Search results for: production line management
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 5275

Search results for: production line management

5275 Study of Hydrocarbons Metering Issues in Algerian Fields under the New Law Context

Authors: A. Hadjadj, S. Maamir

Abstract:

Since the advent of the law 86/14 concerning the
exploitation of the national territory by foreign companies in
partnership with the Algerian oil and gas company, the problem of
hydrocarbons metering in the sharing production come out.
More generally, good management counting hydrocarbons can
provide data on the production wells, the field and the reservoir for
medium and long term planning, particularly in the context of the
management and field development.
In this work, we are interested in the transactional metering which
is a very delicate and crucial period in the current context of the new
hydrocarbon’s law characterized by assets system between the
various activities of Sonatrach and its foreign partners.
After a state of the art on hydrocarbons metering devices in
Algeria and elsewhere, we will decline the advantages and
disadvantages of each system, and then we describe the problem to
try to reach an optimal solution.

Keywords: Flowmeter orifice, heat flow, Sonatrach, Transactional metering.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1386
5274 Performance Comparison of Two Assembly Line Concepts: Conveyor Line and Box Assembly Line

Authors: Kezia Amanda Kurniadi, Emre Islamoglu, Kwangyeol Ryu

Abstract:

As there has been a recognizable transition in automotive industry from mass production to mass customization, automobile manufacturers and their suppliers have been seeking ways for more flexible and efficient processes. Eventually, modular production is currently being applied to manage the changing orders of the industry. In this paper, two different modular assembly line concepts were studied: conveyor line and box assembly line. Mathematical model for two assembly line concepts were developed and their production line efficiency were compared as a performance measure to improve their assembly line balancing.

Keywords: Line Efficiency, Box assembly line, Conventional conveyor line

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2921
5273 The Evaluation of Production Line Performance by Using ARENA – A Case Study

Authors: Muhammad Marsudi, Hani Shafeek

Abstract:

The purpose of this paper is to simulate the production process of a metal stamping industry and to evaluate the utilization of the production line by using ARENA simulation software. The process time and the standard time for each process of the production line is obtained from data given by the company management. Other data are collected through direct observation of the line. There are three work stations performing ten different types of processes in order to produce a single product type. Arena simulation model is then developed based on the collected data. Verification and validation are done to the Arena model, and finally the result of Arena simulation can be analyzed. It is found that utilization at each workstation will increase if batch size is increased although throughput rate remains/is kept constant. This study is very useful for the company because the company needs to improve the efficiency and utilization of its production lines.

Keywords: Arena software, case study, production line, utilization.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 5313
5272 Modeling and Simulation of a Serial Production Line with Constant Work-In-Process

Authors: Mehmet Savsar

Abstract:

This paper presents a model for an unreliable production line, which is operated according to demand with constant work-in-process (CONWIP). A simulation model is developed based on the discrete model and several case problems are analyzed using the model. The model is utilized to optimize storage space capacities at intermediate stages and the number of kanbans at the last stage, which is used to trigger the production at the first stage. Furthermore, effects of several line parameters on production rate are analyzed using design of experiments.

Keywords: Production line simulator, Push-pull system, JIT system, Constant WIP, Machine failures.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1968
5271 A New OvS Approach in an Assembly Line Balancing Problem

Authors: P. Azimi, B. Behtoiy

Abstract:

One of the most famous techniques which affect the efficiency of a production line is the assembly line balancing (ALB) technique. This paper examines the balancing effect of a whole production line of a real auto glass manufacturer in three steps. In the first step, processing time of each activity in the workstations is generated according to a practical approach. In the second step, the whole production process is simulated and the bottleneck stations have been identified, and finally in the third step, several improvement scenarios are generated to optimize the system throughput, and the best one is proposed. The main contribution of the current research is the proposed framework which combines two famous approaches including Assembly Line Balancing and Optimization via Simulation technique (OvS). The results show that the proposed framework could be applied in practical environments, easily.

Keywords: Assembly line balancing problem, optimization via simulation, production planning.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1760
5270 Production Line Layout Planning Based on Complexity Measurement

Authors: Guoliang Fan, Aiping Li, Nan Xie, Liyun Xu, Xuemei Liu

Abstract:

Mass customization production increases the difficulty of the production line layout planning. The material distribution process for variety of parts is very complex, which greatly increases the cost of material handling and logistics. In response to this problem, this paper presents an approach of production line layout planning based on complexity measurement. Firstly, by analyzing the influencing factors of equipment layout, the complexity model of production line is established by using information entropy theory. Then, the cost of the part logistics is derived considering different variety of parts. Furthermore, the function of optimization including two objectives of the lowest cost, and the least configuration complexity is built. Finally, the validity of the function is verified in a case study. The results show that the proposed approach may find the layout scheme with the lowest logistics cost and the least complexity. Optimized production line layout planning can effectively improve production efficiency and equipment utilization with lowest cost and complexity.

Keywords: Production line, layout planning, complexity measurement, optimization, mass customization.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1048
5269 Optimization of Structure of Section-Based Automated Lines

Authors: R. Usubamatov, M. Z. Abdulmuin

Abstract:

Automated production lines with so called 'hard structures' are widely used in manufacturing. Designers segmented these lines into sections by placing a buffer between the series of machine tools to increase productivity. In real production condition the capacity of a buffer system is limited and real production line can compensate only some part of the productivity losses of an automated line. The productivity of such production lines cannot be readily determined. This paper presents mathematical approach to solving the structure of section-based automated production lines by criterion of maximum productivity.

Keywords: optimization production line, productivity, sections

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1278
5268 Managing a Manufacturing System with Integration of Walking Worker and Lean Thinking

Authors: Said Rabah Azzam, Laura Carolina Arias, Shikun Zhou

Abstract:

A product goes through various processes in a production flow which is also known as assembly line in manufacturing process management. Toyota created a new concept which is known as lean concept in manufacturing industry. Today it is the leading model in manufacturing plants through the globe. The linear walking worker assembly line is a flexible assembly system where each worker travels down the line carrying out each assembly task at each station; and each worker accomplishes the assembly of a unit from start to finish. This paper attempts to combine the flexibility of the walking worker and lean in order to quantify the benefits from applying the shop floor principles of lean management.

Keywords: Toyota Production System, TPS, LeanManufacturing, Walking Worker, Lean Management, Management, Linear Assembly Lines, U-shaped Assembly Lines, Shop FloorManagement

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1780
5267 Performance Analysis of a Flexible Manufacturing Line Operated Under Surplus-based Production Control

Authors: K. K. Starkov, A. Y. Pogromsky, I. J. B. F. Adan, J. E. Rooda

Abstract:

In this paper we present our results on the performance analysis of a multi-product manufacturing line. We study the influence of external perturbations, intermediate buffer content and the number of manufacturing stages on the production tracking error of each machine in the multi-product line operated under a surplusbased production control policy. Starting by the analysis of a single machine with multiple production stages (one for each product type), we provide bounds on the production error of each stage. Then, we extend our analysis to a line of multi-stage machines, where similarly, bounds on each production tracking error for each product type, as well as buffer content are obtained. Details on performance of the closed-loop flow line model are illustrated in numerical simulations.

Keywords: Flexible manufacturing systems, tracking systems, discrete time systems, production control, boundary conditions.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1470
5266 Development of Transmission Line Sleeve Inspection Robot

Authors: Jae-Kyung Lee, Nam-Joon Jung, Byung-Hak Cho

Abstract:

The line sleeves on power transmission line connects two conductors while the transmission line is constructing. However, the line sleeves sometimes cause transmission line break down, because the line sleeves are deteriorated and decayed by acid rain. When the transmission line is broken, the economical loss is huge. Therefore the line sleeves on power transmission lines should be inspected periodically to prevent power failure. In this paper, Korea Electric Power Research Institute reviewed several robots to inspect line status and proposes a robot to inspect line sleeve by measuring magnetic field on line sleeve. The developed inspection tool can reliable to move along transmission line and overcome several obstacles on transmission line. The developed system is also applied on power transmission line and verified the efficiency of the robot.

Keywords: Transmission line inspection, line sleeve, transmission line inspection robot, line sleeve inspection

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2225
5265 A New Heuristic Approach to Solving U-shape Assembly Line Balancing Problems Type-1

Authors: M. Fathi, M. J. Alvarez, V. Rodríguez

Abstract:

Assembly line balancing is a very important issue in mass production systems due to production cost. Although many studies have been done on this topic, but because assembly line balancing problems are so complex they are categorized as NP-hard problems and researchers strongly recommend using heuristic methods. This paper presents a new heuristic approach called the critical task method (CTM) for solving U-shape assembly line balancing problems. The performance of the proposed heuristic method is tested by solving a number of test problems and comparing them with 12 other heuristics available in the literature to confirm the superior performance of the proposed heuristic. Furthermore, to prove the efficiency of the proposed CTM, the objectives are increased to minimize the number of workstation (or equivalently maximize line efficiency), and minimizing the smoothness index. Finally, it is proven that the proposed heuristic is more efficient than the others to solve the U-shape assembly line balancing problem.

Keywords: Critical task method, Heuristic, Line balancingproblem, U-shape

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2410
5264 A Hybrid Model of ARIMA and Multiple Polynomial Regression for Uncertainties Modeling of a Serial Production Line

Authors: Amir Azizi, Amir Yazid b. Ali, Loh Wei Ping, Mohsen Mohammadzadeh

Abstract:

Uncertainties of a serial production line affect on the production throughput. The uncertainties cannot be prevented in a real production line. However the uncertain conditions can be controlled by a robust prediction model. Thus, a hybrid model including autoregressive integrated moving average (ARIMA) and multiple polynomial regression, is proposed to model the nonlinear relationship of production uncertainties with throughput. The uncertainties under consideration of this study are demand, breaktime, scrap, and lead-time. The nonlinear relationship of production uncertainties with throughput are examined in the form of quadratic and cubic regression models, where the adjusted R-squared for quadratic and cubic regressions was 98.3% and 98.2%. We optimized the multiple quadratic regression (MQR) by considering the time series trend of the uncertainties using ARIMA model. Finally the hybrid model of ARIMA and MQR is formulated by better adjusted R-squared, which is 98.9%.

Keywords: ARIMA, multiple polynomial regression, production throughput, uncertainties

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2161
5263 Relationship between Transparency, Liquidity and Valuation

Authors: Zahra Lashgari, Naghmeh Sadat MaghamiTekiyeh

Abstract:

Recent evidences on liquidity and valuation of securities in the capital markets clearly show the importance of stock market liquidity and valuation of firms. In this paper, relationship between transparency, liquidity, and valuation is studied by using data obtained from 70 companies listed in Tehran Stock Exchange during2003-2012. In this study, discriminatory earnings management, as a sign of lack of transparency and Tobin's Q, was used as the criteria of valuation. The results indicate that there is a significant and reversed relationship between earnings management and liquidity. On the other hand, there is a relationship between liquidity and transparency.The results also indicate a significant relationship between transparency and valuation. Transparency has an indirect effect on firm valuation alone or through the liquidity channel. Although the effect of transparency on the value of a firm was reduced by adding the variable of liquidity, the cumulative effect of transparency and liquidity increased.

Keywords: Firm valuation, Earnings management, Liquidity, Tobin's Q, Transparency.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2136
5262 Design of the Production Line Based On RFID through 3D Modeling

Authors: Aliakbar Akbari, Majid Hashemipour, Shiva Mirshahi

Abstract:

Radio-frequency identification has entered as a beneficial means with conforming GS1 standards to provide the best solutions in the manufacturing area. It competes with other automated identification technologies e.g. barcodes and smart cards with regard to high speed scanning, reliability and accuracy as well. The purpose of this study is to improve production line-s performance by implementing RFID system in the manufacturing area on the basis of radio-frequency identification (RFID) system by 3D modeling in the program Cinema 4D R13 which provides obvious graphical scenes for users to portray their applications. Finally, with regard to improving system performance, it shows how RFID appears as a well-suited technology in a comparison of the barcode scanner to handle different kinds of raw materials in the production line base on logical process.

Keywords: Radio Frequency Identification, Manufacturing and Production Lines, 3D modeling

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2071
5261 The Application of Queuing Theory in Multi-Stage Production Lines

Authors: Hani Shafeek, Muhammed Marsudi

Abstract:

The purpose of this work is examining the multiproduct multi-stage in a battery production line. To improve the performances of an assembly production line by determine the efficiency of each workstation. Data collected from every workstation. The data are throughput rate, number of operator, and number of parts that arrive and leaves during part processing. Data for the number of parts that arrives and leaves are collected at least at the amount of ten samples to make the data is possible to be analyzed by Chi-Squared Goodness Test and queuing theory. Measures of this model served as the comparison with the standard data available in the company. Validation of the task time value resulted by comparing it with the task time value based on the company database. Some performance factors for the multi-product multi-stage in a battery production line in this work are shown. The efficiency in each workstation was also shown. Total production time to produce each part can be determined by adding the total task time in each workstation. To reduce the queuing time and increase the efficiency based on the analysis any probably improvement should be done. One probably action is by increasing the number of operators how manually operate this workstation.

Keywords: Production line, manufacturing, performance measurement, queuing theory.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3088
5260 Analysis of Production Loss on a Linear Walking Worker Line

Authors: Qian Wang, Sylvain Lassalle, Antony R. Mileham, Geraint W. Owen

Abstract:

This paper mathematically analyses the varying magnitude of production loss, which may occur due to idle time (inprocess waiting time and traveling time) on a linear walking worker assembly line. Within this flexible and reconfigurable assembly system, each worker travels down the line carrying out each assembly task at each station; and each worker accomplishes the assembly of a unit from start to finish and then travels back to the first station to start the assembly of a new product. This strategy of system design attempts to combine the flexibility of the U-shaped moving worker assembly cell with the efficiency of the conventional fixed worker assembly line. The paper aims to evaluate the effect of idle time that may offset the labor efficiency of each walking worker providing an insight into the mechanism of such a flexible and reconfigurable assembly system.

Keywords: Production lines, manufacturing systems, assemblysystems, walking workers.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1849
5259 The Data Mining usage in Production System Management

Authors: Pavel Vazan, Pavol Tanuska, Michal Kebisek

Abstract:

The paper gives the pilot results of the project that is oriented on the use of data mining techniques and knowledge discoveries from production systems through them. They have been used in the management of these systems. The simulation models of manufacturing systems have been developed to obtain the necessary data about production. The authors have developed the way of storing data obtained from the simulation models in the data warehouse. Data mining model has been created by using specific methods and selected techniques for defined problems of production system management. The new knowledge has been applied to production management system. Gained knowledge has been tested on simulation models of the production system. An important benefit of the project has been proposal of the new methodology. This methodology is focused on data mining from the databases that store operational data about the production process.

Keywords: data mining, data warehousing, management of production system, simulation

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3439
5258 Unreliable Production Lines with Simultaneously Unbalanced Operation Time Means, Breakdown, and Repair Rates

Authors: S. Shaaban, T. McNamara, S. Hudson

Abstract:

This paper investigates the benefits of deliberately unbalancing both operation time means (MTs) and unreliability (failure and repair rates) for non-automated production lines. The lines were simulated with various line lengths, buffer capacities, degrees of imbalance and patterns of MT and unreliability imbalance. Data on two performance measures, namely throughput (TR) and average buffer level (ABL) were gathered, analyzed and compared to a balanced line counterpart. A number of conclusions were made with respect to the ranking of configurations, as well as to the relationships among the independent design parameters and the dependent variables. It was found that the best configurations are a balanced line arrangement and a monotone decreasing MT order, coupled with either a decreasing or a bowl unreliability configuration, with the first generally resulting in a reduced TR and the second leading to a lower ABL than those of a balanced line.

Keywords: Average buffer level, throughput, unbalanced failure and repair rates, unequal mean operation times, unreliable production lines.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2199
5257 Implementation of On-Line Cutting Stock Problem on NC Machines

Authors: Jui P. Hung, Hsia C. Chang, Yuan L. Lai

Abstract:

Introduction applicability of high-speed cutting stock problem (CSP) is presented in this paper. Due to the orders continued coming in from various on-line ways for a professional cutting company, to stay competitive, such a business has to focus on sustained production at high levels. In others words, operators have to keep the machine running to stay ahead of the pack. Therefore, the continuous stock cutting problem with setup is proposed to minimize the cutting time and pattern changing time to meet the on-line given demand. In this paper, a novel method is proposed to solve the problem directly by using cutting patterns directly. A major advantage of the proposed method in series on-line production is that the system can adjust the cutting plan according to the floating orders. Examples with multiple items are demonstrated. The results show considerable efficiency and reliability in high-speed cutting of CSP.

Keywords: Cutting stock, Optimization, Heuristics

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1684
5256 Influence of the Line Parameters in Transmission Line Fault Location

Authors: Marian Dragomir, Alin Dragomir

Abstract:

In the paper, two fault location algorithms are presented for transmission lines which use the line parameters to estimate the distance to the fault. The first algorithm uses only the measurements from one end of the line and the positive and zero sequence parameters of the line, while the second one uses the measurements from both ends of the line and only the positive sequence parameters of the line. The algorithms were tested using a transmission grid transposed in MATLAB. In a first stage it was established a fault location base line, where the algorithms mentioned above estimate the fault locations using the exact line parameters. After that, the positive and zero sequence resistance and reactance of the line were calculated again for different ground resistivity values and then the fault locations were estimated again in order to compare the results with the base line results. The results show that the algorithm which uses the zero sequence impedance of the line is the most sensitive to the line parameters modifications. The other algorithm is less sensitive to the line parameters modification.

Keywords: Estimation algorithms, fault location, line parameters, simulation tool.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1111
5255 An Exploration on On-line Mass Collaboration: Focusing on its Motivation Structure

Authors: Jae Kyung Ha, Yong-Hak Kim

Abstract:

The Internet has become an indispensable part of our lives. Witnessing recent web-based mass collaboration, e.g. Wikipedia, people are questioning whether the Internet has made fundamental changes to the society or whether it is merely a hyperbolic fad. It has long been assumed that collective action for a certain goal yields the problem of free-riding, due to its non-exclusive and non-rival characteristics. Then, thanks to recent technological advances, the on-line space experienced the following changes that enabled it to produce public goods: 1) decrease in the cost of production or coordination 2) externality from networked structure 3) production function which integrates both self-interest and altruism. However, this research doubts the homogeneity of on-line mass collaboration and argues that a more sophisticated and systematical approach is required. The alternative that we suggest is to connect the characteristics of the goal to the motivation. Despite various approaches, previous literature fails to recognize that motivation can be structurally restricted by the characteristic of the goal. First we draw a typology of on-line mass collaboration with 'the extent of expected beneficiary' and 'the existence of externality', and then we examine each combination of motivation using Benkler-s framework. Finally, we explore and connect such typology with its possible dominant participating motivation.

Keywords: On-line cooperation, typology, mass collaboration, motivation, wikinomics.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1444
5254 A Universal Approach to Categorize Failures in Production

Authors: K. Knüppel, G. Meyer, P. Nyhuis

Abstract:

The increasing interconnectedness and complexity of  production processes raise the susceptibility of production systems to  failure. Therefore, the ability to respond quickly to failures is  increasingly becoming a competitive factor. The research project  "Sustainable failure management in manufacturing SMEs" is  developing a methodology to identify failures in the production and  select preventive and reactive measures in order to correct failures  and to establish sustainable failure management systems.

 

Keywords: Failure categorization, failure management, logistic performance, production optimization.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1991
5253 Ultra-Light Overhead Conveyor Systems for Logistics Applications

Authors: Batin Latif Aylak, Bernd Noche

Abstract:

Overhead conveyor systems satisfy by their simple
construction, wide application range and their full compatibility with
other manufacturing systems, which are designed according to
international standards. Ultra-light overhead conveyor systems are
rope-based conveying systems with individually driven vehicles. The
vehicles can move automatically on the rope and this can be realized
by energy and signals. Crossings are realized by switches. Overhead
conveyor systems are particularly used in the automotive industry but
also at post offices. Overhead conveyor systems always must be
integrated with a logistical process by finding the best way for a
cheaper material flow and in order to guarantee precise and fast
workflows. With their help, any transport can take place without
wasting ground and space, without excessive company capacity, lost
or damaged products, erroneous delivery, endless travels and without
wasting time. Ultra-light overhead conveyor systems provide optimal
material flow, which produces profit and saves time. This article
illustrates the advantages of the structure of the ultra-light overhead
conveyor systems in logistics applications and explains the steps of
their system design. After an illustration of the steps, currently
available systems on the market will be shown by means of their
technical characteristics. Due to their simple construction, demands
to an ultra-light overhead conveyor system will be illustrated.

Keywords: Logistics, material flow, overhead conveyor.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2021
5252 In vitro and in vivo Anticholinesterase Activity of the Volatile Oil of the Aerial Parts of Ocimum basilicum L. and O. africanum Lour. Growing in Egypt

Authors: M. G. Tadros, S. M. Ezzat, M. M. Salama, M. A. Farag

Abstract:

In this study, the in vitro anticholinesterase activity of
the volatile oils of both O. basilicum and O. africanum was
investigated and both samples showed significant activity. The major
constituents of the two oils were isolated using several column
chromatographies. Linalool, 1,8-cineol and eugenol were isolated
from the volatile oil of O. basilicum and camphor was isolated from
the volatile oil of O. africanum. The anticholinesterase activities of
the isolated compounds were also evaluated where 1,8-cineol showed
the highest inhibitory activity followed by camphor. To confirm these
activities, learning and memory enhancing effects were tested in
mice. Memory impairment was induced by scopolamine, a
cholinergic muscarinic receptor antagonist. Anti-amnesic effects of
both volatile oils and their terpenoids were investigated by the
passive avoidance task in mice. We also examined their effects on
brain acetylcholinesterase activity. Results showed that scopolamineinduced
cognitive dysfunction was significantly attenuated by
administration of the volatile oils and their terpenoids, eugenol and
camphor, in the passive avoidance task and inhibited brain
acetylcholinesterase activity. These results suggest that O. basilicum
and O. africanum volatile oils can be good candidates for further
studies on Alzheimer’s disease via their acetylcholinesterase
inhibitory actions.

Keywords: Acetylcholinesterase, Ocimum africanum, Ocimum basilicum, passive avoidance.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3419
5251 Improving Production Traits for El-Salam and Mandarah Chicken Strains by Crossing II-Estimation of Crossbreeding Effects on Egg Production and Egg Quality Traits

Authors: Ayman E. Taha, Fawzy A. Abd El-Ghany

Abstract:

A crossbreeding experiment was carried out between two Egyptian strains of chickens namely Mandarah (MM) and El-Salam (SS). The two purebred strains and their reciprocal crosses (MS and SM) were used to estimate the effect of crossing on egg laying and egg quality parameters, direct additive and maternal additive effects as well as heterosis and direct heterosis percentages for studied traits. Results revealed that SM cross recorded the highest significant averages for most of egg production traits including body weight at sexual maturity (BW1), egg numbers at first 90 days, 42 weeks and 65 weeks of age (EN1, EN2 and EN3; respectively), egg weight at 90 days, 42 weeks of age (EW1 and EW2), egg mass at 90 days, 42 weeks and 65 weeks of age (EM1, EM2 and EM3; respectively), feed conversion ratio to egg production at 90 days , 42 weeks and 65 weeks of age (FCR1, FCR2 and FCR3; respectively), fertility and commercial hatchability percentages. Moreover, SM line reached the age sexual maturity (ASM) and period to the first ten eggs (Pf10 egg) at earlier age than other lines. On the other hand, crossing did not well improve egg quality parameters. Estimates and percentages of direct additive effect (GI) were negative for most of the studied traits except for EN1, EN2, EN3, FCR3, fertility, scientific and commercial hatchability percentages that were positive. But Estimates and percentages of maternal heterosis (Gm) were positive for all the studied traits of egg production, except for BW2, BW3, ASM, Pf10, FCR1, FCR2, FCR3 and scientific hatchability that were negative. Also, positive estimates and percentages of heterosis were recorded for most of egg production and egg quality traits. It was concluded that using of SS strain as a sire line and MM strain as a dam line resulting in best new commercial egg line (SM) which is of great concern for poultry breeder in Egypt.

Keywords: Mandarahand El-Salam chickens, Crossing, Egg production, Egg quality, Crossbreeding components.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2819
5250 Solving a New Mixed-Model Assembly LineSequencing Problem in a MTO Environment

Authors: N. Manavizadeh, M. Hosseini, M. Rabbani

Abstract:

In the last decades to supply the various and different demands of clients, a lot of manufacturers trend to use the mixedmodel assembly line (MMAL) in their production lines, since this policy make possible to assemble various and different models of the equivalent goods on the same line with the MTO approach. In this article, we determine the sequence of (MMAL) line, with applying the kitting approach and planning of rest time for general workers to reduce the wastages, increase the workers effectiveness and apply the sector of lean production approach. This Multi-objective sequencing problem solved in small size with GAMS22.2 and PSO meta heuristic in 10 test problems and compare their results together and conclude that their results are very similar together, next we determine the important factors in computing the cost, which improving them cost reduced. Since this problem, is NPhard in large size, we use the particle swarm optimization (PSO) meta-heuristic for solving it. In large size we define some test problems to survey it-s performance and determine the important factors in calculating the cost, that by change or improved them production in minimum cost will be possible.

Keywords: Mixed-Model Assembly Line, particle swarmoptimization, Multi-objective sequencing problem, MTO system, kitto-assembly, rest time

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1992
5249 Integrating the Theory of Constraints and Six Sigma in Manufacturing Process Improvement

Authors: Kai Jin, Hyder Abdul-Razzak, Yousri Elkassabgi, Hong Zhou, Aaron Herrera

Abstract:

Six Sigma is a well known discipline that reduces variation using complex statistical tools and the DMAIC model. By integrating Goldratts-s Theory of Constraints, the Five Focusing Points and System Thinking tools, Six Sigma projects can be selected where it can cause more impact in the company. This research defines an integrated model of six sigma and constraint management that shows a step-by-step guide using the original methodologies from each discipline and is evaluated in a case study from the production line of a Automobile engine monoblock V8, resulting in an increase in the line capacity from 18.7 pieces per hour to 22.4 pieces per hour, a reduction of 60% of Work-In-Process and a variation decrease of 0.73%.

Keywords: Constraint Management, Manufacturing Process Improvement, Six Sigma, System Thinking.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1699
5248 The Application of Line Balancing Technique and Simulation Program to Increase Productivity in Hard Disk Drive Components

Authors: Alonggot Limcharoen, Jintana Wannarat, Vorawat Panich

Abstract:

This study aims to investigate the balancing of the number of operators (Line Balancing technique) in the production line of hard disk drive components in order to increase efficiency. At present, the trend of using hard disk drives has continuously declined leading to limits in a company’s revenue potential. It is important to improve and develop the production process to create market share and to have the ability to compete with competitors with a higher value and quality. Therefore, an effective tool is needed to support such matters. In this research, the Arena program was applied to analyze the results both before and after the improvement. Finally, the precedent was used before proceeding with the real process. There were 14 work stations with 35 operators altogether in the RA production process where this study was conducted. In the actual process, the average production time was 84.03 seconds per product piece (by timing 30 times in each work station) along with a rating assessment by implementing the Westinghouse principles. This process showed that the rating was 123% underlying an assumption of 5% allowance time. Consequently, the standard time was 108.53 seconds per piece. The Takt time was calculated from customer needs divided by working duration in one day; 3.66 seconds per piece. Of these, the proper number of operators was 30 people. That meant five operators should be eliminated in order to increase the production process. After that, a production model was created from the actual process by using the Arena program to confirm model reliability; the outputs from imitation were compared with the original (actual process) and this comparison indicated that the same output meaning was reliable. Then, worker numbers and their job responsibilities were remodeled into the Arena program. Lastly, the efficiency of production process enhanced from 70.82% to 82.63% according to the target.

Keywords: Hard disk drive, line balancing, simulation, Arena program.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1141
5247 Structural Safety Evaluation of Zip-Line Due to Dynamic Impact Load

Authors: Bu Seog Ju, Jae Sang Kim, Woo Young Jung

Abstract:

In recent year, with recent increase of interest towards leisure sports, increased number of Zip-Line or Zip-Wire facilities has built. Many researches have been actively conducted on the emphasis of the cable and the wire at the bridge. However, very limited researches have been conducted on the safety of the Zip-Line structure. In fact, fall accidents from Zip-Line have been reported frequently. Therefore, in this study, the structural safety of Zip-Line under dynamic impact loading condition were evaluated on the previously installed steel cable for leisure (Zip-Line), using 3-dimensional nonlinear Finite Element (FE) model. The result from current study would assist assurance of systematic stability of Zip-Line.

Keywords: Zip-Line, Wire, Cable, 3D FE Model, Safety.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 4024
5246 The Place and Effects of Information Management in Corporate Identity

Authors: H. Buluthan Cetintas

Abstract:

Corporate identity, which has several advantages such that the employees become integrated with their corporations, corporation is distinguished from its competitors and it is recognized by the masses, is the total of the distinctive corporate features that and corporation has. That the information takes part in production as a more important component than labor and capital has required that the corporations are reorganized as information-based. Therefore, information and its management have reached a basic and prevalent position in having sustainable competitive advantage. Thanks to the information management which regulates the information and makes it reachable and available, information will be produced in line with a specific purpose in the corporations and be used in all the corporate processes. As an auxiliary power for increase in the economic potential, efficiency and productivity of the corporation, corporate identity consists of four components. These are corporate philosophy, corporate design, corporate behavior and corporate communication. In this study, the effects of the information management on corporate identity are discussed from the point of these four elements.

Keywords: Corporate identity, information management.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1436