16791 Evaluation and Selection of Contractors in Construction Projects with a View Supply Chain Management and Utilization of Promthee

Authors: Sara Najiazarpour, Mahsa Najiazarpour

Abstract:

There are many problems in contracting projects and their performance. At each project stage and due to different reasons, these problems affect cost, time and overall project quality. Hence, in order to increase the efficiency and performance in all levels of the chain and with supply chain management approach, there will be a coordination from the beginning of a project (contractor selection) to the end of project (handover of project). Contractor selection is the foremost part of construction projects which in this multi-criteria decision-making, the best contractor is determined by expert judgment, different variables and their priorities. In this paper for selecting the best contractor, numerous criteria were collected by asking from adept experts and then among them, 16 criteria with highest frequency were considered for questionnaire. This questionnaire was distributed between experts. Cronbach's alpha coefficient was obtained as 72%. Then based on Borda's function 12 important criteria was selected which was categorized in four main criteria and related sub-criteria as follow: Environmental factors and physical equipment: procurement and materials (supplier), company's machines, contractor’s proposed cost estimate - financial capacity: bank turnover and company's assets, the income of tax declaration in last year, Ability to compensate for losses or delays - past performance- records and technical expertise: experts and key personnel, the past technical backgrounds and experiences, employer satisfaction of previous contracts, the number of similar projects was done - standards: rank and field of expertise which company is qualified for and its validity, availability and number of permitted projects done. Then with PROMTHEE method, the criteria were normalized and monitored, finally the best alternative was selected. In this research, qualitative criteria of each company is became a quantitative criteria. Finally, information of some companies was evaluated and the best contractor was selected based on all criteria and their priorities.

Keywords: contractor evaluation and selection, project development, supply chain management, PROMTHEE method

Procedia PDF Downloads 46
16790 Advancing Trustworthy Human-robot Collaboration: Challenges and Opportunities in Diverse European Industrial Settings

Authors: Margarida Porfírio Tomás, Paula Pereira, José Manuel Palma Oliveira

Abstract:

The decline in employment rates across sectors like industry and construction is exacerbated by an aging workforce. This has far-reaching implications for the economy, including skills gaps, labour shortages, productivity challenges due to physical limitations, and workplace safety concerns. To sustain the workforce and pension systems, technology plays a pivotal role. Robots provide valuable support to human workers, and effective human-robot interaction is essential. FORTIS, a Horizon project, aims to address these challenges by creating a comprehensive Human-Robot Interaction (HRI) solution. This solution focuses on multi-modal communication and multi-aspect interaction, with a primary goal of maintaining a human-centric approach. By meeting the needs of both human workers and robots, FORTIS aims to facilitate efficient and safe collaboration. The project encompasses three key activities: 1) A Human-Centric Approach involving data collection, annotation, understanding human behavioural cognition, and contextual human-robot information exchange. 2) A Robotic-Centric Focus addressing the unique requirements of robots during the perception and evaluation of human behaviour. 3) Ensuring Human-Robot Trustworthiness through measures such as human-robot digital twins, safety protocols, and resource allocation. Factor Social, a project partner, will analyse psycho-physiological signals that influence human factors, particularly in hazardous working conditions. The analysis will be conducted using a combination of case studies, structured interviews, questionnaires, and a comprehensive literature review. However, the adoption of novel technologies, particularly those involving human-robot interaction, often faces hurdles related to acceptance. To address this challenge, FORTIS will draw upon insights from Social Sciences and Humanities (SSH), including risk perception and technology acceptance models. Throughout its lifecycle, FORTIS will uphold a human-centric approach, leveraging SSH methodologies to inform the design and development of solutions. This project received funding from European Union’s Horizon 2020/Horizon Europe research and innovation program under grant agreement No 101135707 (FORTIS).

Keywords: skills gaps, productivity challenges, workplace safety, human-robot interaction, human-centric approach, social sciences and humanities, risk perception

Procedia PDF Downloads 22
16789 Voluntary Work Monetary Value and Cost-Benefit Analysis with 'Value Audit and Voluntary Investment' Technique: Case Study of Yazd Red Crescent Society Youth Members Voluntary Work in Health and Safety Plan for New Year's Passengers

Authors: Hamed Seddighi Khavidak

Abstract:

Voluntary work has a lot of economic and social benefits for a country, but the economic value is ignored because it is voluntary. The aim of this study is reviewing Monetary Value of Voluntary Work methods and comparing opportunity cost method and replacement cost method both in theory and in practice. Beside monetary value, in this study, we discuss cost-benefit analysis of health and safety plan in the New Year that conducted by young volunteers of Red Crescent society of Iran. Method: We discussed eight methods for monetary value of voluntary work including: Alternative-Employment Wage Approach, Leisure-Adjusted OCA, Volunteer Judgment OCA, Replacement Wage Approach, Volunteer Judgment RWA, Supervisor Judgment RWA, Cost of Counterpart Goods and Services and Beneficiary Judgment. Also, for cost benefit analysis we drew on 'value audit and volunteer investment' (VIVA) technique that is used widely in voluntary organizations like international federation of Red Cross and Red Crescent societies. Findings: In this study, using replacement cost approach, voluntary work by 1034 youth volunteers was valued 938000000 Riyals and using Replacement Wage Approach it was valued 2268713232 Riyals. Moreover, Yazd Red Crescent Society spent 212800000 Riyals on food and other costs for these volunteers. Discussion and conclusion: In this study, using cost benefit analysis method that is Volunteer Investment and Value Audit (VIVA), VIVA rate showed that for every Riyal that the Red Crescent Society invested in the health and safety of New Year's travelers in its volunteer project, four Riyals returned, and using the wage replacement approach, 11 Riyals returned. Therefore, New Year's travelers health and safety project were successful and economically, it was worthwhile for the Red Crescent Society because the output was much bigger than the input costs.

Keywords: voluntary work, monetary value, youth, red crescent society

Procedia PDF Downloads 190
16788 Environmental Impact Assessment Methodology of the Tirana–Elbasan Road Project

Authors: Aurora Cerri, Niko Pollojani

Abstract:

The Tirana – Elbasan Road project is the most important highway project in Albania, constructed in the period May 2011 - ongoing. This project included construction of 38 km highway category road including 2.6 km of tunnel. It serves as a corridor connecting the Tirana, Capital of Albania and South-East area, and in the near future it is expected to continue in the direction of Macedonian border. Environmental Impact Assesment procedure for this project is provided by the Albanian Environmental Law No. 10431. This law establishes the regulation of procedures for identifying, assessment and reporting on the effects of certain projects on the environment, and the associated administrative procedures, during the decision-making process by the Ministry of Environment and Tourism for issuing environmental permit, and ensures that all relevant information concerning the environment are provided and considered. Due to the nature and size of the project, during the environmental impact assessment process, the European Union legislation, namely the EIA Directive 85/337 / EEC is considered. Moreover, in some cases, due to the lack of national standards and practical guidelines, when necessary those of EU member countries are considered. This paper presents an analysis of the EIA procedure followed on ‘Tirana – Elbasan’ Road project, with a focus on the application of the main stages of the procedure such as: screening, scoping, review, the EIA report; and consideration of alternatives, measures for impact prevention and reduction, and the public hearing T/discussion.

Keywords: highway, environmental impact assesment, Tirana, prevention

Procedia PDF Downloads 292
16787 Agile Software Development Implementation in Developing a Diet Tracker Mobile Application

Authors: Dwi Puspita Sari, Gulnur Baltabayeva, Nadia Salman, Maxut Toleuov, Vijay Kanabar

Abstract:

Technology era drives people to use mobile phone to support their daily life activities. Technology development has a rapid phase which pushes the IT company to adjust any technology changes in order to fulfill customer’s satisfaction. As a result of that, many companies in the USA emerged from systematics software development approach to agile software development approach in developing systems and applications to develop many mobile phone applications in a short phase to fulfill user’s needs. As a systematic approach is considered as time consuming, costly, and too risky, agile software development has become a more popular approach to use for developing software including mobile applications. This paper reflects a short-term project to develop a diet tracker mobile application using agile software development that focused on applying scrum framework in the development process.

Keywords: agile software development, scrum, diet tracker, mobile application

Procedia PDF Downloads 230
16786 Synchronous Versus Asynchronous Telecollaboration in Intercultural Communication

Authors: Vita Kalnberzina, Lauren Miller Anderson

Abstract:

The aim of the paper is to report on the results of the telecollaboration project results carried out between the students of the University of Latvia, National Louis University in the US, and Austral University in Chili during the Intercultural Communication course. The objectives of the study are 1) to compare different forms of student telecollaboration and virtual exchange, 2) to collect and analyse the student feedback on the telecollaboration project, 3) to evaluate the products (films) produced during the telecollaboration project. The methods of research used are as follows: Survey of the student feedback after the project, video text analysis of the films produced by the students, and interview of the students participating in the project. We would like to compare the results of a three-year collaboration project, where we tried out synchronous telecollaboration and asynchronous collaboration. The different variables that were observed were the impact of the different time zones, different language proficiency levels of students, and different curricula developed for collaboration. The main findings suggest that the effort spent by students to organize meetings in different time zones and to get to know each other diminishes the quality of the product developed and thus reduces the students' feeling of accomplishment. Therefore, we would like to propose that asynchronous collaboration where the national teams work on a film project specifically developed by the students of one university for the students of another university ends up with a better quality film, which in its turn appeals more to the students of the other university and creates a deeper intercultural bond between the collaborating students.

Keywords: telecollaboration, intercultural communication, synchronous collaboration, asynchronous collaboration

Procedia PDF Downloads 74
16785 Experiences and Challenges of Community Participation in Urban Renewal Projects: A Case Study of Bhendi Bazzar, Mumbai, India

Authors: Madhura Yadav

Abstract:

Urban redevelopment planning initiatives in developing countries have been largely criticised due to top-down planning approach and lack of involvement of the targeted beneficiaries which have led to a challenging situation which is contrary to the perceived needs of beneficiaries. Urban renewal projects improve the lives of people and meaningful participation of community plays a pivotal role. Public perceptions on satisfaction and participation have been given less priority in the investigation, which hinders effective planning and implementation of urban renewal projects. Moreover, challenges of community participation in urban renewal projects are less documented, particularly in relation to public participation and satisfaction. There is a need for new paradigm shift focusing on community participatory approach in urban renewal projects. The over 125-year-old Bhendi Bazar in Mumbai, India is the country’s first ever cluster redevelopment project, popularly known as Bhendi Bazaar redevelopment and it will be one of the largest projects for urban rejuvenation of one of Mumbai’s oldest and dying inner city areas. The project is led by the community trust, inputs were taken from various stakeholders, including residents, commercial tenants and expert consultants to shape the master plan and design of the project. The project started in 2016 but there is a significant delay in implementing the project. The study aimed at studying and assessing public perceptions on satisfaction and the relationship between community participation and community satisfaction in Bhendi Bazaar of Mumbai, India. Furthermore, the study will outline the challenges and problems of community participation in urban renewal projects and it suggests recommendations for the future. The qualitative and quantitative methods such as reconnaissance survey, key informant interviews, focus group discussions, walking interviews, a narrative inquiry is used for analysis of data. Preliminary findings revealed that all tenants are satisfied for the redevelopment of an area but the willingness of residential tenants to move in transit accommodation has made the projects successful and reductant of some residential and commercial tenants, regulatory provisions rising to face challenges in implementation. Experiences from the case study can help to understand dynamics behind public participation and government. At the same time, they serve as an inspiration and learning opportunity for future projects to ensure that they are sustainable not only from an economic standpoint but also, a social perspective.

Keywords: urban renewal, Bhendi Bazaar, community participation, satisfaction, social perspective

Procedia PDF Downloads 150
16784 Major Causes of Delay in Construction Projects

Authors: Y. Gholipour, E. Rezazadeh

Abstract:

Delay is one of the most serious and common problems of construction project that can affect project delivery unfavorably. This research presents the most important causes of delay in large dam projects based on a survey on some executed dam construction in Iran. In this survey a randomly selected samples of owners, consultants and contractors have been involved. The outcome of this survey revealed that scheduled payments, site management, shop drawing review process, unforeseen ground conditions and contractor experience as the most important factors affecting on delay in dam construction projects.

Keywords: delay, dam construction, project management, Iran

Procedia PDF Downloads 418
16783 The Study of Strength and Weakness Points of Various Techniques for Calculating the Volume of Done Work in Civil Projects

Authors: Ali Fazeli Moslehabadi

Abstract:

One of the topics discussed in civil projects, during the execution of the project, which the continuous change of work volumes is usually the characteristics of these types of projects, is how to calculate the volume of done work. The difference in volumes announced by the execution unit with the estimated volume by the technical office unit, has direct effect on the announced progress of the project. This issue can show the progress of the project more or less than actual value and as a result making mistakes for stakeholders and project managers and misleading them. This article intends to introduce some practical methods for calculating the volume of done work in civil projects. It then reviews the strengths and weaknesses of each of them, in order to resolve these contradictions and conflicts.

Keywords: technical skills, systemic skills, communication skills, done work volume calculation techniques

Procedia PDF Downloads 135
16782 Text2Time: Transformer-Based Article Time Period Prediction

Authors: Karthick Prasad Gunasekaran, B. Chase Babrich, Saurabh Shirodkar, Hee Hwang

Abstract:

Construction preparation is crucial for the success of a construction project. By involving project participants early in the construction phase, project managers can plan ahead and resolve issues early, resulting in project success and satisfaction. This study uses quantitative data from construction management projects to determine the relationship between the pre-construction phase, construction schedule, and customer satisfaction. This study examined a total of 65 construction projects and 93 clients per job to (a) identify the relationship between the pre-construction phase and program reduction and (b) the pre-construction phase and customer retention. Based on a quantitative analysis, this study found a negative correlation between pre-construction status and project schedule in 65 construction projects. This finding means that the more preparatory work done on a particular project, the shorter the total construction time. The Net Promoter Score of 93 clients from 65 projects was then used to determine the relationship between construction preparation and client satisfaction. The pre-construction status and the projects were further analyzed, and a positive correlation between them was found. This shows that customers are happier with projects with a higher ready-to-build ratio than projects with less ready-to-build.

Keywords: NLP, BERT, LLM, deep learning, classification

Procedia PDF Downloads 70
16781 Exploring the Critical Success Factors of Construction Stakeholders Team Effectiveness

Authors: Olusegun Akinsiku, Olukayode Oyediran, Koleola Odusami

Abstract:

A construction project is usually made up of a variety of stakeholders whose interests may positively or negatively impact on the outcome of the project execution. The variability of project stakeholders is apparent in their cultural differences, professional background and ethics, and differences in ideas. The need for the effectiveness of construction teams has been investigated as this is an important aspect to meeting client’s expectations in the construction industry. This study adopts a cross-sectional descriptive survey with the purpose of identifying the critical success factors (CSFs) associated with the team effectiveness of construction projects stakeholders, their relationship and the effects on construction project performance. The instrument for data collection was a designed questionnaire which was administered to construction professionals in the construction industry in Lagos State, Nigeria using proportionate stratified sampling. The highest ranked identified CSFs include “team trust”, “esprit de corps among members” and “team cohesiveness”. Using factor analysis and considering the effects of team cohesiveness on project performance, the identified CSFs were categorized into three groups namely cognitive attributes, behavior and processes attributes and affective attributes. All the three groups were observed to have a strong correlation with project performance. The findings of this study are useful in helping construction stakeholders benchmark the team effectiveness factors that will guarantee project success.

Keywords: construction, critical success factors, performance, stakeholders, team effectiveness

Procedia PDF Downloads 107
16780 Extraction of Grapefruit Essential Oil from Grapefruit Peels

Authors: Adithya Subramanian, S. Ananthan, T. Prasanth, S. P. Selvabharathi

Abstract:

This project involves extraction of grapefruit essential oil from grapefruit peels using various oils like castor oil, gingelly oil, olive oil as carrier oils. The main aim of this project is to extract the oil which has numerous medicinal uses. The extraction can be performed by two methods. Project involves extraction of the oil with various carrier oil in a view to reduce the cost of production and the physical properties of the extracted oil are examined.

Keywords: essential oil, carrier oil, medicinal uses, cost of production

Procedia PDF Downloads 408
16779 An Investigation into the Current Implementation of Design-Build Contracts in the Kingdom of Saudi Arabia

Authors: Ibrahim A. Alhammad, Suleiman A. Al-Otaibi, Khalid S. Al-Gahtani, Naïf Al-Otaibi, Abdulaziz A. Bubshait

Abstract:

In the last decade, the use of project delivery system of design build engineering contracts is increasing in North America due to the reasons of reducing the project duration and minimizing costs. The shift from traditional approach of Design-Bid-Build to Design-Build contracts have been attributed to many factors such as evolution of the regulatory and legal frameworks governing the engineering contracts and improvement in integrating design and construction. The aforementioned practice of contracting is more appropriate in North America; yet, it may not be the case in Saudi Arabia where the traditional approach of construction contracting remains dominant. The authors believe there are number of factors related to the gaps in the level of sophistication of the engineering and management of the construction projects in both countries. A step towards improving the Saudi construction practice by adopting the new trend of construction contracting, this paper identifies the reasons why Design/Build form of contracting are not frequently utilized. A field survey, which includes the questionnaire addressing the research problem, is distributed to three main parties of the construction contracts: clients, consultants, and contractors. The analyzed collected data were statistically sufficient to finding the reasons of not adopting the new trend of good practice of deign build approach in Saudi Arabia. In addition, the reasons are: (1) lack of regulation and legal framework; (2) absence of clear criteria of the owner for the trade-off between competing contractors, (3) and lack of experience, knowledge and skill.

Keywords: design built projects, Saudi Arabia, GCC, mega projects

Procedia PDF Downloads 193
16778 Improving Public Sectors’ Policy Direction on Large Infrastructure Investment Projects: A Developmental Approach

Authors: Ncedo Cameron Xhala

Abstract:

Several public sector institutions lack policy direction on how to successfully implement their large infrastructure investment projects. It is significant to improve strategic policy direction in public sector institutions in order to improve planning, management and implementation of large infrastructure investment projects. It is significant to improve an understanding of internal and external pressures that exerts pressure on large infrastructure projects. The significance is to fulfill the public sector’s mandate, align the sectors’ scarce resources, stakeholders and to improve project management processes. The study used a case study approach which was underpinned by a constructionist approach. The study used a theoretical sampling technique when selecting study participants, and was followed by a snowball sampling technique that was used to select an identified case study project purposefully. The study was qualitative in nature, collected and analyzed qualitative empirical data from the purposefully selected five subject matter experts and has analyzed the case study documents. The study used a semi-structured interview approach, analysed case study documents in a qualitative approach. The interviews were on a face-to-face basis and were guided by an interview guide with focused questions. The study used a three coding process step comprising of one to three steps when analysing the qualitative empirical data. Findings reveal that an improvement of strategic policy direction in public sector institutions improves the integration in planning, management and on implementation on large infrastructure investment projects. Findings show the importance of understanding the external and internal pressures when implementing public sector’s large infrastructure investment projects. The study concludes that strategic policy direction in public sector institutions results in improvement of planning, financing, delivery, monitoring and evaluation and successful implementation of the public sector’s large infrastructure investment projects.

Keywords: implementation, infrastructure, investment, management

Procedia PDF Downloads 130
16777 Digital Twins: Towards an Overarching Framework for the Built Environment

Authors: Astrid Bagireanu, Julio Bros-Williamson, Mila Duncheva, John Currie

Abstract:

Digital Twins (DTs) have entered the built environment from more established industries like aviation and manufacturing, although there has never been a common goal for utilising DTs at scale. Defined as the cyber-physical integration of data between an asset and its virtual counterpart, DT has been identified in literature from an operational standpoint – in addition to monitoring the performance of a built asset. However, this has never been translated into how DTs should be implemented into a project and what responsibilities each project stakeholder holds in the realisation of a DT. What is needed is an approach to translate these requirements into actionable DT dimensions. This paper presents a foundation for an overarching framework specific to the built environment. For the purposes of this research, the UK widely used the Royal Institute of British Architects (RIBA) Plan of Work from 2020 is used as a basis for itemising project stages. The RIBA Plan of Work consists of eight stages designed to inform on the definition, briefing, design, coordination, construction, handover, and use of a built asset. Similar project stages are utilised in other countries; therefore, the recommendations from the interviews presented in this paper are applicable internationally. Simultaneously, there is not a single mainstream software resource that leverages DT abilities. This ambiguity meets an unparalleled ambition from governments and industries worldwide to achieve a national grid of interconnected DTs. For the construction industry to access these benefits, it necessitates a defined starting point. This research aims to provide a comprehensive understanding of the potential applications and ramifications of DT in the context of the built environment. This paper is an integral part of a larger research aimed at developing a conceptual framework for the Architecture, Engineering, and Construction (AEC) sector following a conventional project timeline. Therefore, this paper plays a pivotal role in providing practical insights and a tangible foundation for developing a stage-by-stage approach to assimilate the potential of DT within the built environment. First, the research focuses on a review of relevant literature, albeit acknowledging the inherent constraint of limited sources available. Secondly, a qualitative study compiling the views of 14 DT experts is presented, concluding with an inductive analysis of the interview findings - ultimately highlighting the barriers and strengths of DT in the context of framework development. As parallel developments aim to progress net-zero-centred design and improve project efficiencies across the built environment, the limited resources available to support DTs should be leveraged to propel the industry to reach its digitalisation era, in which AEC stakeholders have a fundamental role in understanding this, from the earliest stages of a project.

Keywords: digital twins, decision-making, design, net-zero, built environment

Procedia PDF Downloads 85
16776 Analyze and Improve Project Delivery Time Enhancing Business Management System of Review and Approval Process for Project Design Submittals

Authors: Abdulaziz Alnajem, Amit Sharma

Abstract:

Business Case: Project delivery and enhancing activities' completion in the shortest possible time is critical during execution to proceed with the subsequent phases of Procurement, C & C phases of Contracts to have the required Production facilities/Infrastructure in place to achieve the Company strategic objective of 4.0 MBOPD oil production. SOR (Statement of requirement): Design and Engineering phase of Projects execution takes a long time. It is observed that, in most of the cases, company has crossed the Project Design Submittals review time as per the Contract/Company Standards, resulting into delays in projects completion, and cost impact to the company. Study Scope: Scope of the study covers the process from date of first submission of D & E documents by the contractor to final approval by the controlling team to proceed with the procurement of materials. This scope covers projects handled by the company’s project management teams and includes only the internal review process by the company.

Keywords: business management system, project management, oil and gas, analysis, improvement, design, delays

Procedia PDF Downloads 191
16775 Kiira EV Project Transition from Student to Professional Team through Project-Based Skills Development

Authors: Doreen Orishaba, Paul Isaac Musasizi, Richard Madanda, Sandy Stevens Tickodri-Togboa

Abstract:

The world of academia tends to be a very insular place. Consequently, scholars who successfully completed their undergraduate and graduate studies are unpleasantly surprised at how challenging the transition to corporate life can get. This is a global trend even as the students who juggle work with attending some of the most demanding and best graduate programs may not easily adjust to and confirm to the professionalism required for corporate management of the industry. This paper explores the trends in the transition of Kiira EV Project from a predominantly student team to a professional team of a national pride program through mentorship and apprenticeship. The core disciplines within the Kiira EV Project include Electrical and Electronics Engineering, Mechanical Engineering, and Industrial Design.

Keywords: mentorship, apprenticeship, professional, development

Procedia PDF Downloads 383
16774 Schedule Risk Management for Complex Projects: The Royal Research Ship: Sir David Attenborough Case Study

Authors: Chatelier Charlene, Oyegoke Adekunle, Ajayi Saheed, Jeffries Andrew

Abstract:

This study seeks to understand Schedule Risk Assessments as a priori for better performance whilst exploring the strategies employed to deliver complex projects like the New Polar research ship. This high-profile vessel was offered to Natural Environment Research Council and British Antarctic Survey (BAS) by Cammell Laird Shipbuilders. The Research Ship was designed to support science in extreme environments, with the expectancy to provide a wide range of specialist scientific facilities, instruments, and laboratories to conduct research over multiple disciplines. Aim: The focus is to understand the allocation and management of schedule risk on such a Major Project. Hypothesising that "effective management of schedule risk management" could be the most critical factor in determining whether the intended benefits mentioned are delivered within time and cost constraints. Objective 1: Firstly, the study seeks to understand the allocation and management of schedule risk in Major Projects. Objective 2: Secondly, it explores "effective management of schedule risk management" as the most critical factor determining the delivery of intended benefits. Methodology: This study takes a retrospective review of schedule risk management and how it influences project performance using a case study approach for the RRS (Royal Research Ship) Sir David Attenborough. Research Contribution: The outcomes of this study will contribute to a better understanding of project performance whilst building on its under-researched relationship to schedule risk management for complex projects. The outcomes of this paper will guide further research on project performance and enable the understanding of how risk-based estimates over time impact the overall risk management of the project.

Keywords: complexity, major projects, performance management, schedule risk management, uncertainty

Procedia PDF Downloads 73
16773 Ontological Modeling Approach for Statistical Databases Publication in Linked Open Data

Authors: Bourama Mane, Ibrahima Fall, Mamadou Samba Camara, Alassane Bah

Abstract:

At the level of the National Statistical Institutes, there is a large volume of data which is generally in a format which conditions the method of publication of the information they contain. Each household or business data collection project includes a dissemination platform for its implementation. Thus, these dissemination methods previously used, do not promote rapid access to information and especially does not offer the option of being able to link data for in-depth processing. In this paper, we present an approach to modeling these data to publish them in a format intended for the Semantic Web. Our objective is to be able to publish all this data in a single platform and offer the option to link with other external data sources. An application of the approach will be made on data from major national surveys such as the one on employment, poverty, child labor and the general census of the population of Senegal.

Keywords: Semantic Web, linked open data, database, statistic

Procedia PDF Downloads 155
16772 Design and Analysis of Electric Power Production Unit for Low Enthalpy Geothermal Reservoir Applications

Authors: Ildar Akhmadullin, Mayank Tyagi

Abstract:

The subject of this paper is the design analysis of a single well power production unit from low enthalpy geothermal resources. A complexity of the project is defined by a low temperature heat source that usually makes such projects economically disadvantageous using the conventional binary power plant approach. A proposed new compact design is numerically analyzed. This paper describes a thermodynamic analysis, a working fluid choice, downhole heat exchanger (DHE) and turbine calculation results. The unit is able to produce 321 kW of electric power from a low enthalpy underground heat source utilizing n-Pentane as a working fluid. A geo-pressured reservoir located in Vermilion Parish, Louisiana, USA is selected as a prototype for the field application. With a brine temperature of 126℃, the optimal length of DHE is determined as 304.8 m (1000ft). All units (pipes, turbine, and pumps) are chosen from commercially available parts to bring this project closer to the industry requirements. Numerical calculations are based on petroleum industry standards. The project is sponsored by the Department of Energy of the US.

Keywords: downhole heat exchangers, geothermal power generation, organic rankine cycle, refrigerants, working fluids

Procedia PDF Downloads 297
16771 A New Suburb Renovation Concept

Authors: Anu Soikkelii, Laura Sorri

Abstract:

Finnish national research project, User- and Business-oriented Suburb Renovation Concept (KLIKK), was started in January 2012 and will end in June 2014. The perspective of energy efficiency is emphasised in the project, but also it addresses what improving the energy efficiency of suburban apartment buildings means from the standpoint of architecturally valuable buildings representing different periods. The project will also test the impacts of stricter energy efficiency requirements on renovation projects. The primary goal of the project is to develop a user-oriented, industrial, economic renovation concept for suburban apartment building renovation, extension and construction of additional storeys. The concept will make it possible to change from performance- and cost-based operation to novel service- and user-oriented, site-specifically tailored renovation methods utilizing integrated order and delivery chains.The present project is collaborating with Ministry of the Environment and participating cities in developing a new type of lighter town planning model for suburban renovations and in-fill construction. To support this, the project will simultaneously develop practices for environmental impact assessment tools in renovation and suburban supplementary and in-fill construction.

Keywords: energy efficiency, prefabrication, renovation concept, suburbs, sustainability, user-orientated

Procedia PDF Downloads 314
16770 The Use of Project to Enhance Learning Domains Stated by National Qualifications Framework: TQF

Authors: Duangkamol Thitivesa

Abstract:

This paper explores the use of project work in a content-based instruction in a Rajabhat University, Thailand. The use of project is to promote kinds of learning expected of student teachers as stated by Thailand Quality Framework: TQF. The kinds of learning are grouped into five domains: Ethical and moral development, knowledge, cognitive skill, interpersonal skills and responsibility, and analytical and communication skills. The content taught in class is used to lead the student teachers to relate their previously-acquired linguistic knowledge to meaningful realizations of the language system in passages of immediate relevance to their professional interests, teaching methods in particular. Two research questions are formulate to guide this study: 1) To what degree are the five domains of learning expected of student teachers after the use of project in a content class?, and 2) What is the academic achievement of the students’ writing skills, as part of the learning domains stated by TQF, against the 70% attainment target after the use of project to enhance the skill? The sample of the study comprised of 38 fourth-year English major students. The data was collected by means of a summative achievement test, student writing works, an observation checklist, and project diary. The scores in the summative achievement test were analyzed by mean score, standard deviation, and t-test. Project diary serves as students’ record of the language acquired during the project. List of structures and vocabulary noted in the diary has shown students’ ability to attend to, recognize, and focus on meaningful patterns of language forms.

Keywords: Thailand quality framework, project Work, writing skill, summative

Procedia PDF Downloads 131
16769 Enhancing Problem Communication and Management Using Civil Information Modeling for Infrastructure Projects

Authors: Yu-Cheng Lin, Yu-Chih Su

Abstract:

Generally, there are many numerous existing problems during the construction phase special in civil engineering. The problems communication and management (PCM) of civil engineering are important and necessary to enhance the performance of construction management. The civil information modelling (CIM) approach is used to retain information with digital format and assist easy updating and transferring of information in the 3D environment for all related civil and infrastructure projects. When the application of CIM technology is adopted in infrastructure projects, all the related project participants can discuss problems and obtain feedback and responds among project participants integrated with the assistance of CIM models 3D illustration. Usually, electronic mail (e-mail) is one of the most popular communication tools among all related participants for rapid transit system (MRT), also known as a subway or metro, construction project in Taiwan. Furthermore, all interfaces should be traced and managed effectively during the process. However, there are many problems with the use of e-mail for communication of all interfaces. To solve the above problems, this study proposes a CIM-based Problem Communication and Management (CPCM) system to improve performance of problem communication and management. The CPCM system is applied to a case study of an MRT project in Taiwan to identify its CPCM effectiveness. Case study results show that the proposed CPCM system and Markup-enabled CIM Viewer are effective CIM-based communication tools in CIM-supported PCM work of civil engineering. Finally, this study identifies conclusion, suggestion, benefits, and limitations for further applications.

Keywords: building information modeling, civil information modeling, infrastructure, general contractor

Procedia PDF Downloads 132
16768 The Global Language Teaching Spots to Accelerate Globalization and Equitable Economic Development Worldwide

Authors: Setyo Pamuji

Abstract:

The basis of this research is to create an international business project by developing an area in every country which focused on global language teaching to accelerate huge project of internationalization for mankind better with equity. It is to make an ease, learning more effective and efficient as well as economic development significantly at the place. Some have attempted to establish it, but could have not succeeded. This study uses stratified random sampling method to determine respondents. It is caused by population coming from around of Indonesia which is heterogeneity. Above all, researcher has already known well the spot including the mapping of students and societies, over 5-year, from beginning studying English (2011) until teaching English (2015). This quantitative research is able to analyze the vital factor of successful Language Village at Pare, Kediri, East Java, Indonesia which has never been obtained anywhere. This project provides valuable information regarding management used by the Language Village. Overall approach depicts vigorous marketing strategy and dedication blended. This will allow for more individual consideration of economist and may direct future research on the uniqueness of the Language Village to ascertain more profound understanding of the village which succeeds inviting people from other places to come, beside formal management and marketing.

Keywords: internationalization, accelerate, global language, economic development, blended, globalization

Procedia PDF Downloads 159
16767 From Customer Innovations to Manufactured Products: A Project Outlook

Authors: M. Holle, M. Roth, M. R. Gürtler, U. Lindemann

Abstract:

This paper gives insights into the research project "InnoCyFer" (in the form of an outlook) which is funded by the German Federal Ministry of Economics and Technology. Enabling the integrated customer individual product design as well as flexible manufacturing of these products are the main objectives of the project. To achieve this, a web-based open innovation-platform containing an integrated Toolkit will be developed. This toolkit enables the active integration of the customer’s creativity and potentials of innovation in the product development process. Furthermore, the project will show the chances and possibilities of customer individualized products by building and examining the continuous process from innovation through the customers to the flexible manufacturing of individual products.

Keywords: customer individual product design, innovation networks, open innovation, open innovation platform, toolkit

Procedia PDF Downloads 285
16766 Development of Intelligent Construction Management System Using Web-Camera Image and 3D Object Image

Authors: Hyeon-Seung Kim, Bit-Na Cho, Tae-Woon Jeong, Soo-Young Yoon, Leen-Seok Kang

Abstract:

Recently, a construction project has been large in the size and complicated in the site work. The web-cameras are used to manage the construction site of such a large construction project. They can be used for monitoring the construction schedule as compared to the actual work image of the planned work schedule. Specially, because the 4D CAD system that the construction appearance is continually simulated in a 3D CAD object by work schedule is widely applied to the construction project, the comparison system between the real image of actual work appearance by web-camera and the simulated image of planned work appearance by 3D CAD object can be an intelligent construction schedule management system (ICON). The delayed activities comparing with the planned schedule can be simulated by red color in the ICON as a virtual reality object. This study developed the ICON and it was verified in a real bridge construction project in Korea. To verify the developed system, a web-camera was installed and operated in a case project for a month. Because the angle and zooming of the web-camera can be operated by Internet, a project manager can easily monitor and assume the corrective action.

Keywords: 4D CAD, web-camera, ICON (intelligent construction schedule management system), 3D object image

Procedia PDF Downloads 487
16765 Providing Open Access for Scholarly Information in Libya

Authors: Mohamed Abolgasem Arteimi, Ahlam Al-Tajori

Abstract:

This paper describes an ongoing project at the Libyan Academy. The project aims to build digital library for thesis and dissertations (ETD). The researchers developed a system based on Greenstone open source systems for building ETD digital library. A metadata for theses and dissertations was developed. The paper addresses issues related to project design, development and user satisfaction. Conclusions highlighted some important lessons learned to date.

Keywords: digital library, electronic theses and dissertations, open access, ETD, metadata

Procedia PDF Downloads 289
16764 Building Information Modelling Based Value for Money Assessment in Public-Private Partnership

Authors: Guoqian Ren, Haijiang Li, Jisong Zhang

Abstract:

Over the past 40 years, urban development has undergone large-scale, high-speed expansion, beyond what was previously considered normal and in a manner not proportionally related to population growth or physical considerations. With more scientific and refined decision-making in the urban construction process, new urbanization approaches, aligned with public-private partnerships (PPPs) which evolved in the early 1990s, have become acceptable and, in some situations, even better solutions to outstanding urban municipal construction projects, especially in developing countries. However, as the main driving force to deal with urban public services, PPPs are still problematic regarding value for money (VFM) process in most large-scale construction projects. This paper therefore reviews recent PPP articles in popular project management journals and relevant toolkits, published in the last 10 years, to identify the indicators that influence VFM within PPPs across regions. With increasing concerns about profitability and environmental and social impacts, the current PPP structure requires a more integrated platform to manage multi-performance project life cycles. Building information modelling (BIM), a popular approach to the procurement process in AEC sectors, provides the potential to ensure VFM while also working in tandem with the semantic approach to holistically measure life cycle costs (LCC) and achieve better sustainability. This paper suggests that BIM applied to the entire PPP life cycle could support holistic decision-making regarding VFM processes and thus meet service targets.

Keywords: public-private partnership, value for money, building information modelling, semantic approach

Procedia PDF Downloads 186
16763 Children's Literature with Mathematical Dialogue for Teaching Mathematics at Elementary Level: An Exploratory First Phase about Students’ Difficulties and Teachers’ Needs in Third and Fourth Grade

Authors: Goulet Marie-Pier, Voyer Dominic, Simoneau Victoria

Abstract:

In a previous research project (2011-2019) funded by the Quebec Ministry of Education, an educational approach was developed based on the teaching and learning of place value through children's literature. Subsequently, the effect of this approach on the conceptual understanding of the concept among first graders (6-7 years old) was studied. The current project aims to create a series of children's literature to help older elementary school students (8-10 years old) in developing a conceptual understanding of complex mathematical concepts taught at their grade level rather than a more typical procedural understanding. Knowing that there are no educational material or children's books that exist to achieve our goals, four stories, accompanied by mathematical activities, will be created to support students, and their teachers, in the learning and teaching of mathematical concepts that can be challenging within their mathematic curriculum. The stories will also introduce a mathematical dialogue into the characters' discourse with the aim to address various mathematical foundations for which there are often erroneous statements among students and occasionally among teachers. In other words, the stories aim to empower students seeking a real understanding of difficult mathematical concepts, as well as teachers seeking a way to teach these difficult concepts in a way that goes beyond memorizing rules and procedures. In order to choose the concepts that will be part of the stories, it is essential to understand the current landscape regarding the main difficulties experienced by students in third and fourth grade (8-10 years old) and their teacher’s needs. From this perspective, the preliminary phase of the study, as discussed in the presentation, will provide critical insight into the mathematical concepts with which the target grade levels struggle the most. From this data, the research team will select the concepts and develop their stories in the second phase of the study. Two questions are preliminary to the implementation of our approach, namely (1) what mathematical concepts are considered the most “difficult to teach” by teachers in the third and fourth grades? and (2) according to teachers, what are the main difficulties encountered by their students in numeracy? Self-administered online questionnaires using the SimpleSondage software will be sent to all third and fourth-grade teachers in nine school service centers in the Quebec region, representing approximately 300 schools. The data that will be collected in the fall of 2022 will be used to compare the difficulties identified by the teachers with those prevalent in the scientific literature. Considering that this ensures consistency between the proposed approach and the true needs of the educational community, this preliminary phase is essential to the relevance of the rest of the project. It is also an essential first step in achieving the two ultimate goals of the research project, improving the learning of elementary school students in numeracy, and contributing to the professional development of elementary school teachers.

Keywords: children’s literature, conceptual understanding, elementary school, learning and teaching, mathematics

Procedia PDF Downloads 70
16762 Department of Social Development/Japan International Cooperation Agency's Journey from South African Community to Southern African Region

Authors: Daisuke Sagiya, Ren Kamioka

Abstract:

South Africa has ratified the United Nations Convention on the Rights of Persons with Disabilities (UNCRPD) on 30th November 2007. In line with this, the Department of Social Development (DSD) revised the White Paper on the Rights of Persons with Disabilities (WPRPD), and the Cabinet approved it on 9th December 2015. The South African government is striving towards the elimination of poverty and inequality in line with UNCRPD and WPRPD. However, there are minimal programmes and services that have been provided to persons with disabilities in the rural community. In order to address current discriminative practices, disunity and limited self-representation in rural community, DSD in cooperation with the Japan International Cooperation Agency (JICA) is implementing the 'Project for the Promotion of Empowerment of Persons with Disabilities and Disability Mainstreaming' from May 2016 to May 2020. The project is targeting rural community as the project sites, namely 1) Collins Chabane municipality, Vhembe district, Limpopo and 2) Maluti-a-Phofung municipality, Thabo Mofutsanyana district, Free State. The project aims at developing good practices on Community-Based Inclusive Development (CBID) at the project sites which will be documented as a guideline and applied in other provinces in South Africa and neighbouring countries (Lesotho, Swaziland, Botswana, Namibia, Zimbabwe, and Mozambique). In cooperation with provincial and district DSD and local government, the project is currently implementing various community activities, for example: Establishment of Self-Help Group (SHG) of persons with disabilities and Peer Counselling in the villages, and will conduct Disability Equality Training (DET) and accessibility workshop in order to enhance the CBID in the project sites. In order to universalise good practices on CBID, the authors will explain lessons learned from the project by utilising the theories of disability and development studies and community psychology such as social model of disability, twin-track approach, empowerment theory, sense of community, helper therapy principle, etc. And the authors conclude that in order to realise social participation of persons with disabilities in rural community, CBID is a strong tool and persons with disabilities must play central roles in all spheres of CBID activities.

Keywords: community-based inclusive development, disability mainstreaming, empowerment of persons with disabilities, self-help group

Procedia PDF Downloads 208