WASET
	@article{(Open Science Index):https://publications.waset.org/pdf/9997781,
	  title     = {Multi-Objective Multi-Mode Resource-Constrained Project Scheduling Problem by Preemptive Fuzzy Goal Programming},
	  author    = {Phruksaphanrat B.},
	  country	= {},
	  institution	= {},
	  abstract     = {This research proposes a preemptive fuzzy goal programming model for multi-objective multi-mode resource constrained project scheduling problem. The objectives of the problem are minimization of the total time and the total cost of the project. Objective in a multi-mode resource-constrained project scheduling problem is often a minimization of makespan. However, both time and cost should be considered at the same time with different level of important priorities. Moreover, all elements of cost functions in a project are not included in the conventional cost objective function. Incomplete total project cost causes an error in finding the project scheduling time. In this research, preemptive fuzzy goal programming is presented to solve the multi-objective multi-mode resource constrained project scheduling problem. It can find the compromise solution of the problem. Moreover, it is also flexible in adjusting to find a variety of alternative solutions. 
},
	    journal   = {International Journal of Computer and Information Engineering},
	  volume    = {8},
	  number    = {3},
	  year      = {2014},
	  pages     = {601 - 605},
	  ee        = {https://publications.waset.org/pdf/9997781},
	  url   	= {https://publications.waset.org/vol/87},
	  bibsource = {https://publications.waset.org/},
	  issn  	= {eISSN: 1307-6892},
	  publisher = {World Academy of Science, Engineering and Technology},
	  index 	= {Open Science Index 87, 2014},
	}