Search results for: sports project
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 5599

Search results for: sports project

5329 Engaging Mature Learners through Video Case Studies

Authors: Jacqueline Mary Jepson

Abstract:

This article provides a case study centred on the development of 13 video episodes which have been created to enhance student engagement with a post graduate online course in Project Management. The student group was unique as their online course needed to provide for asynchronistic learning and an adult learning pedagogy. In addition, students had come from a wide range professional backgrounds, with some having no Project Management experience, while others had 20 years or more. Students had to gain an understanding of an advanced body of knowledge and the course needed to achieve the academic requirements to qualify individuals to apply their learning in a range of contexts for professional practice and scholarship. To achieve this, a 13 episode case study was developed along with supportive learning materials based on the relocation of a zoo. This unique project provided a learning environment where the project could evolve over each video episode demonstrating the application of Project Management methodology which was then tied into the learning outcomes for the course and the assessment tasks. Discussion forums provided a way for students to converse and demonstrate their own understanding of content and how Project Management methodology can be applied.

Keywords: project management, adult learning, video case study, asynchronistic education

Procedia PDF Downloads 332
5328 BIM Application and Construction Schedule Simulation for the Horizontal Work Area

Authors: Hyeon-Seong Kim, Sang-Mi Park, Seul-Gi Kim, Seon-Ju Han, Leen-Seok Kang

Abstract:

The use of BIM, including 4D CAD system, in a construction project is gradually increasing. Since the building construction works repeatedly in the vertical space, it is relatively easy to confirm the interference effect when applying the BIM, but the interference effect for the civil engineering project is relatively small because the civil works perform non-repetitive processes in the horizontal space. For this reason, it is desirable to apply BIM to the construction phase when applying BIM to the civil engineering project, and the most active BIM tool applied to the construction phase is the 4D CAD function for the schedule management. This paper proposes the application procedure of BIM by the construction phase of civil engineering project and a linear 4D CAD construction methodology suitable for the civil engineering project in which linear work is performed.

Keywords: BIM, 4D CAD, linear 4D simulation, VR

Procedia PDF Downloads 392
5327 Enhancing Project Performance Forecasting using Machine Learning Techniques

Authors: Soheila Sadeghi

Abstract:

Accurate forecasting of project performance metrics is crucial for successfully managing and delivering urban road reconstruction projects. Traditional methods often rely on static baseline plans and fail to consider the dynamic nature of project progress and external factors. This research proposes a machine learning-based approach to forecast project performance metrics, such as cost variance and earned value, for each Work Breakdown Structure (WBS) category in an urban road reconstruction project. The proposed model utilizes time series forecasting techniques, including Autoregressive Integrated Moving Average (ARIMA) and Long Short-Term Memory (LSTM) networks, to predict future performance based on historical data and project progress. The model also incorporates external factors, such as weather patterns and resource availability, as features to enhance the accuracy of forecasts. By applying the predictive power of machine learning, the performance forecasting model enables proactive identification of potential deviations from the baseline plan, which allows project managers to take timely corrective actions. The research aims to validate the effectiveness of the proposed approach using a case study of an urban road reconstruction project, comparing the model's forecasts with actual project performance data. The findings of this research contribute to the advancement of project management practices in the construction industry, offering a data-driven solution for improving project performance monitoring and control.

Keywords: project performance forecasting, machine learning, time series forecasting, cost variance, earned value management

Procedia PDF Downloads 38
5326 The Representation of Young Sports Heroines in Cinema: Analysis of a Regressive Portrayal of Young Sportswomen on the Screen

Authors: David Sudre

Abstract:

Sport in cinema, like sport in society, has been mainly concerned with men and masculinity. Whether in the boxing ring, on the basketball playgrounds, or on the soccer fields, these films have mostly focused on the trials and tribulations of male athletes, for whom women have very generally played secondary, often devalued and devaluing roles, such as that of the loving and indispensable woman to the victorious athlete, that of the dangerous femme fatale, or that of the woman as a sexual object. For more than a century, this film genre has, on the contrary, symbolized the dominant values of patriotism, heroism and contributed at the same time to build an ideal of hegemonic masculinity. With the exception of films such as The Grand National (1944) and Million Dollar Baby (2004), the most commercially successful films tell the story of men's adventures in sports. Today, thanks in part to the struggles of the feminist movement and subsequent societal advances, we are seeing an increase in the number of women in increasingly prominent roles in sports films. Indeed, there seems to be a general shift in popular cinema toward women playing major characters in big-budget productions that have also achieved critical and commercial success. However, if, at first sight, the increase in the number of roles given to women suggests an evolution and a more positive image of them on the screen, it will be necessary to see how their representation is really characterized when they are young and occupy major roles in this type of film. In order to answer this question, we will rely on the results of research conducted on a corpus of 28 sports films in which a young woman plays the main role in the story. All of these productions are fictional (not documentary), mostly American, and distributed by major film studios. The chosen sports teen movies are among the biggest commercial successes of the genre and aim to make the maximum profit and occupy the most dominant positions within the "commercial pole" of the cinematic field. Therefore, this research will allow us, although a change has taken place in the last decades in the number of main roles granted to sportswomen, to decode the sociological subtext of these popular sports films for teenagers. The aim is to reveal how these sports films convey a conservative ideology that participates, on the one hand, in the maintenance of patriarchy and, on the other hand, in the dissemination of stereotyped, negative, and regressive images of young women athletes.

Keywords: cinema, sport, gender, youth, representations, inequality, stereotypes

Procedia PDF Downloads 65
5325 Understanding Complexity at Pre-Construction Stage in Project Planning of Construction Projects

Authors: Mehran Barani Shikhrobat, Roger Flanagan

Abstract:

The construction planning and scheduling based on using the current tools and techniques is resulted deterministic in nature (Gantt chart, CPM) or applying a very little probability of completion (PERT) for each task. However, every project embodies assumptions and influences and should start with a complete set of clearly defined goals and constraints that remain constant throughout the duration of the project. Construction planners continue to apply the traditional methods and tools of “hard” project management that were developed for “ideal projects,” neglecting the potential influence of complexity on the design and construction process. The aim of this research is to investigate the emergence and growth of complexity in project planning and to provide a model to consider the influence of complexity on the total project duration at the post-contract award pre-construction stage of a project. The literature review showed that complexity originates from different sources of environment, technical, and workflow interactions. They can be divided into two categories of complexity factors, first, project tasks, and second, project organisation management. Project tasks may originate from performance, lack of resources, or environmental changes for a specific task. Complexity factors that relate to organisation and management refer to workflow and interdependence of different parts. The literature review highlighted the ineffectiveness of traditional tools and techniques in planning for complexity. However, this research focus on understanding the fundamental causes of the complexity of construction projects were investigated through a questionnaire with industry experts. The results were used to develop a model that considers the core complexity factors and their interactions. System dynamics were used to investigate the model to consider the influence of complexity on project planning. Feedback from experts revealed 20 major complexity factors that impact project planning. The factors are divided into five categories known as core complexity factors. To understand the weight of each factor in comparison, the Analytical Hierarchy Process (AHP) analysis method is used. The comparison showed that externalities are ranked as the biggest influence across the complexity factors. The research underlines that there are many internal and external factors that impact project activities and the project overall. This research shows the importance of considering the influence of complexity on the project master plan undertaken at the post-contract award pre-construction phase of a project.

Keywords: project planning, project complexity measurement, planning uncertainty management, project risk management, strategic project scheduling

Procedia PDF Downloads 114
5324 A Quantitative and Exploratory Study of the Changing Ideals and Challenges Involving the Modern Olympic Movement

Authors: Ram Dayal

Abstract:

Since inception of the modern Olympic Games in 1896 in Athens, Greece, it has undergone a paradigm shift over a period of more than a century. It originated with the purpose of inculcating physical and moral qualities, sense of aesthetics, ethical and spiritual value and educating young people, through the spread of the philosophy of amateurism, which is free from the vices of racial discrimination, any country’s domination, corruption, doping menace and political interference. Now, it has metamorphosed into the arena where only professionalism matters and has been reduced to the show of strength for countries analogous to the cold war. Rather than spirit of sports, the economics of sports is the more relevant underpinning. Changes in medal tally over a period of time and its correlation with the changing geo-political structure have been evaluated quantitatively using regression analyses, which have yielded statistically significant relationship among variables. The present study also tries to explore this shift in Olympic spirit through historical approach, using books, thesis, dissertations, articles, related documents. The present study will help evaluate the Olympic ideals with modern perspective and the need to replace or reinstall the same in order to nurture and rejuvenate the modern Olympic movement.

Keywords: challenges, games, olympic, sports

Procedia PDF Downloads 218
5323 Familiarity with Engineering Project Management And Their Duties In Projects

Authors: Mokhtar Nikgoo

Abstract:

Today's industrial world has undergone tremendous changes in certain periods. These changes are called environmental changes. And they have a direct impact on organizations and bodies. Therefore, the importance of knowing these changes is clear. This importance has caused the manufacturing organizations to move towards multiple products and constantly change and expand their system. This research tries to show how the organization moves in this category by defining the basic steps of implementing a project. One of the most important features of a hard-to-order production organization is the definition of different production projects from different customers. Therefore, the lack of sufficient understanding of the type of work causes the project to be defined for the organization in question, and the managers of the organization (in every organizational level) are constantly involved with different projects. In the implementation of the production project of the aforementioned organizations, directing the facilities and people of the organization towards the implementation of the project is of particular importance. Therefore, it is felt necessary to define the project manager and his basic duties. Considering the importance of this topic, the project chapter deals with project management and its importance and examines all the different issues in that category from the perspective of implementation. A project includes certain activities of the organization that require the use of different resources and all the activities of the organization in order to implement the project with defined facilities and at the designated times. Project management is planning, organizing and controlling the organization's resources for a short-term goal that has been created for short-term and medium-term goals and objectives. Project management has the important task of centering and integrating (coordinating) task and line managers. In other words, project management requires having a strong and appropriate relationship with the internal people of the system to carry out the assigned activities and must have a general and technical knowledge related to various activities in the project environment. It seems that everything with project management in It is communication. One of the characteristics of production organizations under the order is the relationship between the customer (customers) and the organization until the completion of the defined project. Due to the nature of the work, it is necessary for a person to establish this relationship between the client and the organization's people and to establish this relationship in such a way that it does not cause a lack of coordination in the organization's activities. Therefore, project management has a very important role at this stage, because the relationship between the client and his organization will be any problems and problems and points of view that the client has, he must inform the management so that he can implement the cases with its analysis and special processes. To be transferred to other departments and line managers.

Keywords: project management, crisis management, project delays bill, project duration

Procedia PDF Downloads 48
5322 Gains and Drawbacks in the Delivery of Senior High School Sports Track Program: The Lived Experiences of Physical Education Teachers

Authors: Steffany Anne Poblador, Ruben Jr. Tagare

Abstract:

The Philippine Education System is now undergoing transition as a result of the implementation of Republic Act 10533, commonly referred to as the Enhanced Basic Education Act. Since its implementation in 2013, researchers have been examining the initial impact of this transition; however, investigations into the gains and drawbacks of the Philippine Senior High School Sports Track Program based on teachers’ assessment were scarcely adequate. As a result, this research used a Qualitative Phenomenology Research Design to elicit information on the gains and drawbacks faced by these instructors. Focus group discussions, in-depth interviews, and extensive field observation were conducted with participants from selected schools in Cotabato Province. During the triangulation of the data, five (5) significant themes for gains and six (6) concerns from the research participants emerged. The findings were then used to provide recommendations for a more effective implementation of the Sports Track Program in the Philippine Senior High School program.

Keywords: teachers’ gains and drawbacks, Philippine K to 12 problems, K to 12 transition years, favorable experiences, phenomenology

Procedia PDF Downloads 229
5321 A Player's Perspective of University Elite Netball Programmes in South Africa

Authors: Wim Hollander, Petrus Louis Nolte

Abstract:

University sport in South Africa is not isolated from the complexity of globalization and professionalization of sport, as it forms an integral part of the sports development environment in South Africa. In order to align their sports programs with global and professional requirements, several universities opted to develop elite sports programs; recruit specialized personnel such as coaches, administrators, and athletes; provide expert coaching; scientific and medical services; sports testing; fitness, technical and tactical expertise; sport psychological and rehabilitation support; academic guidance and career assistance; and student-athlete accommodation. In addition, universities provide administrative support and high-quality physical resources (training facilities) for the benefit of the overall South African sport system. Although it is not compulsory for universities to develop elite sports programs to prepare their teams for competitions, elite competitions such as the annual Varsity Sport, University Sport South Africa (USSA) and local club competitions and leagues within international university competitions where universities not only compete but also deliver players for representative national netball teams. The aim of this study is, therefore, to describe the perceptions of players of the university elite netball programs they were participating in. This study adopted a descriptive design with a quantitative approach, utilizing a self-structured questionnaire as a research technique. As this research formed part of a national research project for NSA with a population of 172 national and provincial netball players, a sample of 92 university netball players from the population was selected. Content validity of the self-structured questionnaire was secured through a test-retest process, with construct validity through a member of the Statistical Consultation Services (STATCON) of the University of Johannesburg that provided feedback on the structural format of the questionnaire. Reliability was measured utilizing Cronbach Alpha on p < 0.005 level of significance. A reliability score of 0.87 was measured. The research was approved by the Board of Netball South Africa and ethical conduct implemented according to the processes and procedures approved by the Ethics Committees of the Faculty of Health Sciences, the University of Johannesburg with clearance number REC-01-30-2019. From the results, it is evident that university elite netball programs are professional, especially with regards to the employment of knowledgeable and competent coaches and technical officials such as team managers and sport sciences staff. These professionals have access to elite training facilities, support staff, and relatively large groups of elite players, all elements of an elite program that could enhance the national federation’s (Netball South Africa) system. Universities could serve the dual purpose of serving as university netball clubs, as well as providing elite training services and facilities as performance hubs for national players.

Keywords: elite sport programmes, university netball, player experiences, varsity sport netball

Procedia PDF Downloads 160
5320 Analyzing the Effectiveness of Communication Practices and Processes within Project-Based Firms

Authors: Paul Saah, Charles Mbohwa, Nelson Sizwe Madonsela

Abstract:

The capacity to deliver projects on schedule, within budget, and to the pleasure of the client depends on effective communication, which is the lifeblood of project-based businesses. In order to pinpoint areas for development and shed light on the crucial role that communication plays in project success, the aim of this study is to evaluate the efficacy of communication practises and processes inside project-based organisations. In order to analyse concepts and get a greater grasp of their theoretical basis, this study's methodology combines a careful review of the relevant literature with a conceptual analysis of the subject. Data from a varied sample of project-based businesses spanning all industries and sizes were collected via document analysis. The relationship between communication practises, and processes were investigated in connection to key performance measures such as project outcomes, client satisfaction, and team dynamics. According to the study's findings, project-based businesses that adopt effective communication practises, and procedures experience a reduction in unfavourable experiences, stronger integration, and coordination, clarity of purpose, and practises that can hasten problem resolution. However, failing to adopt effective communication practises and procedures in project-based company result in counter issues, including project derailment from the schedule, failure to meet goals, inefficient use of existing resources, and failure to meet organisational goals. Therefore, optimising their communication practises, and procedures are crucial for sustainable growth and competitive advantage as project-based enterprises continue to play a crucial part in today's dynamic business scene.

Keywords: effective communication, project-based firms, communication practices, project success, communication strategies

Procedia PDF Downloads 58
5319 Examining the Impact of Intelligence Quotients on Balance and Coordination in Adolescents with Intellectual Disability

Authors: Bilge B. Calik, Ummuhan B. Aslan, Suat Erel, Sehmus Aslan

Abstract:

Objective: Intellectual disability (ID) is characterized by limitations in both intellectual functioning and adaptive behavior, which covers many everyday social and practical skills. The aim of this study was to evaluate the balance and coordination performance determined between mild and moderate ID adolescents who regularly play sport. Methods: The study comprised a total of 179 participants, of which 135 were male adolescents with mild and moderate-level ID who regularly play sports (16.52 ± 2.17 years) and 44 age-matched male adolescents with typical development without ID who do not do any sports (16.52 ± 0.99 years). The participants with ID were students of Special Education Schools for the mentally disabled and had been diagnosed with ID at a Ministry of Health Hospital. The adolescents with mild and moderate ID had been playing football in their school teams at least 2 days a week, for at least one year. Balance and coordination of adolescents were assessed by Bilateral coordination and balance subtests of Short Form Bruininks-Oseretsky Test of Motor Proficiency (BOT-2 SF). Results: As a result of the evaluations comparing coordination and balance scores significant differences were determined between all three groups in favor of the peers without ID (p<0.05). Conclusions: It was observed that balance and coordination levels of adolescents with mild ID were better than those of adolescents with moderate-level ID but lower than those of peers without ID. These results indicate a relationship between IQ level and motor performance. Further comparative studies are needed on individuals with ID who play and do not play sports in order to examine the impact of participation in sports on the motor skills of individuals with ID.

Keywords: balance, coordination, intellectual disability, motor skills, sport

Procedia PDF Downloads 326
5318 Object Trajectory Extraction by Using Mean of Motion Vectors Form Compressed Video Bitstream

Authors: Ching-Ting Hsu, Wei-Hua Ho, Yi-Chun Chang

Abstract:

Video object tracking is one of the popular research topics in computer graphics area. The trajectory can be applied in security, traffic control, even the sports training. The trajectory for sports training can be utilized to analyze the athlete’s performance without traditional sensors. There are many relevant works which utilize mean shift algorithm with background subtraction. This kind of the schemes should select a kernel function which may affect the accuracy and performance. In this paper, we consider the motion information in the pre-coded bitstream. The proposed algorithm extracts the trajectory by composing the motion vectors from the pre-coded bitstream. We gather the motion vectors from the overlap area of the object and calculate mean of the overlapped motion vectors. We implement and simulate our proposed algorithm in H.264 video codec. The performance is better than relevant works and keeps the accuracy of the object trajectory. The experimental results show that the proposed trajectory extraction can extract trajectory form the pre-coded bitstream in high accuracy and achieve higher performance other relevant works.

Keywords: H.264, video bitstream, video object tracking, sports training

Procedia PDF Downloads 425
5317 Percentile Norms of Heart Rate Variability (HRV) of Indian Sportspersons Withdrawn from Competitive Games and Sports

Authors: Pawan Kumar, Dhananjoy Shaw

Abstract:

Heart rate variability (HRV) is the physiological phenomenon of variation in the time interval between heartbeats and is alterable with fitness, age and different medical conditions including withdrawal/retirement from games/sports. Objectives of the study were to develop (a) percentile norms of heart rate variability (HRV) variables derived from time domain analysis of the Indian sportspersons withdrawn from competitive games/sports pertaining to sympathetic and parasympathetic activity (b) percentile norms of heart rate variability (HRV) variables derived from frequency domain analysis of the Indian sportspersons withdrawn from competitive games/sports pertaining to sympathetic and parasympathetic activity. The study was conducted on 430 males. Ages of the sample ranged from 30 to 35 years of same socio-economic status. Date was collected using ECG polygraphs. Data were processed and extracted using frequency domain analysis and time domain analysis. Collected data were computed with percentile from one to hundred. The finding showed that the percentile norms of heart rate variability (HRV) variables derived from time domain analysis of the Indian sportspersons withdrawn from competitive games/sports pertaining to sympathetic and parasympathetic activity namely, NN50 count (ranged from 1 to 189 score as percentile range). pNN50 count (ranged from .24 to 60.80 score as percentile range). SDNN (ranged from 17.34 to 167.29 score as percentile range). SDSD (ranged from 11.14 to 120.46 score as percentile range). RMMSD (ranged from 11.19 to 120.24 score as percentile range) and SDANN (ranged from 4.02 to 88.75 score as percentile range). The percentile norms of heart rate variability (HRV) variables derived from frequency domain analysis of the Indian sportspersons withdrawn from competitive games/sports pertaining to sympathetic and parasympathetic activity namely Low Frequency (Normalized Power) ranged from 20.68 to 90.49 score as percentile range. High Frequency (Normalized Power) ranged from 14.37 to 81.60 score as percentile range. LF/ HF ratio(ranged from 0.26 to 9.52 score as percentile range). LF (Absolute Power) ranged from 146.79 to 5669.33 score as percentile range. HF (Absolute Power) ranged from 102.85 to 10735.71 score as percentile range and Total Power (Absolute Power) ranged from 471.45 to 25879.23 score as percentile range. Conclusion: The analysis documented percentile norms for time domain analysis and frequency domain analysis for versatile use and evaluation.

Keywords: RMSSD, Percentile, SDANN, HF, LF

Procedia PDF Downloads 413
5316 The Role of Risk Management Practices in the Relationship between Risks Factors and Construction Project Performance

Authors: Ali Abdullah Albezaghi

Abstract:

This article aims to introduce a conceptual framework that can facilitate investigations concerning the role of risk management practices in the relationship between construction risks and the construction project's performance. This article is structured based on the extant literature; it reviews theoretical perspectives, highlights the gaps, and illustrates the significance of developing a framework of suggested relationships. Despite growing interest in the role of risks in construction project performance, previous studies have paid little attention to investigating the moderating role of risk management practices on the risk-performance link. This has left researchers and construction project managers with minimal information to explain the conditions under which risk management practices can reduce the impact of project-related risks and improve performance. In this context, this article suggests a viable research model with propositions that assess risk-performance relationships and discusses the potential moderating effects on the domain relationship. This paper adds to the risk management literature by focusing on risk variables that directly impact performance. Further, it also considers the moderating role of risk management practices in such relationships.

Keywords: risk management practices, external risks, internal risks, project risks, project performance

Procedia PDF Downloads 125
5315 Create a Dynamic Model in Project Control and Management

Authors: Hamed Saremi, Shahla Saremi

Abstract:

In this study, control and management of construction projects is evaluated through developing a dynamic model in which some means are used in order to evaluating planning assumptions and reviewing the effectiveness of some project control policies based on previous researches about time, cost, project schedule pressure management, source management, project control, adding elements and sub-systems from cost management such as estimating consumption budget from budget due to costs, budget shortage effects and etc. using sensitivity analysis, researcher has evaluated introduced model that during model simulation by VENSIM software and assuming optimistic times and adding information about doing job and changes rate and project is forecasted with 373 days (2 days sooner than forecasted) and final profit $ 1,960,670 (23% amount of contract) assuming 15% inflation rate in year and costs rate accordance with planned amounts and other input information and final profit.

Keywords: dynamic planning, cost, time, performance, project management

Procedia PDF Downloads 470
5314 Effect of Institutional Structure on Project Managers Performance in Construction Projects: A Case Study in Nigeria

Authors: Ebuka Valentine Iroha, Tsunemi Watanabe, Satoshi Tsuchiya

Abstract:

Project management practices play an important role in construction project performance and are one of project managers' essential key performance indicators. Previous studies have explored the poor performance of the construction industry, with project delays and cost overruns identified to contribute largely to numerous abandoned projects. These challenges are attributed to insufficient project management practices and a lack of utilization of project managers. The actual causes of inadequate project management practices and underutilization of project managers have been rarely discussed. This study tends to bridge the gap by identifying and assessing the actual causes of insufficient project management practices and underutilization of project managers. This study differs from past studies investigating the causes of poor performance by using institutional analysis methods to identify and analyze the factors influencing project management practices and proper utilization of project managers. Based on a comprehensive literature review, this study identified some factors embedded in the construction industry that influence the institutional environment and weaken the laws and regulations. These factors were used as the basis for semi-structured interview questions to investigate their impacts on project management practices and project managers. The data collected were coded into a four-level framework for institutional analysis. This method was used to analyze the interrelationships between the identified embedded factors, institutional laws and regulations, and construction organizations to understand how these influences result in the underutilization of project managers. The study found that the underutilization of project managers consists of two subsystems, including underutilization and lowering commitment. The first subsystem, corruption, political influence, religious and tribal discrimination, and organizational culture, were found to affect the institutional structure. These embedded factors weaken the industry’s governance mechanism, forcing project managers to prioritize corrupt practices over project demands. The ineffectiveness of the existing laws and regulations worsens the situation, supporting unfair working conditions and contributing to the underperformance of project managers. This situation leads to the development of the second subsystem, which is characterized by a lack of opportunities for career development and minimal incentives within construction organizations. The findings provide significant potential for addressing systemic challenges in the construction industry, particularly the underutilization of project managers and enhancing organizational support measures to improve project management practices and mitigate the adverse effects of corruption.

Keywords: construction industry, project management, poor performance, embedded factors, project managers underutilization

Procedia PDF Downloads 23
5313 Project Progress Prediction in Software Devlopment Integrating Time Prediction Algorithms and Large Language Modeling

Authors: Dong Wu, Michael Grenn

Abstract:

Managing software projects effectively is crucial for meeting deadlines, ensuring quality, and managing resources well. Traditional methods often struggle with predicting project timelines accurately due to uncertain schedules and complex data. This study addresses these challenges by combining time prediction algorithms with Large Language Models (LLMs). It makes use of real-world software project data to construct and validate a model. The model takes detailed project progress data such as task completion dynamic, team Interaction and development metrics as its input and outputs predictions of project timelines. To evaluate the effectiveness of this model, a comprehensive methodology is employed, involving simulations and practical applications in a variety of real-world software project scenarios. This multifaceted evaluation strategy is designed to validate the model's significant role in enhancing forecast accuracy and elevating overall management efficiency, particularly in complex software project environments. The results indicate that the integration of time prediction algorithms with LLMs has the potential to optimize software project progress management. These quantitative results suggest the effectiveness of the method in practical applications. In conclusion, this study demonstrates that integrating time prediction algorithms with LLMs can significantly improve the predictive accuracy and efficiency of software project management. This offers an advanced project management tool for the industry, with the potential to improve operational efficiency, optimize resource allocation, and ensure timely project completion.

Keywords: software project management, time prediction algorithms, large language models (LLMS), forecast accuracy, project progress prediction

Procedia PDF Downloads 67
5312 Performance Analysis of Wireless Sensor Networks in Areas for Sports Activities and Environmental Preservation

Authors: Teles de Sales Bezerra, Saulo Aislan da Silva Eleuterio, José Anderson Rodrigues de Souza, Ítalo de Pontes Oliveira

Abstract:

This paper presents a analysis of performance the Received Strength Signal Indicator (RSSI) to Wireless Sensor Networks, with a finality of investigate a behavior of ZigBee devices operating into real environments. The test of performance was realize using two Series 1 ZigBee Module and two modules of development Arduino Uno R3, evaluating in this form a measurements of RSSI into environments like places of sports, preservation forests and water reservoir.

Keywords: wireless sensor networks, RSSI, Arduino, environments

Procedia PDF Downloads 611
5311 The Urban Project: Metropolization Tool and Sustainability Vector - Case of Constantine

Authors: Mouhoubi Nedjima, Sassi Boudemagh Souad, Chouabbia Khedidja

Abstract:

Cities grow, large or small; they seek to gain a place in the market competition, which talks to sell a product that is the city itself. The metropolis are large cities enjoying a legal status and assets providing their dominions elements on a territory larger than their range, do not escape this situation. Thus, the search for promising tool metropolises better development and durability meet the challenges as economic, social and environmental is timely. The urban project is a new way to build the city; it is involved in the metropolises of two ways, either to manage the crisis and to meet the internal needs of the metropolis, or by creating a regional attractiveness with their potential. This communication will address the issue of urban project as a tool that has and should find a place in the panoply of existing institutional tools. Based on the example of the modernization project of the metropolis of eastern Algeria "Constantine", we will examine what the urban project can bring to a city, the extent of its impact but also the relationship between the visions actors so metropolization a success.

Keywords: urban project, metropolis, institutional tools, Constantine

Procedia PDF Downloads 396
5310 Concept to Enhance the Project Success and Promote the Implementation of Success Factors in Infrastructure Projects

Authors: A. Elbaz, K. Spang

Abstract:

Infrastructure projects are often subjected to delays and cost overruns and mistakenly described as unsuccessful projects. These projects have many peculiarities such as public attention, impact on the environment, subjected to special regulations, etc. They also deal with several stakeholders with different motivations and face unique risks. With this in mind we need to reconsider our approach to manage them, define their success factors and implement these success factors. Infrastructure projects are not only lacking a unified meaning of project success or a definition of success factors, but also a clear method to implement these factors. This paper investigates this gap and introduces a concept to implement success factors in an efficient way, taking into consideration the specific characteristics of infrastructure projects. This concept consists of six enablers such as project organization, project team, project management workflow, contract management, communication and knowledge transfer and project documentations. These enablers allow other success factors to be efficiently implemented in projects. In conclusion, this paper provides project managers as well as company managers with a tool to define and implement success factors efficiently in their projects, along with upgrading their assets for the coming projects. This tool consists of processes and validated checklists to ensure the best use of company resources and knowledge. Due to the special features of infrastructure projects this tool will be tested in the German infrastructure market. However, it is meant to be adaptable to other markets and industries.

Keywords: infrastructure projects, operative success factors, project success, success factors, transportation projects

Procedia PDF Downloads 116
5309 Female Athlete Triad: How Much Is Known

Authors: Nadine Abuqtaish

Abstract:

Females’ participation in athletic sports events has increased in the last decades, and the discovery of eating disorders and menstrual dysfunction has been evident since the early 1980s. The term “Female athlete triad” was initially defined by the Task Force on Women’s Issues of the American College of Sports Medicine (ACSM) in 1992. Menstrual irregularities have been prevalent in competitive female athletes, especially in their adolescence and early adulthood age. Nutritional restrictions to maintain a certain physique and lean look are sought to be advantageous in female athletes such as gymnastics, cheerleading, or weight-sensitive sports such as endurance sports (cycling and marathoners). This stress places the female at risk of irregularities in their menstrual cycle which can lead them to lose their circadian estrogen levels. Estrogen is an important female reproductive hormone that plays a role in maintaining bone mass. Bone mineral density peaks by the age 25. Inadequate estrogen due to missed menstrual cycle or amenorrhea has been estimated to cause a yearly loss of 2% of bone mass, increasing the risk of osteoporosis in the postmenopausal phase. This paper is intended to have a better depth understanding of whether female athletes are being monitored by their official entities or coaches. A qualitative research method through online search engines and keywords “females, athletes, triad, amenorrhea, anorexia, osteoporosis” were used to collect the available primary sources from official public library databases. The latest consensus was published in 2014 by the Female Athlete Triad Coalition and the need for further research and emphasis on this issue is still lacking.

Keywords: female, athlete, triad, amenorrhea, anorexia, bone loss

Procedia PDF Downloads 56
5308 Comparative Coverage Analysis of Football and Other Sports by the Leading English Newspapers of India during FIFA World Cup 2014

Authors: Rajender Lal, Seema Kaushik

Abstract:

The FIFA World Cup, often simply called the World Cup, is an international association football competition contested by the senior men's national teams of the members of Fédération Internationale de Football Association (FIFA), the sport's global governing body. The championship has been awarded every four years since the inaugural tournament in 1930, except in 1942 and 1946 when it was not held because of the Second World War. Its 20th edition took place in Brazil from 12 June to 13 July 2014, which was won by Germany. The World Cup is the most widely viewed and followed sporting event in the world, exceeding even the Olympic Games; the cumulative audience of all matches of the 2006 FIFA World Cup was estimated to be 26.29 billion with an estimated 715.1 million people watching the final match, a ninth of the entire population of the planet. General-interest newspapers typically publish news articles and feature articles on national and international news as well as local news. The news includes political events and personalities, business and finance, crime, severe weather, and natural disasters; health and medicine, science, and technology; sports; and entertainment, society, food and cooking, clothing and home fashion, and the arts. It became curiosity to investigate that how much coverage is given to this most widely viewed international event as compared to other sports in India. Hence, the present study was conducted with the aim of examining the comparative coverage of FIFA World Cup 2014 and other sports in the four leading Newspapers of India including Hindustan Times, The Hindu, The Times of India, and The Tribune. Specific objectives were to measure the source of news, type of news items and the placement of news related to FIFA World Cup and other sports. Representative sample of ten editions each of the four English dailies was chosen for the purpose of the study. The analysis was based on the actual scanning of data from the representative sample of the dailies for the period of the competition. It can be concluded from the analysis that this event was given maximum coverage by the Hindustan Times while other sports were equally covered by The Hindu.

Keywords: coverage analysis, FIFA World Cup 2014, Hindustan Times, the Hindu, The Times of India, The Tribune

Procedia PDF Downloads 277
5307 Building Information Modelling (BIM) and Unmanned Aerial Vehicles (UAV) Technologies in Road Construction Project Monitoring and Management: Case Study of a Project in Cyprus

Authors: Yiannis Vacanas, Kyriacos Themistocleous, Athos Agapiou, Diofantos Hadjimitsis

Abstract:

Building Information Modelling (BIM) technology is considered by construction professionals as a very valuable process in modern design, procurement and project management. Construction professionals of all disciplines can use a single 3D model which BIM technology provides, to design a project accurately and furthermore monitor the progress of construction works effectively and efficiently. Unmanned Aerial Vehicles (UAVs), a technology initially developed for military applications, is now without any difficulty accessible and has already been used by commercial industries, including the construction industry. UAV technology has mainly been used for collection of images that allow visual monitoring of building and civil engineering projects conditions in various circumstances. UAVs, nevertheless, have undergone significant advances in equipment capabilities and now have the capacity to acquire high-resolution imagery from many angles in a cost effective manner, and by using photogrammetry methods, someone can determine characteristics such as distances, angles, areas, volumes and elevations of an area within overlapping images. In order to examine the potential of using a combination of BIM and UAV technologies in construction project management, this paper presents the results of a case study of a typical road construction project where the combined use of the two technologies was used in order to achieve efficient and accurate as-built data collection of the works progress, with outcomes such as volumes, and production of sections and 3D models, information necessary in project progress monitoring and efficient project management.

Keywords: BIM, project management, project monitoring, UAV

Procedia PDF Downloads 296
5306 Appraisal of Transaction Cost in South African Construction Projects

Authors: Kenneth O. Otasowie, Matthew Ikuabe, Clinton Aigbavboa, Ayodeji Oke

Abstract:

Construction project cost are not only made up of production costs. This cost comprises of many other elements such as the preparation of a bidding document, cost estimations, drafting contractual agreements and monitoring that contractual obligations are met. Several studies have stressed the need for transaction costs (TC) to be defined in a way that covers all phases of a project and not only the pre-contract phase. Hence, this study aims to appraise transaction cost in South African (SA) construction projects by assessing what constitutes transaction cost, influencing factors and possible optimisation measures. A survey design was adopted. A total number of eighty (80) questionnaires were administered to quantity surveyors, procurement managers and project managers in Guateng Province, SA and seventy-two (72) were returned and found suitable for analysis. Collected data was analysed using percentage, mean item score, standard deviation, one-sample t-test. The findings show that external technical interaction, uncertainty, human factors are the most significant constituents of TC in SA, while technical competency, experience in similar project type and project characteristics are the leading influencing factors. Furthermore, understanding project characteristics, clear communication and technically competent project teams are most of the significant measures for optimising TC in SA construction projects. Therefore, this study recommends that a competent project team and a clear communication are fundamental to proper management of TC in SA construction projects.

Keywords: construction projects, project cost, South Africa, transaction cost

Procedia PDF Downloads 92
5305 Effect of Pre-Construction on Construction Schedule and Client Loyalty

Authors: Jong Hoon Kim, Hyun-Soo Lee, Moonseo Park, Min Jeong, Inbeom Lee

Abstract:

Pre-construction is essential in achieving the success of a construction project. Due to the early involvement of project participants in the construction phase, project managers are able to plan ahead and solve issues well in advance leading to the success of the project and the satisfaction of the client. This research utilizes quantitative data derived from construction management projects in order to identify the relationship between pre-construction, construction schedule, and client satisfaction. A total of 65 construction projects and 93 clients were investigated for this research in an attempt to identify (a) the relationship between pre-construction and schedule reduction, and (b) pre-construction and client loyalty. Based on the quantitative analysis, this research was able to establish a negative correlation based on 65 construction projects between pre-construction and project schedule existed. This finding represents that the more pre-construction is performed for a certain project, the overall construction schedule decreased. Then, to determine the relationship between pre-construction and client satisfaction, Net Promoter Score (NPS) of 93 clients from the 65 projects was utilized. Pre-construction and NPS was further analyzed and a positive correlation was found between the two. This infers that clients tend to be more satisfied with projects with higher ratio of pre-construction than those projects with less pre-construction.

Keywords: client loyalty, NPS, pre-construction, schedule reduction

Procedia PDF Downloads 349
5304 Pavement Quality Evaluation Using Intelligent Compaction Technology: Overview of Some Case Studies in Oklahoma

Authors: Sagar Ghos, Andrew E. Elaryan, Syed Ashik Ali, Musharraf Zaman, Mohammed Ashiqur Rahman

Abstract:

Achieving desired density during construction is an important indicator of pavement quality. Insufficient compaction often compromises pavement performance and service life. Intelligent compaction (IC) is an emerging technology for monitoring compaction quality during the construction of asphalt pavements. This paper aims to provide an overview of findings from four case studies in Oklahoma involving the compaction quality of asphalt pavements, namely SE 44th St project (Project 1) and EOC Turnpike project (Project 2), Highway 92 project (Project 3), and 108th Avenue project (Project 4). For this purpose, an IC technology, the intelligent compaction analyzer (ICA), developed at the University of Oklahoma, was used to evaluate compaction quality. Collected data include GPS locations, roller vibrations, roller speed, the direction of movement, and temperature of the asphalt mat. The collected data were analyzed using a widely used software, VETA. The average densities for Projects 1, 2, 3 and 4, were found as 89.8%, 91.50%, 90.7% and 87.5%, respectively. The maximum densities were found as 94.6%, 95.8%, 95.9%, and 89.7% for Projects 1, 2, 3, and 4, respectively. It was observed that the ICA estimated densities correlated well with the field core densities. The ICA results indicated that at least 90% of the asphalt mats were subjected to at least two roller passes. However, the number of passes required to achieve the desired density (94% to 97%) differed from project to project depending on the underlying layer. The results of these case studies show both opportunities and challenges in using IC for monitoring compaction quality during construction in real-time.

Keywords: asphalt pavement construction, density, intelligent compaction, intelligent compaction analyzer, intelligent compaction measure value

Procedia PDF Downloads 150
5303 A Case Study on Machine Learning-Based Project Performance Forecasting for an Urban Road Reconstruction Project

Authors: Soheila Sadeghi

Abstract:

In construction projects, predicting project performance metrics accurately is essential for effective management and successful delivery. However, conventional methods often depend on fixed baseline plans, disregarding the evolving nature of project progress and external influences. To address this issue, we introduce a distinct approach based on machine learning to forecast key performance indicators, such as cost variance and earned value, for each Work Breakdown Structure (WBS) category within an urban road reconstruction project. Our proposed model leverages time series forecasting techniques, namely Autoregressive Integrated Moving Average (ARIMA) and Long Short-Term Memory (LSTM) networks, to predict future performance by analyzing historical data and project progress. Additionally, the model incorporates external factors, including weather patterns and resource availability, as features to improve forecast accuracy. By harnessing the predictive capabilities of machine learning, our performance forecasting model enables project managers to proactively identify potential deviations from the baseline plan and take timely corrective measures. To validate the effectiveness of the proposed approach, we conduct a case study on an urban road reconstruction project, comparing the model's predictions with actual project performance data. The outcomes of this research contribute to the advancement of project management practices in the construction industry by providing a data-driven solution for enhancing project performance monitoring and control.

Keywords: project performance forecasting, machine learning, time series forecasting, cost variance, schedule variance, earned value management

Procedia PDF Downloads 31
5302 Development of Sports Nation on the Way of Health Management

Authors: Beatrix Faragó, Zsolt Szakály, Ágnes Kovácsné Tóth, Csaba Konczos, Norbert Kovács, Zsófia Pápai, Tamás Kertész

Abstract:

The future of the nation is the embodiment of a healthy society. A key segment of government policy is the development of health and a health-oriented environment. As a result, sport as an activator of health is an important area for development. In Hungary, sport is a strategic sector with the aim of developing a sports nation. The function of sport in the global society is multifaceted, which is manifested in both social and economic terms. The economic importance of sport is gaining ground in the world, with implications for Central and Eastern Europe. Smaller states, such as Hungary, cannot ignore the economic effects of exploiting the effects of sport. The relationship between physical activity and health is driven by the health economy towards the nation's economic factor. In our research, we analyzed sport as a national strategy sector and its impact on age groups. By presenting the current state of health behavior, we get an idea of the directions where development opportunities require even more intervention. The foundation of the health of a nation is the young age group, whose shaping of health will shape the future generation. Our research was attended by university students from the Faculty of Health and Sports Sciences who will be experts in the field of health in the future. The other group is the elderly, who are a growing social group due to demographic change and are a key segment of the labor market and consumer society. Our study presents the health behavior of the two age groups, their differences, and similarities. The survey also identifies gaps in the development of a health management strategy that national strategies should take into account.

Keywords: competitiveness, health behavior, health economy, health management, sports nation

Procedia PDF Downloads 148
5301 Questionnaire for the Evaluation of Entrepreneurship Project Psychopedagogical Practices: Construction Proceedings and Validation

Authors: Cristina Costa-Lobo, Sandra Fernandes, Miguel Magalhães, José Dinis-Carvalho, Alfredo Regueiro, Ana Carvalho

Abstract:

This paper is a report on the findings of the construction and the validation of a questionnaire monetized in a portuguese higher education context with undergraduate students. The Questionnaire for the Evaluation of Entrepreneurship Project Psychopedagogical Practices consists of six scales: Critical appraisal of the project, Developed Learning and Skills, Teamwork, Teacher and Tutor Roles, Evaluation of Student Performance, and Project Effectiveness as a Teaching-Learning Methodology. The proceedings of its construction are analyzed, and the validity and internal consistency analysis are described. Findings indicate good indicators of validity, good fidelity and an interpretable factorial structure.

Keywords: entrepreneurship project, higher education, psychopedagogical practices, teacher and tutor roles

Procedia PDF Downloads 375
5300 Analysis of the Interest of High School Students in Tirana for Physical Activity, Sports and Foreign Languages

Authors: Zylfi Shehu, Shpetim Madani, Bashkim Delia

Abstract:

Context: The study focuses on the interest and engagement of high school students in Tirana, Albania, in physical activity, sports, and foreign languages. It acknowledges the numerous physiological benefits of physical activity, such as cardiovascular health and improved mood. It also recognizes the importance of physical activity in childhood and adolescence for proper skeletal development and long-term health. Research Aim: The main purpose of the study is to investigate and analyze the preferences and interests of male and female high school students in Tirana regarding their functional development, physical activity, sports participation, and choice of foreign languages. The aim is to provide insights for the students and teachers to guide future objectives and improve the quality of physical education. Methodology: The study employed a survey-based approach, targeting both male and female students in public high schools in Tirana. A total of 410 students aged 15 to 19 years old, participated in the study. The data collected from the survey were processed using Excel and presented through tables and graphs. Findings: The results revealed that team sports were more favored by the students, with football being the preferred choice among males, while basketball and volleyball were more popular among females. Additionally, English was found to be the most preferred foreign language, selected by a higher percentage of females (38.57%) compared to males (16.90%). German followed as the second preferred language. Theoretical Importance: This study contributes to the understanding of students' interests in physical activity, sports, and foreign languages in Tirana's high schools. The findings highlight the need to focus on specific sports and languages to cater to students' preferences and guide future educational objectives. It also emphasizes the importance of physical education in promoting students' overall well-being and highlights potential areas for policy and program improvement. Data Collection and Analysis Procedures: The study collected data through surveys administered to high school students in Tirana. The survey responses were processed and analyzed using Excel, and the findings were presented through tables and graphs. The data analysis allowed for the identification of preferences and trends among male and female students, providing valuable insights for future decision-making. Question Addressed: The study aimed to address the question of high school students' interest in physical activity, sports, and foreign languages. It sought to understand the preferences and choices made by students in Tirana and investigate factors such as gender, family income, and accessibility to extracurricular sports activities. Conclusion: The study revealed that high school students in Tirana show a preference for team sports, with football being the most favored among males and basketball and volleyball among females. English was found to be the most preferred foreign language. The findings provide important insights for educators and policymakers to enhance physical education programs and consider students' preferences and interests to foster a more effective learning environment. The study also emphasizes the importance of physical activity and sports in promoting students' physical and mental well-being.

Keywords: female, male, foreign languages, sports, physical education, high school students

Procedia PDF Downloads 87