Design and Implementation of Project Time Management Risk Assessment Tool for SME Projects using Oracle Application Express
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 33122
Design and Implementation of Project Time Management Risk Assessment Tool for SME Projects using Oracle Application Express

Authors: Abdullahi Mohamud Sharif, Mohd. Zaidi Abd. Rozan

Abstract:

Risk Assessment Tool (RAT) is an expert system that assesses, monitors, and gives preliminary treatments automatically based on the project plan. In this paper, a review was taken out for the current project time management risk assessment tools for SME software development projects, analyze risk assessment parameters, conditions, scenarios, and finally propose risk assessment tool (RAT) model to assess, treat, and monitor risks. An implementation prototype system is developed to validate the model.

Keywords: Project Time Management, Risk Assessment Tool(RAT), Small and Medium Enterprises (SME).

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1060791

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2332

References:


[1] Tarek K. Abdel-Hamid, Kishore Sengupta, and Clint Swett. The impact of goals on software project management: an experimental investigation. MIS Q., 23(4):531- 555, 1999.
[2] Dennis Alan, Haley Wixom Barbara, and Tegarden David Paul. System Analysis and Design with UML Version 2.0 an Object-Oriented Approach. John Wiley and Sons, Inc., U.S., 2005.
[3] Carter Bruce, Hancock Tony, Morin Jean-Marc, and Robins Ned. Introducing RISKMAN: the European project risk management methodology. NNC Blackweel Ltd, UK, 1994.
[4] Patterson Fiona D. and Neailey Kevin. A risk register database system to aid the management of project risk. International Journal of Project Management, 20(5):365- 374, Jul 2002.
[5] Donna L. Johnson. Risk Management and the Small Software Project. LOGOS International, Inc., Nashville, Tennessee, 2006.
[6] Steve McConnell. Rapid development: taming wild software schedules. Microsoft Press, Redmond, W.A, 1996.
[7] Robert R. Moeller. COSO Enterprise Risk Management: Understanding The New Integrated ERM Framework. John Wiley and Sons, Hoboken, New Jersey, 2007.
[8] Kathy Schwalbe. Information Technology Project Management. Thomson Course Technology, USA, 2007.
[9] Kathy Schwalbe. Information Technology Project Management. Cengage Learning, USA, 2009.
[10] SC Ward. Assessing and managing important risks. International Journal of Project Management, 17(6):331- 336, Dec 1999.
[11] Terry M. Willams. Using a risk register to integrate risks management in project definition. International Journal of Project Management, 12(1):17- 22, Feb 1994.