Search results for: public/private projects
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 8091

Search results for: public/private projects

8031 Analyzing Competition in Public Construction Projects

Authors: Khaled Hesham Hyari, Amjad Almani

Abstract:

Construction projects in the public sector are commonly awarded through competitive bidding. In the last decade, the Construction projects environment in the Middle East went through many changes. These changes have been caused by different factors including the economic crisis, delays in monthly payments, international competition and reduced number of projects. These factors had a great impact on the bidding behaviors of contractors and their pricing strategies. This paper examines the competition characteristics in public construction projects through an analysis of bidding results of contractors in public construction projects over a period of 6 years (2006-2011) in Jordan. The analyzed projects include all categories of projects such as infrastructure, buildings, transportation and engineering services (design and supervision contracts). Data for the projects were obtained from the General Tender’s Directorate in Jordan and includes 462 projects. The analysis performed in this projects includes, studying the bid spread in all projects as it is an indication of the level of competition in the analyzed bids. The analysis studied the factors that affect bid spread such as number of bidders, Value of the project, Project category and years. It also studying the “Signal to Noise Ratio” in all projects as it is an indication of the accuracy of cost estimating performed by competing bidders and bidder´s evaluation of project risks. The analysis performed includes the relationship between signal to noise ratio and different parameters such as project category, number of bidders and changes over years. Moreover, the analysis includes determining the bidder´s aggressiveness in bidding as it is an indication of competition level in such projects. This was performed by determining the pack price which can be considered as the true value of the project and comparing it with the lowest bid submitted for each project to determine the level of aggressiveness in submitted bids. The analysis performed in this project should prove to be useful to owners in understanding bidding behaviors of contractors and pointing out areas that needs improvement in preparing bidding documents. Also the project should be useful to contractors in understanding the competitive bidding environment and should help them to improve their bidding strategies to maximize the success rate in obtaining contracts.

Keywords: construction projects, competitive bidding, public construction, competition

Procedia PDF Downloads 304
8030 Mechanisms for Strategic Adoption of Innovation Procurement

Authors: Carolina B. A. Morais, Antonio Bob Santos

Abstract:

In order to determine how innovation procurement can strengthen public efficiency and foster the modernization of public services, while at the same time promoting the opening of new private markets, this paper aims to present the two key instruments for the practice of innovation procurement at a European, national, and regional level – Pre-Commercial Procurement (PCP), and Public Procurement of Innovative Solutions (PPI). Thus, it starts with a theoretical framework on the emergence of this topic in the European Innovation Policy (Section 2), then continues with the identification and systematization of the main mechanisms for its effective adoption, both on the demand and supply side of the market (Section 3), as well as to expose and describe methods and tools for positioning innovation at the heart of public entities. The innovative projects best distinguished by the European Commission for their good practices in innovation procurement are identified, and the main methodology for the development and management of innovation procurement – Forward Commitment Procurement (FCP) – is applied to them in a pioneering way (Section 4). The relevance of innovation in public procurement is systematized and reflected upon in Section 5.

Keywords: innovation procurement, innovation policy, innovation, pubic procurement

Procedia PDF Downloads 74
8029 Intra and International Collaborations as Important Factors of Organisational Innovation of Government Agencies in STI Ecosystem in ASEAN

Authors: Salinthip Thipayang, Achara Chandrachai, Rath Pichyangkura, Sukree Sinthupinyo

Abstract:

Most of the well-known frameworks and tools to measure and compare organisational innovation of the public or government agencies have been designed and used in the developed economies such as the EU, Nordic Region, Australia, and South Korea. This project is one of the very first attempts to develop a measurement tool to adequately measure the organisational (administrative) innovation of the government agencies in the developing economies in ASEAN. New measurement framework with the components including the intra and international collaborations of these government agencies to other private, public and academic sectors were added to the proposed measurement framework. Questionnaires and in-depth interviews with the experts and the middle to top executives of the participating public agencies in the ASEAN member states were conducted to determine the suitability and develop the indicators that should be included in the measurement model. The results showed that intra and international collaborations of these government organisations to other agencies in the public, private and academic sectors can lead to new changes and greatly impact the ways in which these government agencies in the ASEAN STI ecosystem are operated and administered. Government organisations in less developing countries in ASEAN are ready and willing to learn from their counterparts in other more advanced countries and adjust their internal management to be more innovative and to better handle international collaborative projects and commitments.

Keywords: organisational innovation, administrative innovation, government agencies, public agencies, ASEAN science technology and innovation ecosystem, international collaborations

Procedia PDF Downloads 353
8028 Impact of Sovereign Debt Risk and Corrective Austerity Measures on Private Sector Borrowing Cost in Euro Zone

Authors: Syed Noaman Shah

Abstract:

The current paper evaluates the effect of external public debt risk on the borrowing cost of private non-financial firms in euro zone. Further, the study also treats the impact of austerity measures on syndicated-loan spreads of private firm followed by euro area member states to revive the economic growth in the region. To test these hypotheses, we follow multivariate ordinary least square estimation method to assess the effect of external public debt on the borrowing cost of private firms. By using foreign syndicated-loan issuance data of non-financial private firms from 2005 to 2011, we attempt to gauge how the private financing cost varies with high levels of sovereign external debt prevalent in the euro zone. Our results suggest significant effect of external public debt on the borrowing cost of private firm. In particular, an increase in external public debt by one standard deviation from its sample mean raises syndicated-loan spread by 89 bps. Furthermore, weak creditor rights protection prevalent in member states deepens this effect. However, we do not find any significant effect of domestic public debt on the private sector borrowing cost. In addition, the results show significant effect of austerity measures on private financing cost, both in normal and in crisis period in the euro zone. In particular, one standard deviation change in fiscal consolidation conditional mean reduces the syndicated-loan spread by 22 bps. In turn, it indicates strong presence of credibility channel due to austerity measures in euro area region.

Keywords: corporate debt, fiscal consolidation, sovereign debt, syndicated-loan spread

Procedia PDF Downloads 376
8027 A Study on Websites of Public and Private Hospitals in Konya

Authors: H. Nur Görkemli, Mehmet Fidan

Abstract:

After the first acquaintance with internet in April 1993, number of internet users increased rapidly in Turkey. According to Turkish Statistical Institute’s 2013 data, internet usage in Turkey between 16-74 age group is 48,9%. Hospitals are one of the areas where internet is being intensively used like many other businesses. As a part of public relations application, websites are important tools for hospitals to reach a wide range of target audience within and outside the organization. With their websites, hospitals have opportunities to give information about their organization, strengthen their image, compete with their rivals, interact with shareholders, reflect their transparency and meet with new audiences. This study examines web sites of totally 31 hospitals which are located in Konya. Institutions are categorized as public and private hospitals and then three main research categories are determined: content, visual and technical. Main and sub categories are examined by using content analysis method. Results are interpreted in terms of public and private institutions.

Keywords: websites, hospital, health communication, internet, webpages

Procedia PDF Downloads 351
8026 Thailand’s Education Cooperation with Neighboring Countries: The Key Factors to Strengthen the “Soft Power” Relationship

Authors: Rungrot Trongsakul

Abstract:

This paper was aimed to study the model of education cooperation during Thailand and neighbor countries, especially the countries which the territory-cohesion border with Thailand used “Soft Power” to enhance the good relationship. This research employed qualitative method, analyzed and synthesized the content of cooperation projects, policies, laws, relevant theories, relevant research papers and documents and used SWOT analysis. The research findings revealed that Thailand’s education cooperation projects with neighbor countries had two characteristics: 1) education cooperation projects/programs were a part in economic cooperation projects, and 2) there were directly education cooperation projects. The suggested education cooperation model was based on the concept of “Soft Power”, thus the determination of action plans or projects as key factors of public and private organizations should be based on sincere participation among people, communities and relevant organizations of the neighbor countries. Adoption of education-cultural exchange, learning and sharing process is a key to strengthen good relationship of the countries’ cooperation. The roles of education in this included sharing and acceptance of culture and local wisdom, human resource development, knowledge management, integration and networking building could enhance relationship between agents of related organizations of Thailand and neighbors countries.

Keywords: education, soft-power, relationship, cooperation, Thailand neighboring countries

Procedia PDF Downloads 333
8025 Activity-Based Safety Assessment of Real Estate Projects in Western India

Authors: Patel Parul, Harsh Ganvit

Abstract:

The construction industry is the second highest industry after agriculture provides employment in India. In developing countries like India, many construction projects are coming up to meet the demand. On the one hand, construction projects are increasing; on the other hand still, construction companies are struggling with many problems. One of the major problems is to ensure safe working conditions at the construction site. Due to a lack of safety awareness and ignorance of safety aspects, many fatal accidents are very common at the construction site in India. One of the key success factors for construction projects is “Accident-Free Construction Projects”. The construction projects can be divided into various categories like Infrastructure projects, industrial construction and real estate construction. Real estate projects are mainly comprised of commercial and residential projects. In the construction industry, private sectors play a huge role in urban and rural development and also contribute significantly to the growth of the nation. Infrastructure and Industrial projects are mainly executed by well-qualified construction contractors. For such projects, ensuring safety at construction projects is inevitable and probably one of the major clauses of contract documents as well. These projects are monitored from time to time by national agencies and researchers, too. However, Real estate projects are rarely monitored for safety aspects. No systematic contract system is followed for these projects. Safety is the most neglected aspect of these projects. In the current research projects, an attempt is made to carry out safety auditing for about 75 real estate projects. The objective of this work is to collect the activity-based safety survey of real estate projects in western India. The analysis of activity-based safety implementation for real estate projects is discussed in the present work. The activities are divided into three categories based on the data collected. The findings of this work will help local monitoring authorities to implement a safety management plan for real estate projects.

Keywords: construction safety, safety assessment, activity-based safety, real estate projects

Procedia PDF Downloads 25
8024 Use of Corporate Social Responsibility in Environmental Protection: Modern Mechanisms of Environmental Self-Regulation

Authors: Jakub Stelina, Janina Ciechanowicz-McLean

Abstract:

Fifty years of existence and development of international environmental law brought a deep disappointment with efficiency and effectiveness of traditional command and control mechanisms of environmental regulation. Agenda 21 agreed during the first Earth Summit in Rio de Janeiro 1992 was one of the first international documents, which explicitly underlined the importance of public participation in environmental protection. This participation includes also the initiatives undertaken by business corporations in the form of private environmental standards setting. Twenty years later during the Rio 20+ Earth Summit the private sector obligations undertaken during the negotiations have proven to be at least as important as the ones undertaken by the governments. The private sector has taken the leading role in environmental standard setting. Among the research methods used in the article two are crucial in the analysis. The comparative analysis of law is the instrument used in the article to analyse the practice of states and private business companies in the field of sustainable development. The article uses economic analysis of law to estimate the costs and benefits of Corporate Social Responsibility Projects in the field of environmental protection. The study is based on the four premises. First is the role of social dialogue, which is crucial for both Corporate Social Responsibility and modern environmental protection regulation. The Aarhus Convention creates a procedural environmental human right to participate in administrative procedures of law setting and environmental decisions making. The public participation in environmental impact assessment is nowadays a universal standard. Second argument is about the role of precaution as a principle of modern environmental regulation. This principle can be observed both in governmental regulatory undertakings and also private initiatives within the Corporate Social Responsibility environmental projects. Even in the jurisdictions which are relatively reluctant to use the principle of preventive action in environmental regulation, the companies often use this standard in their own private business standard setting initiatives. This is often due to the fact that soft law standards are used as the basis for private Corporate Social Responsibility regulatory initiatives. Third premise is about the role of ecological education in environmental protection. Many soft law instruments underline the importance of environmental education. Governments use environmental education only to the limited extent due to the costs of such projects and problems with effects assessment. Corporate Social Responsibility uses various means of ecological education as the basis of their actions in the field of environmental protection. Last but not least Sustainable development is a goal of both legal protection of the environment, and economic instruments of companies development. Modern environmental protection law uses to the increasing extent the Corporate Social Responsibility. This may be the consequence of the limits of hard law regulation. Corporate Social Responsibility is nowadays not only adapting to soft law regulation of environmental protection but also creates such standards by itself, showing new direction for development of international environmental law. Corporate Social Responsibility in environmental protection can be good investment in future development of the company.

Keywords: corporate social responsibility, environmental CSR, environmental justice, stakeholders dialogue

Procedia PDF Downloads 271
8023 A Preliminary Comparative Study Between the United Kingdom and Taiwan: Public Private Collaboration and Cooperation in Tackling Large Scale Cyberattacks

Authors: Chi-Hsuan Cheng

Abstract:

This research aims to evaluate public-private partnerships against cyberattacks by comparing the UK and Taiwan. First, the study analyses major cyberattacks and factors influencing cybersecurity in both countries. Second, it assesses the effectiveness of current cyber defence strategies in combating cyberattacks by comparing the approaches taken in the UK and Taiwan, while also evaluating the cyber resilience of both nations. Lastly, the research evaluates existing public-private partnerships by comparing those in the UK and Taiwan, and proposes recommendations for enhancing cooperation and collaboration mechanisms in tackling cyberattacks. Grounded theory serves as the core research method. Theoretical sampling is used to recruit participants in both the UK and Taiwan, including investigators, police officers, and professionals from cybersecurity firms. Semi-structured interviews are conducted in English in the UK and Mandarin in Taiwan, recorded with consent, and pseudonymised for privacy. Data analysis involves open coding, grouping excerpts into codes, and categorising codes. Axial coding connects codes into categories, leading to the development of a codebook. The process continues iteratively until theoretical saturation is reached. Finally, selective coding identifies the core topic, evaluating public-private cooperation against cyberattacks and its implications for social and policing strategies in the UK and Taiwan, which highlights the current status of the cybersecurity industry, governmental plans for cybersecurity, and contributions to cybersecurity from both government sectors and cybersecurity firms, with a particular focus on public-private partnerships. In summary, this research aims to offer practical recommendations to law enforcement, private sectors, and academia for reflecting on current strategies and tailoring future approaches in cybersecurity

Keywords: cybersecurity, cybercrime, public private partnerships, cyberattack

Procedia PDF Downloads 31
8022 Message Authentication Scheme for Vehicular Ad-Hoc Networks under Sparse RSUs Environment

Authors: Wen Shyong Hsieh, Chih Hsueh Lin

Abstract:

In this paper, we combine the concepts of chameleon hash function (CHF) and identification based cryptography (IBC) to build a message authentication environment for VANET under sparse RSUs. Based on the CHF, TA keeps two common secrets that will be embedded to all identities to be as the evidence of mutual trusting. TA will issue one original identity to every RSU and vehicle. An identity contains one public ID and one private key. The public ID, includes three components: pseudonym, random key, and public key, is used to present one entity and can be verified to be a legal one. The private key is used to claim the ownership of the public ID. Based on the concept of IBC, without any negotiating process, a CHF pairing key multiplied by one private key and other’s public key will be used for mutually trusting and to be utilized as the session key of secure communicating between RSUs and vehicles. To help the vehicles to do message authenticating, the RSUs are assigned to response the vehicle’s temple identity request using two short time secretes that are broadcasted by TA. To light the loading of request information, one day is divided into M time slots. At every time slot, TA will broadcast two short time secretes to all valid RSUs for that time slot. Any RSU can response the temple identity request from legal vehicles. With the collected announcement of public IDs from the neighbor vehicles, a vehicle can set up its neighboring set, which includes the information about the neighbor vehicle’s temple public ID and temple CHF pairing key that can be derived by the private key and neighbor’s public key and will be used to do message authenticating or secure communicating without the help of RSU.

Keywords: Internet of Vehicles (IOV), Vehicular Ad-hoc Networks (VANETs), Chameleon Hash Function (CHF), message authentication

Procedia PDF Downloads 360
8021 Assessing the Role of Water Research and Development Investment towards Water Security in South Africa: During the Five Years Period (2009/10 - 2013/14)

Authors: Hlamulo Makelane

Abstract:

The study aims at providing new insights regarding research and development (R&D) public and private activities based on the national R&D survey of the past five years. The main question of the study is what role does water R&D plays on water security; to then analyze what lessons could be extracted to improve the security of water through R&D. In particular, this work concentrates on three main aspects of R&D investments: (i) the level of expenditures, (ii) the sources of funding related to water R&D, and (iii) the personnel working in the field, both for the public and private sectors. The nonlinear regression approached will be used for data analysis based on secondary data gathered from the South African nation R&D survey conducted annually by the Centre for science, technology and innovation indicators (CeSTII).

Keywords: water, R&D, investment, public sector, private sector

Procedia PDF Downloads 208
8020 Factor Analysis Based on Semantic Differential of the Public Perception of Public Art: A Case Study of the Malaysia National Monument

Authors: Yuhanis Ibrahim, Sung-Pil Lee

Abstract:

This study attempts to address factors that contribute to outline public art factors assessment, memorial monument specifically. Memorial monuments hold significant and rich message whether the intention of the art is to mark and commemorate important event or to inform younger generation about the past. Public monument should relate to the public and raise awareness about the significant issue. Therefore, by investigating the impact of the existing public memorial art will hopefully shed some lights to the upcoming public art projects’ stakeholders to ensure the lucid memorial message is delivered to the public directly. Public is the main actor as public is the fundamental purpose that the art was created. Perception is framed as one of the reliable evaluation tools to assess the public art impact factors. The Malaysia National Monument was selected to be the case study for the investigation. The public’s perceptions were gathered using a questionnaire that involved (n-115) participants to attain keywords, and next Semantical Differential Methodology (SDM) was adopted to evaluate the perceptions about the memorial monument. These perceptions were then measured with Reliability Factor and then were factorised using Factor Analysis of Principal Component Analysis (PCA) method to acquire concise factors for the monument assessment. The result revealed that there are four factors that influence public’s perception on the monument which are aesthetic, audience, topology, and public reception. The study concludes by proposing the factors for public memorial art assessment for the next future public memorial projects especially in Malaysia.

Keywords: factor analysis, public art, public perception, semantical differential methodology

Procedia PDF Downloads 477
8019 Gender-Based Violence Public Art Projects: An Analysis of the Value of Including Social Justice Topics in Tertiary Courses

Authors: F. Saptouw

Abstract:

This paper will examine the value of introducing social justice issues into the tertiary fine art curriculum at a first-year level. The paper will present detail of the conceptual impetus and the logistics related to the execution of a collaborative teaching project. The cohort of students was registered for the Fine Art Foundation course at the Michaelis School of Fine Art at the University of Cape Town. The course is dedicated to the development of critical thinking, communication skills, and varied approaches to knowledge construction within the first-year cohort. A core component of the course is the examination of the representation of gender, identity, politics, and power. These issues are examined within a range of public and private representations like art galleries, museum spaces, and contemporary popular culture. This particular project was a collaborative project with the Office of Inclusivity and Change, and the project leaders were Fabian Saptouw and Gabriel Khan. The paper will conclude by presenting an argument for the importance of such projects within the tertiary environment.

Keywords: art, education, gender-based violence, social responsiveness

Procedia PDF Downloads 112
8018 Private and Public Health Sector Difference on Client Satisfaction: Results from Secondary Data Analysis in Sindh, Pakistan

Authors: Wajiha Javed, Arsalan Jabbar, Nelofer Mehboob, Muhammad Tafseer, Zahid Memon

Abstract:

Introduction: Researchers globally have strived to explore diverse factors that augment the continuation and uptake of family planning methods. Clients’ satisfaction is one of the core determinants facilitating continuation of family planning methods. There is a major debate yet scanty evidence to contrast public and private sectors with respect to client satisfaction. The objective of this study is to compare quality-of-care provided by public and private sectors of Pakistan through a client satisfaction lens. Methods: We used Pakistan Demographic Heath Survey 2012-13 dataset (Sindh province) on a total of 3133 Married Women of Reproductive Age (MWRA) aged 15-49 years. Source of family planning (public/private sector) was the main exposure variable. Outcome variable was client satisfaction judged by ten different dimensions of client satisfaction. Means and standard deviations were calculated for continuous variable while for categorical variable frequencies and percentages were computed. For univariate analysis, Chi-square/Fisher Exact test was used to find an association between clients’ satisfaction in public and private sectors. Ten different multivariate models were made. Variables were checked for multi-collinearity, confounding, and interaction, and then advanced logistic regression was used to explore the relationship between client satisfaction and dependent outcome after adjusting for all known confounding factors and results are presented as OR and AOR (95% CI). Results: Multivariate analyses showed that clients were less satisfied in contraceptive provision from private sector as compared to public sector (AOR 0.92,95% CI 0.63-1.68) even though the result was not statistically significant. Clients were more satisfied from private sector as compared to the public sector with respect to other determinants of quality-of-care (follow-up care (AOR 3.29, 95% CI 1.95-5.55), infection prevention (AOR 2.41, 95% CI 1.60-3.62), counseling services (AOR 2.01, 95% CI 1.27-3.18, timely treatment (AOR 3.37, 95% CI 2.20-5.15), attitude of staff (AOR 2.23, 95% CI 1.50-3.33), punctuality of staff (AOR 2.28, 95% CI 1.92-4.13), timely referring (AOR 2.34, 95% CI 1.63-3.35), staff cooperation (AOR 1.75, 95% CI 1.22-2.51) and complications handling (AOR 2.27, 95% CI 1.56-3.29).

Keywords: client satisfaction, family planning, public private partnership, quality of care

Procedia PDF Downloads 385
8017 Private Technology Parks–The New Engine for Innovation Development in Russia

Authors: K. Volkonitskaya, S. Lyapina

Abstract:

According to the National Monitoring Centre of innovation infrastructure, scientific and technical activities and regional innovation systems by December 2014. 166 technology parks were established in Russia. Comparative analysis of technological parks performance in Russia, the USA, Israel and the European Union countries revealed significant reduction of key performance indicators in Russian innovation infrastructure institutes. The largest deviations were determined in the following indicators: new products and services launched, number of companies and jobs, amount of venture capital invested. Lower performance indicators of Russian technology parks can be partly explained by slack demand for national high-tech products and services, lack of qualified specialists in the sphere of innovation management and insufficient cooperation between different innovation infrastructure institutes. In spite of all constraints in innovation segment of Russian economy in 2010-2012 private investors for the first time proceeded to finance building of technological parks. The general purpose of the research is to answer two questions: why despite the significant investment risks private investors continue to implement such comprehensive infrastructure projects in Russia and is business model of private technological park more efficient than strategies of state innovation infrastructure institutes? The goal of the research was achieved by analyzing business models of private technological parks in Moscow, Kaliningrad, Astrakhan and Kazan. The research was conducted in two stages: the on-line survey of key performance indicators of private and state Russian technological parks and in-depth interviews with top managers and investors, who have already build private technological parks in by 2014 or are going to complete investment stage in 2014-2016. The results anticipated are intended to identify the reasons of efficient and inefficient technological parks performance. Furthermore, recommendations for improving the efficiency of state technological and industrial parks were formulated. Particularly, the recommendations affect the following issues: networking with other infrastructural institutes, services and infrastructure provided, mechanisms of public-private partnership and investment attraction. In general intensive study of private technological parks performance and development of effective mechanisms of state support can have a positive impact on the growth rates of the number of Russian technological, industrial and science parks.

Keywords: innovation development, innovation infrastructure, private technology park, public-private partnership

Procedia PDF Downloads 411
8016 The Dilemma of Retention in the Context of Rapidly Growing Economies Based on the Effectiveness of HRM Policies: A Case Study of Qatar

Authors: A. Qayed Al-Emadi, C. Schwabenland, Q. Wei, B. Czarnecka

Abstract:

In 2009, the new HRM policy was implemented in Qatar for public sector organisations. The purpose of this research is to examine how Qatar’s 2009 HRM policy was significant in influencing employee retention in public organisations. The conducted study utilised quantitative methodology to analyse the data on employees’ perceptions of such HRM practices as performance çanagement, rewards and promotion, training and development associated with the HRM policy in public organisations in comparison to semi-private organisations. Employees of seven public and semi-private organisations filled in the questionnaire based on the 5-point likert scale to present quantitative results. The data was analysed with the correlation and multiple regression statistical analyses. It was found that Performance Management had the relationship with Employee Retention, and Rewards and Promotion influenced Job Satisfaction in public organisations. The relationship between Job Satisfaction and Employee Retention was also observed. However, no significant differences were observed in the role of HRM practices in public and semi-private organisations.

Keywords: performance management, rewards and promotion, training and development, job satisfaction, employee retention, SHRM, configurational perspective

Procedia PDF Downloads 421
8015 Partnerships between Public Administration and Private Social Investment for Territorial Development: Lessons after 15 Brazilian Cases

Authors: Graziela D. de Azevedo, Livia M. Pagotto, Mario P. Monzoni, Neto

Abstract:

This article aims to discuss partnerships between public administration and private social investment aimed at territorial development. There has been some approximation in Brazil from private social investors with initiatives aiming at territorial development policies in highly vulnerable territories or in places where the business sector operates. This represents this paper’s major justification: on the advance of academic debate about how businesses, institutes, and foundations have been working alongside local governments, taking the territory as the reference for joint action. The research was based on the literature on governance and territorial development and adopted a mixed iterative approach (inductive and deductive) through an interpretative lens so as to develop an analysis structure that complements and expands knowledge about the contribution of public policies and private social investments for territorial development in Brazil. The analysis of 15 cases based on three distinct blocks (territorial development plans, articulation for education, and thematic approaches) has made it possible to identify common elements regarding the motivations of partnerships, the specific needs of the actors involved, and the priority drivers for stimulating development. Findings include discussion on the leading role of territories in their development paths, on the institutionalization and strengthening of capacities, and on long-term perspectives in development strategies.

Keywords: private social investment, public administration, territorial governance, territorial development

Procedia PDF Downloads 181
8014 The Impact of the Fitness Center Ownership Structure on the Service Quality Perception in the Fitness in Serbia

Authors: Dragan Zivotic, Mirjana Ilic, Aleksandra Perovic, Predrag Gavrilovic

Abstract:

As with the provision of other services, the service quality perception is one of the key factors that the modern manager must pay attention to. Countries in which the state regulation is in transition also have specific features in providing fitness services. Identification of the dimensions in which the most significant different service quality perception between different types of fitness centers, enables managers to profile the offer according to the wishes and expectations of users. The aim of the paper was the comparison of the quality of services perception in the field of fitness in Serbia between three categories of fitness centers: the privately owned centers, the publicly owned centers, and the Public-private partnership centers. For this research 350 respondents of both genders (174 men and 176 women) were interviewed, aged between 18 and 68 years, being beneficiaries of fitness services for at least 1 year. Administered questionnaire with 100 items provided information about the 15 basic areas in which they expressed the service quality perception in the gym. The core sample was composed of 212 service users in private fitness centers, 69 service users in public fitness centers and 69 service users in the public-private partnership. Sub-samples were equal in representation of women and men, as well as by age and length of use of fitness services. The obtained results were subject of univariate analysis with the Kruskal-Wallis non-parametric analysis of variance. Significant differences between the analyzed sub-samples were not found solely in the areas of rapid response and quality outcomes. In the multivariate model, the results were processed by backward stepwise discriminant analysis that extracted 3 areas that maximize the differences between sub-samples: material and technical basis, secondary facilities and coaches. By applying the classification function 93.87% of private centers services users, 62.32% of public centers services users and 85.51% of the public-private partnership centers users of services were correctly classified (total 86.00%). These results allow optimizing the allocation of the necessary resources in profiling offers of a fitness center in order to optimally adjust it to the user’s needs and expectations.

Keywords: fitness, quality perception, management, public ownership, private ownership, public-private partnership, discriminative analysis

Procedia PDF Downloads 260
8013 Barrier to Implementing Public-Private Mix Approach for Tuberculosis Case Management in Nepal

Authors: R. K. Yadav, S. Baral, H. R. Paudel, R. Basnet

Abstract:

The Public-Private Mix (PPM) approach is a strategic initiative that involves engaging all private and public healthcare providers in the fight against tuberculosis using international healthcare standards. For tuberculosis control in Nepal, the PPM approach could be a milestone. This study aimed to explore the barriers to a public-private mix approach in the management of tuberculosis cases in Nepal. A total of 20 respondents participated in the study. Barriers to PPM were identified in the following three themes: 1) Obstacles related to TB case detection, 2) Obstacles related to patients, and 3) Obstacles related to the healthcare system. PPM implementation was challenged by following subthemes that included staff turnover, low private sector participation in workshops, a lack of training, poor recording and reporting, insufficient joint monitoring and supervision, poor financial benefit, lack of coordination and collaboration, and non-supportive TB-related policies and strategies. The study concludes that numerous barriers exist in the way of effective implementation of the PPM approach, including TB cases detection barriers such as knowledge of TB diagnosis and treatment, HW attitude, workload, patient-related barriers such as knowledge of TB, self-medication practice, stigma and discrimination, financial status, and health system-related barriers such as staff turnover and poor engagement of the private sector in workshops, training, recording, and re-evaluation. Government stakeholders must work together with private sector stakeholders to perform joint monitoring and supervision. Private practitioners should receive training and orientation, and presumptive TB patients should be given adequate time and counseling as well as motivation to visit a government health facility.

Keywords: barrier, tuberculosis, case finding, PPM, nepal

Procedia PDF Downloads 80
8012 Correlates of Modes of Transportation to Work among Working Adults in Ernakulam District, Kerala

Authors: Anjaly Joseph, Elezebeth Mathews

Abstract:

Transportation and urban planning is the least recognised area for physical activity promotion in India, unlike developed regions. Identifying the preferred transportation modalities and factors associated with it is essential to address these lacunae. The objective of the study was to assess the prevalence of modes of transportation to work, and its correlates among working adults in Ernakulam District, Kerala. A cross sectional study was conducted among 350 working individuals in the age group of 18-60 years, selected through multi-staged stratified random sampling in Ernakulam district of Kerala. The inclusion criteria were working individuals 18-60 years, workplace at a distance of more than 1 km from the home and who worked five or more days a week. Pregnant women/women on maternity leave and drivers (taxi drivers, autorickshaw drivers, and lorry drivers) were excluded. An interview schedule was used to capture the modes of transportation namely, public, private and active transportation, socio demographic details, travel behaviour, anthropometric measurements and health status. Nearly two-thirds (64 percent) of them used private transportation to work, while active commuters were only 6.6 percent. The correlates identified for active commuting compared to other modes were low socio-economic status (OR=0.22, CI=0.5-0.85) and presence of a driving license (OR=4.95, CI= 1.59-15.45). The correlates identified for public transportation compared to private transportation were female gender (OR= 17.79, CI= 6.26-50.31), low income (OR=0.33, CI= 0.11-0.93), being unmarried (OR=5.19, CI=1.46-8.37), presence of no or only one private vehicle in the house (OR=4.23, CI=1.24-20.54) and presence of convenient public transportation facility to workplace (OR=3.97, CI= 1.66-9.47). The association between body mass index (BMI) and public transportation were explored and found that public transport users had lesser BMI than private commuters (OR=2.30, CI=1.23-4.29). Policies that encourage active and public transportation needs to be introduced such as discouraging private vehicle through taxes, introduction of convenient and safe public transportation facility, walking/cycling paths, and paid parking facility.

Keywords: active transportation, correlates, India, public transportation, transportation modes

Procedia PDF Downloads 140
8011 Rethinking the Smartness for Sustainable Development Through the Relationship between Public and Private Actors

Authors: Selin Tosun

Abstract:

The improvements in technology have started to transform the way we live, work, play, and commute in our cities. The emerging smart city understanding has been paving the way for more efficient, more useful, and more profitable cities. Smart sensors, smart lighting, smart waste, water and electricity management, smart transportation and communication systems are introduced to cities at a rapid pace. In today's world, innovation is often correlated with start-up companies and technological pioneers seeking broader economic objectives such as production and competitiveness. The government's position is primarily that of an enabler, with creativity mostly coming from the private sector. The paper argues that to achieve sustainable development, the ways in which smart and sustainable city approaches are being applied to cities need to be redefined. The research aims to address common discussions in the discourse of smart and sustainable cities criticizing the priority of lifestyle sterilization over human-centered sustainable interventions and social innovation strategies. The dichotomy between the fact that smart cities are mostly motivated by the competitive global market and the fact that the delocalization is, in fact, their biggest problem in the way of becoming authentic, sustainable cities is the main challenge that we face today. In other words, the key actors in smart cities have different and somewhat conflicting interests and demands. By reviewing the roles of the public and private actors in smart city making, the paper aspires to reconceptualize the understanding of “smartness” in achieving sustainable development in which the “smartness” is understood as a multi-layered complex phenomenon that can be channeled through different dynamics. The case cities around the world are explored and compared in terms of their technological innovations, governance and policy innovations, public-private stakeholder relationships, and the understanding of the public realm. The study aims to understand the current trends and general dynamics in the field, key issues that are being addressed, the scale that is preferred to reflect upon and the projects that are designed for the particular issues.

Keywords: smart city, sustainable development, technological innovation, social innovation

Procedia PDF Downloads 158
8010 Strategic Smart-City Projects and the Economic Impact of Prioritizing around Public Facilities: Case Study of Birnin Kebbi, Nigeria

Authors: Abdullateef Abdulkarim Jimoh, Muhammad Lawal A., Usman Muhammad, Hamisu Abdullahi, Nuhu Abdullahi Jega

Abstract:

Smart city projects can be aided by urban development policies in public facilities, but economic resources to finance urban system reorganization is an issue to various governments. This is further compounded with the impact of the slowing down of national economies. The aim of this paper is to emphasize the need to prioritize the economic benefits of smart city projects and, specifically, in towns transforming into cities like Birnin kebbi. The smart-city projects can aim at developing a new form of ‘‘modernity and civilization’’ of the productive economy. This study adopts the descriptive statistical approach to identify the key performance indicators (KPI) for tracking the progress of cities and its developmental objectives. It has been established that numerous aspects of the modernization policies can enhance the competitiveness of territories, particular in aspects of social cohesion, the diffusion of knowledge, creativity, accessibility, etc.

Keywords: economy, economic policy, public facilities, smart city, urbanization

Procedia PDF Downloads 78
8009 Improving Public Sectors’ Policy Direction on Large Infrastructure Investment Projects: A Developmental Approach

Authors: Ncedo Cameron Xhala

Abstract:

Several public sector institutions lack policy direction on how to successfully implement their large infrastructure investment projects. It is significant to improve strategic policy direction in public sector institutions in order to improve planning, management and implementation of large infrastructure investment projects. It is significant to improve an understanding of internal and external pressures that exerts pressure on large infrastructure projects. The significance is to fulfill the public sector’s mandate, align the sectors’ scarce resources, stakeholders and to improve project management processes. The study used a case study approach which was underpinned by a constructionist approach. The study used a theoretical sampling technique when selecting study participants, and was followed by a snowball sampling technique that was used to select an identified case study project purposefully. The study was qualitative in nature, collected and analyzed qualitative empirical data from the purposefully selected five subject matter experts and has analyzed the case study documents. The study used a semi-structured interview approach, analysed case study documents in a qualitative approach. The interviews were on a face-to-face basis and were guided by an interview guide with focused questions. The study used a three coding process step comprising of one to three steps when analysing the qualitative empirical data. Findings reveal that an improvement of strategic policy direction in public sector institutions improves the integration in planning, management and on implementation on large infrastructure investment projects. Findings show the importance of understanding the external and internal pressures when implementing public sector’s large infrastructure investment projects. The study concludes that strategic policy direction in public sector institutions results in improvement of planning, financing, delivery, monitoring and evaluation and successful implementation of the public sector’s large infrastructure investment projects.

Keywords: implementation, infrastructure, investment, management

Procedia PDF Downloads 126
8008 Cost Overrun in Delivery of Public Projects in the Saudi Construction Industry: A Review

Authors: A. Aljohani, D. Moore, D. D. Ahiaga-Dagbui

Abstract:

Cost overruns are endemic in the delivery of construction projects. The problem is global. It occurs irrespective of type and size of the project, its location, procurement method or client. The size of overruns can be as high as 200% in some cases. Projects thus unfortunately often make the news headlines, not for their immense socio-economic contribution to society, but for being poorly procured. In Saudi Arabia, two-thirds of construction projects are publicly procured by the Saudi government, which has been invested Billions of dollars in infrastructure projects each year as part of an ambitious strategic development agenda to shift from mainly oil dependency to multi-source dependency. However, reports show that about 3,000 public projects face diverse issues related to time and cost overrun. As part of an on-going study to develop a framework for effective public procurement for the Saudi Arabian construction industry, this paper reports the initial findings of the causes of cost overruns in the context of the Gulf State. It also evaluates the interface between some of the front-end loading issues in public procurement in Saudi and their effects on project performance. A systematic review of the existing literature on construction cost overruns, with focus on the Saudi Arabian construction industry has been used. One of the initial findings is that a fixed-price contract is usually used by the client in an attempt to transfer all financial risks to the contractors. This has the unintended consequence of creating a turbulent environment for the delivery of the project which leads to project abandonment by contractors, poor quality of work and substantial rework. Further work is being undertaken to empirically verify the initial findings reported in this paper and their generalizability for the construction industry as a whole.

Keywords: cost overrun, public procurement, Saudi Arabia, construction projects

Procedia PDF Downloads 243
8007 Principle of Progressive Implementation and Education Policy for Former Combatants in Colombia

Authors: Ximena Rincon Castellanos

Abstract:

The research target was analyzed the education public policy of Colombia according to the content of the right to education. One problematic element of that content is the principle of progressive implementation of economic, social and cultural rights. The research included a complete study of public documents and other papers; as well as, one focus group with former combatants in a city where is located one of some 'hogares de paz', which hosts these people after leaving the illegal group. This paper presents a critical approach to the public policy strategies to guarantee education to former combatants and its tension with the right to a progressive implementation. Firstly, education is understood as a technology level without considering higher education. Former combatant attends to SENA and private institutions, which offer technology education and it is counted by the Colombian Government as higher education. Therefore, statistics report a high level of attendance of excombatant to that education level, but actually, they do not expect to study a university carrier. Secondly, the budget approved has been invested in private institutions, despite public institutions are able to include this population and they need more money to strengthen the public offer, which has been considered as a better strategy to ensure education as a human right but not a good, by the special rapporteur on the right to education. As a consequence, the progressive implementation should be a guide to change and improve current strategies, invest the budget available into the public system of education in order to give former combatants the chance to access to universities.

Keywords: higher education, progressive implementation, public service, private offering and technology education

Procedia PDF Downloads 139
8006 Public Procurement and Innovation: A Municipal Approach

Authors: M. Moso-Diez, J. L. Moragues-Oregi, K. Simon-Elorz

Abstract:

Innovation procurement is designed to steer the development of solutions towards concrete public sector needs as a driver for innovation from the demand side (in public services as well as in market opportunities for companies), is horizontally emerging as a new policy instrument. In 2014 the new EU public procurement directives 2014/24/EC and 2014/25/EC reinforced the support for Public Procurement for Innovation, dedicating funding instruments that can be used across all areas supported by Horizon 2020, and targeting potential buyers of innovative solutions: groups of public procurers with similar needs. Under this programme, new policy adapters and networks emerge, aiming to embed innovation criteria into new procurement processes. As these initiatives are in process, research related to is scarce. We argue that Innovation Public Procurement can arise as an innovative policy instrument to public procurement in different policy domains, in spite of existing institutional and cultural barriers (legal guarantee versus innovation). The presentation combines insights from public procurement to supply management chain management in a sustainability and innovation policy arena, as a means of providing understanding of: (1) the circumstances that emerge; (2) the relationship between public and private actors; and (3) the emerging capacities in the definition of the agenda. The policy adopters are the contracting authorities that mainly are at municipal level where they interact with the supply management chain, interconnecting sustainability and climate measures with other policy priorities such as innovation and urban planning; and through the Competitive Dialogue procedure. We found that geography and territory affect both the level of municipal budget (due to municipal income per capita) and its institutional competencies (due to demographic reasons). In spite of the relevance of institutional determinants for public procurement, other factors play an important role such as human factors as well as both public policy and private intervention. The experience is a ‘city project’ (Bilbao) in the field of brownfield decontamination. Brownfield sites typically refer to abandoned or underused industrial and commercial properties—such as old process plants, mining sites, and landfills—that are available but contain low levels of environmental contaminants that may complicate reuse or redevelopment of the land. This article concludes that Innovation Public Procurement in sustainability and climate issues should be further developed both as a policy instrument and as a policy research line that could enable further relevant changes in public procurement as well as in climate innovation.

Keywords: innovation, city projects, public policy, public procurement

Procedia PDF Downloads 281
8005 Cost Overrun Causes in Public Construction Projects in Saudi Arabia

Authors: Ibrahim Mahamid, A. Al-Ghonamy, M. Aichouni

Abstract:

This study is conducted to identify causes of cost deviations in public construction projects in Saudi Arabia from contractors’ perspective. 41 factors that might affect cost estimating accuracy were identified through literature review and discussion with some construction experts. The factors were tabulated in a questionnaire form and a field survey included 51 contractors from the Northern Province of Saudi Arabia was performed. The results show that the top five important causes are: wrong estimation method, long period between design and time of implementation, cost of labor, cost of machinary and absence of construction-cost data.

Keywords: cost deviation, public construction, cost estimating, Saudi Arabia, contractors

Procedia PDF Downloads 435
8004 Public Art and Public Space in an Emerging Knowledge Economy: The Case of Doha

Authors: Grichting Anna, Al Sada Sara, Caccayam Angelica, Khan Urshi

Abstract:

The Qatar Museums Authority recently announced a series of public art initiatives in Doha with the purpose of 'bringing art out of the walls of the museum' to make it accessible to the public on a daily basis and to encourage discussion and debate. While the installation of sculptures in public spaces is not new in Doha, the practice of integrating art in public spaces and architectural projects is reaching a new dimension as internationally renowned artists – such as Damien Hirst and Richard Serra - are being commissioned to install their works in the public spaces and buildings of the city of Doha as well as in more remote desert locations. This research discusses the changing presence, role and context of public art in Doha, both from a historical and cultural overview, and the different forms and media as well as the typologies of urban and public spaces in which the art is installed. It examines the process of implementing site-specific artworks, looking at questions of scale, history, social meaning and formal aesthetics. The methodologies combine theoretical research on the understanding of public art and its role and placement in public space, as well as empirical research on contemporary public art projects in Doha, based on documentation and interviews and as well as site and context analysis of the urban or architectural spaces within which the art is situated. Surveys and interviews – using social media - in different segments of the contemporary Qatari society, including all nationalities and social groups, are used to measure and qualify the impacts and effects on the population.

Keywords: public space, public art, urban design, knowledge economy

Procedia PDF Downloads 492
8003 Meta Root ID Passwordless Authentication Using ZKP Bitcoin Protocol

Authors: Saransh Sharma, Atharv Dekhne

Abstract:

Passwords stored on central services and hashed are prone to cyberattacks and hacks. Hence, given all these nuisances, there’s a need to eliminate character-based authentication protocols, which would ultimately benefit all developers as well as end-users.To replace this conventional but antiquated protocol with a secure alternative would be Passwordless Authentication. The meta root.id system creates a public and private key, of which the user is only able to access the private key. Further, after signing the key, the user sends the information over the API to the server, which checks its validity with the public key and grants access accordingly.

Keywords: passwordless, OAuth, bitcoin, ZKP, SIN, BIP

Procedia PDF Downloads 62
8002 Use of Triclosan-Coated Sutures Led to Cost Saving in Public and Private Setting in India across Five Surgical Categories: An Economical Model Assessment

Authors: Anish Desai, Reshmi Pillai, Nilesh Mahajan, Hitesh Chopra, Vishal Mahajan, Ajay Grover, Ashish Kohli

Abstract:

Surgical Site Infection (SSI) is hospital acquired infection of growing concern. This study presents the efficacy and cost-effectiveness of triclosan-coated suture, in reducing the burden of SSI in India. Methodology: A systematic literature search was conducted for economic burden (1998-2018) of SSI and efficacy of triclosan-coated sutures (TCS) vs. non-coated sutures (NCS) (2000-2018). PubMed Medline and EMBASE indexed articles were searched using Mesh terms or Emtree. Decision tree analysis was used to calculate, the cost difference between TCS and NCS at private and public hospitals, respectively for 7 surgical procedures. Results: The SSI range from low to high for Caesarean section (C-section), Laparoscopic hysterectomy (L-hysterectomy), Open Hernia (O-Hernia), Laparoscopic Cholecystectomy (L-Cholecystectomy), Coronary artery bypass graft (CABG), Total knee replacement (TKR), and Mastectomy were (3.77 to 24.2%), (2.28 to 11.7%), (1.75 to 60%), (1.71 to 25.58%), (1.6 to 18.86%), (1.74 to 12.5%), and (5.56 to 25%), respectively. The incremental cost (%) of TCS ranged 0.1%-0.01% in private and from 0.9%-0.09% at public hospitals across all surgical procedures. Cost savings at median efficacy & SSI risk was 6.52%, 5.07 %, 11.39%, 9.63%, 3.62%, 2.71%, 9.41% for C-section, L-hysterectomy, O-Hernia, L-Cholecystectomy, CABG, TKR, and Mastectomy in private and 8.79%, 4.99%, 12.67%, 10.58%, 3.32%, 2.35%, 11.83% in public hospital, respectively. Efficacy of TCS and SSI incidence in a particular surgical procedure were important determinants of cost savings using one-way sensitivity analysis. Conclusion: TCS suture led to cost savings across all 7 surgeries in both private and public hospitals in India.

Keywords: cost Savings, non-coated sutures, surgical site infection, triclosan-coated sutures

Procedia PDF Downloads 370