15680 Create a Dynamic Model in Project Control and Management

Authors: Hamed Saremi, Shahla Saremi

Abstract:

In this study, control and management of construction projects is evaluated through developing a dynamic model in which some means are used in order to evaluating planning assumptions and reviewing the effectiveness of some project control policies based on previous researches about time, cost, project schedule pressure management, source management, project control, adding elements and sub-systems from cost management such as estimating consumption budget from budget due to costs, budget shortage effects and etc. using sensitivity analysis, researcher has evaluated introduced model that during model simulation by VENSIM software and assuming optimistic times and adding information about doing job and changes rate and project is forecasted with 373 days (2 days sooner than forecasted) and final profit $ 1,960,670 (23% amount of contract) assuming 15% inflation rate in year and costs rate accordance with planned amounts and other input information and final profit.

Keywords: dynamic planning, cost, time, performance, project management

Procedia PDF Downloads 440
15679 Risk Management in Construction Projects

Authors: Mustafa Dogru, Ruveyda Komurlu

Abstract:

Companies and professionals in the construction sector face various risks in every project depending on the characteristics, size, complexity, the location of the projects and the techniques used. Some risks’ effects may increase as the project progresses whereas new risks may emerge. Because of the ever-changing nature of the risks, risk management is a cyclical process that needs to be repeated throughout the project. Since the risks threaten the success of the project, risk management is an important part of the entire project management process. The aims of this study are to emphasize the importance of risk management in construction projects, summarize the risk identification process, and introduce a number of methods for preventing risks such as alternative design, checklists, prototyping and test-analysis-correction technique etc. Following the literature review conducted to list the techniques for preventing risks, case studies has been performed to compare and evaluate the success of the techniques in a number of completed projects with the same typology, performed domestic and international. Findings of the study suggest that controlling and minimizing the level of the risks in construction projects, taking optimal precautions for different risks, and mitigating or eliminating the effects of risks are important in order to prevent additional costs for the project. Additionally, focusing on the risks that have highest impact is the most rational way to minimize the effects of the risks on projects.

Keywords: construction projects, construction management, project management, risk management

Procedia PDF Downloads 280
15678 An Agile, Intelligent and Scalable Framework for Global Software Development

Authors: Raja Asad Zaheer, Aisha Tanveer, Hafza Mehreen Fatima

Abstract:

Global Software Development (GSD) is becoming a common norm in software industry, despite of the fact that global distribution of the teams presents special issues for effective communication and coordination of the teams. Now trends are changing and project management for distributed teams is no longer in a limbo. GSD can be effectively established using agile and project managers can use different agile techniques/tools for solving the problems associated with distributed teams. Agile methodologies like scrum and XP have been successfully used with distributed teams. We have employed exploratory research method to analyze different recent studies related to challenges of GSD and their proposed solutions. In our study, we had deep insight in six commonly faced challenges: communication and coordination, temporal differences, cultural differences, knowledge sharing/group awareness, speed and communication tools. We have established that each of these challenges cannot be neglected for distributed teams of any kind. They are interlinked and as an aggregated whole can cause the failure of projects. In this paper we have focused on creating a scalable framework for detecting and overcoming these commonly faced challenges. In the proposed solution, our objective is to suggest agile techniques/tools relevant to a particular problem faced by the organizations related to the management of distributed teams. We focused mainly on scrum and XP techniques/tools because they are widely accepted and used in the industry. Our solution identifies the problem and suggests an appropriate technique/tool to help solve the problem based on globally shared knowledgebase. We can establish a cause and effect relationship using a fishbone diagram based on the inputs provided for issues commonly faced by organizations. Based on the identified cause, suitable tool is suggested, our framework suggests a suitable tool. Hence, a scalable, extensible, self-learning, intelligent framework proposed will help implement and assess GSD to achieve maximum out of it. Globally shared knowledgebase will help new organizations to easily adapt best practices set forth by the practicing organizations.

Keywords: agile project management, agile tools/techniques, distributed teams, global software development

Procedia PDF Downloads 269
15677 CDIO-Based Teaching Reform for Software Project Management Course

Authors: Liping Li, Wenan Tan, Na Wang

Abstract:

With the rapid development of information technology, project management has gained more and more attention recently. Based on CDIO, this paper proposes some teaching reform ideas for software project management curriculum. We first change from Teacher-centered classroom to Student-centered and adopt project-driven, scenario animation show, teaching rhythms, case study and team work practice to improve students' learning enthusiasm. Results showed these attempts have been well received and very effective; as well, students prefer to learn with this curriculum more than before the reform.

Keywords: CDIO, teaching reform, engineering education, project-driven, scenario animation simulation

Procedia PDF Downloads 403
15676 Projectification: Using Project Management Methodology to Manage the Academic Program Review

Authors: Adam Marks, Munir Majdalawieh, Maytha Al Ali

Abstract:

While research is rich with what criteria could be included in the academic program review processes, there is rarely any mention of how this significant and complex process should be managed. This paper proposes using project management methodology in alignment with the program review criteria of the Dickeson’s Prioritizing Academic Programs model. Project management and academic program review share two distinct characteristics; one is their life cycle, and the second is the core knowledge areas they use. This aligned and structured approach offers academic administrators a step-by-step guide that can help them manage this process and effectively assess academic programs.

Keywords: project management, academic program, program review, education, higher education institution, strategic management

Procedia PDF Downloads 339
15675 Proposal Evaluation of Critical Success Factors (CSF) in Lean Manufacturing Projects

Authors: Guilherme Gorgulho, Carlos Roberto Camello Lima

Abstract:

Critical success factors (CSF) are used to design the practice of project management that can lead directly or indirectly to the success of the project. This management includes many elements that have to be synchronized in order to ensure the project on-time delivery, quality and the lowest possible cost. The objective of this work is to develop a proposal for evaluation of the FCS in lean manufacturing projects, and apply the evaluation in a pilot project. The results show that the use of continuous improvement programs in organizations brings benefits as the process cost reduction and improve productivity.

Keywords: continuous improvement, critical success factors (csf), lean thinking, project management

Procedia PDF Downloads 330
15674 Stage-Gate Based Integrated Project Management Methodology for New Product Development

Authors: Mert Kıranç, Ekrem Duman, Murat Özbilen

Abstract:

In order to achieve new product development (NPD) activities on time and within budgetary constraints, the NPD managers need a well-designed methodology. This study intends to create an integrated project management methodology for the ones who focus on new product development projects. In the scope of the study, four different management systems are combined. These systems are called as 'Schedule-oriented Stage-Gate Method, Risk Management, Change Management and Earned Value Management'. New product development term is quite common in many different industries such as defense industry, construction, health care/dental, higher education, fast moving consumer goods, white goods, electronic devices, marketing and advertising and software development. All product manufacturers run against each other’s for introducing a new product to the market. In order to achieve to produce a more competitive product in the market, an optimum project management methodology is chosen, and this methodology is adapted to company culture. The right methodology helps the company to present perfect product to the customers at the right time. The benefits of proposed methodology are discussed as an application by a company. As a result, how the integrated methodology improves the efficiency and how it achieves the success of the project are unfolded.

Keywords: project, project management, management methodology, new product development, risk management, change management, earned value, stage-gate

Procedia PDF Downloads 291
15673 Lean Implementation Analysis on the Safety Performance of Construction Projects in the Philippines

Authors: Kim Lindsay F. Restua, Jeehan Kyra A. Rivero, Joneka Myles D. Taguba

Abstract:

Lean construction is defined as an approach in construction with the purpose of reducing waste in the process without compromising the value of the project. There are numerous lean construction tools that are applied in the construction process, which maximizes the efficiency of work and satisfaction of customers while minimizing waste. However, the complexity and differences of construction projects cause a rise in challenges on achieving the lean benefits construction can give, such as improvement in safety performance. The objective of this study is to determine the relationship between lean construction tools and their effects on safety performance. The relationship between construction tools applied in construction and safety performance is identified through Logistic Regression Analysis, and Correlation Analysis was conducted thereafter. Based on the findings, it was concluded that almost 60% of the factors listed in the study, which are different tools and effects of lean construction, were determined to have a significant relationship with the level of safety in construction projects.

Keywords: correlation analysis, lean construction tools, lean construction, logistic regression analysis, risk management, safety

Procedia PDF Downloads 146
15672 Sustainable Framework Integration for Construction Project Management: A Multi-Dimensional Analysis

Authors: Tharaki S. Hettiarachchi

Abstract:

Sustainable construction has gained massive attention in the present world as the construction industry is highly responsible for carbon emissions and other types of unsustainable practices. Yet, the construction industry has not been able to completely attain sustainable goals. Therefore, the present study aims to identify the extent to which sustainability has been considered within the scope of construction project management and to analyze the challenges, gaps, and constraints associated. Accordingly, this study develops a sustainable framework to integrate in construction project management. In accomplishing the research aim, this research integrates a qualitative approach while relying on secondary data sources. The data shall be then analyzed with the use of a systematic literature review (SLR) method while following the PRISMA (2020) guideline and represented in a statistical form. The outcomes of this study may become highly significant in identifying the nature of the existing sustainable frameworks associated with construction project management scopes and to develop a new framework to integrate in order to enhance the effectiveness of sustainable applications in construction management. The outcomes of this research may benefit present and future construction professionals and academicians to organize sustainable construction-related knowledge in a useful way to apply in practical implementation for effective project management. Overall, this study directs present and future construction professionals toward an advanced construction project management mechanism.

Keywords: construction, framework development, project management, sustainability

Procedia PDF Downloads 29
15671 The Impact of Management Competency, Project Team, and Process Design to Corporate Performance through Implementing the Self-Development ERP

Authors: Zeplin Jiwa Husada Tarigan, Sautma Ronni Basana, Widjojo Suprapto

Abstract:

Manufacturing companies in East Java develop their own ERP system or alter the ERP system which is developed by other companies to suit their needs. To make their own system, the companies mostly assign several employees from various departments to create a project team, and the employees are from the departments that are going to utilize the ERP system as the integrated data. The project team decides the making of the ERP system from the preparation stage until the going live implementation process. In designing the business process, the top management is working together with the project team until the project is accomplished. The completion of the ERP projects depends on the project to be undertaken itself, the strategy chosen to complete the project, the work method selection, the measurement system to monitor the project, the evaluation system of the project, and, in the end, the declaration of 'going live' of the ERP project. There is an increase in the business performance for the companies that have implemented the information technology or ERP as they manage to integrate all management functions within their companies. To investigate, some questionnaires are distributed to 100 manufacturing companies, and 90 questionnaires are returned; however, there are only 46 companies that develop their own ERP system, so the response rate is 46%. The result of data analysis using PLS shows that the management competency brings impacts to the project team and the process design. The process design is adjusted to the real process in order to implement the ERP, but it does not bring direct impacts to the business performance. The implementation of ERP brings positive impacts to the company business performance.

Keywords: management competency, project team, process design, ERP implementation, business performance

Procedia PDF Downloads 183
15670 The Urban Project and the Urban Improvement to the Test of the Participation, Case: Project of Modernization of Constantine

Authors: Mouhoubi Nedjima, Sassi Boudemagh Souad

Abstract:

In the framework of the modernization of the city of Constantine, and in order to restore its status as a regional metropolis and introduce it into the network of cities international metropolises, a major urban project was launched: project of modernization and of metropolitanization of the city of Constantine (PMMC). Our research project focuses on the management of the project for the modernization of the city of Constantine (PMMC) focusing on the management of some aspects of the urban project whose participation, with the objective assessment of the managerial approach business. Among the cases revealing taken into account in our research work on the question of participation of actors and their organizations, the operation relating to "the urban improvement in the city of the Brothers FERRAD in the district of Zouaghi". This operation with the objective of improving the living conditions of citizens has faced several challenges and obstacles that have been in major part the factors of its failure. Through this study, we examine the management process and the mode of organization of the actors of the project as well as the level of participation of the citizen to finally propose managerial solutions to conflict situations observed.

Keywords: the urban project, the urban improvement, participation, Constantine

Procedia PDF Downloads 374
15669 Analysis of Factors Used by Farmers to Manage Risk: A Case Study on Italian Farms

Authors: A. Pontrandolfi, G. Enjolras, F. Capitanio

Abstract:

The study analyses the strategies Italian farmers use to cope with the risks that face their production. We specifically explore the potential and the limitations of the economic tools for climatic risk management in agriculture of the Common Agricultural Policy 2014-2020, that foresees contributions for economic tools for risk management, in relation to farms’ needs, exposure and vulnerability of agricultural areas to climatic risk. We consider at the farm level approaches to hedge risks in terms of the use of technical tools (agricultural practices, pesticides, fertilizers, irrigation) and economic/financial instruments (insurances, etc.). We develop cross-sectional and longitudinal analyses as well as analyses of correlation that underline the main differences between the way farms adapt their structure and management towards risk. The results show a preference for technical tools, despite the presence of important public aids on economic tools such as insurances. Therefore, there is a strong need for a more effective and integrated risk management policy scheme. Synergies between economic tools and risk reduction actions of a more technical, structural and management nature (production diversification, irrigation infrastructures, technological and management innovations and formation-information-consultancy, etc.) are emphasized.

Keywords: agriculture and climate change, climatic risk management, insurance schemes, farmers' approaches to risk management

Procedia PDF Downloads 307
15668 Empirical Study on Causes of Project Delays

Authors: Khan Farhan Rafat, Riaz Ahmed

Abstract:

Renowned offshore organizations are drifting towards collaborative exertion to win and implement international projects for business gains. However, devoid of financial constraints, with the availability of skilled professionals, and despite improved project management practices through state-of-the-art tools and techniques, project delays have become a norm these days. This situation calls for exploring the factor(s) affecting the bonding between project management performance and project success. In the context of the well-known 3M’s of project management (that is, manpower, machinery, and materials), machinery and materials are dependent upon manpower. Because the body of knowledge inveterate on the influence of national culture on men, hence, the realization of the impact on the link between project management performance and project success need to be investigated in detail to arrive at the possible cause(s) of project delays. This research initiative was, therefore, undertaken to fill the research gap. The unit of analysis for the proposed research excretion was the individuals who had worked on skyscraper construction projects. In reverent studies, project management is best described using construction examples. It is due to this reason that the project oriented city of Dubai was chosen to reconnoiter on causes of project delays. A structured questionnaire survey was disseminated online with the courtesy of the Project Management Institute local chapter to carry out the cross-sectional study. The Construction Industry Institute, Austin, of the United States of America along with 23 high-rise builders in Dubai were also contacted by email requesting for their contribution to the study and providing them with the online link to the survey questionnaire. The reliability of the instrument was warranted using Cronbach’s alpha coefficient of 0.70. The appropriateness of sampling adequacy and homogeneity in variance was ensured by keeping Kaiser–Meyer–Olkin (KMO) and Bartlett’s test of sphericity in the range ≥ 0.60 and < 0.05, respectively. Factor analysis was used to verify construct validity. During exploratory factor analysis, all items were loaded using a threshold of 0.4. Four hundred and seventeen respondents, including members from top management, project managers, and project staff, contributed to the study. The link between project management performance and project success was significant at 0.01 level (2-tailed), and 0.05 level (2-tailed) for Pearson’s correlation. Before initiating the moderator analysis test for linearity, multicollinearity, outliers, leverage points and influential cases, test for homoscedasticity and normality were carried out which are prerequisites for conducting moderator review. The moderator analysis, using a macro named PROCESS, was performed to verify the hypothesis that national culture has an influence on the said link. The empirical findings, when compared with Hofstede's results, showed high power distance as the cause of construction project delays in Dubai. The research outcome calls for the project sponsors and top management to reshape their project management strategy and allow for low power distance between management and project personnel for timely completion of projects.

Keywords: causes of construction project delays, construction industry, construction management, power distance

Procedia PDF Downloads 183
15667 The Impact of Using Building Information Modeling Technology in Construction Projects Management

Authors: Mohammad Ashraf

Abstract:

This research links the use of Building Information Modeling technology in constructions and infrastructure projects, starting from the moment when considering the establishment of a project to demolishing or renovating it, going through the design work, planning, procurement and implementation. BIM Software's which used are Revit, Navisworks and Asta Project in the case study for the Atletico Madrid Stadium project (Wanda Stadium). Also, the project improves through various phases of construction (planning - implementation - management). Besides, the level of the details managed within this project advances gradually. In addition, the construction process problems become about 30 % less than before, resulting from high coordination between designing, implementation and follow through that is done by the project management office (PMO). The current disposition in the industry is to tightly manage the detail contained within the planning and coordination phases of construction, but we miss the opportunity to manage that data as it matures and grows into the execution and commissioning phases.

Keywords: construction management, BIM technology, planning, design, procurements, critical path method

Procedia PDF Downloads 251
15666 Engaging Mature Learners through Video Case Studies

Authors: Jacqueline Mary Jepson

Abstract:

This article provides a case study centred on the development of 13 video episodes which have been created to enhance student engagement with a post graduate online course in Project Management. The student group was unique as their online course needed to provide for asynchronistic learning and an adult learning pedagogy. In addition, students had come from a wide range professional backgrounds, with some having no Project Management experience, while others had 20 years or more. Students had to gain an understanding of an advanced body of knowledge and the course needed to achieve the academic requirements to qualify individuals to apply their learning in a range of contexts for professional practice and scholarship. To achieve this, a 13 episode case study was developed along with supportive learning materials based on the relocation of a zoo. This unique project provided a learning environment where the project could evolve over each video episode demonstrating the application of Project Management methodology which was then tied into the learning outcomes for the course and the assessment tasks. Discussion forums provided a way for students to converse and demonstrate their own understanding of content and how Project Management methodology can be applied.

Keywords: project management, adult learning, video case study, asynchronistic education

Procedia PDF Downloads 310
15665 Overcoming the Impacts of Covid-19 Outbreak Using Value Integrated Project Delivery Model

Authors: G. Ramya

Abstract:

Value engineering is a systematic approach, widely used to optimize the design or process or product in the designing stage. It used to achieve the client's obligation by increasing the functionality and attain the targeted cost in the cost planning. Value engineering effectiveness and benefits decrease along with the progress of the project since the change in the scope of the work and design will account for more cost all along the lifecycle of the project. Integrating the value engineering with other project management activities will promote cost minimization, client satisfaction, and ensure early completion of the project in time. Previous research studies suggested that value engineering can integrate with other project delivery activities, but research studies unable to frame a model that collaborates the project management activities with the job plan of value engineering approach. I analyzed various project management activities and their synergy between each other. The project management activities and processes like a)risk analysis b)lifecycle cost analysis c)lean construction d)facility management e)Building information modelling f)Contract administration, collaborated, and project delivery model planned along with the RIBA plan of work. The key outcome of the research is a value-driven project delivery model, which will succeed in dealing with the economic impact, constraints and conflicts arise due to the COVID-19 outbreak in the Indian construction sector. Benefits associated with the structured framework is construction project delivery that ensures early contractor involvement, mutual risk sharing, and reviving the project with a cost overrun and delay back on track ,are discussed. Keywords: Value-driven project delivery model, Integration, RIBA plan of work Themes: Design Economics

Keywords: value-driven project delivery model, Integration, RIBA

Procedia PDF Downloads 95
15664 The Contribution of Community Involvement in Heritage Management

Authors: Esraa Alhadad

Abstract:

Recently, there has been considerable debate surrounding the definition, conservation, and management of heritage. Over the past few years, there has been a growing call for the inclusion of local communities in heritage management. However, the perspectives on involvement, especially concerning key stakeholders like community members, often diverge significantly. While the theoretical foundation for community involvement is reasonably established, the application of this approach in heritage management has been sluggish. Achieving a balance to fulfill the diverse goals of stakeholders in any involvement project proves challenging in practice. Consequently, there is a dearth of empirical studies exploring the practical implications of effective tools in heritage management, and limited indication exists to persuade current authorities, such as governmental organizations, to share their influence with local community members. This research project delves into community involvement within heritage management as a potent means of constructing a robust management framework. Its objective is to assess both the extent and caliber of involvement within the management of heritage sites overall, utilizing a cultural mapping-centered methodology. The findings of this study underscore the significance of engaging the local community in both heritage management and planning endeavors. Ultimately, this investigation furnishes crucial empirical evidence and extrapolates valuable theoretical and practical insights that advance understanding of cultural mapping in pivotal areas, including the catalysts for involvement and collaborative decision-making processes.

Keywords: community involvement, heritage management, cultural mapping, stakeholder mangement

Procedia PDF Downloads 89
15663 Agile Project Management: A Real Application in a Multi-Project Research and Development Center

Authors: Aysegul Sarac

Abstract:

The aim of this study is to analyze the impacts of integrating agile development principles and practices, in particular to reduce project lead time in a multi-project environment. We analyze Arçelik Washing Machine R&D Center in which multiple projects are conducted by shared resources. In the first part of the study, we illustrate the current waterfall model system by using a value stream map. We define all activities starting from the first idea of the project to the customer and measure process time and lead time of projects. In the second part of the study we estimate potential improvements and select a set of these improvements to integrate agile principles. We aim to develop a future state map and analyze the impacts of integrating lean principles on project lead time. The main contribution of this study is that we analyze and integrate agile product development principles in a real multi-project system.

Keywords: agile project management, multi project system, project lead time, product development

Procedia PDF Downloads 275
15662 ERP Implementation in Iran: A Successful Experience in DGC

Authors: Mohammad Reza Ostad Ali Naghi Kashani

Abstract:

Nowadays, the amounts of companies which tend to have an Enterprise Resource Planning (ERP) application are increasing. Although ERP projects are expensive, time consuming, and complex, there are some successful experiences. These days, developing countries are striving to implement ERP projects successfully; however, there are many obstacles. Therefore, these projects would be failed or partially failed. This paper concerns the implementation of a successful ERP implementation, IFS, in Iran at Dana Geophysics Company (DGC). After a short review of ERP and ERP market in Iran, we propose a three phases deployment methodology (phase 1: Preparation and Business Process Management (BPM) phase 2: implementation and phase 3: testing, golive-1 (pilot) and golive-2 (final)). Then, we present five guidelines (Project Management, Change Management, Business Process Management (BPM), Training& Knowledge Management, and Technical Management), which were chose as work streams. In this case study we present lessons learned in Project management and Business process Management.

Keywords: business process management, critical success factors, ERP, project management

Procedia PDF Downloads 455
15661 Conceptualising Project Complexity in Ghana’s Construction Industry: A Qualitative Study

Authors: Kwasi Dartey-Baah, Mias De Klerk

Abstract:

Project complexity has been cited as one of the essential areas of project management. It can be observed from environmental, social, technological, and organisational viewpoints, and its handling is critical to project success. Conceptualised in varied industries, this paper seeks to ascertain the meaning and understanding of project complexity within the Ghanaian construction industry based on the three dimensions of complexities (faith, fact, and interaction) using experts' opinions. Taking the form of a focus group discussion, the paper sought to gain an in-depth understanding of project complexity issues in Ghana’s construction industry. The method use obtained data from experts (a purposely selected group) comprising project leaders and project management academics. The findings indicated that the experts broadly agreed with the complexity items but offered varied reasons for their agreement. In the composite assessment of the complexity dimensions of (faith, fact, and interaction), it emerged that there was some agreement with the complexity dimensions of fact and interaction within Ghana’s construction industry. On the other hand, with the dimension for complexity by faith, it was noted that the experts in Ghana’s construction construed complexity by faith, not as the absence of evidence but the evidence that hinges on at least a member of the project team. It is expected that other researches on project complexity will focus on other industries to enhance the knowledge of the same within the field of project management.

Keywords: project complexity, complexity by faith, complexity by fact, complexity by interaction, construction industry, Ghana

Procedia PDF Downloads 129
15660 Cross-Cultural Analysis of the Impact of Project Atmosphere on Project Success and Failure

Authors: Omer Livvarcin, Mary Kay Park, Michael Miles

Abstract:

The current literature includes a few studies that mention the impact of relations between teams, the business environment, and experiences from previous projects. There is, however, limited research that treats the phenomenon of project atmosphere (PA) as a whole. This is especially true of research identifying parameters and sub-parameters, which allow project management (PM) teams to build a project culture that ultimately imbues project success. This study’s findings identify a number of key project atmosphere parameters and sub-parameters that affect project management success. One key parameter identified in the study is a cluster related to cultural concurrence, including artifacts such as policies and mores, values, perceptions, and assumptions. A second cluster centers on motivational concurrence, including such elements as project goals and team-member expectations, moods, morale, motivation, and organizational support. A third parameter cluster relates to experiential concurrence, with a focus on project and organizational memory, previous internal PM experience, and external environmental PM history and experience). A final cluster of parameters is comprised of those falling in the area of relational concurrence, including inter/intragroup relationships, role conflicts, and trust. International and intercultural project management data was collected and analyzed from the following countries: Canada, China, Nigeria, South Korea and Turkey. The cross-cultural nature of the data set suggests increased confidence that the findings will be generalizable across cultures and thus applicable for future international project management success. The intent of the identification of project atmosphere as a critical project management element is that a clear understanding of the dynamics of its sub-parameters upon projects may significantly improve the odds of success of future international and intercultural projects.

Keywords: project management, project atmosphere, cultural concurrence, motivational concurrence, relational concurrence

Procedia PDF Downloads 295
15659 Development of an Intelligent Decision Support System for Smart Viticulture

Authors: C. M. Balaceanu, G. Suciu, C. S. Bosoc, O. Orza, C. Fernandez, Z. Viniczay

Abstract:

The Internet of Things (IoT) represents the best option for smart vineyard applications, even if it is necessary to integrate the technologies required for the development. This article is based on the research and the results obtained in the DISAVIT project. For Smart Agriculture, the project aims to provide a trustworthy, intelligent, integrated vineyard management solution that is based on the IoT. To have interoperability through the use of a multiprotocol technology (being the future connected wireless IoT) it is necessary to adopt an agnostic approach, providing a reliable environment to address cyber security, IoT-based threats and traceability through blockchain-based design, but also creating a concept for long-term implementations (modular, scalable). The ones described above represent the main innovative technical aspects of this project. The DISAVIT project studies and promotes the incorporation of better management tools based on objective data-based decisions, which are necessary for agriculture adapted and more resistant to climate change. It also exploits the opportunities generated by the digital services market for smart agriculture management stakeholders. The project's final result aims to improve decision-making, performance, and viticulturally infrastructure and increase real-time data accuracy and interoperability. Innovative aspects such as end-to-end solutions, adaptability, scalability, security and traceability, place our product in a favorable situation over competitors. None of the solutions in the market meet every one of these requirements by a unique product being innovative.

Keywords: blockchain, IoT, smart agriculture, vineyard

Procedia PDF Downloads 166
15658 Adoption of Noise and Vibration Management Tools for Major Infrastructure Projects in Sydney, Australia

Authors: Adrian Morris, Rodney Phillips, Mattia Tabacchi

Abstract:

Minimizing construction noise and vibration impacts is a key challenge for major infrastructure projects in urban environments. Before commencing construction works, Construction Noise and Vibration Management Plan (CNVMP) and Construction Noise and Vibration Impact Statements (CNVIS) are required to be prepared and submitted to the relevant government authorities for review and approval. However, the assessment of potential impacts from work activities at pre-approval stage may be inaccurate as works methodology and scheduling are yet to be determined. In response, noise and vibration management tools have been developed to refine and supplement the CNVIS as works progress. These tools have been successfully implemented in major infrastructure projects allowing contractors to plan and assess construction works in a cost effective and timely manner. As a result, noise and vibration management tools have been incorporated into management plans and are increasingly required by regulators.

Keywords: noise management, environmental noise, infrastructure projects, construction, vibration, cost effective

Procedia PDF Downloads 96
15657 An Assessment of Existing Material Management Process in Building Construction Projects in Nepal

Authors: Uttam Neupane, Narendra Budha, Subash Kumar Bhattarai

Abstract:

Material management is an essential part in construction project management. There are a number of material management problems in the Nepalese construction industry, which contribute to an inefficient material management system. Ineffective material management can cause waste of time and money thus increasing the problem of time and cost overrun. An assessment of material management system with gap and solution was carried out on 20 construction projects implemented by the Federal Level Project Implementation Unit (FPIU); Kaski district of Nepal. To improve the material management process, the respondents have provided possible solutions to overcome the gaps seen in the current material management process. The possible solutions are preparation of material schedule in line with the construction schedule for material requirement planning, verifications of material and locating of source, purchasing of the required material in advance before commencement of work, classifying the materials, and managing the inventory based on their usage value and eliminating and reduction in wastages during the overall material management process.

Keywords: material management, construction site, inventory, construction project

Procedia PDF Downloads 30
15656 The Effect of Artificial Intelligence on Construction Development

Authors: Shady Gamal Aziz Shehata

Abstract:

Difficulty in defining construction quality arises due to perception based on the nature and requirements of the market, the different partners themselves and the results they want. Quantitative research was used in this constructivist research. A case-based study was conducted to assess the structures of positive attitudes and expectations in the context of quality improvement. A survey based on expert opinions was analyzed among construction organizations/companies operating in the construction industry in Pakistan. The financial strength, management structure and construction experience of the construction companies formed the basis of their selection. A good concept is visible at the project level and is seen as the most valuable part of the construction project. Each quality improvement technique was expected to increase the user's profits by improving the efficiency of the construction project. The Survey is useful for construction professionals to evaluate current construction concepts and expectations for the application of quality improvement techniques in construction projects.

Keywords: correlation analysis, lean construction tools, lean construction, logistic regression analysis, risk management, safety construction quality, expectation, improvement, perception

Procedia PDF Downloads 18
15655 Familiarity with Engineering Project Management And Their Duties In Projects

Authors: Mokhtar Nikgoo

Abstract:

Today's industrial world has undergone tremendous changes in certain periods. These changes are called environmental changes. And they have a direct impact on organizations and bodies. Therefore, the importance of knowing these changes is clear. This importance has caused the manufacturing organizations to move towards multiple products and constantly change and expand their system. This research tries to show how the organization moves in this category by defining the basic steps of implementing a project. One of the most important features of a hard-to-order production organization is the definition of different production projects from different customers. Therefore, the lack of sufficient understanding of the type of work causes the project to be defined for the organization in question, and the managers of the organization (in every organizational level) are constantly involved with different projects. In the implementation of the production project of the aforementioned organizations, directing the facilities and people of the organization towards the implementation of the project is of particular importance. Therefore, it is felt necessary to define the project manager and his basic duties. Considering the importance of this topic, the project chapter deals with project management and its importance and examines all the different issues in that category from the perspective of implementation. A project includes certain activities of the organization that require the use of different resources and all the activities of the organization in order to implement the project with defined facilities and at the designated times. Project management is planning, organizing and controlling the organization's resources for a short-term goal that has been created for short-term and medium-term goals and objectives. Project management has the important task of centering and integrating (coordinating) task and line managers. In other words, project management requires having a strong and appropriate relationship with the internal people of the system to carry out the assigned activities and must have a general and technical knowledge related to various activities in the project environment. It seems that everything with project management in It is communication. One of the characteristics of production organizations under the order is the relationship between the customer (customers) and the organization until the completion of the defined project. Due to the nature of the work, it is necessary for a person to establish this relationship between the client and the organization's people and to establish this relationship in such a way that it does not cause a lack of coordination in the organization's activities. Therefore, project management has a very important role at this stage, because the relationship between the client and his organization will be any problems and problems and points of view that the client has, he must inform the management so that he can implement the cases with its analysis and special processes. To be transferred to other departments and line managers.

Keywords: project management, crisis management, project delays bill, project duration

Procedia PDF Downloads 24
15654 Simulating the Interaction of Strategy Development and Project Delivery

Authors: Nipun Agarwal, David Paul, Fareed Un Din

Abstract:

Every organization develops a strategy that needs to be implemented and is undertaken through project delivery. In essence, project requirements should exactly replicate an organization’s strategy. In reality this does not happen, and behavioral factors deviate the project delivery from the strategic objectives. This occurs as project stakeholders can have competing objectives. Resultantly, requirements that are implemented through projects are less aligned to the strategy. This paper develops a game theoretic model to simulate why such deviations occur. That explains the difference between strategy development and implementation.

Keywords: strategy, simulation, project management, game theory

Procedia PDF Downloads 100
15653 Strategic Leadership and Sustainable Project Management in Enugu, Nigeria

Authors: Nnadi Ezekiel Ejiofor

Abstract:

In Enugu, Nigeria, this study investigates the connection between strategic leadership and project management sustainability, with an emphasis on building projects in the State. The study set out to accomplish two specific goals: first, it sought to establish a link between creative project management and resource efficiency in construction projects in Enugu State, Nigeria; and second, it sought to establish a link between innovative thinking and waste minimization in those same projects. A structured questionnaire was used to collect primary data from 45 registered construction enterprises in the study area as part of the study's descriptive research approach. Due to the nonparametric nature of the data, Spearman Rank Order Correlation was used to evaluate the acquired data. The findings demonstrate that creative project management had a significant positive impact on resource efficiency in construction projects carried out by architecture firms in Enugu State, Nigeria (r =.849; p.001), and that innovative thinking had a significant impact on waste reduction in those same projects (r =.849; p.001). It was determined that strategic leadership had a significant impact on the sustainability of project management, and it was thus advised that project managers should foresee, prepare for, and effectively communicate present and future developments to project staff in order to ensure that the objective of sustainable initiatives, such as recycling and reuse, is implemented in construction projects.

Keywords: construction, project management, strategic leadership, sustainability, waste reduction

Procedia PDF Downloads 23
15652 Delay Studies in Construction: Synthesis, Critical Evaluation, and the Way Forward

Authors: Abdullah Alsehaimi

Abstract:

Over decades, there have been many studies of delay in construction, and this type of study continues to be popular in construction management research. A synthesis and critical evaluation of delay studies in developing countries reveals that poor project management is cited as one of the main causes of delay. However, despite such consensus, most of the previous studies fall short in providing clear recommendations demonstrating how project management practice could be improved. Moreover, the majority of recommendations are general and not devoted to solving the difficulties associated with particular delay causes. This paper aims to demonstrate that the root cause of this state of affairs is that typical research into delay tends to be descriptive and explanatory, making it inadequate for solving persistent managerial problems in construction. It is contended that many problems in construction could be mitigated via alternative research approaches, i.e. action and constructive research. Such prescriptive research methods can assist in the development and implementation of innovative tools tackling managerial problems of construction, including that of delay. In so doing, those methods will better connect research and practice, and thus strengthen the relevance of academic construction management.

Keywords: construction delay, action research, constructive research, industrial engineering

Procedia PDF Downloads 399
15651 Enhancing Project Success: A Case Study of Investment Strategies and Planning Practices in Rwanda’s Housing Projects Managed by Rwanda Social Security Board

Authors: Amina Umulisa

Abstract:

Background: Despite efforts to enhance profitability and project planning, Rwanda has experienced a decline in project success rates, notably in housing projects managed by the Rwanda Social Security Board (RSSB). This study aims to assess the impact of investment strategies and project planning practices on the performance of pension funds projects in Rwanda, focusing on housing projects by RSSB. Methods: Using descriptive and correlational research designs, this study surveyed 109 randomly selected respondents from a pool of 148 workers. Data analysis was conducted using descriptive and inferential statistics in STATA version 18. Results: Findings revealed that 54% of respondents acknowledged the importance of personnel generation. Additionally, 61% agreed with the effectiveness of training programs, and 79% supported the cost of human resource utilization. In terms of project management practices, 65.7% could determine when a project needed adjustments, 65.7% agreed with the approved budget, and 73% supported forecasted expenses. Furthermore, 68% agreed with order placement, 76.0% with using the right materials, and 64.4% with defining project scope. The study found significant associations between order placement and project quality outcomes (r=0.711, P-value <0.001), as well as with time management (Pearson was 0.701 and sing was 0.00) and cost management (r=0.885, P-value <0.001). Moreover, project time targets were found to significantly affect quality management (Pearson was 0.798, sing was 0.000), time management, and cost management (r=0.740, P-value <0.001). Conclusion: The findings highlight the positive association between the project implementation stage and quality management, indicating effective project planning practices among senior staff. However, there is a need to enhance project team collaboration and coordination to improve the performance of constructed houses.

Keywords: project success rates, investment strategies, training programs, cost management

Procedia PDF Downloads 17