Search results for: cost.
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 2093

Search results for: cost.

2003 Neural Network Models for Actual Cost and Actual Duration Estimation in Construction Projects: Findings from Greece

Authors: Panagiotis Karadimos, Leonidas Anthopoulos

Abstract:

Predicting the actual cost and duration in construction projects concern a continuous and existing problem for the construction sector. This paper addresses this problem with modern methods and data available from past public construction projects. 39 bridge projects, constructed in Greece, with a similar type of available data were examined. Considering each project’s attributes with the actual cost and the actual duration, correlation analysis is performed and the most appropriate predictive project variables are defined. Additionally, the most efficient subgroup of variables is selected with the use of the WEKA application, through its attribute selection function. The selected variables are used as input neurons for neural network models through correlation analysis. For constructing neural network models, the application FANN Tool is used. The optimum neural network model, for predicting the actual cost, produced a mean squared error with a value of 3.84886e-05 and it was based on the budgeted cost and the quantity of deck concrete. The optimum neural network model, for predicting the actual duration, produced a mean squared error with a value of 5.89463e-05 and it also was based on the budgeted cost and the amount of deck concrete.

Keywords: Actual cost and duration, attribute selection, bridge projects, neural networks, predicting models, FANN TOOL, WEKA.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1229
2002 A Metric-Set and Model Suggestion for Better Software Project Cost Estimation

Authors: Murat Ayyıldız, Oya Kalıpsız, Sırma Yavuz

Abstract:

Software project effort estimation is frequently seen as complex and expensive for individual software engineers. Software production is in a crisis. It suffers from excessive costs. Software production is often out of control. It has been suggested that software production is out of control because we do not measure. You cannot control what you cannot measure. During last decade, a number of researches on cost estimation have been conducted. The metric-set selection has a vital role in software cost estimation studies; its importance has been ignored especially in neural network based studies. In this study we have explored the reasons of those disappointing results and implemented different neural network models using augmented new metrics. The results obtained are compared with previous studies using traditional metrics. To be able to make comparisons, two types of data have been used. The first part of the data is taken from the Constructive Cost Model (COCOMO'81) which is commonly used in previous studies and the second part is collected according to new metrics in a leading international company in Turkey. The accuracy of the selected metrics and the data samples are verified using statistical techniques. The model presented here is based on Multi-Layer Perceptron (MLP). Another difficulty associated with the cost estimation studies is the fact that the data collection requires time and care. To make a more thorough use of the samples collected, k-fold, cross validation method is also implemented. It is concluded that, as long as an accurate and quantifiable set of metrics are defined and measured correctly, neural networks can be applied in software cost estimation studies with success

Keywords: Software Metrics, Software Cost Estimation, Neural Network.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1957
2001 Production Line Layout Planning Based on Complexity Measurement

Authors: Guoliang Fan, Aiping Li, Nan Xie, Liyun Xu, Xuemei Liu

Abstract:

Mass customization production increases the difficulty of the production line layout planning. The material distribution process for variety of parts is very complex, which greatly increases the cost of material handling and logistics. In response to this problem, this paper presents an approach of production line layout planning based on complexity measurement. Firstly, by analyzing the influencing factors of equipment layout, the complexity model of production line is established by using information entropy theory. Then, the cost of the part logistics is derived considering different variety of parts. Furthermore, the function of optimization including two objectives of the lowest cost, and the least configuration complexity is built. Finally, the validity of the function is verified in a case study. The results show that the proposed approach may find the layout scheme with the lowest logistics cost and the least complexity. Optimized production line layout planning can effectively improve production efficiency and equipment utilization with lowest cost and complexity.

Keywords: Production line, layout planning, complexity measurement, optimization, mass customization.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1088
2000 Software Engineering Inspired Cost Estimation for Process Modelling

Authors: Felix Baumann, Aleksandar Milutinovic, Dieter Roller

Abstract:

Up to this point business process management projects in general and business process modelling projects in particular could not rely on a practical and scientifically validated method to estimate cost and effort. Especially the model development phase is not covered by a cost estimation method or model. Further phases of business process modelling starting with implementation are covered by initial solutions which are discussed in the literature. This article proposes a method of filling this gap by deriving a cost estimation method from available methods in similar domains namely software development or software engineering. Software development is regarded as closely similar to process modelling as we show. After the proposition of this method different ideas for further analysis and validation of the method are proposed. We derive this method from COCOMO II and Function Point which are established methods of effort estimation in the domain of software development. For this we lay out similarities of the software development process and the process of process modelling which is a phase of the Business Process Management life-cycle.

Keywords: Cost Estimation, Effort Estimation, Process Modelling, Business Process Management, COCOMO.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2294
1999 Expected Present Value of Losses in the Computation of Optimum Seismic Design Parameters

Authors: J. García-Pérez

Abstract:

An approach to compute optimum seismic design parameters is presented. It is based on the optimization of the expected present value of the total cost, which includes the initial cost of structures as well as the cost due to earthquakes. Different types of seismicity models are considered, including one for characteristic earthquakes. Uncertainties are included in some variables to observe the influence on optimum values. Optimum seismic design coefficients are computed for three different structural types representing high, medium and low rise buildings, located near and far from the seismic sources. Ordinary and important structures are considered in the analysis. The results of optimum values show an important influence of seismicity models as well as of uncertainties on the variables.

Keywords: Importance factors, optimum parameters, seismic losses, seismic risk, total cost.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1354
1998 Discrete Breeding Swarm for Cost Minimization of Parallel Job Shop Scheduling Problem

Authors: Tarek Aboueldah, Hanan Farag

Abstract:

Parallel Job Shop Scheduling Problem (JSSP) is a multi-objective and multi constrains NP-optimization problem. Traditional Artificial Intelligence techniques have been widely used; however, they could be trapped into the local minimum without reaching the optimum solution. Thus, we propose a hybrid Artificial Intelligence (AI) model with Discrete Breeding Swarm (DBS) added to traditional AI to avoid this trapping. This model is applied in the cost minimization of the Car Sequencing and Operator Allocation (CSOA) problem. The practical experiment shows that our model outperforms other techniques in cost minimization.

Keywords: Parallel Job Shop Scheduling Problem, Artificial Intelligence, Discrete Breeding Swarm, Car Sequencing and Operator Allocation, cost minimization.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 610
1997 Time-Cost-Quality Trade-off Software by using Simplified Genetic Algorithm for Typical Repetitive Construction Projects

Authors: Refaat H. Abd El Razek, Ahmed M. Diab, Sherif M. Hafez, Remon F. Aziz

Abstract:

Time-Cost Optimization "TCO" is one of the greatest challenges in construction project planning and control, since the optimization of either time or cost, would usually be at the expense of the other. Since there is a hidden trade-off relationship between project and cost, it might be difficult to predict whether the total cost would increase or decrease as a result of the schedule compression. Recently third dimension in trade-off analysis is taken into consideration that is quality of the projects. Few of the existing algorithms are applied in a case of construction project with threedimensional trade-off analysis, Time-Cost-Quality relationships. The objective of this paper is to presents the development of a practical software system; that named Automatic Multi-objective Typical Construction Resource Optimization System "AMTCROS". This system incorporates the basic concepts of Line Of Balance "LOB" and Critical Path Method "CPM" in a multi-objective Genetic Algorithms "GAs" model. The main objective of this system is to provide a practical support for typical construction planners who need to optimize resource utilization in order to minimize project cost and duration while maximizing its quality simultaneously. The application of these research developments in planning the typical construction projects holds a strong promise to: 1) Increase the efficiency of resource use in typical construction projects; 2) Reduce construction duration period; 3) Minimize construction cost (direct cost plus indirect cost); and 4) Improve the quality of newly construction projects. A general description of the proposed software for the Time-Cost-Quality Trade-Off "TCQTO" is presented. The main inputs and outputs of the proposed software are outlined. The main subroutines and the inference engine of this software are detailed. The complexity analysis of the software is discussed. In addition, the verification, and complexity of the proposed software are proved and tested using a real case study.

Keywords: Project management, typical (repetitive) large scale projects, line of balance, multi-objective optimization, genetic algorithms, time-cost-quality trade-offs.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3065
1996 Selecting Materialized Views Using Two-Phase Optimization with Multiple View Processing Plan

Authors: Jiratta Phuboon-ob, Raweewan Auepanwiriyakul

Abstract:

A data warehouse (DW) is a system which has value and role for decision-making by querying. Queries to DW are critical regarding to their complexity and length. They often access millions of tuples, and involve joins between relations and aggregations. Materialized views are able to provide the better performance for DW queries. However, these views have maintenance cost, so materialization of all views is not possible. An important challenge of DW environment is materialized view selection because we have to realize the trade-off between performance and view maintenance cost. Therefore, in this paper, we introduce a new approach aimed at solve this challenge based on Two-Phase Optimization (2PO), which is a combination of Simulated Annealing (SA) and Iterative Improvement (II), with the use of Multiple View Processing Plan (MVPP). Our experiments show that our method provides a further improvement in term of query processing cost and view maintenance cost.

Keywords: Data warehouse, materialized views, view selectionproblem, two-phase optimization.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1659
1995 Low-Cost Space-Based Geoengineering: An Assessment Based on Self-Replicating Manufacturing of in-Situ Resources on the Moon

Authors: Alex Ellery

Abstract:

Geoengineering approaches to climate change mitigation are unpopular and regarded with suspicion. Of these, space-based approaches are regarded as unworkable and enormously costly. Here, a space-based approach is presented that is modest in cost, fully controllable and reversible, and acts as a natural spur to the development of solar power satellites over the longer term as a clean source of energy. The low-cost approach exploits self-replication technology which it is proposed may be enabled by 3D printing technology. Self-replication of 3D printing platforms will enable mass production of simple spacecraft units. Key elements being developed are 3D-printable electric motors and 3D-printable vacuum tube-based electronics. The power of such technologies will open up enormous possibilities at low cost including space-based geoengineering.

Keywords: 3D printing, in-situ resource utilization, self-replication technology, space-based geoengineering.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1101
1994 Six Sigma Solutions and its Benefit-Cost Ratio for Quality Improvement

Authors: S. Homrossukon, A. Anurathapunt

Abstract:

This is an application research presenting the improvement of production quality using the six sigma solutions and the analyses of benefit-cost ratio. The case of interest is the production of tile-concrete. Such production has faced with the problem of high nonconforming products from an inappropriate surface coating and had low process capability based on the strength property of tile. Surface coating and tile strength are the most critical to quality of this product. The improvements followed five stages of six sigma solutions. After the improvement, the production yield was improved to 80% as target required and the defective products from coating process was remarkably reduced from 29.40% to 4.09%. The process capability based on the strength quality was increased from 0.87 to 1.08 as customer oriented. The improvement was able to save the materials loss for 3.24 millions baht or 0.11 million dollars. The benefits from the improvement were analyzed from (1) the reduction of the numbers of non conforming tile using its factory price for surface coating improvement and (2) the materials saved from the increment of process capability. The benefit-cost ratio of overall improvement was high as 7.03. It was non valuable investment in define, measure, analyses and the initial of improve stages after that it kept increasing. This was due to there were no benefits in define, measure, and analyze stages of six sigma since these three stages mainly determine the cause of problem and its effects rather than improve the process. The benefit-cost ratio starts existing in the improve stage and go on. Within each stage, the individual benefitcost ratio was much higher than the accumulative one as there was an accumulation of cost since the first stage of six sigma. The consideration of the benefit-cost ratio during the improvement project helps make decisions for cost saving of similar activities during the improvement and for new project. In conclusion, the determination of benefit-cost ratio behavior through out six sigma implementation period provides the useful data for managing quality improvement for the optimal effectiveness. This is the additional outcome from the regular proceeding of six sigma.

Keywords: Six Sigma Solutions, Process Improvement, QualityManagement, Benefit Cost Ratio

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2137
1993 Applying Genetic Algorithms for Inventory Lot-Sizing Problem with Supplier Selection under Storage Space

Authors: Vichai Rungreunganaun, Chirawat Woarawichai

Abstract:

The objective of this research is to calculate the optimal inventory lot-sizing for each supplier and minimize the total inventory cost which includes joint purchase cost of the products, transaction cost for the suppliers, and holding cost for remaining inventory. Genetic algorithms (GAs) are applied to the multi-product and multi-period inventory lot-sizing problems with supplier selection under storage space. Also a maximum storage space for the decision maker in each period is considered. The decision maker needs to determine what products to order in what quantities with which suppliers in which periods. It is assumed that demand of multiple products is known over a planning horizon. The problem is formulated as a mixed integer programming and is solved with the GAs. The detailed computation results are presented.

Keywords: Genetic Algorithms, Inventory lot-sizing, Supplier selection, Storage space.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2153
1992 A Novel Model for Simultaneously Minimising Costs and Risks in Just-in-Time Systems Using Multi-Backup Suppliers: Part 2- Results

Authors: Faraj El Dabee, Romeo Marian, Yousef Amer

Abstract:

This paper implements the inventory model developed in the first part of this paper in a simplified problem to simultaneously reduce costs and risks in JIT systems. This model is developed to ascertain an optimal ordering strategy for procuring raw materials by using regular multi-external and local backup suppliers to reduce the total cost of the products, and at the same time to reduce the risks arising from this cost reduction within production systems. A comparison between the cost of using the JIT system and using the proposed inventory model shows the superiority of the use of the inventory model.

Keywords: Lean manufacturing, Just-in-Time (JIT), production system, cost-risk reduction, inventory model, eternal supplier, local backup supplier.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1547
1991 A Study on the Introduction of Wastewater Reuse Facility in Military Barracks by Cost-Benefit Analysis

Authors: D. G. Jung, J. B. Lim, J. H. Kim, J. J. Kim

Abstract:

The international society focuses on the environment protection and natural energy sources control for the global cooperation against weather change and sustainable growth. The study presents the overview of the water shortage status and the necessity of wastewater reuse facility in military facilities and for the possibility of the introduction, compares the economics by means of cost-benefit analysis. The military features such as the number of users of military barracks and the water use were surveyed by the design principles by facility types, the application method of wastewater reuse facility was selected, the feed water, its application and the volume of reuse volume were defined and the expectation was estimated, confirming the possibility of introducing a wastewater reuse possibility by means of cost-benefit analysis.

Keywords: military barracks, wastewater reuse facility, cost-benefit analysis

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1449
1990 Supply Chain Decarbonisation – A Cost-Based Decision Support Model in Slow Steaming Maritime Operations

Authors: Eugene Y. C. Wong, Henry Y. K. Lau, Mardjuki Raman

Abstract:

CO2 emissions from maritime transport operations represent a substantial part of the total greenhouse gas emission. Vessels are designed with better energy efficiency. Minimizing CO2 emission in maritime operations plays an important role in supply chain decarbonisation. This paper reviews the initiatives on slow steaming operations towards the reduction of carbon emission. It investigates the relationship and impact among slow steaming cost reduction, carbon emission reduction, and shipment delay. A scenario-based cost-driven decision support model is developed to facilitate the selection of the optimal slow steaming options, considering the cost on bunker fuel consumption, available speed, carbon emission, and shipment delay. The incorporation of the social cost of cargo is reviewed and suggested. Additional measures on the effect of vessels sizes, routing, and type of fuels towards decarbonisation are discussed.

Keywords: Slow steaming, carbon emission, maritime logistics, sustainability, green supply chain.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2675
1989 Cost Benefit Analysis and Adjustments of Corporate Social Responsibility in the Airline Industry

Authors: Roman Asatryan

Abstract:

The decision-making processes in Corporate Social Responsibility (CSR) among firms in the airlines industry borders on the benefits that accrue to firms through those investments. The crux of the matter is how firms can quantify the benefits derived from such investments. This paper analyses the cost benefit adjustment strategies for firms in the airline industry in their CSR strategy adoption and implementation. The paper discusses the CBA model in order to understand the ways airlines can reduce costs and increase returns on CSR, or balance the cost and benefits. The analysis indicates that, economic concepts especially the CBA are useful, though they are not without challenges. This paper concludes that the CBA model gives a basic understanding of the motivations for investing in intangible assets like CSR. It sets the tone for formulating relevant hypothesis in empirical studies in investment in CSR and other intangible assets in business operations.

Keywords: Cost Benefit Analysis, Corporate Social Responsibility, airline industry.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 5067
1988 Prediction-Based Midterm Operation Planning for Energy Management of Exhibition Hall

Authors: Doseong Eom, Jeongmin Kim, Kwang Ryel Ryu

Abstract:

Large exhibition halls require a lot of energy to maintain comfortable atmosphere for the visitors viewing inside. One way of reducing the energy cost is to have thermal energy storage systems installed so that the thermal energy can be stored in the middle of night when the energy price is low and then used later when the price is high. To minimize the overall energy cost, however, we should be able to decide how much energy to save during which time period exactly. If we can foresee future energy load and the corresponding cost, we will be able to make such decisions reasonably. In this paper, we use machine learning technique to obtain models for predicting weather conditions and the number of visitors on hourly basis for the next day. Based on the energy load thus predicted, we build a cost-optimal daily operation plan for the thermal energy storage systems and cooling and heating facilities through simulation-based optimization.

Keywords: Building energy management, machine learning, simulation-based optimization, operation planning.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 989
1987 Low-Cost Pre-Treatment of Pharmaceutical Wastewater

Authors: A. Abu-Safa, S. Abu-Salah, M. Mosa, S. Gharaibeh

Abstract:

Pharmaceutical industries and effluents of sewage treatment plants are the main sources of residual pharmaceuticals in water resources. These emergent pollutants may adversely impact the biophysical environment. Pharmaceutical industries often generate wastewater that changes in characteristics and quantity depending on the used manufacturing processes. Carbamazepine (CBZ), {5Hdibenzo [b,f]azepine-5-carboxamide, (C15H12N2O)}, is a significant non-biodegradable pharmaceutical contaminant in the Jordanian pharmaceutical wastewater, which is not removed by the activated sludge processes in treatment plants. Activated carbon may potentially remove that pollutant from effluents, but the high cost involved suggests that more attention should be given to the potential use of low-cost materials in order to reduce cost and environmental contamination. Powders of Jordanian non-metallic raw materials namely, Azraq Bentonite (AB), Kaolinite (K), and Zeolite (Zeo) were activated (acid and thermal treatment) and evaluated by removing CBZ. The results of batch and column techniques experiments showed around 46% and 67% removal of CBZ respectively.

Keywords: Azraq bentonite, carbamazepine, pharmaceutical wastewater, zeolite.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2705
1986 Performance Evaluation of Energy Efficient Communication Protocol for Mobile Ad Hoc Networks

Authors: Toshihiko Sasama, Kentaro Kishida, Kazunori Sugahara, Hiroshi Masuyama

Abstract:

A mobile ad hoc network is a network of mobile nodes without any notion of centralized administration. In such a network, each mobile node behaves not only as a host which runs applications but also as a router to forward packets on behalf of others. Clustering has been applied to routing protocols to achieve efficient communications. A CH network expresses the connected relationship among cluster-heads. This paper discusses the methods for constructing a CH network, and produces the following results: (1) The required running costs of 3 traditional methods for constructing a CH network are not so different from each other in the static circumstance, or in the dynamic circumstance. Their running costs in the static circumstance do not differ from their costs in the dynamic circumstance. Meanwhile, although the routing costs required for the above 3 methods are not so different in the static circumstance, the costs are considerably different from each other in the dynamic circumstance. Their routing costs in the static circumstance are also very different from their costs in the dynamic circumstance, and the former is one tenths of the latter. The routing cost in the dynamic circumstance is mostly the cost for re-routing. (2) On the strength of the above results, we discuss new 2 methods regarding whether they are tolerable or not in the dynamic circumstance, that is, whether the times of re-routing are small or not. These new methods are revised methods that are based on the traditional methods. We recommended the method which produces the smallest routing cost in the dynamic circumstance, therefore producing the smallest total cost.

Keywords: cluster, mobile ad hoc network, re-routing cost, simulation

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1350
1985 Speed Optimization Model for Reducing Fuel Consumption Based on Shipping Log Data

Authors: Ayudhia P. Gusti, Semin

Abstract:

It is known that total operating cost of a vessel is dominated by the cost of fuel consumption. How to reduce the fuel cost of ship so that the operational costs of fuel can be minimized is the question that arises. As the basis of these kinds of problem, sailing speed determination is an important factor to be considered by a shipping company. Optimal speed determination will give a significant influence on the route and berth schedule of ships, which also affect vessel operating costs. The purpose of this paper is to clarify some important issues about ship speed optimization. Sailing speed, displacement, sailing time, and specific fuel consumption were obtained from shipping log data to be further analyzed for modeling the speed optimization. The presented speed optimization model is expected to affect the fuel consumption and to reduce the cost of fuel consumption.

Keywords: Maritime transportation, reducing fuel, shipping log data, speed optimization.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1736
1984 Improvements in Material Handling: A Case Study of Cement Manufacturing Plant

Authors: A. Pancharya

Abstract:

The globalization of the Indian economy has thrown a great challenge to the Indian industries in respect of productivity, quality, cost, delivery etc. Achieving success• the global market has required fundamental shift in the way business is conducted and has dramatically affected virtually every aspect of process industry. The internal manufacturing process and supporting infrastructure should be such that it can compete successfully in global markets with better flexibility and delivery. The paper deals with a case study of a reputed process industry, some changes in the process has been suggested, which leads to reduction in labor cost and production cost.

Keywords: Indian cement industry, material handling, plant layout.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 4895
1983 Cascade Kalman Filter Configuration for Low Cost IMU/GPS Integration in Car Navigation Like Robot

Authors: Othman Maklouf, Abdurazag Ghila, Ahmed Abdulla

Abstract:

This paper introduces a low cost INS/GPS algorithm for land vehicle navigation application. The data fusion process is done with an extended Kalman filter in cascade configuration mode. In order to perform numerical simulations, MATLAB software has been developed. Loosely coupled configuration is considered. The results obtained in this work demonstrate that a low-cost INS/GPS navigation system is partially capable of meeting the performance requirements for land vehicle navigation. The relative effectiveness of the kalman filter implementation in integrated GPS/INS navigation algorithm is highlighted. The paper also provides experimental results; field test using a car is carried out.

Keywords: GPS, INS, IMU, Kalman filter.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3849
1982 Multi-Objective Multi-Mode Resource-Constrained Project Scheduling Problem by Preemptive Fuzzy Goal Programming

Authors: Phruksaphanrat B.

Abstract:

This research proposes a preemptive fuzzy goal programming model for multi-objective multi-mode resource constrained project scheduling problem. The objectives of the problem are minimization of the total time and the total cost of the project. Objective in a multi-mode resource-constrained project scheduling problem is often a minimization of makespan. However, both time and cost should be considered at the same time with different level of important priorities. Moreover, all elements of cost functions in a project are not included in the conventional cost objective function. Incomplete total project cost causes an error in finding the project scheduling time. In this research, preemptive fuzzy goal programming is presented to solve the multi-objective multi-mode resource constrained project scheduling problem. It can find the compromise solution of the problem. Moreover, it is also flexible in adjusting to find a variety of alternative solutions. 

Keywords: Multi-mode resource constrained project scheduling problem, Fuzzy set, Goal programming, Preemptive fuzzy goal programming.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2758
1981 Safety Compliance of Substation Earthing Design

Authors: A. Hellany, M.Nagrial, M. Nassereddine, J. Rizk

Abstract:

As new challenges emerge in power electrical workplace safety, it is the responsibility of the systems designer to seek out new approaches and solutions that address them. Design decisions made today will impact cost, safety and serviceability of the installed systems for 40 or 50 years during the useful life for the owner. Studies have shown that this cost is an order of magnitude of 7 to 10 times the installed cost of the power distribution equipment. This paper reviews some aspects of earthing system design in power substation surrounded by residential houses. The electrical potential rise and split factors are discussed and a few recommendations are provided to achieve a safety voltage in the area beyond the boundary of the substation.

Keywords: EPR, Split Factor, Earthing Design

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 4268
1980 A Study of Replacement Policies for Warranty Products with Different Failure Rate

Authors: Wen Liang Chang

Abstract:

This paper provides a replacement policy for warranty products with different failure rate from the consumer-s viewpoint. Assume that the product is replaced once within a finite planning horizon, and the failure rate of the second product is lower than the failure rate of the first product. Within warranty period (WP), the failed product is corrected by minimal repair without any cost to the consumers. After WP, the failed product is repaired with a fixed repair cost to the consumers. However, each failure incurs a fixed downtime cost to the consumers over a finite planning horizon. In this paper, we derive the model of the expected total disbursement cost within a finite planning horizon and some properties of the optimal replacement policy under some reasonable conditions are obtained. Finally, numerical examples are given to illustrate the features of the optimal replacement policy under various maintenance costs.

Keywords: Planning horizon, Free-repair warranty, Minimal repair, Replacement.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1452
1979 A Goal Programming Approach for Plastic Recycling System in Thailand

Authors: Wuthichai Wongthatsanekorn

Abstract:

Plastic waste is a big issue in Thailand, but the amount of recycled plastic in Thailand is still low due to the high investment and operating cost. Hence, the rest of plastic waste are burnt to destroy or sent to the landfills. In order to be financial viable, an effective reverse logistics infrastructure is required to support the product recovery activities. However, there is a conflict between reducing the cost and raising environmental protection level. The purpose of this study is to build a goal programming (GP) so that it can be used to help analyze the proper planning of the Thailand-s plastic recycling system that involves multiple objectives. This study considers three objectives; reducing total cost, increasing the amount of plastic recovery, and raising the desired plastic materials in recycling process. The results from two priority structures show that it is necessary to raise the total cost budget in order to achieve targets on amount of recycled plastic and desired plastic materials.

Keywords: Goal Programming, Plastic Recycling, Thailand.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2656
1978 Cost of Governance in Nigeria: In Whose Interest?

Authors: Francis O. Iyoha, Daniel E. Gberevbie, Charles T. Iruonagbe, Matthew E. Egharevba

Abstract:

Cost of governance in Nigeria has become a challenge to development and concern to practitioners and scholars alike in the field of business and social science research. In the 2010 national budget of NGN4.6 trillion or USD28.75billion for instance, only a pantry sum of NGN1.8trillion or USD11.15billion was earmarked for capital expenditure. Similarly, in 2013, out of a total national budget of NGN4.92trillion or USD30.75billion, only the sum of NGN1.50trllion or USD9.38billion was voted for capital expenditure. Therefore, based on the data sourced from the Nigerian Office of Statistics, Central bank of Nigeria Statistical Bulletin as well as from the United Nations Development Programme, this study examined the causes of high cost of governance in Nigeria. It found out that the high cost of governance in the country is in the interest of the ruling class, arising from their unethical behaviour – corrupt practices and the poor management of public resources. As a result, the study recommends the need to intensify the war against corruption and mismanagement of public resources by government officials as possible solution to overcome the high cost of governance in Nigeria. This could be achieved by strengthening the constitutional powers of the various anti-corruption agencies in the area of arrest, investigation and prosecution of offenders without the interference of the executive arm of government either at the local, state or federal level.

Keywords: Capital expenditure, Cost of governance, recurrent expenditure, unethical behaviour.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3530
1977 Re-Optimization MVPP Using Common Subexpression for Materialized View Selection

Authors: Boontita Suchyukorn, Raweewan Auepanwiriyakul

Abstract:

A Data Warehouses is a repository of information integrated from source data. Information stored in data warehouse is the form of materialized in order to provide the better performance for answering the queries. Deciding which appropriated views to be materialized is one of important problem. In order to achieve this requirement, the constructing search space close to optimal is a necessary task. It will provide effective result for selecting view to be materialized. In this paper we have proposed an approach to reoptimize Multiple View Processing Plan (MVPP) by using global common subexpressions. The merged queries which have query processing cost not close to optimal would be rewritten. The experiment shows that our approach can help to improve the total query processing cost of MVPP and sum of query processing cost and materialized view maintenance cost is reduced as well after views are selected to be materialized.

Keywords: Data Warehouse, materialized views, query rewriting, common subexpressions.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1678
1976 Creating Maintenance Cost Model for University Buildings

Authors: AbdulLateef A. Olanrewaju, Arazi Idrus, Mohd F. Khamidi

Abstract:

Maintenance costs incurred on building differs. The difference can be as results of the types, functions, age, building health index, size, form height, location and complexity of the building. These are contributing to the difficulty in maintenance development of deterministic maintenance cost model. This paper is concerns with reporting the preliminary findings on the creation of building maintenance cost distributions for universities in Malaysia. This study is triggered by the need to provide guides on maintenance costs distributions for decision making. For this purpose, a survey questionnaire was conducted to investigate the distribution of maintenance costs in the universities. Altogether, responses were received from twenty universities comprising both private and publicly owned. The research found that engineering services, roofing and finishes were the elements contributing the larger segment of the maintenance costs. Furthermore, the study indicates the significance of maintenance cost distribution as decision making tool towards maintenance management.

Keywords: Performance matrix, university buildings, costmodel, Malaysia

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2037
1975 Cost Optimized CO2 Pipeline Transportation Grid: A Case Study from Italian Industries

Authors: P Bumb, U Desideri, F Quattrocchi, L Arcioni

Abstract:

This paper presents the feasibility study of CO2 sequestration from the sources to the sinks in the prospective of Italian Industries. CO2 produced at these sources captured, compressed to supercritical pressures, transported via pipelines and stored in underground geologic formations such as depleted oil and natural gas reservoirs, un-minable coal seams and deep saline aquifers. In this work, we present the optimized pipeline infrastructure for the CO2 with appropriate constraints to find lower cost system by the use of nonlinear optimization software LINGO 11.0. This study was conducted on CO2 transportation complex network of Italian Industries, to find minimum cost network for transporting the CO2 from sources to the sinks.

Keywords: CCS, CO2, ECBM, EU, NAP, LINGO, UNMIG.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1640
1974 Deployment of a Biocompatible International Space Station into Geostationary Orbit

Authors: Tim Falk, Chris Chatwin

Abstract:

This study explores the possibility of a space station that will occupy a geostationary equatorial orbit (GEO) and create artificial gravity using centripetal acceleration. The concept of the station is to create a habitable, safe environment that can increase the possibility of space tourism by reducing the wide variation of hazards associated with space exploration. The ability to control the intensity of artificial gravity through Hall-effect thrusters will allow experiments to be carried out at different levels of artificial gravity. A feasible prototype model was built to convey the concept and to enable cost estimation. The SpaceX Falcon Heavy rocket with a 26,700 kg payload to GEO was selected to take the 675 tonne spacecraft into orbit; space station construction will require up to 30 launches, this would be reduced to 5 launches when the SpaceX BFR becomes available. The estimated total cost of implementing the Sussex Biocompatible International Space Station (BISS) is approximately $47.039 billion, which is very attractive when compared to the cost of the International Space Station, which cost $150 billion.

Keywords: Artificial gravity, biocompatible, geostationary orbit, space station.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 566