Development of Maintenance Schedule and Root Cause Analysis Based on Computerized Maintenance Management System for a Fertilizer Plant
Authors: Sanjeev Kumar
Abstract:
This paper deals with development of Computerized Maintenance Management System (CMMS) for a fertilizer plant. The software is advanced, easy to use, less complex, less expensive and also less time consuming. It consists of number of modules like detailed information of equipment, maintenance procedures, work order and employees detail. The objectives of CMMS are to reduce overall downtime, overall yearly maintenance cost and occurrence of failures of the equipment and to get day-by-day maintenance plan and strategy. In this regard, the behavioral chart for urea prilling unit at Fertilizer plant has been developed in form of Root Cause Analysis (RCA). Besides this, a maintenance program has also been proposed and used for the purpose of maintenance planning of the urea prilling unit. The outcome of software has been consulted with the concerned plant individuals and found to be extremely favorable for improving the performance level of the concerned plant.
Keywords: Computerized maintenance management system, root cause analysis, maintenance schedule, urea prilling system.
Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1132737
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1199References:
[1] Elliot, K.A., “Maximize Throughput in a Sugar Milling Operation Using a Computerized Maintenance Management System (CMMS)”, International Journal of American Society of Sugar cane Technologists, vol. 23, pp. 110, 2003.
[2] Bamber, C., Sharp, J. and Hides, M., “The role of the maintenance organization in an integrated management system”, Managerial Auditing Journal, vol. 17, Nos 1/2, pp. 20-25, 2002.
[3] Gupta, S., Tewari, P.C. and Sharma, A.K., “Development and Implementation of Computerized Maintenance Management System for a Sugar Industry”, Proceedings of the National Conference at TIET, Patiala, 2006.
[4] Ashraf W. Labib, “World-class maintenance using a computerized maintenance management system”, Journal of Quality in Maintenance Engineering, vol. 4, No. 1, pp. 66-75,1998.
[5] Labib, A.W.,“A decision analysis model for maintenance policy selection using a CMMS, Journal of Quality in Maintenance Engineering, Volume 10, Number 3, pp. 191–202, 2004.
[6] Suman Rajiv, Kumar Sushil and Preet Pooja, “Computer Govern Maintenance System for a Process Industry”, Computer Engineering and Intelligent System, vol. 5, No.14,pp. 17-24, 2014.
[7] Frank Beichelt, “A replacement policy based on limiting the cumulative maintenance cost”, International Journal of Quality & Reliability Management, vol. 18, No. 1, pp.76 – 83, 2001.
[8] Nakamura, M. Katafuchi, T. Hatazaki, H., “Decisions for maintenance-intervals of equipment in thermal power stations, based on few data”, Journal of IEEE Transactions on Reliability, vol. 50, No.4, pp.360-364, 2001.
[9] Kumar Ravinder, Tewari P. C. and Sharma A.K., “Performance Modeling of Furnace Draft Air Cycle In A Thermal Power Plant”, International Journal of Engineering Science and Technology (IJEST), vol. 3, No.8, pp. 6792-6798, 2011.
[10] Kumar Sanjeev, Tewari P. C. and Kumar S. “Simulation Model for Evaluating the Performance of Urea Decomposition System in a Fertilizer Plant” International Journal of Industrial Engineering and Practices,vol.1(1), pp.10-14, 2009.
[11] Shyjith, K., Ilangkumaran, M. and Kumanan, S., “Multi-criteria decision-making approach to evaluate optimum maintenance strategy in textile industry”, Journal of Quality in Maintenance Engineering, vol. 14 No. 4, pp. 375-386,2008.
[12] Sharma the, R.K. and Kumar, S., “Performance modelling in critical engineering systems using RAM analysis”, Reliability Engineering and System Safety, vol. 93, pp. 891-897, 2008.
[13] Anil Aggarwal, Sanjeev Kumar Vikram Singh, "Performance modeling of the skim milk powder production system of a dairy plant using RAMD analysis", International Journal of Quality & Reliability Management, vol. 32,No. 2, pp. 167-181, 2015.
[14] Kumar S., Tewari P. C. and Sharma R. “Simulated Availability of CO2 Cooling System in a Fertilizer Plant”, Industrial Engineering Journal (Indian Institution of Industrial Engineering, Mumbai), vol.36 pp. 19-23, 2007.
[15] Kumar S., Tewari P. C. and Kumar S., “Development of Performance Evaluating Model for CO- Shift Conversion System in the Fertilizer Plant”, International Journal of Engineering Research and Industrial Applications (IJERIA).vol.1,No.6,pp. 369-382, 2008.
[16] Rajiv Khanduja, P.C. Tewari and Dinesh Kumar,(2008), “Availability Analysis of Bleaching System In A Paper Plant”, Udyog Pragti, The Journal for Practicing Managers, vol.32, pp.24-29,2008.
[17] Kumar Sanjeev, Tewari P. C. and Kumar Sunand. “Development of Decision Support System of Urea Prilling System of Fertilizer plant”, Proceeding of National conference, QRMAES 2007, pp.115-122, 2007.