8800 Presenting a Model Based on Artificial Neural Networks to Predict the Execution Time of Design Projects

Authors: Hamed Zolfaghari, Mojtaba Kord

Abstract:

After feasibility study the design phase is started and the rest of other phases are highly dependent on this phase. forecasting the duration of design phase could do a miracle and would save a lot of time. This study provides a fast and accurate Machine learning (ML) and optimization framework, which allows a quick duration estimation of project design phase, hence improving operational efficiency and competitiveness of a design construction company. 3 data sets of three years composed of daily time spent for different design projects are used to train and validate the ML models to perform multiple projects. Our study concluded that Artificial Neural Network (ANN) performed an accuracy of 0.94.

Keywords: time estimation, machine learning, Artificial neural network, project design phase

Procedia PDF Downloads 63
8799 Impact of Safety and Quality Considerations of Housing Clients on the Construction Firms’ Intention to Adopt Quality Function Deployment: A Case of Construction Sector

Authors: Saif Ul Haq

Abstract:

The current study intends to examine the safety and quality considerations of clients of housing projects and their impact on the adoption of Quality Function Deployment (QFD) by the construction firm. Mixed method research technique has been used to collect and analyze the data wherein a survey was conducted to collect the data from 220 clients of housing projects in Saudi Arabia. Then, the telephonic and Skype interviews were conducted to collect data of 15 professionals working in the top ten real estate companies of Saudi Arabia. Data were analyzed by using partial least square (PLS) and thematic analysis techniques. Findings reveal that today’s customer prioritizes the safety and quality requirements of their houses and as a result, construction firms adopt QFD to address the needs of customers. The findings are of great importance for the clients of housing projects as well as for the construction firms as they could apply QFD in housing projects to address the safety and quality concerns of their clients.

Keywords: construction industry, quality considerations, quality function deployment, safety considerations

Procedia PDF Downloads 102
8798 An Approach for Reliably Transforming Habits Towards Environmental Sustainability Behaviors Among Young Adults

Authors: Dike Felix Okechukwu

Abstract:

Studies and reports from authoritative sources such as the Intergovernmental Panel on Climate Change (IPCC) have stated that to effectively solve environmental sustainability challenges such as pollution, inappropriate waste disposal, and unsustainable consumption, there is a need for more research to seek solutions towards environmentally sustainable behavior. However, literature thus far reports only sporadic developments of TL in Environmental Sustainability because there are scarce reports showing the reliable process(es) to produce TL - for sustainability projects or otherwise. Nonetheless, a recently published article demonstrates how TL can be used to help young adults gain transformed mindsets and habits toward environmental sustainability behaviors and practices. This study, however, does not demonstrate, on a repeated basis, the dependability of the method or reliability of the procedures in using its proposed methodology to help young adults achieve transformed habits towards environmental sustainability behaviors, especially in diverse contexts. In this study, it is demonstrated, through repeated measures, a reliable process that can be used to achieve transformations in habits and mindsets toward environmental sustainability behaviors. To achieve this, the design adopted is multiple case studies and a thematic analysis techniques. Five cases in diverse contexts were used to analyze pieces of evidence of Transformative Learning Outcomes toward environmentally sustainable behaviors. Results from the study offer fresh perspectives on a reliable methodology that can be adopted to achieve Transformations in Habits and mindsets toward environmental sustainability behaviors.

Keywords: environmental sustainability, transformative learning, behaviour, learning, education

Procedia PDF Downloads 71
8797 Ex Situ Conservation Practices for Rare Plants in Living Collections

Authors: Erika Pénzesné Kónya

Abstract:

The conservation programme of various vascular plant species has been started in the Botanical garden o fEszterházy College in Eger cooperating with two national parks in the Northern mountain region and Botanical garden of Eötvös Lóránd University in Budapest. The seeds of the species were collected in the chosen habitats with the permission determined by the National Parks and the conservation specialists. Now we have different numbers of individuals from mainly endemic and relict species. We took some experiments to know how can we germinate and grow up this species succesfully up to blooming and fruiting. In the temperate zone the majority of species after ripening the seeds or corps get dormancy to avoid the inadequate period to germinate. The seeds of species need variously pre-treatment (for example pre-chill) and suitable environment (for example basic medium) to unlock the seed dormancy and germinate in large scale. This impacts are often similar to in their originally habitat. To bloom the plants need suitable types of soil, but we couldn’t grow them in the most fruitful soil of habitat. Suitable microclimate is usually more important for some relict species than the soil, that’s why should we make experiments to find the suitable essential conditions for different species and know all of fenological states of them. These experiments can start a method for growing common wild native plants as food materials.

Keywords: ex situ conservation, germination success, soil preference Hungary, regionality, native wild plants

Procedia PDF Downloads 268
8796 Sustainable Tourism and Heritage in Sığacık/Seferihisar

Authors: Sibel Ecemiş Kılıç, Muhammed Aydoğan

Abstract:

The rapid development of culture tourism has drawn attention to conserving cultural values especially by developing countries that would like to benefit from the economic contribution this type of tourism attracts. Tourism can have both positive and negative outcomes for historical settlements and their residents. The accommodation-purposed rehabilitation and revitalization project in “Sigacik Old City Zone” are to be discussed with spatial, economic, social and organizational dimensions. It is aimed to evaluate the relationship between the development of tourism and sustainable heritage conservation.

Keywords: Sığacık, urban conservation, sustainable tourism, Seferihisar

Procedia PDF Downloads 490
8795 Collaborative Governance in Dutch Flood Risk Management: An Historical Analysis

Authors: Emma Avoyan

Abstract:

The safety standards for flood protection in the Netherlands have been revised recently. It is expected that all major flood-protection structures will have to be reinforced to meet the new standards. The Dutch Flood Protection Programme aims at accomplishing this task through innovative integrated projects such as construction of multi-functional flood defenses. In these projects, flood safety purposes will be combined with spatial planning, nature development, emergency management or other sectoral objectives. Therefore, implementation of dike reinforcement projects requires early involvement and collaboration between public and private sectors, different governmental actors and agencies. The development and implementation of such integrated projects has been an issue in Dutch flood risk management since long. Therefore, this article analyses how cross-sector collaboration within flood risk governance in the Netherlands has evolved over time, and how this development can be explained. The integrative framework for collaborative governance is applied as an analytical tool to map external factors framing possibilities as well as constraints for cross-sector collaboration in Dutch flood risk domain. Supported by an extensive document and literature analysis, the paper offers insights on how the system context and different drivers changing over time either promoted or hindered cross-sector collaboration between flood protection sector, urban development, nature conservation or any other sector involved in flood risk governance. The system context refers to the multi-layered and interrelated suite of conditions that influence the formation and performance of complex governance systems, such as collaborative governance regimes, whereas the drivers initiate and enable the overall process of collaboration. In addition, by applying a method of process tracing we identify a causal and chronological chain of events shaping cross-sectoral interaction in Dutch flood risk management. Our results indicate that in order to evaluate the performance of complex governance systems, it is important to firstly study the system context that shapes it. Clear understanding of the system conditions and drivers for collaboration gives insight into the possibilities of and constraints for effective performance of complex governance systems. The performance of the governance system is affected by the system conditions, while at the same time the governance system can also change the system conditions. Our results show that the sequence of changes within the system conditions and drivers over time affect how cross-sector interaction in Dutch flood risk governance system happens now. Moreover, we have traced the potential of this governance system to shape and change the system context.

Keywords: collaborative governance, cross-sector interaction, flood risk management, the Netherlands

Procedia PDF Downloads 111
8794 Impact of Project Leader's Style on the Success of the Projects

Authors: Saadia Khalid

Abstract:

This paper discusses the various leadership styles of project manager which lead to the success of a project since it is important for a project manager to understand and adopt the skills required to cope up with the modern challenges of any project. A project manager must be able to handle a project effectively and efficiently and be ready to assess the factors effecting success or failure of the project. A project manager must be capable of handling a project by managing, directing and leading the projects with requisite knowledge and skills. In this paper a project manager’s characteristics linkage to project success have been developed and analyzed for three different projects/industries. A web-based survey has also been carried out which revealed that specific leadership styles/traits can lead to better performance and success of organizations. Some basic factors like project complexity, the age, gender and nationality of the project manager and type of project also play a vital role in success of a project.

Keywords: leadership style, project success, project management, project manager

Procedia PDF Downloads 399
8793 Hybridization Potential of Oreochromis Niloticus (Nile Tilapia) with Oreochromis Jipe (Tilapia Jipe) in View of Lake Jipe Fishery Genetic Conservation

Authors: Mercy Chepkirui, Paul Orina, Priscilla Boera, Judith Achoki

Abstract:

Oreochromis jipe is a tropical freshwater bentho-pelagic fish belonging to the Cichlid family that is endemic to the Pangani River basin and Lake Jipe in Kenya and northern Tanzania, while Oreochromis niloticus inhabits the Lake Victoria basin with reported cases in Lake jipe too. Unlike O. jipe, Oreochromis niloticus is spreading across the globe due to its cultural potential. This, however, could cause genetic purity concerns in the event of cross-breeding among the tilapiines, which is already taking place in the wild. The study envisaged establishing the possibility of hybridization among the two species under aquaculture conditions and phenotypically informing the difference between pure and cross lines. Two hundred sixteen mature brooders weighing 100-120g were selected randomly, 108 of Oreochromis Jipe and 108 of Oreochromis niloticus; for each trial, 72 males and 144 females were distributed into 3 crosses, each grouped in triplicates (Oreochromis niloticus (♀) X Oreochromis niloticus(♂);Oreochromis niloticus (♂) X Oreochromis jipe ( ♀); Oreochromis jipe (♂) X Oreochromis niloticus (♀); Oreochromis jipe (♂) X Oreochromis jipe (♀). All trials had the F1 generation, which is currently undergoing growth trials and assessing its viability for the 2nd generation. The results indicated that Oreochromis niloticus has better growth, followed by crosses (Oreochromis niloticus X Oreochromis jipe) and, finally, pure line Oreochromis jipe. Further, pure Oreochromis jipe F1 demonstrated potential for aquaculture adoption despite its recent introduction into aquaculture; thus, this will help towards the conservation of indigenous fish species of Lake Jipe fishery, which is currently under the Internationa Union for Conservation of Nature Red List of endangered fish species. However, there is a need to inform the purity of existing Oreochromis jipe wild stocks to inform genetic material conservation.

Keywords: biodiversity, climate change, fisheries, oreochromis jipe, conservation

Procedia PDF Downloads 94
8792 The Efficacy of Contractual Governance on Task and Relationship Conflict in Construction Projects

Authors: Jingya You, Yongqiang Chen, Yuanyuan Hua, Wenqian Wang

Abstract:

Conflict is commonplace in construction projects, and construction projects always involve designing contracts between the owner and the contractor. However, how the contract affects the level of conflict between the owner and the contractor has not been elaborated. The purpose of this paper is to explain the effects of contractual complexity on the level of conflict, including task conflict and relationship conflict, and then to demonstrate the moderating role played by the interdependence between the owner and the contractor. Using data from owners and general contractors in the Chinese construction industry, this research reveals that contractual control will reduce relationship conflict. Contractual coordination will also reduce relationship conflict by the mediating effect of task conflict. Besides, under high joint interdependence, the positive relationship between task conflict and relationship conflict is strengthened, while high interdependence asymmetry has effects on weakening the relationship between task conflict and relationship conflict. The findings provide guidance for contract designers to draft suitable contracts in order to effectively deal with conflict. Additionally, this research implies that project managers should highlight the importance of contract in conflict management.

Keywords: construction projects, contract governance, interdependence, relationship conflict, task conflict

Procedia PDF Downloads 190
8791 A Quantitative Analysis of the Conservation of Resources, Burnout, and Other Selected Behavioral Variables among Law Enforcement Officers

Authors: Nathan Moran, Robert Hanser, Attapol Kuanliang

Abstract:

The purpose of this study is to determine the relationship between personal and social resources and burnout for police officers. Current conceptualizations of the condition of burnout are challenged as being too phenomenological and ambiguous, and consequently, not given to direct empirical testing. The conservation of resources model is based on the supposition that people strive to retain, protect, and build resources as a means to protect them from the impacts of burnout. The model proposes that the effects of stress (i.e. burnout) can be manifested in personal and professional attitudes and attributes, which can measure burnout using self-reports to provide strong support for the conservation of resources model, in that, personal and professional demands are related to the exhaustion component of burnout, whereas personal and professional resources can be compiled to counteract the negative impact of the burnout condition. Highly similar patterns of burnout resistance factors were witnessed in police officers in two department precincts (N:81). In addition, results confirmed the positive influence of key demographic variables in burnout resistance using the conservation of resources model. Participants in this study are all sheriff’s deputies with a populous county in a Pacific Northwestern state (N = 274). Four instruments will be used in this quantitative study for data collection (a) a series of demographic questions, (b) the Organizational Citizenship Behavior, (c) the PANAS-X Scale (OCB: Watson& Clark, 1994), and (d) The Maslach Burnout Inventory.

Keywords: behavioral, burnout, law enforcement, quantitative

Procedia PDF Downloads 255
8790 Flexibility Cost and Its Application for Construction Projects

Authors: Rashmi Shahu

Abstract:

Flexibility is becoming a more widely accepted aspect of project management. Although contingency theory in project management states that the unknowns are controllable, complexity theory believes that the best way to handle the unknowns would be to have a flexible approach rather than rigidity. Designing a flexible system is a method of managing uncertainty. The present research work aims to evaluate flexibility in the initial design phase of projects taking examples of construction projects. Flexibility in the initial design phase is modeled in order to know the advantage in future. The comparison between the extra cost of flexibility in the initial design phase and the discount that can be achieved in future due to this premium will help the developers in making strategic decisions. This research uses a methodology for valuing flexibility by developing a mathematical formula for predicting future saving of cost. Two case studies were considered in this research to validate the mathematical formula. This research explains three case studies of an educational institution 28 years old for explaining the concept and giving benefits of flexible design for modification/renovation work of building.

Keywords: flexibility, future saving, flexibility cost, construction projects

Procedia PDF Downloads 335
8789 Semi-Natural Meadows of Natura 2000 Habitats – Conservation and Renewable Energy Source

Authors: Mateusz Meserszmit, Mariusz Chrabąszcz, Adriana Trojanowska-Olichwer, Zygmunt Kącki

Abstract:

Semi-natural meadows are valuable communities from the point of view of biodiversity, but their survival is strongly related to human activity. Unfortunately, the current status of preservation of extensively used meadows in Europe is frequently assessed as “unfavorable”. This is due to agricultural activity, in particular the lack of appropriate conservation procedures such as the cutting of meadows or livestock grazing. However, for more effective protective measures, the preservation of the biological diversity of meadows requires an interdisciplinary approach from both scientists and practitioners from many fields. Our research aimed to present the possibility of conservation of semi-natural meadows using cut biomass for the production of bioenergy – biogas, taking into consideration the botanical characteristics of the studied habitat and the chemical properties of biomass. A field study was conducted in Poland, within an area covered by the European Union's nature conservation programme. The samples were collected on four dates (May 24th, July 1st, July 23rd, and September 1st) from a study site established within a Molinion meadow. The biomass collected at the earliest date mostly consisted of plants with flowers in bud or fully open flowers. At the later harvest dates, most plants were at the fruiting or seed shed stage. An earlier stage of plant growth contributed to a lower biomass yield, which also resulted in a lower methane yield per hectare. The methane yield per hectare was at the end of May 482 m3 CH4 ha-1, at the beginning of July 867 m3 CH4 ha-1, at the end of July 759 m3 CH4 ha-1 and at the beginning of September 730 m3 CH4 ha-1. The biomass harvested in May demonstrated a significantly higher content of the elements: N, P, and K, but a lower Ca content compared to later harvested biomass, which may affect the biogas production process. The use of hay as a source of renewable energy can become an important element of conservation adapted for this type of habitat.

Keywords: nature conservation, biomass, bioenergy, grassland

Procedia PDF Downloads 87
8788 Hominin Niche in the Times of Climate Change

Authors: Emilia Hunt, Sally C. Reynolds, Fiona Coward, Fabio Parracho Silva, Philip Hopley

Abstract:

Ecological niche modeling is widely used in conservation studies, but application to the extinct hominin species is a relatively new approach. Being able to understand what ecological niches were occupied by respective hominin species provides a new perspective into influences on evolutionary processes. Niche separation or overlap can tell us more about specific requirements of the species within the given timeframe. Many of the ancestral species lived through enormous climate changes: glacial and interglacial periods, changes in rainfall, leading to desertification or flooding of regions and displayed impressive levels of adaptation necessary for their survival. This paper reviews niche modeling methodologies and their application to hominin studies. Traditional conservation methods might not be directly applicable to extinct species and are not comparable to hominins. Hominin niche also includes aspects of technologies, use of fire and extended communication, which are not traditionally used in building conservation models. Future perspectives on how to improve niche modeling for extinct hominin species will be discussed.

Keywords: hominin niche, climate change, evolution, adaptation, ecological niche modelling

Procedia PDF Downloads 171
8787 The Analysis of Swales Model (Cars Model) in the UMT Final Year Engineering Students

Authors: Kais Amir Kadhim

Abstract:

Context: The study focuses on the rhetorical structure of chapters in engineering final year projects, specifically the Introduction chapter, written by UMT (University of Marine Technology) engineering students. Existing research has explored the use of genre-based approaches to analyze the writing of final year projects in various disciplines. Research Aim: The aim of this study is to investigate the rhetorical structure of Introduction chapters in engineering final year projects by UMT students. The study aims to identify the frequency of communicative moves and their constituent steps within the Introduction chapters, as well as understand how students justify their research projects. Methodology: The research design will utilize a mixed method approach, combining both quantitative and qualitative methods. Forty Introduction chapters from two different fields in UMT engineering undergraduate programs will be selected for analysis. Findings: The study intends to identify the types of moves present in the Introduction chapters of engineering final year projects by UMT students. Additionally, it aims to determine if these moves and steps are obligatory, conventional, or optional. Theoretical Importance: The study draws upon Bunton's modified CARS (Creating a Research Space) model, which is a conceptual framework used for analyzing the introduction sections of theses. By applying this model, the study contributes to the understanding of the rhetorical structure of Introduction chapters in engineering final year projects. Data Collection: The study will collect data from forty Introduction chapters of engineering final year projects written by UMT engineering students. These chapters will be selected from two different fields within UMT's engineering undergraduate programs. Analysis Procedures: The analysis will involve identifying and categorizing the communicative moves and their constituent steps within the Introduction chapters. The study will utilize both quantitative and qualitative analysis methods to examine the frequency and nature of these moves. Question Addressed: The study aims to address the question of how UMT engineering students structure and justify their research projects within the Introduction chapters of their final year projects. Conclusion: The study aims to contribute to the knowledge of rhetorical structure in engineering final year projects by investigating the Introduction chapters written by UMT engineering students. By using a mixed method research design and applying the modified CARS model, the study intends to identify the types of moves and steps employed by students and explore their justifications for their research projects. The findings have the potential to enhance the understanding of effective academic writing in engineering disciplines.

Keywords: cohesive markers, learning, meaning, students

Procedia PDF Downloads 52
8786 Cost Overrun in Construction Projects

Authors: Hailu Kebede Bekele

Abstract:

Construction delays are suitable where project events occur at a certain time expected due to causes related to the client, consultant, and contractor. Delay is the major cause of the cost overrun that leads to the poor efficiency of the project. The cost difference between completion and the originally estimated is known as cost overrun. The common ways of cost overruns are not simple issues that can be neglected, but more attention should be given to prevent the organization from being devastated to be failed, and financial expenses to be extended. The reasons that may raised in different studies show that the problem may arise in construction projects due to errors in budgeting, lack of favorable weather conditions, inefficient machinery, and the availability of extravagance. The study is focused on the pace of mega projects that can have a significant change in the cost overrun calculation.15 mega projects are identified to study the problem of the cost overrun in the site. The contractor, consultant, and client are the principal stakeholders in the mega projects. 20 people from each sector were selected to participate in the investigation of the current mega construction project. The main objective of the study on the construction cost overrun is to prioritize the major causes of the cost overrun problem. The methodology that was employed in the construction cost overrun is the qualitative methodology that mostly rates the causes of construction project cost overrun. Interviews, open-ended and closed-ended questions group discussions, and rating qualitative methods are the best methodologies to study construction projects overrun. The result shows that design mistakes, lack of labor, payment delay, old equipment and scheduling, weather conditions, lack of skilled labor, payment delays, transportation, inflation, and order variations, market price fluctuation, and people's thoughts and philosophies, the prior cause of the cost overrun that fail the project performance. The institute shall follow the scheduled activities to bring a positive forward in the project life.

Keywords: cost overrun, delay, mega projects, design

Procedia PDF Downloads 39
8785 Conflict Causes within Construction Projects; Conflict Interaction across Project Phases

Authors: Abdullah Mohammed Alshehri

Abstract:

The projects in the construction industry have significantly increased, given its contribution to the overall Gross Domestic Product (GDP) of the countries. Reflecting upon the complex nature and involvement of various agents, the study aims to analyze the conflicts cause within construction projects. Therefore, the study strived to come out with understanding the levels of conflict interaction across project phases. However, this conducted by investigating the association between antecedents and apparent conflicts inherent in. The study used a qualitative approach for collecting the data through a quantitative, semi-structured method. Formation of a questionnaire survey has been conducted for over 30 respondents. However, the survey came out with the identification of 25 conflict cause categories, which can take place in different construction project phases, including pre-design phase, pre-construction phase, construction phase, commissioning, and completion phase. For example, conflicts associated with inconsistencies or discrepancies within or between project documents, which took place at tendering time in the pre-construction phase were relatable with the selection of material specifications that should be supplied or used in the construction projects at the construction phase. Its analysis can provide comprehensive understanding, trace the root of the problem, which offers a roadmap to deepen the understanding of the conflict conditions and ‘course of action’ necessary for project management strategy actions toward avoiding or minimizing conflict causes at project life.

Keywords: construction, conflict causes, levels, interaction, phases

Procedia PDF Downloads 157
8784 Integration of Wireless Sensor Networks and Radio Frequency Identification (RFID): An Assesment

Authors: Arslan Murtaza

Abstract:

RFID (Radio Frequency Identification) and WSN (Wireless sensor network) are two significant wireless technologies that have extensive diversity of applications and provide limitless forthcoming potentials. RFID is used to identify existence and location of objects whereas WSN is used to intellect and monitor the environment. Incorporating RFID with WSN not only provides identity and location of an object but also provides information regarding the condition of the object carrying the sensors enabled RFID tag. It can be widely used in stock management, asset tracking, asset counting, security, military, environmental monitoring and forecasting, healthcare, intelligent home, intelligent transport vehicles, warehouse management, and precision agriculture. This assessment presents a brief introduction of RFID, WSN, and integration of WSN and RFID, and then applications related to both RFID and WSN. This assessment also deliberates status of the projects on RFID technology carried out in different computing group projects to be taken on WSN and RFID technology.

Keywords: wireless sensor network, RFID, embedded sensor, Wi-Fi, Bluetooth, integration, time saving, cost efficient

Procedia PDF Downloads 307
8783 3D Printing Technology in Housing Projects Construction

Authors: Mohammed F. Haddad, Mohammad A. Albenayyan

Abstract:

Realistically, 3-D printing as a technology has not yet reached the required maturity level to handle construction housing projects for citizens on a country scale. However, potentially, it has all of the required elements for addressing this issue. There are two main high-level elements of this technology that need to be capitalized on in order for the technology to reach its full potential, technical and logistical. This paper aims to cover how 3-D printing can be a viable technical solution for housing projects and describe the impact of 3-D printing technical features on the logistical aspects of completing a housing project. Additionally, a perspective about 3-D printing in Saudi Arabia will be presented in order to give the reader an idea of where the kingdom stands in the deployment of this technology. Finally, a glimpse will be given regarding the potential utilization of this technology for space applications.

Keywords: large-scale 3-D printing, additive manufacturing, D- shape, contour crafting

Procedia PDF Downloads 107
8782 The Conservation of the Roman Mosaics in the Museum of Sousse, Tunisia: Between Doctrines and Practices

Authors: Zeineb Yousse, Fakher Kharrat

Abstract:

Mosaic is a part of a broad universal cultural heritage; sometimes it represents a rather essential source for the researches on the everyday life of some of the previous civilizations. Tunisia has one of the finest and largest collections of mosaics in the world, which is essentially exhibited in the Museums of Bardo and Sousse. Restored and reconstituted, they bear witnesses to hard work. Our paper deals with the discipline of conservation of Roman mosaics based on the proceedings of the workshop of the Museum of Sousse. Thus, we highlight two main objectives. In the first place, it is a question of revealing the techniques adopted by professionals to handle mosaics and to which school of conservation these techniques belong. In the second place, we are going to interpret the works initiated to preserve the archaeological heritage in order to protect it in present time and transmit it to future generations. To this end, we paid attention to four Roman mosaics currently exhibited in the Museum of Sousse. These Mosaics show different voids or gaps at the level of their surfaces and the method used to fill these gaps seems to be interesting to analyze. These mosaics are known under the names of: Orpheus Charming the Animals, Gladiator and Bears, Stud farm of Sorothus and finally Head of Medusa. The study on the conservation passes through two chained phases. We start with a small historical overview in order to gather information related to the original location, the date of its composition as well as the description of its image. Afterward, the intervention process is analyzed by handling three complementary elements which are: diagnosis of the existing state, the study of the medium processing and the study of the processing of the tesselatum surface which includes the pictorial composition of the mosaic. Furthermore, we have implemented an evaluation matrix with six operating principles allowing the assessment of the appropriateness of the intervention. These principles are the following: minimal intervention, reversibility, compatibility, visibility, durability, authenticity and enhancement. Various accumulated outcomes are pointing out the techniques used to fill the gaps as well as the level of compliance with the principles of conservation. Accordingly, the conservation of mosaics in Tunisia is a practice that combines various techniques without really arguing about the choice of a particular theory.

Keywords: conservation, matrix, museum of Sousse, operating particular theory, principles, Roman mosaics

Procedia PDF Downloads 305
8781 Branding Tourism Destinations; The Trending Initiatives for Edifice Image Choices of Foreign Policy

Authors: Mehtab Alam, Mudiarasan Kuppusamy, Puvaneswaran Kunaserkaran

Abstract:

The purpose of this paper is to bridge the gap and complete the relationship between tourism destinations and image branding as a choice of edifice foreign policy. Such options became a crucial component for individuals interested in leisure and travel activities. The destination management factors have been evaluated and analyzed using the primary and secondary data in a mixed-methods approach (quantitative sample of 384 and qualitative 8 semi-structured interviews at saturated point). The study chose the Environmental Management Accounting (EMA) and Image Restoration (IR) theories, along with a schematic diagram and an analytical framework supported by NVivo software 12, for two locations in Abbottabad, KPK, Pakistan: Shimla Hill and Thandiani. This incorporates the use of PLS-SEM model for assessing validity of data while SPSS for data screening of descriptive statistics. The results show that destination management's promotion of tourism has significantly improved Pakistan's state image. The use of institutional setup, environmental drivers, immigration, security, and hospitality as well as recreational initiatives on destination management is encouraged. The practical ramifications direct the heads of tourism projects, diplomats, directors, and policymakers to complete destination projects before inviting people to Pakistan. The paper provides the extent of knowledge for academic tourism circles to use tourism destinations as brand ambassadors.

Keywords: tourism, management, state image, foreign policy, image branding

Procedia PDF Downloads 47
8780 Role of Non-Timber Forest Products in Local Livelihood and Household Economies in Resource-Rich vs. Resource Poor Forest Area of Mizoram

Authors: Uttam Kumar Sahoo, K. Lalhmingsangi, J. H. Lalremruati

Abstract:

Non-timber forest resources particularly the high-value, low volume NTFPs has drawn interest as an activity all over the world during the past three decades that could raise standards of living for the rural folks while being compatible with forest conservation. This is particularly true for the people living in and around or fringes of protected areas. However, the economics that plays between resources’ stock and its utilization by the humans is yet to be validated and evaluated logistically. A study was therefore designed to understand the linkages between resource (especially NTFPs) availability and their utilization, existing threats to this biodiversity conservation and the role of NTFPs within the livelihood systems of those households that are most directly involved in creating conservation threats. About 25% of the households were sampled from the two sites ‘resource-rich’ and ‘resource poor’ area of Dampa Tiger Reserve (Western boundary). Our preliminary findings suggest that the collection of relatively high-volume and low value NTFPs such as fuelwood, fodder has caused degradation of forest resources while the low-volume and high-value NTFPs such as wild edible mushrooms, vegetables, other specialty food products, inputs to crafts, medicinal plants have resulted into species promotion/conservation through their domestication in traditional agroforestry systems including home gardens and/or collateral protection of the Tiger Reserve. It is thus suggested that proper assessment of these biodiversities, their direct and indirect valuation, market and non-market profits etc be carried out in greater details which would result in prescribing effective management plans around the park.

Keywords: household economy, livelihood strategies, non-timber forest products, species conservation

Procedia PDF Downloads 168
8779 Feasibility Study of a Solar Farm Project with an Executive Approach

Authors: Amir Reza Talaghat

Abstract:

Since 2015, a new approach and policy regarding energy resources protection and using renewable energies has been started in Iran which was developing new projects. Investigating about the feasibility study of these new projects helped to figure out five steps to prepare an executive feasibility study of the concerned projects, which are proper site selections, authorizations, design and simulation, economic study and programming, respectively. The results were interesting and essential for decision makers and investors to start implementing of these projects in reliable condition. The research is obtained through collection and study of the project's documents as well as recalculation to review conformity of the results with GIS data and the technical information of the bidders. In this paper, it is attempted to describe the result of the performed research by describing the five steps as an executive methodology, for preparing a feasible study of installing a 10 MW – solar farm project. The corresponding results of the research also help decision makers to start similar projects is explained in this paper as follows: selecting the best location for the concerned PV plant, reliable and safe conditions for investment and the required authorizations to start implementing the solar farm project in the concerned region, selecting suitable component to achieve the best possible performance for the plant, economic profit of the investment, proper programming to implement the project on time.

Keywords: solar farm, solar energy, execution of PV power plant PV power plant

Procedia PDF Downloads 151
8778 Application of Agile Project Management to Construction Projects: Case Study

Authors: Ran Etgar, Sarit Freund

Abstract:

Agile project management (APM) has been developed originally for software development project. Construction projects seemed to be more apt to traditional water-fall approach than to APM. However, Construction project suffers from similar problems that necessitated the invention of APM, mainly the need to break down the project structure to small increments, thus minimizing the needed managerial planning and design. Since the classical structure of APM is not applicable the way it is to construction project, a modified version of APM was devised. This method, nicknamed 'The anchor method', exploits the fundamentals of APM (i.e., iterations, or sprints of short time frames or timeboxes, cross-functional teams, risk reduction and adaptation to changes) and adjust them to the construction world. The projects had to be structured appropriately to proactively and quickly adapt to change. The method aims to encompass human behavior and lean towards adaptivity rather than predictability. To enable smooth application of the method, a special project management software was developed, so as to provide solid administrational help and accurate data. The method is tested on a bunch of construction projects and some key performance indicators (KPIs) are collected. According to preliminary results the method is indeed very advantageous and with proper assimilation can radically change the construction project management paradigm.

Keywords: agile project management, construction, information systems, project management

Procedia PDF Downloads 106
8777 Legal Basis for Water Resources Management in Brazil: Case Study of the Rio Grande Basin

Authors: Janaína F. Guidolini, Jean P. H. B. Ometto, Angélica Giarolla, Peter M. Toledo, Carlos A. Valera

Abstract:

The water crisis, a major problem of the 21st century, occurs mainly due to poor management. The central issue that should govern the management is the integration of the various aspects that interfere with the use of water resources and their protection, supported by legal basis. A watershed is a unit of water interacting with the physical, biotic, social, economic and cultural variables. The Brazilian law recognized river basin as the territorial management unit. Based on the diagnosis of the current situation of the water resources of the Rio Grande Basin, a discussion informed in the Brazilian legal basis was made to propose measures to fight or mitigate damages and environmental degradation in the Basin. To manage water resources more efficiently, conserve water and optimize their multiple uses, the integration of acquired scientific knowledge and management is essential. Moreover, it is necessary to monitor compliance with environmental legislation.

Keywords: conservation of soil and water, environmental laws, river basin, sustainability

Procedia PDF Downloads 253
8776 An Argument for Agile, Lean, and Hybrid Project Management in Museum Conservation Practice: A Qualitative Evaluation of the Morris Collection Conservation Project at the Sainsbury Centre for Visual Arts

Authors: Maria Ledinskaya

Abstract:

This paper is part case study and part literature review. It seeks to introduce Agile, Lean, and Hybrid project management concepts from business, software development, and manufacturing fields to museum conservation by looking at their practical application on a recent conservation project at the Sainsbury Centre for Visual Arts. The author outlines the advantages of leaner and more agile conservation practices in today’s faster, less certain, and more budget-conscious museum climate where traditional project structures are no longer as relevant or effective. The Morris Collection Conservation Project was carried out in 2019-2021 in Norwich, UK, and concerned the remedial conservation of around 150 Abstract Constructivist artworks bequeathed to the Sainsbury Centre by private collectors Michael and Joyce Morris. It was a medium-sized conservation project of moderate complexity, planned and delivered in an environment with multiple known unknowns – unresearched collection, unknown conditions and materials, unconfirmed budget. The project was later impacted by the COVID-19 pandemic, introducing indeterminate lockdowns, budget cuts, staff changes, and the need to accommodate social distancing and remote communications. The author, then a staff conservator at the Sainsbury Centre who acted as project manager on the Morris Project, presents an incremental, iterative, and value-based approach to managing a conservation project in an uncertain environment. The paper examines the project from the point of view of Traditional, Agile, Lean, and Hybrid project management. The author argues that most academic writing on project management in conservation has focussed on a Traditional plan-driven approach – also known as Waterfall project management – which has significant drawbacks in today’s museum environment due to its over-reliance on prediction-based planning and its low tolerance to change. In the last 20 years, alternative Agile, Lean and Hybrid approaches to project management have been widely adopted in software development, manufacturing, and other industries, although their recognition in the museum sector has been slow. Using examples from the Morris Project, the author introduces key principles and tools of Agile, Lean, and Hybrid project management and presents a series of arguments on the effectiveness of these alternative methodologies in museum conservation, including the ethical and practical challenges to their implementation. These project management approaches are discussed in the context of consequentialist, relativist, and utilitarian developments in contemporary conservation ethics. Although not intentionally planned as such, the Morris Project had a number of Agile and Lean features which were instrumental to its successful delivery. These key features are identified as distributed decision-making, a co-located cross-disciplinary team, servant leadership, focus on value-added work, flexible planning done in shorter sprint cycles, light documentation, and emphasis on reducing procedural, financial, and logistical waste. Overall, the author’s findings point in favour of a hybrid model, which combines traditional and alternative project processes and tools to suit the specific needs of the project.

Keywords: agile project management, conservation, hybrid project management, lean project management, waterfall project management

Procedia PDF Downloads 52
8775 Environmental Impact Assessment Methodology of the Tirana–Elbasan Road Project

Authors: Aurora Cerri, Niko Pollojani

Abstract:

The Tirana – Elbasan Road project is the most important highway project in Albania, constructed in the period May 2011 - ongoing. This project included construction of 38 km highway category road including 2.6 km of tunnel. It serves as a corridor connecting the Tirana, Capital of Albania and South-East area, and in the near future it is expected to continue in the direction of Macedonian border. Environmental Impact Assesment procedure for this project is provided by the Albanian Environmental Law No. 10431. This law establishes the regulation of procedures for identifying, assessment and reporting on the effects of certain projects on the environment, and the associated administrative procedures, during the decision-making process by the Ministry of Environment and Tourism for issuing environmental permit, and ensures that all relevant information concerning the environment are provided and considered. Due to the nature and size of the project, during the environmental impact assessment process, the European Union legislation, namely the EIA Directive 85/337 / EEC is considered. Moreover, in some cases, due to the lack of national standards and practical guidelines, when necessary those of EU member countries are considered. This paper presents an analysis of the EIA procedure followed on ‘Tirana – Elbasan’ Road project, with a focus on the application of the main stages of the procedure such as: screening, scoping, review, the EIA report; and consideration of alternatives, measures for impact prevention and reduction, and the public hearing T/discussion.

Keywords: highway, environmental impact assesment, Tirana, prevention

Procedia PDF Downloads 293
8774 Preserving Egypt's Cultural Heritage Amidst Urban Development: A Case Study of the Historic Cairo Cemetery

Authors: Ali Mahfouz

Abstract:

Egypt's cultural heritage and artistic riches find themselves at a complex intersection of preservation and urban development, where they face intricate challenges exacerbated by climate change, pollution, urbanization, and construction activities. In this research, it delves into the multifaceted dynamics involved in conserving Egypt's heritage within urban contexts, spotlighting the historic Cairo cemetery as a poignant and timely case study. The historic Cairo cemetery serves as a repository of priceless cultural assets, housing the final resting places of public figures, artists, historians, politicians, and other luminaries. These graves are adorned with magnificent artworks and rare tombstones, collectively representing an irreplaceable slice of Egypt's history and culture. Yet, the looming threat of demolition to make way for new infrastructure projects underscores the delicate equilibrium that preservation efforts must maintain in the face of urban development pressures. This paper illuminates the collaborative efforts of historians, intellectuals, and civil society organizations who are determined to forestall the destruction of this invaluable cultural heritage. Their initiatives, driven by a shared commitment to documenting and safeguarding the cemetery's treasures, underscore the urgent imperative of protecting Egypt's cultural legacy. Through this case study, It gain insights into how Egypt navigates the challenges of preserving its rich heritage amidst urban expansion and a changing climate, emphasizing the broader importance of heritage conservation in an evolving world.

Keywords: Egypt’s cultural heritage, urban development, historic Cairo cemetery, tombstone artworks, demolition threat, heritage conservation, civil society initiatives

Procedia PDF Downloads 53
8773 Appraisal of Transaction Cost in South African Construction Projects

Authors: Kenneth O. Otasowie, Matthew Ikuabe, Clinton Aigbavboa, Ayodeji Oke

Abstract:

Construction project cost are not only made up of production costs. This cost comprises of many other elements such as the preparation of a bidding document, cost estimations, drafting contractual agreements and monitoring that contractual obligations are met. Several studies have stressed the need for transaction costs (TC) to be defined in a way that covers all phases of a project and not only the pre-contract phase. Hence, this study aims to appraise transaction cost in South African (SA) construction projects by assessing what constitutes transaction cost, influencing factors and possible optimisation measures. A survey design was adopted. A total number of eighty (80) questionnaires were administered to quantity surveyors, procurement managers and project managers in Guateng Province, SA and seventy-two (72) were returned and found suitable for analysis. Collected data was analysed using percentage, mean item score, standard deviation, one-sample t-test. The findings show that external technical interaction, uncertainty, human factors are the most significant constituents of TC in SA, while technical competency, experience in similar project type and project characteristics are the leading influencing factors. Furthermore, understanding project characteristics, clear communication and technically competent project teams are most of the significant measures for optimising TC in SA construction projects. Therefore, this study recommends that a competent project team and a clear communication are fundamental to proper management of TC in SA construction projects.

Keywords: construction projects, project cost, South Africa, transaction cost

Procedia PDF Downloads 77
8772 Lessons-Learned in a Post-Alliance Framework

Authors: Olubukola Olumuyiwa Tokede, Dominic D. Ahiaga-Dagbui, John Morrison

Abstract:

The project environment in construction has been widely criticised for its inability to learn from experience effectively. As each project is bespoke, learning is ephemeral, as it is often confined within its bounds and seldom assimilated with others that are being delivered in the project environment. To engender learning across construction projects, collaborative contractual arrangements, such as alliancing and partnering, have been embraced to aid the transferability of lessons across projects. These cooperative arrangements, however, tend to be costly, and hence construction organisations could revert to less expensive traditional procurement approaches after successful collaborative project delivery. This research, therefore, seeks to assess the lessons-learned in a post-alliance contractual framework. Using a case-study approach, we examine the experiences of a public sector authority who engaged a project facilitator to foster learning during the delivery of a significant piece of critical infrastructure. It was found that the facilitator enabled optimal learning outcomes in post-alliance contractual frameworks by attenuating the otherwise adversarial relationship between clients and contractors. Further research will seek to assess the effectiveness of different knowledge-brokering agencies in construction projects.

Keywords: facilitation, knowledge-brokering, learning, projects

Procedia PDF Downloads 113
8771 Buffer Zone a Means of Reduction of Deforestation on Protected Area: A Case Study of Gunung Palung National Park in West Kalimantan, Indonesia

Authors: Dhruba Khatri, Uttam Ghimire, Nabin Kumar Thapalia

Abstract:

Protected area management in Indonesia is based on MAB program and ICDPs have become Indonesia’s main approach to biodiversity conservation since the early 1990s. However, very few ICDPs have realized the importance of biodiversity conservation in Indonesia and significantly enhanced as a result of currently planned project activities. Gunung Palung National Park in West Kalimantan was damaged illegal logging after decentralization. It made clear through the field survey: (1) Agroforestry did not make reduce to deforestation on regional level and (2) local people who engaging illegal logging activities have two characteristics that for their life and for vent of surplus labor in village. From these results, it became clear that a local resident had a bilateral character as an actor of conservation and the deforestation and also it confirmed that a market also was working on both of the conservation and deforestation. Therefore, surplus labor can be the key actors for future program design and at the same time it is necessary corroborative system which central government, local government, and local people are concerned with the process of policy making under the situation that management body of national park and buffer zone was separated.

Keywords: buffer zone, decentralization, Gunung Palung National Park, illegal logging, Indonesia

Procedia PDF Downloads 384