A New OvS Approach in an Assembly Line Balancing Problem
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 33104
A New OvS Approach in an Assembly Line Balancing Problem

Authors: P. Azimi, B. Behtoiy

Abstract:

One of the most famous techniques which affect the efficiency of a production line is the assembly line balancing (ALB) technique. This paper examines the balancing effect of a whole production line of a real auto glass manufacturer in three steps. In the first step, processing time of each activity in the workstations is generated according to a practical approach. In the second step, the whole production process is simulated and the bottleneck stations have been identified, and finally in the third step, several improvement scenarios are generated to optimize the system throughput, and the best one is proposed. The main contribution of the current research is the proposed framework which combines two famous approaches including Assembly Line Balancing and Optimization via Simulation technique (OvS). The results show that the proposed framework could be applied in practical environments, easily.

Keywords: Assembly line balancing problem, optimization via simulation, production planning.

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1106609

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1806

References:


[1] N. Boysen, M. Fliedner, and A. Scholl. “Assembly line balancing: Which model to use when, International Journal of Production Economics, vol. 111, 2008, pp. 509-528.
[2] N. Y. Sotskov, Alexandre Dolgui, Marie-Claude Portmann,“Stability analysis of an optimal balance for an assembly line with fixed cycle time”, Proceedings of Emerging Technologies & Factory Automation, DOI: 10.1109/ETFA.2009.5347109, 2009,
[3] Lale Ozbakira, Adil Baykasoglub, Beyza Gorkemlia, Latife Gorkemlia, “Multiple-colony ant algorithm for parallel assembly line balancing problem”, European Journal of Operations Research, vol. 168, 2006, pp. 783-797.
[4] Morteza Saberi, Ali Azadeh, Alireza Aliasgari, Shahrzad Faghihroohi, “Assembly Line Balancing with Discrete Simulation”, Proceedings of APIEMS 2008, Nusa Dua, Bali – Indonesia, December 3rd – 5th, 2008.
[5] Amardeep, T. M. Rangaswamy, and Gautham,“Line Balancing Of Single Model Assembly Line”, International Journal of Innovative Research in Science, Engineering and Technology, vol. 2, 2013, pp. 1678-1680.
[6] Houshang Taghizadeh, Amin Zeinalzadeh, “The Use of Heuristic Models of ranked positional weight and longest candidate rules (LCR) For Assembly Lines Balancing and its Effect on Organizational Performance (Case Study: Urmia Tractor Manufacturing Company)”, International Journal of Industrial Engineering and Production Management, vol. 20, 2009, pp. 55-64.
[7] L. Tiacci, “Coupling a genetic algorithm approach and a discrete event simulator to design mixed-model un-paced assembly lines with parallel workstations and stochastic task times”, International Journal of Production Economics, vol. 159, 2015, pp. 319-333.