WASET
	@article{(Open Science Index):https://publications.waset.org/pdf/8012,
	  title     = {Solving a New Mixed-Model Assembly LineSequencing Problem in a MTO Environment},
	  author    = {N. Manavizadeh and  M. Hosseini and  M. Rabbani},
	  country	= {},
	  institution	= {},
	  abstract     = {In the last decades to supply the various and different
demands of clients, a lot of manufacturers trend to use the mixedmodel
assembly line (MMAL) in their production lines, since this
policy make possible to assemble various and different models of the
equivalent goods on the same line with the MTO approach.
In this article, we determine the sequence of (MMAL) line, with
applying the kitting approach and planning of rest time for general
workers to reduce the wastages, increase the workers effectiveness
and apply the sector of lean production approach.
This Multi-objective sequencing problem solved in small size with
GAMS22.2 and PSO meta heuristic in 10 test problems and compare
their results together and conclude that their results are very similar
together, next we determine the important factors in computing the
cost, which improving them cost reduced. Since this problem, is NPhard
in large size, we use the particle swarm optimization (PSO)
meta-heuristic for solving it. In large size we define some test
problems to survey it-s performance and determine the important
factors in calculating the cost, that by change or improved them
production in minimum cost will be possible.},
	    journal   = {International Journal of Industrial and Manufacturing Engineering},
	  volume    = {5},
	  number    = {9},
	  year      = {2011},
	  pages     = {1762 - 1771},
	  ee        = {https://publications.waset.org/pdf/8012},
	  url   	= {https://publications.waset.org/vol/57},
	  bibsource = {https://publications.waset.org/},
	  issn  	= {eISSN: 1307-6892},
	  publisher = {World Academy of Science, Engineering and Technology},
	  index 	= {Open Science Index 57, 2011},
	}