7971 Key Issues in Transfer Stage of BOT Project: Experience from China

Authors: Wang Liguang, Zhang Xueqing

Abstract:

The build-operate-transfer (BOT) project delivery system has provided effective routes to mobilize private sector funds, innovative technologies, management skills and operational efficiencies for public infrastructure development and have been widely used in China during the last 20 years. Many BOT projects in China will be smoothly transferred to the government soon and the transfer stage, which is considered as the last stage, must be studied carefully and handled well to achieve the overall success of BOT projects. There will be many issues faced by both the public sector and private sector in the transfer stage of BOT projects, including project post-assessment, technology and documents transfer, personal training and staff transition, etc. and sometimes additional legislation is needed for future operation and management of facilities. However, most previous studies focused on the bidding, financing, and building and operation stages instead of transfer stage. This research identifies nine key issues in the transfer stage of BOT projects through a comprehensive study on three cases in China, and the expert interview and expert discussion meetings are held to validate the key issues and give detail analysis. A proposed framework of transfer management is prepared based on the experiences derived and lessons drawn from the case studies and expert interview and discussions, which is expected to improve the transfer management of BOT projects in practice.

Keywords: BOT project, key issues, transfer management, transfer stage

Procedia PDF Downloads 256
7970 Analysis of Delays during Initial Phase of Construction Projects and Mitigation Measures

Authors: Sunaitan Al Mutairi

Abstract:

A perfect start is a key factor for project completion on time. The study examined the effects of delayed mobilization of resources during the initial phases of the project. This paper mainly highlights the identification and categorization of all delays during the initial construction phase and their root cause analysis with corrective/control measures for the Kuwait Oil Company oil and gas projects. A relatively good percentage of the delays identified during the project execution (Contract award to end of defects liability period) attributed to mobilization/preliminary activity delays. Data analysis demonstrated significant increase in average project delay during the last five years compared to the previous period. Contractors had delays/issues during the initial phase, which resulted in slippages and progressively increased, resulting in time and cost overrun. Delays/issues not mitigated on time during the initial phase had very high impact on project completion. Data analysis of the delays for the past five years was carried out using trend chart, scatter plot, process map, box plot, relative importance index and Pareto chart. Construction of any project inside the Gathering Centers involves complex management skills related to work force, materials, plant, machineries, new technologies etc. Delay affects completion of projects and compromises quality, schedule and budget of project deliverables. Works executed as per plan during the initial phase and start-up duration of the project construction activities resulted in minor slippages/delays in project completion. In addition, there was a good working environment between client and contractor resulting in better project execution and management. Mainly, the contractor was on the front foot in the execution of projects, which had minimum/no delays during the initial and construction period. Hence, having a perfect start during the initial construction phase shall have a positive influence on the project success. Our research paper studies each type of delay with some real example supported by statistic results and suggests mitigation measures. Detailed analysis carried out with all stakeholders based on impact and occurrence of delays to have a practical and effective outcome to mitigate the delays. The key to improvement is to have proper control measures and periodic evaluation/audit to ensure implementation of the mitigation measures. The focus of this research is to reduce the delays encountered during the initial construction phase of the project life cycle.

Keywords: construction activities delays, delay analysis for construction projects, mobilization delays, oil & gas projects delays

Procedia PDF Downloads 318
7969 Understanding Co-Living Experience through University Residential Halls - A Pilot Study

Authors: Michelle W. T. Cheng, Yau Y.

Abstract:

Hong Kong continues to be ranked as the least affordable housing market in the world, making co-living a feasible alternative in this high-density city. Although the number of co-living residences has increased in Hong Kong, co-living as a housing typology is still a new concept for many. Little research has been conducted on this new housing typology, let alone the co-living experience. To address this gap, this study targeted student residents in university residential halls as it is a more controlled environment (e.g., with established rules and guidelines regarding the use of communal facilitates and housing management) for studying co-living experiences in Hong Kong. To date, no research study has systematically identified anti-social behavior (ASB) in co-living spaces. Since ASB can be influenced by factors such as social norms and individual interpretation, it has an elastic definition that results in different levels of acceptance. Unlike other types of housing, co-living spaces can be potentially more influenced by the neighborhood as residents share more time and space. As a pilot study, this research targeted one university residential hall to examine student co-living experiences. To clarify, the research question is focused on identifying the social factors that impact the residential satisfaction of those who co-living in residential halls. Quantitative data (n=100) were collected via a structured questionnaire to measure the residential environment, including ASB, social neighboring, community attachment, and perceived hall management efficacy. The survey was distributed at the end of the academic year to ensure that respondents had at least one year of first-hand experience living in a co-living space. To gather qualitative data, follow-up focus group interviews were conducted with 16 participants who completed the survey. The semi-structured interviews aimed to elicit the participants' perspectives on their co-living experience. Through analyzing their co-living experiences, the researcher identified factors that affected their residential satisfaction and provided recommendations to enhance their co-living experience.

Keywords: co-living, university residential hall, anti-social behabiour, neighbour relationship, community attachement

Procedia PDF Downloads 86
7968 Proposals for the Thermal Regulation of Buildings in Algeria: A New Energy Label for Social Housing

Authors: Marco Morini, Nicolandrea Calabrese, Dario Chello

Abstract:

Despite the international commitment of Algeria towards the development of energy efficiency and renewable energy in the country, the internal energy demand has been continuously growing during the last decade due to the substantial increase of population and of living conditions, which in turn has led to an unprecedented expansion of the residential building sector. The thermal building regulation is the technical document that establishes the calculation framework for the thermal performance of buildings in Algeria, setting up minimum obligatory targets for the thermal performance of new buildings. An update of this regulation is due in the coming years, and this paper discusses some proposals in this regard, with the aim to improve the energy efficiency of the building sector, particularly with regard to social housing. In particular, it proposes a methodology for drafting an energy performance label of new Algerian residential buildings, moving from the results of the thermal compliance verification and sizing of technical systems as defined in the RTB. Such an energy performance label – whose calculation method is briefly described in the paper – aims to raise citizens' awareness of the benefits of energy efficiency. It can represent the first step in a process of integrating technical installations into the calculation of the energy performance of buildings in Algeria.

Keywords: building, energy certification, energy efficiency, social housing, international cooperation, Mediterranean region

Procedia PDF Downloads 144
7967 Quantitative Analysis of Contract Variations Impact on Infrastructure Project Performance

Authors: Soheila Sadeghi

Abstract:

Infrastructure projects often encounter contract variations that can significantly deviate from the original tender estimates, leading to cost overruns, schedule delays, and financial implications. This research aims to quantitatively assess the impact of changes in contract variations on project performance by conducting an in-depth analysis of a comprehensive dataset from the Regional Airport Car Park project. The dataset includes tender budget, contract quantities, rates, claims, and revenue data, providing a unique opportunity to investigate the effects of variations on project outcomes. The study focuses on 21 specific variations identified in the dataset, which represent changes or additions to the project scope. The research methodology involves establishing a baseline for the project's planned cost and scope by examining the tender budget and contract quantities. Each variation is then analyzed in detail, comparing the actual quantities and rates against the tender estimates to determine their impact on project cost and schedule. The claims data is utilized to track the progress of work and identify deviations from the planned schedule. The study employs statistical analysis using R to examine the dataset, including tender budget, contract quantities, rates, claims, and revenue data. Time series analysis is applied to the claims data to track progress and detect variations from the planned schedule. Regression analysis is utilized to investigate the relationship between variations and project performance indicators, such as cost overruns and schedule delays. The research findings highlight the significance of effective variation management in construction projects. The analysis reveals that variations can have a substantial impact on project cost, schedule, and financial outcomes. The study identifies specific variations that had the most significant influence on the Regional Airport Car Park project's performance, such as PV03 (additional fill, road base gravel, spray seal, and asphalt), PV06 (extension to the commercial car park), and PV07 (additional box out and general fill). These variations contributed to increased costs, schedule delays, and changes in the project's revenue profile. The study also examines the effectiveness of project management practices in managing variations and mitigating their impact. The research suggests that proactive risk management, thorough scope definition, and effective communication among project stakeholders can help minimize the negative consequences of variations. The findings emphasize the importance of establishing clear procedures for identifying, assessing, and managing variations throughout the project lifecycle. The outcomes of this research contribute to the body of knowledge in construction project management by demonstrating the value of analyzing tender, contract, claims, and revenue data in variation impact assessment. However, the research acknowledges the limitations imposed by the dataset, particularly the absence of detailed contract and tender documents. This constraint restricts the depth of analysis possible in investigating the root causes and full extent of variations' impact on the project. Future research could build upon this study by incorporating more comprehensive data sources to further explore the dynamics of variations in construction projects.

Keywords: contract variation impact, quantitative analysis, project performance, claims analysis

Procedia PDF Downloads 40
7966 Stabilizing a Failed Slope in Islamabad, Pakistan

Authors: Muhammad Umer Zubair, Kamran Akhtar, Muhammad Arsalan Khan

Abstract:

This paper is based on a research carried out on a failed slope in Defence Housing Authority (DHA) Phase I, Islamabad. The research included determination of Soil parameters, Site Surveying and Cost Estimation. Apart from these, the use of three dimensional (3D) slope stability analysis in conjunction with two dimensional (2D) analysis was used determination of slope conditions. In addition collection of soil reports, a detailed survey was carried out to create a 3D model in Surfer 8 software. 2D cross-sections that needed to be analyzed for stability were generated from 3D model. Slope stability softwares, Rocscience Slide 6.0 and Clara-W were employed for 2D and 3D Analyses respectively which have the ability to solve complex mathematical functions. Results of the analyses were used to confirm site conditions and the threats were identified to recommend suitable remedies.The most effective remedy was suggested for slope stability after analyzing all remedies in software Slide 6 and its feasibility was determined through cost benefit analysis. This paper should be helpful to Geotechnical engineers, design engineers and the organizations working with slope stability.

Keywords: slope stability, Rocscience, Clara W., 2d analysis, 3D analysis, sensitivity analysis

Procedia PDF Downloads 525
7965 A Predictive Analytics Approach to Project Management: Reducing Project Failures in Web and Software Development Projects

Authors: Tazeen Fatima

Abstract:

Use of project management in web & software development projects is very significant. It has been observed that even with the application of effective project management, projects usually do not complete their lifecycle and fail. To minimize these failures, key performance indicators have been introduced in previous studies to counter project failures. However, there are always gaps and problems in the KPIs identified. Despite of incessant efforts at technical and managerial levels, projects still fail. There is no substantial approach to identify and avoid these failures in the very beginning of the project lifecycle. In this study, we aim to answer these research problems by analyzing the concept of predictive analytics which is a specialized technology and is very easy to use in this era of computation. Project organizations can use data gathering, compute power, and modern tools to render efficient Predictions. The research aims to identify such a predictive analytics approach. The core objective of the study was to reduce failures and introduce effective implementation of project management principles. Existing predictive analytics methodologies, tools and solution providers were also analyzed. Relevant data was gathered from projects and was analyzed via predictive techniques to make predictions well advance in time to render effective project management in web & software development industry.

Keywords: project management, predictive analytics, predictive analytics methodology, project failures

Procedia PDF Downloads 347
7964 Analysing the Cost of Immigrants to the National Health System in Eastern Macedonia and Thrace

Authors: T. Theodosiou, P. Polychronidou, A. G. Karasavvoglou

Abstract:

The latest years the number of immigrants at Greece has increased dramatically. Their impact on the National Health System (NHS) has not been yet thoroughly investigated. This paper analyses the cost of immigrants to the NHS hospitals of the region of Eastern Macedonia and Thrace. The data are collected from 2005 to 2011 from five different hospitals and are analysed using linear mixed effects models in order to investigate the effects of nationality and year on the cost of hospitalization and treatment. The results show that generally the Greek nationality patients have a higher mean cost of hospitalization compared to the immigrants and that there is an increasing trend for the cost except for the year 2010.

Keywords: cost, Eastern Macedonia and Thrace, immigrants, national health system

Procedia PDF Downloads 245
7963 Non-Chronological Approach in Crane Girder and Composite Steel Beam Installation: Case Study

Authors: Govindaraj Ramanathan

Abstract:

The time delay and the structural stability are major issues in big size projects due to several factors. Improper planning and poor coordination lead to delay in construction, which sometimes result in reworking or rebuilding. This definitely increases the cost and time of project. This situation stresses the structural engineers to plan out of the limits of contemporary technology utilizing non-chronological approach with creative ideas. One of the strategies to solve this issue is through structural integrity solutions in a cost-effective way. We have faced several problems in a project worth 470 million USD, and one such issue is crane girder installation with composite steel beams. We have applied structural integrity approach with the proper and revised planning schedule to solve the problem efficiently with minimal expenses.

Keywords: construction management, delay, non-chronological approach, composite beam, structural integrity

Procedia PDF Downloads 237
7962 A Global Business Network Built on Hive: Two Use Cases: Buying and Selling of Products and Services and Carrying Out of Social Impact Projects

Authors: Gheyzer Villegas, Edgardo Cedeño, Veruska Mata, Edmundo Chauran

Abstract:

One of the most significant changes that occurred in global commerce was the emergence of cryptocurrencies and blockchain technology. There is still much debate about the adoption of the economic model based on crypto assets, and myriad international projects and initiatives are being carried out to try and explore the potential that this new field offers. The Hive blockchain is a prime example of this, featuring two use cases: of how trade based on its native currencies can give successful results in the exchange of goods and services and in the financing of social impact projects. Its decentralized management model and visionary administration of its development fund have become a key part of its success.

Keywords: Hive, business, network, blockchain

Procedia PDF Downloads 68
7961 Thermodynamic Performance of a Low-Cost House Coated with Transparent Infrared Reflective Paint

Authors: Ochuko K. Overen, Edson L. Meyer

Abstract:

Uncontrolled heat transfer between the inner and outer space of low-cost housings through the thermal envelope result in indoor thermal discomfort. As a result, an excessive amount of energy is consumed for space heating and cooling. Thermo-optical properties are the ability of paints to reduce the rate of heat transfer through the thermal envelope. The aim of this study is to analyze the thermal performance of a low-cost house with its walls inner surface coated with transparent infrared reflective paint. The thermo-optical properties of the paint were analyzed using Scanning Electron Microscopy/ Energy Dispersive X-ray spectroscopy (SEM/EDX), Fourier Transform Infra-Red (FTIR) and thermal photographic technique. Meteorological indoor and ambient parameters such as; air temperature, relative humidity, solar radiation, wind speed and direction of a low-cost house in Golf-course settlement, South Africa were monitored. The monitoring period covers both winter and summer period before and after coating. The thermal performance of the coated walls was evaluated using time lag and decrement factor. The SEM image shows that the coat is transparent to light. The presence of Al as Al2O and other elements were revealed by the EDX spectrum. Before coating, the average decrement factor of the walls in summer was found to be 0.773 with a corresponding time lag of 1.3 hours. In winter, the average decrement factor and corresponding time lag were 0.467 and 1.6 hours, respectively. After coating, the average decrement factor and corresponding time lag were 0.533 and 2.3 hour, respectively in summer. In winter, an average decrement factor of 1.120 and corresponding time lag of 3 hours was observed. The findings show that the performance of the coats is influenced by the seasons. With a 74% reduction in decrement factor and 1.4 time lag increase in winter, it implies that the coatings have more ability to retain heat within the inner space of the house than preventing heat flow into the house. In conclusion, the results have shown that transparent infrared reflective paint has the ability to reduce the propagation of heat flux through building walls. Hence, it can serve as a remedy to the poor thermal performance of low-cost housings in South Africa.

Keywords: energy efficiency, decrement factor, low-cost housing, paints, rural development, thermal comfort, time lag

Procedia PDF Downloads 283
7960 Inequality and Poverty Assessment on Affordable Housing in Austria: A Comprehensive Perspective on SDG 1 and SDG 10 (UniNEtZ Project)

Authors: M. Bukowski, K. Kreissl

Abstract:

Social and environmental pressures in our times bear threats that often cross-border in scale, such as climate change, poverty-driven migration, demographic change as well as socio-economic developments. One of the hot topics is prevailing in many societies across Europe and worldwide, concerns 'affordable housing' and poverty-driven international and domestic migration (including displacements through gentrification processes), focusing here on the urban and regional context. The right to adequate housing and shelter is one of the recognized in the Universal Declaration of Human rights and International Covenant on Economic, Social and Cultural Rights, and as such considered as a human right of the second generation. The decreasing supply of affordable housing, especially in urban areas, has reached dimensions that have led to an increasing 'housing crisis'. This crisis, which has even reached middle-income homes, has an even more devastating impact on low income and poor households raising poverty levels. Therefore, the understanding of the connection between housing and poverty is vital to integrate and support the different stakeholders in order to tackle poverty. When it comes to issues of inequalities and poverty within the SDG framework, multi-faceted stakeholders with different claims, distribution of resources and interactions with other development goals (spill-over and trade-offs) account for a highly complex context. To contribute to a sustainable and fair society and hence to support the UN Sustainable Development Goals, the University of Salzburg participates in the Austrian-wide universities' network 'UniNEtZ'. Our joint target is to develop an options report for the Austrian Government regarding the seventeen SDGs, so far hosted by 18 Austrian universities. In this vein, the University of Salzburg; i.e., the Centre for Ethics and Poverty Research, the departments of Geography and Geology and the Department of Sociology and Political Science are focusing on the SDG 1 (No Poverty) and SDG 10 (Reduced Inequalities). Our target and research focus is to assess and evaluate the status of SDG 1 and 10 in Austria, to find possible solutions and to support stakeholders' integration. We aim at generating and deducing appropriate options as scientific support, from interdisciplinary research studies to 'Sustainability Developing Goals and their Targets' in action. For this reason, and to deal with the complexity of the Agenda 2030, we have developed a special Model for Inequalities and Poverty Assessment (IPAM). Through the example of 'affordable housing' we provide insight into the situation focusing on sustainable outcomes, including ethical and justice perceptions. The IPAM has proven to be a helpful tool in detecting the different imponderables on the Agenda 2030, assessing the situation, showing gaps and options for ethical SDG actions combining different SDG targets. Supported by expert and expert group interviews, this assessment allows different stakeholders to overview a complex and dynamic SDG challenge (here housing) which is necessary to be involved in an action finding process.

Keywords: affordable housing, inequality, poverty, sustainable development goals

Procedia PDF Downloads 105
7959 Place-Making Theory behind Claremont Court

Authors: Sandra Costa-Santos, Nadia Bertolino, Stephen Hicks, Vanessa May, Camilla Lewis

Abstract:

This paper aims to elaborate the architectural theory on place-making that supported Claremont Court housing scheme (Edinburgh, United Kingdom). Claremont Court (1959-62) is a large post-war mixed development housing scheme designed by Basil Spence, which included ‘place-making’ as one of its founding principles. Although some stylistic readings of the housing scheme have been published, the theory on place-making that allegedly ruled the design has yet to be clarified. The architecture allows us to mark or make a place within space in order to dwell. Under the framework of contemporary philosophical theories of place, this paper aims to explore the relationship between place and dwelling through a cross-disciplinary reading of Claremont Court, with a view to develop an architectural theory on place-making. Since dwelling represents the way we are immersed in our world in an existential manner, this theme is not just relevant for architecture but also for philosophy and sociology. The research in this work is interpretive-historic in nature. It examines documentary evidence of the original architectural design, together with relevant literature in sociology, history, and architecture, through the lens of theories of place. First, the paper explores how the dwelling types originally included in Claremont Court supported ideas of dwelling or meanings of home. Then, it traces shared space and social ties in order to study the symbolic boundaries that allow the creation of a collective identity or sense of belonging. Finally, the relation between the housing scheme and the supporting theory is identified. The findings of this research reveal Scottish architect Basil Spence’s exploration of the meaning of home, as he changed his approach to the mass housing while acting as President of the Royal Incorporation of British Architects (1958-60). When the British Government was engaged in various ambitious building programmes, he sought to drive architecture to a wider socio-political debate as president of the RIBA, hence moving towards a more ambitious and innovative socio-architectural approach. Rather than trying to address the ‘genius loci’ with an architectural proposition, as has been stated, the research shows that the place-making theory behind the housing scheme was supported by notions of community-based on shared space and dispositions. The design of the housing scheme was steered by a desire to foster social relations and collective identities, rather than by the idea of keeping the spirit of the place. This research is part of a cross-disciplinary project funded by the Arts and Humanities Research Council. The findings present Claremont Court as a signifier of Basil Spence’s attempt to address the post-war political debate on housing in United Kingdom. They highlight the architect’s theoretical agenda and challenge current purely stylistic readings of Claremont Court as they fail to acknowledge its social relevance.

Keywords: architectural theory, dwelling, place-making, post-war housing

Procedia PDF Downloads 265
7958 Key Principles and Importance of Applied Geomorphological Maps for Engineering Structure Placement

Authors: Sahar Maleki, Reza Shahbazi, Nayere Sadat Bayat Ghiasi

Abstract:

Applied geomorphological maps are crucial tools in engineering, particularly for the placement of structures. These maps provide precise information about the terrain, including landforms, soil types, and geological features, which are essential for making informed decisions about construction sites. The importance of these maps is evident in risk assessment, as they help identify potential hazards such as landslides, erosion, and flooding, enabling better risk management. Additionally, these maps assist in selecting the most suitable locations for engineering projects. Cost efficiency is another significant benefit, as proper site selection and risk assessment can lead to substantial cost savings by avoiding unsuitable areas and minimizing the need for extensive ground modifications. Ensuring the maps are accurate and up-to-date is crucial for reliable decision-making. Detailed information about various geomorphological features is necessary to provide a comprehensive overview. Integrating geomorphological data with other environmental and engineering data to create a holistic view of the site is one of the most fundamental steps in engineering. In summary, the preparation of applied geomorphological maps is a vital step in the planning and execution of engineering projects, ensuring safety, efficiency, and sustainability. In the Geological Survey of Iran, the preparation of these applied maps has enabled the identification and recognition of areas prone to geological hazards such as landslides, subsidence, earthquakes, and more. Additionally, areas with problematic soils, potential groundwater zones, and safe construction sites are identified and made available to the public.

Keywords: geomorphological maps, geohazards, risk assessment, decision-making

Procedia PDF Downloads 23
7957 Feasibility and Impact of the Community Based Supportive Housing Intervention for Individuals with Chronic Mental Illness in Bangladesh

Authors: Rubina Jahan, Mohammad Zayeed Bin Alam, Razia Sultana, Md. Faroque Miah

Abstract:

Mental health remains a significant global public health challenge, profoundly affecting millions worldwide. In Bangladesh, the situation is dire, with the National Mental Health Survey 2018-19 indicating that 19% of adults suffer from any kind of mental disorders, including severe mental disorder of around 2%. Despite these high prevalence rates, there is a substantial treatment gap in low- and middle-income countries, including Bangladesh, where up to 92% of individuals with mental illnesses do not receive adequate care. This gap is exacerbated by social barriers such as stigma, discrimination, social exclusion, poverty, homelessness, and human rights violations. To address these challenges, the SAJIDA Foundation launched the Proshanti in November 2022. Proshanti is a community based supportive housing intervention designed to provide cost-effective, sustainable, long-term care for individuals with chronic mental illnesses. It aims to rehabilitate participants by improving their mental health, quality of life, and equipping them with skills necessary for independent living and social mobility. Currently, Proshanti operates seven houses in Manikganj and Habiganj districts of Bangladesh, accommodating up to 40 individuals. Over a two-year period, individuals have received personalized support from trained personal assistants and care coordinators, regular health checkups, and opportunities for vocational training and community engagement. In this presentation, we will present the outcome of such intervention on individual’s functionality, quality of life and psychological health generated from 24 months of journey. Additionally, a qualitative approach will be employed to understand the facilitators and barriers of program implementation. The Proshanti program represents a promising model for addressing the significant mental health treatment gap in Bangladesh at the community level. Our findings will provide crucial insights into the program's feasibility, effectiveness, and the factors influencing its implementation, potentially guiding future mental health interventions in similar contexts.

Keywords: mental health, community based supportive housing, treatment gap, bangladesh

Procedia PDF Downloads 51
7956 Knowledge Management Challenges within Traditional Procurement System

Authors: M. Takhtravanchi, C. Pathirage

Abstract:

In the construction industry, project members are conveyor of project knowledge which is, often, not managed properly to be used in future projects. As construction projects are temporary and unique, project members are willing to be recruited once a project is completed. Therefore, poor management of knowledge across construction projects will lead to a considerable amount of knowledge loss; the ignoring of which would be detrimental to project performance. This issue is more prominent in projects undertaken through the traditional procurement system, as this system does not incentives project members for integration. Thus, disputes exist between the design and construction phases based on the poor management of knowledge between those two phases. This paper aims to highlight the challenges of the knowledge management that exists within the traditional procurement system. Expert interviews were conducted and challenges were identified and analysed by the Interpretive Structural Modelling (ISM) approach in order to summarise the relationships among them. Two identified key challenges are the Culture of an Organisation and Knowledge Management Policies. A knowledge of the challenges and their relationships will help project manager and stakeholders to have a better understanding of the importance of knowledge management.

Keywords: challenges, construction industry, knowledge management, traditional procurement system

Procedia PDF Downloads 431
7955 Design and Construction of a Maize Dehusking Machine for Small and Medium-Scale Farmers

Authors: Francis Ojo Ologunagba, Monday Olatunbosun Ale, Lewis A. Olutayo

Abstract:

The economic successes of commercial development of agricultural product processing depend upon the adaptability of each processing stage to mechanization. In maize processing, one of its post-harvest operations that is still facing a major challenge is dehusking. Therefore, a maize dehusking machine that could replace the prevalent traditional method of dehusking maize in developing countries, especially Nigeria was designed, constructed and tested at the Department of Agricultural and Bio-Environmental Engineering Technology, Rufus Giwa Polytechnic, Owo. The basic features of the machine are feeding unit (hopper), housing frame, dehusking unit, drive mechanism and discharge outlets. The machine was tested with maize of 50mm average diameter at 13% moisture content and 2.5mm machine roller clearance. Test results showed appreciable performance with the dehusking efficiency of 92% and throughput capacity of 200 Kg/hr at a machine speed of 400rpm. The estimated production cost of the machine at the time of construction is forty-five thousand, one hundred and eighty nairas (₦45,180) excluding the cost of the electric motor. It is therefore recommended for small and medium-scale maize farmers and processors in Nigeria.

Keywords: construction, dehusking, design, efficiency, maize

Procedia PDF Downloads 324
7954 A Survey of Key Challenges of Adopting Agile in Global Software Development: A Case Study with Malaysia Perspective

Authors: Amna Batool

Abstract:

Agile methodology is the current most popular technique in software development projects. Agile methods in software development bring optimistic impact on software performances, quality and customer satisfaction. There are some organizations and small-medium enterprises adopting agile into their local software development projects as well as in distributed software development projects. Adopting agile methods in local software development projects is valuable. However, agile global software deployment needs an attention. There are different key challenges in agile global software development that need to resolve and enhance the global software development cycles. The proposed systematic literature review investigates all key challenges of agile in global software development. Moreover, a quantitative methodology (an actual survey) targeted to present a real case scenario of these particular key challenges faced by one of the software houses that is BestWeb Malaysia. The outcomes of systematic literature and the results of quantitative methodology are compared with each other to evaluate if the key challenges pointed out in systematic review still exist. The proposed research and its exploratory results can assist small medium enterprises to avoid these challenges by adopting the best practices in their global software development projects. Moreover, it is helpful for novice researchers to get valuable information altogether.

Keywords: agile software development, ASD challenges, agile global software development, challenges in agile global software development

Procedia PDF Downloads 157
7953 Causes of Variation Orders in the Egyptian Construction Industry: Time and Cost Impacts

Authors: A. Samer Ezeldin, Jwanda M. El Sarag

Abstract:

Variation orders are of great importance in any construction project. Variation orders are defined as any change in the scope of works of a project that can be an addition omission, or even modification. This paper investigates the variation orders that occur during construction projects in Egypt. The literature review represents a comparison of causes of variation orders among Egypt, Tanzania, Nigeria, Malaysia and the United Kingdom. A classification of occurrence of variation orders due to owner related factors, consultant related factors and other factors are signified in the literature review. These classified events that lead to variation orders were introduced in a survey with 19 events to observe their frequency of occurrence, and their time and cost impacts. The survey data was obtained from 87 participants that included clients, consultants, and contractors and a database of 42 scenarios was created. A model is then developed to help assist project managers in predicting the frequency of variations and account for a budget for any additional costs and minimize any delays that can take place. Two experts with more than 25 years of experience were given the model to verify that the model was working effectively. The model was then validated on a residential compound that was completed in July 2016 to prove that the model actually produces acceptable results.

Keywords: construction, cost impact, Egypt, time impact, variation orders

Procedia PDF Downloads 183
7952 Marketing Factors Influencing the Decision to Choose Low Cost Airlines

Authors: Noppadol Sritragool

Abstract:

The objectives of this research were to investigate the decision of passengers who choose to fry with low cost airlines and to study marketing factors which have the influence to the decision to choose each low cost airlines. This paper was a quantitative research technique. A total of 400 low cost airlines’ passengers were interviewed via English questionnaire to collect the respondents’ opinions. The findings revealed that respondents were male and female at a similar proportion. The majority had at least an undergraduate degree, have a lower management level jobs, and had income in the range of 25,000 -35,000 baht per month.. In addition, the findings also revealed that the first three marketing factors influencing the decision of the respondents to choose low-cost airlines were low price, direct flight, and online system.

Keywords: decision to choose, marketing factors, low-cost airlines

Procedia PDF Downloads 427
7951 Evaluation of Earthquake Induced Cost for Mid-Rise Buildings

Authors: Gulsah Olgun, Ozgur Bozdag, Yildirim Ertutar

Abstract:

This paper mainly focuses on performance assessment of buildings by associating the damage level with the damage cost. For this purpose a methodology is explained and applied to the representative mid-rise concrete building residing in Izmir. In order to consider uncertainties in occurrence of earthquakes, the structural analyses are conducted for all possible earthquakes in the region through the hazard curve. By means of the analyses, probability of the structural response being in different limit states are obtained and used to calculate expected damage cost. The expected damage cost comprises diverse cost components related to earthquake such as cost of casualties, replacement or repair cost of building etc. In this study, inter-story drift is used as an effective response variable to associate expected damage cost with different damage levels. The structural analysis methods performed to obtain inter story drifts are response spectrum method as a linear one, accurate push-over and time history methods to demonstrate the nonlinear effects on loss estimation. Comparison of the results indicates that each method provides similar values of expected damage cost. To sum up, this paper explains an approach which enables to minimize the expected damage cost of buildings and relate performance level to damage cost.

Keywords: expected damage cost, limit states, loss estimation, performance based design

Procedia PDF Downloads 269
7950 Data Projects for “Social Good”: Challenges and Opportunities

Authors: Mikel Niño, Roberto V. Zicari, Todor Ivanov, Kim Hee, Naveed Mushtaq, Marten Rosselli, Concha Sánchez-Ocaña, Karsten Tolle, José Miguel Blanco, Arantza Illarramendi, Jörg Besier, Harry Underwood

Abstract:

One of the application fields for data analysis techniques and technologies gaining momentum is the area of social good or “common good”, covering cases related to humanitarian crises, global health care, or ecology and environmental issues, among others. The promotion of data-driven projects in this field aims at increasing the efficacy and efficiency of social initiatives, improving the way these actions help humanity in general and people in need in particular. This application field, however, poses its own barriers and challenges when developing data-driven projects, lagging behind in comparison with other scenarios. These challenges derive from aspects such as the scope and scale of the social issue to solve, cultural and political barriers, the skills of main stakeholders and the technological resources available, the motivation to be engaged in such projects, or the ethical and legal issues related to sensitive data. This paper analyzes the application of data projects in the field of social good, reviewing its current state and noteworthy initiatives, and presenting a framework covering the key aspects to analyze in such projects. The goal is to provide guidelines to understand the main challenges and opportunities for this type of data project, as well as identifying the main differential issues compared to “classical” data projects in general. A case study is presented on the initial steps and stakeholder analysis of a data project for the inclusion of refugees in the city of Frankfurt, Germany, in order to empirically confront the framework with a real example.

Keywords: data-driven projects, humanitarian operations, personal and sensitive data, social good, stakeholders analysis

Procedia PDF Downloads 328
7949 A Framework for Systemically Understanding and Increasing Compliance with Water Regulation in Time Limited and Uncertain Contexts

Authors: Luisa Perez-Mujica

Abstract:

Traditionally, non-compliance in water regulation has been understood to be attributable to lack of information or knowledge of regulations. In other words, it is confusing behavioural change and education with communication or regulations. However, compliance is a complex response to water regulation factors including 1) knowledge and understanding of regulations; 2) perception that resources are overregulated; 3) presence of regulatory officers in the field; 4) accurate communication of what is being protected; 5) time lag between behavioral change projects and observation of outcomes and 6) how success of behavioral change is measured and evaluated. This paper presents a framework for designing education and behavioral change projects by understanding non-compliance in terms of the interaction of its factors, including a process for prioritizing projects, actions, evaluation and monitoring of outcomes. By taking a systemic approach to compliance, a more directed type of actions can be efficiently identified and prioritized, preventing the reactive nature of education and behavioral change projects.

Keywords: water regulation, compliance, behaviour change, systems thinking

Procedia PDF Downloads 240
7948 Possibilistic Aggregations in the Investment Decision Making

Authors: I. Khutsishvili, G. Sirbiladze, B. Ghvaberidze

Abstract:

This work proposes a fuzzy methodology to support the investment decisions. While choosing among competitive investment projects, the methodology makes ranking of projects using the new aggregation OWA operator – AsPOWA, presented in the environment of possibility uncertainty. For numerical evaluation of the weighting vector associated with the AsPOWA operator the mathematical programming problem is constructed. On the basis of the AsPOWA operator the projects’ group ranking maximum criteria is constructed. The methodology also allows making the most profitable investments into several of the project using the method developed by the authors for discrete possibilistic bicriteria problems. The article provides an example of the investment decision-making that explains the work of the proposed methodology.

Keywords: expert evaluations, investment decision making, OWA operator, possibility uncertainty

Procedia PDF Downloads 558
7947 Development of an Information System Based on the Establishment and Evaluation of Performance Rating by Application Part/Type of Remodeling Element Technologies

Authors: Sungwon Jung

Abstract:

The percentage of 20 years or older apartment houses in South Korea is approximately 20% (1.55 million houses), and the explosive increase of aged houses is expected around the first planned new towns. Accordingly, we should prepare for social issues such as difficulty of housing lease and degradation of housing performance. The improvement of performance of aged houses is essential for achieving the national energy and carbon reduction goals, and we should develop techniques to respond to the changing construction environment. Furthermore, we should develop a performance evaluation system that is appropriate for the demands of residents such as the improvement of remodeling floor plan by performance improvement in line with the residence type of the housing vulnerable groups such as low-income group and elderly people living alone. For this purpose, remodeling techniques and business models optimized for the target complexes must be spread through the development of various business models. In addition, it is necessary to improve the remodeling business by improving the laws and systems related to the improvement of the residential performance and to prepare techniques to respond to the increasing business demands. In other words, performance improvement and evaluation and knowledge systems need to be researched as new issues related to remodeling that has not been addressed in the existing research.

Keywords: remodelling, performance evaluation, web-based system, big data

Procedia PDF Downloads 224
7946 Strategic Smart-City Projects and the Economic Impact of Prioritizing around Public Facilities: Case Study of Birnin Kebbi, Nigeria

Authors: Abdullateef Abdulkarim Jimoh, Muhammad Lawal A., Usman Muhammad, Hamisu Abdullahi, Nuhu Abdullahi Jega

Abstract:

Smart city projects can be aided by urban development policies in public facilities, but economic resources to finance urban system reorganization is an issue to various governments. This is further compounded with the impact of the slowing down of national economies. The aim of this paper is to emphasize the need to prioritize the economic benefits of smart city projects and, specifically, in towns transforming into cities like Birnin kebbi. The smart-city projects can aim at developing a new form of ‘‘modernity and civilization’’ of the productive economy. This study adopts the descriptive statistical approach to identify the key performance indicators (KPI) for tracking the progress of cities and its developmental objectives. It has been established that numerous aspects of the modernization policies can enhance the competitiveness of territories, particular in aspects of social cohesion, the diffusion of knowledge, creativity, accessibility, etc.

Keywords: economy, economic policy, public facilities, smart city, urbanization

Procedia PDF Downloads 111
7945 Engaging Local Communities on Large-Scale Construction Project

Authors: Melissa Teo

Abstract:

It is increasingly important that project managers develop greater capabilities to better manage the social, cultural, political, environmental and economic impacts on proposed construction projects. These challenges are best resolved in consultation with communities rather than in conflict with them. This is particularly important on controversial projects which are projects that have obtained government sanctioned ‘development approval’ but not ‘community approval’. While a rich body of research and intellectual frameworks exist in the fields of urban geography and planning to understand and manage community concerns during the pre-development approval stages of new projects, current theoretical frameworks guiding community engagement in project management are inadequate. A new and innovative research agenda is needed to guide thinking about the role of local communities in the construction process and is an important research gap that needs to be filled. Within this context, this research aims to assess the effectiveness of strategies adopted by project teams to engage with local communities so as to capture lessons learnt to apply to future projects. This paper reports a research methodology which uses Arnstein’s model of participation to better understand how power differentials between the project team and local communities can influence the adoption of community engagement strategies. A case study approach is utilizing interviews and documentary analysis of a large-scale controversial construction project in Queensland, Australia is presented. The findings will result in a number of recommendations to guide community engagement practices on future projects.

Keywords: community engagement, construction, case study, project management

Procedia PDF Downloads 253
7944 Promoting Innovation Pedagogy in a Capacity Building Project in Indonesia

Authors: Juha Kettunen

Abstract:

This study presents a project that tests and adjusts active European learning and teaching methods in Indonesian universities to increase their external impact on enterprises and other organizations; it also assesses the implementation of the Erasmus+ projects funded by the European Union. The project is based on the approach of innovation pedagogy that responds to regional development needs and integrates applied research and development projects into education to create capabilities for students to participate in development work after graduation. The assessment of the Erasmus+ project resulted in many improvements that can be made to achieve higher quality and innovativeness. The results of this study are useful for those who want to improve the applied research and development projects of higher education institutions.

Keywords: higher education, innovations, social network, project management

Procedia PDF Downloads 286
7943 Integrating Building Information Modeling into Facilities Management Operations

Authors: Mojtaba Valinejadshoubi, Azin Shakibabarough, Ashutosh Bagchi

Abstract:

Facilities such as residential buildings, office buildings, and hospitals house large density of occupants. Therefore, a low-cost facility management program (FMP) should be used to provide a satisfactory built environment for these occupants. Facility management (FM) has been recently used in building projects as a critical task. It has been effective in reducing operation and maintenance cost of these facilities. Issues of information integration and visualization capabilities are critical for reducing the complexity and cost of FM. Building information modeling (BIM) can be used as a strong visual modeling tool and database in FM. The main objective of this study is to examine the applicability of BIM in the FM process during a building’s operational phase. For this purpose, a seven-storey office building is modeled Autodesk Revit software. Authors integrated the cloud-based environment using a visual programming tool, Dynamo, for the purpose of having a real-time cloud-based communication between the facility managers and the participants involved in the project. An appropriate and effective integrated data source and visual model such as BIM can reduce a building’s operational and maintenance costs by managing the building life cycle properly.

Keywords: building information modeling, facility management, operational phase, building life cycle

Procedia PDF Downloads 155
7942 The Current Application of BIM - An Empirical Study Focusing on the BIM-Maturity Level

Authors: Matthias Stange

Abstract:

Building Information Modelling (BIM) is one of the most promising methods in the building design process and plays an important role in the digitalization of the Architectural, Engineering, and Construction (AEC) Industry. The application of BIM is seen as the key enabler for increasing productivity in the construction industry. The model-based collaboration using the BIM method is intended to significantly reduce cost increases, schedule delays, and quality problems in the planning and construction of buildings. Numerous qualitative studies based on expert interviews support this theory and report perceived benefits from the use of BIM in terms of achieving project objectives related to cost, schedule, and quality. However, there is a large research gap in analysing quantitative data collected from real construction projects regarding the actual benefits of applying BIM based on representative sample size and different application regions as well as different project typologies. In particular, the influence of the project-related BIM maturity level is completely unexplored. This research project examines primary data from 105 construction projects worldwide using quantitative research methods. Projects from the areas of residential, commercial, and industrial construction as well as infrastructure and hydraulic engineering were examined in application regions North America, Australia, Europe, Asia, MENA region, and South America. First, a descriptive data analysis of 6 independent project variables (BIM maturity level, application region, project category, project type, project size, and BIM level) were carried out using statistical methods. With the help of statisticaldata analyses, the influence of the project-related BIM maturity level on 6 dependent project variables (deviation in planning time, deviation in construction time, number of planning collisions, frequency of rework, number of RFIand number of changes) was investigated. The study revealed that most of the benefits of using BIM perceived through numerous qualitative studies have not been confirmed. The results of the examined sample show that the application of BIM did not have an improving influence on the dependent project variables, especially regarding the quality of the planning itself and the adherence to the schedule targets. The quantitative research suggests the conclusion that the BIM planning method in its current application has not (yet) become a recognizable increase in productivity within the planning and construction process. The empirical findings indicate that this is due to the overall low level of BIM maturity in the projects of the examined sample. As a quintessence, the author suggests that the further implementation of BIM should primarily focus on an application-oriented and consistent development of the project-related BIM maturity level instead of implementing BIM for its own sake. Apparently, there are still significant difficulties in the interweaving of people, processes, and technology.

Keywords: AEC-process, building information modeling, BIM maturity level, project results, productivity of the construction industry

Procedia PDF Downloads 73