5179 A Model Approach of Good Practice Based on the Project Management Body of Knowledge® Guide in the Project Owner
Authors: Claudia Marcela Munoz Gonzalez, Diego Fernando Hernandez Losada, Hugo Alberto Herrera Fonseca
Abstract:
The project owner's role in the public-private investment consists of controlling and verifying the correct execution of the project's objectives and resources. Likewise, it is a discipline little explored in the academic field, whereby this work wishes to contribute with a model of good practices based on the project management methodology proposed by the Project Management Body of Knowledge® Guide. In the same way, highlight what are the controls that an integral project owner should take into account in its exercise and application, through the stages in which its contract runs. This proposal aims to structure its practice and integrate its functions according to a project management methodology. In addition, these practices will be applied in a case study of projects in the agricultural sector, particularly in the construction of irrigation district in Cundinamarca, Colombia.Keywords: controls, construction of irrigation district, PMBOK®, project owner
Procedia PDF Downloads 4585178 Resolution Method for Unforeseen Ground Condition Problem Case in Coal Fired Steam Power Plant Project Location Adipala, Indonesia
Authors: Andi Fallahi, Bona Ryan Situmeang
Abstract:
The Construction Industry is notoriously risky. Much of the preparatory paperwork that precedes construction project can be viewed as the formulation of risk allocation between the owner and the Contractor. The Owner is taking the risk that his project will not get built on the schedule that it will not get built for what he has budgeted and that it will not be of the quality he expected. The Contractor Face a multitude of risk. One of them is an unforeseen condition at the construction site. The Owner usually has the upper hand here if the unforeseen condition occurred. Site data contained in Ground Investigation report is often of significant contractual importance in disputes related to the unforeseen ground condition. A ground investigation can never fully disclose all the details of the underground condition (Risk of an unknown ground condition can never be 100% eliminated). Adipala Coal Fired Steam Power Plant (CSFPP) 1 x 660 project is one of the large CSFPP project in Indonesia based on Engineering, Procurement, and Construction (EPC) Contract. Unforeseen Ground Condition it’s responsible by the Contractor has stipulated in the clausal of Contract. In the implementation, there’s indicated unforeseen ground condition at Circulating Water Pump House (CWPH) area which caused the Contractor should be changed the Method of Work that give big impact against Time of Completion and Cost Project. This paper tries to analyze the best way for allocating the risk between The Owner and The Contractor. All parties that allocating of sharing risk fairly can ultimately save time and money for all parties, and get the job done on schedule for the least overall cost.Keywords: unforeseen ground condition, coal fired steam power plant, circulating water pump house, Indonesia
Procedia PDF Downloads 3285177 Liquidity and Cash Management Practices of Owner-Managed Firms-A Case of South East, Nigeria
Authors: Ugbor Raphael Oluchukwu
Abstract:
The survey research design was adopted to examine whether liquidity and cash management practices of owner-managed firms in South East Nigeria influence their profitability, growth and survival. Four independent variables (accounting systems, working capital management, budgetary control, and managerial planning) were used in the evaluation which was restricted to eight small firms. Results indicate that one variable, working capital management alone dominate the liquidity perception of owner managers. As a result, owner managers find it difficult to meet maturing business obligations as growth sets in. The study also reveals that the four independent variables have significant impact on the profitability, growth and survival of owner managed firms. Owner managers are therefore advised to undertake regular entrepreneurship training in order to upgrade their liquidity and cash management knowledge and practices to enhance their overall performance.Keywords: liquidity management, owner-managed firm, profitability, survival
Procedia PDF Downloads 4305176 Identification of Factors Affecting Labor Productivity in Construction Projects of Iran
Authors: Elham Dehghan, A. Shirzadi Javid, Mohsen Tadayon
Abstract:
Labor productivity is very important and gained special concerns among professionals in the construction industry, worldwide. Productivity improvements on labors achieve higher cost savings with minimal investment. Due to the fact that profit margins are small on construction projects, cost savings associated with productivity are crucial to become a successful contractor. This research program studies and highlights the factors affecting labor productivity in Iranian construction industry. A questionnaire was used to gather the relevant data from respondents who involve in managing various types of projects in wide areas in Iran. It involved ranking 57 predefined factors divided into 5 categories: Human/Labor; Financial; Management; Equipments/Materials and Environmental. Total 62 feedbacks were analyzed through the Relative Importance Index (RII) technique. The top ten factors affecting construction labor productivity in Iran are: 1) Professional capability of contractor project manager, 2) skills of contractor’s project management team, 3) professional capability of owner project manager, 4) professional capability of Consulting Project manager, 5) discipline working, 6) delay payments by the owner, 7) material shortages, 8) delays in delivery of materials, 9) turnover power of the owner, 10) poor site management. Recommendations have been made in the study to address these factors. The research has direct benefits to key stakeholders in Iranian construction industry.Keywords: Iranian construction projects, labor, productivity, relative importance index
Procedia PDF Downloads 2645175 Small and Medium Enterprises Owner-Managers/Entrepreneurs and Their Risk Perception in Songkhla Province, Thailand
Authors: Patraporn Kaewkhanitarak, Weerawan Marangkun
Abstract:
The objective of this study was to explore the establishment and to investigate the relationship between the gender (male or female) of SME owner-managers/ entrepreneurs and their risk perception in business activity. The study examines the data by interviewing 76 SME owner-managers/entrepreneurs’ responses (37 males, 39 females) in manufacturing, finance, human resources and marketing sector in the economic regions of Songkhla province, Thailand. This study found that four tools which were operation, cash flow, staff, and new market were perceived by the SME owner-managers/entrepreneurs at high level. However, male and female SME owner-managers/entrepreneurs perceived some factors such as the age of SME owner-managers/entrepreneurs, the duration of firm operation, type of firm, and type of business without significant differences. In contrast, the gender affected the risk perception about increasing cost, fierce competition, leapfrog development of firm, substandard staff, namely that male and female perceived these factors with significant differences. According to the research, SME owner-managers/entrepreneurs should develop their risk management competency to deal with the risk efficiently. Secondly, SME firms should gather into groups. Furthermore, it was shown that the five key tools used to manage these risky situations were the use of managerial competencies and clustering.Keywords: risk perception, owner-managers/entrepreneurs, SME, Songkhla, Thailand
Procedia PDF Downloads 4365174 Project Time and Quality Management during Construction
Authors: Nahed Al-Hajeri
Abstract:
Time and cost is an integral part of every construction plan and can affect each party’s contractual obligations. The performance of both time and cost are usually important to the client and contractor during the project. Almost all construction projects are experiencing time overrun. These time overruns always contributed as expensive to both client and contractor. Construction of any project inside the gathering centers involves complex management skills related to work force, materials, plant, machineries, new technologies etc. It also involves many agencies interdependent on each other like the vendors, structural and functional designers including various types of specialized engineers and it includes support of contractors and specialized contractors. This paper mainly highlights the types of construction delays due to which project suffer time and cost overrun. This paper also speaks about the delay causes and factors that contribute to the construction sequence delay for the oil and gas projects. Construction delay is supposed to be one of the repeated problems in the construction projects and it has an opposing effect on project success in terms of time, cost and quality. Some effective methods are identified to minimize delays in construction projects such as: 1. Site management and supervision, 2. Effective strategic planning, 3. Clear information and communication channel. Our research paper studies the types of delay with some real examples with statistic results and suggests solutions to overcome this problem.Keywords: non-compensable delay, delays caused by force majeure, compensable delay, delays caused by the owner or the owner’s representative, non-excusable delay, delay caused by the contractor or the contractor’s representative, concurrent delay, delays resulting from two separate causes at the same time
Procedia PDF Downloads 2425173 The Efficacy of Contractual Governance on Task and Relationship Conflict in Construction Projects
Authors: Jingya You, Yongqiang Chen, Yuanyuan Hua, Wenqian Wang
Abstract:
Conflict is commonplace in construction projects, and construction projects always involve designing contracts between the owner and the contractor. However, how the contract affects the level of conflict between the owner and the contractor has not been elaborated. The purpose of this paper is to explain the effects of contractual complexity on the level of conflict, including task conflict and relationship conflict, and then to demonstrate the moderating role played by the interdependence between the owner and the contractor. Using data from owners and general contractors in the Chinese construction industry, this research reveals that contractual control will reduce relationship conflict. Contractual coordination will also reduce relationship conflict by the mediating effect of task conflict. Besides, under high joint interdependence, the positive relationship between task conflict and relationship conflict is strengthened, while high interdependence asymmetry has effects on weakening the relationship between task conflict and relationship conflict. The findings provide guidance for contract designers to draft suitable contracts in order to effectively deal with conflict. Additionally, this research implies that project managers should highlight the importance of contract in conflict management.Keywords: construction projects, contract governance, interdependence, relationship conflict, task conflict
Procedia PDF Downloads 2185172 Contractor Selection by Using Analytical Network Process
Authors: Badr A. Al-Jehani
Abstract:
Nowadays, contractor selection is a critical activity of the project owner. Selecting the right contractor is essential to the project manager for the success of the project, and this cab happens by using the proper selecting method. Traditionally, the contractor is being selected based on his offered bid price. This approach focuses only on the price factor and forgetting other essential factors for the success of the project. In this research paper, the Analytic Network Process (ANP) method is used as a decision tool model to select the most appropriate contractor. This decision-making method can help the clients who work in the construction industry to identify contractors who are capable of delivering satisfactory outcomes. Moreover, this research paper provides a case study of selecting the proper contractor among three contractors by using ANP method. The case study identifies and computes the relative weight of the eight criteria and eleven sub-criteria using a questionnaire.Keywords: contractor selection, project management, decision-making, bidding
Procedia PDF Downloads 885171 Sustainable Building Law - The Legal Issues Abound
Authors: Richard J. Sobelsohn
Abstract:
Green Building and Sustainable Development help fight climate change, and protects the ozone, animal habitats, air quality, and ground water. The myriad of reasons to go Green has multiplied to the point that a developer that is building a ground-up or renovating/retrofitting a property has a plethora of choices to get to the green goal post. Sustainability not affects the bottom line but satisfies corporate mandates (ESG), consumer demand, market requirements, and the many laws dictating green building practices. The good news is that there are many paths a property owner can take to become green. The bad news is that there are many paths a property owner can take to become green, and they need to choose which direction to take. Certification of a building used to be the highest achievement in the Green building world. Now there are so many variables and laws with which a property owner must comply, and the legal analysis has mushroomed. Operation and Maintenance have also become one of the most important functions for a prudent Green Building owner. So adding to the “development/retrofit” parties involved in the sustainable building legal world, we now need to include all those people who keep the building green, and there are a lot of them!Keywords: green building, sustainable development, legal issues, greenwashing, green cleaning, compliance, ESQ
Procedia PDF Downloads 1235170 The Successful in Construction Project via Effectiveness of Project Team
Authors: Zarabizan Zakaria, Hayati Zainal
Abstract:
The construction industry is one of the most important sectors that contribute to the nation’s economy and catalyze towards the growth of other industries. However, some construction projects have not been completed on its stipulated time and duration, scope and budget due to several factors. This problem arises due to the weaknesses of human factors, especially from ineffective leadership quality practiced by project managers and contractors in managing project teams. Therefore, a construction project should impose the element of Project Team. The project team is formed in the implementation of the project which includes the project brief, project scope, customer requirements and provided designs. Many organizations in the construction sector use teams to meet today's global competition and customer expectations, however, team effectiveness evaluation is required. In insuring the construction team is successful and effectiveness, the construction department must encourage, measure, set up, and evaluate or review the effectiveness of project team that was formed. In order to produce a better outcome for a high-end project, an effective and efficient project team is required which also help in increasing overall productivity. The purpose of this study is to determine the role of team effectiveness in the construction project team based on the overall construction project performance. It examines several different factors which related to team effectiveness. It also examines the relationship between team effectiveness factor and project performance aspect. Team Effect Review and Project Performance Review are developed to be used for data collection. Data collected were analyzed using several statistical tests. Results obtained from data analysis are validated using semi-structured interviews. Besides that, a comprehensive survey were developed to assess the way construction project teams in order to maintain its effectiveness throughout the project phase. In order to determine a project successful it has been found that Project Team Leadership is the most important factor. In addition, the definition of team effectiveness in the construction project team is developed based on the perspective of project clients and project team members. The results of this study are expected to provide an idea on the factors that are needed to be focused on improving the team's effectiveness towards project performance aspects. At the same time, the definition of team effectiveness from team members and owner views has been developed in order to provide a better understanding of the word team's effectiveness in construction projects.Keywords: project team, leadership, construction project, project successful
Procedia PDF Downloads 1775169 Empirical Research on Preference for Conflict Resolution Styles of Owners and Contractors in China
Authors: Junqi Zhao, Yongqiang Chen
Abstract:
The preference for different conflict resolution styles are influenced by cultural background and power distance of two parties involving in conflict. This research put forward 7 hypotheses and tested the preference differences of the five conflict resolution styles between Chinese owner and contractor as well as the preference differences concerning the same style between two parties. The research sample includes 202 practitioners from construction enterprises in mainland China. Research result found that theories concerning conflict resolution styles could be applied in the Chinese construction industry. Some results of this research were not in line with former research, and this research also gave explanation to the differences from the characteristics of construction projects. Based on the findings, certain suggestions were made to serve as a guidance for managers to choose appropriate conflict resolution styles for a better handling of conflict.Keywords: Chinese owner and contractor, conflict, construction project, conflict resolution styles
Procedia PDF Downloads 5325168 Change to the Location/Ownership and Control of Liquid Metering Skids
Authors: Mahmoud Jumah
Abstract:
This paper presents the circumstances and decision making in case of change management in any industrial processes, and the effective strategic planning ensured to provide with the on time completion of projects. In this specific case, the Front End Engineering Design and the awarded Lump Sum Turn Key Contract had provided for full control and ownership of all Liquid Metering Skids by Controlling Team. The demarcation and location were changed, and the Ownership and Control of the Liquid Metering Skids inside the boundaries of the Asset Owner were transferred from Controlling Team to Asset Owner after the award of the LSTK Contract. The requested changes resulted in Adjustment Order and the relevant scope of work is an essential part of the original Contract. The majority of equipment and materials (i.e. liquid metering skids, valves, piping, etc.) has already been in process.Keywords: critical path, project change management, stakeholders problem solving, strategic planning
Procedia PDF Downloads 2675167 Impact of Project Leader's Style on the Success of the Projects
Authors: Saadia Khalid
Abstract:
This paper discusses the various leadership styles of project manager which lead to the success of a project since it is important for a project manager to understand and adopt the skills required to cope up with the modern challenges of any project. A project manager must be able to handle a project effectively and efficiently and be ready to assess the factors effecting success or failure of the project. A project manager must be capable of handling a project by managing, directing and leading the projects with requisite knowledge and skills. In this paper a project manager’s characteristics linkage to project success have been developed and analyzed for three different projects/industries. A web-based survey has also been carried out which revealed that specific leadership styles/traits can lead to better performance and success of organizations. Some basic factors like project complexity, the age, gender and nationality of the project manager and type of project also play a vital role in success of a project.Keywords: leadership style, project success, project management, project manager
Procedia PDF Downloads 4275166 Educational Attainment of Owner-Managers and Performance of Micro- and Small Informal Businesses in Nigeria
Authors: Isaiah Oluranti Olurinola, Michael Kayode Bolarinwa, Ebenezer Bowale, Ifeoluwa Ogunrinola
Abstract:
Abstract - While much literature exists on microfinancing and its impact on the development of micro, small and medium-scale enterprises (MSME), yet little is known in respect of the impact of different types of education of owner-managers on the performances as well as innovative possibilities of such enterprises. This paper aims at contributing to the understanding of the impact of different types of education (academic, technical, apprenticeship, etc) that influence the performance of micro, small and medium-sized enterprise (MSME). This study utilises a recent and larger data-set collected in six states and FCT Abuja, Nigeria in the year 2014. Furthermore, the study carries out a comparative analysis of business performance among the different geo-political zones in Nigeria, given the educational attainment of the owner-managers. The data set were enterprise-based and were collected by the Nigerian Institute for Social and Economic Research (NISER) in the year 2014. Six hundred and eighty eight enterprises were covered in the survey. The method of data analysis for this study is the use of basic descriptive statistics in addition to the Logistic Regression model used in the prediction of the log of odds of business performance in relation to any of the identified educational attainment of the owner-managers in the sampled enterprises. An OLS econometric technique is also used to determine the effects of owner-managers' different educational types on the performance of the sampled MSME. Policy measures that will further enhance the contributions of education to MSME performance will be put forward.Keywords: Business Performance, Education, Microfinancing, Micro, Small and Medium Scale Enterprises
Procedia PDF Downloads 5225165 Risk Assessment in Construction of K-Span Buildings in United Arab Emirates (UAE)
Authors: Imtiaz Ali, Imam Mansoor
Abstract:
Investigations as a part of the academic study were undertaken to identify and evaluate the significant risks associated with the construction of K-span buildings in the region of UAE. Primary field data was collected through questionnaires obtaining specific open and close-ended questions from carefully selected construction firms, civil engineers and, construction manager regarding risks associated to K-span building construction. Historical data available for other regions of the same construction technique was available which was compared for identifying various non-critical and critical risk parameters by comparative evaluation techniques to come up with important risks and potential sources for their control and minimization in K-Span buildings that is increasing in the region. The associated risks have been determined with their Relative Importance Index (RII) values of which Risk involved in Change of Design required by Owners carries the highest value (RII=0.79) whereas, Delayed Payment by Owner to Contractor is one of the least (RII=0.42) value. The overall findings suggest that most relative risks as quantified originate or associated with the contractors. It may be concluded that project proponents undertaking K-span projects in planning and budgeting the cost and delays should take into account of risks on high account if changes in design are also required any delays in the material by the supplier would then be a major risk in K-span project delay. Since projects are, less costly, so owners have limited budgets, then they hire small contractors, which are not highly competent contractors. So study suggests that owner should be aware of these types of risks associated with the construction of K-span buildings in order to make it cost effective.Keywords: k-span buildings, k-span construction, risk management, relative improvement index (RII)
Procedia PDF Downloads 3755164 A Smart Visitors’ Notification System with Automatic Secure Door Lock Using Mobile Communication Technology
Authors: Rabail Shafique Satti, Sidra Ejaz, Madiha Arshad, Marwa Khalid, Sadia Majeed
Abstract:
The paper presents the development of an automated security system to automate the entry of visitors, providing more flexibility of managing their record and securing homes or workplaces. Face recognition is part of this system to authenticate the visitors. A cost effective and SMS based door security module has been developed and integrated with the GSM network and made part of this system to allow communication between system and owner. This system functions in real time as when the visitor’s arrived it will detect and recognizes his face and on the result of face recognition process it will open the door for authorized visitors or notifies and allows the owner’s to take further action in case of unauthorized visitor. The proposed system is developed and it is successfully ensuring security, managing records and operating gate without physical interaction of owner.Keywords: SMS, e-mail, GSM modem, authenticate, face recognition, authorized
Procedia PDF Downloads 7895163 Pet Care Monitoring with Arduino
Authors: Sathapath Kilaso
Abstract:
Nowadays people who live in the city tend to have a pet in order to relief the loneliness more than usual. It can be observed by the growth of the local pet industry. But the essentials of lifestyle of the urban people which is restricted by time and work might not allow the owner to take care of the pet properly. So this article will be about how to develop the prototype of pet care monitoring with Arduino Microcontroller. This prototype can be used to monitor the pet and its environment around the pet such as temperature (both pet’s temperature and outside temperature), humidity, food’s quantity, air’s quality and also be able to reduce the stress of the pet. This prototype can report the result back to the owner via online-channel such as website etc.Keywords: pet care, Arduino Microcontroller, monitoring, prototype
Procedia PDF Downloads 3585162 "Project" Approach in Urban: A Response to Uncertainty
Authors: Mouhoubi Nedjima, Sassi Boudemagh Souad
Abstract:
In this paper, we will try to demonstrate the importance of the project approach in the urban to deal with uncertainty, the importance of the involvement of all stakeholders in the urban project process and that the absence of an actor can lead to project failure but also the importance of the urban project management. These points are handled through the following questions: Does the urban adhere to the theory of complexity? Does the project approach bring hope and solution to make urban planning "sustainable"? How converging visions of actors for the same project? Is the management of urban project the solution to support the urban project approach?Keywords: strategic planning, project, urban project stakeholders, management
Procedia PDF Downloads 5125161 Detection of Fuel Theft and Vehicle Position Using Third Party Monitoring Software
Authors: P. Senthilraja, C. Rukumani Khandhan, M. Palaniappan, S. L. Rama, P. Sai Sushimitha, R. Madhan, J. Vinumathi, N. Vijayarangan
Abstract:
Nowadays, the logistics achieve a vast improvement in efficient delivery of goods. The technology improvement also helps to improve its development, but still the owners of transport vehicles face problems, i.e., fuel theft in vehicles by the drivers or by an unknown person. There is no proper solution to overcome the problems. This scheme is to determine the amount of fuel that has been stolen and also to determine the position of the vehicle at a particular time using the technologies like GPS, GSM, ultrasonic fuel level sensor and numeric lock system. The ultrasonic sensor uses the ultrasonic waves to calculate the height of the tank up to which the fuel is available. Based on height it is possible to calculate the amount of fuel. The Global Positioning System (GPS) is a satellite-based navigation system. The scientific community uses GPS for its precision timing capability and position information. The GSM provides the periodic information about the fuel level. A numeric lock system has been provided for fuel tank opening lever. A password is provided to access the fuel tank lever and this is authenticated only by the driver and the owner. Once the fuel tank is opened an alert is sent to owner through a SMS including the timing details. Third party monitoring software is a user interface that updates the information automatically into the database which helps to retrieve the data as and when required. Third party monitoring software provides vehicle’s information to the owner and also shows the status of the vehicle. The techniques that are to be proposed will provide an efficient output. This project helps to overcome the theft and hence to put forth fuel economy.Keywords: fuel theft, third party monitoring software, bioinformatics, biomedicine
Procedia PDF Downloads 3915160 The Significance of a Well-Defined Systematic Approach in Risk Management for Construction Projects within Oil Industry
Authors: Batool Ismaeel, Umair Farooq, Saad Mushtaq
Abstract:
Construction projects in the oil industry can be very complex, having unknown outcomes and uncertainties that cannot be easily predicted. Each project has its unique risks generated by a number of factors which, if not controlled, will impact the successful completion of the project mainly in terms of schedule, cost, quality, and safety. This paper highlights the historic risks associated with projects in the south and east region of Kuwait Oil Company (KOC) collated from the company’s lessons learned database. Starting from Contract Award through to handover of the project to the Asset owner, the gaps in project execution in terms of managing risk will be brought to discussion and where a well-defined systematic approach in project risk management reflecting many claims, change of scope, exceeding budget, delays in engineering phase as well as in the procurement and fabrication of long lead items should be adopted. This study focuses on a proposed feasible approach in risk management for engineering, procurement and construction (EPC) level projects including the various stakeholders involved in executing the works from International to local contractors and vendors in KOC. The proposed approach covers the areas categorized into organizational, design, procurement, construction, pre-commissioning, commissioning and project management in which the risks are identified and require management and mitigation. With the effective deployment and implementation of the proposed risk management system and the consideration of it as a vital key in achieving the project’s target, the outcomes will be more predictable in the future, and the risk triggers will be managed and controlled. The correct resources can be allocated on a timely basis for the company for avoiding any unpredictable outcomes during the execution of the project. It is recommended in this paper to apply this risk management approach as an integral part of project management and investigate further in the future, the effectiveness of this proposed system for newly awarded projects and compare the same with those projects of similar budget/complexity that have not applied this approach to risk management.Keywords: construction, project completion, risk management, uncertainties
Procedia PDF Downloads 1535159 Project Objective Structure Model: An Integrated, Systematic and Balanced Approach in Order to Achieve Project Objectives
Authors: Mohammad Reza Oftadeh
Abstract:
The purpose of the article is to describe project objective structure (POS) concept that was developed on research activities and experiences about project management, Balanced Scorecard (BSC) and European Foundation Quality Management Excellence Model (EFQM Excellence Model). Furthermore, this paper tries to define a balanced, systematic, and integrated measurement approach to meet project objectives and project strategic goals based on a process-oriented model. In this paper, POS is suggested in order to measure project performance in the project life cycle. After using the POS model, the project manager can ensure in order to achieve the project objectives on the project charter. This concept can help project managers to implement integrated and balanced monitoring and control project work.Keywords: project objectives, project performance management, PMBOK, key performance indicators, integration management
Procedia PDF Downloads 3785158 The Management of the Urban Project between Challenge and Need: The Case of the Modernization Project of Constantine
Authors: Mouhoubi Nedjima, Sassi Boudemagh Souad
Abstract:
In this article, and through the modernization project of metropolis of Constantine (PMMC) experience in Algeria, discussed to highlight the importance of management in an urban project at various levels: strategic and operational. The statement we attended to reach is to evaluate the modernization project of metropolis of Constantine in the light of management and prove the relation between a good urban management and the success of an urban project.Keywords: urban project, strategic management, operational management, the modernization project of constantine
Procedia PDF Downloads 5235157 The Duty of Sea Carrier to Transship the Cargo in Case of Vessel Breakdown
Authors: Mojtaba Eshraghi Arani
Abstract:
Concluding the contract for carriage of cargo with the shipper (through bill of lading or charterparty), the carrier must transport the cargo from loading port to the port of discharge and deliver it to the consignee. Unless otherwise agreed in the contract, the carrier must avoid from any deviation, transfer of cargo to another vessel or unreasonable stoppage of carriage in-transit. However, the vessel might break down in-transit for any reason and becomes unable to continue its voyage to the port of discharge. This is a frequent incident in the carriage of goods by sea which leads to important dispute between the carrier/owner and the shipper/charterer (hereinafter called “cargo interests”). It is a generally accepted rule that in such event, the carrier/owner must repair the vessel after which it will continue its voyage to the destination port. The dispute will arise in the case that temporary repair of the vessel cannot be done in the short or reasonable term. There are two options for the contract parties in such a case: First, the carrier/owner is entitled to repair the vessel while having the cargo onboard or discharged in the port of refugee, and the cargo interests must wait till the breakdown is rectified at any time, whenever. Second, the carrier/owner will be responsible to charter another vessel and transfer the entirety of cargo to the substitute vessel. In fact, the main question revolves around the duty of carrier/owner to perform transfer of cargo to another vessel. Such operation which is called “trans-shipment” or “transhipment” (in terms of the oil industry it is usually called “ship-to-ship” or “STS”) needs to be done carefully and with due diligence. In fact, the transshipment operation for various cargoes might be different as each cargo requires its own suitable equipment for transfer to another vessel, so this operation is often costly. Moreover, there is a considerable risk of collision between two vessels in particular in bulk carriers. Bulk cargo is also exposed to the shortage and partial loss in the process of transshipment especially during bad weather. Concerning tankers which carry oil and petrochemical products, transshipment, is most probably followed by sea pollution. On the grounds of the above consequences, the owners are afraid of being held responsible for such operation and are reluctant to perform in the relevant disputes. The main argument raised by them is that no regulation has recognized such duty upon their shoulders so any such operation must be done under the auspices of the cargo interests and all costs must be reimbursed by themselves. Unfortunately, not only the international conventions including Hague rules, Hague-Visby Rules, Hamburg rules and Rotterdam rules but also most domestic laws are silent in this regard. The doctrine has yet to analyse the issue and no legal researches was found out in this regard. A qualitative method with the concept of interpretation of data collection has been used in this paper. The source of the data is the analysis of regulations and cases. It is argued in this article that the paramount rule in the maritime law is “the accomplishment of the voyage” by the carrier/owner in view of which, if the voyage can only be finished by transshipment, then the carrier/owner will be responsible to carry out this operation. The duty of carrier/owner to apply “due diligence” will strengthen this reasoning. Any and all costs and expenses will also be on the account pf the owner/carrier, unless the incident is attributable to any cause arising from the cargo interests’ negligence.Keywords: cargo, STS, transshipment, vessel, voyage
Procedia PDF Downloads 1195156 The Implementation of the Lean Six Sigma Production Process in a Telecommunications Company in Brazil
Authors: Carlos Fontanillas
Abstract:
The implementation of the lean six sigma methodology aims to implement practices to systematically improve processes by eliminating defects, making them cheaper. The implementation of projects with the methodology uses a division into five phases: definition, measurement, analysis, implementation, and control. In this process, it is understood that the implementation of said methodology generates benefits to organizations that adhere through the improvement of their processes. In the case of a telecommunications company, it was realized that the implementation of a lean six sigma project contributed to the improvement of the presented process, generating a financial return with the avoided cost. However, such study has limitations such as a specific segment of performance and procedure, i.e., it can not be defined that return under other circumstances will be the same. It is also concluded that lean six sigma projects tend to contribute to improved processes evaluated due to their methodology that is based on statistical analysis and quality management tools and can generate a financial return. It is hoped that the present study can be used to provide a clearer view of the methodology for entrepreneurs who wish to implement process improvement actions in their companies, as well as to provide a foundation for professionals working with lean six sigma projects. After the review of the processes, the completion of the project stages and the monitoring for three months in partnership with the owner of the process to ensure the effectiveness of the actions, the project was completed with the objective reached. There was an average of 60% reduction with the issuance of undue invoices generated after the deactivation and it was possible to extend the project to other companies, which allowed a reduction well above the initially stipulated target.Keywords: quality, process, lean six sigma, organization
Procedia PDF Downloads 1295155 Causes of Variation Orders in the Egyptian Construction Industry: Time and Cost Impacts
Authors: A. Samer Ezeldin, Jwanda M. El Sarag
Abstract:
Variation orders are of great importance in any construction project. Variation orders are defined as any change in the scope of works of a project that can be an addition omission, or even modification. This paper investigates the variation orders that occur during construction projects in Egypt. The literature review represents a comparison of causes of variation orders among Egypt, Tanzania, Nigeria, Malaysia and the United Kingdom. A classification of occurrence of variation orders due to owner related factors, consultant related factors and other factors are signified in the literature review. These classified events that lead to variation orders were introduced in a survey with 19 events to observe their frequency of occurrence, and their time and cost impacts. The survey data was obtained from 87 participants that included clients, consultants, and contractors and a database of 42 scenarios was created. A model is then developed to help assist project managers in predicting the frequency of variations and account for a budget for any additional costs and minimize any delays that can take place. Two experts with more than 25 years of experience were given the model to verify that the model was working effectively. The model was then validated on a residential compound that was completed in July 2016 to prove that the model actually produces acceptable results.Keywords: construction, cost impact, Egypt, time impact, variation orders
Procedia PDF Downloads 1835154 ‘BEST BARK’ Dog Care and Owner Consultation System
Authors: Shalitha Jayasekara, Saluk Bawantha, Dinithi Anupama, Isuru Gunarathne, Pradeepa Bandara, Hansi De Silva
Abstract:
Dogs have been known as "man's best friend" for generations, providing friendship and loyalty to their human counterparts. However, due to people's busy lives, they are unaware of the ailments that can affect their pets. However, in recent years, mobile technologies have had a significant impact on our lives, and with technological improvements, a rule-based expert system allows the end-user to enable new types of healthcare systems. The advent of Android OS-based smartphones with more user-friendly interfaces and lower pricing opens new possibilities for continuous monitoring of pets' health conditions, such as healthy dogs, dangerous ingestions, and swallowed objects. The proposed ‘Best Bark’ Dog care and owner consultation system is a mobile application for dog owners. Four main components for dog owners were implemented after a questionnaire was distributed to the target group of audience and the findings were evaluated. The proposed applications are widely used to provide health and clinical support to dog owners, including suggesting exercise and diet plans and answering queries about their dogs. Additionally, after the owner uploads a photo of the dog, the application provides immediate feedback and a description of the dog's skin disease.Keywords: Convolution Neural Networks, Artificial Neural Networks, Knowledgebase, Sentimental Analysis.
Procedia PDF Downloads 1535153 Project Abandonment and Its Effect on Host Community: Case Study of Ajaokuta Steel Project, Nigeria
Authors: A. A. Omonori, K. T. Alade, A. F. Lawal
Abstract:
This research was conducted to identify the causes of project abandonment in Nigeria and the effect it has on the host community. The aim of the research was to identify the causes and effects of project failure and abandonment. Project abandonment is a major course of concern in the country as different projects fail and are abandoned at various levels. These projects do not fulfill the purpose for which they were initiated. This is the absolute definition of failure and hence the selection of the Ajaokuta Steel Project as an interesting case study and a typical example of project failure and abandonment. This has been done by conducting field study through the administration of questionnaires. This study was carried out on the Ajaokuta Steel Project to investigate the causes of the abandonment of the project and the effects it has had on the people of Ajaokuta community. Qualitative method of data analysis was used to analyze the findings through frequency tables and ranking. This study brought to light the major factors that led to the abandonment of the Ajaokuta Steel Project. The effects the abandonment of the project has had on the immediate community were identified and recommendations made to prevent the menace of Project abandonment.Keywords: abandonment, case-study, Nigeria, project
Procedia PDF Downloads 3635152 An Explorative Study of the Application of Project Management in German Research Projects
Authors: Marcel Randermann, Roland Jochem
Abstract:
Research activities are mostly conducted in form of projects. In fact, research projects take the highest share of all project forms combined. However, project management is very rarely applied purposefully by researchers and scientists. More specifically no project management frameworks, methods or tools are not being used to plan, execute or control research project to ensure research success or improve project quality. In this qualitative study, several interviews were conducted with scientists and research managers from German institutions to gain insights into project management activities, to determine challenges and barriers, and to evaluate premises for successful project management. The analyses show that conventional project management is not easily applicable in scientific environments and researchers’ mindsets prevent a reasonable application.Keywords: academics, project management methods, research and science projects, scientist's mindset
Procedia PDF Downloads 1985151 An Efficient Traceability Mechanism in the Audited Cloud Data Storage
Authors: Ramya P, Lino Abraham Varghese, S. Bose
Abstract:
By cloud storage services, the data can be stored in the cloud, and can be shared across multiple users. Due to the unexpected hardware/software failures and human errors, which make the data stored in the cloud be lost or corrupted easily it affected the integrity of data in cloud. Some mechanisms have been designed to allow both data owners and public verifiers to efficiently audit cloud data integrity without retrieving the entire data from the cloud server. But public auditing on the integrity of shared data with the existing mechanisms will unavoidably reveal confidential information such as identity of the person, to public verifiers. Here a privacy-preserving mechanism is proposed to support public auditing on shared data stored in the cloud. It uses group signatures to compute verification metadata needed to audit the correctness of shared data. The identity of the signer on each block in shared data is kept confidential from public verifiers, who are easily verifying shared data integrity without retrieving the entire file. But on demand, the signer of the each block is reveal to the owner alone. Group private key is generated once by the owner in the static group, where as in the dynamic group, the group private key is change when the users revoke from the group. When the users leave from the group the already signed blocks are resigned by cloud service provider instead of owner is efficiently handled by efficient proxy re-signature scheme.Keywords: data integrity, dynamic group, group signature, public auditing
Procedia PDF Downloads 3925150 Public-Private Partnership Transportation Projects: An Exploratory Study in the US
Authors: Medya Fathi
Abstract:
When public transportation projects were delivered through design-bid-build and later design-build, governments found a serious issue: inadequate funding. With population growth, governments began to develop new arrangements in which the private sectors were involved to cut the financial burden. This arrangement, known as Public-Private Partnership (PPP), has its own risks; however, performance outputs can motivate or discourage its use. On top of such output's list are time and budget, which can be affected by the type of project delivery methods. Project completion within or ahead of schedule as well as within or under budget is among any owner’s objectives. With a higher application of PPP in the highway industry in the US and insufficient PPP research, the current study addresses the schedule and cost performance of PPP highway projects and determines which one outperforms the other. To meet this objective, after collecting performance data of all PPP projects, schedule growth and cost growth are calculated, and finally, statistical analysis is conducted to evaluate the PPP performance. The results and conclusions will be provided. This study can assist practitioners in applying PPP for transportation projects by showing its ability to save time and/or cost.Keywords: cost, delivery method, highway, public-private partnership, schedule, transportation
Procedia PDF Downloads 176