Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 103

Search results for: maintenance

103 Implementation of CMMS Software for a Maintenance Plan in a Manufacturing Industry

Authors: Abimbola O. Aniki, Esther T. Akinlabi

Abstract:

This paper proposes an effective maintenance method by considering the implementation of the Computerized Maintenance Management System (CMMS) software to plan a maintenance activity in a manufacturing industry. Globally, maintenance is a very important activity in the manufacturing sector to prolong the life span of equipment and machinery; it is also applicable to all household items. It is obvious and well known that apart from giving long life to equipment, it reduces the substantial financial losses for repairs and save the production downtime. In some cases, appropriate maintenance of plant equipment and machinery reduces the tendencies of injuries to personnel in the job floor. But before the maintenance process can be carried out, proper and effective work order planning and scheduling must be in place in other to achieve the set goals and objectives of a maintenance shop. Brief reviews of common planning tools which include the Computerized Maintenance Management System (CMMS) are presented. An interesting outline of analyses on planning and scheduling for effective job planning in a typical manufacturing industry using the CMMS is also presented and discussed. Finally, the steps to adhere to in making job planning effective in a manufacturing industry are also highlighted.

Keywords: Advanced Downtime Analysis Programme (ADAP), Computerized Maintenance Management System (CMMS), Corrective Maintenance (CM), Executing Department (ED), Maintenance Department (MD), Preventive Maintenance (PM).

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF
102 Research on Maintenance Design Method based Virtual Maintenance

Authors: Yunbin Yang, Liangli He, Fengjun Wang

Abstract:

The essentiality of maintenance assessment and maintenance optimization in design stage is analyzed, and the existent problems of conventional maintenance design method are illuminated. MDMVM (Maintenance Design Method based Virtual Maintenance) is illuminated, and the process of MDMVM established, and the MDMVM architecture is given out. The key techniques of MDMVM are analyzed, and include maintenance design based KBE (Knowledge Based Engineering) and virtual maintenance based physically attribute. According to physical property, physically based modeling, visual object movement control, the simulation of operation force and maintenance sequence planning method are emphatically illuminated. Maintenance design system based virtual maintenance is established in foundation of maintenance design method.

Keywords: Digital mock-up, virtual maintenance, knowledge engineering, maintenance sequence planning.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF
101 Optimal Opportunistic Maintenance Policy for a Two-Unit System

Authors: Nooshin Salari, Viliam Makis, Jane Doe

Abstract:

This paper presents a maintenance policy for a system consisting of two units. Unit 1 is gradually deteriorating and is subject to soft failure. Unit 2 has a general lifetime distribution and is subject to hard failure. Condition of unit 1 of the system is monitored periodically and it is considered as failed when its deterioration level reaches or exceeds a critical level N. At the failure time of unit 2 system is considered as failed, and unit 2 will be correctively replaced by the next inspection epoch. Unit 1 or 2 are preventively replaced when deterioration level of unit 1 or age of unit 2 exceeds the related preventive maintenance (PM) levels. At the time of corrective or preventive replacement of unit 2, there is an opportunity to replace unit 1 if its deterioration level reaches the opportunistic maintenance (OM) level. If unit 2 fails in an inspection interval, system stops operating although unit 1 has not failed. A mathematical model is derived to find the preventive and opportunistic replacement levels for unit 1 and preventive replacement age for unit 2, that minimize the long run expected average cost per unit time. The problem is formulated and solved in the semi-Markov decision process (SMDP) framework. Numerical example is provided to illustrate the performance of the proposed model and the comparison of the proposed model with an optimal policy without opportunistic maintenance level for unit 1 is carried out.

Keywords: Condition-based maintenance, opportunistic maintenance, preventive maintenance, two-unit system.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF
100 Simultaneous Optimization of Design and Maintenance through a Hybrid Process Using Genetic Algorithms

Authors: O. Adjoul, A. Feugier, K. Benfriha, A. Aoussat

Abstract:

In general, issues related to design and maintenance are considered in an independent manner. However, the decisions made in these two sets influence each other. The design for maintenance is considered an opportunity to optimize the life cycle cost of a product, particularly in the nuclear or aeronautical field, where maintenance expenses represent more than 60% of life cycle costs. The design of large-scale systems starts with product architecture, a choice of components in terms of cost, reliability, weight and other attributes, corresponding to the specifications. On the other hand, the design must take into account maintenance by improving, in particular, real-time monitoring of equipment through the integration of new technologies such as connected sensors and intelligent actuators. We noticed that different approaches used in the Design For Maintenance (DFM) methods are limited to the simultaneous characterization of the reliability and maintainability of a multi-component system. This article proposes a method of DFM that assists designers to propose dynamic maintenance for multi-component industrial systems. The term "dynamic" refers to the ability to integrate available monitoring data to adapt the maintenance decision in real time. The goal is to maximize the availability of the system at a given life cycle cost. This paper presents an approach for simultaneous optimization of the design and maintenance of multi-component systems. Here the design is characterized by four decision variables for each component (reliability level, maintainability level, redundancy level, and level of monitoring data). The maintenance is characterized by two decision variables (the dates of the maintenance stops and the maintenance operations to be performed on the system during these stops). The DFM model helps the designers choose technical solutions for the large-scale industrial products. Large-scale refers to the complex multi-component industrial systems and long life-cycle, such as trains, aircraft, etc. The method is based on a two-level hybrid algorithm for simultaneous optimization of design and maintenance, using genetic algorithms. The first level is to select a design solution for a given system that considers the life cycle cost and the reliability. The second level consists of determining a dynamic and optimal maintenance plan to be deployed for a design solution. This level is based on the Maintenance Free Operating Period (MFOP) concept, which takes into account the decision criteria such as, total reliability, maintenance cost and maintenance time. Depending on the life cycle duration, the desired availability, and the desired business model (sales or rental), this tool provides visibility of overall costs and optimal product architecture.

Keywords: Availability, design for maintenance, DFM, dynamic maintenance, life cycle cost, LCC, maintenance free operating period, MFOP, simultaneous optimization.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF
99 Scheduled Maintenance and Downtime Cost in Aircraft Maintenance Management

Authors: Remzi Saltoglu, Nazmia Humaira, Gokhan Inalhan

Abstract:

During aircraft maintenance scheduling, operator calculates the budget of the maintenance. Usually, this calculation includes only the costs that are directly related to the maintenance process such as cost of labor, material, and equipment. In some cases, overhead cost is also included. However, in some of those, downtime cost is neglected claiming that grounding is a natural fact of maintenance; therefore, it is not considered as part of the analytical decision-making process. Based on the normalized data, we introduce downtime cost with its monetary value and add its seasonal character. We envision that the rest of the model, which works together with the downtime cost, could be checked with the real life cases, through the review of MRO cost and airline spending in the particular and scheduled maintenance events.

Keywords: Aircraft maintenance, downtime, downtime cost, maintenance cost.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF
98 Providing a Practical Model to Reduce Maintenance Costs: A Case Study in GeG Company

Authors: Iman Atighi, Jalal Soleimannejad, Reza Pourjafarabadi, Saeid Moradpour

Abstract:

In the past, we could increase profit by increasing product prices. But in the new decade, a competitive market does not let us to increase profit with increased prices. Therefore, the only way to increase profit will be to reduce costs. A significant percentage of production costs are the maintenance costs, and analysis of these costs could achieve more profit. Most maintenance strategies such as RCM (Reliability-Center-Maintenance), TPM (Total Productivity Maintenance), PM (Preventive Maintenance) and etc., are trying to reduce maintenance costs. In this paper, decreasing the maintenance costs of Concentration Plant of Golgohar Iron Ore Mining & Industrial Company (GeG) was examined by using of MTBF (Mean Time Between Failures) and MTTR (Mean Time To Repair) analyses. These analyses showed that instead of buying new machines and increasing costs in order to promote capacity, the improving of MTBF and MTTR indexes would solve capacity problems in the best way and decrease costs.

Keywords: GeG Company, maintainability, maintenance costs, reliability-center-maintenance.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF
97 Application of IED to Condition Based Maintenance of Medium Voltage GCB/VCB

Authors: Ming-Ta Yang, Jyh-Cherng Gu, Chun-Wei Huang, Jin-Lung Guan

Abstract:

Time base maintenance (TBM) is conventionally applied by the power utilities to maintain circuit breakers (CBs), transformers, bus bars and cables, which may result in under maintenance or over maintenance. As information and communication technology (ICT) industry develops, the maintenance policies of many power utilities have gradually changed from TBM to condition base maintenance (CBM) to improve system operating efficiency, operation cost and power supply reliability. This paper discusses the feasibility of using intelligent electronic devices (IEDs) to construct a CB CBM management platform. CBs in power substations can be monitored using IEDs with additional logic configuration and wire connections. The CB monitoring data can be sent through intranet to a control center and be analyzed and integrated by the Elipse Power Studio software. Finally, a human-machine interface (HMI) of supervisory control and data acquisition (SCADA) system can be designed to construct a CBM management platform to provide maintenance decision information for the maintenance personnel, management personnel and CB manufacturers.

Keywords: Circuit breaker, Condition base maintenance, Intelligent electronic device, Time base maintenance, SCADA.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF
96 Development of Maintenance Schedule and Root Cause Analysis Based on Computerized Maintenance Management System for a Fertilizer Plant

Authors: Sanjeev Kumar

Abstract:

This paper deals with development of Computerized Maintenance Management System (CMMS) for a fertilizer plant. The software is advanced, easy to use, less complex, less expensive and also less time consuming. It consists of number of modules like detailed information of equipment, maintenance procedures, work order and employees detail. The objectives of CMMS are to reduce overall downtime, overall yearly maintenance cost and occurrence of failures of the equipment and to get day-by-day maintenance plan and strategy. In this regard, the behavioral chart for urea prilling unit at Fertilizer plant has been developed in form of Root Cause Analysis (RCA). Besides this, a maintenance program has also been proposed and used for the purpose of maintenance planning of the urea prilling unit. The outcome of software has been consulted with the concerned plant individuals and found to be extremely favorable for improving the performance level of the concerned plant.

Keywords: Computerized maintenance management system, root cause analysis, maintenance schedule, urea prilling system.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF
95 Neural Network Based Approach of Software Maintenance Prediction for Laboratory Information System

Authors: Vuk M. Popovic, Dunja D. Popovic

Abstract:

Software maintenance phase is started once a software project has been developed and delivered. After that, any modification to it corresponds to maintenance. Software maintenance involves modifications to keep a software project usable in a changed or a changing environment, to correct discovered faults, and modifications, and to improve performance or maintainability. Software maintenance and management of software maintenance are recognized as two most important and most expensive processes in a life of a software product. This research is basing the prediction of maintenance, on risks and time evaluation, and using them as data sets for working with neural networks. The aim of this paper is to provide support to project maintenance managers. They will be able to pass the issues planned for the next software-service-patch to the experts, for risk and working time evaluation, and afterward to put all data to neural networks in order to get software maintenance prediction. This process will lead to the more accurate prediction of the working hours needed for the software-service-patch, which will eventually lead to better planning of budget for the software maintenance projects.

Keywords: Laboratory information system, maintenance engineering, neural networks, software maintenance, software maintenance costs.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF
94 Reliability-Based Maintenance Management Methodology to Minimise Life Cycle Cost of Water Supply Networks

Authors: Mojtaba Mahmoodian, Joshua Phelan, Mehdi Shahparvari

Abstract:

With a large percentage of countries’ total infrastructure expenditure attributed to water network maintenance, it is essential to optimise maintenance strategies to rehabilitate or replace underground pipes before failure occurs. The aim of this paper is to provide water utility managers with a maintenance management approach for underground water pipes, subject to external loading and material corrosion, to give the lowest life cycle cost over a predetermined time period. This reliability-based maintenance management methodology details the optimal years for intervention, the ideal number of maintenance activities to perform before replacement and specifies feasible renewal options and intervention prioritisation to minimise the life cycle cost. The study was then extended to include feasible renewal methods by determining the structural condition index and potential for soil loss, then obtaining the failure impact rating to assist in prioritising pipe replacement. A case study on optimisation of maintenance plans for the Melbourne water pipe network is considered in this paper to evaluate the practicality of the proposed methodology. The results confirm that the suggested methodology can provide water utility managers with a reliable systematic approach to determining optimum maintenance plans for pipe networks.

Keywords: Water pipe networks, maintenance management, reliability analysis, optimum maintenance plan.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF
93 Reliability Analysis in Electrical Distribution System Considering Preventive Maintenance Applications on Circuit Breakers

Authors: Mahmud Fotuhi-Firuzabad, Saeed Afshar

Abstract:

This paper presents the results of a preventive maintenance application-based study and modeling of failure rates in breakers of electrical distribution systems. This is a critical issue in the reliability assessment of a system. In the analysis conducted in this paper, the impacts of failure rate variations caused by a preventive maintenance are examined. This is considered as a part of a Reliability Centered Maintenance (RCM) application program. A number of load point reliability indices is derived using the mathematical model of the failure rate, which is established using the observed data in a distribution system.

Keywords: Reliability-Centered Maintenance (RCM), failure rate, preventive maintenance (PM), Distribution System Reliability.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF
92 A New Failure Analysis for Maintenance Management in Complex Hospitals

Authors: R. Miniati, F. Dori, E. Iadanza, M. Fregonara Medici

Abstract:

management of medical devices in hospitals includes the planning of medical equipment acquisition and maintenance. The presence of critical and non-critical areas together with technological proliferation render the management of medical devices very complex. This study creates an easy and objective methodology for the analysis of medical equipment maintenance, that makes the management of medical devices more feasible. The study has been carried out at Florence Hospital Careggi and it aims to help the clinical engineering department to manage medical equipment by clarifying the hospital situation through a characterization of the different areas, technologies and fault typologies.

Keywords: Clinical Engineering, Maintenance, Medical DevicesManagement, Key Performance Indicators.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF
91 Defect-Based Urgency Index for Bridge Maintenance Ranking and Prioritization

Authors: Saleh Abu Dabous, Khaled Hamad, Rami Al-Ruzouq

Abstract:

Bridge condition assessment and rating provide essential information needed for bridge management. This paper reviews bridge inspection and condition rating practices and introduces a defect-based urgency index. The index is estimated at the element-level based on the extent and severity of the different defects typical to the bridge element. The urgency index approach has the following advantages: (1) It facilitates judgment submission, i.e. instead of rating the bridge element with a specific linguistic overall expression (which can be subjective and used differently by different people), the approach is based on assessing the defects; (2) It captures multiple defects that can be present within a deteriorated element; and (3) It reflects how critical the element is through quantifying critical defects and their severity. The approach can be further developed and validated. It is expected to be useful for practical purposes as an early-warning system for critical bridge elements.

Keywords: Condition rating, deterioration, inspection, maintenance.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF
90 Implementing a Strategy of Reliability Centered Maintenance (RCM) in the Libyan Cement Industry

Authors: Khalid M. Albarkoly, Kenneth S. Park

Abstract:

The substantial development of the construction industry has forced the cement industry, its major support, to focus on achieving maximum productivity to meet the growing demand for this material. This means that the reliability of a cement production system needs to be at the highest level that can be achieved by good maintenance. This paper studies the extent to which the implementation of RCM is needed as a strategy for increasing the reliability of the production systems component can be increased, thus ensuring continuous productivity. In a case study of four Libyan cement factories, 80 employees were surveyed and 12 top and middle managers interviewed. It is evident that these factories usually breakdown more often than once per month which has led to a decline in productivity. In many times they cannot achieve the minimum level of production amount. This has resulted from the poor reliability of their production systems as a result of poor or insufficient maintenance. It has been found that most of the factories’ employees misunderstand maintenance and its importance. The main cause of this problem is the lack of qualified and trained staff, but in addition it has been found that most employees are not found to be motivated as a result of a lack of management support and interest. In response to these findings, it has been suggested that the RCM strategy should be implemented in the four factories. The results show the importance of the development of maintenance strategies through the implementation of RCM in these factories. The purpose of it would be to overcome the problems that could secure the reliability of the production systems. This study could be a useful source of information for academic researchers and the industrial organizations which are still experiencing problems in maintenance practices.

Keywords: Libyan cement industry, maintenance, production, reliability centered maintenance, reliability.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF
89 Maintenance Dredging at Port of Townsville

Authors: M. Jaditager, J. Lovisa, N. Sivakugan

Abstract:

The Port of Townsville conducts regular annual maintenance dredging to maintain depths of its harbor basin and approach channels for the navigational safety of the vessels against the natural accumulation of marine sediments. In addition to the regular maintenance dredging, the port undertakes emergency dredging in cases where large quantities of sediments are mobilized and deposited in port waters by cyclone or major flood events. The maintenance dredging material derived from the port may be disposed at sea or on land in accordance with relevant state and commonwealth regulations. For the land disposal, the dredged mud slurry is hydraulically placed into containment ponds and left to undergo sedimentation and self-weight consolidation to form fill material for land reclamation. This paper provides an overview of the maintenance dredging at the Port of Townsville and emphasis on maintenance dredging requirements, sediment quality, bathymetry, dredging methods used, and dredged material disposal options.

Keywords: Consolidation, dredged material, maintenance dredging, marine sediments, sedimentation.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF
88 A Condition-Based Maintenance Policy for Multi-Unit Systems Subject to Deterioration

Authors: Nooshin Salari, Viliam Makis

Abstract:

In this paper, we propose a condition-based maintenance policy for multi-unit systems considering the existence of economic dependency among units. We consider a system composed of N identical units, where each unit deteriorates independently. Deterioration process of each unit is modeled as a three-state continuous time homogeneous Markov chain with two working states and a failure state. The average production rate of units varies in different working states and demand rate of the system is constant. Units are inspected at equidistant time epochs, and decision regarding performing maintenance is determined by the number of units in the failure state. If the total number of units in the failure state exceeds a critical level, maintenance is initiated, where units in failed state are replaced correctively and deteriorated state units are maintained preventively. Our objective is to determine the optimal number of failed units to initiate maintenance minimizing the long run expected average cost per unit time. The problem is formulated and solved in the semi-Markov decision process (SMDP) framework. A numerical example is developed to demonstrate the proposed policy and the comparison with the corrective maintenance policy is presented.

Keywords: Reliability, production, maintenance optimization, Semi-Markov Decision Process.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF
87 Mathematical Model and Solution Algorithm for Containership Operation/Maintenance Scheduling

Authors: Hun Go, Ji-Su Kim, Dong-Ho Lee

Abstract:

This study considers the problem of determining operation and maintenance schedules for a containership equipped with components during its sailing according to a pre-determined navigation schedule. The operation schedule, which specifies work time of each component, determines the due-date of each maintenance activity, and the maintenance schedule specifies the actual start time of each maintenance activity. The main constraints are component requirements, workforce availability, working time limitation, and inter-maintenance time. To represent the problem mathematically, a mixed integer programming model is developed. Then, due to the problem complexity, we suggest a heuristic for the objective of minimizing the sum of earliness and tardiness between the due-date and the starting time of each maintenance activity. Computational experiments were done on various test instances and the results are reported.

Keywords: Containerships, operation and preventive maintenance schedules, integer programming, heuristic

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF
86 Building a Scalable Telemetry Based Multiclass Predictive Maintenance Model in R

Authors: Jaya Mathew

Abstract:

Many organizations are faced with the challenge of how to analyze and build Machine Learning models using their sensitive telemetry data. In this paper, we discuss how users can leverage the power of R without having to move their big data around as well as a cloud based solution for organizations willing to host their data in the cloud. By using ScaleR technology to benefit from parallelization and remote computing or R Services on premise or in the cloud, users can leverage the power of R at scale without having to move their data around.

Keywords: Predictive maintenance, machine learning, big data, cloud, on premise SQL, R.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF
85 Validation of Building Maintenance Performance Model for Malaysian Universities

Authors: AbdulLateef A. Olanrewaju, Mohd F. Khamidi, Arazi Idrus

Abstract:

This paper is part of an ongoing research on the development of systemic maintenance management model Malaysian university buildings. In order to achieve this aim, there is a need to develop a performance model against which services are measure. Measuring performance is a significant part of maintenance management service delivery. Maintenance organization needs to know where they are in order to provide user-driven services and to enhance productivity. The aim of this paper is to formulate a template or model for university maintenance organization in Malaysia. The model is based on literature review and survey questionnaire and has been validated. Through grounded theory, this paper developed a 8 points matrix for the university maintenance organizations for measuring and improving their service delivery. The potential of the model is guide and assists towards providing value added service delivery through initiating maintenance according to user value system rather than on the condition of the building.

Keywords: Performance matrix, university buildings, users, maintenance organization

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF
84 Portable Hands-Free Process Assistant for Gas Turbine Maintenance

Authors: Elisabeth Brandenburg, Robert Woll, Rainer Stark

Abstract:

This paper presents how smart glasses and voice commands can be used for improving the maintenance process of industrial gas turbines. It presents the process of inspecting a gas turbine’s combustion chamber and how it is currently performed using a set of paper-based documents. In order to improve this process, a portable hands-free process assistance system has been conceived. In the following, it will be presented how the approach of user-centered design and the method of paper prototyping have been successfully applied in order to design a user interface and a corresponding workflow model that describes the possible interaction patterns between the user and the interface. The presented evaluation of these results suggests that the assistance system could help the user by rendering multiple manual activities obsolete, thus allowing him to work hands-free and to save time for generating protocols.

Keywords: Paper prototyping, smart glasses, turbine maintenance, user centered design.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF
83 Towards a Simulation Model to Ensure the Availability of Machines in Maintenance Activities

Authors: Maryam Gallab, Hafida Bouloiz, Youness Chater, Mohamed Tkiouat

Abstract:

The aim of this paper is to present a model based on multi-agent systems in order to manage the maintenance activities and to ensure the reliability and availability of machines just with the required resources (operators, tools). The interest of the simulation is to solve the complexity of the system and to find results without cost or wasting time. An implementation of the model is carried out on the AnyLogic platform to display the defined performance indicators.

Keywords: Maintenance, complexity, simulation, multi-agent systems, AnyLogic platform.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF
82 Designing a Tool for Software Maintenance

Authors: Amir Ngah, Masita Abdul Jalil, Zailani Abdullah

Abstract:

The aim of software maintenance is to maintain the software system in accordance with advancement in software and hardware technology. One of the early works on software maintenance is to extract information at higher level of abstraction. In this paper, we present the process of how to design an information extraction tool for software maintenance. The tool can extract the basic information from old programs such as about variables, based classes, derived classes, objects of classes, and functions. The tool have two main parts; the lexical analyzer module that can read the input file character by character, and the searching module which users can get the basic information from the existing programs. We implemented this tool for a patterned sub-C++ language as an input file.

Keywords: Extraction tool, software maintenance, reverse engineering, C++.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF
81 Qualitative Survey on Managing Building Maintenance Projects

Authors: Edmond W.M. Lam, Albert P.C. Chan, Daniel W.M. Chan

Abstract:

Buildings are one of the valuable assets to provide people with shelters for work, leisure and rest. After years of attacks by weather, buildings will deteriorate which need proper maintenance in order to fulfill the requirements and satisfaction of the users. Poorly managed buildings not just give a negative image to the city itself, but also pose potential risk hazards to the health and safety of the general public. As a result, the management of maintenance projects has played an important role in cities like Hong Kong where the problem of urban decay has drawn much attention. However, most research has focused on managing new construction, and little research effort has been put on maintenance projects. Given the short duration and more diversified nature of work, repair and maintenance works are found to be more difficult to monitor and regulate when compared with new works. Project participants may face with problems in running maintenance projects which should be investigated so that proper strategies can be established. This paper aims to provide a thorough analysis on the problems of running maintenance projects. A review of literature on the characteristics of building maintenance projects was firstly conducted, which forms a solid basis for the empirical study. Results on the problems and difficulties of running maintenance projects from the viewpoints of industry practitioners will also be delivered with a view to formulating effective strategies for managing maintenance projects successfully.

Keywords: characteristics, problems, building maintenance, Hong Kong

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF
80 Development of Road Maintenance Management System Based on WebGIS

Authors: Feng Xiao, Zhou Hongyu, YuCaixia

Abstract:

Based on an analysis of the current research and application of Road maintenance, geographic information system (WebGIS) and ArcGIS Server, the platform overhead construction for Road maintenance development is studied and the key issues are presented, including the organization and design of spatial data on the basis of the geodatabase technology, middleware technology, tiles cache index technology and dynamic segmentation of WebGIS. Road maintenance geographic information platform is put forward through the researching ideas of analysis of the system design. The design and application of WebGIS system are discussed on the basis of a case study of BaNan district of Chongqing highway maintenance management .The feasibility of the theories and methods are validated through the system.

Keywords: WebGIS, Tile, Road maintenance, dynamic segmentation

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF
79 An Integrated Logistics Model of Spare Parts Maintenance Planning within the Aviation Industry

Authors: Roy Fritzsche, Rainer Lasch

Abstract:

Avoidable unscheduled maintenance events and unnecessary spare parts deliveries are mostly caused by an incorrect choice of the underlying maintenance strategy. For a faster and more efficient supply of spare parts for aircrafts of an airline we examine options for improving the underlying logistics network integrated in an existing aviation industry network. This paper presents a dynamic prediction model as decision support for maintenance method selection considering requirements of an entire flight network. The objective is to guarantee a high supply of spare parts by an optimal interaction of various network levels and thus to reduce unscheduled maintenance events and minimize total costs. By using a prognostics-based preventive maintenance strategy unscheduled component failures are avoided for an increase in availability and reliability of the entire system. The model is intended for use in an aviation company that utilizes a structured planning process based on collected failures data of components.

Keywords: Aviation industry, Prognosis, Reliability, Preventive maintenance.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF
78 Improvement of Overall Equipment Effectiveness through Total Productive Maintenance

Authors: S. Fore, L. Zuze

Abstract:

Frequent machine breakdowns, low plant availability and increased overtime are a great threat to a manufacturing plant as they increase operating costs of an industry. The main aim of this study was to improve Overall Equipment Effectiveness (OEE) at a manufacturing company through the implementation of innovative maintenance strategies. A case study approach was used. The paper focuses on improving the maintenance in a manufacturing set up using an innovative maintenance regime mix to improve overall equipment effectiveness. Interviews, reviewing documentation and historical records, direct and participatory observation were used as data collection methods during the research. Usually production is based on the total kilowatt of motors produced per day. The target kilowatt at 91% availability is 75 Kilowatts a day. Reduced demand and lack of raw materials particularly imported items are adversely affecting the manufacturing operations. The company had to reset its targets from the usual figure of 250 Kilowatt per day to mere 75 per day due to lower availability of machines as result of breakdowns as well as lack of raw materials. The price reductions and uncertainties as well as general machine breakdowns further lowered production. Some recommendations were given. For instance, employee empowerment in the company will enhance responsibility and authority to improve and totally eliminate the six big losses. If the maintenance department is to realise its proper function in a progressive, innovative industrial society, then its personnel must be continuously trained to meet current needs as well as future requirements. To make the maintenance planning system effective, it is essential to keep track of all the corrective maintenance jobs and preventive maintenance inspections. For large processing plants these cannot be handled manually. It was therefore recommended that the company implement (Computerised Maintenance Management System) CMMS.

Keywords: Maintenance, Manufacturing, Overall Equipment Effectiveness

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF
77 Investigating the Road Maintenance Performance in Developing Countries

Authors: Jamaa Salih, Francis Edum-Fotwe, Andrew Price

Abstract:

One of the most critical aspects of the management of road infrastructure is the type and scale of maintenance systems adopted and the consequences of their inadequacy. The performance of road maintenance systems can be assessed by a number of important indicators such as: cost, safety, environmental impact, and level of complaints by users. A review of practice reveals that insufficient level of expenditure or poor management of the road network often has serious consequences for the economic and social life of a country in terms of vehicle operating costs (VOC), travel time costs, accident costs and environmental impact. Despite an increase in the attention paid by global road agencies to the environmental and the road users’ satisfaction, the overwhelming evidence from the available literature agree on the lack of similar levels of attention for the two factors in many developing countries. While many sources agree that the road maintenance backlog is caused by either the shortage of expenditures or lack of proper management or both, it appears that managing the available assets particularly in the developing countries is the main issue. To address this subject, this paper will concentrate on exposing the various issues related to this field.  

Keywords: Environmental impact, performance indicators, road maintenance, users’ satisfaction.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF
76 Maintenance Function's Performance Evaluation Using Adapted Balanced Scorecard Model

Authors: A. Bakhtiar, B. Purwanggono, N. Metasari

Abstract:

PT XYZ is a bottled drinking water company. To preserve production resources owned by the company so that the resources could be utilized well, it has implemented maintenance management system, which has important role in company's profitability, and is one of the factors influenced overall company's performance. Yet, up to now the company has never measured maintenance activities' contribution to company's performance. Performance evaluation is done according to adapted Balanced Scorecard model fitted to maintenance function context. This model includes six perspectives: innovation and growth, production, maintenance, environment, costumer, and finance. Actual performance measurement is done through Analytic Hierarchy Process and Objective Matrix. From the research done, we can conclude that the company's maintenance function is categorized in moderate performance. But, there are some indicators which has high priority but low performance, which are: costumers' complain rate, work lateness rate, and Return on Investment.

Keywords: Maintenance, performance, balanced scorecard, objective matrix.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF
75 Maintenance Management System for Upstream Operations in Oil and Gas Industry: Case Study

Authors: Wan Hasrulnizzam Wan Mahmood, Mohd Nizam Ab Rahman, Husiah Mazli, Baba Md Deros

Abstract:

This paper explores the plant maintenance management system that has been used by giant oil and gas company in Malaysia. The system also called as PMMS used to manage the upstream operations for more than 100 plants of the case study company. Moreover, from the observations, focus group discussion with PMMS personnel and application through simulation (SAP R/3), the paper reviews the step-by-step approach and the elements that required for the PMMS. The findings show that the PMMS integrates the overall business strategy in upstream operations that consist of asset management, work management and performance management. In addition, PMMS roles are to help operations personnel organize and plan their daily activities, to improve productivity and reduce equipment downtime and to help operations management analyze the facilities and create performance, and to provide and maintain the operational effectiveness of the facilities.

Keywords: Maintenance, Oil and Gas Industry, Upstream Operations

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF
74 Use of Life Cycle Data for Condition-Oriented Maintenance

Authors: M. Winkens, M. Goerke, P. Nyhuis

Abstract:

This technical contribution treats of a novel approach to condition-oriented maintenance as elaborated by Collaborative Research Centre 653 at the Leibniz University in Hanover. The objective resides in the targeted analysis of information about a component's lifecycle for maintenance purposes. The information in question is collected by means of the Collaborative Research Centre's innovative technologies. This enables preventive maintenance of components on the basis of their condition. This contribution initially explains condition-oriented maintenance, before introducing the Collaborative Research Centre and finally presenting the methodology for analyzing the information. The current state of development is described and an outlook provided for expanding the methodology.

Keywords: Gentelligent Components, Preventive Maintenance, life cycle data.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF