6275 Projectification: Using Project Management Methodology to Manage the Academic Program Review

Authors: Adam Marks, Munir Majdalawieh, Maytha Al Ali

Abstract:

While research is rich with what criteria could be included in the academic program review processes, there is rarely any mention of how this significant and complex process should be managed. This paper proposes using project management methodology in alignment with the program review criteria of the Dickeson’s Prioritizing Academic Programs model. Project management and academic program review share two distinct characteristics; one is their life cycle, and the second is the core knowledge areas they use. This aligned and structured approach offers academic administrators a step-by-step guide that can help them manage this process and effectively assess academic programs.

Keywords: project management, academic program, program review, education, higher education institution, strategic management

Procedia PDF Downloads 359
6274 Shortening Distances: The Link between Logistics and International Trade

Authors: Felipe Bedoya Maya, Agustina Calatayud, Vileydy Gonzalez Mejia

Abstract:

Encompassing inventory, warehousing, and transportation management, logistics is a crucial predictor of firm performance. This has been extensively proven by extant literature in business and operations management. Logistics is also a fundamental determinant of a country's ability to access international markets. Available studies in international and transport economics have shown that limited transport infrastructure and underperforming transport services can severely affect international competitiveness. However, the evidence lacks the overall impact of logistics performance-encompassing all inventory, warehousing, and transport components- on global trade. In order to fill this knowledge gap, the paper uses a gravitational trade model with 155 countries from all geographical regions between 2007 and 2018. Data on logistics performance is obtained from the World Bank's Logistics Performance Index (LPI). First, the relationship between logistics performance and a country’s total trade is estimated, followed by a breakdown by the economic sector. Then, the analysis is disaggregated according to the level of technological intensity of traded goods. Finally, after evaluating the intensive margin of trade, the relevance of logistics infrastructure and services for the extensive trade margin is assessed. Results suggest that: (i) improvements in both logistics infrastructure and services are associated with export growth; (ii) manufactured goods can significantly benefit from these improvements, especially when both exporting and importing countries increase their logistics performance; (iii) the quality of logistics infrastructure and services becomes more important as traded goods are technology-intensive; and (iv) improving the exporting country's logistics performance is essential in the intensive margin of trade while enhancing the importing country's logistics performance is more relevant in the extensive margin.

Keywords: gravity models, infrastructure, international trade, logistics

Procedia PDF Downloads 198
6273 Project and Module Based Teaching and Learning

Authors: Jingyu Hou

Abstract:

This paper proposes a new teaching and learning approach-project and Module Based Teaching and Learning (PMBTL). The PMBTL approach incorporates the merits of project/problem based and module based learning methods, and overcomes the limitations of these methods. The correlation between teaching, learning, practice, and assessment is emphasized in this approach, and new methods have been proposed accordingly. The distinct features of these new methods differentiate the PMBTL approach from conventional teaching approaches. Evaluation of this approach on practical teaching and learning activities demonstrates the effectiveness and stability of the approach in improving the performance and quality of teaching and learning. The approach proposed in this paper is also intuitive to the design of other teaching units.

Keywords: computer science education, project and module based, software engineering, module based teaching and learning

Procedia PDF Downloads 486
6272 Economic Indicators as Correlates of Inward Foreign Direct Investment in Nigeria

Authors: C. F. Popoola, P. Osho, S. B. Babarinde

Abstract:

This study examined economic indicators as correlates of inward FDI. An exploratory research design was used to obtained annual published data on inflation rate, market size, exchange rate, political instability, human development, and infrastructure from Central Bank of Nigeria, National Bureau of Statistics, Nigerian Capital Market, Nigeria Institute of Social and Economic Research, and UNCTAD. Data generated were analyzed using Pearson correlation, analysis of variance and regression. The findings of the study revealed that market size (r = 0.852, p < 0.001), infrastructure (r = 0.264, p < 0.001), human development (r = 0.154, p < 0.01) and exchange rate ( r= 0.178, p < 0.05) correlate positively with inward FDI, while inflation rate (r = -0.88, p < 0.001), and political instability (r= -0.102, p < 0.05) correlate negatively with inward FDI. Findings also revealed that the economic indicators significantly predicted inward FDI (R2 = 0.913; F(1,19) = 29.40; p < 0.05) for Nigeria. It was concluded that exchange rate, market size, human development, and infrastructure positively related to inward FDI while the high level of inflation and political instability negatively related to inward FDI. Therefore, it was suggested that policy makers and government agencies should readdress steps and design policies that would encourage more FDI into the country.

Keywords: exchange rate, foreign direct investment, human development, inflation rate, infrastructure, market size, political instability

Procedia PDF Downloads 407
6271 Modeling a Sustainable City in the Twenty-First Century: A Case Study of Ibadan Oyo State Nigeria

Authors: K. J. Jegede, O. O. Odekunle

Abstract:

The challenges facing government at all levels in the area of urban development are two folds, first is how to provide basic services for urban dwellers especially the urban poor and second, how to make cities and towns as model of good places for economic development. The key ingredients and catalysts for achieving these goals are strong and virile institutional capacity, urban infrastructure and a supportive urban policy framework. The government at all levels have been upgrading and expanding city infrastructure and services in Ibadan, the state capital to support sustainable economic development of the city, particularly in the areas of electricity, neighbourhood, solid waste management, transport, water supply, education, health facilities and markets developments to discourage street trading. This paper attempts to present Ibadan in the millennium as 'a model of a sustainable city'. A planned development strategy that had sustained the growth of the city from a war camp in the 19th century to a cosmopolitan city in the 21st century with the potential to become a megacity. The presentation examines, among others, the physical structure and population density of Ibadan city, the challenges of economic development, the development of urban infrastructure and services in Ibadan metropolitan area. The paper submitted by mapping out a strategy to achieve sustainable development of Ibadan city.

Keywords: megacity, physical structure, sustainable city, urban infrastructure

Procedia PDF Downloads 296
6270 Relationship among Teams' Information Processing Capacity and Performance in Information System Projects: The Effects of Uncertainty and Equivocality

Authors: Ouafa Sakka, Henri Barki, Louise Cote

Abstract:

Uncertainty and equivocality are defined in the information processing literature as two task characteristics that require different information processing responses from managers. As uncertainty often stems from a lack of information, addressing it is thought to require the collection of additional data. On the other hand, as equivocality stems from ambiguity and a lack of understanding of the task at hand, addressing it is thought to require rich communication between those involved. Past research has provided weak to moderate empirical support to these hypotheses. The present study contributes to this literature by defining uncertainty and equivocality at the project level and investigating their moderating effects on the association between several project information processing constructs and project performance. The information processing constructs considered are the amount of information collected by the project team, and the richness and frequency of formal communications among the team members to discuss the project’s follow-up reports. Data on 93 information system development (ISD) project managers was collected in a questionnaire survey and analyzed it via the Fisher Test for correlation differences. The results indicate that the highest project performance levels were observed in projects characterized by high uncertainty and low equivocality in which project managers were provided with detailed and updated information on project costs and schedules. In addition, our findings show that information about user needs and technical aspects of the project is less useful to managing projects where uncertainty and equivocality are high. Further, while the strongest positive effect of interactive use of follow-up reports on performance occurred in projects where both uncertainty and equivocality levels were high, its weakest effect occurred when both of these were low.

Keywords: uncertainty, equivocality, information processing model, management control systems, project control, interactive use, diagnostic use, information system development

Procedia PDF Downloads 286
6269 Conflict Causes within Construction Projects; Conflict Interaction across Project Phases

Authors: Abdullah Mohammed Alshehri

Abstract:

The projects in the construction industry have significantly increased, given its contribution to the overall Gross Domestic Product (GDP) of the countries. Reflecting upon the complex nature and involvement of various agents, the study aims to analyze the conflicts cause within construction projects. Therefore, the study strived to come out with understanding the levels of conflict interaction across project phases. However, this conducted by investigating the association between antecedents and apparent conflicts inherent in. The study used a qualitative approach for collecting the data through a quantitative, semi-structured method. Formation of a questionnaire survey has been conducted for over 30 respondents. However, the survey came out with the identification of 25 conflict cause categories, which can take place in different construction project phases, including pre-design phase, pre-construction phase, construction phase, commissioning, and completion phase. For example, conflicts associated with inconsistencies or discrepancies within or between project documents, which took place at tendering time in the pre-construction phase were relatable with the selection of material specifications that should be supplied or used in the construction projects at the construction phase. Its analysis can provide comprehensive understanding, trace the root of the problem, which offers a roadmap to deepen the understanding of the conflict conditions and ‘course of action’ necessary for project management strategy actions toward avoiding or minimizing conflict causes at project life.

Keywords: construction, conflict causes, levels, interaction, phases

Procedia PDF Downloads 174
6268 ASEAN Limited Centrality in Connectivity: Managing the China-Japan Infrastructure Competition

Authors: Barbora Valockova

Abstract:

Scholars recommend the establishment of a multilateral coordination mechanism by ASEAN, such as an infrastructure forum, to contain the China-Japan infrastructure financing competition in the region. However, they do not systematically investigate the reasons for its absence. This paper aims to fill the gap by addressing the following question: Why has ASEAN been unable to set up any multilateral coordination mechanism to soften the China-Japan infrastructure financing competition? This paper argues that ASEAN has not been able to set up such a mechanism due to its limited centrality in connectivity. This limited centrality decreases ASEAN’s ability to manage the China-Japan competition in a more comprehensive and coordinated way. Rather, ASEAN acts as a scope setter in connectivity, although this is not completely ineffective. This paper is divided into four sections. The first section explores the key tenets of the concept of ASEAN centrality in connectivity, which is under-examined in the current literature. The second section examines the extent to which ASEAN limited centrality in connectivity is being respected by China and Japan. The third section analyses how various stakeholders, such as ASEAN member states, their leaders and bureaucracy, and foreign private companies prevent ASEAN from attaining stronger centrality. The last section concludes and offers recommendations. Data is gathered using primary sources (official ASEAN, Chinese, and Japanese documents, interviews, etc.) and secondary material. By providing a nuanced analysis of ASEAN centrality in connectivity and developing a new operationalization of the concept, this paper aims to contribute to the international relations literature on ASEAN centrality. Initial findings suggest that while ASEAN limited centrality in connectivity has some effectiveness, it is not sufficient for setting up a multilateral coordination mechanism. While it represents a solid departure point, any potential possessed by ASEAN to evolve beyond a scope setter in connectivity is hampered by stakeholders involved in infrastructure development. While these players and their interactions can have both positive and negative effects on the scope set by ASEAN, it is unlikely that they would allow ASEAN to become the real central player. There can be no stronger ASEAN centrality in connectivity without ASEAN unity and neutrality. However, the last two factors are difficult to attain in the context of infrastructure development since ASEAN member states and stakeholders all have their styles and preferences. All other things being equal, these circumstances favor a loose, vague, and quasi-prescriptive arrangement among the relevant stakeholders.

Keywords: ASEAN centrality, China-Japan infrastructure competition, connectivity, scope setter

Procedia PDF Downloads 187
6267 The Management of Urban Facilities in the City of Chlef

Authors: Belakhdar Salah Brahim

Abstract:

The Urban management is a major element of social control of public space and thus the functioning of society. As such, it is a key element of a social conception of sustainable development. Also, it is a cross-cutting sector that relies on land management, infrastructure management, habitat management, management of social services, the management of economic development, etc. This study aims to study how urban management focusing on the study of problems related to urban waste management in developing countries. It appears from the study that the city management is to improve infrastructure and urban services in order to increase the city's development and improve living conditions in cities. It covers various aspects including management of urban space, economic management, administrative management, asset management or infrastructure and finally waste management. Environmental management is important because it solves the pollution problems of life and preserve resources for future generations. Changing perceptions of waste has led to the definition of new policies for integrated waste management requirements appropriate to the urban site.

Keywords: urbanization, urban management, environmental management, waste management

Procedia PDF Downloads 424
6266 Towards the Need of Resilient Design and Its Assessment in South China

Authors: Alan Lai, Wilson Yik

Abstract:

With rapid urbanization, there has been a dramatic increase in global urban population in Asia and over half of population in Asia will live in urban regions in the near future. Facing with increasing exposure to climate-related stresses and shocks, most of the Asian cities will very likely to experience more frequent heat waves and flooding with rising sea levels, particularly the coastal cities will grapple for intense typhoons and storm surges. These climate changes have severe impacts in urban areas at the costs of infrastructure and population, for example, human health, wellbeing and high risks of dengue fever, malaria and diarrheal disease. With the increasing prominence of adaptation to climate changes, there have been changes in corresponding policies. Smaller cities have greater potentials for integrating the concept of resilience into their infrastructure as well as keeping pace with their rapid growths in population. It is therefore important to explore the potentials of Asian cities adapting to climate change and the opportunities of building climate resilience in urban planning and building design. Furthermore, previous studies have mainly attempted at exploiting the potential of resilience on a macro-level within urban planning rather than that on micro-level within the context of individual building. The resilience of individual building as a research field has not yet been much explored. Nonetheless, recent studies define that the resilience of an individual building is the one which is able to respond to physical damage and recover from such damage in a quickly and cost-effectively manner, while maintain its primary functions. There is also a need to develop an assessment tool to evaluate the resilience on building scale which is still largely uninvestigated as it should be regarded as a basic function of a building. Due to the lack of literature reporting metric for assessing building resilience with sustainability, the research will be designed as a case study to provide insight into the issue. The aim of this research project is to encourage and assist in developing neighborhood climate resilience design strategies for Hong Kong so as to bridge the gap between difference scales and that between theory and practice.

Keywords: resilience cities, building resilience, resilient buildings and infrastructure, climate resilience, hot and humid southeast area, high-density cities

Procedia PDF Downloads 159
6265 A Construction Scheduling Model by Applying Pedestrian and Vehicle Simulation

Authors: Akhmad F. K. Khitam, Yi Tai, Hsin-Yun Lee

Abstract:

In the modern research of construction management, the goals of scheduling are not only to finish the project within the limited duration, but also to improve the impact of people and environment. Especially for the impact to the pedestrian and vehicles, the considerable social cost should be estimated in the total performance of a construction project. However, the site environment has many differences between projects. These interactions affect the requirement and goal of scheduling. It is difficult for schedule planners to quantify these interactions. Therefore, this study use 3D dynamic simulation technology to plan the schedule of the construction engineering projects that affect the current space users (i.e., the pedestrians and vehicles). The proposed model can help the project manager find out the optimal schedule to minimize the inconvenience brought to the space users. Besides, a roadwork project and a building renovation project were analyzed for the practical situation of engineering and operations. Then this study integrates the proper optimization algorithms and computer technology to establish a decision support model. The proposed model can generate a near-optimal schedule solution for project planners.

Keywords: scheduling, simulation, optimization, pedestrian and vehicle behavior

Procedia PDF Downloads 133
6264 The Effect of the Construction Contract System by Simulating the Comparative Costs of Capital to the Financial Feasibility of the Construction of Toll Bali Mandara

Authors: Mas Pertiwi I. G. AG Istri, Sri Kristinayanti Wayan, Oka Aryawan I. Gede Made

Abstract:

Ability of government to meet the needs of infrastructure investment constrained by the size of the budget commitments for other sectors. Another barrier is the complexity of the process of land acquisition. Public Private Partnership can help bridge the investment gap by including the amount of funding from the private sector, shifted the responsibility of financing, construction of the asset, and the operation and post-project design and care to them. In principle, a construction project implementation always requires the investor as a party to provide resources in the form of funding which it must be contained in a successor agreement in the form of a contract. In general, construction contracts consist of contracts which passed in Indonesia and contract International. One source of funding used in the implementation of construction projects comes from funding that comes from the collaboration between the government and the private sector, for example with the system: BLT (Build Lease Transfer), BOT (Build Operate Transfer), BTO (Build Transfer Operate) and BOO (Build Operate Own). And form of payment under a construction contract can be distinguished several ways: monthly payment, payments based on progress and payment after completed projects (Turn Key). One of the tools used to analyze the feasibility of the investment is to use financial models. The financial model describes the relationship between different variables and assumptions used. From a financial model will be known how the cash flow structure of the project, which includes revenues, expenses, liabilities to creditors and the payment of taxes to the government. Net cash flow generated from the project will be used as a basis for analyzing the feasibility of investment source of project financing Public Private Partnership could come from equity or debt. The proportion of funding according to its source is a comparison of a number of investment funds originating from each source of financing for a total investment cost during the construction period by selected the contract system and several alternative financing percentage ratio determined according to sources will generate cash flow structure that is different. Of the various possibilities for the structure of the cash flow generated will be analyzed by software is to test T Paired to compared the contract system used by various alternatives comparison of financing to determine the effect of the contract system and the comparison of such financing for the feasibility of investment toll road construction project for the economic life of 20 (twenty) years. In this use case studies of toll road contruction project Bali Mandara. And in this analysis only covered two systems contracts, namely Build Operate Transfer and Turn Key. Based on the results obtained by analysis of the variable investment feasibility of the NPV, BCR and IRR between the contract system Build Operate Transfer and contract system Turn Key on the interest rate of 9%, 12% and 15%.

Keywords: contract system, financing, internal rate of return, net present value

Procedia PDF Downloads 222
6263 Preliminary Investigation of Hospital Buildings Maintenance Management in Malaysia

Authors: Christtestimony Oluwafemi Jesumoroti, AbdulLateef Ashola Olanrewaju, Khor Soo Cheen

Abstract:

The worth of buildings is known by the quality of the maintenance imbibe in them. Maintenance management being carried out in the hospitals has a direct impact on the performance of the hospital buildings, environment, and sustainable infrastructure, and as such, there is a need to give it adequate attention. The media and reports on hospital buildings maintenance management in Malaysia were not favorable. Hospital buildings in Malaysia need to have proper structure for maintenance management and sustainability as this will enhance the good infrastructure for users and the entire nation. The paper reports the preliminary results of the determinants of maintenance in hospital buildings. To achieve the aim of this research, a survey questionnaire was administered to the users of the hospital buildings. The findings of the study revealed that there are lack of maintenance standard, use of poor quality components and materials, Improper response time, Poor complaint reporting system. Hence, the influent of rework, thorough responsibilities of quality performance of hospital buildings, and others are the results of the investigations.

Keywords: sustainable infrastructure, optimum performance, implementation, key performance indicators, maintenance policies

Procedia PDF Downloads 144
6262 A Project Screening System for Energy Enterprise Based on Dempster-Shafer Theory

Authors: Woosik Jang, Seung Heon Han, Seung Won Baek

Abstract:

Natural gas (NG) is an energy resource in a few countries, and most NG producers do business in politically unstable countries. In addition, as 90% of the LNG market is controlled by a small number of international oil companies (IOCs) and national oil companies (NOCs), entry of latecomers into the market is extremely limited. To meet these challenges, project viability needs to be assessed based on limited information from a project screening perspective. However, the early stages of the project have the following difficulties: (1) What are the factors to consider? (2) How many professionals do you need to decide? (3) How to make the best decision with limited information? To address this problem, this study proposes a model for evaluating LNG project viability based on the Dempster-Shafer theory (DST). A total of 11 indicators for analyzing the gas field, reflecting the characteristics of the LNG industry, and 23 indicators for analyzing the market environment, were identified. The proposed model also evaluates the LNG project based on the survey and provides uncertainty of the results based on DST as well as quantified results. Thus, the proposed model is expected to be able to support the decision-making process of the gas field project using quantitative results as a systematic framework, and it was developed as a stand-alone system to improve its usefulness in practice. Consequently, the amount of information and the mathematical approach are expected to improve the quality and opportunity of decision making for LNG projects for enterprises.

Keywords: project screen, energy enterprise, decision support system, Dempster-Shafer theory

Procedia PDF Downloads 335
6261 Adding Security Blocks to the DevOps Lifecycle

Authors: Andrew John Zeller, Francis Pouatcha

Abstract:

Working according to the DevOps principle has gained in popularity over the past decade. While its extension DevSecOps started to include elements of cybersecurity, most real-life projects do not focus risk and security until the later phases of a project as teams are often more familiar with engineering and infrastructure services. To help bridge the gap between security and engineering, this paper will take six building blocks of cybersecurity and apply them to the DevOps approach. After giving a brief overview of the stages in the DevOps lifecycle, the main part discusses to what extent six cybersecurity blocks can be utilized in various stages of the lifecycle. The paper concludes with an outlook on how to stay up to date in the dynamic world of cybersecurity.

Keywords: information security, data security, cybersecurity, devOps, IT management

Procedia PDF Downloads 101
6260 To Improve or Not to Improve Reflections from Jerash Urban Improvement Project, Jordan

Authors: Dina Dahood Dabash

Abstract:

Palestine Refugee Camps have never been settings that can be overlooked; they even became (as physical settings) a cornerstone topic of negotiations whenever Palestinian matters are on the table (specifically in Jordan). Consequently, maintaining the familiar face of the camp with its dilapidated shelters and narrow streets that rarely allowed its residents to extinguish a fire or evacuate a building safely has become a fundamental method to protect the “right of the return” from the perspective of various stakeholders. When the Infrastructure and Camp Improvement Programme (ICIP) was established in 2007 as an additional UNRWA program, some concerns were raised around the newly established section, mainly due to its direct impact on the “image” of the camp through a provision of a relatively nonconventional service that differs from what the Agency used to provide in the past seventy years. By presenting the Urban Improvement Project in Jerash camp (UIP) -Jordan, this paper aims to contribute to the ongoing discussion around enduring the improvement of Palestine refugee camps “programmatically” in UNRWA or not. The UIP as a co-product by UNRWA and the camp’s community within one of the most vulnerable refugee camps in Jordan offers a remarkable opportunity to excerpt lessons that can contribute to the strategic shaping of the ICIP. The paper concludes with five mine uptakes mainly related to community engagement, power structures and UNRWA's role in camps.

Keywords: camp improvement program, Jerash camp, Palestine refugee camps, UNRWA.

Procedia PDF Downloads 199
6259 Implementation of an Economic – Probabilistic Model to Risk Analysis of ERP Project in Technological Innovation Firms – A Case Study of ICT Industry in Iran

Authors: Reza Heidari, Maryam Amiri

Abstract:

In a technological world, many countries have a tendency to fortifying their companies and technological infrastructures. Also, one of the most important requirements for developing technology is innovation, and then, all companies are struggling to consider innovation as a basic principle. Since, the expansion of a product need to combine different technologies, therefore, different innovative projects would be run in the firms as a base of technology development. In such an environment, enterprise resource planning (ERP) has special significance in order to develop and strengthen of innovations. In this article, an economic-probabilistic analysis was provided to perform an implementation project of ERP in the technological innovation (TI) based firms. The used model in this article assesses simultaneously both risk and economic analysis in view of the probability of each event that is jointly between economical approach and risk investigation approach. To provide an economic-probabilistic analysis of risk of the project, activities and milestones in the cash flow were extracted. Also, probability of occurrence of each of them was assessed. Since, Resources planning in an innovative firm is the object of this project. Therefore, we extracted various risks that are in relation with innovative project and then they were evaluated in the form of cash flow. This model, by considering risks affecting the project and the probability of each of them and assign them to the project's cash flow categories, presents an adjusted cash flow based on Net Present Value (NPV) and with probabilistic simulation approach. Indeed, this model presented economic analysis of the project based on risks-adjusted. Then, it measures NPV of the project, by concerning that these risks which have the most effect on technological innovation projects, and in the following measures probability associated with the NPV for each category. As a result of application of presented model in the information and communication technology (ICT) industry, provided an appropriate analysis of feasibility of the project from the point of view of cash flow based on risk impact on the project. Obtained results can be given to decision makers until they can practically have a systematically analysis of the possibility of the project with an economic approach and as moderated.

Keywords: cash flow categorization, economic evaluation, probabilistic, risk assessment, technological innovation

Procedia PDF Downloads 399
6258 Remote Building: An Integrated Approach to Domestic Rainwater Harvesting System Implementation in a Rural Village in Himachal Pradesh, India

Authors: Medha Iyer, Anshul Paul, Aunnesha Bhowmick, Anahita Banerjee, Sana Prasad, Anoushka Singal, Lauren Sinopoli, Pooja Bapat, Shivi Jain

Abstract:

In Himachal Pradesh, India, a majority of the population lives in rural villages spread throughout its hilly regions; many of these households rely on subsistence farming as their main source of livelihood. The student-run non-profit organization affiliated with this study, Project RISHI (Rural India Social and Health Improvement), works to promote sustainable development practices in Bharog Baneri, a gram panchayat, or union, of villages in Himachal Pradesh. In 2017, an established rainwater harvesting (RWH) project group within Project RISHI had surveyed many families, finding that the most common issue regarding food and water access was a lack of accessible water sources for agricultural use in the dry season. After a prototype build in 2018, the group built 6 systems for eligible residents that demonstrated need in 2019. Subsequently, the project went through an evaluation period, including self-evaluation of project goals and post-impact surveying of system recipients. The group used the social impact assessment model to optimize the implementation of domestic RWH systems in Bharog Baneri. Assessing implementation after in-person builds produced three pillars of focus — system design, equitable recipient selection, and community involvement. After two years of remote involvement during COVID-19, the group prepared to visit Bharog Baneri to build 10 new systems in the Summer 2022. First, the group created a more durable and cost-effective design that could withstand debris and heavy rains to prevent gutter failure. The domestic system design is a rooftop RWH catchment system with two tanks attached, an overflow pipe, debris filtration, and a spigot for accessibility. The group also developed a needs-based eligibility methodology with assistance from village leaders and surveying in Bharog Baneri and set up the groundwork for a future community board. COVID-19 has strengthened remote work, telecommunications, and other organizational support systems. As sustainable development evolves to encompass these practices in a post-pandemic world, the potential for new RWH system design and implementation processes has emerged as well. This raises the question: how can a social impact assessment of rural RWH projects inform an integrated approach to post-pandemic RWH system practices? The objective of this exploratory study is to investigate and evaluate a novel remote build infrastructure that brings access to reliable and sustainable sources of water for agricultural use. To construct the remote build approach, the group identified and assigned a point of contact who was experienced with previous RWH system builds. The recipients were selected based on demonstrated need and ease of building. The contact visited each of the houses and coordinated supplier relations and transportation of the materials in accordance with the participatory approach to sustainable development. Over the course of two months, the group completed four system builds with the resulting infrastructure. The infrastructure adhered to the social impact assessment model by centering supplier relations, material transportation, and construction logistics within the community. The conclusion of this exploration is that post-pandemic rural RWH practices should be rooted in strengthening villager communication and utilizing local assets. Through this, non-profit organizations can incorporate remote build strategies into their long-term goals.

Keywords: capturing run-off from rooftops, domestic rainwater harvesting, Implementation approaches and strategies, rainwater harvesting and management in rural sectors

Procedia PDF Downloads 85
6257 Environmental Impact Assessment Methodology of the Tirana–Elbasan Road Project

Authors: Aurora Cerri, Niko Pollojani

Abstract:

The Tirana – Elbasan Road project is the most important highway project in Albania, constructed in the period May 2011 - ongoing. This project included construction of 38 km highway category road including 2.6 km of tunnel. It serves as a corridor connecting the Tirana, Capital of Albania and South-East area, and in the near future it is expected to continue in the direction of Macedonian border. Environmental Impact Assesment procedure for this project is provided by the Albanian Environmental Law No. 10431. This law establishes the regulation of procedures for identifying, assessment and reporting on the effects of certain projects on the environment, and the associated administrative procedures, during the decision-making process by the Ministry of Environment and Tourism for issuing environmental permit, and ensures that all relevant information concerning the environment are provided and considered. Due to the nature and size of the project, during the environmental impact assessment process, the European Union legislation, namely the EIA Directive 85/337 / EEC is considered. Moreover, in some cases, due to the lack of national standards and practical guidelines, when necessary those of EU member countries are considered. This paper presents an analysis of the EIA procedure followed on ‘Tirana – Elbasan’ Road project, with a focus on the application of the main stages of the procedure such as: screening, scoping, review, the EIA report; and consideration of alternatives, measures for impact prevention and reduction, and the public hearing T/discussion.

Keywords: highway, environmental impact assesment, Tirana, prevention

Procedia PDF Downloads 312
6256 Synchronous Versus Asynchronous Telecollaboration in Intercultural Communication

Authors: Vita Kalnberzina, Lauren Miller Anderson

Abstract:

The aim of the paper is to report on the results of the telecollaboration project results carried out between the students of the University of Latvia, National Louis University in the US, and Austral University in Chili during the Intercultural Communication course. The objectives of the study are 1) to compare different forms of student telecollaboration and virtual exchange, 2) to collect and analyse the student feedback on the telecollaboration project, 3) to evaluate the products (films) produced during the telecollaboration project. The methods of research used are as follows: Survey of the student feedback after the project, video text analysis of the films produced by the students, and interview of the students participating in the project. We would like to compare the results of a three-year collaboration project, where we tried out synchronous telecollaboration and asynchronous collaboration. The different variables that were observed were the impact of the different time zones, different language proficiency levels of students, and different curricula developed for collaboration. The main findings suggest that the effort spent by students to organize meetings in different time zones and to get to know each other diminishes the quality of the product developed and thus reduces the students' feeling of accomplishment. Therefore, we would like to propose that asynchronous collaboration where the national teams work on a film project specifically developed by the students of one university for the students of another university ends up with a better quality film, which in its turn appeals more to the students of the other university and creates a deeper intercultural bond between the collaborating students.

Keywords: telecollaboration, intercultural communication, synchronous collaboration, asynchronous collaboration

Procedia PDF Downloads 95
6255 Employing a Flipped Classroom Approach to Support Project-Based Learning

Authors: Kian Jon Chua, Islam Md Raisul

Abstract:

Findings on a research study conducted for a group of year-2 engineering students participating in a flipped classroom (FC) experience that is judiciously incorporated into project-based learning (PBL) module are presented. The chief purpose of the research is to identify whether if the incorporation of flipped classroom approach to project-based learning indeed yields a positive learning experience for engineering students. Results are presented and compared from the two classes of students – one is subjected to a traditional PBL learning mode while the other undergoes a hybrid PBL-FC learning format. Some themes related to active learning, problem-solving ability, teacher as facilitator, and degree of self-efficacy are also discussed. This paper hopes to provide new knowledge and insights relating to the introduction of flipped classroom learning to a project-based engineering module. Some potential study limitations and future directions to address them are also presented.

Keywords: hybrid project-based learning, flipped classroom, problem-solving, active learning

Procedia PDF Downloads 130
6254 The Experiences of Agency in the Utilization of Twitter for English Language Learning in a Saudi EFL Context

Authors: Fahd Hamad Alqasham

Abstract:

This longitudinal study investigates Saudi students’ use trajectory and experiences of Twitter as an innovative tool for in-class learning of the English language in a Saudi tertiary English as a foreign language (EFL) context for a 12-week semester. The study adopted van Lier’s agency theory (2008, 2010) as the analytical framework to obtain an in-depth analysis of how the learners’ could utilize Twitter to create innovative ways for them to engage in English learning inside the language classroom. The study implemented a mixed methods approach, including six data collection instruments consisting of a research log, observations, focus group participation, initial and post-project interviews, and a post-project questionnaire. The study was conducted at Qassim University, specifically at Preparatory Year Program (PYP) on the main campus. The sample included 25 male students studying in the first level of PYP. The findings results revealed that although Twitter’s affordances initially paled a crucial role in motivating the learners to initiate their agency inside the classroom to learn English, the contextual constraints, mainly anxiety, the university infrastructure, and the teacher’s role negatively influenced the sustainability of Twitter’s use past week nine of its implementation.

Keywords: CALL, agency, innovation, EFL, language learning

Procedia PDF Downloads 69
6253 Major Causes of Delay in Construction Projects

Authors: Y. Gholipour, E. Rezazadeh

Abstract:

Delay is one of the most serious and common problems of construction project that can affect project delivery unfavorably. This research presents the most important causes of delay in large dam projects based on a survey on some executed dam construction in Iran. In this survey a randomly selected samples of owners, consultants and contractors have been involved. The outcome of this survey revealed that scheduled payments, site management, shop drawing review process, unforeseen ground conditions and contractor experience as the most important factors affecting on delay in dam construction projects.

Keywords: delay, dam construction, project management, Iran

Procedia PDF Downloads 437
6252 The Study of Strength and Weakness Points of Various Techniques for Calculating the Volume of Done Work in Civil Projects

Authors: Ali Fazeli Moslehabadi

Abstract:

One of the topics discussed in civil projects, during the execution of the project, which the continuous change of work volumes is usually the characteristics of these types of projects, is how to calculate the volume of done work. The difference in volumes announced by the execution unit with the estimated volume by the technical office unit, has direct effect on the announced progress of the project. This issue can show the progress of the project more or less than actual value and as a result making mistakes for stakeholders and project managers and misleading them. This article intends to introduce some practical methods for calculating the volume of done work in civil projects. It then reviews the strengths and weaknesses of each of them, in order to resolve these contradictions and conflicts.

Keywords: technical skills, systemic skills, communication skills, done work volume calculation techniques

Procedia PDF Downloads 151
6251 An Approach to Specify Software Requirements in Semantic Form

Authors: Deepa Vijay, Chellammal Surianarayanan, Gopinath Ganapathy

Abstract:

Requirements of a software project serve as a guideline for the entire project team which enable the team towards producing the right outcome. As requirements are the key in deciding the success of the project, it should be specified in an unambiguous manner. Also, the requirements should be complete and consistent. It should be interpreted in the same way by the entire software project team as the customer interprets. Specifying requirements in textual manner is common in software development. This leads to poor understanding of the requirements which results in more errors and degraded quality. There are some literatures which focus on semantic way of specifying functional requirement which ensure the consistency and completeness of requirements. Alternately in the work, a method is proposed to map the syntactic requirements with corresponding semantics in the form of ontologies. This improves the understanding of requirements, prevents errors and improves quality.

Keywords: functional requirement, ontology, requirements management, semantics

Procedia PDF Downloads 360
6250 Text2Time: Transformer-Based Article Time Period Prediction

Authors: Karthick Prasad Gunasekaran, B. Chase Babrich, Saurabh Shirodkar, Hee Hwang

Abstract:

Construction preparation is crucial for the success of a construction project. By involving project participants early in the construction phase, project managers can plan ahead and resolve issues early, resulting in project success and satisfaction. This study uses quantitative data from construction management projects to determine the relationship between the pre-construction phase, construction schedule, and customer satisfaction. This study examined a total of 65 construction projects and 93 clients per job to (a) identify the relationship between the pre-construction phase and program reduction and (b) the pre-construction phase and customer retention. Based on a quantitative analysis, this study found a negative correlation between pre-construction status and project schedule in 65 construction projects. This finding means that the more preparatory work done on a particular project, the shorter the total construction time. The Net Promoter Score of 93 clients from 65 projects was then used to determine the relationship between construction preparation and client satisfaction. The pre-construction status and the projects were further analyzed, and a positive correlation between them was found. This shows that customers are happier with projects with a higher ready-to-build ratio than projects with less ready-to-build.

Keywords: NLP, BERT, LLM, deep learning, classification

Procedia PDF Downloads 96
6249 Exploring the Critical Success Factors of Construction Stakeholders Team Effectiveness

Authors: Olusegun Akinsiku, Olukayode Oyediran, Koleola Odusami

Abstract:

A construction project is usually made up of a variety of stakeholders whose interests may positively or negatively impact on the outcome of the project execution. The variability of project stakeholders is apparent in their cultural differences, professional background and ethics, and differences in ideas. The need for the effectiveness of construction teams has been investigated as this is an important aspect to meeting client’s expectations in the construction industry. This study adopts a cross-sectional descriptive survey with the purpose of identifying the critical success factors (CSFs) associated with the team effectiveness of construction projects stakeholders, their relationship and the effects on construction project performance. The instrument for data collection was a designed questionnaire which was administered to construction professionals in the construction industry in Lagos State, Nigeria using proportionate stratified sampling. The highest ranked identified CSFs include “team trust”, “esprit de corps among members” and “team cohesiveness”. Using factor analysis and considering the effects of team cohesiveness on project performance, the identified CSFs were categorized into three groups namely cognitive attributes, behavior and processes attributes and affective attributes. All the three groups were observed to have a strong correlation with project performance. The findings of this study are useful in helping construction stakeholders benchmark the team effectiveness factors that will guarantee project success.

Keywords: construction, critical success factors, performance, stakeholders, team effectiveness

Procedia PDF Downloads 125
6248 Relevance of the Tokyo Trial: A Comparative Perspective

Authors: Nalanda Roy

Abstract:

The project will offer a fresh and critical perspective into the Tokyo Trial judgment led by the Indian Jurist Dr. Radha Binod Pal. The project will focus on the Third World Approach to International Law (TWAIL) methodology to examine the relevance of international law from the post-colonial perspectives. The project will analyze Pal’s dissenting arguments from a new and comparative perspective, apply for work from other disciplines, and create an understanding of the significance of the historic judgment considering its contemporary relevance, and fill in the gaps that exist in the call for global justice.

Keywords: Tokyo trial, third world, judgment, international law

Procedia PDF Downloads 85
6247 Extraction of Grapefruit Essential Oil from Grapefruit Peels

Authors: Adithya Subramanian, S. Ananthan, T. Prasanth, S. P. Selvabharathi

Abstract:

This project involves extraction of grapefruit essential oil from grapefruit peels using various oils like castor oil, gingelly oil, olive oil as carrier oils. The main aim of this project is to extract the oil which has numerous medicinal uses. The extraction can be performed by two methods. Project involves extraction of the oil with various carrier oil in a view to reduce the cost of production and the physical properties of the extracted oil are examined.

Keywords: essential oil, carrier oil, medicinal uses, cost of production

Procedia PDF Downloads 430
6246 REITs India- New Investment Avenue for Financing Urban Infrastructure in India

Authors: Rajat Kapoor

Abstract:

Indian Real Estate sector is the second largest employer after agriculture and is slated to grow at 30 percent over the next decade. Indian cities have shown tumultuous growth since last two decades. With the growing need of infrastructure, it has become inevitable for real estate sector to adopt more organized and transparent system of investment. SPVs such as REITs ensure transparency facilitating accessibility to invest in real estate for those who find it difficult to purchase real estate as an investment option with a realistic income expectation from their investment. RIETs or real estate investment trusts is an instrument of pooling funds similar to that of mutual funds. In a simpler term REIT is an Investment Vehicle in the form a trust which holds & manages large commercial rent¬ earning properties on behalf of investors and distributes most of its profit as dividends. REIT enables individual investors to invest their money in commercial real estate assets in a diversified portfolio and on the other hand provides fiscal liquidity to developers as easy exit option and channel funds for new projects. However, the success REIT is very much dependent on the taxation structure making such models attractive and adaptive enough for both developers and investors to opt for such investment option. This paper is intended to capture an overview of REITs with context to Indian real estate scenario.

Keywords: Indian real estate, real estate infrastructure trusts, urban finance, infrastructure investment trusts