Search results for: repeat construction
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 3907

Search results for: repeat construction

3907 The Repetition of New Words and Information in Mandarin-Speaking Children: A Corpus-Based Study

Authors: Jian-Jun Gao

Abstract:

Repetition is used for a variety of functions in conversation. When young children first learn to speak, they often repeat words from the adult’s recent utterance with the learning and social function. The objective of this study was to ascertain whether the repetitions are equivalent in indicating attention to new words and the initial repeat of information in conversation. Based on the observation of naturally occurring language use in Taiwan Corpus of Child Mandarin (TCCM), the results in this study provided empirical support to the previous findings that children are more likely to repeat new words they are offered than to repeat new information. When children get older, there would be a drop in the repetition of both new words and new information.

Keywords: acquisition, corpus, mandarin, new words, new information, repetition

Procedia PDF Downloads 120
3906 CAG Repeat Polymorphism of Androgen Receptor and Female Sexual Functions in Egyptian Female Population

Authors: Azza Gaber Farag, Yasser Atta Shehata, Sara Elsayed Elghazouly, Mustafa Elsayed Elshaib, Nesreen Gamal Elden Elhelbawy

Abstract:

Background: Androgen receptor (AR) polymorphism in cytosine adenineguanine (CAG) repeat has an effect on the functional capacity of AR in males. However, little researches in this field are available regarding female sexual function. Aim: To investigate the possible link between polymorphism in the CAG repeat of AR gene and female sexual function in a sample of the Egyptian population. Materials and methods: 500 Egyptian married females completed a questionnaire regarding sociodemographic, reproductive, and sexual data. AR CAG repeat length was analyzed for those having female sexual dysfunctions (FSD) using real-time PCR. Results: The most sensitive domain to AR CAG repeat length was the orgasm domain that showed significant positive correlations with short allele (p=0.001), long allele (p=.015), biallellic mean (p=.000), and X weighted biallelic mean (p=.000). The satisfaction domain had significant positive correlations with the biallelic mean (p=.035), and the X weighted biallelic mean (p=. 032). However, the pain domain was of significant negative correlations with AR polymorphism of short allele (p=.002), biallelic mean (p=.013), and X weighted biallelic mean (p = . 011). Conclusions: AR polymorphism could represent a non-negligible aspect in female sexual function. The lower AR CAG repeat polymorphism was of significant impact on FSD, affecting mainly female orgasm followed by pain disorders that finally reflected On her sexual satisfaction.

Keywords: female sexual dysfunction, androgen receptor, CAG repeat polymorphism, androgen

Procedia PDF Downloads 147
3905 Histopathological and Microbiological Studies on Subclinical Endometritis in Repeat Breeder Cow

Authors: Mehmet Akoz

Abstract:

In this study the clinical, mikrobiological and histopathological diagnoses of subclinic and nonspecific endometritis resulting in repeat breeder. Total of 36 cows, aging between 3-9 years having normal oestrous cycles with no pregnancy following at least 3 unsuccesful inseminations, were used. Biopsy specimens for histopathological and swab for bacteri microbiological cultures were obtanied from endometrium of repeat breeders showing no macroskopic evidence of any defectiveness of genital organs and based on anamneses. Eleven out of 36 cows have positive bacteriological results. While 19 cows have varying degrees of and endometritis, the other 17 cows did not have any pathologic lesions. A total of 19 biopsies in 4 of the I. degree in endometritis, 9 of them II. degree endometritis and 6 were also III. degree endometritis was evaluated. In the majority of cows by the histopathological evaluation results (78.9%) monitored by the second and third-degree endometritis shape, in 83.3% of the isolated microorganisms were identified similar results. Histopathological and microbiological evaluation, along with clinical examination are important for the diagnoses and treatment of repeat breeders, having no resistance with well dissipation to endometrium rifaximina foam formulation was found to be more effective than PGF2α.

Keywords: repeat breeder, dairy cattle, histopathology, PGF2α, rifaximina

Procedia PDF Downloads 263
3904 Oxidative Status and Some Serum Macro Minerals during Estrus, Anestrous and Repeat Breeding in Cholistani Cattle

Authors: Farah Ali, Laeeq Akbar Lodhi, Riaz Hussain, Muhammad Sufyan

Abstract:

The present study was conducted to determine the macro mineral profile and biomarkers of oxidative stress in Cholistani cattle kept at a public farm and various villages in district Bahawalpur. For this purpose 90 blood samples were collected each from estrual, anestrous and repeat breeding cattle having different age and lactation number. Reproductive tract examination of all the cattle was carried out to determine the reproductive status. Blood samples without EDTA were collected for serum separation at day of estrus (normal cyclic), repeat breeder and anestrous cows. The serum calcium levels were significantly decreased (P<0.05) in anestrous (7.31±0.02 mg/dl) cattle as compared to estrus. However, these values were non-significantly different between repeat breeder and cattle having estrus phase. The concentrations of serum phosphorus were significantly higher (P<0.01) in normal estrual (4.99±0.08 mg/dl) as compared torepeat breeder (3.90±0.06 mg/dl) and anestrous (3.82±0.04 mg/dl) Cholistani cattle. Mean serum MDA (nmol/ml) levels of repeat breeder (2.68±0.18) and anestrous (2.54±0.22) were significantly(P<0.01) higher than the estrous (1.71±0.03) cattle. Moreover, the serum nitric oxide levels(µmol/L) were also increased significantly (P<0.01) in repeat breeder(58.28±4.01)and anestrous (61.40±9.40) than the normalestrous (31.67±6.71) cattle. The ratio of Ca: P in normal cyclic animals was lower (1.73:1) as compared to the anestrous animals (1.92:1). It can be concluded from the present study that the level of Ca: P should also be near to 1.5:1 for better reproductive performance.

Keywords: anestrus, cholistani cattle, minerals, oxidative stress, repeat breeder

Procedia PDF Downloads 570
3903 The Impact of COVID-19 on Antibiotic Prescribing in Primary Care in England: Evaluation and Risk Prediction of the Appropriateness of Type and Repeat Prescribing

Authors: Xiaomin Zhong, Alexander Pate, Ya-Ting Yang, Ali Fahmi, Darren M. Ashcroft, Ben Goldacre, Brian Mackenna, Amir Mehrkar, Sebastian C. J. Bacon, Jon Massey, Louis Fisher, Peter Inglesby, Kieran Hand, Tjeerd van Staa, Victoria Palin

Abstract:

Background: This study aimed to predict risks of potentially inappropriate antibiotic type and repeat prescribing and assess changes during COVID-19. Methods: With the approval of NHS England, we used the OpenSAFELY platform to access the TPP SystmOne electronic health record (EHR) system and selected patients prescribed antibiotics from 2019 to 2021. Multinomial logistic regression models predicted the patient’s probability of receiving an inappropriate antibiotic type or repeating the antibiotic course for each common infection. Findings: The population included 9.1 million patients with 29.2 million antibiotic prescriptions. 29.1% of prescriptions were identified as repeat prescribing. Those with same-day incident infection coded in the EHR had considerably lower rates of repeat prescribing (18.0%), and 8.6% had a potentially inappropriate type. No major changes in the rates of repeat antibiotic prescribing during COVID-19 were found. In the ten risk prediction models, good levels of calibration and moderate levels of discrimination were found. Important predictors included age, prior antibiotic prescribing, and region. Patients varied in their predicted risks. For sore throat, the range from 2.5 to 97.5th percentile was 2.7 to 23.5% (inappropriate type) and 6.0 to 27.2% (repeat prescription). For otitis externa, these numbers were 25.9 to 63.9% and 8.5 to 37.1%, respectively. Interpretation: Our study found no evidence of changes in the level of inappropriate or repeat antibiotic prescribing after the start of COVID-19. Repeat antibiotic prescribing was frequent and varied according to regional and patient characteristics. There is a need for treatment guidelines to be developed around antibiotic failure and clinicians provided with individualised patient information.

Keywords: antibiotics, infection, COVID-19 pandemic, antibiotic stewardship, primary care

Procedia PDF Downloads 78
3902 A Study on Relationships between Authenticity of Transactions, Quality of Relationships, and Transaction Performances

Authors: Chan Kwon Park, Chae-Bogk Kim, Sung-Min Park

Abstract:

This study is a research on the authenticity of transactions between corporations and quality of their relationships and transaction performances. As the factors of authenticity of transactions, honesty, transparency, customer orientation and consistency were selected; as the factors of quality of relationships, trust and commitment were selected, and as the factors of transactions performances, intention of repeat transactions and switching intention were selected, and on these relationships a hypothesis was established, and verification was conducted. First, the factors of the authenticity of transactions positively influenced the factors of quality of relationships. Thus, a higher level of authenticity of transactions can lead to higher level of trust and commitment. Second, the factors of quality of relationships made a positive influence on the intention of repeat transactions, while a negative influence in the switching intention. Third, it showed that trust and commitment as the factors of quality of relationships functioned partly as the parameter between the authenticity of transactions and transaction performances. Finally, it proved that the factors of the authenticity of transactions improved trust and commitment in transactions between corporations and further improved the intention of repeat transactions while they decreased the switching intention.

Keywords: authenticity of transactions, trust, commitment, intention of repeat transactions, switching intention

Procedia PDF Downloads 346
3901 Massively Parallel Sequencing Improved Resolution for Paternity Testing

Authors: Xueying Zhao, Ke Ma, Hui Li, Yu Cao, Fan Yang, Qingwen Xu, Wenbin Liu

Abstract:

Massively parallel sequencing (MPS) technologies allow high-throughput sequencing analyses with a relatively affordable price and have gradually been applied to forensic casework. MPS technology identifies short tandem repeat (STR) loci based on sequence so that repeat motif variation within STRs can be detected, which may help one to infer the origin of the mutation in some cases. Here, we report on one case with one three-step mismatch (D18S51) in family trios based on both capillary electrophoresis (CE) and MPS typing. The alleles of the alleged father (AF) are [AGAA]₁₇AGAG[AGAA]₃ and [AGAA]₁₅. The mother’s alleles are [AGAA]₁₉ and [AGAA]₉AGGA[AGAA]₃. The questioned child’s (QC) alleles are [AGAA]₁₉ and [AGAA]₁₂. Given that the sequence variants in repeat regions of AF and mother are not observed in QC’s alleles, the QC’s allele [AGAA]₁₂ was likely inherited from the AF’s allele [AGAA]₁₅ by loss of three repeat [AGAA]. Besides, two new alleles of D18S51 in this study, [AGAA]₁₇AGAG[AGAA]₃ and [AGAA]₉AGGA[AGAA]₃, have not been reported before. All the results in this study were verified using Sanger-type sequencing. In summary, the MPS typing method can offer valuable information for forensic genetics research and play a promising role in paternity testing.

Keywords: family trios analysis, forensic casework, ion torrent personal genome machine (PGM), massively parallel sequencing (MPS)

Procedia PDF Downloads 277
3900 The Associations of Family Support with Sexual Behaviour and Repeat Induced Abortion among Chinese Adolescents

Authors: Jiashu Shen

Abstract:

Background: The abortion rate has increased significantly, which is harmful especially to adolescents, making repeat induced abortion (RIA) among adolescents a social problem. This study aims to investigate the associations of family support with sexual behavior and repeat induced abortion among Chinese adolescents Methods: This study based on a national hospital-based sample with 945 girls aged 15-19 who underwent induced abortion in 43 hospitals. Multivariate logistic regressions were performed to estimated odds ratio for the risk factors. Results: Adolescences living with parents were less inclined to undergo RIA, especially if they were rural (adjusted odds ratio=0.48 95%CI 0.31-0.72) and local (adjusted odds ratio =0.39 95%=0.23-0.66). Those with parental financial support were likely to have less sexual partnersand take contraceptives more regularly. Those with higher self-perceived importance in family were more likely to take contraceptives during the first sexual intercourse in higher age, and with higher first abortion age and less sexual partners. Conclusion: In mainland China, living with parents, parental financial support, high self-perceived importance in family and adequate family sexuality communications may contribute to lower incidence of RIA.

Keywords: Chinese adolescent, family support, repeat induced abortion, sexual behavior

Procedia PDF Downloads 88
3899 Signaling of Leucine-Rich-Repeat Receptor-Like Kinases in Higher Plants

Authors: Man-Ho Oh

Abstract:

Membrane localized Leucine-Rich-Repeat Receptor-Like Kinases (LRR-RLKs) play crucial roles in plant growth and abiotic/biotic stress responses in higher plants including Arabidopsis and Brassica species. Among several Receptor-Like Kinases (RLKs), Leucine-Rich-Repeat Receptor-Like-Kinases (LRR-RLKs) are the major group of genes that play crucial roles related to growth, development and stress conditions in plant system. Since it is involved in several functional roles, it seems to be very important to investigate their roles in higher plants. We are particularly interested in brassinosteroid (BR) signaling, which is mediated by the BRASSINOSTEROID INSENSITIVE 1 (BRI1) receptor kinase and its co-receptor, BRI1-ASSOCIATED KINASE 1 (BAK1). Autophosphorylation of receptor kinases is recognized to be an important process in activation of signaling in higher plants. Although the plant receptors are generally classified as Ser/Thr protein kinases, many other receptor kinases including BRI1 and BAK1 are shown to autophosphorylate on Tyr residues in addition to Ser/Thr. As an interesting result, we determined that several 14-3-3 regulatory proteins bind to BRI1-CD and are phosphorylated by several receptor kinases in vitro, suggesting that BRI1 is critical for diverse signaling.

Keywords: autophosphorylation, brassinosteroid, BRASSINOSTEROID INSENSITIVE 1, BRI1-ASSOCIATED KINASE 1, Leucine-Rich-Repeat Receptor-Like Kinases (LRR-RLKs)

Procedia PDF Downloads 196
3898 Effect of Pre-Construction on Construction Schedule and Client Loyalty

Authors: Jong Hoon Kim, Hyun-Soo Lee, Moonseo Park, Min Jeong, Inbeom Lee

Abstract:

Pre-construction is essential in achieving the success of a construction project. Due to the early involvement of project participants in the construction phase, project managers are able to plan ahead and solve issues well in advance leading to the success of the project and the satisfaction of the client. This research utilizes quantitative data derived from construction management projects in order to identify the relationship between pre-construction, construction schedule, and client satisfaction. A total of 65 construction projects and 93 clients were investigated for this research in an attempt to identify (a) the relationship between pre-construction and schedule reduction, and (b) pre-construction and client loyalty. Based on the quantitative analysis, this research was able to establish a negative correlation based on 65 construction projects between pre-construction and project schedule existed. This finding represents that the more pre-construction is performed for a certain project, the overall construction schedule decreased. Then, to determine the relationship between pre-construction and client satisfaction, Net Promoter Score (NPS) of 93 clients from the 65 projects was utilized. Pre-construction and NPS was further analyzed and a positive correlation was found between the two. This infers that clients tend to be more satisfied with projects with higher ratio of pre-construction than those projects with less pre-construction.

Keywords: client loyalty, NPS, pre-construction, schedule reduction

Procedia PDF Downloads 329
3897 The Expression of a Novel Gene Encoding an Ankyrin-Repeat Protein, DRA1, Is Regulated by Drought-Responsive Alternative Splicing

Authors: H. Sakamoto, Y. Nakagawara, S. Oguri

Abstract:

Drought stress is a critical environmental factor that adversely affects crop productivity and quality. Because of their immobile nature, plants have evolved mechanisms to sense and respond to drought stress. We identified a novel locus of Arabidopsis, designated DRA1 (drought responsive ankyrin 1), whose disruption leads to increased drought stress tolerance. DRA1 encodes a transmembrane protein with an ankyrin repeat motif that has been implicated in diverse cellular processes such as signal transduction. RT-PCR analysis revealed that there were at least two splicing variants of DRA1 transcripts in wild type plants. In response to drought stress, the levels of DRA1 transcripts retaining second and third introns were increased, whereas these introns were removed under unstressed conditions. These results suggest that DRA1 protein may negatively regulate plant drought tolerance and that the expression of DRA1 is regulated in response to drought stress by alternative splicing.

Keywords: alternative splicing, ankyrin repeat, Arabidopsis, drought tolerance

Procedia PDF Downloads 291
3896 Construction Quality Perception of Construction Professionals and Their Expectations from a Quality Improvement Technique in Pakistan

Authors: Muhammad Yousaf Sadiq

Abstract:

The complexity arises in defining the construction quality due to its perception, based on inherent market conditions and their requirements, the diversified stakeholders itself and their desired output. An quantitative survey based approach was adopted in this constructive study. A questionnaire-based survey was conducted for the assessment of construction Quality perception and expectations in the context of quality improvement technique. The survey feedback of professionals of the leading construction organizations/companies of Pakistan construction industry were analyzed. The financial capacity, organizational structure, and construction experience of the construction firms formed basis for their selection. The quality perception was found to be project-scope-oriented and considered as an excess cost for a construction project. Any quality improvement technique was expected to maximize the profit for the employer, by improving the productivity in a construction project. The study is beneficial for the construction professionals to assess the prevailing construction quality perception and the expectations from implementation of any quality improvement technique in construction projects.

Keywords: construction quality, expectation, improvement, perception

Procedia PDF Downloads 443
3895 Lean Implementation Analysis on the Safety Performance of Construction Projects in the Philippines

Authors: Kim Lindsay F. Restua, Jeehan Kyra A. Rivero, Joneka Myles D. Taguba

Abstract:

Lean construction is defined as an approach in construction with the purpose of reducing waste in the process without compromising the value of the project. There are numerous lean construction tools that are applied in the construction process, which maximizes the efficiency of work and satisfaction of customers while minimizing waste. However, the complexity and differences of construction projects cause a rise in challenges on achieving the lean benefits construction can give, such as improvement in safety performance. The objective of this study is to determine the relationship between lean construction tools and their effects on safety performance. The relationship between construction tools applied in construction and safety performance is identified through Logistic Regression Analysis, and Correlation Analysis was conducted thereafter. Based on the findings, it was concluded that almost 60% of the factors listed in the study, which are different tools and effects of lean construction, were determined to have a significant relationship with the level of safety in construction projects.

Keywords: correlation analysis, lean construction tools, lean construction, logistic regression analysis, risk management, safety

Procedia PDF Downloads 147
3894 Study of Management of Waste Construction Materials in Civil Engineering Projects

Authors: Jalindar R. Patil, Harish P. Gayakwad

Abstract:

The increased economic growth across the globe as well as urbanization in developing countries have led into extensive construction activities that generate large amounts of wastes. Material wastage in construction projects resulted into huge financial setbacks to builders and contractors. In addition to this, it may also cause significant effects over aesthetics, health, and the general environment. However in many cities across the globe where construction wastes material management is still a problem. In this paper, the discussion is all about the method for the management of waste construction materials. The objectives of this seminar are to identify the significant source of construction waste globally, to improve the performance of by extracting the major barriers construction waste management and to determine the cost impact on the construction project. These wastes needs to be managed as well as their impacts needs to be ascertained to pave way for their proper management. The seminar includes the details of construction waste management with the reference to construction project. The application of construction waste management in the civil engineering projects is to describe the reduction in the construction wastes.

Keywords: civil engineering, construction materials, waste management, construction activities

Procedia PDF Downloads 483
3893 Green Construction in EGYPT

Authors: Hanan A. Anwar

Abstract:

This paper introduces green building construction in Egypt with different concepts and practices. The following study includes green building applied definition, guidelines, regulations and Standards. Evaluation of cost/benefit of green construction methods and green construction rating systems are presented. Relevant case studies will be reviewed. Four sites will be included.

Keywords: green construction, ecofreindly, self-sufficient town, carbon neutral atmosphere

Procedia PDF Downloads 620
3892 The Effect of Artificial Intelligence on Construction Development

Authors: Shady Gamal Aziz Shehata

Abstract:

Difficulty in defining construction quality arises due to perception based on the nature and requirements of the market, the different partners themselves and the results they want. Quantitative research was used in this constructivist research. A case-based study was conducted to assess the structures of positive attitudes and expectations in the context of quality improvement. A survey based on expert opinions was analyzed among construction organizations/companies operating in the construction industry in Pakistan. The financial strength, management structure and construction experience of the construction companies formed the basis of their selection. A good concept is visible at the project level and is seen as the most valuable part of the construction project. Each quality improvement technique was expected to increase the user's profits by improving the efficiency of the construction project. The Survey is useful for construction professionals to evaluate current construction concepts and expectations for the application of quality improvement techniques in construction projects.

Keywords: correlation analysis, lean construction tools, lean construction, logistic regression analysis, risk management, safety construction quality, expectation, improvement, perception

Procedia PDF Downloads 20
3891 Application of Mobile Aluminium Light Structure Housing System in Sustainable Building Process

Authors: Wang Haining, Zhang Hong

Abstract:

In China, rapid urbanization needs more and more buildings constructed for the growing population in cities. With the help of the methodology which contains investigation, contrastive analysis, design based on component with BIM and experiment before real construction, this research based on mobile light structure system, trying to the sustainable problems partly in present China by systematic study. The system cannot replace the permanent heavy structure completely. So the goal is the improvement of the whole building system by the addition of light structure. This house system uses modularized envelopes and standardized connections, which are pre-fabricated and assembled in factories and transported like containers. Aluminum is used as the structural material in this system, and inorganic thermal insulation material used in the envelope, which have high fireproof properties. The relationship between manufactory and construction of the system is progressive hierarchy. They exist as First Industrial, Second Industrial, Third Industrial and Site Assembly Stage. It could maximize the land usage capacity by fully exploit the area where normal permanent architecture can't take advantage of. Not only the building system itself especially the thermal isolated materials used and active solar photovoltaic system equipped can save energy, but also the way of product development is sustainable.

Keywords: aluminum house, light Structure, rapid assembly, repeat construction

Procedia PDF Downloads 455
3890 Differentiation of Customer Types by Stereotypical Characteristics for Modular and Conventional Construction Methods

Authors: Peter Schnell, Phillip Haag

Abstract:

In the course of the structural transformation of the construction industry, the integration of industrialization and digitization has led to the development of construction methods with an increased degree of prefabrication, such as system or modular construction. Compared to conventional construction, these innovative construction methods are characterized by modified structural and procedural properties and expand the range of construction services. Faced with the supply side, it is possible to identify construction-specific customer types with different characteristics and certain preferences as far as the choice of construction method is concerned. The basis for this finding was qualitative expert interviews. By evaluating the stereotypical customer needs, a corresponding segmentation of the demand side can be made along with the basic orientation and decision behavior. This demarcation supports the target- and needs-oriented customer approach and contributes to cooperative and successful project management.

Keywords: differentiation of customer types, modular construction methods, conventional construction methods, stereotypical customer types

Procedia PDF Downloads 83
3889 A Study on Occupational Injuries among Building Construction Workers in Bhubaneswar City Odisha

Authors: Rahul Pal

Abstract:

In India, construction industry plays a vital role in the development of infrastructures. It is one of the most hazardous industries. Construction workers are a group that is particularly vulnerable to health risks because they have few legal protection. India has the world’s highest accident rate among construction workers. This study aimed to investigate the prevalence of occupation injury among construction workers and to find out the factors responsible for such injuries. Methodology: A cross-sectional study using a semi-structured questionnaire among 305 construction workers in Bhubaneswar city. In this study, it was found that the overall prevalence of injury was 43.28% in the previous one year period. Majority of the construction workers were less experience in the construction work. Factors responsible for injuries are fall of the object followed by striking, and majority of the workers reported their injuries to have occurred in the summer season. And most of the construction workers are not using personal protective equipment (PPE). Conclusion: Given the occupational injuries, the majority of the construction workers are injured in this study; there is a need to address this issue to ensure necessary step for the safety and well-being of construction workers.

Keywords: construction, construction workers, occupational injuries, personal protective equipment

Procedia PDF Downloads 172
3888 The Challenges for Engineers to Change the Construction Method in Brazil

Authors: Yuri B. Cesarino, Vinícius R. Domingues, Darym J. F. Campos

Abstract:

Developing countries have some restrains towards the adoption of new technologies and construction methods. Some nations, such as Brazil, still use conventional construction methodologies, knowing its lesser cost-effectiveness. This research has been conducted to demonstrate how industrialized construction methods should be implemented in Brazil, especially in times of need. Using the common sense among different authors with different perspectives, it is clear that the second method is more suitable for construction development because of its great advantages. However, it is unlikely for this process to be adopted in the country as a result of several social-economic restraints. Nonetheless, Brazilian engineers have a major challenge ahead of them, and it will take more than creativity to solve such an issue.

Keywords: Brazilian engineers, construction methods, industrialized construction, infrastructure

Procedia PDF Downloads 256
3887 Efficient Management of Construction Logistics: A Challenge to Both Conventional and Technological Systems in the Developing Nations

Authors: Nuruddeen Usman, Ahmad Muhammad Ibrahim

Abstract:

Management of construction logistics at construction sites becomes increasingly complex with rising construction volume, which made it relatively inefficient in the developing nations even with the technological advancement. The objective of this research is to conceptually synthesise the approaches and challenges befall in the course of construction logistic management, with the aim to proffer possible solution to it. Therefore, this study appraised the glitches associated with both conventional and technological methods of construction logistic management that result in its inefficiency. Thus, this investigation found that, both conventional and the technological issues were due to certain obstacles that affect the construction logistic management which resulted into delays, accidents, fraudulent activities, time and cost overrun. Therefore, this study has developed a framework that might bring a lasting solution to the challenges of construction logistic management.

Keywords: construction, conventional, logistic, technological

Procedia PDF Downloads 518
3886 A Probability Analysis of Construction Project Schedule Using Risk Management Tool

Authors: A. L. Agarwal, D. A. Mahajan

Abstract:

Construction industry tumbled along with other industry/sectors during recent economic crash. Construction business could not regain thereafter and still pass through slowdown phase, resulted many real estate as well as infrastructure projects not completed on schedule and within budget. There are many theories, tools, techniques with software packages available in the market to analyze construction schedule. This study focuses on the construction project schedule and uncertainties associated with construction activities. The infrastructure construction project has been considered for the analysis of uncertainty on project activities affecting project duration and analysis is done using @RISK software. Different simulation results arising from three probability distribution functions are compiled to benefit construction project managers to plan more realistic schedule of various construction activities as well as project completion to document in the contract and avoid compensations or claims arising out of missing the planned schedule.

Keywords: construction project, distributions, project schedule, uncertainty

Procedia PDF Downloads 309
3885 A Review of the Factors Causing Cost Overrun in Construction Projects in Malaysia

Authors: Kaleem Ullah, Abd Halid Bin Abdullah

Abstract:

This study examines previous literature on cost overrun in construction projects with the specific aim of determining the frequently observed causes of cost overruns in Malaysian construction projects. Cost overrun is one of the major problems in construction projects. Cost overrun is frequently observed in almost every construction projects. This cost overrun in construction projects occurs due to various reasons and many researchers have carried out various studies to identify the cause factors of this issue. The causes of construction cost overrun could vary from country to country because of the difference in political, economic, social and environmental conditions. Likewise, other countries construction projects in Malaysia have also the issue of cost overrun. The concept of cost overrun in construction projects has attracted much attention in recent years and researches are trying to understand the causes of these overruns and their effects to the construction industry as whole. This paper review various research studies carried out in Malaysia which surveyed the cost performance and cause factors of cost overruns in construction projects in Malaysia.

Keywords: cause of cost overrun, cost overrun, construction industry in Malaysia, effects of cost overrun

Procedia PDF Downloads 252
3884 BIM Model and Virtual Prototyping in Construction Management

Authors: Samar Alkindy

Abstract:

Purpose: The BIM model has been used to support the planning of different construction projects in the industry by showing the different stages of the construction process. The model has been instrumental in identifying some of the common errors in the construction process through the spatial arrangement. The continuous use of the BIM model in the construction industry has resulted in various radical changes such as virtual prototyping. Construction virtual prototyping is a highly advanced technology that incorporates a BIM model with realistic graphical simulations, and facilitates the simulation of the project before a product is built in the factory. The paper presents virtual prototyping in the construction industry by examining its application, challenges and benefits to a construction project. Methodology approach: A case study was conducted for this study in four major construction projects, which incorporate virtual construction prototyping in several stages of the construction project. Furthermore, there was the administration of interviews with the project manager and engineer and the planning manager. Findings: Data collected from the methodological approach shows a positive response for virtual construction prototyping in construction, especially concerning communication and visualization. Furthermore, the use of virtual prototyping has increased collaboration and efficiency between construction experts handling a project. During the planning stage, virtual prototyping has increased accuracy, reduced planning time, and reduced the amount of rework during the implementation stage. Irrespective of virtual prototyping being a new concept in the construction industry, the findings outline that the approach will benefit the management of construction projects.

Keywords: construction operations, construction planning, process simulation, virtual prototyping

Procedia PDF Downloads 199
3883 Determinants of Repeated Abortion among Women of Reproductive Age Attending Health Facilities in Northern Ethiopia: A Case-Control Study

Authors: Henok Yebyo Henok, Araya Abrha Araya, Alemayehu Bayray Alemayehu, Gelila Goba Gelila

Abstract:

Background: Every year, an estimated 19–20 million unsafe abortions take place, almost all in developing countries, leading to 68,000 deaths and millions more injured many permanently. Many women throughout the world, experience more than one abortion in their lifetimes. Repeat abortion is an indicator of the larger problem of unintended pregnancy. This study aimed to identify determinants of repeat abortion in Tigray Region, Ethiopia. Methods: Unmatched case-control study was conducted in hospitals in Tigray Region, Northern Ethiopia, from November 2014 to June 2015. The sample included 105 cases and 204 controls, recruited from among women seeking abortion care at public hospitals. Clients having two or more abortions (“repeat abortion”) were taken as cases, and those who had a total of one abortion were taken as controls (“single abortion”). Cases were selected consecutive based on proportional to size allocation while systematic sampling was employed for controls. Data were analyzed using SPSS version 20.0. Binary and multiple variable logistic regression analyses were calculated with 95% CI. Results: Mean age of cases was 24 years (±6.85) and 22 years (±6.25) for controls. 79.0% of cases had their sexual debut in less than 18 years of age compared to 57% of controls. 42.2% of controls and 23.8% of cases cited rape as the reason for having an abortion. Study participants who did not understand their fertility cycle and when they were most likely to conceive after menstruation (adjusted odds ratio [AOR]=2.0, 95% confidence interval [CI]: 1.1-3.7), having a previous abortion using medication(AOR=3.3, CI: 1.83, 6.11), having multiple sexual partners in the preceding 12 months (AOR=4.4, CI: 2.39,8.45), perceiving that the abortion procedure is not painful (AOR=2.3, CI: 1.31,4.26), initiating sexual intercourse before the age of 18 years (AOR=2.7, CI: 1.49, 5.23) and disclosure to a third-party about terminating the pregnancy (AOR=2.1, CI: 1.2,3.83) were independent predictors of repeat abortion. Conclusion: This study identified several factors correlated with women having repeat abortions. It may be helpful for the Government of Ethiopia to encourage women to delay sexual debut and decrease their number of sexual partners, including by promoting discussion within families about sexuality, to decrease the occurrence of repeated abortion.

Keywords: abortion, Ethiopia, repeated abortion, single abortion

Procedia PDF Downloads 244
3882 Construction 4.0: The Future of the Construction Industry in South Africa

Authors: Temidayo. O. Osunsanmi, Clinton Aigbavboa, Ayodeji Oke

Abstract:

The construction industry is a renowned latecomer to the efficiency offered by the adoption of information technology. Whereas, the banking, manufacturing, retailing industries have keyed into the future by using digitization and information technology as a new approach for ensuring competitive gain and efficiency. The construction industry has yet to fully realize similar benefits because the adoption of ICT is still at the infancy stage with a major concentration on the use of software. Thus, this study evaluates the awareness and readiness of construction professionals towards embracing a full digitalization of the construction industry using construction 4.0. The term ‘construction 4.0’ was coined from the industry 4.0 concept which is regarded as the fourth industrial revolution that originated from Germany. A questionnaire was utilized for sourcing data distributed to practicing construction professionals through a convenience sampling method. Using SPSS v24, the hypotheses posed were tested with the Mann Whitney test. The result revealed that there are no differences between the consulting and contracting organizations on the readiness for adopting construction 4.0 concepts in the construction industry. Using factor analysis, the study discovers that adopting construction 4.0 will improve the performance of the construction industry regarding cost and time savings and also create sustainable buildings. In conclusion, the study determined that construction professionals have a low awareness towards construction 4.0 concepts. The study recommends an increase in awareness of construction 4.0 concepts through seminars, workshops and training, while construction professionals should take hold of the benefits of adopting construction 4.0 concepts. The study contributes to the roadmap for the implementation of construction industry 4.0 concepts in the South African construction industry.

Keywords: building information technology, Construction 4.0, Industry 4.0, smart site

Procedia PDF Downloads 363
3881 Causes of Construction Delays in Qatar Construction Projects

Authors: Murat Gunduz, Mohanad H. A. AbuHassan

Abstract:

Construction industry mainly focuses on the superstructure, infrastructure, and oil and gas industry. The development of infrastructure projects in developing countries attracted a lot of foreign construction contractors, consultants, suppliers and diversified workforce to interfere and to be evolved in such huge investment. Reducing worksite delays in such projects require knowledge and attention. Therefore, it is important to identify the influencing delay attributes affecting construction projects. The significant project factors affecting construction delays were investigated. Data collection was carried out through an online web survey system to capture significant factors. Significant factors were determined with importance index and relevant recommendations are made. The output of the data analysis would lead the industry experts better assess the impact of construction delays on construction projects.

Keywords: construction industry, delays, importance index, frequency index

Procedia PDF Downloads 316
3880 Genetic Characterization of Barley Genotypes via Inter-Simple Sequence Repeat

Authors: Mustafa Yorgancılar, Emine Atalay, Necdet Akgün, Ali Topal

Abstract:

In this study, polymerase chain reaction based Inter-simple sequence repeat (ISSR) from DNA fingerprinting techniques were used to investigate the genetic relationships among barley crossbreed genotypes in Turkey. It is important that selection based on the genetic base in breeding programs via ISSR, in terms of breeding time. 14 ISSR primers generated a total of 97 bands, of which 81 (83.35%) were polymorphic. The highest total resolution power (RP) value was obtained from the F2 (0.53) and M16 (0.51) primers. According to the ISSR result, the genetic similarity index changed between 0.64–095; Lane 3 with Line 6 genotypes were the closest, while Line 36 were the most distant ones. The ISSR markers were found to be promising for assessing genetic diversity in barley crossbreed genotypes.

Keywords: barley, crossbreed, genetic similarity, ISSR

Procedia PDF Downloads 313
3879 Assessing Indicators, Challenges and Benefits of Sustainable Procurement in Construction Projects

Authors: Taha Anjamrooz, Sareh Rajabi, Salwa Bheiry

Abstract:

Procurement is a key process in construction project management. The present construction procurement practices have been extensively analyzed for disregarding sustainability in the project life cycle. Currently, there is a gap of information on status-quo of sustainable procurement in construction field. Thus, the aim of this study is to review sustainable procurement practices in the construction field. Disregard of three sustainability pillars is one of the major drawbacks of present construction procurement practices. Sustainable procurement is a developing idea that can enhance procurement practices and improve the sustainability performance of the construction projects. At present, sustainable procurement is still not entirely used in the construction projects. A comprehensive literature review indicated that the construction industry is still not entirely informed about the benefits and challenges of using sustainable procurement, and about important indicators that play major impacts on those benefits and challenges. This study assesses the major indicator, benefits and challenges encountered in applying sustainable procurement in the construction industry. In addition, this study investigates understanding of construction professionals on the benefits and challenges of utilizing sustainable procurement for construction projects through selected indicators that are categorized according to society and community needs.

Keywords: sustainability, sustainable development, sustainable procurement, procurement, construction industry

Procedia PDF Downloads 152
3878 Production and Recycling of Construction and Demolition Waste

Authors: Vladimira Vytlacilova

Abstract:

Recycling of construction and demolition waste (C&DW) and their new reuse in structures is one of the solutions of environmental problems. Construction and demolition waste creates a major portion of total solid waste production in the world and most of it is used in landfills all the time. The paper deals with the situation of the recycling of the building and demolition waste in the Czech Republic during the recent years. The paper is dealing with questions of C&D waste recycling, it also characterizes construction and demolition waste in general, furthermore it analyses production of construction waste and subsequent production of recycled materials.

Keywords: Recycling, Construction and demolition waste, Recycled rubble, Waste management

Procedia PDF Downloads 274