1448 Project Time and Quality Management during Construction

Authors: Nahed Al-Hajeri

Abstract:

Time and cost is an integral part of every construction plan and can affect each party’s contractual obligations. The performance of both time and cost are usually important to the client and contractor during the project. Almost all construction projects are experiencing time overrun. These time overruns always contributed as expensive to both client and contractor. Construction of any project inside the gathering centers involves complex management skills related to work force, materials, plant, machineries, new technologies etc. It also involves many agencies interdependent on each other like the vendors, structural and functional designers including various types of specialized engineers and it includes support of contractors and specialized contractors. This paper mainly highlights the types of construction delays due to which project suffer time and cost overrun. This paper also speaks about the delay causes and factors that contribute to the construction sequence delay for the oil and gas projects. Construction delay is supposed to be one of the repeated problems in the construction projects and it has an opposing effect on project success in terms of time, cost and quality. Some effective methods are identified to minimize delays in construction projects such as: 1. Site management and supervision, 2. Effective strategic planning, 3. Clear information and communication channel. Our research paper studies the types of delay with some real examples with statistic results and suggests solutions to overcome this problem.

Keywords: non-compensable delay, delays caused by force majeure, compensable delay, delays caused by the owner or the owner’s representative, non-excusable delay, delay caused by the contractor or the contractor’s representative, concurrent delay, delays resulting from two separate causes at the same time

Procedia PDF Downloads 225
1447 The Impact of Regulatory Changes on the Development of Mobile Medical Apps

Authors: M. McHugh, D. Lillis

Abstract:

Mobile applications are being used to perform a wide variety of tasks in day-to-day life, ranging from checking email to controlling your home heating. Application developers have recognized the potential to transform a smart device into a medical device, by using a mobile medical application i.e. a mobile phone or a tablet. When initially conceived these mobile medical applications performed basic functions e.g. BMI calculator, accessing reference material etc.; however, increasing complexity offers clinicians and patients a range of functionality. As this complexity and functionality increases, so too does the potential risk associated with using such an application. Examples include any applications that provide the ability to inflate and deflate blood pressure cuffs, as well as applications that use patient-specific parameters and calculate dosage or create a dosage plan for radiation therapy. If an unapproved mobile medical application is marketed by a medical device organization, then they face significant penalties such as receiving an FDA warning letter to cease the prohibited activity, fines and possibility of facing a criminal conviction. Regulatory bodies have finalized guidance intended for mobile application developers to establish if their applications are subject to regulatory scrutiny. However, regulatory controls appear contradictory with the approaches taken by mobile application developers who generally work with short development cycles and very little documentation and as such, there is the potential to stifle further improvements due to these regulations. The research presented as part of this paper details how by adopting development techniques, such as agile software development, mobile medical application developers can meet regulatory requirements whilst still fostering innovation.

Keywords: agile, applications, FDA, medical, mobile, regulations, software engineering, standards

Procedia PDF Downloads 338
1446 The Role of People and Data in Complex Spatial-Related Long-Term Decisions: A Case Study of Capital Project Management Groups

Authors: Peter Boyes, Sarah Sharples, Paul Tennent, Gary Priestnall, Jeremy Morley

Abstract:

Significant long-term investment projects can involve complex decisions. These are often described as capital projects, and the factors that contribute to their complexity include budgets, motivating reasons for investment, stakeholder involvement, interdependent projects, and the delivery phases required. The complexity of these projects often requires management groups to be established involving stakeholder representatives; these teams are inherently multidisciplinary. This study uses two university campus capital projects as case studies for this type of management group. Due to the interaction of projects with wider campus infrastructure and users, decisions are made at varying spatial granularity throughout the project lifespan. This spatial-related context brings complexity to the group decisions. Sensemaking is the process used to achieve group situational awareness of a complex situation, enabling the team to arrive at a consensus and make a decision. The purpose of this study is to understand the role of people and data in the complex spatial related long-term decision and sensemaking processes. The paper aims to identify and present issues experienced in practical settings of these types of decision. A series of exploratory semi-structured interviews with members of the two projects elicit an understanding of their operation. From two stages of thematic analysis, inductive and deductive, emergent themes are identified around the group structure, the data usage, and the decision making within these groups. When data were made available to the group, there were commonly issues with the perception of veracity and validity of the data presented; this impacted the ability of group to reach consensus and, therefore, for decisions to be made. Similarly, there were different responses to forecasted or modelled data, shaped by the experience and occupation of the individuals within the multidisciplinary management group. This paper provides an understanding of further support required for team sensemaking and decision making in complex capital projects. The paper also discusses the barriers found to effective decision making in this setting and suggests opportunities to develop decision support systems in this team strategic decision-making process. Recommendations are made for further research into the sensemaking and decision-making process of this complex spatial-related setting.

Keywords: decision making, decisions under uncertainty, real decisions, sensemaking, spatial, team decision making

Procedia PDF Downloads 100
1445 Anti-Corruption, an Important Challenge for the Construction Industry!

Authors: Ahmed Stifi, Sascha Gentes, Fritz Gehbauer

Abstract:

The construction industry is perhaps one of the oldest industry of the world. The ancient monuments like the egyptian pyramids, the temples of Greeks and Romans like Parthenon and Pantheon, the robust bridges, old Roman theatres, the citadels and many more are the best testament to that. The industry also has a symbiotic relationship with other . Some of the heavy engineering industry provide construction machineries, chemical industry develop innovative construction materials, finance sector provides fund solutions for complex construction projects and many more. Construction Industry is not only mammoth but also very complex in nature. Because of the complexity, construction industry is prone to various tribulations which may have the propensity to hamper its growth. The comparitive study of this industry with other depicts that it is associated with a state of tardiness and delay especially when we focus on the managerial aspects and the study of triple constraint (time, cost and scope). While some institutes says the complexity associated with it as a major reason, others like lean construction, refers to the wastes produced across the construction process as the prime reason. This paper introduces corruption as one of the prime factors for such delays.To support this many international reports and studies are available depicting that construction industry is one of the most corrupt sectors worldwide, and the corruption can take place throught the project cycle comprising project selection, planning, design, funding, pre-qualification, tendering, execution, operation and maintenance, and even through the reconstrction phase. It also happens in many forms such as bribe, fraud, extortion, collusion, embezzlement and conflict of interest and the self-sufficient. As a solution to cope the corruption in construction industry, the paper introduces the integrity as a key factor and build a new integrity framework to develop and implement an integrity management system for construction companies and construction projects.

Keywords: corruption, construction industry, integrity, lean construction

Procedia PDF Downloads 347
1444 Integrating Cost-Benefit Assessment and Contract Design to Support Industrial Symbiosis Deployment

Authors: Robin Molinier

Abstract:

Industrial symbiosis (I.S) is the realization of Industrial Ecology (I.E) principles in production systems in function. I.S consists in the use of waste materials, fatal energy, recirculated utilities and infrastructure/service sharing as resources for production. Environmental benefits can be achieved from resource conservation but economic profitability is required by the participating actors. I.S indeed involves several actors with their own objectives and resources so that each one must be satisfied by ex-ante arrangements to commit toward I.S execution (investments and transactions). Following the Resource-Based View of transactions we build a modular framework to assess global I.S profitability and to specify each actor’s contributions to costs and benefits in line with their resource endowments and performance requirements formulations. I.S projects specificities implied by the need for customization (asset specificity, non-homogeneity) induce the use of long-term contracts for transactions following Transaction costs economics arguments. Thus we propose first a taxonomy of costs and value drivers for I.S and an assignment to each actor of I.S specific risks that we identified as load profiles mismatch, quality problems and value fluctuations. Then appropriate contractual guidelines (pricing, cost sharing and warranties) that support mutual profitability are derived from the detailed identification of contributions by the cost-benefits model. This analytical framework helps identifying what points to focus on when bargaining over contracting for transactions and investments. Our methodology is applied to I.S archetypes raised from a literature survey on eco-industrial parks initiatives and practitioners interviews.

Keywords: contracts, cost-benefit analysis, industrial symbiosis, risks

Procedia PDF Downloads 318
1443 An Exploration of Nursing Assistants' Continuing Professional Development (CPD) Engagement in a Acute Healthcare Setting: A Qualitative Case Study Pilot in England

Authors: Ana Fouto

Abstract:

Background: Continuing Personal Development (CPD) enables professionals to keep up to date with the professional requirements, broadening their knowledge and expertise. However, much of the research explores the registered professionals’ experiences and the factors that influence their choice of engaging, despite the unregistered staff providing the majority of the direct patient care. Aim: To explore the Nursing/Midwifery Assistants’ (NAs) perception of the concept of CPD, as well as explore the factors that influence the NAs to engage (or not) with CPD experiences. Methodology: This pilot study used a qualitative approach through a case study, where a semi-structured interview was applied to three NAs to explore the factors that influence the decision-making of process of CPD engagement. Thematic analysis was used to analyse their answers and interpret patterns and associations. Findings: All the participants agreed that CPD is important and relevant to their practice and personal lives. Five main categories were identified: NAs’ scope of practice, the impact of CPD; decision-making process; challenges; changes required. Although similar findings to the registered nurses were identified, the lack of CPD regulation for NAs and the rapid evolution of their role make the CPD engagement more problematic. Conclusion: Engagement with CPD is influenced by a wide range of professional (organisational and national) and personal factors. NAs perceive lack of management support at different stages of the CPD activities as a main influence. Organisations should be more flexible in the recruitment, offer of CPD choices, content, delivery, and contractual arrangements of NAs, which may increase engagement.

Keywords: nursing assistants, engagement, factors, pilot, continuing professional development (CPD)

Procedia PDF Downloads 127
1442 An Estimating Equation for Survival Data with a Possibly Time-Varying Covariates under a Semiparametric Transformation Models

Authors: Yemane Hailu Fissuh, Zhongzhan Zhang

Abstract:

An estimating equation technique is an alternative method of the widely used maximum likelihood methods, which enables us to ease some complexity due to the complex characteristics of time-varying covariates. In the situations, when both the time-varying covariates and left-truncation are considered in the model, the maximum likelihood estimation procedures become much more burdensome and complex. To ease the complexity, in this study, the modified estimating equations those have been given high attention and considerations in many researchers under semiparametric transformation model was proposed. The purpose of this article was to develop the modified estimating equation under flexible and general class of semiparametric transformation models for left-truncated and right censored survival data with time-varying covariates. Besides the commonly applied Cox proportional hazards model, such kind of problems can be also analyzed with a general class of semiparametric transformation models to estimate the effect of treatment given possibly time-varying covariates on the survival time. The consistency and asymptotic properties of the estimators were intuitively derived via the expectation-maximization (EM) algorithm. The characteristics of the estimators in the finite sample performance for the proposed model were illustrated via simulation studies and Stanford heart transplant real data examples. To sum up the study, the bias for covariates has been adjusted by estimating density function for the truncation time variable. Then the effect of possibly time-varying covariates was evaluated in some special semiparametric transformation models.

Keywords: EM algorithm, estimating equation, semiparametric transformation models, time-to-event outcomes, time varying covariate

Procedia PDF Downloads 128
1441 Estimation of Endogenous Brain Noise from Brain Response to Flickering Visual Stimulation Magnetoencephalography Visual Perception Speed

Authors: Alexander N. Pisarchik, Parth Chholak

Abstract:

Intrinsic brain noise was estimated via magneto-encephalograms (MEG) recorded during perception of flickering visual stimuli with frequencies of 6.67 and 8.57 Hz. First, we measured the mean phase difference between the flicker signal and steady-state event-related field (SSERF) in the occipital area where the brain response at the flicker frequencies and their harmonics appeared in the power spectrum. Then, we calculated the probability distribution of the phase fluctuations in the regions of frequency locking and computed its kurtosis. Since kurtosis is a measure of the distribution’s sharpness, we suppose that inverse kurtosis is related to intrinsic brain noise. In our experiments, the kurtosis value varied among subjects from K = 3 to K = 5 for 6.67 Hz and from 2.6 to 4 for 8.57 Hz. The majority of subjects demonstrated leptokurtic kurtosis (K < 3), i.e., the distribution tails approached zero more slowly than Gaussian. In addition, we found a strong correlation between kurtosis and brain complexity measured as the correlation dimension, so that the MEGs of subjects with higher kurtosis exhibited lower complexity. The obtained results are discussed in the framework of nonlinear dynamics and complex network theories. Specifically, in a network of coupled oscillators, phase synchronization is mainly determined by two antagonistic factors, noise, and the coupling strength. While noise worsens phase synchronization, the coupling improves it. If we assume that each neuron and each synapse contribute to brain noise, the larger neuronal network should have stronger noise, and therefore phase synchronization should be worse, that results in smaller kurtosis. The described method for brain noise estimation can be useful for diagnostics of some brain pathologies associated with abnormal brain noise.

Keywords: brain, flickering, magnetoencephalography, MEG, visual perception, perception time

Procedia PDF Downloads 113
1440 The Relationship Between Soldiers’ Psychological Resilience, Leadership Style and Organisational Commitment

Authors: Rosita Kanapeckaite

Abstract:

The modern operational military environment is a combination of factors such as change, uncertainty, complexity and ambiguity. Stiehm (2002) refers to such situations as VUCA situations. VUCA is an acronym commonly used to describe the volatility, uncertainty, complexity and ambiguity of various situations and conditions. Increasingly fast-paced military operations require military personnel to demonstrate readiness and resilience under stressful conditions in order to maintain the optimum cognitive and physical performance necessary to achieve success. Military resilience can be defined as the ability to cope with the negative effects of setbacks and associated stress on military performance and combat effectiveness. In the volatile, uncertain, complex and ambiguous modern operational environment, both current and future operations require and place a higher priority on enhancing and maintaining troop readiness and resilience to win decisively in multidimensional combat. This paper explores the phenomenon of soldiers' psychological resilience, theories of leadership, and commitment to the organisation. The aim of the study is to examine the relationship between soldiers' psychological resilience, leadership style and commitment to the organisation. The study involved 425 professional soldiers, the research method was a questionnaire survey. The instruments used were measures of psychological resilience, leadership styles and commitment to the organisation. Results: transformational leadership style predicts higher psychological resilience, and psychologically resilient professional servicemen are more committed to the organisation. The study confirms the importance of soldiers' psychological resilience for their commitment to the organisation. The paper also discusses practical applications.

Keywords: resilience, commitment, solders, leadership style

Procedia PDF Downloads 52
1439 An Analytical Approach of Computational Complexity for the Method of Multifluid Modelling

Authors: A. K. Borah, A. K. Singh

Abstract:

In this paper we deal building blocks of the computer simulation of the multiphase flows. Whole simulation procedure can be viewed as two super procedures; The implementation of VOF method and the solution of Navier Stoke’s Equation. Moreover, a sequential code for a Navier Stoke’s solver has been studied.

Keywords: Bi-conjugate gradient stabilized (Bi-CGSTAB), ILUT function, krylov subspace, multifluid flows preconditioner, simple algorithm

Procedia PDF Downloads 497
1438 Hip Resurfacing Makes for Easier Surgery with Better Functional Outcomes at Time of Revision: A Case Controlled Study

Authors: O. O. Onafowokan, K. Anderson, M. R. Norton, R. G. Middleton

Abstract:

Revision total hip arthroplasty (THA) is known to be a challenging procedure with potential for poor outcomes. Due to its lack of metaphyseal encroachment, hip resurfacing arthroplasty (HRA) is classified as a bone conserving procedure. Although the literature postulates that this is an advantage at time of revision surgery, there is no evidence to either support or refute this claim. We identified 129 hips that had undergone HRA and 129 controls undergoing first revision THA. We recorded the clinical assessment and survivorship of implants in a multi-surgeon, single centre, retrospective case control series for both arms. These were matched for age and sex. Data collected included demographics, indications for surgery, Oxford Hip Score (OHS), length of surgery, length of hospital stay, blood transfusion, implant complexity and further surgical procedures. Significance was taken as p < 0.05. Mean follow up was 7.5 years (1 to 15). There was a significant 6 point difference in postoperative OHS in favour of the revision resurfacing group (p=0.0001). The revision HRA group recorded 48 minutes less length of surgery (p<0.0001), 2 days less in length of hospital stay (p=0.018), a reduced need for blood transfusion (p=0.0001), a need for less complexity in revision implants (p=0.001) and a reduced probability of further surgery being required (P=0.003). Whilst we acknowledge the limitations of this study our results suggest that, in contrast to THA, the bone conservation element of HRA may make for a less traumatic revision procedure with better functional outcomes. Use of HRA has seen a dramatic decline as a result of concerns regarding metallosis. However, this information remains of relevance when counselling young active patients about their arthroplasty options and may become pertinent in the future if the promise of ceramic hip resurfacing is ever realized.

Keywords: hip resurfacing, metallosis, revision surgery, total hip arthroplasty

Procedia PDF Downloads 62
1437 Efficient Chess Board Representation: A Space-Efficient Protocol

Authors: Raghava Dhanya, Shashank S.

Abstract:

This paper delves into the intersection of chess and computer science, specifically focusing on the efficient representation of chess game states. We propose two methods: the Static Method and the Dynamic Method, each offering unique advantages in terms of space efficiency and computational complexity. The Static Method aims to represent the game state using a fixedlength encoding, allocating 192 bits to capture the positions of all pieces on the board. This method introduces a protocol for ordering and encoding piece positions, ensuring efficient storage and retrieval. However, it faces challenges in representing pieces no longer in play. In contrast, the Dynamic Method adapts to the evolving game state by dynamically adjusting the encoding length based on the number of pieces in play. By incorporating Alive Bits for each piece kind, this method achieves greater flexibility and space efficiency. Additionally, it includes provisions for encoding additional game state information such as castling rights and en passant squares. Our findings demonstrate that the Dynamic Method offers superior space efficiency compared to traditional Forsyth-Edwards Notation (FEN), particularly as the game progresses and pieces are captured. However, it comes with increased complexity in encoding and decoding processes. In conclusion, this study provides insights into optimizing the representation of chess game states, offering potential applications in chess engines, game databases, and artificial intelligence research. The proposed methods offer a balance between space efficiency and computational overhead, paving the way for further advancements in the field.

Keywords: chess, optimisation, encoding, bit manipulation

Procedia PDF Downloads 20
1436 Hybrid Precoder Design Based on Iterative Hard Thresholding Algorithm for Millimeter Wave Multiple-Input-Multiple-Output Systems

Authors: Ameni Mejri, Moufida Hajjaj, Salem Hasnaoui, Ridha Bouallegue

Abstract:

The technology advances have most lately made the millimeter wave (mmWave) communication possible. Due to the huge amount of spectrum that is available in MmWave frequency bands, this promising candidate is considered as a key technology for the deployment of 5G cellular networks. In order to enhance system capacity and achieve spectral efficiency, very large antenna arrays are employed at mmWave systems by exploiting array gain. However, it has been shown that conventional beamforming strategies are not suitable for mmWave hardware implementation. Therefore, new features are required for mmWave cellular applications. Unlike traditional multiple-input-multiple-output (MIMO) systems for which only digital precoders are essential to accomplish precoding, MIMO technology seems to be different at mmWave because of digital precoding limitations. Moreover, precoding implements a greater number of radio frequency (RF) chains supporting more signal mixers and analog-to-digital converters. As RF chain cost and power consumption is increasing, we need to resort to another alternative. Although the hybrid precoding architecture has been regarded as the best solution based on a combination between a baseband precoder and an RF precoder, we still do not get the optimal design of hybrid precoders. According to the mapping strategies from RF chains to the different antenna elements, there are two main categories of hybrid precoding architecture. Given as a hybrid precoding sub-array architecture, the partially-connected structure reduces hardware complexity by using a less number of phase shifters, whereas it sacrifices some beamforming gain. In this paper, we treat the hybrid precoder design in mmWave MIMO systems as a problem of matrix factorization. Thus, we adopt the alternating minimization principle in order to solve the design problem. Further, we present our proposed algorithm for the partially-connected structure, which is based on the iterative hard thresholding method. Through simulation results, we show that our hybrid precoding algorithm provides significant performance gains over existing algorithms. We also show that the proposed approach reduces significantly the computational complexity. Furthermore, valuable design insights are provided when we use the proposed algorithm to make simulation comparisons between the hybrid precoding partially-connected structure and the fully-connected structure.

Keywords: alternating minimization, hybrid precoding, iterative hard thresholding, low-complexity, millimeter wave communication, partially-connected structure

Procedia PDF Downloads 295
1435 Text Analysis to Support Structuring and Modelling a Public Policy Problem-Outline of an Algorithm to Extract Inferences from Textual Data

Authors: Claudia Ehrentraut, Osama Ibrahim, Hercules Dalianis

Abstract:

Policy making situations are real-world problems that exhibit complexity in that they are composed of many interrelated problems and issues. To be effective, policies must holistically address the complexity of the situation rather than propose solutions to single problems. Formulating and understanding the situation and its complex dynamics, therefore, is a key to finding holistic solutions. Analysis of text based information on the policy problem, using Natural Language Processing (NLP) and Text analysis techniques, can support modelling of public policy problem situations in a more objective way based on domain experts knowledge and scientific evidence. The objective behind this study is to support modelling of public policy problem situations, using text analysis of verbal descriptions of the problem. We propose a formal methodology for analysis of qualitative data from multiple information sources on a policy problem to construct a causal diagram of the problem. The analysis process aims at identifying key variables, linking them by cause-effect relationships and mapping that structure into a graphical representation that is adequate for designing action alternatives, i.e., policy options. This study describes the outline of an algorithm used to automate the initial step of a larger methodological approach, which is so far done manually. In this initial step, inferences about key variables and their interrelationships are extracted from textual data to support a better problem structuring. A small prototype for this step is also presented.

Keywords: public policy, problem structuring, qualitative analysis, natural language processing, algorithm, inference extraction

Procedia PDF Downloads 562
1434 The Power of Words: The Use of Language in Ethan Frome

Authors: Ritu Sharma

Abstract:

In order to be objective, critics must examine the dynamic relationships between the author, the reader, the text, and the outside world. However, it is also crucial to recognize that because the language was created by God, meaning is ingrained in it. Meaning is located in and discovered through literature rather than being limited to the author, reader, text, or the outside world. The link between the author, the reader, and the text is crucial because literature unites an author and a reader through the use of language. Literature is a potent kind of communication, and Ethan Frome's audience is forever changed as a result of the book's language and the language its characters use. The narrative of Ethan Frome and his wife Zeena is presented in Ethan Frome. Ethan's story is told throughout the course of the book, revealed through the eyes of the narrator, an outsider passing through Starkfield, as well as through the insight that the narrator gains from the townspeople and his stay on the Frome farm. The story is set in the rural New England community of Starkfield, Massachusetts. The weather provides the ideal setting for Ethan and the narrator to get to know one another as the narrator gets preoccupied with unraveling the narrative that underlies Ethan's physical anomalies. In addition to telling a gripping tale and capturing human nature as it is, Ethan Frome uses its storyline to achieve something more significant. The book by Edith Wharton supports language. Zeena's deliberate and convincing language challenges relativity and meaninglessness. Ethan and Mattie's effort to effectively use words reflects the complexity of language, and their battle illustrates the influence that language may have if and when it is used. Ethan Frome defends the written word, the foundation upon which it is constructed, as a literary work. Communication is based on language, and as the characters respond to and get involved in disputes throughout the book, Zeena, Ethan, and Mattie, each reflects particular theories of communication that help define their uses of communication within the broader context of language.

Keywords: dynamic relationships, potent, communication, complexity

Procedia PDF Downloads 64
1433 The Optimization of TICSI in the Convergence Mechanism of Urban Water Management

Authors: M. Macchiaroli, L. Dolores, V. Pellecchia

Abstract:

With the recent Resolution n. 580/2019/R/idr, the Italian Regulatory Authority for Energy, Networks, and Environment (ARERA) for the Urban Water Management has introduced, for water managements characterized by persistent critical issues regarding the planning and organization of the service and the implementation of the necessary interventions for the improvement of infrastructures and management quality, a new mechanism for determining tariffs: the regulatory scheme of Convergence. The aim of this regulatory scheme is the overcoming of the Water Service Divided in order to improve the stability of the local institutional structures, technical quality, contractual quality, as well as in order to guarantee transparency elements for Users of the Service. Convergence scheme presupposes the identification of the cost items to be considered in the tariff in parametric terms, distinguishing three possible cases according to the type of historical data available to the Manager. The study, in particular, focuses on operations that have neither data on tariff revenues nor data on operating costs. In this case, the Manager's Constraint on Revenues (VRG) is estimated on the basis of a reference benchmark and becomes the starting point for defining the structure of the tariff classes, in compliance with the TICSI provisions (Integrated Text for tariff classes, ARERA's Resolution n. 665/2017/R/idr). The proposed model implements the recent studies on optimization models for the definition of tariff classes in compliance with the constraints dictated by TICSI in the application of the Convergence mechanism, proposing itself as a support tool for the Managers and the local water regulatory Authority in the decision-making process.

Keywords: decision-making process, economic evaluation of projects, optimizing tools, urban water management, water tariff

Procedia PDF Downloads 94
1432 Resolution Method for Unforeseen Ground Condition Problem Case in Coal Fired Steam Power Plant Project Location Adipala, Indonesia

Authors: Andi Fallahi, Bona Ryan Situmeang

Abstract:

The Construction Industry is notoriously risky. Much of the preparatory paperwork that precedes construction project can be viewed as the formulation of risk allocation between the owner and the Contractor. The Owner is taking the risk that his project will not get built on the schedule that it will not get built for what he has budgeted and that it will not be of the quality he expected. The Contractor Face a multitude of risk. One of them is an unforeseen condition at the construction site. The Owner usually has the upper hand here if the unforeseen condition occurred. Site data contained in Ground Investigation report is often of significant contractual importance in disputes related to the unforeseen ground condition. A ground investigation can never fully disclose all the details of the underground condition (Risk of an unknown ground condition can never be 100% eliminated). Adipala Coal Fired Steam Power Plant (CSFPP) 1 x 660 project is one of the large CSFPP project in Indonesia based on Engineering, Procurement, and Construction (EPC) Contract. Unforeseen Ground Condition it’s responsible by the Contractor has stipulated in the clausal of Contract. In the implementation, there’s indicated unforeseen ground condition at Circulating Water Pump House (CWPH) area which caused the Contractor should be changed the Method of Work that give big impact against Time of Completion and Cost Project. This paper tries to analyze the best way for allocating the risk between The Owner and The Contractor. All parties that allocating of sharing risk fairly can ultimately save time and money for all parties, and get the job done on schedule for the least overall cost.

Keywords: unforeseen ground condition, coal fired steam power plant, circulating water pump house, Indonesia

Procedia PDF Downloads 307
1431 Search for APN Permutations in Rings ℤ_2×ℤ_2^k

Authors: Daniel Panario, Daniel Santana de Freitas, Brett Stevens

Abstract:

Almost Perfect Nonlinear (APN) permutations with optimal resistance against differential cryptanalysis can be found in several domains. The permutation used in the standard for symmetric cryptography (the AES), for example, is based on a special kind of inversion in GF(28). Although very close to APN (2-uniform), this permutation still contains one number 4 in its differential spectrum, which means that, rigorously, it must be classified as 4-uniform. This fact motivates the search for fully APN permutations in other domains of definition. The extremely high complexity associated to this kind of problem precludes an exhaustive search for an APN permutation with 256 elements to be performed without the support of a suitable mathematical structure. On the other hand, in principle, there is nothing to indicate which mathematically structured domains can effectively help the search, and it is necessary to test several domains. In this work, the search for APN permutations in rings ℤ2×ℤ2k is investigated. After a full, exhaustive search with k=2 and k=3, all possible APN permutations in those rings were recorded, together with their differential profiles. Some very promising heuristics in these cases were collected so that, when used as a basis to prune backtracking for the same search in ℤ2×ℤ8 (search space with size 16! ≅244), just a few tenths of a second were enough to produce an APN permutation in a single CPU. Those heuristics were empirically extrapolated so that they could be applied to a backtracking search for APNs over ℤ2×ℤ16 (search space with size 32! ≅2117). The best permutations found in this search were further refined through Simulated Annealing, with a definition of neighbors suitable to this domain. The best result produced with this scheme was a 3-uniform permutation over ℤ2×ℤ16 with only 24 values equal to 3 in the differential spectrum (all the other 968 values were less than or equal 2, as it should be the case for an APN permutation). Although far from being fully APN, this result is technically better than a 4-uniform permutation and demanded only a few seconds in a single CPU. This is a strong indication that the use of mathematically structured domains, like the rings described in this work, together with heuristics based on smaller cases, can lead to dramatic cuts in the computational resources involved in the complexity of the search for APN permutations in extremely large domains.

Keywords: APN permutations, heuristic searches, symmetric cryptography, S-box design

Procedia PDF Downloads 133
1430 Quoting Jobshops Due Dates Subject to Exogenous Factors in Developing Nations

Authors: Idris M. Olatunde, Kareem B.

Abstract:

In manufacturing systems, especially job shops, service performance is a key factor that determines customer satisfaction. Service performance depends not only on the quality of the output but on the delivery lead times as well. Besides product quality enhancement, delivery lead time must be minimized for optimal patronage. Quoting accurate due dates is sine quo non for job shop operational survival in a global competitive environment. Quoting accurate due dates in job shops has been a herculean task that nearly defiled solutions from many methods employed due to complex jobs routing nature of the system. This class of NP-hard problems possessed no rigid algorithms that can give an optimal solution. Jobshop operational problem is more complex in developing nations due to some peculiar factors. Operational complexity in job shops emanated from political instability, poor economy, technological know-how, and the non-promising socio-political environment. The mentioned exogenous factors were hardly considered in the previous studies on scheduling problem related to due date determination in job shops. This study has filled the gap created in the past studies by developing a dynamic model that incorporated the exogenous factors for accurate determination of due dates for varying jobs complexity. Real data from six job shops selected from the different part of Nigeria, were used to test the efficacy of the model, and the outcomes were analyzed statistically. The results of the analyzes showed that the model is more promising in determining accurate due dates than the traditional models deployed by many job shops in terms of patronage and lead times minimization.

Keywords: due dates prediction, improved performance, customer satisfaction, dynamic model, exogenous factors, job shops

Procedia PDF Downloads 386
1429 Co-Operation in Hungarian Agriculture

Authors: Eszter Hamza

Abstract:

The competitiveness of economic operators is based on interoperability, which is relatively low in Hungary. The development of co-operation is high priority in Common Agricultural Policy 2014-2020. The aim of the paper to assess co-operations in Hungarian agriculture, estimate the economic outputs and benefits of co-operations, based on statistical data processing and literature. Further objective is to explore the potential of agricultural co-operation with the help of interviews and questionnaire survey. The research seeks to answer questions as to what fundamental factors play role in the development of co-operation, and what are the motivations of the actors and the key success factors and pitfalls. The results were analysed using econometric methods. In Hungarian agriculture we can find several forms of co-operation: cooperatives, producer groups (PG) and producer organizations (PO), machinery cooperatives, integrator companies, product boards and interbranch organisations. Despite the several appearance of the agricultural co-operation, their economic weight is significantly lower in Hungary than in western European countries. Considering the agricultural importance, the integrator companies represent the most weight among the co-operations forms. Hungarian farmers linked to co-operations or organizations mostly in relation to procurement and sales. Less than 30 percent of surveyed farmers are members of a producer organization or cooperative. The trust level is low among farmers. The main obstacle to the development of formalized co-operation, is producers' risk aversion and the black economy in agriculture. Producers often prefer informal co-operation instead of long-term contractual relationships. The Hungarian agricultural co-operations are characterized by non-dynamic development, but slow qualitative change. For the future, one breakout point could be the association of producer groups and organizations, which in addition to the benefits of market concentration, in the dissemination of knowledge, advisory network operation and innovation can act more effectively.

Keywords: agriculture, co-operation, producer organisation, trust level

Procedia PDF Downloads 365
1428 Sensing of Cancer DNA Using Resonance Frequency

Authors: Sungsoo Na, Chanho Park

Abstract:

Lung cancer is one of the most common severe diseases driving to the death of a human. Lung cancer can be divided into two cases of small-cell lung cancer (SCLC) and non-SCLC (NSCLC), and about 80% of lung cancers belong to the case of NSCLC. From several studies, the correlation between epidermal growth factor receptor (EGFR) and NSCLCs has been investigated. Therefore, EGFR inhibitor drugs such as gefitinib and erlotinib have been used as lung cancer treatments. However, the treatments result showed low response (10~20%) in clinical trials due to EGFR mutations that cause the drug resistance. Patients with resistance to EGFR inhibitor drugs usually are positive to KRAS mutation. Therefore, assessment of EGFR and KRAS mutation is essential for target therapies of NSCLC patient. In order to overcome the limitation of conventional therapies, overall EGFR and KRAS mutations have to be monitored. In this work, the only detection of EGFR will be presented. A variety of techniques has been presented for the detection of EGFR mutations. The standard detection method of EGFR mutation in ctDNA relies on real-time polymerase chain reaction (PCR). Real-time PCR method provides high sensitive detection performance. However, as the amplification step increases cost effect and complexity increase as well. Other types of technology such as BEAMing, next generation sequencing (NGS), an electrochemical sensor and silicon nanowire field-effect transistor have been presented. However, those technologies have limitations of low sensitivity, high cost and complexity of data analyzation. In this report, we propose a label-free and high-sensitive detection method of lung cancer using quartz crystal microbalance based platform. The proposed platform is able to sense lung cancer mutant DNA with a limit of detection of 1nM.

Keywords: cancer DNA, resonance frequency, quartz crystal microbalance, lung cancer

Procedia PDF Downloads 207
1427 Contractual Risk Transfer in Islamic Home Financing: Analysis in Bank Malaysia

Authors: Ahmad Dahlan Salleh, Nik Abdul Rahim Nik Abdul Ghani, Muhamad Firdaus M. Hatta

Abstract:

Risk management has implications on pricing, governance arrangements, business practices and strategy. Nowadays, home financing contract offers more in the risk transfer form to increase bank profit. This is parallel with Islamic jurisprudence method al-Kharaj bi al-thaman (gain accompanies liability for loss) and al-ghurm bil ghunm (gain is justified with risk) that determine the matching between risk transfer and returns. Malaysian financing trend is to buy house. Besides, exists transparency lacking risk transfer issues to the clients because of not been informed clearly. Terms and conditions of each financing also do not reflect clearly that the risk has been transferred to the client, justifying a determination price been made. The assumption on risk occurrence is also inaccurate as each risk is different with the type of financing contract. This makes the Islamic Financial Services Act 2013 in providing standards that transparent and consistent can be used by Islamic financial institution less effective. This study examines how far the level of the risk and obligation incurred by bank and client under various Islamic home financing contract. This research is qualitative by using two methods, document analysis, and semi-structured interviews. Document analysis from literature review to identify profile, themes and risk transfer element in home financing from Islamic jurisprudence perspective. This study finds that need to create a risk transfer parameter by banks which are consistent with risk transfer theory according to Islamic jurisprudence. This study has potential to assist the authority in Islamic finance such as The Central Bank of Malaysia (Bank Negara Malaysia) in regulating Islamic banking industry so that the risk transfer valuation in home financing contract based on home financing good practice and determined risk limits.

Keywords: risk transfer, home financing contract, Sharia compliant, Malaysia

Procedia PDF Downloads 393
1426 The Design and Implementation of an Enhanced 2D Mesh Switch

Authors: Manel Langar, Riad Bourguiba, Jaouhar Mouine

Abstract:

In this paper, we propose the design and implementation of an enhanced wormhole virtual channel on chip router. It is a heart of a mesh NoC using the XY deterministic routing algorithm. It is characterized by its simple virtual channel allocation strategy which allows reducing area and complexity of connections without affecting the performance. We implemented our router on a Tezzaron process to validate its performances. This router is a basic element that will be used later to design a 3D mesh NoC.

Keywords: NoC, mesh, router, 3D NoC

Procedia PDF Downloads 536
1425 The Potential Role of Industrialized Building Systems in Malaysian Sustainable Construction: Awareness and Barriers

Authors: Aawag Mohsen Al-Awag, Wesam Salah Alaloul, M. S. Liew

Abstract:

Industrialized building system (IBS) is a method of construction with concentrated practices consisting of techniques, products, and a set of linked elements which operate collectively to accomplish objectives. The Industrialised Building System (IBS) has been recognised as a viable method for improving overall construction performance in terms of quality, cost, safety and health, waste reduction, and productivity. The Malaysian construction industry is considered one of the contributors to the development of the country. The acceptance level of IBS is still below government expectations. Thus, the Malaysian government has been continuously encouraging the industry to use and implement IBS. Conventional systems have several drawbacks, including project delays, low economic efficiency, excess inventory, and poor product quality. When it comes to implementing IBS, construction companies still face several obstacles and problems, notably in terms of contractual and procurement concerns, which leads to the low adoption of IBS in Malaysia. There are barriers to the acceptance of IBS technology, focused on awareness of historical failure and risks connected to IBS practices to provide enhanced performance. Therefore, the transformation from the existing conventional building systems to the industrialized building systems (IBS) is needed more than ever. The flexibility of IBS in Malaysia’s construction industry is very low due to numerous shortcomings and obstacles. Due to its environmental, economic, and social benefits, IBS could play a significant role in the Malaysian construction industry in the future. This paper concentrates on the potential role of IBS in sustainable construction practices in Malaysia. It also highlights the awareness, barriers, advantages, and disadvantages of IBS in the construction sector. The study concludes with recommendations for Malaysian construction stakeholders to encourage and increase the utilization of industrialised building systems.

Keywords: construction industry, industrialized building system, barriers, advantages and disadvantages, construction, sustainability, Malaysia

Procedia PDF Downloads 72
1424 A 0-1 Goal Programming Approach to Optimize the Layout of Hospital Units: A Case Study in an Emergency Department in Seoul

Authors: Farhood Rismanchian, Seong Hyeon Park, Young Hoon Lee

Abstract:

This paper proposes a method to optimize the layout of an emergency department (ED) based on real executions of care processes by considering several planning objectives simultaneously. Recently, demand for healthcare services has been dramatically increased. As the demand for healthcare services increases, so do the need for new healthcare buildings as well as the need for redesign and renovating existing ones. The importance of implementation of a standard set of engineering facilities planning and design techniques has been already proved in both manufacturing and service industry with many significant functional efficiencies. However, high complexity of care processes remains a major challenge to apply these methods in healthcare environments. Process mining techniques applied in this study to tackle the problem of complexity and to enhance care process analysis. Process related information such as clinical pathways extracted from the information system of an ED. A 0-1 goal programming approach is then proposed to find a single layout that simultaneously satisfies several goals. The proposed model solved by optimization software CPLEX 12. The solution reached using the proposed method has 42.2% improvement in terms of walking distance of normal patients and 47.6% improvement in walking distance of critical patients at minimum cost of relocation. It has been observed that lots of patients must unnecessarily walk long distances during their visit to the emergency department because of an inefficient design. A carefully designed layout can significantly decrease patient walking distance and related complications.

Keywords: healthcare operation management, goal programming, facility layout problem, process mining, clinical processes

Procedia PDF Downloads 265
1423 Model-Based Approach as Support for Product Industrialization: Application to an Optical Sensor

Authors: Frederic Schenker, Jonathan J. Hendriks, Gianluca Nicchiotti

Abstract:

In a product industrialization perspective, the end-product shall always be at the peak of technological advancement and developed in the shortest time possible. Thus, the constant growth of complexity and a shorter time-to-market calls for important changes on both the technical and business level. Undeniably, the common understanding of the system is beclouded by its complexity which leads to the communication gap between the engineers and the sale department. This communication link is therefore important to maintain and increase the information exchange between departments to ensure a punctual and flawless delivery to the end customer. This evolution brings engineers to reason with more hindsight and plan ahead. In this sense, they use new viewpoints to represent the data and to express the model deliverables in an understandable way that the different stakeholder may identify their needs and ideas. This article focuses on the usage of Model-Based System Engineering (MBSE) in a perspective of system industrialization and reconnect the engineering with the sales team. The modeling method used and presented in this paper concentrates on displaying as closely as possible the needs of the customer. Firstly, by providing a technical solution to the sales team to help them elaborate commercial offers without omitting technicalities. Secondly, the model simulates between a vast number of possibilities across a wide range of components. It becomes a dynamic tool for powerful analysis and optimizations. Thus, the model is no longer a technical tool for the engineers, but a way to maintain and solidify the communication between departments using different views of the model. The MBSE contribution to cost optimization during New Product Introduction (NPI) activities is made explicit through the illustration of a case study describing the support provided by system models to architectural choices during the industrialization of a novel optical sensor.

Keywords: analytical model, architecture comparison, MBSE, product industrialization, SysML, system thinking

Procedia PDF Downloads 133
1422 Recent Developments and Expectations in the Legal Expenses Insurance in Turkey

Authors: İbrahim Arslan, Mücahit Ünal

Abstract:

An important issue to ensure justice is to simplify the right to seek justice. But there is a cost of seeking justice in civil law. It costs at least, attorneys' fees and judicial expenses during the beginning and in case of losing a trial. Indeed, most of the people refrain from seeking justice because of these expenses. Therefore, it is not inappropriate to say that the removal of obstacles staying on the way of seeking justice will increase the belief in justice. Legal expenses insurance is a private law contract of insurance in which the insurer is obliged to pay premiums of the insured, to provide the necessary services for the protection of legal interests of the insured person within the agreed scope. This type of insurance is being practiced in the Western world for a long time. The special rights, duties and obligations of the parties to a legal expenses insurance contract shall be governed by the Turkish Commercial Code (TCC) and the contractual agreements which are regularly closed in the form of general terms and conditions. If the number of the legal expenses insurance contracts concluded increase this will definitely improve the percentage of seeking justice before the courts. The general terms and conditions applicable in Turkey generally include litigation costs, referee fees, guarantee fund , enforcement costs , appeal costs borne decision corrections costs. In addition, besides the insured, other family members or the people specified in the policy are protected in the scope of personal/family legal expenses insurance. The commercial law disputes fall outside the scope of coverage in this insurance branch. The insured person chooses his own lawyer and the insurer is not allowed to give advice during the selection of a lawyer. In April 2015, the Prime Minister announced of a new era in the field of legal expenses insurance in Turkey and this announcement excited the insurance industry and legal community.

Keywords: insurance, in the Turkish law on legal protection insurance, legal protection insurance, legal protection

Procedia PDF Downloads 335
1421 The Process of Crisis: Model of Its Development in the Organization

Authors: M. Mikušová

Abstract:

The main aim of this paper is to present a clear and comprehensive picture of the process of a crisis in the organization which will help to better understand its possible developments. For a description of the sequence of individual steps and an indication of their causation and possible variants of the developments, a detailed flow diagram with verbal comment is applied. For simplicity, the process of the crisis is observed in four basic phases called: symptoms of the crisis, diagnosis, action and prevention. The model highlights the complexity of the phenomenon of the crisis and that the various phases of the crisis are interweaving.

Keywords: crisis, management, model, organization

Procedia PDF Downloads 269
1420 Demand-Oriented Supplier Integration in Agile New Product Development Projects

Authors: Guenther Schuh, Stephan Schroeder, Marcel Faulhaber

Abstract:

Companies are facing an increasing pressure to innovate faster, cheaper and more radical in last years, due to shrinking product lifecycles and higher volatility of markets and customer demands. Especially established companies struggle meeting those demands. Thus, many producing companies are adapting their development processes to address this increasing pressure. One approach taken by many companies is the use of agile, highly iterative development processes to reduce development times and costs as well as to increase the fulfilled customer requirements and the realized level of innovation. At the same time decreasing depths of added value and increasing focus on core competencies as well as a growing product complexity result in a high dependency on suppliers and external development partners during the product development. Thus, a successful introduction of agile development methods into the development of physical products requires also a successful integration of the necessary external partners and suppliers into the new processes and procedures and an adaption of the organizational interfaces to external partners according to the new circumstances and requirements of agile development processes. For an effective and efficient product development, the design of customer-supplier-relationships should be demand-oriented. A significant influence on the required design has the characteristics of the procurement object. Examples therefore are the complexity of technical interfaces between supply object and final product or the importance of the supplied component for the major product functionalities. Thus, this paper presents an approach to derive general requirements on the design of supplier integration according to the characteristics of supply objects. First, therefore the most relevant evaluation criteria and characteristics have been identified based on a thorough literature review. Subsequently the resulting requirements on the design of the supplier integration were derived depending on the different possible values of these criteria.

Keywords: iterative development processes, agile new product development, procurement, supplier integration

Procedia PDF Downloads 152
1419 Visual Preferences of Elementary School Children with Autism Spectrum Disorder: An Experimental Study

Authors: Larissa Pliska, Isabel Neitzel, Michael Buschermöhle, Olga Kunina-Habenicht, Ute Ritterfeld

Abstract:

Visual preferences that can be assessed via eye tracking technologies are considered one of the defining hallmarks of Autism Spectrum Disorder (ASD). Specifically, children with ASD show a decreased preference for social compared to geometric images compared to typically developed (TD) children. Such differences are already prevalent at a very early age and indicate the severity of the disorder: toddlers with ASD who preferred the geometric images when presented with social and geometric images also showed higher ASD symptom severity than toddlers with ASD who showed higher social attention. Furthermore, the complexity of social pictures (one child playing vs. two children playing together) as well as the mode of stimulus presentation (video or image), appear to have no influence on the hallmark. Although such visual preferences are also a hallmark of the diagnosis of ASD, studies have primarily been conducted with toddlers and preschool children. Since the age for diagnosis often falls into this age group – the average age of diagnosis for ASD in Germany is 6.5 years – we were investigating whether visual preferences (1) persist into this age range and (2) might be used for a technology-based screening. We examined the visual preferences of 16 boys aged 6 to 11 with ASD and normal cognition and TD children (1:1 matching) within an experimental setting. Matching criteria are the children's age and the parent's level of education. Different stimulus presentation formats (images vs. videos) and different levels of stimulus complexity are included. Children with and without ASD always receive pairs of social and non-social images and video stimuli on a screen. For images, the social stimuli show one or more children playing whereas the non-social show images of the universe. For videos, the social stimuli show a man or a woman making faces, and the non-social are dynamic geometric shapes. During stimulus presentation of approx. 10 s length by image and of approx. 18 s length by video, eye movements (i.e., eye position and gaze direction) are captured. Therefore, KIZMO GmbH developed a customized, native iOS app (KIZMO Face-Analyzer) for use on iPads. In addition, the preferences of the image stimuli are directly measured. Data collection is currently ongoing, with an expected sample size of 32 (16 children with ASD and 16 TD children). One expected finding is that children with ASD demonstrate lower attention (total fixation time) on social stimuli (images and video) compared to their TD peers, even at this elementary school age. We also expect that the stimulus presentation, including different complexity levels, will not affect social attention. The data for the group of children with ASD is already available, while the data for the control group will be collected in the coming months. Preliminary descriptive analyses for 16 children with ASD show that in 80 possible image comparisons 52 times the non-social one was selected, 8 times the social one and 20 are missing or cannot be correctly assigned. The results will be discussed concerning various clinical implications, e.g. implementation of an automated digital screening.

Keywords: autism spectrum disorder, visual preference, hallmark, eye movement

Procedia PDF Downloads 28