Search results for: start-up delay
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 837

Search results for: start-up delay

807 Application on Metastable Measurement with Wide Range High Resolution VDL Circuit

Authors: Po-Hui Yang, Jing-Min Chen, Po-Yu Kuo, Chia-Chun Wu

Abstract:

This paper proposed a high resolution Vernier Delay Line (VDL) measurement circuit with coarse and fine detection mechanism, which improved the trade-off problem between high resolution and less delay cells in traditional VDL circuits. And the measuring time of proposed measurement circuit is also under the high resolution requests. At first, the testing range of input signal which proposed high resolution delay line is detected by coarse detection VDL. Moreover, the delayed input signal is transmitted to fine detection VDL for measuring value with better accuracy. This paper is implemented at 0.18μm process, operating frequency is 100 MHz, and the resolution achieved 2.0 ps with only 16-stage delay cells. The test range is 170ps wide, and 17% stages saved compare with traditional single delay line circuit.

Keywords: vernier delay line, D-type flip-flop, DFF, metastable phenomenon

Procedia PDF Downloads 573
806 Design and Realization of Double-Delay Line Canceller (DDLC) Using Fpga

Authors: A. E. El-Henawey, A. A. El-Kouny, M. M. Abd –El-Halim

Abstract:

Moving target indication (MTI) which is an anti-clutter technique that limits the display of clutter echoes. It uses the radar received information primarily to display moving targets only. The purpose of MTI is to discriminate moving targets from a background of clutter or slowly-moving chaff particles as shown in this paper. Processing system in these radars is so massive and complex; since it is supposed to perform a great amount of processing in very short time, in most radar applications the response of a single canceler is not acceptable since it does not have a wide notch in the stop-band. A double-delay canceler is an MTI delay-line canceler employing the two-delay-line configuration to improve the performance by widening the clutter-rejection notches, as compared with single-delay cancelers. This canceler is also called a double canceler, dual-delay canceler, or three-pulse canceler. In this paper, a double delay line canceler is chosen for study due to its simplicity in both concept and implementation. Discussing the implementation of a simple digital moving target indicator (DMTI) using FPGA which has distinct advantages compared to other application specific integrated circuit (ASIC) for the purposes of this work. The FPGA provides flexibility and stability which are important factors in the radar application.

Keywords: FPGA, MTI, double delay line canceler, Doppler Shift

Procedia PDF Downloads 583
805 The Impact of the Corona Virus Outbreak Crisis on Startups

Authors: Mohammad Mehdizadeh, Sara Miri

Abstract:

Due to the recent events surrounding the global health crisis and the spread of the coronavirus (COVID-19), the activities of many businesses and start-up companies have been disrupted. It solves many economic problems and can reduce unemployment in countries because governments can take advantage of their potential without direct investment. However, with the help of their innovative ideas and new technologies, these companies can develop and grow the economy. But it is essential to consider that there will be no guarantee of their success in the event of unforeseen events, as the coronavirus outbreak in the last two years has seriously damaged these companies and, like other businesses, challenges and stagnation have started. The startup companies' challenge in the face of coronavirus begins with its impact on customers. Changing customer behavior can affect their products and distribution channels. On the other hand, to prevent countless losses in this crisis, startup companies require creative solutions to address challenges in various areas of human capital, supply chain management, sales and marketing, and so on. Therefore, all business leaders must consider and plan for the current crisis and the future; after overcoming these conditions and returning to regular business routines, it will no longer be an option, and new situations will prevail in a competitive environment. The essential strategies for developing and growing startups during the Coronavirus outbreak can be connecting with the global startup ecosystem, hosting webinars, providing podcasts and free question and answer sessions, mentoring services to growing teams, and consulting pointed out this to firms for digitalization.

Keywords: business, COVID-19, digitalization, startups

Procedia PDF Downloads 133
804 A Hybrid MAC Protocol for Delay Constrained Mobile Wireless Sensor Networks

Authors: Hanefi Cinar, Musa Cibuk, Ismail Erturk, Fikri Aggun, Munip Geylani

Abstract:

Mobile Wireless Sensor Networks (MWSNs) carry heterogeneous data traffic with different urgency and quality of service (QoS) requirements. There are a lot of studies made on energy efficiency, bandwidth, and communication methods in literature. But delay, high throughput, utility parameters are not well considered. Increasing demand for real-time data transfer makes these parameters more important. In this paper we design new MAC protocol which is delay constrained and targets for improving delay, utility, and throughput performance of the network and finding solutions on collision and interference problems. Protocol improving QoS requirements by using TDMA, FDM, and OFDMA hybrid communication methods with multi-channel communication.

Keywords: MWSN, delay, hybrid MAC, TDMA, FDM, OFDMA

Procedia PDF Downloads 447
803 Entrepreneurial Leadership in a Startup Context: A Comparative Study on Two Egyptian Startup Businesses

Authors: Nada Basset

Abstract:

Problem Statement: The study examines the important role of leading change inside start-ups and highlights the challenges faced by an entrepreneur during the startup phase of the business. Research Methods/Procedures/Approaches: A qualitative research approach is taken, using the case study analysis method. A comparative study was made between two day care nurseries in Greater Cairo. Non-probability purposive sampling was used and a triangulation of semi-structured interviews, document analysis and participant-observation were applied simultaneously. The in-depth case study analysis took place over a longitudinal study of four calendar months. Results/Findings: Findings demonstrated that leading change in an entrepreneurial setup must be initiated by the entrepreneur, who must also be the owner of the change process. Another important finding showed that the culture of change, although created by the entrepreneur, needs the support and engagement of followers, who should be sharing the same value system and vision of the entrepreneur. Conclusions and Implications: An important implication suggests that during the first year of a start-up lifecycle, special emphasis must be made to the recruitment and selection of personnel, who should play a role into setting the new start-up culture and help it grow or shrink. Another drawn conclusion is that the success of the change must be measured in both quantitative and qualitative terms. Increasing revenues and customer attrition rates -as quantitative KPIs- must be aligned with other qualitative KPIs like customer satisfaction, employee satisfaction, and organizational commitment and business reputation. Originality of Paper: The paper addresses change management in an entrepreneurial concept, with an empirical application on an Egyptian start-up model providing a service to both adults and children. This privileges the research as the constructs measured merged together the level of satisfaction of employees, decision-makers (parents of children), and the users (children).

Keywords: leadership, change management, entrepreneurship, startup business

Procedia PDF Downloads 155
802 Identifying Project Delay Factors in the Australian Construction Industry

Authors: Syed Sohaib Bin Hasib, Hiyam Al-Kilidar

Abstract:

Meeting project deadlines is a major challenge for most construction projects. In this study, perceptions of contractors, clients, and consultants are compared relative to a list of factors derived from the review of the extant literature on project delay. 59 causes (categorized into 8 groups) of project delays were identified from the literature. A survey was devised to get insights and ranking of these factors from clients, consultants & contractors in the Australian construction industry. Findings showed that project delays in the Australian construction industry are mainly the result of skill shortages, interference in execution, and poor coordination and communication between the project stakeholders.

Keywords: construction, delay factors, time delay, australian construction industry

Procedia PDF Downloads 140
801 An Agent-Based Modelling Simulation Approach to Calculate Processing Delay of GEO Satellite Payload

Authors: V. Vicente E. Mujica, Gustavo Gonzalez

Abstract:

The global coverage of broadband multimedia and internet-based services in terrestrial-satellite networks demand particular interests for satellite providers in order to enhance services with low latencies and high signal quality to diverse users. In particular, the delay of on-board processing is an inherent source of latency in a satellite communication that sometimes is discarded for the end-to-end delay of the satellite link. The frame work for this paper includes modelling of an on-orbit satellite payload using an agent model that can reproduce the properties of processing delays. In essence, a comparison of different spatial interpolation methods is carried out to evaluate physical data obtained by an GEO satellite in order to define a discretization function for determining that delay. Furthermore, the performance of the proposed agent and the development of a delay discretization function are together validated by simulating an hybrid satellite and terrestrial network. Simulation results show high accuracy according to the characteristics of initial data points of processing delay for Ku bands.

Keywords: terrestrial-satellite networks, latency, on-orbit satellite payload, simulation

Procedia PDF Downloads 236
800 Contractors Perspective on Causes of Delays in Power Transmission Projects

Authors: Goutom K. Pall

Abstract:

At the very heart of the power system, power transmission (PT) acts as an essential link between power generation and distribution. Timely completion of PT infrastructures is therefore crucial to support the development of power system as a whole. Yet despite the importance, studies on PT infrastructure development projects are embryonic and, hence, PT projects undergoing widespread delays worldwide. These delay factors are idiosyncratic and identifying the critical delay factors is essential if the PT industry professionals are to complete their projects efficiently and within the expected timeframes. This study identifies and categorizes 46 causes of PT project delay under ten major groups using six sector expert’s recommendations studied by a preliminary questionnaire survey. Based on the experts’ strong recommendations, two new groups are introduced in the final questionnaire survey: sector specific factors (SSF) and general factors (GF). SSF pertain to delay factors applicable only to the PT projects, while GF represents less biased samples with shared responsibilities of all project parties involved in a project. The study then uses 112 data samples from the contractors to rank the delay factors using relative importance index (RII). The results reveal that SSF, GF and external factors are the most critical groups, while the highest ranked delay factors include the right of way (RoW) problems of transmission lines (TL), delay in payments, frequent changes in TL routes, poor communication and coordination among the project parties and accessibility to TL tower locations. Finally, recommendations are made to minimize the identified delay. The findings are expected to be of substantial benefit to professionals in minimizing time overrun in PT projects implementation, as well as power generation, power distribution, and non-power linear construction projects worldwide.

Keywords: delay, project delay, power transmission projects, time-overruns

Procedia PDF Downloads 146
799 Nitrogen Effects on Ignition Delay Time in Supersonic Premixed and Diffusion Flames

Authors: A. M. Tahsini

Abstract:

Computational study of two dimensional supersonic reacting hydrogen-air flows is performed to investigate the nitrogen effects on ignition delay time for premixed and diffusion flames. Chemical reaction is treated using detail kinetics and the advection upstream splitting method is used to calculate the numerical inviscid fluxes. The results show that only in the stoichiometric condition for both premixed and diffusion flames, there is monotone dependency of the ignition delay time to the nitrogen addition. In other situations, the optimal condition from ignition viewpoint should be found using numerical investigations.

Keywords: diffusion flame, ignition delay time, mixing layer, numerical simulation, premixed flame, supersonic flow

Procedia PDF Downloads 428
798 Simulation of Pedestrian Service Time at Different Delay Times

Authors: Imran Badshah

Abstract:

Pedestrian service time reflects the performance of the facility, and it’s a key parameter to analyze the capability of facilities provided to serve pedestrians. The level of service of pedestrians (LOS) mainly depends on pedestrian time and safety. The pedestrian time utilized by taking a service is mainly influenced by the number of available services and the time utilized by each pedestrian in receiving a service; that is called a delay time. In this paper, we analyzed the simulated pedestrian service time with different delay times. A simulation is performed in AnyLogic by developing a model that reflects the real scenario of pedestrian services such as ticket machine gates at rail stations, airports, shopping malls, and cinema halls. The simulated pedestrian time is determined for various delay values. The simulated result shows how pedestrian time changes with the delay pattern. The histogram and time plot graph of a model gives the mean, maximum and minimum values of the pedestrian time. This study helps us to check the behavior of pedestrian time at various services such as subway stations, airports, shopping malls, and cinema halls.

Keywords: agent-based simulation, anylogic model, pedestrian behavior, time delay

Procedia PDF Downloads 178
797 Sliding Mode Control for Active Suspension System with Actuator Delay

Authors: Aziz Sezgin, Yuksel Hacioglu, Nurkan Yagiz

Abstract:

Sliding mode controller for a vehicle active suspension system is designed in this study. The widely used quarter car model is preferred and it is aimed to improve the ride comfort of the passengers. The effect of the actuator time delay, which may arise due to the information processing, sensors or actuator dynamics, is also taken into account during the design of the controller. A sliding mode controller was designed that has taken into account the actuator time delay by using Smith predictor. The successful performance of the designed controller is confirmed via numerical results.

Keywords: sliding mode control, active suspension system, actuator, time delay, vehicle

Procedia PDF Downloads 377
796 Project Time and Quality Management during Construction

Authors: Nahed Al-Hajeri

Abstract:

Time and cost is an integral part of every construction plan and can affect each party’s contractual obligations. The performance of both time and cost are usually important to the client and contractor during the project. Almost all construction projects are experiencing time overrun. These time overruns always contributed as expensive to both client and contractor. Construction of any project inside the gathering centers involves complex management skills related to work force, materials, plant, machineries, new technologies etc. It also involves many agencies interdependent on each other like the vendors, structural and functional designers including various types of specialized engineers and it includes support of contractors and specialized contractors. This paper mainly highlights the types of construction delays due to which project suffer time and cost overrun. This paper also speaks about the delay causes and factors that contribute to the construction sequence delay for the oil and gas projects. Construction delay is supposed to be one of the repeated problems in the construction projects and it has an opposing effect on project success in terms of time, cost and quality. Some effective methods are identified to minimize delays in construction projects such as: 1. Site management and supervision, 2. Effective strategic planning, 3. Clear information and communication channel. Our research paper studies the types of delay with some real examples with statistic results and suggests solutions to overcome this problem.

Keywords: non-compensable delay, delays caused by force majeure, compensable delay, delays caused by the owner or the owner’s representative, non-excusable delay, delay caused by the contractor or the contractor’s representative, concurrent delay, delays resulting from two separate causes at the same time

Procedia PDF Downloads 222
795 Dispersion-Less All Reflective Split and Delay Unit for Ultrafast Metrology

Authors: Akansha Tyagi, Mehar S. Sidhu, Ankur Mandal, Sanjay Kapoor, Sunil Dahiya, Jan M. Rost, Thomas Pfeifer, Kamal P. Singh

Abstract:

An all-reflective split and delay unit is designed for dispersion free measurement of broadband ultrashort pulses using a pair of reflective knife edge prism for splitting and recombining of the measuring pulse. It is based on symmetrical wavefront splitting of the measuring pulse having two separate arms to independently shape both split parts. We have validated our delay line with NIR –femtosecond pulse measurement centered at 800 nm using second harmonic-Interferometric frequency resolved optical gating (SH-IFROG). The delay line is compact, easy to align and provides attosecond stability and precision and thus make it more versatile for wide range of applications in ultrafast measurements. We envision that the present delay line will find applications in IR-IR controlling for high harmonic generation (HHG) and attosecond IR-XUV pump-probe measurements with solids and gases providing attosecond resolution and wide delay range.

Keywords: HHG, nonlinear optics, pump-probe spectroscopy, ultrafast metrology

Procedia PDF Downloads 164
794 Maximizing Profit Using Optimal Control by Exploiting the Flexibility in Thermal Power Plants

Authors: Daud Mustafa Minhas, Raja Rehan Khalid, Georg Frey

Abstract:

The next generation power systems are equipped with abundantly available free renewable energy resources (RES). During their low-cost operations, the price of electricity significantly reduces to a lower value, and sometimes it becomes negative. Therefore, it is recommended not to operate the traditional power plants (e.g. coal power plants) and to reduce the losses. In fact, it is not a cost-effective solution, because these power plants exhibit some shutdown and startup costs. Moreover, they require certain time for shutdown and also need enough pause before starting up again, increasing inefficiency in the whole power network. Hence, there is always a trade-off between avoiding negative electricity prices, and the startup costs of power plants. To exploit this trade-off and to increase the profit of a power plant, two main contributions are made: 1) introducing retrofit technology for state of art coal power plant; 2) proposing optimal control strategy for a power plant by exploiting different flexibility features. These flexibility features include: improving ramp rate of power plant, reducing startup time and lowering minimum load. While, the control strategy is solved as mixed integer linear programming (MILP), ensuring optimal solution for the profit maximization problem. Extensive comparisons are made considering pre and post-retrofit coal power plant having the same efficiencies under different electricity price scenarios. It concludes that if the power plant must remain in the market (providing services), more flexibility reflects direct economic advantage to the plant operator.

Keywords: discrete optimization, power plant flexibility, profit maximization, unit commitment model

Procedia PDF Downloads 116
793 Fast Authentication Using User Path Prediction in Wireless Broadband Networks

Authors: Gunasekaran Raja, Rajakumar Arul, Kottilingam Kottursamy, Ramkumar Jayaraman, Sathya Pavithra, Swaminathan Venkatraman

Abstract:

Wireless Interoperability for Microwave Access (WiMAX) utilizes the IEEE 802.1X mechanism for authentication. However, this mechanism incurs considerable delay during handoffs. This delay during handoffs results in service disruption which becomes a severe bottleneck. To overcome this delay, our article proposes a key caching mechanism based on user path prediction. If the user mobility follows that path, the user bypasses the normal IEEE 802.1X mechanism and establishes the necessary authentication keys directly. Through analytical and simulation modeling, we have proved that our mechanism effectively decreases the handoff delay thereby achieving fast authentication.

Keywords: authentication, authorization, and accounting (AAA), handoff, mobile, user path prediction (UPP) and user pattern

Procedia PDF Downloads 363
792 Performance Analysis of Carbon Nanotube for VLSI Interconnects and Their Comparison with Copper Interconnects

Authors: Gagnesh Kumar, Prashant Gupta

Abstract:

This paper investigates the performance of the bundle of single wall carbon nanotubes (SWCNT) for low-power and high-speed interconnects for future VLSI applications. The power dissipation, delay and power delay product (PDP) of SWCNT bundle interconnects are examined and compared with that of the Cu interconnects at 22 nm technology node for both intermediate and global interconnects. The results show that SWCNT bundle consume less power and also faster than Cu for intermediate and global interconnects. It is concluded that the metallic SWCNT has been regarded as a viable candidate for intermediate and global interconnects in future technologies.

Keywords: carbon nanotube, SWCNT, low power, delay, power delay product, global and intermediate interconnects

Procedia PDF Downloads 288
791 Hybrid Subspace Approach for Time Delay Estimation in MIMO Systems

Authors: Mojtaba Saeedinezhad, Sarah Yousefi

Abstract:

In this paper, we present a hybrid subspace approach for Time Delay Estimation (TDE) in multivariable systems. While several methods have been proposed for time delay estimation in SISO systems, delay estimation in MIMO systems were always a big challenge. In these systems the existing TDE methods have significant limitations because most of procedures are just based on system response estimation or correlation analysis. We introduce a new hybrid method for TDE in MIMO systems based on subspace identification and explicit output error method; and compare its performance with previously introduced procedures in presence of different noise levels and in a statistical manner. Then the best method is selected with multi objective decision making technique. It is shown that the performance of new approach is much better than the existing methods, even in low signal-to-noise conditions.

Keywords: system identification, time delay estimation, ARX, OE, merit ratio, multi variable decision making

Procedia PDF Downloads 313
790 Offset Dependent Uniform Delay Mathematical Optimization Model for Signalized Traffic Network Using Differential Evolution Algorithm

Authors: Tahseen Saad, Halim Ceylan, Jonathan Weaver, Osman Nuri Çelik, Onur Gungor Sahin

Abstract:

A new concept of uniform delay offset dependent mathematical optimization problem is derived as the main objective for this study using a differential evolution algorithm. To control the coordination problem, which depends on offset selection and to estimate uniform delay based on the offset choice in a traffic signal network. The assumption is the periodic sinusoidal function for arrival and departure patterns. The cycle time is optimized at the entry links and the optimized value is used in the non-entry links as a common cycle time. The offset optimization algorithm is used to calculate the uniform delay at each link. The results are illustrated by using a case study and are compared with the canonical uniform delay model derived by Webster and the highway capacity manual’s model. The findings show new model minimizes the total uniform delay to almost half compared to conventional models. The mathematical objective function is robust. The algorithm convergence time is fast.

Keywords: area traffic control, traffic flow, differential evolution, sinusoidal periodic function, uniform delay, offset variable

Procedia PDF Downloads 247
789 Performance Evaluation of Dynamic Signal Control System for Mixed Traffic Conditions

Authors: Aneesh Babu, S. P. Anusha

Abstract:

A dynamic signal control system combines traditional traffic lights with an array of sensors to intelligently control vehicle and pedestrian traffic. The present study focus on evaluating the performance of dynamic signal control systems for mixed traffic conditions. Data collected from four different approaches to a typical four-legged signalized intersection at Trivandrum city in the Kerala state of India is used for the study. Performance of three other dynamic signal control methods, namely (i) Non-sequential method (ii) Webster design for consecutive signal cycle using flow as input, and (iii) dynamic signal control using RFID delay as input, were evaluated. The evaluation of the dynamic signal control systems was carried out using a calibrated VISSIM microsimulation model. Python programming was used to integrate the dynamic signal control algorithm through the COM interface in VISSIM. The intersection delay obtained from different dynamic signal control methods was compared with the delay obtained from fixed signal control. Based on the study results, it was observed that the intersection delay was reduced significantly by using dynamic signal control methods. The dynamic signal control method using delay from RFID sensors resulted in a higher percentage reduction in delay and hence is a suitable choice for implementation under mixed traffic conditions. The developed dynamic signal control strategies can be implemented in ITS applications under mixed traffic conditions.

Keywords: dynamic signal control, intersection delay, mixed traffic conditions, RFID sensors

Procedia PDF Downloads 75
788 The Evaluation of Signal Timing Optimization and Implement of Transit Signal Priority in Intersections and Their Effect on Delay Reduction

Authors: Mohammad Reza Ramezani, Shahriyar Afandizadeh

Abstract:

Since the intersections play a crucial role in traffic delay, it is significant to evaluate them precisely. In this paper, three critical intersections in Tehran (Capital of Iran) had been simulated. The main purpose of this paper was to optimize the public transit delay. The simulation had three different phase in three intersections of Tehran. The first phase was about the current condition of intersection; the second phase was about optimized signal timing and the last phase was about prioritized public transit access. The Aimsun software was used to simulate all phases, and the Synchro software was used to optimization of signals as well. The result showed that the implement of optimization and prioritizing system would reduce about 50% of delay for public transit.

Keywords: transit signal priority, intersection optimization, public transit, simulation

Procedia PDF Downloads 436
787 Estimation of Delay Due to Loading–Unloading of Passengers by Buses and Reduction of Number of Lanes at Selected Intersections in Dhaka City

Authors: Sumit Roy, A. Uddin

Abstract:

One of the significant reasons that increase the delay time in the intersections at heterogeneous traffic condition is a sudden reduction of the capacity of the roads. In this study, the delay for this sudden capacity reduction is estimated. Two intersections at Dhaka city were brought in to thestudy, i.e., Kakrail intersection, and SAARC Foara intersection. At Kakrail intersection, the sudden reduction of capacity in the roads is seen at three downstream legs of the intersection, which are because of slowing down or stopping of buses for loading and unloading of passengers. At SAARC Foara intersection, sudden reduction of capacity was seen at two downstream legs. At one leg, it was due to loading and unloading of buses, and at another leg, it was for both loading and unloading of buses and reduction of the number of lanes. With these considerations, the delay due to intentional stoppage or slowing down of buses and reduction of the number of lanes for these two intersections are estimated. Here the delay was calculated by two approaches. The first approach came from the concept of shock waves in traffic streams. Here the delay was calculated by determining the flow, density, and speed before and after the sudden capacity reduction. The second approach came from the deterministic analysis of queues. Here the delay is calculated by determining the volume, capacity and reduced capacity of the road. After determining the delay from these two approaches, the results were compared. For this study, the video of each of the two intersections was recorded for one hour at the evening peak. Necessary geometric data were also taken to determine speed, flow, and density, etc. parameters. The delay was calculated for one hour with one-hour data at both intersections. In case of Kakrail intersection, the per hour delay for Kakrail circle leg was 5.79, and 7.15 minutes, for Shantinagar cross intersection leg they were 13.02 and 15.65 minutes, and for Paltan T intersection leg, they were 3 and 1.3 minutes for 1st and 2nd approaches respectively. In the case of SAARC Foara intersection, the delay at Shahbag leg was only due to intentional stopping or slowing down of busses, which were 3.2 and 3 minutes respectively for both approaches. For the Karwan Bazar leg, the delays for buses by both approaches were 5 and 7.5 minutes respectively, and for reduction of the number of lanes, the delays for both approaches were 2 and 1.78 minutes respectively. Measuring the delay per hour for the Kakrail leg at Kakrail circle, it is seen that, with consideration of the first approach of delay estimation, the intentional stoppage and lowering of speed by buses contribute to 26.24% of total delay at Kakrail circle. If the loading and unloading of buses at intersection is made forbidden near intersection, and any other measures for loading and unloading of passengers are established far enough from the intersections, then the delay at intersections can be reduced at significant scale, and the performance of the intersections can be enhanced.

Keywords: delay, deterministic queue analysis, shock wave, passenger loading-unloading

Procedia PDF Downloads 153
786 Dependence of Autoignition Delay Period on Equivalence Ratio for i-Octane, Primary Reference Fuel

Authors: Sunil Verma

Abstract:

In today’s world non-renewable sources are depleting quickly, so there is a need to produce efficient and unconventional engines to minimize the use of fuel. Also, there are many fatal accidents happening every year during extraction, distillation, transportation and storage of fuel. Reason for explosions of gaseous fuel is unwanted autoignition. Autoignition characterstics of fuel are mandatory to study to build efficient engines and to avoid accidents. This report is concerned with study of autoignition delay characteristics of iso-octane by using rapid compression machine. The paper clearly explains the dependence of ignition delay characteristics on variation of equivalence ratios from lean to rich mixtures. The equivalence ratio is varied from 0.3 to 1.2.

Keywords: autoignition, iso-octane, combustion, rapid compression machine, equivalence ratio, ignition delay

Procedia PDF Downloads 415
785 Number of Parametrization of Discrete-Time Systems without Unit-Delay Element: Single-Input Single-Output Case

Authors: Kazuyoshi Mori

Abstract:

In this paper, we consider the parametrization of the discrete-time systems without the unit-delay element within the framework of the factorization approach. In the parametrization, we investigate the number of required parameters. We consider single-input single-output systems in this paper. By the investigation, we find, on the discrete-time systems without the unit-delay element, three cases that are (1) there exist plants which require only one parameter and (2) two parameters, and (3) the number of parameters is at most three.

Keywords: factorization approach, discrete-time system, parameterization of stabilizing controllers, system without unit-delay

Procedia PDF Downloads 207
784 A Time Delay Neural Network for Prediction of Human Behavior

Authors: A. Hakimiyan, H. Namazi

Abstract:

Human behavior is defined as a range of behaviors exhibited by humans who are influenced by different internal or external sources. Human behavior is the subject of much research in different areas of psychology and neuroscience. Despite some advances in studies related to forecasting of human behavior, there are not many researches which consider the effect of the time delay between the presence of stimulus and the related human response. Analysis of EEG signal as a fractal time series is one of the major tools for studying the human behavior. In the other words, the human brain activity is reflected in his EEG signal. Artificial Neural Network has been proved useful in forecasting of different systems’ behavior especially in engineering areas. In this research, a time delay neural network is trained and tested in order to forecast the human EEG signal and subsequently human behavior. This neural network, by introducing a time delay, takes care of the lagging time between the occurrence of the stimulus and the rise of the subsequent action potential. The results of this study are useful not only for the fundamental understanding of human behavior forecasting, but shall be very useful in different areas of brain research such as seizure prediction.

Keywords: human behavior, EEG signal, time delay neural network, prediction, lagging time

Procedia PDF Downloads 630
783 The SOCI Strategy as a Method to Meet the Innovation Challenges of COVID-19

Authors: Victoria Wolf, Renata Dobrucka, Robert Prezkop, Stephan Haubold

Abstract:

The COVID-19 causes a worldwide crisis and has an impact in every dimension of the economy. Organizations with the ability to adapt to new developments and which innovate solutions for the disrupted world during and after the Corona crises have the opportunity to not only survive the crisis but rather to use new trends to implement new business models and gain advantage. In this context, startups seem to have better opportunities to manage the Corona crisis through their innovation-based nature. The main result of this paper is the understanding that by applying a startup orientated innovation (SOCI) strategy, established companies can be motivated to meet the challenge of COVID-19 in a similar way like startups. This result can be achieved by describing the role of innovation and a SOCI strategy as helpful methods for organizations to meet the coming challenges during and after the COVID-19 epidemics. In addition to this, this paper presents a practical application of SOCI through the PANDA approach of the Fresenius University of Applied Sciences in Germany and discuss it in the context of COVID-19 as an exemplary successful real-world implementation of SOCI strategy.

Keywords: Covid-19, innovation, open innovation, startup, soci framework

Procedia PDF Downloads 204
782 Study of Incubation Centres and Its Role in Fostering Entrepreneurship in India with Special Reference to Centres Set up in IIMs/IITs

Authors: Kalpeshkumar L. Gupta, Shivali Rathore

Abstract:

India is home to over 30 crore rural poor, aware of the criticality of the situation that has made to come with an innovative business idea. Entrepreneurship in India is on the verge of explosive growth and which is actually need of an hour for employment generation, poverty elevation at grass root through developmental intervention. India economic progress has started from the development of its small and medium scale enterprises to ensure that the sectors continues to stay competitive and achieve sustained growth in the era of global economy many incubators centers has been established with the mission to give the encouragement to many innovative ideas. If we define an Incubator, it is simply an enclosed apparatus in which premature small babies are placed and which provides a controlled and protective environment for their care this gives them a chance to adjust to outside environment, and grow stronger before they face the outside world. In a similar way the startup entrepreneur’s business idea is incubated in the incubation centers. Entrepreneurship has been conventionally rated as risky career, to break the myth and to augment the supply of new entrepreneurs through education; research training the incubation centers has been established, their goal is to help create and grow young businesses by providing them with necessary support and financial and technical services. The startup companies spend on an average two years in a business incubator during which numerous benefits like funding, office space, equipment’s etc. is provided by the incubators to the startup business. Present paper will study the background, role, objectives of different incubators set up in Indian Institute of Management (IIMs) and Indian Institute of Technology (IITs) for our study.

Keywords: incubation centres, entrepreneurship, Indian Institute of Management, Indian Institute of Technology

Procedia PDF Downloads 236
781 Company's Orientation and Human Resource Management Evolution in Technological Startup Companies

Authors: Yael Livneh, Shay Tzafrir, Ilan Meshoulam

Abstract:

Technological startup companies have been recognized as bearing tremendous potential for business and economic success. However, many entrepreneurs who produce promising innovative ideas fail to implement them as successful businesses. A key argument for such failure is the entrepreneurs' lack of competence in adaptation of the relevant level of formality of human resource management (HRM). The purpose of the present research was to examine multiple antecedents and consequences of HRM formality in growing startup companies. A review of the research literature identified two central components of HRM formality: HR control and professionalism. The effect of three contextual predictors was examined. The first was an intra-organizational factor: the development level of the organization. We based on a differentiation between knowledge exploration and knowledge exploitation. At a given time, the organization chooses to focus on a specific mix of these orientations, a choice which requires an appropriate level of HRM formality, in order to efficiently overcome the challenges. It was hypothesized that the mix of orientations of knowledge exploration and knowledge exploitation would predict HRM formality. The second predictor was the personal characteristics the organization's leader. According the idea of blueprint effect of CEO's on HRM, it was hypothesized that the CEO's cognitive style would predict HRM formality. The third contextual predictor was an external organizational factor: the level of investor involvement. By using the agency theory, and based on Transaction Cost Economy, it was hypothesized that the level of investor involvement in general management and HRM would be positively related to the HRM formality. The effect of formality on trust was examined directly and indirectly by the mediation role of procedural justice. The research method included a time-lagged field study. In the first study, data was obtained using three questionnaires, each directed to a different source: CEO, HR position-holder and employees. 43 companies participated in this study. The second study was conducted approximately a year later. Data was recollected using three questionnaires by reapplying the same sample. 41 companies participated in the second study. The organizations samples included technological startup companies. Both studies included 884 respondents. The results indicated consistency between the two studies. HRM formality was predicted by the intra-organizational factor as well as the personal characteristics of the CEO, but not at all by the external organizational context. Specifically, the organizational orientations was the greatest contributor to both components of HRM formality. The cognitive style predicted formality to a lesser extent. The investor's involvement was found not to have any predictive effect on the HRM formality. The results indicated a positive contribution to trust in HRM, mainly via the mediation of procedural justice. This study contributed a new concept for technological startup company development by a mixture of organizational orientation. Practical implications indicated that the level of HRM formality should be matched to that of the company's development. This match should be challenged and adjusted periodically by referring to the organization orientation, relevant HR practices, and HR function characteristics. A relevant matching could enhance further trust and business success.

Keywords: control, formality, human resource management, organizational development, professionalism, technological startup company

Procedia PDF Downloads 238
780 Examining Procrastination and Delay among Individuals with and without Attention Deficit Hyperactivity Disorder

Authors: S. J. Taylor, S. Chowdhury, T. A. Pychyl

Abstract:

Attention Deficit Hyperactivity Disorder (ADHD) and procrastination are often discussed in relation to problems with self-regulation and executive functioning (EF). The small body of extant research that has explored the relations between these variables has many limitations particularly in terms of the samples used and the measurement of procrastination. In this study, we recruited a sample of undergraduate students with a confirmed clinical diagnosis of ADHD (n = 48, 66.7% females) as well as a sample of student volunteers without ADHD (n = 68, 75.8% females) to investigate the relations between ADHD subtypes, EF, procrastination and other forms of delay. We used the newly developed Multidimensional Measure of Academic Procrastination and Delay Questionnaire. As hypothesized, the results revealed that individuals with ADHD displayed significantly more irrational delay, general procrastination and academic procrastination compared to individuals without ADHD. This study contributed to the research literature indicating that individuals with ADHD struggle with procrastination as a result of symptoms of ADHD and EF deficits. Theses results provide support for adopting a new language when describing procrastination problems among individuals with ADHD, and they have implications for the nature of academic accommodations and interventions for individuals with ADHD.

Keywords: ADHD, delay, executive functioning, procrastination, self-regulation

Procedia PDF Downloads 172
779 Virtual Reality for Chemical Engineering Unit Operations

Authors: Swee Kun Yap, Sachin Jangam, Suraj Vasudevan

Abstract:

Experiential learning is dubbed as a highly effective way to enhance learning. Virtual reality (VR) is thus a helpful tool in providing a safe, memorable, and interactive learning environment. A class of 49 fluid mechanics students participated in starting up a pump, one of the most used equipment in the chemical industry, in VR. They experience the process in VR to familiarize themselves with the safety training and the standard operating procedure (SOP) in guided mode. Students subsequently observe their peers (in groups of 4 to 5) complete the same training. The training first brings each user through the personal protection equipment (PPE) selection, before guiding the user through a series of steps for pump startup. One of the most common feedback given by industries include the weakness of our graduates in pump design and operation. Traditional fluid mechanics is a highly theoretical module loaded with engineering equations, providing limited opportunity for visualization and operation. With VR pump, students can now learn to startup, shutdown, troubleshoot and observe the intricacies of a centrifugal pump in a safe and controlled environment, thereby bridging the gap between theory and practical application. Following the completion of the guided mode operation, students then individually complete the VR assessment for pump startup on the same day, which requires students to complete the same series of steps, without any cues given in VR to test their recollection rate. While most students miss out a few minor steps such as the checking of lubrication oil and the closing of minor drain valves before pump priming, all the students scored full marks in the PPE selection, and over 80% of the students were able to complete all the critical steps that are required to startup a pump safely. The students were subsequently tested for their recollection rate by means of an online quiz 3 weeks later, and it is again found that over 80% of the students were able to complete the critical steps in the correct order. In the survey conducted, students reported that the VR experience has been enjoyable and enriching, and 79.5% of the students voted to include VR as a positive supplementary exercise in addition to traditional teaching methods. One of the more notable feedback is the higher ease of noticing and learning from mistakes as an observer rather than as a VR participant. Thus, the cycling between being a VR participant and an observer has helped tremendously in their knowledge retention. This reinforces the positive impact VR has on learning.

Keywords: experiential learning, learning by doing, pump, unit operations, virtual reality

Procedia PDF Downloads 102
778 Success Factors and Challenges of Startup Businesses in a Crisis Context

Authors: Joanna Konstantinou

Abstract:

The study is about the challenges faced by entrepreneurs in a crisis context and in turbulent economies. The scope is to determine which factors, if any, are related to the success of a new business venture, such as innovation, access to funding and capital, enhanced digital skills, employment relations and organizational culture as well as a company’s strategic orientation towards international markets. The crisis context has been recorded to have affected the number of SMEs in the Greek economy, the number of people employed as well as the volume of the output produced. Although not all SMEs have been equally impacted by the crisis, which has been identified to affect certain sectors more than others, and although research is not exhaustive in that end, employment relations and patterns, firm’s age, and innovation practices in relation to employees’ learning curve seem to have a positive correlation with the successful survival and resilience of the firm. The aim is to identify important factors that can contribute positively to the success of a startup business, and that will allow businesses to acquire resilience and survive economic adversities, and it will focus on businesses of the Greek economy, the country with the longer lasting economic crisis and the findings will be lessons to learn for other economies.

Keywords: entrepreneurship, innovation, crisis, challenges

Procedia PDF Downloads 205