1715 Assessment of Environmental Risk Factors of Railway Using Integrated ANP-DEMATEL Approach in Fuzzy Conditions

Authors: Mehrdad Abkenari, Mehmet Kunt, Mahdi Nourollahi

Abstract:

Evaluating the environmental risk factors is a combination of analysis of transportation effects. Various definitions for risk can be found in different scientific sources. Each definition depends on a specific and particular perspective or dimension. The effects of potential risks present along the new proposed routes and existing infrastructures of large transportation projects like railways should be studied under comprehensive engineering frameworks. Despite various definitions provided for ‘risk’, all include a uniform concept. Two obvious aspects, loss and unreliability, have always been pointed in all definitions of this term. But, selection as the third aspect is usually implied and means how one notices it. Currently, conducting engineering studies on the environmental effects of railway projects have become obligatory according to the Environmental Assessment Act in developing countries. Considering the longitudinal nature of these projects and probable passage of railways through various ecosystems, scientific research on the environmental risk of these projects have become of great interest. Although many areas of expertise such as road construction in developing countries have not seriously committed to these studies yet, attention to these subjects in establishment or implementation of different systems have become an inseparable part of this wave of research. The present study used environmental risks identified and existing in previous studies and stations to use in next step. The second step proposes a new hybrid approach of analytical network process (ANP) and DEMATEL in fuzzy conditions for assessment of determined risks. Since evaluation of identified risks was not an easy touch, mesh structure was an appropriate approach for analyzing complex systems which were accordingly employed for problem description and modeling. Researchers faced the shortage of real space data and also due to the ambiguity of experts’ opinions and judgments, they were declared in language variables instead of numerical ones. Since fuzzy logic is appropriate for ambiguity and uncertainty, formulation of experts’ opinions in the form of fuzzy numbers seemed an appropriate approach. Fuzzy DEMATEL method was used to extract the relations between major and minor risk factors. Considering the internal relations of risk major factors and its sub-factors in the analysis of fuzzy network, the weight of risk’s main factors and sub-factors were determined. In general, findings of the present study, in which effective railway environmental risk indicators were theoretically identified and rated through the first usage of combined model of DEMATEL and fuzzy network analysis, indicate that environmental risks can be evaluated more accurately and also employed in railway projects.

Keywords: DEMATEL, ANP, fuzzy, risk

Procedia PDF Downloads 381
1714 Critical Appraisal, Smart City Initiative: China vs. India

Authors: Suneet Jagdev, Siddharth Singhal, Dhrubajyoti Bordoloi, Peesari Vamshidhar Reddy

Abstract:

There is no universally accepted definition of what constitutes a Smart City. It means different things to different people. The definition varies from place to place depending on the level of development and the willingness of people to change and reform. It tries to improve the quality of resource management and service provisions for the people living in the cities. Smart city is an urban development vision to integrate multiple information and communication technology (ICT) solutions in a secure fashion to manage the assets of a city. But most of these projects are misinterpreted as being technology projects only. Due to urbanization, a lot of informal as well government funded settlements have come up during the last few decades, thus increasing the consumption of the limited resources available. The people of each city have their own definition of Smart City. In the imagination of any city dweller in India is the picture of a Smart City which contains a wish list of infrastructure and services that describe his or her level of aspiration. The research involved a comparative study of the Smart City models in India and in China. Behavioral changes experienced by the people living in the pilot/first ever smart cities have been identified and compared. This paper discussed what is the target of the quality of life for the people in India and in China and how well could that be realized with the facilities being included in these Smart City projects. Logical and comparative analyses of important data have been done, collected from government sources, government papers and research papers by various experts on the topic. Existing cities with historically grown infrastructure and administration systems will require a more moderate step-by-step approach to modernization. The models were compared using many different motivators and the data is collected from past journals, interacting with the people involved, videos and past submissions. In conclusion, we have identified how these projects could be combined with the ongoing small scale initiatives by the local people/ small group of individuals and what might be the outcome if these existing practices were implemented on a bigger scale.

Keywords: behavior change, mission monitoring, pilot smart cities, social capital

Procedia PDF Downloads 256
1713 Social Awareness and Praxical Knowledge

Authors: F. Saptouw, L. Reddy

Abstract:

Tertiary institutions are often faced with a challenge when incorporating social awareness into course content. The information campaigns in the media often alienate the viewers and the knowledge is not readily assimilated into the students’ consciousness. This paper will present a discussion of the results of collaborative teaching projects run by the Michaelis School of fine art and the HIV/AIDS, Inclusivity and Change Unit (HAICU) at the University of Cape Town. In these projects the artistic process is employed to generate ‘praxical knowledge’ in the student body about socially relevant issues like HIV-AIDS, Gender-Based Violence (GBV) and sexual identity, specifically LGBTQI. The combination of lectures, group discussions and the creative process has been a very successful way to disseminate information amongst the student population. Evidence of the project’s success will be provided by referencing interviews, focus groups as well as surveys done with the participants. This paper will conclude by arguing for the positive role of practice-led research in developing a socially conscious public.

Keywords: art, education, HIV-AIDS, practice-led research

Procedia PDF Downloads 289
1712 Human Capital Mobility of a Skilled Workforce: A Need for a Future of Europe

Authors: Tiron-Tudor Adriana, Farcas Teodora Viorica, Ciolomic Ioana Andreea

Abstract:

The issue of human capital mobility inside Europe is still an open one. Even though there were created some tools in order to better move from one country to another to work and study the number of the people doing this is very low because of various factors presented in this paper. The "rethinking educational" agenda of the European Commission has open the floor for new projects which can create steps towards a European language for skills and competences, qualifications. One of these projects is the Partnership for Exchange of experience in Student on-the-job Training. As part of this project, we are interested to see the situation of the human capital inside EU and the elements that were created until now to support this mobility. Also, the main objective of the project is to make a comparison between the four countries involved in PEST project (Romania, Hungary, Finland, and Estonia), at the education and internship level. The results are helpful for the follow of the project, for identifying where changes can be done and need to be done.

Keywords: ECVET, human capital mobility, partnership exchange, students on the job mobility, vocational education and training

Procedia PDF Downloads 390
1711 The End Is Just the Beginning: The Importance of Project Post-Implementation Reviews

Authors: Catalin-Teodor Dogaru, Ana-Maria Dogaru

Abstract:

Success means different things to different people. For us, project managers, it becomes even harder to find a definition. Many factors have to be included in the evaluation. Moreover, literature is not very helpful, lacking consensus and neutrality. Post-implementation reviews (PIR) can be an efficient tool in evaluating how things worked on a certain project. Despite the visible progress, PIR is not a very detailed subject yet and there is not a common understanding in this matter. This may be the reason that some organizations include it in the projects’ lifecycle and some do not. Through this paper, we point out the reasons why all project managers should pay proper attention to this important step and to the elements, which can be assessed, beside the already famous triple constraints: cost, budget, and time. It is essential to take notice that PIR is not a checklist. It brings the edge in eliminating subjectivity and judging projects based on actual proof. Based on our experience, our success indicator model, presented in this paper, contributes to the success of the project! In the same time, it increases trust among customers who will perceive success more objectively.

Keywords: project, post implementation, review, success, indicators

Procedia PDF Downloads 344
1710 Navigating Construction Project Outcomes: Synergy Through the Evolution of Digital Innovation and Strategic Management

Authors: Derrick Mirindi, Frederic Mirindi, Oluwakemi Oshineye

Abstract:

The ongoing high rate of construction project failures worldwide is often blamed on the difficulties of managing stakeholders. This highlights the crucial role of strategic management (SM) in achieving project success. This study investigates how integrating digital tools into the SM framework can effectively address stakeholder-related challenges. This work specifically focuses on the impact of evolving digital tools, such as Project Management Software (PMS) (e.g., Basecamp and Wrike), Building Information Modeling (BIM) (e.g., Tekla BIMsight and Autodesk Navisworks), Virtual and Augmented Reality (VR/AR) (e.g., Microsoft HoloLens), drones and remote monitoring, and social media and Web-Based platforms, in improving stakeholder engagement and project outcomes. Through existing literature with examples of failed projects, the study highlights how the evolution of digital tools will serve as facilitators within the strategic management process. These tools offer benefits such as real-time data access, enhanced visualization, and more efficient workflows to mitigate stakeholder challenges in construction projects. The findings indicate that integrating digital tools with SM principles effectively addresses stakeholder challenges, resulting in improved project outcomes and stakeholder satisfaction. The research advocates for a combined approach that embraces both strategic management and digital innovation to navigate the complex stakeholder landscape in construction projects.

Keywords: strategic management, digital tools, virtual and augmented reality, stakeholder management, building information modeling, project management software

Procedia PDF Downloads 23
1709 Application of Simulation of Discrete Events in Resource Management of Massive Concreting

Authors: Mohammad Amin Hamedirad, Seyed Javad Vaziri Kang Olyaei

Abstract:

Project planning and control are one of the most critical issues in the management of construction projects. Traditional methods of project planning and control, such as the critical path method or Gantt chart, are not widely used for planning projects with discrete and repetitive activities, and one of the problems of project managers is planning the implementation process and optimal allocation of its resources. Massive concreting projects is also a project with discrete and repetitive activities. This study uses the concept of simulating discrete events to manage resources, which includes finding the optimal number of resources considering various limitations such as limitations of machinery, equipment, human resources and even technical, time and implementation limitations using analysis of resource consumption rate, project completion time and critical points analysis of the implementation process. For this purpose, the concept of discrete-event simulation has been used to model different stages of implementation. After reviewing the various scenarios, the optimal number of allocations for each resource is finally determined to reach the maximum utilization rate and also to reduce the project completion time or reduce its cost according to the existing constraints. The results showed that with the optimal allocation of resources, the project completion time could be reduced by 90%, and the resulting costs can be reduced by up to 49%. Thus, allocating the optimal number of project resources using this method will reduce its time and cost.

Keywords: simulation, massive concreting, discrete event simulation, resource management

Procedia PDF Downloads 102
1708 Exercise and Social Activities for Elderly with an Impairment Who Are Living Alone in the Community: Effects and Influencing Factors of a Dutch Program

Authors: Renate Verkaik, Mieke Rijken, Hennie Boeije

Abstract:

Elderly who are living alone and who are having one or more impairments are vulnerable for a loss of wellbeing and institutionalization. Physical exercise and social activities together with peers have the potential to make them more resilient. The Dutch program ‘More Resilience, Longer at Home’ initiated by FNO funded 126 local projects to stimulate vulnerable older citizens to participate in exercise and social activities, and as such to improve wellbeing and independent living. The program evaluation addressed the following questions: (1) what are the effects of the program on older (65+) participants exercise behavior, social activities and what is the relationship with wellbeing?, (2) which factors contribute to successful implementation of the projects and their outcomes? A mixed method approach was used. Effects on participants were assessed with a short survey, containing questions on exercise, social engagement, daily functioning, loneliness and life satisfaction. Results of the participants were compared with those of a reference group from the Dutch national population. Perceived influencing factors were investigated with a questionnaire for project leaders. This questionnaire was based on site visits and interviews with project leaders, volunteers and participating elderly. Preliminary results show that social engagement of the participating elderly rises significantly (p ≤ .05) as do their exercise levels and daily functioning. They experience less social loneliness, but not less emotional loneliness. Additionally, there is a positive association between daily functioning and life satisfaction and between exercise and life satisfaction. Perceived influencing factors that contribute to successful implementation of the projects can be categorized in 4 types: (1) characteristics of the activities; (2) profiles of the involved staff (professionals and volunteers), (3) characteristics of the organization, (4) the social political environment. Conclusions are that local projects have been successful in stimulating older citizens to participate in exercise and social activities. Multiple factors need to be addressed to ensure sustainability and scaling-up of the good practices.

Keywords: elderly living alone in the community, exercise and social activities, resilience, quality of life

Procedia PDF Downloads 108
1707 Teaching Timber: The Role of the Architectural Student and Studio Course within an Interdisciplinary Research Project

Authors: Catherine Sunter, Marius Nygaard, Lars Hamran, Børre Skodvin, Ute Groba

Abstract:

Globally, the construction and operation of buildings contribute up to 30% of annual green house gas emissions. In addition, the building sector is responsible for approximately a third of global waste. In this context, the utilization of renewable resources in buildings, especially materials that store carbon, will play a significant role in the growing city. These are two reasons for introducing wood as a building material with a growing relevance. A third is the potential economic value in countries with a forest industry that is not currently used to capacity. In 2013, a four-year interdisciplinary research project titled “Wood Be Better” was created, with the principle goal to produce and publicise knowledge that would facilitate increased use of wood in buildings in urban areas. The research team consisted of architects, engineers, wood technologists and mycologists, both from research institutions and industrial organisations. Five structured work packages were included in the initial research proposal. Work package 2 was titled “Design-based research” and proposed using architecture master courses as laboratories for systematic architectural exploration. The aim was twofold: to provide students with an interdisciplinary team of experts from consultancies and producers, as well as teachers and researchers, that could offer the latest information on wood technologies; whilst at the same time having the studio course test the effects of the use of wood on the functional, technical and tectonic quality within different architectural projects on an urban scale, providing results that could be fed back into the research material. The aim of this article is to examine the successes and failures of this pedagogical approach in an architecture school, as well as the opportunities for greater integration between academic research projects, industry experts and studio courses in the future. This will be done through a set of qualitative interviews with researchers, teaching staff and students of the studio courses held each semester since spring 2013. These will investigate the value of the various experts of the course; the different themes of each course; the response to the urban scale, architectural form and construction detail; the effect of working with the goals of a research project; and the value of the studio projects to the research. In addition, six sample projects will be presented as case studies. These will show how the projects related to the research and could be collected and further analysed, innovative solutions that were developed during the course, different architectural expressions that were enabled by timber, and how projects were used as an interdisciplinary testing ground for integrated architectural and engineering solutions between the participating institutions. The conclusion will reflect on the original intentions of the studio courses, the opportunities and challenges faced by students, researchers and teachers, the educational implications, and on the transparent and inclusive discourse between the architectural researcher, the architecture student and the interdisciplinary experts.

Keywords: architecture, interdisciplinary, research, studio, students, wood

Procedia PDF Downloads 282
1706 Causes of Cost Overrun in Building Construction Projects: Case Study from Al Madinah, Saudi Arabia

Authors: Z. Hamed, K. Sa'deya, E. Abdelrasheed, I. Mahamid

Abstract:

The construction industry is one of the main sectors that play basic role in the urban and rural development of a society. It provides important ingredients for the development of an economy. However, many construction projects experience extensive cost overrun. This study was conducted to identify the causes of cost overrun in building construction contracts in Al Madinah, Saudi Arabia and test the importance of these causes from contractors' perspective. To achieve the study objectives, a questionnaire survey was conducted to identify and rank cost overrun causes from the perspective of contractors. The findings found that the top five cost overrun causes are: lack of experience in the line of work, lack of labor productivity, delay in payments, rework and material waste. It is hoped that the findings will guide efforts to improve the performance of construction industry in Saudi Arabia and other developing countries.

Keywords: building, contractor, cost increase, cost overrun

Procedia PDF Downloads 123
1705 Reimaging Archetype of Mosque: A Case Study on Contemporary Mosque Architecture in Bangladesh

Authors: Sabrina Rahman

Abstract:

The Mosque is Islam’s most symbolic structure, as well as the expression of collective identity. From the explicit words of our Prophet, 'The earth has been created for me as a masjid and a place of purity, and whatever man from my Ummah finds himself in need of prayer, let him pray' (anywhere)! it is obvious that a devout Muslim does not require a defined space or structure for divine worship since the whole earth is his prayer house. Yet we see that from time immemorial man throughout the Muslim world has painstakingly erected innumerable mosques. However, mosque design spans time, crosses boundaries, and expresses cultures. It is a cultural manifestation as much as one based on a regional building tradition or a certain interpretation of religion. The trend to express physical signs of religion is not new. Physical forms seem to convey symbolic messages. However, in recent times physical forms of mosque architecture are dominantly demising from mosque architecture projects in Bangladesh. Dome & minaret, the most prominent symbol of the mosque, is replacing by contextual and contemporary improvisation rather than subcontinental mosque architecture practice of early fellows. Thus the recent mosque projects of the last 15 years established the contemporary architectural realm in their design. Contextually, spiritual lighting, the serenity of space, tranquility of outdoor spaces, the texture of materials is widely establishing a new genre of Muslim prayer space. A case study based research will lead to specify its significant factors of modernism. Based on the findings, the paper presents evidence of recent projects as well as a guideline for the future image of contemporary Mosque architecture in Bangladesh.

Keywords: contemporary architecture, modernism, prayer space, symbolism

Procedia PDF Downloads 93
1704 An Investigation into the Current Implementation of Design-Build Contracts in the Kingdom of Saudi Arabia

Authors: Ibrahim A. Alhammad, Suleiman A. Al-Otaibi, Khalid S. Al-Gahtani, Naïf Al-Otaibi, Abdulaziz A. Bubshait

Abstract:

In the last decade, the use of project delivery system of design build engineering contracts is increasing in North America due to the reasons of reducing the project duration and minimizing costs. The shift from traditional approach of Design-Bid-Build to Design-Build contracts have been attributed to many factors such as evolution of the regulatory and legal frameworks governing the engineering contracts and improvement in integrating design and construction. The aforementioned practice of contracting is more appropriate in North America; yet, it may not be the case in Saudi Arabia where the traditional approach of construction contracting remains dominant. The authors believe there are number of factors related to the gaps in the level of sophistication of the engineering and management of the construction projects in both countries. A step towards improving the Saudi construction practice by adopting the new trend of construction contracting, this paper identifies the reasons why Design/Build form of contracting are not frequently utilized. A field survey, which includes the questionnaire addressing the research problem, is distributed to three main parties of the construction contracts: clients, consultants, and contractors. The analyzed collected data were statistically sufficient to finding the reasons of not adopting the new trend of good practice of deign build approach in Saudi Arabia. In addition, the reasons are: (1) lack of regulation and legal framework; (2) absence of clear criteria of the owner for the trade-off between competing contractors, (3) and lack of experience, knowledge and skill.

Keywords: design built projects, Saudi Arabia, GCC, mega projects

Procedia PDF Downloads 187
1703 Heritage Impact Assessment Policy within Western Balkans, Albania

Authors: Anisa Duraj

Abstract:

As usually acknowledged, cultural heritage is the weakest component in EIA studies. The role of heritage impact assessment (HIA) in development projects is not often accounted for, and in those cases where it is, HIA is considered as a reactive response and not as a solutions provider. Because of continuous development projects, in most cases, heritage is unconsidered and often put under threat. Cultural protection and development challenges ask for prudent legal regulation and appropriate policy implementation. The challenges become even more peculiar in underdeveloped countries or endangered areas, which are generally characterized by numerous legal constraints. Therefore, the need for strategic proposals for HIA is of high importance. In order to trigger HIA as a proactive operation in the IA process and make sure to cover cultural heritage in the whole EIA framework, an appropriate system of evaluation of impacts should be provided. To obtain the required results for HIA, this last must be part of a regional policy, which will address and guide development projects toward a proper evaluation of their impacts affecting heritage. In order to get a clearer picture of existing gabs but also new possibilities for HIA, this paper will focus on the Western Balkans region and the undergoing changes that it faces. Concerning continuous development pressure in the region and within the aspiration of the Western Balkans countries to join the European Union (EU) as member states, attention should be paid to new development policies under the EU directives for conducting EIAs, and accurate support is required for the restructuration of existing policies as well as for the implementation of the UN Agenda for SDGs. In the framework of new emerging needs, if HIA is taken into account, the outcome would be an inclusive regional program that would help to overcome marginality issues of spaces and people.

Keywords: cultural heritage, impact assessment, SDGs, urban development, western Balkans, regional policy, HIA, EIA

Procedia PDF Downloads 62
1702 Colonial Body: Historicizing the Becoming of the Kashmiri Body

Authors: Ain ul Khair

Abstract:

In this study, the author situates the formation of the Kashmiri body as colonized in the postcolonial society, on which India continues to execute and maintain colonial practices adopted and replicated from the Western colonial projects. This paper explores the formation of a Kashmiri body as a site of complete dehumanization, which has deliberately been politicized based on its religion, racialized because of its ethnic distinction, and consequently has been subjected to extreme forms of violence. This paper specifically looks at the creation of the Kashmiri colonized body through India’s colonial practices that are in continuity from the Western imperialist colonial projects through the historicization of the careful manufacturing of the Kashmiri colonial body through the lens of the political, legal, geographical, and demographic landscape of India’s colonial project. The paper looks at the framing of the colonial legal framework that informs the construction of the colonized Kashmiri body, drawing violence and religion at the center of it.

Keywords: historicization, colonial body, kashmir, india, pakistan, south asia, religion, political identity, politics, Mahmood Mamdani, Ann Stoler, Fanon

Procedia PDF Downloads 16
1701 Interoperable Design Coordination Method for Sharing Communication Information Using Building Information Model Collaboration Format

Authors: Jin Gang Lee, Hyun-Soo Lee, Moonseo Park

Abstract:

The utilization of BIM and IFC allows project participants to collaborate across different areas by consistently sharing interoperable product information represented in a model. Comments or markups generated during the coordination process can be categorized as communication information, which can be shared in less standardized manner. It can be difficult to manage and reuse such information compared to the product information in a model. The present study proposes an interoperable coordination method using BCF (the BIM Collaboration Format) for managing and sharing the communication information during BIM based coordination process. A management function for coordination in the BIM collaboration system is developed to assess its ability to share the communication information in BIM collaboration projects. This approach systematically links communication information during the coordination process to the building model and serves as a type of storage system for retrieving knowledge created during BIM collaboration projects.

Keywords: design coordination, building information model, BIM collaboration format, industry foundation classes

Procedia PDF Downloads 393
1700 System of System Decisions Framework for Cross-Border Railway Projects

Authors: Dimitrios J. Dimitriou, Maria F. Sartzetaki, Anastasia Kalamakidou

Abstract:

Transport infrastructure assets are key components of the national asset portfolio. The decision to invest in a new infrastructure in transports could take from a few years to some decades. This is mainly because of the need to reserve and spent many capitals, the long payback period, the number of the stakeholders involved in the decision process and –many times- the investment and business risks are high. Decision makers and stakeholders need to define the framework and the outputs of the decision process taking into account the project characteristics, the business uncertainties, and the different expectations. Therefore, the decision assessment framework is an essential challenge linked with the key decision factors meet the stakeholder expectations highlighting project trade-offs, financial risks, business uncertainties and market limitations. This paper examines the decision process for new transport infrastructure projects in cross-border regions, where a wide range of stakeholders with different expectation is involved. According to a consequences analysis systemic approach, the relationship of transport infrastructure development, economic system development and stakeholder expectation is analysed. Adopting the on system of system methodological approach, the decision making the framework, variables, inputs and outputs are defined, highlighting the key shareholder’s role and expectations. The application provides the methodology outputs presenting the proposed decision framework for a strategic railway project in north Greece deals with the upgrade of the existing railway corridor connecting Greece, Turkey, and Bulgaria.

Keywords: system of system decision making, managing decisions for transport projects, decision support framework, defining decision process

Procedia PDF Downloads 276
1699 Integration of Wireless Sensor Networks and Radio Frequency Identification (RFID): An Assesment

Authors: Arslan Murtaza

Abstract:

RFID (Radio Frequency Identification) and WSN (Wireless sensor network) are two significant wireless technologies that have extensive diversity of applications and provide limitless forthcoming potentials. RFID is used to identify existence and location of objects whereas WSN is used to intellect and monitor the environment. Incorporating RFID with WSN not only provides identity and location of an object but also provides information regarding the condition of the object carrying the sensors enabled RFID tag. It can be widely used in stock management, asset tracking, asset counting, security, military, environmental monitoring and forecasting, healthcare, intelligent home, intelligent transport vehicles, warehouse management, and precision agriculture. This assessment presents a brief introduction of RFID, WSN, and integration of WSN and RFID, and then applications related to both RFID and WSN. This assessment also deliberates status of the projects on RFID technology carried out in different computing group projects to be taken on WSN and RFID technology.

Keywords: wireless sensor network, RFID, embedded sensor, Wi-Fi, Bluetooth, integration, time saving, cost efficient

Procedia PDF Downloads 300
1698 Managing the Water Projects and Controlling Its Boundary Disturbances Which Affect the Water Supply

Authors: Sead A. Bakheet, Salah M. Elkoum, Asharaf A. Almaghribi

Abstract:

Disturbance defined as activity that malfunction, intrusion, or interruption. We have to look around for the source of the disturbance affecting the inputs and outputs of engineering projects, take the necessary actions to control them. In this paper we will present and discuss a production system consisting of three elements, inputs, the production process and outputs. The production process which we chose is the production of large diameter pre-stressed concrete cylinder pipes (out puts), in reality, the outputs are the starting points of the operation (laying the concrete pipes for transporting drinkable water). The main objective also to address the controlling methods of the natural resources and raw materials (basic inputs), study the disturbances affecting them as well as the output quality. The importance of making the right decision, which effect the final product quality will be summarized. Finally, we will address the proposals regarding the managing of secure water supply to the customers.

Keywords: disturbances, management, inputs, outputs, decision

Procedia PDF Downloads 39
1697 Eco-Index for Assessing Ecological Disturbances at Downstream of a Hydropower Project

Authors: Chandra Upadhyaya, Arup Kumar Sarma

Abstract:

In the North Eastern part of India several hydro power projects are being proposed and execution for some of them are already initiated. There are controversies surrounding these constructions. Impact of these dams in the downstream part of the rivers needs to be assessed so that eco-system and people living downstream are protected by redesigning the projects if it becomes necessary. This may result in reducing the stresses to the affected ecosystem and people living downstream. At present many index based ecological methods are present to assess impact on ecology. However, none of these methods are capable of assessing the affect resulting from dam induced diurnal variation of flow in the downstream. We need environmental flow methodology based on hydrological index which can address the affect resulting from dam induced diurnal variation of flow and play an important role in a riverine ecosystem management and be able to provide a qualitative idea about changes in the habitat for aquatic and riparian species.

Keywords: ecosystem, environmental flow assessment, entropy, IHA, TNC

Procedia PDF Downloads 354
1696 Faults in the Projects, Deviation in the Cost

Authors: S. Ahmed, P. Dlask, B. Hasan

Abstract:

There are several ways to estimate the cost of the construction project: simple and detailed. The process of estimating cost is usually done during the design stage, which should take long-time and the designer must give attention to all details. This paper explain the causes of the deviations occurring in the cost of the construction project, and determines the reasons of these differences between contractual cost and final cost of the construction project, through the study of literature review related to this field, and benefiting from the experience of workers in the field of building (owners, contractors) through designing a questionnaire, and finding the most ten important reasons and explain the relation between the contractual cost and the final cost according to these reasons. The difference between those values will be showed through diagrams drawn using the statistical program. In addition to studying the effects of overrun costs on the advancing of the project, and identify the most five important effects. According to the results, we can propose the right direction for the final cost evaluation and propose some measures that would help to control and adjust the deviation in the costs.

Keywords: construction projects, building, cost, estimating costs, delay, overrun

Procedia PDF Downloads 265
1695 Digital Humanities in The US/Mexico Borderlands: Activism, Literature, and Border Crossers

Authors: Martin Camps

Abstract:

The two-thousand-mile border that divides the United States and Mexico is a “contact zone” of cultural friction and unbalanced power relations as defined by Mary Louise Pratt. The interest of this paper is to analyze digital platforms created to address the study and comprehension of the borderlands with pedagogical and research reasons. The paper explores ways to engage students in archival and analytical practices to build a repository of resources, links, and digital tools and consider how to adapt them to the study of the borderlands. Sites such as “Torn Apart / Separados,” “Digital Borderlands,” “Borderlands Archives Cartography,” and “Juaritos Literario” show visualizations, mapping, and access to materials and marginal literature on the border phenomenon. Analyzing these projects contributes to highlighting digital projects and the study of the border and how to engage in activism via the study of literature and the representation of a human tragedy that underscores the divisions and biopolitics imposed on the Global South and imagine the digital border futures.

Keywords: borderlands, digital humanities, activism, border literature

Procedia PDF Downloads 52
1694 Engineering Practice in Nigerian University: A Microcosm of Engineering Development and Practice in Developing Countries

Authors: Sunday Olufemi Adesogan

Abstract:

There is a strong link between engineering and development. Engineering as a profession is a call to service by the society. Perhaps next to soldiers, engineers are the most patriotic professionals. However, unlike soldiers, they remain servants of society at all times and in all circumstances. Despite their role to the society, engineering profession seems not to be enjoying the respect due to it probably because of failures associated with some engineering projects. This paper focuses on the need to improve on engineering practices for developments in developing countries using Engineering practice in Nigerian Universities as a tool for argument. Purposeful Survey, interview and focus group discussion were carried out among one hundred and twenty (120) reputable firms in Nigeria. The topic was approached through a few projects that the firms have been involved in from the planning stage, some to completion and beyond into the stage of maintenance and monitoring. It is revealed that some factors which are not determined by the engineers themselves impeded progress and full success of engineering practice in developing countries. The key culprit is corruption whose eradication will put the nation on the solid path of effective engineering development and poverty alleviation.

Keywords: development, engineering, practices, sustainable

Procedia PDF Downloads 305
1693 Identification of Factors Influencing Costs in Green Projects

Authors: Nazirah Zainul Abidin, Nurul Zahirah Mokhtar Azizi

Abstract:

Cost has always been the leading concern in green building development. The perception that construction cost for green building is higher than conventional buildings has only made the discussion of green building cost more difficult. Understanding the factors that will influence the cost of green construction is expected to shed light into what makes green construction more or at par with conventional projects, or perhaps, where cost can be optimised. This paper identifies the elements of cost before shifting the attention to the influencing factors. Findings from past studies uncovered various factors related to cost which are grouped into five focal themes i.e. awareness, knowledge, financial, technical, and government support. A conceptual framework is produced in a form of a flower diagram indicating the cost influencing factors of green building development. These factors were found to be both physical and non-physical aspects of a project. The framework provides ground for the next stage of research that is to further explore how these factors influence the project cost and decision making.

Keywords: green project, factors influencing cost, hard cost, soft cost

Procedia PDF Downloads 314
1692 A Morphological Examination of Urban Renewal Processes: The Sample of Konya City

Authors: Muzaffer Ali Yaygın, Mehmet Topçu

Abstract:

This research aims to investigate morphological changes in urban patterns in urban renewal areas by using geographic information systems and to reveal pattern differences that occur before and after urban renewal processes by applying a morphological analysis. The concept of urban morphology is not involved in urban renewal and urban planning practices in Turkey. This situation destroys the structural characteristic of urban space which appears as a consequence of changes at city, street or plot level. Different approaches and renewal interventions to urban settlements, which are formed as a reflection of cultural issues, may have positive and negative results. A morphological analysis has been applied to an urban renewal area that covers 325 ha. in Konya, in which city urban renewal projects have gained speed with the increasing of economic investments in this study. The study mentions urban renewal and urban morphology relationship, varied academic approach on the urban morphology issue, urban morphology components, changes in lots pattern and numerical differences that occur on road, construction and green space ratios that are before and after the renewal project, and the results of the morphological analysis. It is seen that the built-up area has significant differences when compared to the previous situation. The amount of green areas decreased significantly in quantitative terms; the transportation systems has been changed completely; and the property ownership has been reconstructed without taking the previous situation into account. Findings show that urban renewal projects in Turkey are put into practice with a rent-oriented approach without making an in-depth analysis. The paper discusses the morphological dimension of urban renewal projects in Turkey through a case study from Konya city.

Keywords: Konya, pattern, urban morphology, urban renewal

Procedia PDF Downloads 338
1691 Project Abandonment and Its Effect on Host Community: Case Study of Ajaokuta Steel Project, Nigeria

Authors: A. A. Omonori, K. T. Alade, A. F. Lawal

Abstract:

This research was conducted to identify the causes of project abandonment in Nigeria and the effect it has on the host community. The aim of the research was to identify the causes and effects of project failure and abandonment. Project abandonment is a major course of concern in the country as different projects fail and are abandoned at various levels. These projects do not fulfill the purpose for which they were initiated. This is the absolute definition of failure and hence the selection of the Ajaokuta Steel Project as an interesting case study and a typical example of project failure and abandonment. This has been done by conducting field study through the administration of questionnaires. This study was carried out on the Ajaokuta Steel Project to investigate the causes of the abandonment of the project and the effects it has had on the people of Ajaokuta community. Qualitative method of data analysis was used to analyze the findings through frequency tables and ranking. This study brought to light the major factors that led to the abandonment of the Ajaokuta Steel Project. The effects the abandonment of the project has had on the immediate community were identified and recommendations made to prevent the menace of Project abandonment.

Keywords: abandonment, case-study, Nigeria, project

Procedia PDF Downloads 318
1690 An Assessment of Existing Material Management Process in Building Construction Projects in Nepal

Authors: Uttam Neupane, Narendra Budha, Subash Kumar Bhattarai

Abstract:

Material management is an essential part in construction project management. There are a number of material management problems in the Nepalese construction industry, which contribute to an inefficient material management system. Ineffective material management can cause waste of time and money thus increasing the problem of time and cost overrun. An assessment of material management system with gap and solution was carried out on 20 construction projects implemented by the Federal Level Project Implementation Unit (FPIU); Kaski district of Nepal. To improve the material management process, the respondents have provided possible solutions to overcome the gaps seen in the current material management process. The possible solutions are preparation of material schedule in line with the construction schedule for material requirement planning, verifications of material and locating of source, purchasing of the required material in advance before commencement of work, classifying the materials, and managing the inventory based on their usage value and eliminating and reduction in wastages during the overall material management process.

Keywords: material management, construction site, inventory, construction project

Procedia PDF Downloads 27
1689 Numerical Investigation on Load Bearing Capacity of Pervious Concrete Piles as an Alternative to Granular Columns

Authors: Ashkan Shafee, Masoud Ghodrati, Ahmad Fahimifar

Abstract:

Pervious concrete combines considerable permeability with adequate strength, which makes it very beneficial in pavement construction and also in ground improvement projects. In this paper, a single pervious concrete pile subjected to vertical and lateral loading is analysed using a verified three dimensional finite element code. A parametric study was carried out in order to investigate load bearing capacity of a single unreinforced pervious concrete pile in saturated soft soil and also gain insight into the failure mechanism of this rather new soil improvement technique. The results show that concrete damaged plasticity constitutive model can perfectly simulate the highly brittle nature of the pervious concrete material and considering the computed vertical and horizontal load bearing capacities, some suggestions have been made for ground improvement projects.

Keywords: concrete damaged plasticity, ground improvement, load-bearing capacity, pervious concrete pile

Procedia PDF Downloads 202
1688 A Post-Occupancy Evaluation of LEED-Certified Residential Communities Using Structural Equation Modeling

Authors: Mohsen Goodarzi, George Berghorn

Abstract:

Despite the rapid growth in the number of green building and community development projects, the long-term performance of these projects has not yet been sufficiently evaluated from the users’ points of view. This is partially due to the lack of post-occupancy evaluation tools available for this type of project. In this study, a post-construction evaluation model is developed to evaluate the relationship between the perceived performance and satisfaction of residents in LEED-certified residential buildings and communities. To develop this evaluation model, a primary five-factor model was developed based on the existing models and residential satisfaction theories. Each factor of the model included several measures that were adopted from LEED certification systems such as LEED-BD+C New Construction, LEED-BD+C Multifamily Midrise, LEED-ND, as well as the UC Berkeley’s Center for the Built Environment survey tool. The model included four predictor variables (factors), including perceived building performance (8 measures), perceived infrastructure performance (9 measures), perceived neighborhood design (6 measures), and perceived economic performance (4 measures), and one dependent variable (factor), which was residential satisfaction (6 measures). An online survey was then conducted to collect the data from the residents of LEED-certified residential communities (n=192) and the validity of the model was tested through Confirmatory Factor Analysis (CFA). After modifying the CFA model, 26 measures, out of the initial 33 measures, were retained to enter into a Structural Equation Model (SEM) and to find the relationships between the perceived buildings performance, infrastructure performance, neighborhood design, economic performance and residential Satisfaction. The results of the SEM showed that the perceived building performance was the most influential factor in determining residential satisfaction in LEED-certified communities, followed by the perceived neighborhood design. On the other hand, perceived infrastructure performance and perceived economic performance did not show any significant relationship with residential satisfaction in these communities. This study can benefit green building researchers by providing a model for the evaluation of the long-term performance of these projects. It can also provide opportunities for green building practitioners to determine priorities for future residential development projects.

Keywords: green building, residential satisfaction, perceived performance, confirmatory factor analysis, structural equation modeling

Procedia PDF Downloads 204
1687 A Systematic Analysis of Knowledge Development Trends in Industrial Maintenance Projects

Authors: Lilian Ogechi Iheukwumere-Esotu, Akilu Yunusa-Kaltungo, Paul Chan

Abstract:

Industrial assets are prone to degradation and eventual failures due to repetitive loads and harsh environments in which they operate. These failures often lead to costly downtimes, which may involve loss of critical assets and/or human lives. The rising pressures from stakeholders for optimized systems’ outputs have further placed strains on business organizations. Traditional means of combating such failures are by adopting strategies capable of predicting, controlling, and/or reducing the likelihood of systems’ failures. Turnarounds, shutdowns, and outages (TSOs) projects are popular maintenance management activities conducted over a certain period of time. However, despite the critical and significant cost implications of TSOs, the management of the interface of knowledge between academia and industry to our best knowledge has not been fully explored in comparison to other aspects of industrial operations. This is perhaps one of the reasons for the limited knowledge transfer between academia and industry, which has affected the outcomes of most TSOs. Prior to now, the study of knowledge development trends as a failure analysis tool in the management of TSOs projects have not gained the required level of attention. Hence, this review provides useful references and their implications for future studies in this field. This study aims to harmonize the existing research trends of TSOs through a systematic review of more than 3,000 research articles published over 7 decades (1940- till date) which were extracted using very specific research criteria and later streamlined using nominated inclusion and exclusion parameters. The information obtained from the analysis were then synthesized and coded into 8 parameters, thereby allowing for a transformation into actionable outputs. The study revealed a variety of information, but the most critical findings can be classified into 4 folds: (1) Empirical validation of available conceptual frameworks and models is still a far cry in practice, (2) traditional project management views for managing uncertainties are still dominant, (3) Inconsistent approaches towards the adoption and promotion of knowledge management systems which supports creation, transfer and application of knowledge within and outside the project organization and, (4) exploration of social practices in industrial maintenance project environments are under-represented within the existing body of knowledge. Thus, the intention of this study is to depict the usefulness of a framework which incorporates fact findings emanating from careful analysis and illustrations of evidence based results as a suitable approach which can tackle reoccurring failures in industrial maintenance projects.

Keywords: industrial maintenance, knowledge management, maintenance projects, systematic review, TSOs

Procedia PDF Downloads 92
1686 BIM Application Research Based on the Main Entrance and Garden Area Project of Shanghai Disneyland

Authors: Ying Yuken, Pengfei Wang, Zhang Qilin, Xiao Ben

Abstract:

Based on the main entrance and garden area (ME&G) project of Shanghai Disneyland, this paper introduces the application of BIM technology in this kind of low-rise comprehensive building with complex facade system, electromechanical system and decoration system. BIM technology is applied to the whole process of design, construction and completion of the whole project. With the construction of BIM application framework of the whole project, the key points of BIM modeling methods of different systems and the integration and coordination of BIM models are elaborated in detail. The specific application methods of BIM technology in similar complex low-rise building projects are sorted out. Finally, the paper summarizes the benefits of BIM technology application, and puts forward some suggestions for BIM management mode and practical application of similar projects in the future.

Keywords: BIM, complex low-rise building, BIM modeling, model integration and coordination, 3D scanning

Procedia PDF Downloads 132