3234 A Construction Management Tool: Determining a Project Schedule Typical Behaviors Using Cluster Analysis

Authors: Natalia Rudeli, Elisabeth Viles, Adrian Santilli

Abstract:

Delays in the construction industry are a global phenomenon. Many construction projects experience extensive delays exceeding the initially estimated completion time. The main purpose of this study is to identify construction projects typical behaviors in order to develop a prognosis and management tool. Being able to know a construction projects schedule tendency will enable evidence-based decision-making to allow resolutions to be made before delays occur. This study presents an innovative approach that uses Cluster Analysis Method to support predictions during Earned Value Analyses. A clustering analysis was used to predict future scheduling, Earned Value Management (EVM), and Earned Schedule (ES) principal Indexes behaviors in construction projects. The analysis was made using a database with 90 different construction projects. It was validated with additional data extracted from literature and with another 15 contrasting projects. For all projects, planned and executed schedules were collected and the EVM and ES principal indexes were calculated. A complete linkage classification method was used. In this way, the cluster analysis made considers that the distance (or similarity) between two clusters must be measured by its most disparate elements, i.e. that the distance is given by the maximum span among its components. Finally, through the use of EVM and ES Indexes and Tukey and Fisher Pairwise Comparisons, the statistical dissimilarity was verified and four clusters were obtained. It can be said that construction projects show an average delay of 35% of its planned completion time. Furthermore, four typical behaviors were found and for each of the obtained clusters, the interim milestones and the necessary rhythms of construction were identified. In general, detected typical behaviors are: (1) Projects that perform a 5% of work advance in the first two tenths and maintain a constant rhythm until completion (greater than 10% for each remaining tenth), being able to finish on the initially estimated time. (2) Projects that start with an adequate construction rate but suffer minor delays culminating with a total delay of almost 27% of the planned time. (3) Projects which start with a performance below the planned rate and end up with an average delay of 64%, and (4) projects that begin with a poor performance, suffer great delays and end up with an average delay of a 120% of the planned completion time. The obtained clusters compose a tool to identify the behavior of new construction projects by comparing their current work performance to the validated database, thus allowing the correction of initial estimations towards more accurate completion schedules.

Keywords: cluster analysis, construction management, earned value, schedule

Procedia PDF Downloads 238
3233 Assessment of the Impact of Road Transportation Improvement on Rural Development

Authors: Mohammad Mirwais Arghandiwal, Fujita Motohiro, Wisinee Wisetjindawat

Abstract:

Since 2001, the new government of Afghanistan addressed the improvement of transportation in rural areas as one of the key issues for the country development. This paper thus, aims to show the impotency of transportation in the rural area of Kabul province. A field survey in Kabul Province capital of Afghanistan has been conducted during March, 2015, and 201 questionnaires were collected from four districts named Shakar Dara, Paghman, Char Asyab, and Khak Jabar to investigate the impacts of road transportation on the people’s daily life. The districts had their road projects constructed during the last 3-5 years. The interviewees are chosen randomly from a different category of districts residences. As transportation is one of the most important factors for the development of the communities, during the survey it was very easily to observe a positive effect on the life of people. The improvement on the accessibility has had a positive impact on the land and land price. In this paper, a model is created to show the relationship between different factors and the land price improvement. In the end, a recommendation is presented on the establishment of the community council for a better use and maintenance of road projects. We emphasize on a public and private partnership at a community level in the districts during the construction period too. In addition, the communities should be encouraged on their positive role in the improvement of transportation through their participation and collaboration with the local government.

Keywords: accessibility, Afghanistan, poverty, rural area, transportation development

Procedia PDF Downloads 407
3232 Planning Quality and Maintenance Activities in a Closed-Loop Serial Multi-Stage Manufacturing System under Constant Degradation

Authors: Amauri Josafat Gomez Aguilar, Jean Pierre Kenné

Abstract:

This research presents the development of a self-sustainable manufacturing system from a circular economy perspective, structured by a multi-stage serial production system consisting of a series of machines under deterioration in charge of producing a single product and a reverse remanufacturing system constituted by the same productive systems of the first scheme and different tooling, fed by-products collected at the end of their life cycle, and non-conforming elements of the first productive scheme. Since the advanced production manufacturing system is unable to satisfy the customer's quality expectations completely, we propose the development of a mixed integer linear mathematical model focused on the optimal search and assignment of quality stations and preventive maintenance operation to the machines over a time horizon, intending to segregate the correct number of non-conforming parts for reuse in the remanufacturing system and thereby minimizing production, quality, maintenance, and customer non-conformance penalties. Numerical experiments are performed to analyze the solutions found by the model under different scenarios. The results showed that the correct implementation of a closed manufacturing system and allocation of quality inspection and preventive maintenance operations generate better levels of customer satisfaction and an efficient manufacturing system.

Keywords: closed loop, mixed integer linear programming, preventive maintenance, quality inspection

Procedia PDF Downloads 55
3231 Optimal Production and Maintenance Policy for a Partially Observable Production System with Stochastic Demand

Authors: Leila Jafari, Viliam Makis

Abstract:

In this paper, the joint optimization of the economic manufacturing quantity (EMQ), safety stock level, and condition-based maintenance (CBM) is presented for a partially observable, deteriorating system subject to random failure. The demand is stochastic and it is described by a Poisson process. The stochastic model is developed and the optimization problem is formulated in the semi-Markov decision process framework. A modification of the policy iteration algorithm is developed to find the optimal policy. A numerical example is presented to compare the optimal policy with the policy considering zero safety stock.

Keywords: condition-based maintenance, economic manufacturing quantity, safety stock, stochastic demand

Procedia PDF Downloads 444
3230 Tokenization of Blue Bonds to Scale Blue Carbon Projects

Authors: Rodrigo Buaiz Boabaid

Abstract:

Tokenization of Blue Bonds is an emerging Green Finance tool that has the potential to scale Blue Carbon Projects to fight climate change. This innovative solution has a huge potential to democratize the green finance market and catalyze innovations in the climate change finance sector. Switzerland has emerged as a leader in the Green Finance space and is well-positioned to drive the adoption of Tokenization of Blue & Green Bonds. This unique approach has the potential to unlock new sources of capital and enable global investors to participate in the financing of sustainable blue carbon projects. By leveraging the power of blockchain technology, Tokenization of Blue Bonds can provide greater transparency, efficiency, and security in the investment process while also reducing transaction costs. Investments are in line with the highest regulations and designed according to the stringent legal framework and compliance standards set by Switzerland. The potential benefits of Tokenization of Blue Bonds are significant and could transform the way that sustainable projects are financed. By unlocking new sources of capital, this approach has the potential to accelerate the deployment of Blue Carbon projects and create new opportunities for investors to participate in the fight against climate change.

Keywords: blue bonds, blue carbon, tokenization, green finance

Procedia PDF Downloads 59
3229 Assessing Renewal Needs of Urban Water Infrastructure Systems: Case Study of Linköping in Sweden

Authors: Eman Hegazy, Stefan Anderberg, Joakim Krook

Abstract:

Urban water infrastructure systems are central to functioning cities. For securing a continuous and efficient supply of the systems services, continuous investment, maintenance, and renewal are needed. Neglecting maintenance and renewal can lead to recurrent breakdown problems as systems age, which makes it more and more difficult to secure efficient long-term supply. Globally, many cities struggle with aging water infrastructure, often due to competing funding priorities. Investment in maintenance and renewal is not prioritized. The problem primarily stems from the challenge of reaping the benefits of investments promptly. The long-term benefits gained from investing in the renewal of water infrastructure may be achievable in the long run, resulting in the oversight of such investments. This leads to a build-up of "renewal debt" for future generations to inherit. Addressing this issue is difficult due to various contributing factors and the complex nature of the systems. The study aims to contribute to an increased understanding of the long-term management challenges of urban water infrastructure, the development of improved maintenance and renewal strategies through the examination of water infrastructure management, and the assessment of the adequacy of the maintenance and renewal in a case study, the city of Linköping, Sweden. Employing a multi-methods approach, this study utilized both qualitative and quantitative methods, including interviews, workshops, and data analysis. The findings of the study provided insights into the current status of the water and sewerage networks in Linkoping, highlighting the risks to ensuring reliable and sustainable water supply and discussing strategies for improving maintenance and renewal.

Keywords: case study, infrastructure management, renewal needs, Sweden, urban water infrastructure

Procedia PDF Downloads 41
3228 PPPs as Panacea to Delivery of Public Sector Construction Project in Zimbabwe

Authors: Ringisai Abigail Mawondo-Dhliwayo, Kahilu Kajimo-Shakantu

Abstract:

Due to financial challenges which governments in general face, it is becoming more difficult for many to continually use their limited resources to undertake infrastructural development. Governments increasingly now need other delivery approaches, in particular, the Public-Private Partnerships which make it possible for the public sector to achieve infrastructural development without incurring any/minimum cost. The literature reviewed outlined that benefits of PPPs include timely delivery of quality projects with cost limits. The methodology utilized for the empirical study comprised six interviews and sixty questionnaires which were undertaken and administered by construction consultants and government officials involved in PPPs projects. The results obtained showed that PPPs are not widely used in Zimbabwe although the need for their use exists. The study also found some challenges which prevent or derail the rate at which PPPs are utilized, of which the primary one was a political influence. It is concluded that despite limitations, PPPs remain the most effective and viable option for the delivery of government projects. The study recommends that policy and framework for the implementation of PPPs be developed. More useful information could have been obtained if final users of PPPs projects were included in the sample for data collection.

Keywords: construction projects, procurement, public private partnerships, public sector

Procedia PDF Downloads 231
3227 Climate Policy Actions for Sustaining International Agricultural Development Projects: The Role of Non-State, Sub-National Stakeholder Engagements, and Monitoring and Evaluation

Authors: EMMANUEL DWAMENA SASU

Abstract:

International climate policy actions require countries under Paris Agreement to design instruments, provide support (financial and technical), and strengthen institutional capacity with tendency to transcending policy formulation to implementation and sustainability. Changes associated with moisture depletion has been a growing phenomenon; especially in developing countries with projected global GDP drop from 7% to 2% between 2005 and 2050. These developments have potential to adversely affect food production in feeding the growing world population, with corresponding rise in global hunger. Incongruously, there is global absence of a harmonized policy direction; capable of providing the required indicators on climate policies for monitoring sustainability of international agricultural development projects. We conduct extensive review and synthesis on existing limitations on global climate policy governance, agricultural food security and sustainability of international agricultural development projects, and conjecture the role of non-state and sub-national climate stakeholder engagements, and monitoring and evaluation strategies for improved climate policy action for sustaining international agricultural development projects.

Keywords: climate policy, agriculture, development projects, sustainability

Procedia PDF Downloads 105
3226 Critical Success Factors of OCOP Business Model in Pattani Province Thailand: A Qualitative Approach

Authors: Poonsook Thatchaopas, Nik Kamariah Nikmat, Nattakarn Eakuru

Abstract:

Since 2003, the Thai Government has implemented several initiatives to encourage and incubate entrepreneurial skills and motivation among her citizens. One of the initiatives is the “One College One Product” business model or well known as ‘OCOP’, launched by the Vocational Education Commission to encourage partnership between college students to choose at least one product for business venture. In line with this mission, several business enterprises were established such as food products, restaurants, spa, Thai massage, minimart, computer maintenance, karaoke centre, internet café, mini theater etc. Currently, these business incubator projects can be observed at 404 vocational colleges and 21 incubation centres to encourage entrepreneurial small and medium enterprise (SME) development. However, the number of successful OCOP projects is still minimal. Out of the 404 individual OCOP projects at Vocational Colleges around Thailand, very few became successful. The objective of this paper is to identify the critical success factors needed to be a successful OCOP business entrepreneur. This study uses qualitative method by interviewing business partners of an OCOP business called Crispy Roti Krua Acheeva Brand (CRKAB). It is a snack food company that is developed at Pattani Vocational College in South Thailand. This project was initiated by three female entrepreneurs who were alumni student cum owners of the CRKAB. The finding shows that the main critical success factors are self-confidence, creativity or innovativeness, knowledge, skills and perseverance. Additionally, they reiterated that the keys to business success are product quality, perceived price, promotion, branding, new packaging to increase sales and continuous developments. The results implies for a student business SME to be successful, the company should have credible partners and effective marketing plan.

Keywords: student entrepreneurship, business incubator, food industry, qualitative, Thailand

Procedia PDF Downloads 371
3225 An Efficient Hybrid Approach Based on Multi-Agent System and Emergence Method for the Integration of Systematic Preventive Maintenance Policies

Authors: Abdelhadi Adel, Kadri Ouahab

Abstract:

This paper proposes a hybrid algorithm for the integration of systematic preventive maintenance policies in hybrid flow shop scheduling to minimize makespan. We have implemented a problem-solving approach for optimizing the processing time, methods based on metaheuristics. The proposed approach is inspired by the behavior of the human body. This hybridization is between a multi-agent system and inspirations of the human body, especially genetics. The effectiveness of our approach has been demonstrated repeatedly in this paper. To solve such a complex problem, we proposed an approach which we have used advanced operators such as uniform crossover set and single point mutation. The proposed approach is applied to three preventive maintenance policies. These policies are intended to maximize the availability or to maintain a minimum level of reliability during the production chain. The results show that our algorithm outperforms existing algorithms. We assumed that the machines might be unavailable periodically during the production scheduling.

Keywords: multi-agent systems, emergence, genetic algorithm, makespan, systematic maintenance, scheduling, hybrid flow shop scheduling

Procedia PDF Downloads 313
3224 Validating Condition-Based Maintenance Algorithms through Simulation

Authors: Marcel Chevalier, Léo Dupont, Sylvain Marié, Frédérique Roffet, Elena Stolyarova, William Templier, Costin Vasile

Abstract:

Industrial end-users are currently facing an increasing need to reduce the risk of unexpected failures and optimize their maintenance. This calls for both short-term analysis and long-term ageing anticipation. At Schneider Electric, we tackle those two issues using both machine learning and first principles models. Machine learning models are incrementally trained from normal data to predict expected values and detect statistically significant short-term deviations. Ageing models are constructed by breaking down physical systems into sub-assemblies, then determining relevant degradation modes and associating each one to the right kinetic law. Validating such anomaly detection and maintenance models is challenging, both because actual incident and ageing data are rare and distorted by human interventions, and incremental learning depends on human feedback. To overcome these difficulties, we propose to simulate physics, systems, and humans -including asset maintenance operations- in order to validate the overall approaches in accelerated time and possibly choose between algorithmic alternatives.

Keywords: degradation models, ageing, anomaly detection, soft sensor, incremental learning

Procedia PDF Downloads 101
3223 Benefits of Construction Management Implications and Processes by Projects Managers on Project Completion

Authors: Mamoon Mousa Atout

Abstract:

Projects managers in construction industry usually face a difficult organizational environment especially if the project is unique. The organization lacks the processes to practice construction management correctly, and the executive’s technical managers who have lack of experience in playing their role and responsibilities correctly. Project managers need to adopt best practices that allow them to do things effectively to make sure that the project can be delivered without any delay even though the executive’s technical managers should follow a certain process to avoid any factor might cause any delay during the project life cycle. The purpose of the paper is to examine the awareness level of projects managers about construction management processes, tools, techniques and implications to complete projects on time. The outcome and the results of the study are prepared based on the designed questionnaires and interviews conducted with many project managers. The method used in this paper is a quantitative study. A survey with a sample of 100 respondents was prepared and distributed in a construction company in Dubai, which includes nine questions to examine the level of their awareness. This research will also identify the necessary benefits of processes of construction management that has to be adopted by projects managers to mitigate the maximum potential problems which might cause any delay to the project life cycle.

Keywords: construction management, project objectives, resource planing and scheduling, project completion

Procedia PDF Downloads 377
3222 Designing a Method to Control and Determine the Financial Performance of the Real Cost Sub-System in the Information Management System of Construction Projects

Authors: Alireza Ghaffari, Hassan Saghi

Abstract:

Project management is more complex than managing the day-to-day affairs of an organization. When the project dimensions are broad and multiple projects have to be monitored in different locations, the integrated management becomes even more complicated. One of the main concerns of project managers is the integrated project management, which is mainly rooted in the lack of accurate and accessible information from different projects in various locations. The collection of dispersed information from various parts of the network, their integration and finally the selective reporting of this information is among the goals of integrated information systems. It can help resolve the main problem, which is bridging the information gap between executives and senior managers in the organization. Therefore, the main objective of this study is to design and implement an important subset of a project management information system in order to successfully control the cost of construction projects so that its results can be used to design raw software forms and proposed relationships between different project units for the collection of necessary information.

Keywords: financial performance, cost subsystem, PMIS, project management

Procedia PDF Downloads 83
3221 Key Issues in Transfer Stage of BOT Project: Experience from China

Authors: Wang Liguang, Zhang Xueqing

Abstract:

The build-operate-transfer (BOT) project delivery system has provided effective routes to mobilize private sector funds, innovative technologies, management skills and operational efficiencies for public infrastructure development and have been widely used in China during the last 20 years. Many BOT projects in China will be smoothly transferred to the government soon and the transfer stage, which is considered as the last stage, must be studied carefully and handled well to achieve the overall success of BOT projects. There will be many issues faced by both the public sector and private sector in the transfer stage of BOT projects, including project post-assessment, technology and documents transfer, personal training and staff transition, etc. and sometimes additional legislation is needed for future operation and management of facilities. However, most previous studies focused on the bidding, financing, and building and operation stages instead of transfer stage. This research identifies nine key issues in the transfer stage of BOT projects through a comprehensive study on three cases in China, and the expert interview and expert discussion meetings are held to validate the key issues and give detail analysis. A proposed framework of transfer management is prepared based on the experiences derived and lessons drawn from the case studies and expert interview and discussions, which is expected to improve the transfer management of BOT projects in practice.

Keywords: BOT project, key issues, transfer management, transfer stage

Procedia PDF Downloads 227
3220 Prescription of Maintenance Fluids in the Emergency Department

Authors: Adrian Craig, Jonathan Easaw, Rose Jordan, Ben Hall

Abstract:

The prescription of intravenous fluids is a fundamental component of inpatient management, but it is one which usually lacks thought. Fluids are a drug, which like any other can cause harm when prescribed inappropriately or wrongly. However, it is well recognised that it is poorly done, especially in the acute portals. The National Institute for Health and Care Excellence (NICE) recommends 1mmol/kg of potassium, sodium, and chloride per day. With various options of fluids, clinicians tend to face difficulty in choosing the most appropriate maintenance fluid, and there is a reluctance to prescribe potassium as part of an intravenous maintenance fluid regime. The aim was to prospectively audit the prescription of the first bag of intravenous maintenance fluids, the use of urea and electrolytes results to guide the choice of fluid and the use of fluid prescription charts, in a busy emergency department of a major trauma centre in Stoke-on-Trent, United Kingdom. This was undertaken over a week in early November 2016. Of those prescribed maintenance fluid only 8.9% were prescribed a fluid which was most appropriate for their daily electrolyte requirements. This audit has helped to highlight further the issues that are faced in busy Emergency Departments within hospitals that are stretched and lack capacity for prompt transfer to a ward. It has supported the findings of NICE, that emergency admission portals such as Emergency Departments poorly prescribed intravenous fluid therapy. The findings have enabled simple steps to be taken to educate clinicians about their fluid of choice. This has included: posters to remind clinicians to consider the urea and electrolyte values before prescription, suggesting the inclusion of a suggested intravenous fluid of choice in the prescription chart of the trust and the inclusion of a session within the introduction programme revising intravenous fluid therapy and daily electrolyte requirements. Moving forward, once the interventions have been implemented then, the data will be reaudited in six months to note any improvement in maintenance fluid choice. Alongside this, an audit of the rate of intravenous maintenance fluid therapy would be proposed to further increase patient safety by avoiding unintentional fluid overload which may cause unnecessary harm to patients within the hospital. In conclusion, prescription of maintenance fluid therapy was poor within the Emergency Department, and there is a great deal of opportunity for improvement. Therefore, the measures listed above will be implemented and the data reaudited.

Keywords: chloride, electrolyte, emergency department, emergency medicine, fluid, fluid therapy, intravenous, maintenance, major trauma, potassium, sodium, trauma

Procedia PDF Downloads 298
3219 A Predictive Analytics Approach to Project Management: Reducing Project Failures in Web and Software Development Projects

Authors: Tazeen Fatima

Abstract:

Use of project management in web & software development projects is very significant. It has been observed that even with the application of effective project management, projects usually do not complete their lifecycle and fail. To minimize these failures, key performance indicators have been introduced in previous studies to counter project failures. However, there are always gaps and problems in the KPIs identified. Despite of incessant efforts at technical and managerial levels, projects still fail. There is no substantial approach to identify and avoid these failures in the very beginning of the project lifecycle. In this study, we aim to answer these research problems by analyzing the concept of predictive analytics which is a specialized technology and is very easy to use in this era of computation. Project organizations can use data gathering, compute power, and modern tools to render efficient Predictions. The research aims to identify such a predictive analytics approach. The core objective of the study was to reduce failures and introduce effective implementation of project management principles. Existing predictive analytics methodologies, tools and solution providers were also analyzed. Relevant data was gathered from projects and was analyzed via predictive techniques to make predictions well advance in time to render effective project management in web & software development industry.

Keywords: project management, predictive analytics, predictive analytics methodology, project failures

Procedia PDF Downloads 310
3218 A Global Business Network Built on Hive: Two Use Cases: Buying and Selling of Products and Services and Carrying Out of Social Impact Projects

Authors: Gheyzer Villegas, Edgardo Cedeño, Veruska Mata, Edmundo Chauran

Abstract:

One of the most significant changes that occurred in global commerce was the emergence of cryptocurrencies and blockchain technology. There is still much debate about the adoption of the economic model based on crypto assets, and myriad international projects and initiatives are being carried out to try and explore the potential that this new field offers. The Hive blockchain is a prime example of this, featuring two use cases: of how trade based on its native currencies can give successful results in the exchange of goods and services and in the financing of social impact projects. Its decentralized management model and visionary administration of its development fund have become a key part of its success.

Keywords: Hive, business, network, blockchain

Procedia PDF Downloads 40
3217 Knowledge Management Challenges within Traditional Procurement System

Authors: M. Takhtravanchi, C. Pathirage

Abstract:

In the construction industry, project members are conveyor of project knowledge which is, often, not managed properly to be used in future projects. As construction projects are temporary and unique, project members are willing to be recruited once a project is completed. Therefore, poor management of knowledge across construction projects will lead to a considerable amount of knowledge loss; the ignoring of which would be detrimental to project performance. This issue is more prominent in projects undertaken through the traditional procurement system, as this system does not incentives project members for integration. Thus, disputes exist between the design and construction phases based on the poor management of knowledge between those two phases. This paper aims to highlight the challenges of the knowledge management that exists within the traditional procurement system. Expert interviews were conducted and challenges were identified and analysed by the Interpretive Structural Modelling (ISM) approach in order to summarise the relationships among them. Two identified key challenges are the Culture of an Organisation and Knowledge Management Policies. A knowledge of the challenges and their relationships will help project manager and stakeholders to have a better understanding of the importance of knowledge management.

Keywords: challenges, construction industry, knowledge management, traditional procurement system

Procedia PDF Downloads 405
3216 Feature Analysis of Predictive Maintenance Models

Authors: Zhaoan Wang

Abstract:

Research in predictive maintenance modeling has improved in the recent years to predict failures and needed maintenance with high accuracy, saving cost and improving manufacturing efficiency. However, classic prediction models provide little valuable insight towards the most important features contributing to the failure. By analyzing and quantifying feature importance in predictive maintenance models, cost saving can be optimized based on business goals. First, multiple classifiers are evaluated with cross-validation to predict the multi-class of failures. Second, predictive performance with features provided by different feature selection algorithms are further analyzed. Third, features selected by different algorithms are ranked and combined based on their predictive power. Finally, linear explainer SHAP (SHapley Additive exPlanations) is applied to interpret classifier behavior and provide further insight towards the specific roles of features in both local predictions and global model behavior. The results of the experiments suggest that certain features play dominant roles in predictive models while others have significantly less impact on the overall performance. Moreover, for multi-class prediction of machine failures, the most important features vary with type of machine failures. The results may lead to improved productivity and cost saving by prioritizing sensor deployment, data collection, and data processing of more important features over less importance features.

Keywords: automated supply chain, intelligent manufacturing, predictive maintenance machine learning, feature engineering, model interpretation

Procedia PDF Downloads 106
3215 Replacement Time and Number of Preventive Maintenance Actions for Second-Hand Device

Authors: Wen Liang Chang

Abstract:

In this study, the optimal replacement time and number of preventive maintenance (PM) actions were investigated for a second-hand device. Suppose that a user intends to use a second-hand device for manufacturing products, and that the device is replaced with a new one. Any device failure is rectified through minimal repair, thereby incurring a fixed repair cost to the user. If the new device fails within the FRW period, minimal repair is performed at no cost to the user. After the FRW expires, a failed device is repaired and the cost of repair is incurred by the user. In this study, two profit models were developed, and the optimal replacement time and number of PM actions were determined to maximize profits. Finally, the influence of the optimal replacement time and number of PM actions were elaborated on, using numerical examples.

Keywords: second-hand device, preventive maintenance, replacement time, device failure

Procedia PDF Downloads 445
3214 Maintenance Optimization for a Multi-Component System Using Factored Partially Observable Markov Decision Processes

Authors: Ipek Kivanc, Demet Ozgur-Unluakin

Abstract:

Over the past years, technological innovations and advancements have played an important role in the industrial world. Due to technological improvements, the degree of complexity of the systems has increased. Hence, all systems are getting more uncertain that emerges from increased complexity, resulting in more cost. It is challenging to cope with this situation. So, implementing efficient planning of maintenance activities in such systems are getting more essential. Partially Observable Markov Decision Processes (POMDPs) are powerful tools for stochastic sequential decision problems under uncertainty. Although maintenance optimization in a dynamic environment can be modeled as such a sequential decision problem, POMDPs are not widely used for tackling maintenance problems. However, they can be well-suited frameworks for obtaining optimal maintenance policies. In the classical representation of the POMDP framework, the system is denoted by a single node which has multiple states. The main drawback of this classical approach is that the state space grows exponentially with the number of state variables. On the other side, factored representation of POMDPs enables to simplify the complexity of the states by taking advantage of the factored structure already available in the nature of the problem. The main idea of factored POMDPs is that they can be compactly modeled through dynamic Bayesian networks (DBNs), which are graphical representations for stochastic processes, by exploiting the structure of this representation. This study aims to demonstrate how maintenance planning of dynamic systems can be modeled with factored POMDPs. An empirical maintenance planning problem of a dynamic system consisting of four partially observable components deteriorating in time is designed. To solve the empirical model, we resort to Symbolic Perseus solver which is one of the state-of-the-art factored POMDP solvers enabling approximate solutions. We generate some more predefined policies based on corrective or proactive maintenance strategies. We execute the policies on the empirical problem for many replications and compare their performances under various scenarios. The results show that the computed policies from the POMDP model are superior to the others. Acknowledgment: This work is supported by the Scientific and Technological Research Council of Turkey (TÜBİTAK) under grant no: 117M587.

Keywords: factored representation, maintenance, multi-component system, partially observable Markov decision processes

Procedia PDF Downloads 112
3213 Adoption of Noise and Vibration Management Tools for Major Infrastructure Projects in Sydney, Australia

Authors: Adrian Morris, Rodney Phillips, Mattia Tabacchi

Abstract:

Minimizing construction noise and vibration impacts is a key challenge for major infrastructure projects in urban environments. Before commencing construction works, Construction Noise and Vibration Management Plan (CNVMP) and Construction Noise and Vibration Impact Statements (CNVIS) are required to be prepared and submitted to the relevant government authorities for review and approval. However, the assessment of potential impacts from work activities at pre-approval stage may be inaccurate as works methodology and scheduling are yet to be determined. In response, noise and vibration management tools have been developed to refine and supplement the CNVIS as works progress. These tools have been successfully implemented in major infrastructure projects allowing contractors to plan and assess construction works in a cost effective and timely manner. As a result, noise and vibration management tools have been incorporated into management plans and are increasingly required by regulators.

Keywords: noise management, environmental noise, infrastructure projects, construction, vibration, cost effective

Procedia PDF Downloads 101
3212 A Survey of Key Challenges of Adopting Agile in Global Software Development: A Case Study with Malaysia Perspective

Authors: Amna Batool

Abstract:

Agile methodology is the current most popular technique in software development projects. Agile methods in software development bring optimistic impact on software performances, quality and customer satisfaction. There are some organizations and small-medium enterprises adopting agile into their local software development projects as well as in distributed software development projects. Adopting agile methods in local software development projects is valuable. However, agile global software deployment needs an attention. There are different key challenges in agile global software development that need to resolve and enhance the global software development cycles. The proposed systematic literature review investigates all key challenges of agile in global software development. Moreover, a quantitative methodology (an actual survey) targeted to present a real case scenario of these particular key challenges faced by one of the software houses that is BestWeb Malaysia. The outcomes of systematic literature and the results of quantitative methodology are compared with each other to evaluate if the key challenges pointed out in systematic review still exist. The proposed research and its exploratory results can assist small medium enterprises to avoid these challenges by adopting the best practices in their global software development projects. Moreover, it is helpful for novice researchers to get valuable information altogether.

Keywords: agile software development, ASD challenges, agile global software development, challenges in agile global software development

Procedia PDF Downloads 132
3211 A Multi Criteria Approach for Prioritization of Low Volume Rural Roads for Maintenance and Improvement

Authors: L. V. S. S. Phaneendra Bolem, S. Shankar

Abstract:

Low Volume Rural Roads (LVRRs) constitute an integral component of the road system in all countries. These encompass all aspects of the social and economic development of rural communities. It is known that on a worldwide basis the number of low traffic roads far exceeds the length of high volume roads. Across India, 90% of the roads are LVRRs, and they often form the most important link in terms of providing access to educational, medical, recreational and commercial activities in local and regional areas. In the recent past, Government of India (GoI), with the initiation of the ambitious programme namely 'Pradhan Mantri Gram Sadak Yojana' (PMGSY) gave greater importance to LVRRs realizing their role in economic development of rural communities. The vast expansion of the road network has brought connectivity to the rural areas of the country. Further, it is noticed that due to increasing axle loads and lack of timely maintenance, is accelerated the process of deterioration of LVRRs. In addition to this due to limited budget for maintenance of these roads systematic and scientific approach in utilizing the available resources has been necessitated. This would enable better prioritization and ranking for the maintenance and make ‘all-weather roads’. Taking this into account the present study has adopted a multi-criteria approach. The multi-criteria approach includes parameters such as social, economic, environmental and pavement condition as the main criterion and some sub-criteria to find the best suitable parameters and their weight. For this purpose the expert’s opinion survey was carried out using Delphi Technique (DT) considering Likert scale, pairwise comparison and ranking methods and entire data was analyzed. Finally, this study developed the maintenance criterion considering the socio-economic, environmental and pavement condition parameters for effective maintenance of low volume roads based on the engineering judgment.

Keywords: Delphi technique, experts opinion survey, low volume rural road maintenance, multi criteria analysis

Procedia PDF Downloads 143
3210 Higher Language Education in Australia: Uncovering Language Positioning

Authors: Mobina Sahraee Juybari

Abstract:

There are around 300 languages spoken in Australia, and more than one-fifth of the population speaks a language other than English at home. The presence of international students in schools raises this number still further. Although the multilingual and multicultural status of Australia has been acknowledged by the government in education policy, the strong focus on English in institutional settings threatens the maintenance and learning of other languages. This is particularly true of universities’ language provisions. To cope with the financial impact of Covid-19, the government has cut funding for a number of Asian languages, such as Indonesian, Japanese and Chinese. This issue threats the maintenance of other languages in Australia and leaves students unprepared for the future job market. By taking account of the current reality of Australia’s diverse cultural and lingual makeup, this research intends to uncover the positioning of languages by having a historical look at Australia’s language policy and examining the value of languages and the probable impact of Covid-19 on the place of languages taught in Australian universities. A qualitative study will be adopted with language program tutors and course coordinators, with semi-structured interviews and government language policy analysis. This research hopes to provide insights into both the maintenance and learning of international language programs in tertiary language education in Australia and more widely.

Keywords: Australia, COVID-19, higher education sector, language maintenance, language and culture diversity

Procedia PDF Downloads 83
3209 Data Projects for “Social Good”: Challenges and Opportunities

Authors: Mikel Niño, Roberto V. Zicari, Todor Ivanov, Kim Hee, Naveed Mushtaq, Marten Rosselli, Concha Sánchez-Ocaña, Karsten Tolle, José Miguel Blanco, Arantza Illarramendi, Jörg Besier, Harry Underwood

Abstract:

One of the application fields for data analysis techniques and technologies gaining momentum is the area of social good or “common good”, covering cases related to humanitarian crises, global health care, or ecology and environmental issues, among others. The promotion of data-driven projects in this field aims at increasing the efficacy and efficiency of social initiatives, improving the way these actions help humanity in general and people in need in particular. This application field, however, poses its own barriers and challenges when developing data-driven projects, lagging behind in comparison with other scenarios. These challenges derive from aspects such as the scope and scale of the social issue to solve, cultural and political barriers, the skills of main stakeholders and the technological resources available, the motivation to be engaged in such projects, or the ethical and legal issues related to sensitive data. This paper analyzes the application of data projects in the field of social good, reviewing its current state and noteworthy initiatives, and presenting a framework covering the key aspects to analyze in such projects. The goal is to provide guidelines to understand the main challenges and opportunities for this type of data project, as well as identifying the main differential issues compared to “classical” data projects in general. A case study is presented on the initial steps and stakeholder analysis of a data project for the inclusion of refugees in the city of Frankfurt, Germany, in order to empirically confront the framework with a real example.

Keywords: data-driven projects, humanitarian operations, personal and sensitive data, social good, stakeholders analysis

Procedia PDF Downloads 298
3208 A Framework for Systemically Understanding and Increasing Compliance with Water Regulation in Time Limited and Uncertain Contexts

Authors: Luisa Perez-Mujica

Abstract:

Traditionally, non-compliance in water regulation has been understood to be attributable to lack of information or knowledge of regulations. In other words, it is confusing behavioural change and education with communication or regulations. However, compliance is a complex response to water regulation factors including 1) knowledge and understanding of regulations; 2) perception that resources are overregulated; 3) presence of regulatory officers in the field; 4) accurate communication of what is being protected; 5) time lag between behavioral change projects and observation of outcomes and 6) how success of behavioral change is measured and evaluated. This paper presents a framework for designing education and behavioral change projects by understanding non-compliance in terms of the interaction of its factors, including a process for prioritizing projects, actions, evaluation and monitoring of outcomes. By taking a systemic approach to compliance, a more directed type of actions can be efficiently identified and prioritized, preventing the reactive nature of education and behavioral change projects.

Keywords: water regulation, compliance, behaviour change, systems thinking

Procedia PDF Downloads 213
3207 An Assessment of Factors Affecting the Cost and Time Performance of Subcontractors

Authors: Adedayo Jeremiah Adeyekun, Samuel Oluwagbemiga Ishola,

Abstract:

This paper is an assessment of factors influencing the cost and time performance of subcontractors and the need for effective performance of subcontractors at the project sites. The factors influencing the performance of subcontractors are grouped, similar to those identified with the project or an organization and on another hand, there are significant factors influencing the performance of the subcontractors. These factors incorporate management level leadership, time required to complete the project, profit, staff capability/expertise, reputation, installment method, organization history, and project procurement method strategy, security, bidding technique, insurance, bond and relationship with the major contractors. The factors influencing the management of subcontractors in building development projects includes performance of significant past projects, standard of workmanship, consistence with guidelines, regular payment to labourers, adherence to program, regularity and viability of communication with main contractor, adherence to subcontract necessities. Other factors comprise adherence to statutory environmental regulations, number of experienced sites administrative staff, inspection and maintenance of good workplace, number of artisans and workers, quality of as-built and shop drawings and ability to carry out the quantity of work and so on. This study also aimed to suggest a way forward to improve the performance of subcontractors which is the reason for exceeding budget at the project sites. To carry out this study, a questionnaire was drafted to derive information on the causes of low performance of subcontractors and the implication to cost.

Keywords: performance, contractor, subcontractors, construction

Procedia PDF Downloads 48
3206 Ranking the Factors That Influence the Construction Project Success: The Jordanian Perspective

Authors: Ghanim A. Bekr

Abstract:

Project success is what must be done for the project to be acceptable to the client, stakeholders and end-users who will be affected by the project. The study of project success and the critical success factors (CSFs) are the means adopted to improve the effectiveness of project. This research is conducted to make an attempt to identify which variables influence the success of project implementation. This study has selected, through an extensive literature review and interviews, (83) factors categorized in (7) groups that the questionnaire respondents were asked to score. The responses from 66 professionals with an average of 15 years of experience in different types of construction projects in Jordan were collected and analyzed using SPSS and most important factors for success for various success criteria are presented depending on the relative importance index to rank the categories. The research revealed the significant groups of factors are: Client related factors, Contractor’s related factors, Project Manager (PM) related factors, and Project management related factors. In addition the top ten sub factors are: Assertion of the client towards short time of the project, availability of skilled labor, Assertion of the client towards high level of the quality, capability of the client in taking risk, previous experience of the PM in similar projects, previous experience of the contractor in similar projects, decision making by the client/ the client’s representative at the right time, assertion of client towards low cost of project, experience in project management in previous projects, and flow of the information among parties. The results would be helpful to construction project professionals in taking proactive measures for successful completion of construction projects in Jordan.

Keywords: construction projects, critical success factors, Jordan, project success

Procedia PDF Downloads 132
3205 Possibilistic Aggregations in the Investment Decision Making

Authors: I. Khutsishvili, G. Sirbiladze, B. Ghvaberidze

Abstract:

This work proposes a fuzzy methodology to support the investment decisions. While choosing among competitive investment projects, the methodology makes ranking of projects using the new aggregation OWA operator – AsPOWA, presented in the environment of possibility uncertainty. For numerical evaluation of the weighting vector associated with the AsPOWA operator the mathematical programming problem is constructed. On the basis of the AsPOWA operator the projects’ group ranking maximum criteria is constructed. The methodology also allows making the most profitable investments into several of the project using the method developed by the authors for discrete possibilistic bicriteria problems. The article provides an example of the investment decision-making that explains the work of the proposed methodology.

Keywords: expert evaluations, investment decision making, OWA operator, possibility uncertainty