Search results for: project costs
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 6732

Search results for: project costs

6462 Public Preferences and Willingness to Pay for Social Health Insurance in Iran: A Discrete Choice Experiment

Authors: Mohammad Ranjbar, Mohammad Bazyar, Blake Angell, Thomas Lung, Yibeltal Assefa

Abstract:

Background: Current health insurance programs in Iran suffer from low enrolment and are not sufficient to attain the country to universal health coverage (UHC). We hypothesize that improving the enrollment rate and moving towards a more sustainable UHC can be achieved by improving the benefits package and providing new incentives. The objective of this study is to assess public preferences and willingness to pay (WTP) for social health insurance (SHI) in Iran. Methods: A discrete choice experiment (DCE) was conducted in 2021, using a self-administered questionnaire on 500 participants to estimate WTP and determine individual preferences for the SHI in Yazd, Iran. Respondents were presented with an eight-choice set and asked to select their preferred one. In each choice set, scenarios were described by eight attributes with varying levels. The conditional logit regression model was used to analyze the participants' preferences. Willingness to pay for each attribute was also calculated. Results: Most included attributes were significant predictors of the choice of a health insurance package. The maximum coverage of hospitalization costs in the private sector, ancillary services such as glasses, canes, etc., as well as coverage for hospitalization costs in the public sector and drug costs, were the most important determining factors for this choice. Coverage of preventive dental care did not significantly influence respondent choices. Estimating WTP showed that individuals are willing to pay more for higher financial protection, particularly against private sector costs; the WTP to increase the coverage of hospitalization costs in the private sector from 50% to 90% is estimated at 362,068 IR, Rials per month. Conclusion: This study identifies the key factors that the population value with regard to health insurance and the tradeoffs they are willing to make between them. Hospitalization, drugs, and ancillary services were the most important determining factors for their choice. The data suggest that additional resources coming into the Iranian health system might best be prioritized to cover hospitalization and drug costs and those associated with ancillary services.

Keywords: social health insurance, preferences, discrete choice experiment, willingness to pay

Procedia PDF Downloads 59
6461 Analyze and Improve Project Delivery Time Enhancing Business Management System of Review and Approval Process for Project Design Submittals

Authors: Abdulaziz Alnajem, Amit Sharma

Abstract:

Business Case: Project delivery and enhancing activities' completion in the shortest possible time is critical during execution to proceed with the subsequent phases of Procurement, C & C phases of Contracts to have the required Production facilities/Infrastructure in place to achieve the Company strategic objective of 4.0 MBOPD oil production. SOR (Statement of requirement): Design and Engineering phase of Projects execution takes a long time. It is observed that, in most of the cases, company has crossed the Project Design Submittals review time as per the Contract/Company Standards, resulting into delays in projects completion, and cost impact to the company. Study Scope: Scope of the study covers the process from date of first submission of D & E documents by the contractor to final approval by the controlling team to proceed with the procurement of materials. This scope covers projects handled by the company’s project management teams and includes only the internal review process by the company.

Keywords: business management system, project management, oil and gas, analysis, improvement, design, delays

Procedia PDF Downloads 191
6460 Kiira EV Project Transition from Student to Professional Team through Project-Based Skills Development

Authors: Doreen Orishaba, Paul Isaac Musasizi, Richard Madanda, Sandy Stevens Tickodri-Togboa

Abstract:

The world of academia tends to be a very insular place. Consequently, scholars who successfully completed their undergraduate and graduate studies are unpleasantly surprised at how challenging the transition to corporate life can get. This is a global trend even as the students who juggle work with attending some of the most demanding and best graduate programs may not easily adjust to and confirm to the professionalism required for corporate management of the industry. This paper explores the trends in the transition of Kiira EV Project from a predominantly student team to a professional team of a national pride program through mentorship and apprenticeship. The core disciplines within the Kiira EV Project include Electrical and Electronics Engineering, Mechanical Engineering, and Industrial Design.

Keywords: mentorship, apprenticeship, professional, development

Procedia PDF Downloads 380
6459 The Effects of Cost-Sharing Contracts on the Costs and Operations of E-Commerce Supply Chains

Authors: Sahani Rathnasiri, Pritee Ray, Sardar M. N. Isalm, Carlos A. Vega-Mejia

Abstract:

This study develops a cooperative game theory-based cost-sharing contract model for a business to consumer (B2C) e-commerce supply chain to minimize the overall supply chain costs and the individual costs within an information asymmetry scenario. The objective of this study is to address the issues of strategic interactions among the key players of the e-commerce supply chain operation, which impedes the optimal operational outcomes. Game theory has been included in the field of supply chain management to resolve strategic decision-making issues; however, most of the studies are limited only to two-echelons of the supply chains. Multi-echelon supply chain optimizations based on game-theoretic models are less explored in the previous literature. This study adopts a cooperative game model to focus on the common payoff of operations and addresses the issues of information asymmetry and coordination of a three-echelon e-commerce supply chain. The cost-sharing contract model integrates operational features such as production, inventory management and distribution with the contract related constraints. The outcomes of the model highlight the importance of maintaining lower operational costs by all players to obtain benefits from the cost-sharing contract. Further, the cost-sharing contract ensures true cost revelation, and hence eliminates the information asymmetry issues among the players. Comparing the results of the contract model with the de-centralized e-commerce supply chain operation further emphasizes that the cost-sharing contract derives Pareto-improved outcomes and minimizes the costs of overall e-commerce supply chain operation.

Keywords: cooperative game theory, cost-sharing contract, e-commerce supply chain, information asymmetry

Procedia PDF Downloads 98
6458 Improvement of Contractor’s Competitiveness through Sustainable Construction Practices in UAE

Authors: Sareh Rajabi, Taha Anjamrooz, Salwa Bheiry

Abstract:

Sustainability of construction projects is an important issue to be addressed since the sector will continue to be developed in the coming years, especially in developing countries. Thus, it is significant to discover approaches and solutions for improving sustainability. Currently, the construction industry is the largest consumer of natural resources. This is the same in other countries in the Gulf region, and the United Arab Emirates (UAE) has limited natural resources such as water, electricity, etc. Recently, the UAE has taken several actions in order to implement sustainable initiatives within its construction industry. Within the industry, the contractors’ role is significant in promoting sustainable development by taking the responsibility to minimize their negative impacts on the environment and society, and maximize their economic distribution. In this research, sustainability will be studied as an important key to bring competitive advantages to contracting organizations. The contractors should understand the need to improve their sustainable performance in order to expand their business competitiveness. Competitiveness at the construction project level refers to a contractor’s ability to compete for a project. There is less focus on how to improve contractors’ competitiveness by implementing sustainable construction practices. Based on an inclusive literature review on the relationship between sustainability performance and business competitiveness, this research will conduct a study of sustainable practice in the construction industry and the relationship between sustainability performance and business competitiveness in order to develop a framework for evaluating how contractors can improve their competitiveness in terms of more efficient processes, enhancements in productivity, and lower costs of compliance in order to reduce the initial project cost and obtain market opportunities in the UAE. The research findings will provide a framework that can be a useful guideline for contractors to develop their sustainability policy, strategy and practice for meeting the increased requirements for sustainable development in construction.

Keywords: sustainable construction practice, sustainability, competitiveness, construction industry, contractors

Procedia PDF Downloads 101
6457 Project Production Control (PPC) Implementation for an Offshore Facilities Construction Project

Authors: Muhammad Hakim Bin Mat Tasir, Erwan Shahfizad Hasidan, Hamidah Makmor Bakry, M. Hafiz B. Izhar

Abstract:

Every key performance indicator used to monitor a project’s construction progress emphasizes trade productivity or specific commodity run-down curves. Examples include the productivity of welding by the number of joints completed per day, quantity of NDT (Non-Destructive Tests) inspection per day, etc. This perspective is based on progress and productivity; however, it does not enable a system perspective of how we produce. This paper uses a project production system perspective by which projects are a collection of production systems comprising the interconnected network of processes and operations that represent all the work activities to execute a project from start to finish. Furthermore, it also uses the 5 Levels of production system optimization as a frame. The goal of the paper is to describe the application of Project Production Control (PPC) to control and improve the performance of several production processes associated with the fabrication and assembly of a Central Processing Platform (CPP) Jacket, part of an offshore mega project. More specifically, the fabrication and assembly of buoyancy tanks as they were identified as part of the critical path and required the highest demand for capacity. In total, seven buoyancy tanks were built, with a total estimated weight of 2,200 metric tons. These huge buoyancy tanks were designed to be reversed launching and self-upending of the jacket, easily retractable, and reusable for the next project, ensuring sustainability. Results showed that an effective application of PPC not only positively impacted construction progress and productivity but also exposed sources of detrimental variability as the focus of continuous improvement practices. This approach augmented conventional project management practices, and the results had a high impact on construction scheduling, planning, and control.

Keywords: offshore, construction, project management, sustainability

Procedia PDF Downloads 27
6456 Big Data in Construction Project Management: The Colombian Northeast Case

Authors: Sergio Zabala-Vargas, Miguel Jiménez-Barrera, Luz VArgas-Sánchez

Abstract:

In recent years, information related to project management in organizations has been increasing exponentially. Performance data, management statistics, indicator results have forced the collection, analysis, traceability, and dissemination of project managers to be essential. In this sense, there are current trends to facilitate efficient decision-making in emerging technology projects, such as: Machine Learning, Data Analytics, Data Mining, and Big Data. The latter is the most interesting in this project. This research is part of the thematic line Construction methods and project management. Many authors present the relevance that the use of emerging technologies, such as Big Data, has taken in recent years in project management in the construction sector. The main focus is the optimization of time, scope, budget, and in general mitigating risks. This research was developed in the northeastern region of Colombia-South America. The first phase was aimed at diagnosing the use of emerging technologies (Big-Data) in the construction sector. In Colombia, the construction sector represents more than 50% of the productive system, and more than 2 million people participate in this economic segment. The quantitative approach was used. A survey was applied to a sample of 91 companies in the construction sector. Preliminary results indicate that the use of Big Data and other emerging technologies is very low and also that there is interest in modernizing project management. There is evidence of a correlation between the interest in using new data management technologies and the incorporation of Building Information Modeling BIM. The next phase of the research will allow the generation of guidelines and strategies for the incorporation of technological tools in the construction sector in Colombia.

Keywords: big data, building information modeling, tecnology, project manamegent

Procedia PDF Downloads 105
6455 Cost-Effectiveness Analysis of the Use of COBLATION™ Knee Chondroplasty versus Mechanical Debridement in German Patients

Authors: Ayoade Adeyemi, Leo Nherera, Paul Trueman, Antje Emmermann

Abstract:

Background and objectives: Radiofrequency (RF) generated plasma chondroplasty is considered a promising treatment alternative to mechanical debridement (MD) with a shaver. The aim of the study was to perform a cost-effectiveness analysis comparing costs and outcomes following COBLATION chondroplasty versus mechanical debridement in patients with knee pain associated with a medial meniscus tear and idiopathic ICRS grade III focal lesion of the medial femoral condyle from a payer perspective. Methods: A decision-analytic model was developed comparing economic and clinical outcomes between the two treatment options in German patients following knee chondroplasty. Revision rates based on the frequency of repeat arthroscopy, osteotomy and conversion to total knee replacement, reimbursement costs and outcomes data over a 4-year time horizon were extracted from published literature. One-way sensitivity analyses were conducted to assess uncertainties around model parameters. Threshold analysis determined the revision rate at which model results change. All costs were reported in 2016 euros, future costs were discounted at a 3% annual rate. Results: Over a 4 year period, COBLATION chondroplasty resulted in an overall net saving cost of €461 due to a lower revision rate of 14% compared to 48% with MD. Threshold analysis showed that both options were associated with comparable costs if COBLATION revision rate was assumed to increase up to 23%. The initial procedure costs for COBLATION were higher compared to MD and outcome scores were significantly improved at 1 and 4 years post-operation versus MD. Conclusion: The analysis shows that COBLATION chondroplasty is a cost-effective option compared to mechanical debridement in the treatment of patients with a medial meniscus tear and idiopathic ICRS grade III defect of the medial femoral condyle.

Keywords: COBLATION, cost-effectiveness, knee chondroplasty, mechanical debridement

Procedia PDF Downloads 362
6454 A New Suburb Renovation Concept

Authors: Anu Soikkelii, Laura Sorri

Abstract:

Finnish national research project, User- and Business-oriented Suburb Renovation Concept (KLIKK), was started in January 2012 and will end in June 2014. The perspective of energy efficiency is emphasised in the project, but also it addresses what improving the energy efficiency of suburban apartment buildings means from the standpoint of architecturally valuable buildings representing different periods. The project will also test the impacts of stricter energy efficiency requirements on renovation projects. The primary goal of the project is to develop a user-oriented, industrial, economic renovation concept for suburban apartment building renovation, extension and construction of additional storeys. The concept will make it possible to change from performance- and cost-based operation to novel service- and user-oriented, site-specifically tailored renovation methods utilizing integrated order and delivery chains.The present project is collaborating with Ministry of the Environment and participating cities in developing a new type of lighter town planning model for suburban renovations and in-fill construction. To support this, the project will simultaneously develop practices for environmental impact assessment tools in renovation and suburban supplementary and in-fill construction.

Keywords: energy efficiency, prefabrication, renovation concept, suburbs, sustainability, user-orientated

Procedia PDF Downloads 312
6453 Optimizing Design Works in Construction Consultant Company: A Knowledge-Based Application

Authors: Phan Nghiem Vu, Le Tuan Vu, Ta Quang Tai

Abstract:

The optimal construction design used during the execution of a construction project is a key factor in determining high productivity and customer satisfaction, however, this management process sometimes is carried out without care and the systematic method that it deserves, bringing negative consequences. This study proposes a knowledge management (KM) approach that will enable the intelligent use of experienced and acknowledged engineers to improve the management of construction design works for a project. Then a knowledge-based application to support this decision-making process is proposed and described. To define and design the system for the application, semi-structured interviews were conducted within five construction consulting organizations with the purpose of studying the way that the method’ optimizing process is implemented in practice and the knowledge supported with it. A system of an optimizing construction design works (OCDW) based on knowledge was developed then validated with construction experts. The OCDW was liked as a valuable tool for construction design works’ optimization, by supporting organizations to generate a corporate memory on this issue, reducing the reliance on individual knowledge and also the subjectivity of the decision-making process. The benefits are described as provided by the performance support system, reducing costs and time, improving product design quality, satisfying customer requirements, expanding the brand organization.

Keywords: optimizing construction design work, construction consultant organization, knowledge management, knowledge-based application

Procedia PDF Downloads 102
6452 The Use of Project to Enhance Learning Domains Stated by National Qualifications Framework: TQF

Authors: Duangkamol Thitivesa

Abstract:

This paper explores the use of project work in a content-based instruction in a Rajabhat University, Thailand. The use of project is to promote kinds of learning expected of student teachers as stated by Thailand Quality Framework: TQF. The kinds of learning are grouped into five domains: Ethical and moral development, knowledge, cognitive skill, interpersonal skills and responsibility, and analytical and communication skills. The content taught in class is used to lead the student teachers to relate their previously-acquired linguistic knowledge to meaningful realizations of the language system in passages of immediate relevance to their professional interests, teaching methods in particular. Two research questions are formulate to guide this study: 1) To what degree are the five domains of learning expected of student teachers after the use of project in a content class?, and 2) What is the academic achievement of the students’ writing skills, as part of the learning domains stated by TQF, against the 70% attainment target after the use of project to enhance the skill? The sample of the study comprised of 38 fourth-year English major students. The data was collected by means of a summative achievement test, student writing works, an observation checklist, and project diary. The scores in the summative achievement test were analyzed by mean score, standard deviation, and t-test. Project diary serves as students’ record of the language acquired during the project. List of structures and vocabulary noted in the diary has shown students’ ability to attend to, recognize, and focus on meaningful patterns of language forms.

Keywords: Thailand quality framework, project Work, writing skill, summative

Procedia PDF Downloads 131
6451 3rd Generation Modular Execution: A Global Breakthrough in Modular Facility Construction System

Authors: Sean Bryner S. Rey, Eric Tanjutco

Abstract:

Modular execution strategies are performed to address the various challenges of any projects and are implemented on each project phase that covers Engineering, Procurement, Fabrication and Construction. It was until the recent years that the intent to surpass mechanical modularization approach were conceptualized to give solution to much greater demands of project components such as site location and adverse weather condition, material sourcing, construction schedule, safety risks and overall plot layout and allocation. The intent of this paper is to introduce the 3rd Generation Modular Execution with an overview of its advantages on project execution and will give emphasis on Engineering, Construction, Operation and Maintenance. Most importantly, the paper will present the key differentiator of 3rd Gen modular execution against other conventional project execution and the merits it bears for the industry.

Keywords: 3rd generation modular, process block, construction, operation & maintenance

Procedia PDF Downloads 448
6450 Inventory Management to Minimize Storage Costs and Improve Delivery Time in a Pharmaceutical Industry

Authors: Israel Becerril Rosales, Manuel González De La Rosa, Gerardo Villa Sánchez

Abstract:

In this work, the effects that produce not having a good inventory management is analyzed, in addition of the way that how it affects the storage costs. The research began conducting the historical analysis about stored products, its storage capacity, and distribution. The results were not optimal, since in all its raw materials (RM) have overstocking, the warehouse capacity is only used by 61%, does not have a specific place for each of its RM, causing that the delivery times increases and makes difficult a cyclical inventory. These shortcomings allowed to view and select as design alternatives the inventory ABC, so that depending on the consumption of each RM would be redistributed by using economic amount requested. Also, the Delphi method to ensure the practical applicability of the proposed tool was used, taking in account comments and suggestions of the involved experts, as well as the compliance of NOM-059-SSA1-2015 good manufacturing practices of drug. With the actions implemented, the utilization rate drops of 61% to 32% capacity, it shows that the warehouse was not designed properly due to there is not an industrial engineering area.

Keywords: lead time, improve delivery, storage costs, inventory management

Procedia PDF Downloads 205
6449 From Customer Innovations to Manufactured Products: A Project Outlook

Authors: M. Holle, M. Roth, M. R. Gürtler, U. Lindemann

Abstract:

This paper gives insights into the research project "InnoCyFer" (in the form of an outlook) which is funded by the German Federal Ministry of Economics and Technology. Enabling the integrated customer individual product design as well as flexible manufacturing of these products are the main objectives of the project. To achieve this, a web-based open innovation-platform containing an integrated Toolkit will be developed. This toolkit enables the active integration of the customer’s creativity and potentials of innovation in the product development process. Furthermore, the project will show the chances and possibilities of customer individualized products by building and examining the continuous process from innovation through the customers to the flexible manufacturing of individual products.

Keywords: customer individual product design, innovation networks, open innovation, open innovation platform, toolkit

Procedia PDF Downloads 283
6448 Development of Intelligent Construction Management System Using Web-Camera Image and 3D Object Image

Authors: Hyeon-Seung Kim, Bit-Na Cho, Tae-Woon Jeong, Soo-Young Yoon, Leen-Seok Kang

Abstract:

Recently, a construction project has been large in the size and complicated in the site work. The web-cameras are used to manage the construction site of such a large construction project. They can be used for monitoring the construction schedule as compared to the actual work image of the planned work schedule. Specially, because the 4D CAD system that the construction appearance is continually simulated in a 3D CAD object by work schedule is widely applied to the construction project, the comparison system between the real image of actual work appearance by web-camera and the simulated image of planned work appearance by 3D CAD object can be an intelligent construction schedule management system (ICON). The delayed activities comparing with the planned schedule can be simulated by red color in the ICON as a virtual reality object. This study developed the ICON and it was verified in a real bridge construction project in Korea. To verify the developed system, a web-camera was installed and operated in a case project for a month. Because the angle and zooming of the web-camera can be operated by Internet, a project manager can easily monitor and assume the corrective action.

Keywords: 4D CAD, web-camera, ICON (intelligent construction schedule management system), 3D object image

Procedia PDF Downloads 485
6447 A 500 MWₑ Coal-Fired Power Plant Operated under Partial Oxy-Combustion: Methodology and Economic Evaluation

Authors: Fernando Vega, Esmeralda Portillo, Sara Camino, Benito Navarrete, Elena Montavez

Abstract:

The European Union aims at strongly reducing their CO₂ emissions from energy and industrial sector by 2030. The energy sector contributes with more than two-thirds of the CO₂ emission share derived from anthropogenic activities. Although efforts are mainly focused on the use of renewables by energy production sector, carbon capture and storage (CCS) remains as a frontline option to reduce CO₂ emissions from industrial process, particularly from fossil-fuel power plants and cement production. Among the most feasible and near-to-market CCS technologies, namely post-combustion and oxy-combustion, partial oxy-combustion is a novel concept that can potentially reduce the overall energy requirements of the CO₂ capture process. This technology consists in the use of higher oxygen content in the oxidizer that should increase the CO₂ concentration of the flue gas once the fuel is burnt. The CO₂ is then separated from the flue gas downstream by means of a conventional CO₂ chemical absorption process. The production of a higher CO₂ concentrated flue gas should enhance the CO₂ absorption into the solvent, leading to further reductions of the CO₂ separation performance in terms of solvent flow-rate, equipment size, and energy penalty related to the solvent regeneration. This work evaluates a portfolio of CCS technologies applied to fossil-fuel power plants. For this purpose, an economic evaluation methodology was developed in detail to determine the main economical parameters for CO₂ emission removal such as the levelized cost of electricity (LCOE) and the CO₂ captured and avoided costs. ASPEN Plus™ software was used to simulate the main units of power plant and solve the energy and mass balance. Capital and investment costs were determined from the purchased cost of equipment, also engineering costs and project and process contingencies. The annual capital cost and operating and maintenance costs were later obtained. A complete energy balance was performed to determine the net power produced in each case. The baseline case consists of a supercritical 500 MWe coal-fired power plant using anthracite as a fuel without any CO₂ capture system. Four cases were proposed: conventional post-combustion capture, oxy-combustion and partial oxy-combustion using two levels of oxygen-enriched air (40%v/v and 75%v/v). CO₂ chemical absorption process using monoethanolamine (MEA) was used as a CO₂ separation process whereas the O₂ requirement was achieved using a conventional air separation unit (ASU) based on Linde's cryogenic process. Results showed a reduction of 15% of the total investment cost of the CO₂ separation process when partial oxy-combustion was used. Oxygen-enriched air production also reduced almost half the investment costs required for ASU in comparison with oxy-combustion cases. Partial oxy-combustion has a significant impact on the performance of both CO₂ separation and O₂ production technologies, and it can lead to further energy reductions using new developments on both CO₂ and O₂ separation processes.

Keywords: carbon capture, cost methodology, economic evaluation, partial oxy-combustion

Procedia PDF Downloads 124
6446 Clarification of the Essential of Life Cycle Cost upon Decision-Making Process: An Empirical Study in Building Projects

Authors: Ayedh Alqahtani, Andrew Whyte

Abstract:

Life Cycle Cost (LCC) is one of the goals and key pillars of the construction management science because it comprises many of the functions and processes necessary, which assist organisations and agencies to achieve their goals. It has therefore become important to design and control assets during their whole life cycle, from the design and planning phase through to disposal phase. LCCA is aimed to improve the decision making system in the ownership of assets by taking into account all the cost elements including to the asset throughout its life. Current application of LCC approach is impractical during misunderstanding of the advantages of LCC. This main objective of this research is to show a different relationship between capital cost and long-term running costs. One hundred and thirty eight actual building projects in United Kingdom (UK) were used in order to achieve and measure the above-mentioned objective of the study. The result shown that LCC is one of the most significant tools should be considered on the decision making process.

Keywords: building projects, capital cost, life cycle cost, maintenance costs, operation costs

Procedia PDF Downloads 525
6445 Development of Methods for Plastic Injection Mold Weight Reduction

Authors: Bita Mohajernia, R. J. Urbanic

Abstract:

Mold making techniques have focused on meeting the customers’ functional and process requirements; however, today, molds are increasing in size and sophistication, and are difficult to manufacture, transport, and set up due to their size and mass. Presently, mold weight saving techniques focus on pockets to reduce the mass of the mold, but the overall size is still large, which introduces costs related to the stock material purchase, processing time for process planning, machining and validation, and excess waste materials. Reducing the overall size of the mold is desirable for many reasons, but the functional requirements, tool life, and durability cannot be compromised in the process. It is proposed to use Finite Element Analysis simulation tools to model the forces, and pressures to determine where the material can be removed. The potential results of this project will reduce manufacturing costs. In this study, a light weight structure is defined by an optimal distribution of material to carry external loads. The optimization objective of this research is to determine methods to provide the optimum layout for the mold structure. The topology optimization method is utilized to improve structural stiffness while decreasing the weight using the OptiStruct software. The optimized CAD model is compared with the primary geometry of the mold from the NX software. Results of optimization show an 8% weight reduction while the actual performance of the optimized structure, validated by physical testing, is similar to the original structure.

Keywords: finite element analysis, plastic injection molding, topology optimization, weight reduction

Procedia PDF Downloads 268
6444 Providing Open Access for Scholarly Information in Libya

Authors: Mohamed Abolgasem Arteimi, Ahlam Al-Tajori

Abstract:

This paper describes an ongoing project at the Libyan Academy. The project aims to build digital library for thesis and dissertations (ETD). The researchers developed a system based on Greenstone open source systems for building ETD digital library. A metadata for theses and dissertations was developed. The paper addresses issues related to project design, development and user satisfaction. Conclusions highlighted some important lessons learned to date.

Keywords: digital library, electronic theses and dissertations, open access, ETD, metadata

Procedia PDF Downloads 287
6443 Influence of Transportation Mode to the Deterioration Rate: Case Study of Food Transport by Ship

Authors: Danijela Tuljak-Suban, Valter Suban

Abstract:

Food as perishable goods represents a specific and sensitive part in the supply chain theory, since changing of its physical or chemical characteristics considerably influences the approach to stock management. The most delicate phase of this process is transportation, where it becomes difficult to ensure stability conditions that limit the deterioration, since the value of the deterioration rate could be easily influenced by the transportation mode. Fuzzy definition of variables allows taking into account these variations. Furthermore an appropriate choice of the defuzzification method permits to adapt results, as much as possible, to real conditions. In the article will be applied the those methods to the relationship between the deterioration rate of perishable goods and transportation by ship, with the aim: (a) to minimize the total costs function, defined as the sum of the ordering cost, holding cost, disposing cost and transportation costs, and (b) to improve supply chain sustainability by reducing the environmental impact and waste disposal costs.

Keywords: perishable goods, fuzzy reasoning, transport by ship, supply chain sustainability

Procedia PDF Downloads 523
6442 Correlation between Nutritional Status and Length of Stay and Hospital Costs in Critical Care and IPD Patients of Somdech Phra Debaratana Medical Center (SDMC), Faculty of Medicine, Ramathibodi Hospital

Authors: Nuttapimon Bhirommuang, Kulapong Jayanama

Abstract:

Background: Prevalence of malnutrition in hospitalized patient is higher than general population. As a result of the unawareness of consequence and the more concerning in the other aspects of care, many patients with high risk of malnutrition are unrecognized. Even if malnutrition has been identified as affecting in many patient outcomes, the impact may differ in each population and group of patients. Objectives: The aims of this study were to examine the association between the nutritional status and the length of stay and hospital costs in hospitalized patients, to investigate the factors related these outcomes and to determine the frequency of malnutrition in hospitals. Method: This retrospective cohort study enrolled all patients aged 15 years old or older and admitted in SDMC, Ramathibodi Hospital between 1st January 2016 and 30th September 2016. The nutritional status assessment by Nutrition Alert Form (NAF) was performed by well-trained nurses in all patients at admission. Baseline characteristics were recorded. Length of stay and hospital costs were collected during their hospitalization. Univariate analysis, nonparametric rank test, Kruskal-Wallis test were used to compare means in the case of nonnormally and noncontinuously distributed data. Chi-square used to analyze categorical variables, the nutritional status and the length of stay and hospital costs and identify possible confounding factors (data were analyzed using SPSS version 18.0). Result: Of the 2,906 patients, 3.9% were severe malnutrition (NAF-C score > 10) and 11.4% were moderate malnutrition (NAF-B score 6 - 10). Both length of stay and hospital costs were found significantly higher in more severe malnutrition group (p < 0.001), NAF = A: 3.21 days, 95% CI 3.06-3.35 and 111,544.25 THB, 95% CI 106,994.41 – 116,094.1; NAF = B: 7.54 days, 95% CI 6.32 – 8.76 and 162,302.4 THB, 95% CI 129,557.88 – 195,046.92; NAF =C: 14.77 days, 95% CI 11.34 – 18.2 and 323,572.11 THB, 95% CI 226,958.1 – 420,096.13 (1 THB = 0.03019 USD). Age of each nutritional status group had also significant increase from NAF A to NAF C (p < 0.001): 55.07, 67.03 and 73.88 years old, respectively. Conclusion: The prevalence of malnutrition in Ramathibodi hospital is voluminous. Severe malnutrition screening by NAF is significantly correlated with worse clinical outcome, especially higher length of stay and hospital costs. Elderly is also a significant factor which correlates with malnutrition. The results of this study could change the awareness of health personnel and the practice protocol. Moreover, the further study concerning nutritional support in high-risk group of malnutrition is ongoing to confirm this hypothesis.

Keywords: malnutrition, NAF, length of stay, hospital costs

Procedia PDF Downloads 250
6441 Reducing the Incidence Rate of Pressure Sore in a Medical Center in Taiwan

Authors: Chang Yu Chuan

Abstract:

Background and Aim: Pressure sore is not only the consequence of any gradual damage of the skin leading to tissue defects but also an important indicator of clinical care. If hospitalized patients develop pressure sores without proper care, it would result in delayed healing, wound infection, increase patient physical pain, prolonged hospital stay and even death, which would have a negative impact on the quality of care and also increase nursing manpower and medical costs. This project is aimed at decreasing the incidence of pressure sore in one ward of internal medicine. Our data showed 53 cases (0.61%) of pressure sore in 2015, which exceeded the average (0.5%) of Taiwan Clinical Performance Indicator (TCPI) for medical centers. The purpose of this project is to reduce the incidence rate of pressure sore in the ward. After data collection and analysis from January to December 2016, the reasons of developing pressure sore were found: 1. Lack of knowledge to prevent pressure among nursing staffs; 2. No relevant courses about preventing pressure ulcers and pressure wound care being held in this unit; 3. Low complete rate of pressure sore care education that family members should receive from nursing staffs; 4. Decompression equipment is not enough; 5. Lack of standard procedures for body-turning and positioning care. After team members brainstorming, several strategies were proposed, including holding in-service education, pressure sore care seed training, purchasing decompression mattress and memory pillows, designing more elements of health education tools, such as health education pamphlet, posters and multimedia films of body-turning and positioning demonstration, formulation and promotion of standard operating procedures. In this way, nursing staffs can understand the body-turning and positioning guidelines for pressure sore prevention and enhance the quality of care. After the implementation of this project, the pressure sore density significantly decreased from 0.61%(53 cases) to 0.45%(28 cases) in this ward. The project shows good results and good example for nurses working at the ward and helps to enhance quality of care.

Keywords: body-turning and positioning, incidence density, nursing, pressure sore

Procedia PDF Downloads 245
6440 Cross-Cultural Competence Development through 'Learning by Reflection': A Case Study of Chinese International Students Learning through Taking Part-Time Jobs in the UK

Authors: Xin Zhao

Abstract:

The project aims to expand the notion of narrative learning and address the importance of learning by reflection in our learning and teaching context at a British university. Drawing on the key concepts such as development ZPD, transition and reflection-in and –on-action, this project analyses the learning experiences of a small sample of Chinese postgraduate students in a British University, who use part-time job experience to develop cross-cultural communication skills. The project adopts a mixed methods approach. Questionnaires and focus group interviews are used to examine the way in which students adapt (or not adapt) to the culture of learning in a British university and develop a renewed sense of self in transitions from one culture to the other. The project also looks at how the students appropriate opportunities for learning not just from classrooms but outside classrooms from everyday encounters. The project aims to address the implication of learning by reflection as development in transition. Time in and for learning, or duration, is taken for granted in theorising narrative learning. The project shall explore this very issue of time in relation to learning by reflection in considering time in/of/for learning as duration.

Keywords: cross-cultural competence, learning by refection, international student transition, part-time work experience

Procedia PDF Downloads 165
6439 Application of Value Engineering Approach for Improving the Quality and Productivity of Ready-Mixed Concrete Used in Construction and Hydraulic Projects

Authors: Adel Mohamed El-Baghdady, Walid Sayed Abdulgalil, Ahmad Asran, Ibrahim Nosier

Abstract:

This paper studies the effectiveness of applying value engineering to actual concrete mixtures. The study was conducted in the State of Qatar on a number of strategic construction projects with international engineering specifications for the 2022 World Cup projects. The study examined the concrete mixtures of Doha Metro project and the development of KAHRAMAA’s (Qatar Electricity and Water Company) Abu Funtas Strategic Desalination Plant, in order to generally improve the quality and productivity of ready-mixed concrete used in construction and hydraulic projects. The application of value engineering to such concrete mixtures resulted in the following: i) improving the quality of concrete mixtures and increasing the durability of buildings in which they are used; ii) reducing the waste of excess materials of concrete mixture, optimizing the use of resources, and enhancing sustainability; iii) reducing the use of cement, thus reducing CO₂ emissions which ensures the protection of environment and public health; iv) reducing actual costs of concrete mixtures and, in turn, reducing the costs of construction projects; and v) increasing the market share and competitiveness of concrete producers. This research shows that applying the methodology of value engineering to ready-mixed concrete is an effective way to save around 5% of the total cost of concrete mixtures supplied to construction and hydraulic projects, improve the quality according to the technical requirements and as per the standards and specifications for ready-mixed concrete, improve the environmental impact, and promote sustainability.

Keywords: value management, cost of concrete, performance, optimization, sustainability, environmental impact

Procedia PDF Downloads 325
6438 Achieving Design-Stage Elemental Cost Planning Accuracy: Case Study of New Zealand

Authors: Johnson Adafin, James O. B. Rotimi, Suzanne Wilkinson, Abimbola O. Windapo

Abstract:

An aspect of client expenditure management that requires attention is the level of accuracy achievable in design-stage elemental cost planning. This has been a major concern for construction clients and practitioners in New Zealand (NZ). Pre-tender estimating inaccuracies are significantly influenced by the level of risk information available to estimators. Proper cost planning activities should ensure the production of a project’s likely construction costs (initial and final), and subsequent cost control activities should prevent unpleasant consequences of cost overruns, disputes and project abandonment. If risks were properly identified and priced at the design stage, observed variance between design-stage elemental cost plans (ECPs) and final tender sums (FTS) (initial contract sums) could be reduced. This study investigates the variations between design-stage ECPs and FTS of construction projects, with a view to identifying risk factors that are responsible for the observed variance. Data were sourced through interviews, and risk factors were identified by using thematic analysis. Access was obtained to project files from the records of study participants (consultant quantity surveyors), and document analysis was employed in complementing the responses from the interviews. Study findings revealed the discrepancies between ECPs and FTS in the region of -14% and +16%. It is opined in this study that the identified risk factors were responsible for the variability observed. The values obtained from the analysis would enable greater accuracy in the forecast of FTS by Quantity Surveyors. Further, whilst inherent risks in construction project developments are observed globally, these findings have important ramifications for construction projects by expanding existing knowledge on what is needed for reasonable budgetary performance and successful delivery of construction projects. The findings contribute significantly to the study by providing quantitative confirmation to justify the theoretical conclusions generated in the literature from around the world. This therefore adds to and consolidates existing knowledge.

Keywords: accuracy, design-stage, elemental cost plan, final tender sum

Procedia PDF Downloads 240
6437 Impact of Electric Vehicles on Energy Consumption and Environment

Authors: Amela Ajanovic, Reinhard Haas

Abstract:

Electric vehicles (EVs) are considered as an important means to cope with current environmental problems in transport. However, their high capital costs and limited driving ranges state major barriers to a broader market penetration. The core objective of this paper is to investigate the future market prospects of various types of EVs from an economic and ecological point of view. Our method of approach is based on the calculation of total cost of ownership of EVs in comparison to conventional cars and a life-cycle approach to assess the environmental benignity. The most crucial parameters in this context are km driven per year, depreciation time of the car and interest rate. The analysis of future prospects it is based on technological learning regarding investment costs of batteries. The major results are the major disadvantages of battery electric vehicles (BEVs) are the high capital costs, mainly due to the battery, and a low driving range in comparison to conventional vehicles. These problems could be reduced with plug-in hybrids (PHEV) and range extenders (REXs). However, these technologies have lower CO₂ emissions in the whole energy supply chain than conventional vehicles, but unlike BEV they are not zero-emission vehicles at the point of use. The number of km driven has a higher impact on total mobility costs than the learning rate. Hence, the use of EVs as taxis and in car-sharing leads to the best economic performance. The most popular EVs are currently full hybrid EVs. They have only slightly higher costs and similar operating ranges as conventional vehicles. But since they are dependent on fossil fuels, they can only be seen as energy efficiency measure. However, they can serve as a bridging technology, as long as BEVs and fuel cell vehicle do not gain high popularity, and together with PHEVs and REX contribute to faster technological learning and reduction in battery costs. Regarding the promotion of EVs, the best results could be reached with a combination of monetary and non-monetary incentives, as in Norway for example. The major conclusion is that to harvest the full environmental benefits of EVs a very important aspect is the introduction of CO₂-based fuel taxes. This should ensure that the electricity for EVs is generated from renewable energy sources; otherwise, total CO₂ emissions are likely higher than those of conventional cars.

Keywords: costs, mobility, policy, sustainability,

Procedia PDF Downloads 202
6436 Stakeholder Management for Successful Software Projects

Authors: Kassem Saleh

Abstract:

An alarming number of software projects fail to deliver the required functionalities within the provided budget and timeframe and with the required qualities. Some of the main reasons for this problem include bad stakeholder management, poor communications and informal change management. Informal processes to identify, engage and control stakeholders lead to these reasons. Recently, to emphasize its importance, the Project Management Institute (PMI) updated the Project Management Body of Knowledge (PMBoK) to explicitly include the stakeholder management knowledge area. This knowledge area consists of four processes to identify stakeholders, plan stakeholder management, and manage and control stakeholder engagement. The use of appropriate techniques for stakeholder management in software projects will definitely lead to higher quality and successful software. In this paper, we describe some of the proven techniques that can be used during the execution of the four processes for stakeholder management. Development of collaboration tools for automating these processes are recommended and need to be integrated in available software project management tools.

Keywords: project management, stakeholder management, software development, project management body of knowledge

Procedia PDF Downloads 274
6435 Empowering Youth Through Pesh Poultry: A Transformative Approach to Addressing Unemployment and Fostering Sustainable Livelihoods in Busia District, Uganda

Authors: Bisemiire Anthony,

Abstract:

PESH Poultry is a business project proposed specifically to solve unemployment and income-related problems affecting the youths in the Busia district. The project is intended to transform the life of the youth in terms of economic, social and behavioral, as well as the domestic well-being of the community at large. PESH Poultry is a start-up poultry farm that will be engaged in the keeping of poultry birds, broilers and layers for the production of quality and affordable poultry meat and eggs respectively and other poultry derivatives targeting consumers in eastern Uganda, for example, hotels, restaurants, households and bakeries. We intend to use a semi-intensive system of farming, where water and some food are provided in a separate nighttime shelter for the birds; our location will be in Lumino, Busia district. The poultry project will be established and owned by Bisemiire Anthony, Nandera Patience, Naula Justine, Bwire Benjamin and other investors. The farm will be managed and directed by Nandera Patience, who has five years of work experience and business administration knowledge. We will sell poultry products, including poultry eggs, chicken meat, feathers and poultry manure. We also offer consultancy services for poultry farming. Our eggs and chicken meat are hygienic, rich in protein and high quality. We produce processes and packages to meet the standard organization of Uganda and international standards. The business project shall comprise five (5) workers on the key management team who will share various roles and responsibilities in the identified business functions such as marketing, finance and other related poultry farming activities. PESH Poultry seeks 30 million Ugandan shillings in long-term financing to cover start-up costs, equipment, building expenses and working capital. Funding for the launch of the business will be provided primarily by equity from the investors. The business will reach positive cash flow in its first year of operation, allowing for the expected repayment of its loan obligations. Revenue will top UGX 11,750,000, and net income will reach about UGX115 950,000 in the 1st year of operation. The payback period for our project is 2 years and 3 months. The farm plans on starting with 1000 layer birds and 1000 broiler birds, 20 workers in the first year of operation.

Keywords: chicken, pullets, turkey, ducks

Procedia PDF Downloads 53
6434 Recent Developments and Expectations in the Legal Expenses Insurance in Turkey

Authors: İbrahim Arslan, Mücahit Ünal

Abstract:

An important issue to ensure justice is to simplify the right to seek justice. But there is a cost of seeking justice in civil law. It costs at least, attorneys' fees and judicial expenses during the beginning and in case of losing a trial. Indeed, most of the people refrain from seeking justice because of these expenses. Therefore, it is not inappropriate to say that the removal of obstacles staying on the way of seeking justice will increase the belief in justice. Legal expenses insurance is a private law contract of insurance in which the insurer is obliged to pay premiums of the insured, to provide the necessary services for the protection of legal interests of the insured person within the agreed scope. This type of insurance is being practiced in the Western world for a long time. The special rights, duties and obligations of the parties to a legal expenses insurance contract shall be governed by the Turkish Commercial Code (TCC) and the contractual agreements which are regularly closed in the form of general terms and conditions. If the number of the legal expenses insurance contracts concluded increase this will definitely improve the percentage of seeking justice before the courts. The general terms and conditions applicable in Turkey generally include litigation costs, referee fees, guarantee fund , enforcement costs , appeal costs borne decision corrections costs. In addition, besides the insured, other family members or the people specified in the policy are protected in the scope of personal/family legal expenses insurance. The commercial law disputes fall outside the scope of coverage in this insurance branch. The insured person chooses his own lawyer and the insurer is not allowed to give advice during the selection of a lawyer. In April 2015, the Prime Minister announced of a new era in the field of legal expenses insurance in Turkey and this announcement excited the insurance industry and legal community.

Keywords: insurance, in the Turkish law on legal protection insurance, legal protection insurance, legal protection

Procedia PDF Downloads 335
6433 The Influence of Beta Shape Parameters in Project Planning

Authors: Αlexios Kotsakis, Stefanos Katsavounis, Dimitra Alexiou

Abstract:

Networks can be utilized to represent project planning problems, using nodes for activities and arcs to indicate precedence relationship between them. For fixed activity duration, a simple algorithm calculates the amount of time required to complete a project, followed by the activities that comprise the critical path. Program Evaluation and Review Technique (PERT) generalizes the above model by incorporating uncertainty, allowing activity durations to be random variables, producing nevertheless a relatively crude solution in planning problems. In this paper, based on the findings of the relevant literature, which strongly suggests that a Beta distribution can be employed to model earthmoving activities, we utilize Monte Carlo simulation, to estimate the project completion time distribution and measure the influence of skewness, an element inherent in activities of modern technical projects. We also extract the activity criticality index, with an ultimate goal to produce more accurate planning estimations.

Keywords: beta distribution, PERT, Monte Carlo simulation, skewness, project completion time distribution

Procedia PDF Downloads 121