Search results for: time implementation process.
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 11578

Search results for: time implementation process.

11548 The Current Awareness of Just-In-Time Techniques within the Libyan Textile Private Industry: A Case Study

Authors: Rajab Abdullah Hokoma

Abstract:

Almost all Libyan industries (both private and public) have struggled with many difficulties during the past three decades due to many problems. These problems have created a strongly negative impact on the productivity and utilization of many companies within Libya. This paper studies the current awareness and implementation levels of Just-In-Time (JIT) within the Libyan Textile private industry. A survey has been applied in this study using an intensive detailed questionnaire. Based on the analysis of the survey responses, the results show that the management body within the surveyed companies has a modest strategy towards most of the areas that are considered as being very crucial in any successful implementation of JIT. The results also show a variation within the implementation levels of the JIT elements as these varies between Low and Acceptable levels. The paper has also identified limitations within the investigated areas within this industry, and has pointed to areas where senior managers within the Libyan textile industry should take immediate actions in order to achieve effective implementation of JIT within their companies.

Keywords: Industry, questionnaire, JIT, textile.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1996
11547 Combining the Description Features of UMLRT and CSP+T Specifications Applied to a Complete Design of Real-Time Systems

Authors: Kawtar Benghazi Akhlaki, Manuel I. Capel-Tuñón

Abstract:

UML is a collection of notations for capturing a software system specification. These notations have a specific syntax defined by the Object Management Group (OMG), but many of their constructs only present informal semantics. They are primarily graphical, with textual annotation. The inadequacies of standard UML as a vehicle for complete specification and implementation of real-time embedded systems has led to a variety of competing and complementary proposals. The Real-time UML profile (UML-RT), developed and standardized by OMG, defines a unified framework to express the time, scheduling and performance aspects of a system. We present in this paper a framework approach aimed at deriving a complete specification of a real-time system. Therefore, we combine two methods, a semiformal one, UML-RT, which allows the visual modeling of a realtime system and a formal one, CSP+T, which is a design language including the specification of real-time requirements. As to show the applicability of the approach, a correct design of a real-time system with hard real time constraints by applying a set of mapping rules is obtained.

Keywords: CSP+T, formal software specification, process algebras, real-time systems, unified modeling language.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1763
11546 A Retrospective Analysis of a Professional Learning Community: How Teachers- Capacities Shaped It

Authors: S.Pancucci

Abstract:

The purpose of this paper is to describe the process of setting up a learning community within an elementary school in Ontario, Canada. The description is provided through reflection and examination of field notes taken during the yearlong training and implementation process. Specifically the impact of teachers- capacity on the creation of a learning community was of interest. This paper is intended to inform and add to the debate around the tensions that exist in implementing a bottom-up professional development model like the learning community in a top-down organizational structure. My reflections of the process illustrate that implementation of the learning community professional development model may be difficult and yet transformative in the professional lives of the teachers, students, and administration involved in the change process. I conclude by suggesting the need for a new model of professional development that requires a transformative shift in power dynamics and a shift in the view of what constitutes effective professional learning.

Keywords: Learning community model, professionaldevelopment, teacher capacity, teacher leadership.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1601
11545 Design and Implementation of Project Time Management Risk Assessment Tool for SME Projects using Oracle Application Express

Authors: Abdullahi Mohamud Sharif, Mohd. Zaidi Abd. Rozan

Abstract:

Risk Assessment Tool (RAT) is an expert system that assesses, monitors, and gives preliminary treatments automatically based on the project plan. In this paper, a review was taken out for the current project time management risk assessment tools for SME software development projects, analyze risk assessment parameters, conditions, scenarios, and finally propose risk assessment tool (RAT) model to assess, treat, and monitor risks. An implementation prototype system is developed to validate the model.

Keywords: Project Time Management, Risk Assessment Tool(RAT), Small and Medium Enterprises (SME).

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2277
11544 The Implementation of Remote Automation Execution Agent over ACL on QOS POLICY Based System

Authors: Hazly Amir, Roime Puniran

Abstract:

This paper will present the implementation of QoS policy based system by utilizing rules on Access Control List (ACL) over Layer 3 (L3) switch. Also presented is the architecture on that implementation; the tools being used and the result were gathered. The system architecture has an ability to control ACL rules which are installed inside an external L3 switch. ACL rules used to instruct the way of access control being executed, in order to entertain all traffics through that particular switch. The main advantage of using this approach is that the single point of failure could be prevented when there are any changes on ACL rules inside L3 switches. Another advantage is that the agent could instruct ACL rules automatically straight away based on the changes occur on policy database without configuring them one by one. Other than that, when QoS policy based system was implemented in distributed environment, the monitoring process can be synchronized easily due to the automate process running by agent over external policy devices.

Keywords: QOS, ACL, L3 Switch.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1196
11543 Information Technology for Business Process Management in Insurance Companies

Authors: Vesna Bosilj Vukšić, Darija Ivandić Vidović, Ljubica Milanović Glavan

Abstract:

Information technology plays an irreplaceable role in introducing and improving business process orientation in a company. It enables implementation of the theoretical concept, measurement of results achieved and undertaking corrective measures aimed at improvements. Information technology is a key concept in the development and implementation of the business process management systems as it establishes a connection to business operations. Both in the literature and practice, insurance companies are often seen as highly process oriented due to the nature of their business and focus on customers. They are also considered leaders in using information technology for business process management. The research conducted aimed to investigate whether the perceived leadership status of insurance companies is well deserved, i.e. to establish the level of process orientation and explore the practice of information technology use in insurance companies in the region. The main instrument for primary data collection within this research was an electronic survey questionnaire sent to the management of insurance companies in the Republic of Croatia, Bosnia and Herzegovina, Slovenia, Serbia and Macedonia. The conducted research has shown that insurance companies have a satisfactory level of process orientation, but that there is also a huge potential for improvement, especially in the segment of information technology and its connection to business processes.

Keywords: Business processes management, process orientation, information technology, insurance companies.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2412
11542 Method for Tuning Level Control Loops Based on Internal Model Control and Closed Loop Step Test Data

Authors: Arnaud Nougues

Abstract:

This paper describes a two-stage methodology derived from IMC (Internal Model Control) for tuning a PID (Proportional-Integral-Derivative) controller for levels or other integrating processes in an industrial environment. Focus is ease of use and implementation speed which are critical for an industrial application. Tuning can be done with minimum effort and without the need of time-consuming open-loop step tests on the plant. The first stage of the method applies to levels only: the vessel residence time is calculated from equipment dimensions and used to derive a set of preliminary PI (Proportional-Integral) settings with IMC. The second stage, re-tuning in closed-loop, applies to levels as well as other integrating processes: a tuning correction mechanism has been developed based on a series of closed-loop simulations with model errors. The tuning correction is done from a simple closed-loop step test and application of a generic correlation between observed overshoot and integral time correction. A spin-off of the method is that an estimate of the vessel residence time (levels) or open-loop process gain (other integrating process) is obtained from the closed-loop data.

Keywords: closed-loop model identification, IMC-PID tuning method, integrating process control, on-line PID tuning adaptation

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 506
11541 A Scenario-Based Approach for the Air Traffic Flow Management Problem with Stochastic Capacities

Authors: Soumia Ichoua

Abstract:

In this paper, we investigate the strategic stochastic air traffic flow management problem which seeks to balance airspace capacity and demand under weather disruptions. The goal is to reduce the need for myopic tactical decisions that do not account for probabilistic knowledge about the NAS near-future states. We present and discuss a scenario-based modeling approach based on a time-space stochastic process to depict weather disruption occurrences in the NAS. A solution framework is also proposed along with a distributed implementation aimed at overcoming scalability problems. Issues related to this implementation are also discussed.

Keywords: Air traffic management, sample average approximation, scenario-based approach, stochastic capacity.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2036
11540 A Middleware Management System with Supporting Holonic Modules for Reconfigurable Management System

Authors: Roscoe McLean, Jared Padayachee, Glen Bright

Abstract:

There is currently a gap in the technology covering the rapid establishment of control after a reconfiguration in a Reconfigurable Manufacturing System. This gap involves the detection of the factory floor state and the communication link between the factory floor and the high-level software. In this paper, a thin, hardware-supported Middleware Management System (MMS) is proposed and its design and implementation are discussed. The research found that a cost-effective localization technique can be combined with intelligent software to speed up the ramp-up of a reconfigured system. The MMS makes the process more intelligent, more efficient and less time-consuming, thus supporting the industrial implementation of the RMS paradigm.

Keywords: Intelligent systems, middleware, reconfigurable manufacturing.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1573
11539 Simulation Modeling and Analysis of In-Plant Logistics at a Cement Manufacturing Plant in India

Authors: Sachin Kamble, Shradha Gawankar

Abstract:

This paper presents the findings of successful implementation of Business Process Reengineering (BPR) of cement dispatch activities in a cement manufacturing plant located in India. Simulation model was developed for the purpose of identifying and analyzing the areas for improvement. The company was facing a problem of low throughput rate and subsequent forced stoppages of the plant leading to a high production loss of 15000MT per month. It was found from the study that the present systems and procedures related to the in-plant logistics plant required significant changes. The major recommendations included process improvement at the entry gate, reducing the cycle time at the security gate and installation of an additional weigh bridge. This paper demonstrates how BPR can be implemented for improving the in-plant logistics process. Various recommendations helped the plant to increase its throughput by 14%.

Keywords: Business process reengineering, simulation modeling, in-plant logistics, distribution process, cement industry.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2243
11538 Design for Manufacturability and Concurrent Engineering for Product Development

Authors: Alemu Moges Belay

Abstract:

In the 1980s, companies began to feel the effect of three major influences on their product development: newer and innovative technologies, increasing product complexity and larger organizations. And therefore companies were forced to look for new product development methods. This paper tries to focus on the two of new product development methods (DFM and CE). The aim of this paper is to see and analyze different product development methods specifically on Design for Manufacturability and Concurrent Engineering. Companies can achieve and be benefited by minimizing product life cycle, cost and meeting delivery schedule. This paper also presents simplified models that can be modified and used by different companies based on the companies- objective and requirements. Methodologies that are followed to do this research are case studies. Two companies were taken and analysed on the product development process. Historical data, interview were conducted on these companies in addition to that, Survey of literatures and previous research works on similar topics has been done during this research. This paper also tries to show the implementation cost benefit analysis and tries to calculate the implementation time. From this research, it has been found that the two companies did not achieve the delivery time to the customer. Some of most frequently coming products are analyzed and 50% to 80 % of their products are not delivered on time to the customers. The companies are following the traditional way of product development that is sequentially design and production method, which highly affect time to market. In the case study it is found that by implementing these new methods and by forming multi disciplinary team in designing and quality inspection; the company can reduce the workflow steps from 40 to 30.

Keywords: Design for manufacturability, Concurrent Engineering, Time-to-Market, Product development

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 5528
11537 Proposing Enterprise Wide Information Systems Business Performance Model

Authors: Vineet Kansal

Abstract:

Enterprise Wide Information Systems (EWIS) implementation involves the entire business and will require changes throughout the firm. Because of the scope, complexity and continuous nature of ERP, the project-based approach to managing the implementation process resulted in failure rates of between 60% and 80%. In recent years ERP systems have received much attention. The organizational relevance and risk of ERP projects make it important for organizations to focus on ways to make ERP implementation successful. Once these systems are in place, however, their performance depends on the identified macro variables viz. 'Business Process', 'Decision Making' and 'Individual / Group working'. The questionnaire was designed and administered. The responses from 92 organizations were compiled. The relationship of these variables with EWIS performance is analyzed using inferential statistical measurements. The study helps to understand the performance of model presented. The study suggested in keeping away from the calamities and thereby giving the necessary competitive edge. Whenever some discrepancy is identified during the process of performance appraisal care has to be taken to draft necessary preventive measures. If all these measures are taken care off then the EWIS performance will definitely deliver the results.

Keywords: Enterprise Systems, performance, technology

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1261
11536 The Application of Six Sigma to Integration of Computer Based Systems

Authors: Zenon Chaczko, Essam Rahali, Rizwan Tariq

Abstract:

This paper introduces a process for the module level integration of computer based systems. It is based on the Six Sigma Process Improvement Model, where the goal of the process is to improve the overall quality of the system under development. We also present a conceptual framework that shows how this process can be implemented as an integration solution. Finally, we provide a partial implementation of key components in the conceptual framework.

Keywords: Software Quality, Six Sigma, System Integration, 3SI Process, 3SI Conceptual Framework.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1626
11535 Design and Characterization of a CMOS Process Sensor Utilizing Vth Extractor Circuit

Authors: Rohana Musa, Yuzman Yusoff, Chia Chieu Yin, Hanif Che Lah

Abstract:

This paper presents the design and characterization of a low power Complementary Metal Oxide Semiconductor (CMOS) process sensor. The design is targeted for implementation using Silterra’s 180 nm CMOS process technology. The proposed process sensor employs a voltage threshold (Vth) extractor architecture for detection of variations in the fabrication process. The process sensor generates output voltages in the range of 401 mV (fast-fast corner) to 443 mV (slow-slow corner) at nominal condition. The power dissipation for this process sensor is 6.3 µW with a supply voltage of 1.8V with a silicon area of 190 µm X 60 µm. The preliminary result of this process sensor that was fabricated indicates a close resemblance between test and simulated results.

Keywords: CMOS Process sensor, Process, Voltage and Temperature (PVT) sensor, threshold extractor circuit, Vth extractor circuit.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 688
11534 Implementation of Building Information Modeling in Turkish Government Sector Projects

Authors: Mohammad Lemar Zalmai, Mustafa Nabi Kocakaya, Cemil Akcay, Ekrem Manisali

Abstract:

In recent years, the Building Information Modeling (BIM) approach has been developed expeditiously. As people see the benefits of this approach, it has begun to be used widely in construction projects and some countries made it mandatory to get more benefits from it. To promote the implementation of BIM in construction projects, it will be helpful to get some relevant information from surveys and interviews. The purpose of this study is to research the current adoption and implementation of BIM in public projects in Turkey. This study specified the challenges of BIM implementation in Turkey and proposed some solutions to overcome them. In this context, the challenges for BIM implementation and the factors that affect the BIM usage are determined based on previous academic researches and expert opinions by conducting interviews and questionnaire surveys. Several methods are used to process information in order to obtain weights of different factors to make BIM widespread in Turkey. This study concluded interviews' and questionnaire surveys' outcomes and proposed some suggestions to promote the implementation of BIM in Turkey. We believe research findings will be a good reference for boosting BIM implementation in Turkey.

Keywords: Building Information Modeling, BIM, BIM implementations, Turkish construction industry, Turkish government sector projects.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 743
11533 Developments for ''Virtual'' Monitoring and Process Simulation of the Cryogenic Pilot Plant

Authors: Carmen Maria Moraru, Iuliana Stefan, Ovidiu Balteanu, Ciprian Bucur, Liviu Stefan, Anisia Bornea, Ioan Stefanescu

Abstract:

The implementation of the new software and hardware-s technologies for tritium processing nuclear plants, and especially those with an experimental character or of new technology developments shows a coefficient of complexity due to issues raised by the implementation of the performing instrumentation and equipment into a unitary monitoring system of the nuclear technological process of tritium removal. Keeping the system-s flexibility is a demand of the nuclear experimental plants for which the change of configuration, process and parameters is something usual. The big amount of data that needs to be processed stored and accessed for real time simulation and optimization demands the achievement of the virtual technologic platform where the data acquiring, control and analysis systems of the technological process can be integrated with a developed technological monitoring system. Thus, integrated computing and monitoring systems needed for the supervising of the technological process will be executed, to be continued with the execution of optimization system, by choosing new and performed methods corresponding to the technological processes within the tritium removal processing nuclear plants. The developing software applications is executed with the support of the program packages dedicated to industrial processes and they will include acquisition and monitoring sub-modules, named “virtually" as well as the storage sub-module of the process data later required for the software of optimization and simulation of the technological process for tritium removal. The system plays and important role in the environment protection and durable development through new technologies, that is – the reduction of and fight against industrial accidents in the case of tritium processing nuclear plants. Research for monitoring optimisation of nuclear processes is also a major driving force for economic and social development.

Keywords: Monitoring system, process simulation.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1930
11532 Assessing Semantic Consistency of Business Process Models

Authors: Bernhard G. Humm, Janina Fengel

Abstract:

Business process modeling has become an accepted means for designing and describing business operations. Thereby, consistency of business process models, i.e., the absence of modeling faults, is of upmost importance to organizations. This paper presents a concept and subsequent implementation for detecting faults in business process models and for computing a measure of their consistency. It incorporates not only syntactic consistency but also semantic consistency, i.e., consistency regarding the meaning of model elements from a business perspective.

Keywords: Business process modeling, model analysis, semantic consistency, Semantic Web

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1813
11531 A Study of Factors Affecting the Elapsed Time of Housing Renewal Project Implementation in Seoul

Authors: In Su Na, Gunwon Lee, Seiyong Kim

Abstract:

This study analyzed the effect of area variables and economic variables on the length of each period of the project in order to analyze the effect of agreement rate on project implementation in housing renewal projects. In conclusion, as can be seen from these results, a low agreement rate may not translate into project promotion, and a higher agreement rate may not translate into project delay. The expectation of the policy is that the lower the agreement rate, the more projects would be promoted, but that is not the actual effect. From a policy consistency viewpoint, changing the agreement rate frequently, depending on the decision of the public, is not reasonable. The policy of using agreement rate as a necessary condition for project implementation should be reconsidered.

Keywords: Area and Economic Variables, Elapsed time, Housing Renewal Project.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1584
11530 Current Issues on Enterprise Architecture Implementation Evaluation

Authors: Fatemeh Nikpay, Rodina Binti Ahmad, Babak Darvish Rouhani

Abstract:

Enterprise Architecture (EA) is employed by enterprises for providing integrated Information Systems (ISs) in order to support alignment of their business and Information Technology (IT). Evaluation of EA implementation can support enterprise to reach intended goals. There are some problems in current evaluation methods of EA implementation that lead to ineffectiveness implementation of EA. This paper represents current issues on evaluation of EA implementation. In this regard, we set the framework in order to represent evaluation’s issues based on their functionality and structure. The results of this research not only increase the knowledge of evaluation, but also could be useful for both academics and practitioners in order to realize the current situation of evaluations.

Keywords: Current issues on EA, implementation evaluation, Evaluation, Enterprise Architecture, Evaluation of Enterprise Architecture Implementation.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3967
11529 Determining the Principles Affecting Perceptions of Strategic Quality Management Implementation: A Study of the Turkish Large Scale Firms

Authors: Gül Tekin Temur, Tolga Kaya, Serpil Öktem, Sıtkı Gözlü

Abstract:

The purpose of this study is to reveal the principles, which have the highest impact on determining the Strategic Quality Management (SQM) implementation perceptions of managers. In order to accomplish this goal, first of all, a factor analysis is conducted on the attitudes of managers at 80 large-scale firms in Turkey for SQM principles. Secondly, utilizing t tests and discriminant analysis, the most effective items are determined. The results show that “process improvement" and “assessment of competitiveness" are the management principles, which have the highest impact on determining the SQM implementation perceptions of Turkish managers.

Keywords: Assessment of Competitiveness, Process Improvement, Strategic Quality Management.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1493
11528 Improved Pattern Matching Applied to Surface Mounting Devices Components Localization on Automated Optical Inspection

Authors: Pedro M. A. Vitoriano, Tito. G. Amaral

Abstract:

Automated Optical Inspection (AOI) Systems are commonly used on Printed Circuit Boards (PCB) manufacturing. The use of this technology has been proven as highly efficient for process improvements and quality achievements. The correct extraction of the component for posterior analysis is a critical step of the AOI process. Nowadays, the Pattern Matching Algorithm is commonly used, although this algorithm requires extensive calculations and is time consuming. This paper will present an improved algorithm for the component localization process, with the capability of implementation in a parallel execution system.

Keywords: AOI, automated optical inspection, SMD, surface mounting devices, pattern matching, parallel execution.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1024
11527 Time Comparative Simulator for Distributed Process Scheduling Algorithms

Authors: Nazleeni Samiha Haron, Anang Hudaya Muhamad Amin, Mohd Hilmi Hasan, Izzatdin Abdul Aziz, Wirdhayu Mohd Wahid

Abstract:

In any distributed systems, process scheduling plays a vital role in determining the efficiency of the system. Process scheduling algorithms are used to ensure that the components of the system would be able to maximize its utilization and able to complete all the processes assigned in a specified period of time. This paper focuses on the development of comparative simulator for distributed process scheduling algorithms. The objectives of the works that have been carried out include the development of the comparative simulator, as well as to implement a comparative study between three distributed process scheduling algorithms; senderinitiated, receiver-initiated and hybrid sender-receiver-initiated algorithms. The comparative study was done based on the Average Waiting Time (AWT) and Average Turnaround Time (ATT) of the processes involved. The simulation results show that the performance of the algorithms depends on the number of nodes in the system.

Keywords: Distributed Systems, Load Sharing, Process Scheduling, AWT and ATT

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1577
11526 The Framework of Termination Mechanism in Modern Emergency Management

Authors: Yannan Wu, An Chen, Yan Zhao

Abstract:

Termination Mechanism is an indispensible part of the emergency management mechanism. Despite of its importance in both theory and practice, it is almost a brand new field for researching. The concept of termination mechanism is proposed firstly in this paper, and the design and implementation which are helpful to guarantee the effect and integrity of emergency management are discussed secondly. Starting with introduction of the problems caused by absent termination and incorrect termination, the essence of termination mechanism is analyzed, a model based on Optimal Stopping Theory is constructed and the termination index is given. The model could be applied to find the best termination time point.. Termination decision should not only be concerned in termination stage, but also in the whole emergency management process, which makes it a dynamic decision making process. Besides, the main subjects and the procedure of termination are illustrated after the termination time point is given. Some future works are discussed lastly.

Keywords: Emergency management, Termination Mechanism, Optimal Termination Model, Decision Making, Optimal StoppingTheory.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1228
11525 Implementation of Watch Dog Timer for Fault Tolerant Computing on Cluster Server

Authors: Meenakshi Bheevgade, Rajendra M. Patrikar

Abstract:

In today-s new technology era, cluster has become a necessity for the modern computing and data applications since many applications take more time (even days or months) for computation. Although after parallelization, computation speeds up, still time required for much application can be more. Thus, reliability of the cluster becomes very important issue and implementation of fault tolerant mechanism becomes essential. The difficulty in designing a fault tolerant cluster system increases with the difficulties of various failures. The most imperative obsession is that the algorithm, which avoids a simple failure in a system, must tolerate the more severe failures. In this paper, we implemented the theory of watchdog timer in a parallel environment, to take care of failures. Implementation of simple algorithm in our project helps us to take care of different types of failures; consequently, we found that the reliability of this cluster improves.

Keywords: Cluster, Fault tolerant, Grid, Grid ComputingSystem, Meta-computing.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2178
11524 Innovation Strategy in Slovak Businesses

Authors: V. Lendel, M. Varmus

Abstract:

The aim of the paper is based on detailed analysis of literary sources and carried out research to develop a model development and implementation of innovation strategy in the business. The paper brings the main results of the authors conducted research on a sample of 462 respondents that shows the current situation in the Slovak enterprises in the use of innovation strategy. Carried out research and analysis provided the base for a model development and implementation of innovation strategy in the business, which is in the paper in detail, step by step explained with emphasis on the implementation process. Implementing the innovation strategy is described a separate model. Paper contains recommendations for successful implementation of innovation strategy in the business. These recommendations should serve mainly business managers as valuable tool in implementing the innovation strategy.

Keywords: innovation, innovation strategy, innovative management, innovative potential

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1691
11523 Challenges of Implementing Urban Master Plans: The Lahore Experience

Authors: Rizwan Hameed, Obaidullah Nadeem

Abstract:

Master plan is a tool to guide and manage the growth of cities in a planned manner. The soul of a master plan lies in its implementation framework. If not implemented, people are trapped in a mess of urban problems and laissez-faire development having serious long term repercussions. Unfortunately, Master Plans prepared for several major cities of Pakistan could not be fully implemented due to host of reasons and Lahore is no exception. Being the second largest city of Pakistan with a population of over 7 million people, Lahore holds the distinction that the first ever Master Plan in the country was prepared for this city in 1966. Recently in 2004, a new plan titled `Integrated Master Plan for Lahore-2021- has been approved for implementation. This paper provides a comprehensive account of the weaknesses and constraints in the plan preparation process and implementation strategies of Master Plans prepared for Lahore. It also critically reviews the new Master Plan particularly with respect to the proposed implementation framework. The paper discusses the prospects and pre-conditions for successful implementation of the new Plan in the light of historic analysis, interviews with stakeholders and the new institutional context under the devolution plan.

Keywords: City District Government, Implementation of plan, Lahore Development Authority, Master Planning.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 7180
11522 FPGA Implementation of Adaptive Clock Recovery for TDMoIP Systems

Authors: Semih Demir, Anil Celebi

Abstract:

Circuit switched networks widely used until the end of the 20th century have been transformed into packages switched networks. Time Division Multiplexing over Internet Protocol (TDMoIP) is a system that enables Time Division Multiplexing (TDM) traffic to be carried over packet switched networks (PSN). In TDMoIP systems, devices that send TDM data to the PSN and receive it from the network must operate with the same clock frequency. In this study, it was aimed to implement clock synchronization process in Field Programmable Gate Array (FPGA) chips using time information attached to the packages received from PSN. The designed hardware is verified using the datasets obtained for the different carrier types and comparing the results with the software model. Field tests are also performed by using the real time TDMoIP system.

Keywords: Clock recovery on TDMoIP, FPGA, MATLAB reference model, clock synchronization.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1385
11521 Just-In-Time Implementation Status in the Middle East Industry

Authors: Rami H. Fouad

Abstract:

The purpose of this study is to identify and evaluate the scale of implementation of Just-In-Time (JIT) in the different industrial sectors in the Middle East. This study analyzes the empirical data collected by a questionnaire survey distributed to companies in three main industrial sectors in the Middle East, which are: food, chemicals and fabrics. The following main hypotheses is formulated and tested: (The requirements of JIT application differ according to the type of industrial sector).Descriptive statistics and Box plot analysis were used to examine the hypotheses. This study indicates a reasonable evidence for accepting the main hypotheses. It reveals that there is no standard way to adopt JIT as a production system. But each industrial sector should concentrate in the investment on critical requirements that differ according to the nature and strategy of production followed in that sector.

Keywords: Just-In-Time, JIT, Questionnaire, Types of Industrial Sectors.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1924
11520 Real-Time Implementation of STANAG 4539 High-Speed HF Modem

Authors: S. Saraç, F. Kara, C.Vural

Abstract:

High-frequency (HF) communications have been used by military organizations for more than 90 years. The opportunity of very long range communications without the need for advanced equipment makes HF a convenient and inexpensive alternative of satellite communications. Besides the advantages, voice and data transmission over HF is a challenging task, because the HF channel generally suffers from Doppler shift and spread, multi-path, cochannel interference, and many other sources of noise. In constructing an HF data modem, all these effects must be taken into account. STANAG 4539 is a NATO standard for high-speed data transmission over HF. It allows data rates up to 12800 bps over an HF channel of 3 kHz. In this work, an efficient implementation of STANAG 4539 on a single Texas Instruments- TMS320C6747 DSP chip is described. The state-of-the-art algorithms used in the receiver and the efficiency of the implementation enables real-time high-speed data / digitized voice transmission over poor HF channels.

Keywords: High frequency, modem, STANAG 4539.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 5283
11519 Efficient Real-time Remote Data Propagation Mechanism for a Component-Based Approach to Distributed Manufacturing

Authors: V. Barot, S. McLeod, R. Harrison, A. A. West

Abstract:

Manufacturing Industries face a crucial change as products and processes are required to, easily and efficiently, be reconfigurable and reusable. In order to stay competitive and flexible, situations also demand distribution of enterprises globally, which requires implementation of efficient communication strategies. A prototype system called the “Broadcaster" has been developed with an assumption that the control environment description has been engineered using the Component-based system paradigm. This prototype distributes information to a number of globally distributed partners via an adoption of the circular-based data processing mechanism. The work highlighted in this paper includes the implementation of this mechanism in the domain of the manufacturing industry. The proposed solution enables real-time remote propagation of machine information to a number of distributed supply chain client resources such as a HMI, VRML-based 3D views and remote client instances regardless of their distribution nature and/ or their mechanisms. This approach is presented together with a set of evaluation results. Authors- main concentration surrounds the reliability and the performance metric of the adopted approach. Performance evaluation is carried out in terms of the response times taken to process the data in this domain and compared with an alternative data processing implementation such as the linear queue mechanism. Based on the evaluation results obtained, authors justify the benefits achieved from this proposed implementation and highlight any further research work that is to be carried out.

Keywords: Broadcaster, circular buffer, Component-based, distributed manufacturing, remote data propagation.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1336