Search results for: insurance contract
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 666

Search results for: insurance contract

456 Portable Cardiac Monitoring System Based on Real-Time Microcontroller and Multiple Communication Interfaces

Authors: Ionel Zagan, Vasile Gheorghita Gaitan, Adrian Brezulianu

Abstract:

This paper presents the contributions in designing a mobile system named Tele-ECG implemented for remote monitoring of cardiac patients. For a better flexibility of this application, the authors chose to implement a local memory and multiple communication interfaces. The project described in this presentation is based on the ARM Cortex M0+ microcontroller and the ADAS1000 dedicated chip necessary for the collection and transmission of Electrocardiogram signals (ECG) from the patient to the microcontroller, without altering the performances and the stability of the system. The novelty brought by this paper is the implementation of a remote monitoring system for cardiac patients, having a real-time behavior and multiple interfaces. The microcontroller is responsible for processing digital signals corresponding to ECG and also for the implementation of communication interface with the main server, using GSM/Bluetooth SIMCOM SIM800C module. This paper translates all the characteristics of the Tele-ECG project representing a feasible implementation in the biomedical field. Acknowledgment: This paper was supported by the project 'Development and integration of a mobile tele-electrocardiograph in the GreenCARDIO© system for patients monitoring and diagnosis - m-GreenCARDIO', Contract no. BG58/30.09.2016, PNCDI III, Bridge Grant 2016, using the infrastructure from the project 'Integrated Center for research, development and innovation in Advanced Materials, Nanotechnologies, and Distributed Systems for fabrication and control', Contract No. 671/09.04.2015, Sectoral Operational Program for Increase of the Economic Competitiveness co-funded from the European Regional Development Fund.

Keywords: Tele-ECG, real-time cardiac monitoring, electrocardiogram, microcontroller

Procedia PDF Downloads 245
455 Applicable Law to Intellectual and Industrial Property Agreements According to Turkish Private International Law and Rome I Regulation

Authors: Sema Cortoglu Koca

Abstract:

Intellectual and industrial property rules, have a substantial effect on the sustainable development. Intellectual and industrial property rights, as temporary privileges over the products of intellectual activity, determine the supervision of information and technology. The level and scope of intellectual property protection thus influence the flow of technology between developed and developing countries. In addition, intellectual and industrial property rights are based on the notion of balance. Since they are time-limited rights, they reconcile private and public benefits. That is, intellectual and industrial property rights respond to both private interests and public interests by rewarding innovators and by promoting the dissemination of ideas, respectively. Intellectual and industrial property rights can, therefore, be a tool for sustainable development. If countries can balance their private and public interests according to their particular context and circumstances, they can ensure the intellectual and industrial property which promotes innovation and technology transfer relevant for them. People, enterprises and countries who need technology, can transfer developed technology which is acquired by people, enterprises and countries so as to decrease their technological necessity and improve their technology. Because of the significance of intellectual and industrial property rights on the technology transfer law as mentioned above, this paper is confined to intellectual and industrial property agreements especially technology transfer contracts. These are license contract, know-how contract, franchise agreement, joint venture agreement, management agreement, research and development agreement. In Turkey, technology transfer law is still a developing subject. For developing countries, technology transfer regulations are very important for their private international law because these countries do not know which technology transfer law is applicable when conflicts arise. In most technology transfer contracts having international elements, the parties choose a law to govern their contracts. Where the parties do not choose a law, either expressly or impliedly, and matters which is not excluded in party autonomy, the court has to determine the applicable law to contracts in a matter of capacity, material, the formal and essential validity of contracts. For determining the proper law of technology transfer contracts, it is tried to build a rule for applying all technology transfer contracts. This paper is confined to the applicable law to intellectual and industrial property agreements according to ‘5718 Turkish Act on Private International Law and Civil Procedure’ and ‘Regulation (EC) No 593/2008 of the European Parliament and of the Council of 17 June 2008 on the law applicable to contractual obligations (Rome I)’. Like these complex contracts, to find a rule can be really difficult. We can arrange technology transfer contracts in groups, and we can determine the rule and connecting factors to these groups. For the contracts which are not included in these groups, we can determine a special rule considering the characteristics of the contract.

Keywords: intellectual and industrial property agreements, Rome I regulation, technology transfer, Turkish act on private international law and civil procedure

Procedia PDF Downloads 121
454 Onco@Home: Comparing the Costs, Revenues, and Patient Experience of Cancer Treatment at Home with the Standard of Care

Authors: Sarah Misplon, Wim Marneffe, Johan Helling, Jana Missiaen, Inge Decock, Dries Myny, Steve Lervant, Koen Vaneygen

Abstract:

The aim of this study was twofold. First, we investigated whether the current funding from the national health insurance (NHI) of home hospitalization (HH) for oncological patients is sufficient in Belgium. Second, we compared patient’s experiences and preferences of HH to the standard of care (SOC). Two HH models were examined in three Belgian hospitals and three home nursing organizations. In a first HH model, the blood draw and monitoring prior to intravenous therapy were performed by a trained home nurse at the patient’s home the day before the visit to the day hospital. In a second HH model, the administration of two subcutaneous treatments was partly provided at home instead of in the hospital. Therefore, we conducted (1) a bottom-up micro-costing study to compare the costs and revenues for the providers (hospitals and home care organizations), and (2) a cross-sectional survey to compare patient’s experiences and preferences of the SOC group and the HH group. Our results show that HH patients prefer HH and none of them wanted to return to SOC, although the satisfaction of patients was not significantly different between the two categories. At the same time, we find that costs associated to HH are higher overall. Comparing revenues with costs, we conclude that the current funding from NHI of HH for oncological patients is insufficient.

Keywords: cost analysis, health insurance, preference, home hospitalization

Procedia PDF Downloads 92
453 Analysis of Risks of Adopting Integrated Project Delivery: Application of Bayesian Theory

Authors: Shan Li, Qiuwen Ma

Abstract:

Integrated project delivery (IPD) is a project delivery method distinguished by a shared risk/rewards mechanism and multiparty agreement. IPD has drawn increasing attention from construction industry due to its reliability to deliver high-performing buildings. However, unavailable IPD specific insurance concerns the industry participants who are interested in IPD implementation. Even though the risk management capability can be enhanced using shared risk mechanism, some risks may occur when the partners do not commit themselves into the integrated practices in a desired manner. This is because the intense collaboration and close integration can not only create added value but bring new opportunistic behaviors and disputes. The study is aimed to investigate the risks of implementing IPD using Bayesian theory. IPD risk taxonomy is presented to identify all potential risks of implementing IPD and a risk network map is developed to capture the interdependencies between IPD risks. The conditional relations between risk occurrences and the impacts of IPD risks on project performances are evaluated and simulated based on Bayesian theory. The probability of project outcomes is predicted by simulation. In addition, it is found that some risks caused by integration are most possible occurred risks. This study can help the IPD project participants identify critical risks of adopting IPD to improve project performances. In addition, it is helpful to develop IPD specific insurance when the pertinent risks can be identified.

Keywords: Bayesian theory, integrated project delivery, project risks, project performances

Procedia PDF Downloads 267
452 Carbonaceous Monolithic Multi-Channel Denuders as a Gas-Particle Partitioning Tool for the Occupational Sampling of Aerosols from Semi-Volatile Organic Compounds

Authors: Vesta Kohlmeier, George C. Dragan, Juergen Orasche, Juergen Schnelle-Kreis, Dietmar Breuer, Ralf Zimmermann

Abstract:

Aerosols from hazardous semi-volatile organic compounds (SVOC) may occur in workplace air and can simultaneously be found as particle and gas phase. For health risk assessment, it is necessary to collect particles and gases separately. This can be achieved by using a denuder for the gas phase collection, combined with a filter and an adsorber for particle collection. The study focused on the suitability of carbonaceous monolithic multi-channel denuders, so-called Novacarb™-Denuders (MastCarbon International Ltd., Guilford, UK), to achieve gas-particle separation. Particle transmission efficiency experiments were performed with polystyrene latex (PSL) particles (size range 0.51-3 µm), while the time dependent gas phase collection efficiency was analysed for polar and nonpolar SVOC (mass concentrations 7-10 mg/m3) over 2 h at 5 or 10 l/min. The experimental gas phase collection efficiency was also compared with theoretical predictions. For n-hexadecane (C16), the gas phase collection efficiency was max. 91 % for one denuder and max. 98 % for two denuders, while for diethylene glycol (DEG), a maximal gas phase collection efficiency of 93 % for one denuder and 97 % for two denuders was observed. At 5 l/min higher gas phase collection efficiencies were achieved than at 10 l/min. The deviations between the theoretical and experimental gas phase collection efficiencies were up to 5 % for C16 and 23 % for DEG. Since the theoretical efficiency depends on the geometric shape and length of the denuder, flow rate and diffusion coefficients of the tested substances, the obtained values define an upper limit which could be reached. Regarding the particle transmission through the denuders, the use of one denuder showed transmission efficiencies around 98 % for 1-3 µm particle diameters. The use of three denuders resulted in transmission efficiencies from 93-97 % for the same particle sizes. In summary, NovaCarb™-Denuders are well applicable for sampling aerosols of polar/nonpolar substances with particle diameters ≤3 µm and flow rates of 5 l/min or lower. These properties and their compact size make them suitable for use in personal aerosol samplers. This work is supported by the German Social Accident Insurance (DGUV), research contract FP371.

Keywords: gas phase collection efficiency, particle transmission, personal aerosol sampler, SVOC

Procedia PDF Downloads 146
451 Parametric Approach for Reserve Liability Estimate in Mortgage Insurance

Authors: Rajinder Singh, Ram Valluru

Abstract:

Chain Ladder (CL) method, Expected Loss Ratio (ELR) method and Bornhuetter-Ferguson (BF) method, in addition to more complex transition-rate modeling, are commonly used actuarial reserving methods in general insurance. There is limited published research about their relative performance in the context of Mortgage Insurance (MI). In our experience, these traditional techniques pose unique challenges and do not provide stable claim estimates for medium to longer term liabilities. The relative strengths and weaknesses among various alternative approaches revolve around: stability in the recent loss development pattern, sufficiency and reliability of loss development data, and agreement/disagreement between reported losses to date and ultimate loss estimate. CL method results in volatile reserve estimates, especially for accident periods with little development experience. The ELR method breaks down especially when ultimate loss ratios are not stable and predictable. While the BF method provides a good tradeoff between the loss development approach (CL) and ELR, the approach generates claim development and ultimate reserves that are disconnected from the ever-to-date (ETD) development experience for some accident years that have more development experience. Further, BF is based on subjective a priori assumption. The fundamental shortcoming of these methods is their inability to model exogenous factors, like the economy, which impact various cohorts at the same chronological time but at staggered points along their life-time development. This paper proposes an alternative approach of parametrizing the loss development curve and using logistic regression to generate the ultimate loss estimate for each homogeneous group (accident year or delinquency period). The methodology was tested on an actual MI claim development dataset where various cohorts followed a sigmoidal trend, but levels varied substantially depending upon the economic and operational conditions during the development period spanning over many years. The proposed approach provides the ability to indirectly incorporate such exogenous factors and produce more stable loss forecasts for reserving purposes as compared to the traditional CL and BF methods.

Keywords: actuarial loss reserving techniques, logistic regression, parametric function, volatility

Procedia PDF Downloads 98
450 A Conceptual Framework and a Mathematical Equation for Managing Construction-Material Waste and Cost Overruns

Authors: Saidu Ibrahim, Winston M. W. Shakantu

Abstract:

The problem of construction material waste remains unresolved, as a significant percentage of the materials delivered to some project sites end up as waste which might result in additional project cost. Cost overrun is a problem which affects 90% of the completed projects in the world. The argument on how to eliminate it has been on-going for the past 70 years, but there is neither substantial improvement nor significant solution for mitigating its detrimental effects. Research evidence has proposed various construction cost overruns and material-waste management approaches; nonetheless, these studies failed to give a clear indication on the framework and the equation for managing construction material waste and cost overruns. Hence, this research aims to develop a conceptual framework and a mathematical equation for managing material waste and cost overrun in the construction industry. The paper adopts the desktop methodological approach. This involves comparing the causes of material waste and those of cost overruns from the literature to determine the possible relationship. The review revealed a relationship between material waste and cost overrun that; increase in material waste would result to a corresponding increase in the amount of cost overrun at both the pre-contract and the post contract stages of a project. It was found from the equation that achieving an effective construction material waste management must ensure a “Good Quality-of-Planning, Estimating, and Design Management” and a “Good Quality- of-Construction, Procurement and Site Management”; a decrease in “Design Complexity” which would reduce “Material Waste” and subsequently reduce the amount of cost overrun by 86.74%. The conceptual framework and the mathematical equation developed in this study are recommended to the professionals of the construction industry.

Keywords: conceptual framework, cost overrun, material waste, project stags

Procedia PDF Downloads 262
449 Accounting for Rice Productivity Heterogeneity in Ghana: The Two-Step Stochastic Metafrontier Approach

Authors: Franklin Nantui Mabe, Samuel A. Donkoh, Seidu Al-Hassan

Abstract:

Rice yields among agro-ecological zones are heterogeneous. Farmers, researchers and policy makers are making frantic efforts to bridge rice yield gaps between agro-ecological zones through the promotion of improved agricultural technologies (IATs). Farmers are also modifying these IATs and blending them with indigenous farming practices (IFPs) to form farmer innovation systems (FISs). Also, different metafrontier models have been used in estimating productivity performances and their drivers. This study used the two-step stochastic metafrontier model to estimate the productivity performances of rice farmers and their determining factors in GSZ, FSTZ and CSZ. The study used both primary and secondary data. Farmers in CSZ are the most technically efficient. Technical inefficiencies of farmers are negatively influenced by age, sex, household size, education years, extension visits, contract farming, access to improved seeds, access to irrigation, high rainfall amount, less lodging of rice, and well-coordinated and synergized adoption of technologies. Albeit farmers in CSZ are doing well in terms of rice yield, they still have the highest potential of increasing rice yield since they had the lowest TGR. It is recommended that government through the ministry of food and agriculture, development partners and individual private companies promote the adoption of IATs as well as educate farmers on how to coordinate and synergize the adoption of the whole package. Contract farming concept and agricultural extension intensification should be vigorously pursued to the latter.

Keywords: efficiency, farmer innovation systems, improved agricultural technologies, two-step stochastic metafrontier approach

Procedia PDF Downloads 239
448 Treating On-Demand Bonds as Cash-In-Hand: Analyzing the Use of “Unconscionability” as a Ground for Challenging Claims for Payment under On-Demand Bonds

Authors: Asanga Gunawansa, Shenella Fonseka

Abstract:

On-demand bonds, also known as unconditional bonds, are commonplace in the construction industry as a means of safeguarding the employer from any potential non-performance by a contractor. On-demand bonds may be obtained from commercial banks, and they serve as an undertaking by the issuing bank to honour payment on demand without questioning and/or considering any dispute between the employer and the contractor in relation to the underlying contract. Thus, whether or not a breach had occurred under the underlying contract, which triggers the demand for encashment by the employer, is not a question the bank needs to be concerned with. As a result, an unconditional bond allows the beneficiary to claim the money almost without any condition. Thus, an unconditional bond is as good as cash-in-hand. In the past, establishing fraud on the part of the employer, of which the bank had knowledge, was the only ground on which a bank could dishonour a claim made under an on-demand bond. However, recent jurisprudence in common law countries shows that courts are beginning to consider unconscionable conduct on the part of the employer in claiming under an on-demand bond as a ground that contractors could rely on the prevent the banks from honouring such claims. This has created uncertainty in connection with on-demand bonds and their liquidity. This paper analyzes recent judicial decisions in four common law jurisdictions, namely, England, Singapore, Hong Kong, and Sri Lanka, to identify the scope of using the concept of “unconscionability” as a ground for preventing unreasonable claims for encashment of on-demand bonds. The objective of this paper is to argue that on-demand bonds have lost their effectiveness as “cash-in-hand” and that this is, in fact, an advantage and not an impediment to international commerce, as the purpose of such bonds should not be to provide for illegal and unconscionable conduct by the beneficiaries.

Keywords: fraud, performance guarantees, on-demand bonds, unconscionability

Procedia PDF Downloads 68
447 Resolution Method for Unforeseen Ground Condition Problem Case in Coal Fired Steam Power Plant Project Location Adipala, Indonesia

Authors: Andi Fallahi, Bona Ryan Situmeang

Abstract:

The Construction Industry is notoriously risky. Much of the preparatory paperwork that precedes construction project can be viewed as the formulation of risk allocation between the owner and the Contractor. The Owner is taking the risk that his project will not get built on the schedule that it will not get built for what he has budgeted and that it will not be of the quality he expected. The Contractor Face a multitude of risk. One of them is an unforeseen condition at the construction site. The Owner usually has the upper hand here if the unforeseen condition occurred. Site data contained in Ground Investigation report is often of significant contractual importance in disputes related to the unforeseen ground condition. A ground investigation can never fully disclose all the details of the underground condition (Risk of an unknown ground condition can never be 100% eliminated). Adipala Coal Fired Steam Power Plant (CSFPP) 1 x 660 project is one of the large CSFPP project in Indonesia based on Engineering, Procurement, and Construction (EPC) Contract. Unforeseen Ground Condition it’s responsible by the Contractor has stipulated in the clausal of Contract. In the implementation, there’s indicated unforeseen ground condition at Circulating Water Pump House (CWPH) area which caused the Contractor should be changed the Method of Work that give big impact against Time of Completion and Cost Project. This paper tries to analyze the best way for allocating the risk between The Owner and The Contractor. All parties that allocating of sharing risk fairly can ultimately save time and money for all parties, and get the job done on schedule for the least overall cost.

Keywords: unforeseen ground condition, coal fired steam power plant, circulating water pump house, Indonesia

Procedia PDF Downloads 305
446 Beyond Adoption: Econometric Analysis of Impacts of Farmer Innovation Systems and Improved Agricultural Technologies on Rice Yield in Ghana

Authors: Franklin N. Mabe, Samuel A. Donkoh, Seidu Al-Hassan

Abstract:

In order to increase and bridge the differences in rice yield, many farmers have resorted to adopting Farmer Innovation Systems (FISs) and Improved Agricultural Technologies (IATs). This study econometrically analysed the impacts of adoption of FISs and IATs on rice yield using multinomial endogenous switching regression (MESR). Nine-hundred and seven (907) rice farmers from Guinea Savannah Zone (GSZ), Forest Savannah Transition Zone (FSTZ) and Coastal Savannah Zone (CSZ) were used for the study. The study used both primary and secondary data. FBO advice, rice farming experience and distance from farming communities to input markets increase farmers’ adoption of only FISs. Factors that increase farmers’ probability of adopting only IATs are access to extension advice, credit, improved seeds and contract farming. Farmers located in CSZ have higher probability of adopting only IATs than their counterparts living in other agro-ecological zones. Age and access to input subsidy increase the probability of jointly adopting FISs and IATs. FISs and IATs have heterogeneous impact on rice yield with adoption of only IATs having the highest impact followed by joint adoption of FISs and IATs. It is important for stakeholders in rice subsector to champion the provision of improved rice seeds, the intensification of agricultural extension services and contract farming concept. Researchers should endeavour to researched into FISs.

Keywords: farmer innovation systems, improved agricultural technologies, multinomial endogenous switching regression, treatment effect

Procedia PDF Downloads 391
445 A Brief History of Kampo Extract Formulations for Prescription in Japan

Authors: Kazunari Ozaki, Mitsuru Kageyama, Kenki Miyazawa, Yoshio Nakamura

Abstract:

Background: Kampo (Japanese Traditional medicine) is a medicine traditionally practiced in Japan, based on ancient Chinese medicine. Most Kampo doctors have used decoction of crude drug pieces for treatment. 93% of the Kampo drugs sold in Japan are Kampo products nowadays. Of all Kampo products, 81% of them are Kampo extract formulations for prescription, which is prepared in powdered or granulated form from medicinal crude drug extracts mixed with appropriate excipient. Physicians with medical license for Western medicine prescribe these Kampo extract formulations for prescription in Japan. Objectives: Our study aims at presenting a brief history of Kampo extract formulations for prescription in Japan. Methods: Systematic searches for relevant studies were conducted using not only printed journals but also electronic journals from the bibliographic databases, such as PubMed/Medline, Ichushi-Web, and university/institutional websites, as well as search engines, such as Google and Google Scholar. Results: The first commercialization of Kampo extract formulations for general use (or OTC (over-the-counter) Kampo extract formulation) was achieved after 1957. The number of drugs has been subsequentially increased, reaching 148 Kampo extract formulation for prescription currently. Conclusion: We provide a history of Kampo extract formulations for prescription in Japan. The originality of this research is that it analyzes the background history of Kampo in parallel with relevant transitions in the government and insurance systems.

Keywords: health insurance system, history, Kampo, Kampo extract formulation for prescription, OTC Kampo extract formulation, pattern corresponding prescription (Ho-sho-so-tai) system

Procedia PDF Downloads 251
444 Management in Health Education Process among Spa Resorts in Poland

Authors: J. Wozniak-Holecka, T. Holecki, P. Romaniuk

Abstract:

Spa facilities are being perceived as the ways of healing treatment in Poland and are guaranteed within the public financing. The universal health insurance (National Health Fund, NFZ), and the disability prevention programme held by Social Insurance Institution (ZUS) are the main sources of financing spa facilities. The dominant public payer of spa services is the NFZ. The Social Insurance Institution covers the cost of health treatment realized in spa facilities as medical rehabilitation, in the field of disability prevention. Health services delivered in the spa resorts are characterized by complexity, and the combination of various methods, typical for health prevention, education, balneotherapy, and physiotherapy. Healing with natural methods, believed to enhance the therapeutic effect, is also involved in health spa treatment. Regardless of the type of facility, each form of spa treatment includes health promotion, health education, prevention at all levels, including rehabilitation. The aim of the study was to determine the optimal organization of health education process. Its efficiency strongly depends on the type of service provider and the funding institution (NFZ vs ZUS). It results from the use of different measures of the effectiveness, the quality and the evaluation of the process being assessed by funding institutions. The methods of the study include a comparative and descriptive quantitative and qualitative analysis. In the empirical part, a questionnaire had been developed. It was then distributed among spa personnel, responsible directly for the health promotion, and among patients who are beneficiaries of health services in spa centers. The quantitative part of the study was based on interviews carried with the use of the online survey (CAWI: Computer-Assisted Web Interview), telephone survey (CATI: Computer-Assisted Telephone Interview) and a conventional questionnaire (PAPI: Paper over Pencil Interview). As a result of the conducted research, it was found that the effectiveness of health education activities in spa resort facilities in Poland is higher when the services are organized using structured tools for managerial control. This applies to formalized procedures implemented by one of the dominant payers covering costs of services (ZUS) and involves the application of health education as one of the mandatory elements of treatment, subjected to the process of control during the course of spa therapy and evaluation after it is completed.

Keywords: effectiveness, health education, public health system, spa treatment

Procedia PDF Downloads 120
443 Digitalisation of Onboarding: A Case Study to Investigate the Impact of Virtual Reality Technology on Employees Social Interactions and Information Seeking During Job-Onboarding

Authors: Ewenam Gbormittah

Abstract:

Because of the effects of the pandemic, companies are focusing on the future of work arrangements for their employees. This includes adapting to a remote or hybrid working model. It is important that employers provide those working remotely or in a hybrid mode a rewarding onboarding experience and opportunities for interaction. Although, Information & Communication Technologies (ICT) have transformed the ways organisations manage employees over the years, there is still a need for a platform where organisations can adjust their onboarding to suit the social and interactive aspects of their employees, to facilitate successful integration. This study aimed to explore this matter by investigating whether Virtual Reality (VR) technology contributes to new employees integration into the organisation during their job-onboarding (JOB) process. The research questions are as follows: (1) To what extent does VR have an impact on employees successful integration into the organisation, and (2) How does VR help elements of new employees Psychological Contract (PC) during the course of interactions. An exploratory case study approach, which consisted of a semi-structured interview was conducted on 20 employees, split from two different case organisations. The results of the data were analysed according to each case, and then a cross-case comparison was provided. The results have generated 8 themes, presenting in excess of 7 sub-themes for CS1 and presented 7 themes, in excess of 7 sub-themes for CS2. The cross-case analysis has revealed that VR does have the potential to support employees integration into the organisation. However, the effects were shown to be stronger for employees in CS2, compared to employees in CS1. The results highlight practical implications for onboarding psychology and strategic talent solutions within recruitment. Such strategy this research particularly outlines, involves providing insights on how to manage the PC of employees from the recruitment stage to creating successful employment relationships.

Keywords: job-onboarding, psychological contract, virtual reality, case study one, case study two

Procedia PDF Downloads 25
442 Activity-Based Safety Assessment of Real Estate Projects in Western India

Authors: Patel Parul, Harsh Ganvit

Abstract:

The construction industry is the second highest industry after agriculture provides employment in India. In developing countries like India, many construction projects are coming up to meet the demand. On the one hand, construction projects are increasing; on the other hand still, construction companies are struggling with many problems. One of the major problems is to ensure safe working conditions at the construction site. Due to a lack of safety awareness and ignorance of safety aspects, many fatal accidents are very common at the construction site in India. One of the key success factors for construction projects is “Accident-Free Construction Projects”. The construction projects can be divided into various categories like Infrastructure projects, industrial construction and real estate construction. Real estate projects are mainly comprised of commercial and residential projects. In the construction industry, private sectors play a huge role in urban and rural development and also contribute significantly to the growth of the nation. Infrastructure and Industrial projects are mainly executed by well-qualified construction contractors. For such projects, ensuring safety at construction projects is inevitable and probably one of the major clauses of contract documents as well. These projects are monitored from time to time by national agencies and researchers, too. However, Real estate projects are rarely monitored for safety aspects. No systematic contract system is followed for these projects. Safety is the most neglected aspect of these projects. In the current research projects, an attempt is made to carry out safety auditing for about 75 real estate projects. The objective of this work is to collect the activity-based safety survey of real estate projects in western India. The analysis of activity-based safety implementation for real estate projects is discussed in the present work. The activities are divided into three categories based on the data collected. The findings of this work will help local monitoring authorities to implement a safety management plan for real estate projects.

Keywords: construction safety, safety assessment, activity-based safety, real estate projects

Procedia PDF Downloads 22
441 Windstorm Risk Assessment for Offshore Wind Farms in the North Sea

Authors: Paul Buchana, Patrick E. Mc Sharry

Abstract:

In 2017 there will be about 38 wind farms in the North Sea belonging to 5 different countries. The North Sea is ideal for offshore wind power generation and is thus attractive to offshore wind energy developers and investors. With concerns about the potential for offshore wind turbines to sustain substantial damage as a result of extreme weather conditions, particularly windstorms, this poses a unique challenge to insurers and reinsurers as to adequately quantify the risk and offer appropriate insurance cover for these assets. The need to manage this risk also concerns regulators, who provide the oversight needed to ensure that if a windstorm or a series of storms occur in this area over a one-year time frame, the insurers of these assets in the EU remain solvent even after meeting consequent damage costs. In this paper, using available European windstorm data for the past 33 years and actual wind farm locations together with information pertaining to each of the wind farms (number of turbines, total capacity and financial value), we present a Monte Carlo simulation approach to assess the number of turbines that would be buckled in each of the wind farms using maximum wind speeds reaching each of them. These wind speeds are drawn from historical windstorm data. From the number of turbines buckled, associated financial loss and output capacity can be deduced. The results presented in this paper are targeted towards offshore wind energy developers, insurance and reinsurance companies and regulators.

Keywords: catastrophe modeling, North Sea wind farms, offshore wind power, risk analysis

Procedia PDF Downloads 270
440 Risk Management Practices In The Construction Industry In Malawi

Authors: Taonga Temwani Chibaka

Abstract:

This qualitative research study was conducted to identify the common risk factors that affect the construction industry in Malawi in the building and infrastructure (civil works) projects. The study then evaluates the possible risk responses that are done to mitigate the various risk factors that were identified. I addition the research also established the barriers to risk management implementation with lastly mapping out as where the identified risk factors fall on which stage of the project and then also map out the knowledge areas that need to be worked on the cases on Malawian construction industry in order to mitigate most of the identified risk factors. The study involved the interviewing the professionals from the construction industry in Malawi where insights and ideas were collected, analysed and interpreted. The key study findings show that risks related to clients group are perceived as most critical followed by the contractor related, consultant related and then external group related factors respectively where preventive measures are the most applied risk response technique where the aim to avoid most of the risk factors from happening. Most of the risk factors identified were internal risks and in managerial category which suggested that risk planning was to be emphasized at pre-contract stage to minimize these risks since a bigger percentage of the risk factors were mapped out at implementation stage. Furthermore, barriers to risk management were identified and the key barriers were lack of awareness; lack of knowledge; lack of formal policies in place; regarded as costly and limited time which resulted in proposing that regulating authorities to purposefully introduce intense training on risk management to make known of this new knowledge area. The study then recommends that organisation should formally implement risk management where policies should be introduced to enforce all parties to undertake this. Risk planning was regarded as paramount and this to be done from pre-contract phase so as to mitigate 80% of the risk factors. Finally, training should be done on all project management knowledge areas.

Keywords: risk management, risk factors, risks, malawi

Procedia PDF Downloads 254
439 Legal Allocation of Risks: A Computational Analysis of Force Majeure Clauses

Authors: Farshad Ghodoosi

Abstract:

This article analyzes the effect of supervening events in contracts. Contracts serve an important function: allocation of risks. In spite of its importance, the case law and the doctrine are messy and inconsistent. This article provides a fresh look at excuse doctrines (i.e., force majeure, impracticability, impossibility, and frustration) with a focus on force majeure clauses. The article makes the following contributions: First, it furnishes a new conceptual and theoretical framework of excuse doctrines. By distilling the decisions, it shows that excuse doctrines rests on the triangle of control, foreseeability, and contract language. Second, it analyzes force majeure clauses used by S&P 500 companies to understand the stickiness and similarity of such clauses and the events they cover. Third, using computational and statistical tools, it analyzes US cases since 1810 in order to assess the weight given to the triangle of control, foreseeability, and contract language. It shows that the control factor plays an important role in force majeure analysis, while the contractual interpretation is the least important factor. The Article concludes that it is the standard for control -whether the supervening event is beyond the control of the party- that determines the outcome of cases in the force majeure context and not necessarily the contractual language. This article has important implications on COVID-19-related contractual cases. Unlike the prevailing narrative that it is the language of the force majeure clause that’s determinative, this article shows that the primarily focus of the inquiry will be on whether the effects of COVID-19 have been beyond the control of the promisee. Normatively, the Article suggests that the trifactor of control, foreseeability, and contractual language are not effective for allocation of legal risks in times of crises. It puts forward a novel approach to force majeure clauses whereby that the courts should instead focus on the degree to which parties have relied on (expected) performance, in particular during the time of crisis.

Keywords: contractual risks, force majeure clauses, foreseeability, control, contractual language, computational analysis

Procedia PDF Downloads 113
438 Factors Affecting Contractual Disputes in Construction ProJects in Sri Lanka

Authors: R. M. Rajapaksa

Abstract:

Construction industry is one of the key players in driving the economy of a country to achieve its prosperity. However, a dispute is one of the crucial factors which prevent the completion of construction contracts within the budgeted cost, scheduled time, and accepted quality. Disputes are inevitable in the construction contract. Accordingly, a study has been undertaken to identify the factors affecting contractual disputes in construction projects in Sri Lanka. The study was a mixed approach with major qualitative and minor quantitative. Qualitative study was set in the form of in-depth interviews with eighteen participants, and quantitative study was conducted using a questionnaire with twenty-four respondents from previously implemented projects by the National Water Supply & Drainage Board representing the employer, engineer and the Contractor to identify the factors affecting contractual disputes and to verify most critical factors respectively. Data analysis for qualitative and quantitative studies was carried out by means of transcribing, code & categorizeand average score methods, respectively. The study reveals that there are forty factors affecting the contractual disputes in construction contracts in Sri Lanka. The finding further illustrates that conflicting decisions by inexperience personnel in the higher position of the Employer, ambiguities resulting inadequate descriptions of the preliminary/general items in price schedule, unfair valuation and late confirmation of variations, unfair determination due to lack of experience of the Engineer/Consultant, under certification of progress payments, unfair grant of EOT & application of delay damages, unreasonable claims for variation of works, errors/discrepancies/ambiguities in the contract conditions and discrepancies & errors in designs & specifications are the most critical factors affecting contractual disputes. Finally, the study proposed remedial measures to most critical factors affecting contractual disputes.

Keywords: dispute, contractual, factors, employer, engineer, contractor, construction projects

Procedia PDF Downloads 184
437 Seaworthiness and Liability Risks Involving Technology and Cybersecurity in Transport and Logistics

Authors: Eugene Wong, Felix Chan, Linsey Chen, Joey Cheung

Abstract:

The widespread use of technologies and cyber/digital means for complex maritime operations have led to a sharp rise in global cyber-attacks. They have generated an increasing number of liability disputes, insurance claims, and legal proceedings. An array of antiquated case law, regulations, international conventions, and obsolete contractual clauses drafted in the pre-technology era have become grossly inadequate in addressing the contemporary challenges. This paper offers a critique of the ambiguity of cybersecurity liabilities under the obligation of seaworthiness entailed in the Hague-Visby Rules, which apply either by law in a large number of jurisdictions or by express incorporation into the shipping documents. This paper also evaluates the legal and technological criteria for assessing whether a vessel is properly equipped with the latest offshore technologies for navigation and cargo delivery operations. Examples include computer applications, networks and servers, enterprise systems, global positioning systems, and data centers. A critical analysis of the carriers’ obligations to exercise due diligence in preventing or mitigating cyber-attacks is also conducted in this paper. It is hoped that the present study will offer original and crucial insights to policymakers, regulators, carriers, cargo interests, and insurance underwriters closely involved in dispute prevention and resolution arising from cybersecurity liabilities.

Keywords: seaworthiness, cybersecurity, liabilities, risks, maritime, transport

Procedia PDF Downloads 111
436 Implementation of Proof of Work Using Ganache

Authors: Sakshi Singh, Shampa Chakraverty

Abstract:

One of the essential characteristics of Blockchain is the ability to validate the integrity of new transactions added to the Blockchain. Moreover, one of the essential consensus algorithms, Proof of Work, performs this job. In this work, we implemented the Proof of Work consensus method on the block formed by performing the transaction using Ganache. The primary goal of this implementation is to understand the process and record how Proof of Work works in reality on newly created blocks.

Keywords: proof of work, blockchain, ganache, smart contract

Procedia PDF Downloads 118
435 The Duty of Sea Carrier to Transship the Cargo in Case of Vessel Breakdown

Authors: Mojtaba Eshraghi Arani

Abstract:

Concluding the contract for carriage of cargo with the shipper (through bill of lading or charterparty), the carrier must transport the cargo from loading port to the port of discharge and deliver it to the consignee. Unless otherwise agreed in the contract, the carrier must avoid from any deviation, transfer of cargo to another vessel or unreasonable stoppage of carriage in-transit. However, the vessel might break down in-transit for any reason and becomes unable to continue its voyage to the port of discharge. This is a frequent incident in the carriage of goods by sea which leads to important dispute between the carrier/owner and the shipper/charterer (hereinafter called “cargo interests”). It is a generally accepted rule that in such event, the carrier/owner must repair the vessel after which it will continue its voyage to the destination port. The dispute will arise in the case that temporary repair of the vessel cannot be done in the short or reasonable term. There are two options for the contract parties in such a case: First, the carrier/owner is entitled to repair the vessel while having the cargo onboard or discharged in the port of refugee, and the cargo interests must wait till the breakdown is rectified at any time, whenever. Second, the carrier/owner will be responsible to charter another vessel and transfer the entirety of cargo to the substitute vessel. In fact, the main question revolves around the duty of carrier/owner to perform transfer of cargo to another vessel. Such operation which is called “trans-shipment” or “transhipment” (in terms of the oil industry it is usually called “ship-to-ship” or “STS”) needs to be done carefully and with due diligence. In fact, the transshipment operation for various cargoes might be different as each cargo requires its own suitable equipment for transfer to another vessel, so this operation is often costly. Moreover, there is a considerable risk of collision between two vessels in particular in bulk carriers. Bulk cargo is also exposed to the shortage and partial loss in the process of transshipment especially during bad weather. Concerning tankers which carry oil and petrochemical products, transshipment, is most probably followed by sea pollution. On the grounds of the above consequences, the owners are afraid of being held responsible for such operation and are reluctant to perform in the relevant disputes. The main argument raised by them is that no regulation has recognized such duty upon their shoulders so any such operation must be done under the auspices of the cargo interests and all costs must be reimbursed by themselves. Unfortunately, not only the international conventions including Hague rules, Hague-Visby Rules, Hamburg rules and Rotterdam rules but also most domestic laws are silent in this regard. The doctrine has yet to analyse the issue and no legal researches was found out in this regard. A qualitative method with the concept of interpretation of data collection has been used in this paper. The source of the data is the analysis of regulations and cases. It is argued in this article that the paramount rule in the maritime law is “the accomplishment of the voyage” by the carrier/owner in view of which, if the voyage can only be finished by transshipment, then the carrier/owner will be responsible to carry out this operation. The duty of carrier/owner to apply “due diligence” will strengthen this reasoning. Any and all costs and expenses will also be on the account pf the owner/carrier, unless the incident is attributable to any cause arising from the cargo interests’ negligence.

Keywords: cargo, STS, transshipment, vessel, voyage

Procedia PDF Downloads 81
434 Law, Resistance, and Development in Georgia: A Case of Namakhvani HPP

Authors: Konstantine Eristavi

Abstract:

The paper will contribute to the discussion on the pitfalls, limits, and possibilities of legal and rights discourse in opposing large infrastructural projects in the context of neoliberal globalisation. To this end, the paper will analyse the struggle against the Namakhvani HPP project in Georgia. The latter has been hailed by the government as one of the largest energy projects in the history of the country, with an enormous potential impact on energy security, energy independence, economic growth, and development. This takes place against the backdrop of decades of market-led -or neoliberal- model of development in Georgia, characterised by structural adjustments, deregulation, privatisation, and Laissez-Fair approach to foreign investment. In this context, the Georgian state vies with other low and middle-income countries for foreign capital by offering to potential investors, on the one hand, exemptions from social and environmental regulations and, on the other hand, huge legal concessions and safeguards, thereby participating in what is often called a “race to the bottom.” The Namakhvani project is a good example of this. At every stage, the project has been marred with violations of laws and regulations concerning transparency, participation, social and environmental regulations, and so on. Moreover, the leaked contract between the state and the developer reveals the contractual safeguards which effectively insulate the investment throughout the duration of the contract from the changes in the national law that might adversely affect investors’ rights and returns. These clauses, aimed at preserving investors' economic position, place the contract above national law in many respects and even conflict with fundamental constitutional rights. In response to the perceived deficiencies of the project, one of the largest and most diverse social movements in the history of post-soviet Georgia has been assembled, consisting of the local population, conservative and leftist groups, human rights and environmental NGOs, etc. Crucially, the resistance movement is actively using legal tools. In order to analyse both the limitations and possibilities of legal discourse, the paper will distinguish between internal and immanent critiques. Law as internal critique, in the context of the struggles around the Namakhvani project, while potentially fruitful in hindering the project, risks neglecting and reproducing those factors -e.g., the particular model of development- that made such contractual concessions and safeguards and concomitant rights violations possible in the first place. On the other hand, the use of rights and law as part of immanent critique articulates a certain incapacity on the part of the addressee government to uphold existing laws and rights due to structural factors, hence, pointing to a need for a fundamental change. This 'ruptural' form of legal discourse that the movement employs makes it possible to go beyond the discussion around the breaches of law and enables a critical deliberation on the development model within which these violations and extraordinary contractual safeguards become necessary. It will be argued that it is this form of immanent critique that expresses the emancipatory potential of legal discourse.

Keywords: law, resistance, development, rights

Procedia PDF Downloads 56
433 Effectiveness and Efficiency of Unified Philippines Accident Reporting and Database System in Optimizing Road Crash Data Usage with Various Stakeholders

Authors: Farhad Arian Far, Anjanette Q. Eleazar, Francis Aldrine A. Uy, Mary Joyce Anne V. Uy

Abstract:

The Unified Philippine Accident Reporting and Database System (UPARDS), is a newly developed system by Dr. Francis Aldrine Uy of the Mapua Institute of Technology. The main purpose is to provide an advanced road accident investigation tool, record keeping and analysis system for stakeholders such as Philippine National Police (PNP), Metro Manila Development Authority (MMDA), Department of Public Works and Highways (DPWH), Department of Health (DOH), and insurance companies. The system is composed of 2 components, the mobile application for road accident investigators that takes advantage of available technology to advance data gathering and the web application that integrates all accident data for the use of all stakeholders. The researchers with the cooperation of PNP’s Vehicle Traffic Investigation Sector of the City of Manila, conducted the field-testing of the application in fifteen (15) accident cases. Simultaneously, the researchers also distributed surveys to PNP, Manila Doctors Hospital, and Charter Ping An Insurance Company to gather their insights regarding the web application. The survey was designed on information systems theory called Technology Acceptance Model. The results of the surveys revealed that the respondents were greatly satisfied with the visualization and functions of the applications as it proved to be effective and far more efficient in comparison with the conventional pen-and-paper method. In conclusion, the pilot study was able to address the need for improvement of the current system.

Keywords: accident, database, investigation, mobile application, pilot testing

Procedia PDF Downloads 409
432 A Multilevel Analysis of Predictors of Early Antenatal Care Visits among Women of Reproductive Age in Benin: 2017/2018 Benin Demographic and Health Survey

Authors: Ebenezer Kwesi Armah-Ansah, Kenneth Fosu Oteng, Esther Selasi Avinu, Eugene Budu, Edward Kwabena Ameyaw

Abstract:

Background: Maternal mortality, particularly in Benin, is a major public health concern in Sub-Saharan Africa. To provide a positive pregnancy experience and reduce maternal morbidities, all pregnant women must get appropriate and timely prenatal support. However, many pregnant women in developing countries, including Benin, begin antenatal care late. There is a paucity of empirical literature on the prevalence and predictors of early antenatal care visits in Benin. As a result, the purpose of this study is to investigate the prevalence and predictors of early antenatal care visits among women of productive age in Benin. Methods: This is a secondary analysis of the 2017/2018 Benin Demographic and Health Survey (BDHS) data. The study involved 6,919 eligible women. Data analysis was conducted using Stata version 14.2 for Mac OS. We adopted a multilevel logistic regression to examine the predictors of early ANC visits in Benin. The results were presented as odds ratios (ORs) associated with 95% confidence intervals (CIs) and p-value <0.05 to determine the significant associations. Results: The prevalence of early ANC visits among pregnant women in Benin was 57.03% [95% CI: 55.41-58.64]. In the final multilevel logistic regression, early ANC visit was higher among women aged 30-34 [aOR=1.60, 95% CI=1.17-2.18] compared to those aged 15-19, women with primary education [aOR=1.22, 95% CI=1.06-142] compared to the non-educated women, women who were covered by health insurance [aOR=3.03, 95% CI=1.35-6.76], women without a big problem in getting the money needed for treatment [aOR=1.31, 95% CI=1.16-1.49], distance to the health facility, not a big problem [aOR=1.23, 95% CI=1.08-1.41], and women whose partners had secondary/higher education [aOR=1.35, 95% CI=1.15-1.57] compared with those who were not covered by health insurance, had big problem in getting money needed for treatment, distance to health facility is a big problem and whose partners had no education respectively. However, women who had four or more births [aOR=0.60, 95% CI=0.48-0.74] and those in Atacora Region [aOR=0.50, 95% CI=0.37-0.68] had lower odds of early ANC visit. Conclusion: This study revealed a relatively high prevalence of early ANC visits among women of reproductive age in Benin. Women's age, educational status of women and their partners, parity, health insurance coverage, distance to health facilities, and region were all associated with early ANC visits among women of reproductive in Benin. These factors ought to be taken into account when developing ANC policies and strategies in order to boost early ANC visits among women in Benin. This will significantly reduce maternal and newborn mortality and help achieve the World Health Organization’s recommendation that all pregnant women should initiate early ANC visits within the first three months of pregnancy.

Keywords: antenatal care, Benin, maternal health, pregnancy, DHS, public health

Procedia PDF Downloads 28
431 The Integration Process of Non-EU Citizens in Luxembourg: From an Empirical Approach Toward a Theoretical Model

Authors: Angela Odero, Chrysoula Karathanasi, Michèle Baumann

Abstract:

Integration of foreign communities has been a forefront issue in Luxembourg for some time now. The country’s continued progress depends largely on the successful integration of immigrants. The aim of our study was to analyze factors which intervene in the course of integration of Non-EU citizens through the discourse of Non-EU citizens residing in Luxembourg, who have signed the Welcome and Integration Contract (CAI). The two-year contract offers integration services to assist foreigners in getting settled in the country. Semi-structured focus group discussions with 50 volunteers were held in English, French, Spanish, Serbo-Croatian or Chinese. Participants were asked to talk about their integration experiences. Recorded then transcribed, the transcriptions were analyzed with the help of NVivo 10, a qualitative analysis software. A systematic and reiterative analysis of decomposing and reconstituting was realized through (1) the identification of predetermined categories (difficulties, challenges and integration needs) (2) initial coding – the grouping together of similar ideas (3) axial coding – the regrouping of items from the initial coding in new ways in order to create sub-categories and identify other core dimensions. Our results show that intervening factors include language acquisition, professional career and socio-cultural activities or events. Each of these factors constitutes different components whose weight shifts from person to person and from situation to situation. Connecting these three emergent factors are two elements essential to the success of the immigrant’s integration – the role of time and deliberate effort from the immigrants, the community, and the formal institutions charged with helping immigrants integrate. We propose a theoretical model where the factors described may be classified in terms of how they predispose, facilitate, and / or reinforce the process towards a successful integration. Measures currently in place propose one size fits all programs yet integrative measures which target the family unit and those customized to target groups based on their needs would work best.

Keywords: integration, integration services, non-eu citizens, qualitative analysis, third country nationals

Procedia PDF Downloads 282
430 Public Preferences for Lung Cancer Screening in China: A Discrete Choice Experiment

Authors: Zixuan Zhao, Lingbin Du, Le Wang, Youqing Wang, Yi Yang, Jingjun Chen, Hengjin Dong

Abstract:

Objectives: Few results from public attitudes for lung cancer screening are available both in China and abroad. This study aimed to identify preferred lung cancer screening modalities in a Chinese population and predict uptake rates of different modalities. Materials and Methods: A discrete choice experiment questionnaire was administered to 392 Chinese individuals aged 50–74 years who were at high risk for lung cancer. Each choice set had two lung screening options and an option to opt-out, and respondents were asked to choose the most preferred one. Both mixed logit analysis and stepwise logistic analysis were conducted to explore whether preferences were related to respondent characteristics and identify which kinds of respondents were more likely to opt out of any screening. Results: On mixed logit analysis, attributes that were predictive of choice at 1% level of statistical significance included the screening interval, screening venue, and out-of-pocket costs. The preferred screening modality seemed to be screening by low-dose computed tomography (LDCT) + blood test once a year in a general hospital at a cost of RMB 50; this could increase the uptake rate by 0.40 compared to the baseline setting. On stepwise logistic regression, those with no endowment insurance were more likely to opt out; those who were older and housewives/househusbands, and those with a health check habit and with commercial endowment insurance were less likely to opt out from a screening programme. Conclusions: There was considerable variance between real risk and self-perceived risk of lung cancer among respondents, and further research is required in this area. Lung cancer screening uptake can be increased by offering various screening modalities, so as to help policymakers further design the screening modality.

Keywords: lung cancer, screening, China., discrete choice experiment

Procedia PDF Downloads 219
429 The Marriage of a Sui Juris Girl: Permission of Wali (Guardian) or Consent of Ward in the Context of Personal Law in Pakistan

Authors: Muhammad Farooq

Abstract:

The present article explores the woman's consent as a paramount element in contracting a Muslim marriage. Also, whether permission of the wali (guardian) is a condition per se for a valid nikah (marriage deed) in the eye of law and Sharia. The researcher attempts to treat it through the related issues, inter alia; the marriage guardian, the women's legal capacity to give consent whether she is a virgin or nonvirgin and how that consent is to be given or may be understood. Does her laugh, tears or salience needs a legal interpretation as well as other female manifestations of emotion explained by the Muslim jurists? The silence of Muslim Family Law Ordinance 1961 (hereafter; MFLO 1961) in this regard and the likely reasons behind such silence is also inquired in brief. Germane to the theme, the various cases in which the true notion of woman's consent is interpreted by courts in Pakistan are also examined. In order to address the issue in hand, it is proposed to provide a brief overview of a few contemporary writers' opinions in which the real place of woman's consent in Muslim marriage is highlighted. Key to the idea of young Muslim woman's marriage, the doctrine of kafa'a (equality or suitability) between the man and woman is argued here to be grounded in the patriarchal and social norms. It is, therefore, concluded that such concept was the result of analogical reasoning and has less importance in the present time. As such it is not a valid factor in current scenarios to validate or invalidate marital bonds. A standard qualitative convention is used for this research. Among primary and secondary sources; for examples, Qur'an, Sunnah, Books, Scholarly articles, texts of law and case law is used to point out the researcher's view. In summation, the article is concluded with a bold statement that a young woman being a party to the contract, is absolutely entitled to 'full and free' consent for the Muslim marriage contract. It is the woman, an indispensable partaker and her consent (not the guardian' permission) that does validate or invalidate the said agreement in the eye of contemporary personal law and in Sharia.

Keywords: consent of woman, ejab (declaration), Nikah (marriage agreement), qabol (acceptance), sui juris (of age; independent), wali (guardian), wilayah (guardianship)

Procedia PDF Downloads 117
428 A Strategic Approach for Promoting Renewable Energy Technologies in Developing Countries

Authors: Hanee Ryu

Abstract:

The supporting policies for renewable energy have been designed to deploy renewable energy technology targeting domestic market. The government encourages market creation through obligations such as FIT or RPS on an energy supplier. With these policy measures, the securing vast market needs to induce technology development. Furthermore, it is crucial that ensuring developing market can make the environment nurture the renewable energy industry. Overseas expansion to countries being in demand is essential under immature domestic market. Extending its business abroad can make the domestic company get the knowledge through learning-by-doing. Besides, operation in the countries to be rich in renewable resources such as weather conditions helps to develop proven track record required for verifying technologies. This paper figures out the factor to hamper the global market entry and build up the strategies to overcome difficulties. Survey conducted renewable energy company having overseas experiences at least once. Based on the survey we check the obstacle against exporting home goods and services. As a result, securing funds is salient fact to proceed to business. It is difficult that only private bank or investment agencies participate in the project under uncertainty which renewable energy development project bears inherently. These uncertainties need public fund such as ODA to encourage private sectors to start a business. Furthermore, international organizations such as IRENA or multilateral development banks as WBG play a role to guarantee the investment including risk insurance against uncertainty. It can also manage excavation business cooperating with developing countries and supplement inadequate government funding involved. With survey results strategies to obtain the order, the international organization places are categorized according to the type of getting a contract. This paper suggests 3 types approaching to the international organization project (going through international competitive bidding, using ODA and project financing) and specifies the role of government to support the domestic firms with running out of funds. Under renewable energy industry environment where hard to being created as a spontaneous market, government policy approach needs to motivate the actors to get into the business. It is one of the good strategies that countries with the low demand of renewable energies participate in the project international agencies order in the developing countries having abundant resources. This provides crucial guidance for the formulation of renewable energy development policy and planning with consideration of business opportunities and funding.

Keywords: exporting strategies, multilateral development banks, promoting in developing countries, renewable energy technologies

Procedia PDF Downloads 494
427 Financial Burden of Occupational Slip and Fall Incidences in Taiwan

Authors: Kai Way Li, Lang Gan

Abstract:

Slip &Fall are common in Taiwan. They could result in injuries and even fatalities. Official statistics indicate that more than 15% of all occupational incidences were slip/fall related. All the workers in Taiwan are required by the law to join the worker’s insurance program administered by the Bureau of Labor Insurance (BLI). The BLI is a government agency under the supervision of the Ministry of Labor. Workers claim with the BLI for insurance compensations when they suffer fatalities or injuries at work. Injuries statistics based on worker’s compensation claims were rarely studied. The objective of this study was to quantify the injury statistics and financial cost due to slip-fall incidences based on the BLI compensation records. Compensation records in the BLI during 2007 to 2013 were retrieved. All the original application forms, approval opinions, results for worker’s compensations were in hardcopy and were stored in the BLI warehouses. Xerox copies of the claims, excluding the personal information of the applicants (or the victim if passed away), were obtained. The content in the filing forms were coded in an Excel worksheet for further analyses. Descriptive statistics were performed to analyze the data. There were a total of 35,024 claims including 82 deaths, 878 disabilities, and 34,064 injuries/illnesses which were slip/fall related. It was found that the average losses for the death cases were 40 months. The total dollar amount for these cases paid was 86,913,195 NTD. For the disability cases, the average losses were 367.36 days. The total dollar amount for these cases paid was almost 2.6 times of those for the death cases (233,324,004 NTD). For the injury/illness cases, the average losses for the illness cases were 58.78 days. The total dollar amount for these cases paid was approximately 13 times of those of the death cases (1134,850,821 NTD). For the applicants/victims, 52.3% were males. There were more males than females for the deaths, disability, and injury/illness cases. Most (57.8%) of the female victims were between 45 to 59 years old. Most of the male victims (62.6%) were, on the other hand, between 25 to 39 years old. Most of the victims were in manufacturing industry (26.41%), next the construction industry (22.20%), and next the retail industry (13.69%). For the fatality cases, head injury was the main problem for immediate or eventual death (74.4%). For the disability case, foot (17.46%) and knee (9.05%) injuries were the leading problems. The compensation claims other than fatality and disability were mainly associated with injuries of the foot (18%), hand (12.87%), knee (10.42%), back (8.83%), and shoulder (6.77%). The slip/fall cases studied indicate that the ratios among the death, disability, and injury/illness counts were 1:10:415. The ratios of dollar amount paid by the BLI for the three categories were 1:2.6:13. Such results indicate the significance of slip-fall incidences resulting in different severity. Such information should be incorporated in to slip-fall prevention program in industry.

Keywords: epidemiology, slip and fall, social burden, workers’ compensation

Procedia PDF Downloads 302