urgent Care centre was started in the ED of George Eliot Hospital, Nuneaton, UK. We looked at the working of the centre by looking at the number of patients seen daily against the number of total attendances in the ED. We studied the number and type of patients seen by the Urgent Care Doctor. All the medical records of the patients were seen and the time patients spent in the Urgent Care centre was recorded. The total number of patients seen during this study were 1532. 219 (14.3% ) were seen within our Urgent Care centre. None of the patients waited over four hours to be seen. It has been recognised that primary care patients in the ED are a major part of attendances of the department and unless these patients are seen in Urgent Care centres, overcrowding and long waits cannot been avoided. It has been shown that employing primary care Physicians in Urgent Care centres reduces overall cost because they do not carry out as many investigations as Junior Doctors. In our study over 14% patients were seen by Urgent Care Physicians and none of the patients waited for more than four hours and we feel that care provided to the patients by Urgent Care centre was highly effective and satisfying for the patient.

Keywords: urgent care centres, primary care physicians, overcrowding, cost

Procedia PDF Downloads 439
10051 Risk Management and Security Practice in Customs Supply Chain: Application of Cross ABC Method to the Moroccan Customs

Authors: Lamia Hammadi, Abdellah Ait Ouhman, Aomar Ibourk

Abstract:

It is widely assumed that the case of Customs Supply Chain is classified as a complex system, due to not only the variety and large number of actors, but also their complex structural links, and the interactions between these actors, that’s why this system is subject to various types of Risks. The economic, political and social impacts of those risks are highly detrimental to countries, businesses and the public, for this reason, Risk management in the customs supply chain is becoming a crucial issue to ensure the sustainability, security and safety. The main characteristic of customs risk management approach is determining which goods and means of transport should be examined? To what extend? And where future compliance resources should be directed? The purposes of this article are, firstly to deal with the concept of customs supply chain, secondly present our risk management approach based on Cross Activity Based Costing (ABC) Method as an interactive tool to support decision making in customs risk management. Finally, analysis of case study of Moroccan customs to putting theory into practice and will thus draw together the various elements of a structured and efficient risk management approach.

Keywords: cross ABC method, customs supply chain, risk, risk management

Procedia PDF Downloads 379
10050 Modern Work Modules in Construction Practice

Authors: Robin Becker, Nane Roetmann, Manfred Helmus

Abstract:

Construction companies lack junior staff for construction management. According to a nationwide survey of students, however, the profession lacks attractiveness. The conflict between the traditional job profile and the current desires of junior staff for contemporary and flexible working models must be resolved. Increasing flexibility is essential for the future viability of small and medium-sized enterprises. The implementation of modern work modules can help here. The following report will present the validation results of the developed work modules in construction practice.

Keywords: modern construction management, construction industry, work modules, shortage of junior staff, sustainable personnel management, making construction management more attractive, working time model

Procedia PDF Downloads 86
10049 Performance Management in Public Administration on Chile and Portugal

Authors: Lilian Bambirra De Assis, Patricia Albuquerque Gomes, Kamila Pagel De Oliveira, Deborah Oliveira Santos, Marcelo Esteves Chaves Campos

Abstract:

This paper aimed to analyze how performance management occurs in the context of the modernization of the federal public sector in Chile and Portugal. To do so, the study was based on a theoretical framework that covers the modernization of public administration to performance management, passing on people management. The work consisted of qualitative-descriptive research in which 16 semi-structured interviews were applied in the countries of study and documents and legislation were used referring to the subject. Performance management, as well as other people management subsystems, is criticized for using private sector management tools, based on a results-driven logic. From this point of view, it is understood that certain practices of the private sector, regarding the measurement of performance, can not be simply inserted in the scenario of the public administration. Beyond this criticism, performance management can contribute to the achievement of the strategic objectives of the countries and its focus is upward, a trend that can be verified through the manuals produced; by the interest of consultants and professional organizations, both public and private; and OECD (Organization for Economic Cooperation and Development) evaluations. In Portugal, public administration reform was implemented during the Constitutional Government (2005-2009) and had as its objective the restructuring of human resources management, with an emphasis on its integration with budget management, which is an inclination of the OECD, while in Chile HRM (Human Resource Management) practices are directed to ministries to a lesser extent than the OECD average. The central human resources management sector, for the most part, coordinates policy but is also responsible for other issues, including payment and classification systems. Chile makes less use of strategic Human Resource Management practices than the average of OECD countries, and its prominence lies in the decentralization of public bodies, which may grant autonomy, but fragments the implementation of policies and practices in that country since they are not adopted by all organs. Through the analysis, it was possible to identify that Chile and Portugal have practices and personnel management policies that make reference to performance management, which is similar to other OECD countries. The study countries also have limitations to implement performance management and the results indicate that there are still processes to be perfected, such as performance appraisal and compensation.

Keywords: management of people in the public sector, modernization of public administration, performance management in the public sector, HRM, OECD

Procedia PDF Downloads 152
10048 Integrating Best Practices for Construction Waste in Quality Management Systems

Authors: Paola Villoria Sáez, Mercedes Del Río Merino, Jaime Santa Cruz Astorqui, Antonio Rodríguez Sánchez

Abstract:

The Spanish construction industry generates large volumes of waste. However, despite the legislative improvements introduced for construction and demolition waste (CDW), construction waste recycling rate remains well below other European countries and also below the target set for 2020. This situation can be due to many difficulties. i.e.: The difficulty of onsite segregation or the estimation in advance of the total amount generated. Despite these difficulties, the proper management of CDW must be one of the main aspects to be considered by the construction companies. In this sense, some large national companies are implementing Integrated Management Systems (IMS) including not only quality and safety aspects, but also environment issues. However, although this fact is a reality for large construction companies still the vast majority of companies need to adopt this trend. In short, it is common to find in small and medium enterprises a decentralized management system: A single system of quality management, another for system safety management and a third one for environmental management system (EMS). In addition, the EMSs currently used address CDW superficially and are mainly focus on other environmental concerns such as carbon emissions. Therefore, this research determines and implements a specific best practice management system for CDW based on eight procedures in a Spanish Construction company. The main advantages and drawbacks of its implementation are highlighted. Results of this study show that establishing and implementing a CDW management system in building works, improve CDW quantification as the company obtains their own CDW generation ratio. This helps construction stakeholders when developing CDW Management Plans and also helps to achieve a higher adjustment of CDW management costs. Finally, integrating this CDW system with the EMS of the company favors the cohesion of the construction process organization at all stages, establishing responsibilities in the field of waste and providing a greater control over the process.

Keywords: construction and demolition waste, waste management, best practices, waste minimization, building, quality management systems

Procedia PDF Downloads 533
10047 Gas Transmission Pipeline Integrity Management System Through Corrosion Mitigation and Inspection Strategy: A Case Study of Natural Gas Transmission Pipeline from Wafa Field to Mellitah Gas Plant in Libya

Authors: Osama Sassi, Manal Eltorki, Iftikhar Ahmad

Abstract:

Poor integrity is one of the major causes of leaks and accidents in gas transmission pipelines. To ensure safe operation, it is must to have efficient and effective pipeline integrity management (PIM) system. The corrosion management is one of the important aspects of successful pipeline integrity management program together design, material selection, operations, risk evaluation and communication aspects to maintain pipelines in a fit-for-service condition. The objective of a corrosion management plan is to design corrosion mitigation, monitoring, and inspection strategy, and for maintenance in a timely manner. This paper presents the experience of corrosion management of a gas transmission pipeline from Wafa field to Mellitah gas plant in Libya. The pipeline is 525.5 km long and having 32 inches diameter. It is a buried pipeline. External corrosion on pipeline is controlled with a combination of coatings and cathodic protection while internal corrosion is controlled with a combination of chemical inhibitors, periodic cleaning and process control. The monitoring and inspection techniques provide a way to measure the effectiveness of corrosion control systems and provide an early warning when changing conditions may be causing a corrosion problem. This paper describes corrosion management system used in Mellitah Oil & Gas BV for its gas transmission pipeline based on standard practices of corrosion mitigation and inspection.

Keywords: corrosion mitigation on gas transmission pipelines, pipeline integrity management, corrosion management of gas pipelines, prevention and inspection of corrosion

Procedia PDF Downloads 78
10046 Personal Egocentrism as an Indicator of the Management Activity Efficiency

Authors: Lusine S. Stepanyan, Elina V. Asriyan.

Abstract:

It is known, that the efficiency of management depend on individual characteristics of manager. In case, was shown the role of personal position in the efficiency of management. Current research is aimed at reveal psychological and psychophysiological basis efficiency of management and finding ways of increasing the productivity of management that is most essential and topical problems of modern society. To understand the investigated phenomenon it was applied a complex approach. The Eysenk questionnaire was used for determining the level of aggression, frustration, anxiety and rigidity. The test of egocentric associations was used for determining the level of egocentrism. The test of COS (communicativeness and organizational skills) was used for diagnosing the level of communicativeness. The integral index of job satisfaction was used for diagnosis the efficiency of management activity. Then, the relationship between the above mentioned mental state, communicativeness, self-esteem, job satisfaction, locus of control, and egocentrism was investigated. The obtained results have shown the positive correlation between the egocentrism and frustration, anxiety and also the negative correlation with job satisfaction and communicativeness. Intergroup analyses has revealed the significant differences by communicativeness and the internality’ level. The revealed results can be used for diagnosis of efficiency of management.

Keywords: egocentrism, locus control, mental state, job satisfaction, professional activity

Procedia PDF Downloads 367
10045 Outcomes of Pain Management for Patients in Srinagarind Hospital: Acute Pain Indicator

Authors: Chalermsri Sorasit, Siriporn Mongkhonthawornchai, Darawan Augsornwan, Sudthanom Kamollirt

Abstract:

Background: Although knowledge of pain and pain management is improving, they are still inadequate to patients. The Nursing Division of Srinagarind Hospital is responsible for setting the pain management system, including work instruction development and pain management indicators. We have developed an information technology program for monitoring pain quality indicators, which was implemented to all nursing departments in April 2013. Objective: To study outcomes of acute pain management in process and outcome indicators. Method: This is a retrospective descriptive study. The sample population was patients who had acute pain 24-48 hours after receiving a procedure, while admitted to Srinagarind Hospital in 2014. Data were collected from the information technology program. 2709 patients with acute pain from 10 Nursing Departments were recruited in the study. The research tools in this study were 1) the demographic questionnaire 2) the pain management questionnaire for process indicators, and 3) the pain management questionnaire for outcome indicators. Data were analyzed and presented by percentages and means. Results: The process indicators show that nurses used pain assessment tool and recorded 99.19%. The pain reassessment after the intervention was 96.09%. The 80.15% of the patients received opioid for pain medication and the most frequency of non-pharmacological intervention used was positioning (76.72%). For the outcome indicators, nearly half of them (49.90%) had moderate–severe pain, mean scores of worst pain was 6.48 and overall pain was 4.08. Patient satisfaction level with pain management was good (49.17%) and very good (46.62%). Conclusion: Nurses used pain assessment tools and pain documents which met the goal of the pain management process. Patient satisfaction with pain management was at high level. However the patients had still moderate to severe pain. Nurses should adhere more strictly to the guidelines of pain management, by using acute pain guidelines especially when pain intensity is particularly moderate-high. Nurses should also develop and practice a non-pharmacological pain management program to continually improve the quality of pain management. The information technology program should have more details about non-pharmacological pain techniques.

Keywords: outcome, pain management, acute pain, Srinagarind Hospital

Procedia PDF Downloads 232
10044 An Analytical Study of the Quality of Educational Administration and Management At Secondary School Level in Punjab, Pakistan

Authors: Shamim Akhtar

Abstract:

The purpose of the present research was to analyse the performance level of district administrators and school heads teachers at secondary school level. The sample of the study was head teachers and teachers of secondary schools. In survey three scales were used, two scales were for the head teachers, one five point scale was for analysing the working efficiency of educational administrators and other seven points scale was for head teachers for analysing their own performance and one another seven point rating scale similar to head teacher was for the teachers for analysing the working performance of their head teachers. The results of the head teachers’ responses revealed that the performance of their District Educational Administrators was average and for the performance efficiency of the head teachers, researcher constructed the rating scales on seven parameters of management likely academic management, personnel management, financial management, infra-structure management, linkage and interface, student’s services, and managerial excellence. Results of percentages, means, and graphical presentation on different parameters of management showed that there was an obvious difference in head teachers and teachers’ responses and head teachers probably were overestimating their efficiency; but teachers evaluated that they were performing averagely on majority statements. Results of t-test showed that there was no significance difference in the responses of rural and urban teachers but significant difference in male and female teachers’ responses showed that female head teachers were performing their responsibilities better than male head teachers in public sector schools. When efficiency of the head teachers on different parameters of management were analysed it was concluded that their efficiency on academic and personnel management was average and on financial management and on managerial excellence was highly above of average level but on others parameters like infra-structure management, linkage and interface and on students services was above of average level on most statements but highly above of average on some statements. Hence there is need to improve the working efficiency in academic management and personnel management.

Keywords: educational administration, educational management, parameters of management, education

Procedia PDF Downloads 337
10043 Basics of SCADA Security: A Technical Approach

Authors: Michał Witas

Abstract:

This paper presents a technical approach to analysis of security of SCADA systems. Main goal of the paper is to make SCADA administrators aware of risks resulting from SCADA systems usage and to familiarize with methods that can be adopt to existing or planned system, to increase overall system security level. Because SCADA based systems become a industrial standard, more attention should be paid to the security of that systems. Industrial Control Systems (ICS) like SCADA are responsible for controlling crucial aspects of wide range of industrial processes. In pair with that responsibility, goes a lot of money that can be earned or lost – this fact is main reason of increased interest of attackers. Additionally ICS are often responsible for maintaining resources strategic from the point of view of national economy, like electricity (including nuclear power plants), heating, water resources or military facilities, so they can be targets of terrorist cybernetic attacks. Without proper risk analysis and management, vulnerabilities resulting from the usage of SCADA can be easily exploited by potential attacker. Paper is based mostly on own experience in systems security, gathered during academic studies and professional work in international company. As title suggests, it will cover only basics of topic, because every of points mentioned in the document can be base for additional research and papers.

Keywords: denial of service, SCADA, security policy, distributed network

Procedia PDF Downloads 373