Search results for: chemotherapy patients scheduling
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 5864

Search results for: chemotherapy patients scheduling

5594 Comparative Analysis of the Psychosocial Impact of Skin Diseases in India

Authors: Priyanka Jain, Sushila Pareek

Abstract:

Skin disease is often considered to be ‘only cosmetic’ by many medical professionals and lay-people alike but unlike most internal illnesses, skin disease is often immediately visible to others and therefore people suffering from dermatological conditions may suffer serious social and emotional consequences. The purpose of this research was to compare patients suffering from acne, alopecia areata (AA) and melanosis on perceived stress, social appearance anxiety and coping. The study included 120 patients (acne = 40 AA = 40 melanosis = 40) ages ranged from 15 to 25 years. Perceived Stress Scale (PSS), Social Appearance Anxiety Scale (SAAS), and The Brief COPE were administered to the patients. Analytical evaluation was done by Kruskal Wallis and ANOVA-tests. The results of the present study clearly revealed that perceived stress and social appearance anxiety were highest in patients with AA followed by acne patients and found least in patients with melanosis. With regard to coping, self-distraction as a coping technique was found highest in patients suffering from AA followed by acne and then melanosis. Denial was highest in acne patients followed by AA and experienced least by patients with melanosis. Behavioural disengagement was almost equal in patients with melanosis and acne and a little less in patients suffering from AA Acceptance was highest in patients with melanosis, followed by AA and least in acne patients. Self-blame was found highest in patients with acne, followed by AA patients further followed by patients suffering from melanosis. This study is an attempt to stimulate professionals working in the field of dermatology and mental health to explore their supportive communication and increase awareness regarding the difficulties that patients with skin disease can face.

Keywords: coping, dermatology, perceived stress, psychosocial impact, social appearance anxiety

Procedia PDF Downloads 439
5593 Thyroid-Stimulating Hormone as a Stress Biomarker in Thyroidectomy Patients: A Cohort Study

Authors: Jeonghun Lee

Abstract:

In this study, we investigated the relationship between stress and thyroid dysfunction in such patients who underwent thyroidectomy. This study included 101 patients who underwent thyroidectomy from January 2015 to June 2020 and experienced hypothyroidism. The included patients had good drug compliance with the same dosage of levothyroxine (LT4). The male-to-female ratio was 1:4.6, and the mean age was 45.4 years at surgery and 50.2 years at stressful events. Eighteen patients underwent lobectomies and, of these, 12 did not take LT4. The mean follow-up period was 49(8-93) months. Statistical analyses were performed using the paired t-test, Wilcoxon signed-rank test, and McNemer test using PROC MIXED with SAS 9.4. Forty-five patients (44.6%) had hypothyroidism with thyroid-stimulating hormone (TSH) >10 μIU/mL. There was distress in 81 patients and eustress in 10 patients. TSH levels increased during a mean 5.8 months (min 1, max 12) in 24 patients who specified the date of their life events. Even though each patient took the same dose of LT4, when the patients were under stress, both the free T4 and T3 decreased and TSH increased, regardless of whether the patient experienced distress or eustress (P <0.001). While adjusting for the effect of the free T4 and T3, TSH increased significantly in the patients after stress (P <0.001). For patients with thyroid cancer who are simultaneously experiencing life events, TSH may be used as a stress biomarker to enable the implementation of appropriate treatment and counseling strategies.

Keywords: endocrine, thyroid, thyroid function, biomarker, stress

Procedia PDF Downloads 48
5592 Optimal MRO Process Scheduling with Rotable Inventory to Minimize Total Earliness

Authors: Murat Erkoc, Kadir Ertogral

Abstract:

Maintenance, repair and overhauling (MRO) of high cost equipment used in many industries such as transportation, military and construction are typically subject to regulations set by local governments or international agencies. Aircrafts are prime examples for this kind of equipment. Such equipment must be overhauled at certain intervals for continuing permission of use. As such, the overhaul must be completed by strict deadlines, which often times cannot be exceeded. Due to the fact that the overhaul is typically a long process, MRO companies carry so called rotable inventory for exchange of expensive modules in the overhaul process of the equipment so that the equipment continue its services with minimal interruption. The extracted module is overhauled and returned back to the inventory for future exchange, hence the name rotable inventory. However, since the rotable inventory and overhaul capacity are limited, it may be necessary to carry out some of the exchanges earlier than their deadlines in order to produce a feasible overhaul schedule. An early exchange results with a decrease in the equipment’s cycle time in between overhauls and as such, is not desired by the equipment operators. This study introduces an integer programming model for the optimal overhaul and exchange scheduling. We assume that there is certain number of rotables at hand at the beginning of the planning horizon for a single type module and there are multiple demands with known deadlines for the exchange of the modules. We consider an MRO system with identical parallel processing lines. The model minimizes total earliness by generating optimal overhaul start times for rotables on parallel processing lines and exchange timetables for orders. We develop a fast exact solution algorithm for the model. The algorithm employs full-delay scheduling approach with backward allocation and can easily be used for overhaul scheduling problems in various MRO settings with modular rotable items. The proposed procedure is demonstrated by a case study from the aerospace industry.

Keywords: rotable inventory, full-delay scheduling, maintenance, overhaul, total earliness

Procedia PDF Downloads 515
5591 Task Scheduling and Resource Allocation in Cloud-based on AHP Method

Authors: Zahra Ahmadi, Fazlollah Adibnia

Abstract:

Scheduling of tasks and the optimal allocation of resources in the cloud are based on the dynamic nature of tasks and the heterogeneity of resources. Applications that are based on the scientific workflow are among the most widely used applications in this field, which are characterized by high processing power and storage capacity. In order to increase their efficiency, it is necessary to plan the tasks properly and select the best virtual machine in the cloud. The goals of the system are effective factors in scheduling tasks and resource selection, which depend on various criteria such as time, cost, current workload and processing power. Multi-criteria decision-making methods are a good choice in this field. In this research, a new method of work planning and resource allocation in a heterogeneous environment based on the modified AHP algorithm is proposed. In this method, the scheduling of input tasks is based on two criteria of execution time and size. Resource allocation is also a combination of the AHP algorithm and the first-input method of the first client. Resource prioritization is done with the criteria of main memory size, processor speed and bandwidth. What is considered in this system to modify the AHP algorithm Linear Max-Min and Linear Max normalization methods are the best choice for the mentioned algorithm, which have a great impact on the ranking. The simulation results show a decrease in the average response time, return time and execution time of input tasks in the proposed method compared to similar methods (basic methods).

Keywords: hierarchical analytical process, work prioritization, normalization, heterogeneous resource allocation, scientific workflow

Procedia PDF Downloads 120
5590 Palliative Orthovoltage Radiotherapy and Subcutaneous Infusion of Carboplatin for Treatment of Appendicular Osteosarcoma in Dogs

Authors: Kathryn L. Duncan, Charles A. Kuntz, Alessandra C. Santamaria, James O. Simcock

Abstract:

Access to megavoltage radiation therapy for small animals is limited in many locations around the world. This can preclude the use of palliative radiation therapy for the treatment of appendicular osteosarcoma in dogs. The objective of this study was to retrospectively assess the adverse effects and survival times of dogs with appendicular osteosarcoma that were treated with hypofractionated orthovoltage radiation therapy and adjunctive carboplatin chemotherapy administered via a single subcutaneous infusion. Medical records were reviewed retrospectively to identify client-owned dogs with spontaneously occurring appendicular osteosarcoma that was treated with palliative orthovoltage radiation therapy and a single subcutaneous infusion of carboplatin. Data recorded included signalment, tumour location, results of diagnostic imaging, haematologic and serum biochemical analyses, adverse effects of radiation therapy and chemotherapy, and survival times. Kaplan-Meier survival analysis was performed, and log-rank analysis was used to determine the impact of specific patient variables on survival time. Twenty-three dogs were identified that met the inclusion criteria. Median survival time for dogs was 182 days. Eleven dogs had adverse haematologic effects, 3 had adverse gastrointestinal effects, 6 had adverse effects at the radiation site and 7 developed infections at the carboplatin infusion site. No statistically significant differences were identified in survival times based on sex, tumour location, development of infection, or pretreatment serum alkaline phosphatase. Median survival time and incidence of adverse effects were comparable to those previously reported in dogs undergoing palliative radiation therapy with megavoltage or cobalt radiation sources and conventional intravenous carboplatin chemotherapy. The use of orthovoltage palliative radiation therapy may be a reasonable alternative to megavoltage radiation in locations where access is limited.

Keywords: radiotherapy, veterinary oncology, chemotherapy, osteosarcoma

Procedia PDF Downloads 45
5589 Linear Parameter-Varying Control for Selective Catalytic Reduction Systems

Authors: Jihoon Lim, Patrick Kirchen, Ryozo Nagamune

Abstract:

This paper proposes a linear parameter-varying (LPV) controller capable of reducing nitrogen oxide (NOx) emissions with low ammonia (NH3) slip downstream of selective catalytic reduction (SCR) systems. SCR systems are widely adopted in diesel engines due to high NOx conversion efficiency. However, the nonlinearity of the SCR system and sensor uncertainty result in a challenging control problem. In order to overcome the control challenges, an LPV controller is proposed based on gain-scheduling parameters, that is, exhaust gas temperature and exhaust gas flow rate. Based on experimentally obtained data under the non-road transient driving cycle (NRTC), the simulations firstly show that the proposed controller yields high NOx conversion efficiency with a desired low NH3 slip. The performance of the proposed LPV controller is then compared with other controllers, including a gain-scheduling PID controller and a sliding mode controller. Additionally, the robustness is also demonstrated using the uncertainties ranging from 10 to 30%. The results show that the proposed controller is robustly stable under uncertainties.

Keywords: diesel engine, gain-scheduling control, linear parameter-varying, selective catalytic reduction

Procedia PDF Downloads 123
5588 Matlab Method for Exclusive-or Nodes in Fuzzy GERT Networks

Authors: Roland Lachmayer, Mahtab Afsari

Abstract:

Research is the cornerstone for advancement of human communities. So that it is one of the indexes for evaluating advancement of countries. Research projects are usually cost and time-consuming and do not end in result in short term. Project scheduling is one of the integral parts of project management. The present article offers a new method by using C# and Matlab software to solve Fuzzy GERT networks for Exclusive-OR kind of nodes to schedule the network. In this article we concentrate on flowcharts that we used in Matlab to show how we apply Matlab to schedule Exclusive-OR nodes.

Keywords: research projects, fuzzy GERT, fuzzy CPM, CPM, α-cuts, scheduling

Procedia PDF Downloads 364
5587 Reducing Lean by Implementing Distance Learning in the Training Programs of Oil and Gas Industries

Authors: Sayed-Mahdi Hashemi-Dehkordi, Ian Baker

Abstract:

This paper investigates the benefits of implementing distance learning in training courses for the oil and gas industries to reduce lean. Due to the remote locations of many oil and gas operations, scheduling and organizing in-person training classes for employees in these sectors is challenging. Furthermore, considering that employees often work in periodic shifts such as day, night, and resting periods, arranging in-class training courses requires significant time and transportation. To explore the effectiveness of distance learning compared to in-class learning, a set of questionnaires was administered to employees of a far on-shore refinery unit in Iran, where both in-class and distance classes were conducted. The survey results revealed that over 72% of the participants agreed that distance learning saved them a significant amount of time by rating it 4 to 5 points out of 5 on a Likert scale. Additionally, nearly 67% of the participants acknowledged that distance learning considerably reduced transportation requirements, while approximately 64% agreed that it helped in resolving scheduling issues. Introducing and encouraging the use of distance learning in the training environments of oil and gas industries can lead to notable time and transportation savings for employees, ultimately reducing lean in a positive manner.

Keywords: distance learning, in-class learning, lean, oil and gas, scheduling, time, training programs, transportation

Procedia PDF Downloads 44
5586 Optimization of Scheduling through Altering Layout Using Pro-Model

Authors: Zouhair Issa Ahmed, Ahmed Abdulrasool Ahmed, Falah Hassan Abdulsada

Abstract:

This paper presents a layout of a factory using Pro-Model simulation by choosing the best layout that gives the highest productivity and least work in process. The general problem is to find the best sequence in which jobs pass between the machines which are compatible with the technological constraints and optimal with respect to some performance criteria. The best simulation with Pro-Model program increased productivity and reduced work in process by balancing lines of production compared with the current layout of factory when productivity increased from 45 products to 180 products through 720 hours.

Keywords: scheduling, Pro-Model, simulation, balancing lines of production, layout planning, WIP

Procedia PDF Downloads 592
5585 Epidemiological, Clinical, Histopathological Profile and Management of Breast Cancer at Kinshasa University Clinics

Authors: Eddy K. Mukadi

Abstract:

This work is a documentary and descriptive study devoted to the epidemiological, clinical, histopathological and therapeutic profile of breast cancer deals with the department of gynecology and obstetrics of the university clinics of Kinshasa during the period from 1 January 2014 to 31 December 2014. We have identified 56 cases of breast cancer. These cancers accounted for 45.2% of gynecological mammary cancers. The youngest in our series was 18 years old while the oldest was 74 years old; And the mean age of these patients was 43.4 years and mostly multiparous (35.7%). Brides (60.7%) and bachelors (26.8%) were the most affected by breast cancer. The reasons for consultation were dominated by nodules in the breast (48.2%) followed by pain (35.7%) and nipple discharge (14.3%). In 89.2% of the cases, it was the advanced clinical stage (stage 3 and 4) and the infiltrating ductal carcinoma was the most frequent histological type (75%) The malignant tumor was mainly in the left breast (55.3%), and chemotherapy with hormone therapy and patey was the most convenient treatment (42.8%), while patey mastectomy was performed in 12.5% of patients. Because of the high incidence of breast cancer identified in our study, some preventive measures must be taken into account to address this public health problem, including breast autopalpation once a month, Early detection system development of a national breast cancer policy and the implementation of a national breast cancer control program.

Keywords: breast cancer, histopathological profile, epidemiological profile, Kinshasa

Procedia PDF Downloads 185
5584 Effects of Using Clinical Guidelines for Feeding through a Gastrostomy Tube in Critically ill Surgical Patients Songkla Hospital Thailand

Authors: Siriporn Sikkaphun

Abstract:

Food is essential for living, and receiving correct, suitable, and adequate food is advantageous to the body, especially for patients because it can enable good recovery. Feeding through a gastrostomy tube is one useful way that is widely used because it is easy, convenient, and economical.To compare the effectiveness of using the clinical guidelines for feeding through a gastrostomy tube in critically ill surgical patients.This is a pre-post quasi-experimental study on 15 critically ill surgical or accident patients who needed intubation and the gastrostomy tube from August 2011 to November 2012. The data were collected using the guidelines, and an evaluation form for effectiveness of guidelines for feeding through a gastrostomy tube in critically ill surgical patients. After using the guidelines for feeding through a gastrostomy tube in critically ill surgical patients, it was found that The average number of days from the admission date to the day the patients received food through the G-tube significantly reduced at the level .05. The number of personnel who practiced nursing activities correctly and suitably for patients with complications during feeding significantly increased at the level .05.The number of patients receiving energy to the target level significantly increased at the level .05. The results of this study indicated that the use of the guidelines for feeding through a gastrostomy tube in critically ill surgical patients was feasible in practice, and the outcomes were beneficial to the patients.

Keywords: clinical guidelines, feeding, gastrostomy tube, critically ill, surgical patients

Procedia PDF Downloads 298
5583 The Attitude and Willingness to Use Telecare for Arthritis Patients

Authors: Jui-Chen Huang

Abstract:

Nowadays, the population is aging, the number of people who need to be taken care of is increased, but the manpower and funding are insufficient. Therefore, this study aims to explore the attitudes and willingness of arthritis patients to adopt telecare and to take a large medical institution in the central area of Taiwan as a sample hospital. A structured questionnaire (using the Likert five-point scale) was used to collect chronic patients over 20 years old as sample data, and a total of 500 valid questionnaires were effectively collected. The SPSS 18.0 statistical software was used for reliability analysis and independent sample t-test to explore the differences in attitudes and willingness to use telecare for arthritis patients and non-arthritic patients. The Cronbach's alpha value of this study questionnaire was above 0.94, showing good reliability. Arthritis patients and non-arthritic patients had statistically significant differences in attitudes toward telecare, while the willingness to use did not reach statistically significant differences. In addition, the average attitude and intention of arthritis patients for telecare are 3.38 and 3.41, respectively, indicating that arthritis patients have a certain degree of attitude and willingness to adopt telecare, which is worthy of follow-up research and practical industry push.

Keywords: telecare, arthritis patients, attitudes, intention

Procedia PDF Downloads 115
5582 Truck Scheduling Problem in a Cross-Dock Centre with Fixed Due Dates

Authors: Mohsen S. Sajadieha, Danyar Molavia

Abstract:

In this paper, a truck scheduling problem is investigated at a two-touch cross-docking center with due dates for outbound trucks as a hard constraint. The objective is to minimize the total cost comprising penalty and delivery cost of delayed shipments. The sequence of unloading shipments is considered and is assumed that shipments are sent to shipping dock doors immediately after unloading and a First-In-First-Out (FIFO) policy is considered for loading the shipments. A mixed integer programming model is developed for the proposed model. Two meta-heuristic algorithms including genetic algorithm (GA) and variable neighborhood search (VNS) are developed to solve the problem in medium and large sized scales. The numerical results show that increase in due dates for outbound trucks has a crucial impact on the reduction of penalty costs of delayed shipments. In addition, by increase the due dates, the improvement in the objective function arises on average in comparison with the situation that the cross-dock is multi-touch and shipments are sent to shipping dock doors only after unloading the whole inbound truck.

Keywords: cross-docking, truck scheduling, fixed due date, door assignment

Procedia PDF Downloads 375
5581 Psychosocial Determinants of Quality of Life After Treatment for Breast Cancer - A Systematic Review

Authors: Lakmali Anthony, Madeline Gillies

Abstract:

Purpose: Decreasing mortality has led to increased focus on patient-reported outcomes such as quality of life (QoL) in breast cancer. Breast cancer patients often have decreased QoL even after treatment is complete. This systematic review of the literature aims to identify psychosocial factors associated with decreased QoL in post-treatment breast cancer patients. Methodology: This systematic review was performed in accordance with the 2020 Preferred Reporting Items for Systematic Reviews and Meta-Analyses recommendations. The search was conducted in MEDLINE, EMBASE, and PsychINFO using MeSH headings. The two authors screened studies for relevance and extracted data. Results: Seventeen studies were identified, including 3,150 total participants (mean = 197) with a mean age of 51.9 years. There was substantial heterogeneity in measures of QoL. The most common was the European Organisation for Research and Treatment of Cancer QLQ-C30 (n=7, 41.1%). Most studies (n=12, 70.5%) found that emotional distress correlated with poor QoL, while 3 found no significant association. The most common measure of emotional distress was the Hospital Anxiety and Depression Scale (n=12, 70.5%). Other psychosocial factors associated with QoL were unmet needs, problematic social support, and negative affect. Clinicopathologic determinants included mastectomy without reconstruction, stage IV disease, and adjuvant chemotherapy. Conclusion: This systematic review provides a summary of the psychosocial determinants of poor QoL in post-treatment breast cancer patients, as well as the most commonly reported measures of these. An understanding of these potentially modifiable determinants of poor outcome is pivotal to the provision of quality, patient-centred care in surgical oncology.

Keywords: breast cancer, quality of life, psychosocial determinants, cancer surgery

Procedia PDF Downloads 43
5580 A Genetic Algorithm to Schedule the Flow Shop Problem under Preventive Maintenance Activities

Authors: J. Kaabi, Y. Harrath

Abstract:

This paper studied the flow shop scheduling problem under machine availability constraints. The machines are subject to flexible preventive maintenance activities. The nonresumable scenario for the jobs was considered. That is, when a job is interrupted by an unavailability period of a machine it should be restarted from the beginning. The objective is to minimize the total tardiness time for the jobs and the advance/tardiness for the maintenance activities. To solve the problem, a genetic algorithm was developed and successfully tested and validated on many problem instances. The computational results showed that the new genetic algorithm outperforms another earlier proposed algorithm.

Keywords: flow shop scheduling, genetic algorithm, maintenance, priority rules

Procedia PDF Downloads 447
5579 Minimizing Total Completion Time in No-Wait Flowshops with Setup Times

Authors: Ali Allahverdi

Abstract:

The m-machine no-wait flowshop scheduling problem is addressed in this paper. The objective is to minimize total completion time subject to the constraint that the makespan value is not greater than a certain value. Setup times are treated as separate from processing times. Several recent algorithms are adapted and proposed for the problem. An extensive computational analysis has been conducted for the evaluation of the proposed algorithms. The computational analysis indicates that the best proposed algorithm performs significantly better than the earlier existing best algorithm.

Keywords: scheduling, no-wait flowshop, algorithm, setup times, total completion time, makespan

Procedia PDF Downloads 320
5578 An Extended Basic Period and Power-of-Two Policy for Economic Lot-Size Batch-Shipment Scheduling Problem

Authors: Wen-Tsung Ho, Ku-Kuang Chang, Hsin-Yuan Chang

Abstract:

In this study, we consider an economic lot-size batch-shipment scheduling problem (ELBSP) with extended basic period (EBP) and power-of-two (PoT) policies. In this problem, the supplier using a single facility to manufacture multiple products and equally sized batches are then delivered by the supplier to buyers over an infinite planning horizon. Further, the extended basic period (EBP) and power-of-two (PoT) policy are utilized. Relaxing the production schedule converts the ELBSP to an economic lot-size batch-shipment problem (ELBP) with EBP and PoT policies, and a nonlinear integer programming model of the ELBP is constructed. Using the replenishment cycle division and recursive tightening methods, optimal solutions are then solved separately for each product. The sum of these optimal solutions is the lower bound of the ELBSP. A proposed heuristic method with polynomial complexity is then applied to figure out the near-optimal solutions of the ELBSP. Numerical example is presented to confirm the efficacy of the proposed method.

Keywords: economic lot-size scheduling problem, extended basic period, replenishment cycle division, recursive tightening, power-of-two

Procedia PDF Downloads 312
5577 Proxisch: An Optimization Approach of Large-Scale Unstable Proxy Servers Scheduling

Authors: Xiaoming Jiang, Jinqiao Shi, Qingfeng Tan, Wentao Zhang, Xuebin Wang, Muqian Chen

Abstract:

Nowadays, big companies such as Google, Microsoft, which have adequate proxy servers, have perfectly implemented their web crawlers for a certain website in parallel. But due to lack of expensive proxy servers, it is still a puzzle for researchers to crawl large amounts of information from a single website in parallel. In this case, it is a good choice for researchers to use free public proxy servers which are crawled from the Internet. In order to improve efficiency of web crawler, the following two issues should be considered primarily: (1) Tasks may fail owing to the instability of free proxy servers; (2) A proxy server will be blocked if it visits a single website frequently. In this paper, we propose Proxisch, an optimization approach of large-scale unstable proxy servers scheduling, which allow anyone with extremely low cost to run a web crawler efficiently. Proxisch is designed to work efficiently by making maximum use of reliable proxy servers. To solve second problem, it establishes a frequency control mechanism which can ensure the visiting frequency of any chosen proxy server below the website’s limit. The results show that our approach performs better than the other scheduling algorithms.

Keywords: proxy server, priority queue, optimization algorithm, distributed web crawling

Procedia PDF Downloads 184
5576 A Multi-Criteria Model for Scheduling of Stochastic Single Machine Problem with Outsourcing and Solving It through Application of Chance Constrained

Authors: Homa Ghave, Parmis Shahmaleki

Abstract:

This paper presents a new multi-criteria stochastic mathematical model for a single machine scheduling with outsourcing allowed. There are multiple jobs processing in batch. For each batch, all of job or a quantity of it can be outsourced. The jobs have stochastic processing time and lead time and deterministic due dates arrive randomly. Because of the stochastic inherent of processing time and lead time, we use the chance constrained programming for modeling the problem. First, the problem is formulated in form of stochastic programming and then prepared in a form of deterministic mixed integer linear programming. The objectives are considered in the model to minimize the maximum tardiness and outsourcing cost simultaneously. Several procedures have been developed to deal with the multi-criteria problem. In this paper, we utilize the concept of satisfaction functions to increases the manager’s preference. The proposed approach is tested on instances where the random variables are normally distributed.

Keywords: single machine scheduling, multi-criteria mathematical model, outsourcing strategy, uncertain lead times and processing times, chance constrained programming, satisfaction function

Procedia PDF Downloads 237
5575 Ultra-Reliable Low Latency V2X Communication for Express Way Using Multiuser Scheduling Algorithm

Authors: Vaishali D. Khairnar

Abstract:

The main aim is to provide lower-latency and highly reliable communication facilities for vehicles in the automobile industry; vehicle-to-everything (V2X) communication basically intends to increase expressway road security and its effectiveness. The Ultra-Reliable Low-Latency Communications (URLLC) algorithm and cellular networks are applied in combination with Mobile Broadband (MBB). This is particularly used in express way safety-based driving applications. Expressway vehicle drivers (humans) will communicate in V2X systems using the sixth-generation (6G) communication systems which have very high-speed mobility features. As a result, we need to determine how to ensure reliable and consistent wireless communication links and improve the quality to increase channel gain, which is becoming a challenge that needs to be addressed. To overcome this challenge, we proposed a unique multi-user scheduling algorithm for ultra-massive multiple-input multiple-output (MIMO) systems using 6G. In wideband wireless network access in case of high traffic and also in medium traffic conditions, moreover offering quality-of-service (QoS) to distinct service groups with synchronized contemporaneous traffic on the highway like the Mumbai-Pune expressway becomes a critical problem. Opportunist MAC (OMAC) is a way of proposing communication across a wireless communication link that can change in space and time and might overcome the above-mentioned challenge. Therefore, a multi-user scheduling algorithm is proposed for MIMO systems using a cross-layered MAC protocol to achieve URLLC and high reliability in V2X communication.

Keywords: ultra-reliable low latency communications, vehicle-to-everything communication, multiple-input multiple-output systems, multi-user scheduling algorithm

Procedia PDF Downloads 52
5574 Decision Support System for Solving Multi-Objective Routing Problem

Authors: Ismail El Gayar, Ossama Ismail, Yousri El Gamal

Abstract:

This paper presented a technique to solve one of the transportation problems that faces us in real life which is the Bus Scheduling Problem. Most of the countries using buses in schools, companies and traveling offices as an example to transfer multiple passengers from many places to specific place and vice versa. This transferring process can cost time and money, so we build a decision support system that can solve this problem. In this paper, a genetic algorithm with the shortest path technique is used to generate a competitive solution to other well-known techniques. It also presents a comparison between our solution and other solutions for this problem.

Keywords: bus scheduling problem, decision support system, genetic algorithm, shortest path

Procedia PDF Downloads 372
5573 Converting Scheduling Time into Calendar Date Considering Non-Interruptible Construction Tasks

Authors: Salman Ali Nisar, Suzuki Koji

Abstract:

In this paper we developed a new algorithm to convert the project scheduling time into calendar date in order to handle non-interruptible activities not to be split by non-working days (such as weekend and holidays). In a construction project some activities might require not to be interrupted even on non-working days, or to be finished on the end day of business days. For example, concrete placing work might be required to be completed by the end day of weekdays i.e. Friday, and curing in the weekend. This research provides an algorithm that imposes time constraint for start and finish times of non-interruptible activities. The algorithm converts working days, which is obtained by Critical Path Method (CPM), to calendar date with consideration of the start date of a project. After determining the interruption by non-working days, the start time of a certain activity should be postponed, if there is enough total float value. Otherwise, the duration is shortened by hiring additional resources capacity or/and using overtime work execution. Then, time constraints are imposed to start time and finish time of the activity. The algorithm is developed in Excel Spreadsheet for microcomputer and therefore we can easily get a feasible, calendared construction schedule for such a construction project with some non-interruptible activities.

Keywords: project management, scheduling, critical path method, time constraint, non-interruptible tasks

Procedia PDF Downloads 470
5572 Solving Process Planning, Weighted Apparent Tardiness Cost Dispatching, and Weighted Processing plus Weight Due-Date Assignment Simultaneously Using a Hybrid Search

Authors: Halil Ibrahim Demir, Caner Erden, Abdullah Hulusi Kokcam, Mumtaz Ipek

Abstract:

Process planning, scheduling, and due date assignment are three important manufacturing functions which are studied independently in literature. There are hundreds of works on IPPS and SWDDA problems but a few works on IPPSDDA problem. Integrating these three functions is very crucial due to the high relationship between them. Since the scheduling problem is in the NP-Hard problem class without any integration, an integrated problem is even harder to solve. This study focuses on the integration of these functions. Sum of weighted tardiness, earliness, and due date related costs are used as a penalty function. Random search and hybrid metaheuristics are used to solve the integrated problem. Marginal improvement in random search is very high in the early iterations and reduces enormously in later iterations. At that point directed search contribute to marginal improvement more than random search. In this study, random and genetic search methods are combined to find better solutions. Results show that overall performance becomes better as the integration level increases.

Keywords: process planning, genetic algorithm, hybrid search, random search, weighted due-date assignment, weighted scheduling

Procedia PDF Downloads 337
5571 An Advanced Match-Up Scheduling Under Single Machine Breakdown

Authors: J. Ikome, M. Ndeley

Abstract:

When a machine breakdown forces a Modified Flow Shop (MFS) out of the prescribed state, the proposed strategy reschedules part of the initial schedule to match up with the preschedule at some point. The objective is to create a new schedule that is consistent with the other production planning decisions like material flow, tooling and purchasing by utilizing the time critical decision making concept. We propose a new rescheduling strategy and a match-up point determination procedure through a feedback mechanism to increase both the schedule quality and stability. The proposed approach is compared with alternative reactive scheduling methods under different experimental settings.

Keywords: advanced critical task methods modified flow shop (MFS), Manufacturing, experiment, determination

Procedia PDF Downloads 385
5570 Rescheduling of Manufacturing Flow Shop under Different Types of Disruption

Authors: M. Ndeley

Abstract:

Now our days, Almost all manufacturing facilities need to use production planning and scheduling systems to increase productivity and to reduce production costs. Real-life production operations are subject to a large number of unexpected disruptions that may invalidate the original schedules. In these cases, rescheduling is essential to minimize the impact on the performance of the system. In this work we consider flow shop layouts that have seldom been studied in the rescheduling literature. We generate and employ three types of disruption that interrupt the original schedules simultaneously. We develop rescheduling algorithms to finally accomplish the twofold objective of establishing a standard framework on the one hand; and proposing rescheduling methods that seek a good trade-off between schedule quality and stability on the other.

Keywords: flow shop scheduling, uncertainty, rescheduling, stability

Procedia PDF Downloads 413
5569 The Effect of Primary Treatment on Histopathological Patterns and Choice of Neck Dissection in Regional Failure of Nasopharyngeal Carcinoma Patients

Authors: Ralene Sim, Stefan Mueller, N. Gopalakrishna Iyer, Ngian Chye Tan, Khee Chee Soo, R. Shetty Mahalakshmi, Hiang Khoon Tan

Abstract:

Background: Regional failure in nasopharyngeal carcinoma (NPC) is managed by salvage treatment in the form of neck dissection. Radical neck dissection (RND) is preferred over modified radical neck dissection (MRND) since it is traditionally believed to offer better long-term disease control. However, with the advent of more advanced imaging modalities like high-resolution Magnetic Resonance Imaging, Computed Tomography, and Positron Emission Tomography-CT scans, earlier detection is achieved. Additionally, concurrent chemotherapy also contributes to reduced tumour burden. Hence, there may be a lesser need for an RND and a greater role for MRND. With this retrospective study, the primary aim is to ascertain whether MRND, as opposed to RND, has similar outcomes and hence, whether there would be more grounds to offer a less aggressive procedure to achieve lower patient morbidity. Methods: This is a retrospective study of 66 NPC patients treated at Singapore General Hospital between 1994 to 2016 for histologically proven regional recurrence, of which 41 patients underwent RND and 25 who underwent MRND, based on surgeon preference. The type of ND performed, primary treatment mode, adjuvant treatment, and pattern of recurrence were reviewed. Overall survival (OS) was calculated using Kaplan-Meier estimate and compared. Results: Overall, the disease parameters such as nodal involvement and extranodal extension were comparable between the two groups. Comparing MRND and RND, the median (IQR) OS is 1.76 (0.58 to 3.49) and 2.41 (0.78 to 4.11) respectively. However, the p-value found is 0.5301 and hence not statistically significant. Conclusion: RND is more aggressive and has been associated with greater morbidity. Hence, with similar outcomes, MRND could be an alternative salvage procedure for regional failure in selected NPC patients, allowing similar salvage rates with lesser mortality and morbidity.

Keywords: nasopharyngeal carcinoma, neck dissection, modified neck dissection, radical neck dissection

Procedia PDF Downloads 140
5568 Evaluation of Salt Content in Bread and the Amount Intake by Hypertensive Patients in the Algiers Region

Authors: S.lanasri, A.Boudjerrane, R.Belgherbi, O.Hadjoudj

Abstract:

Introduction: Bread is the most popular food in Algeria. The aim of this study was to examine the consumption of salt from bread by hypertensive patients. Materials and methods: sixty breads were collected from different artisans Algiers bakeries, each sample was mixed in harm distilled water until homogeneous and filtered. Analysis of the salt content was carried out according to the Mohr method titration. We calculated the amount of salt in bread consumed by 100 hypertensive patients using a questionnaire about the average amount of bread per day. Results: The salt content values from bread were 3.4g ± 0.37 NaCl / 100g.The average amount of salt consumed per day by patients from only bread was 3.82 g ± 3.8 with a maximum of 17 g per day. Only 38.18% of patients consume bread without salt even then 95% knew that excess salt intake can complicate hypertension. Conclusion: This study showed that bread is a major contributor to salt intake by Algerian hypertensive patients.

Keywords: salt, bread, hypertensive patients, Algiers

Procedia PDF Downloads 123
5567 An Application of a Feedback Control System to Minimize Unforeseen Disruption in a Paper Manufacturing Industry in South Africa

Authors: Martha E. Ndeley

Abstract:

Operation management is the key element within the manufacturing process. However, during this process, there are a number of unforeseen disruptions that causes the process to a standstill which are, machine breakdown, employees absenteeism, improper scheduling. When this happens, it forces the shop flow to a rescheduling process and these strategy reschedules only a limited part of the initial schedule to match up with the pre-schedule at some point with the objective to create a new schedule that is reliable which in the long run gets disrupted. In this work, we have developed feedback control system that minimizes any form of disruption before the impact becomes severe, the model was tested in a paper manufacturing industries and the results revealed that, if the disruption is minimized at the initial state, the impact becomes unnoticeable.

Keywords: disruption, machine, absenteeism, scheduling

Procedia PDF Downloads 280
5566 The Occurrence of Depression with Chronic Liver Disease

Authors: Roop Kiran, Muhammad Shoaib Zafar, Nazish Idrees Chaudhary

Abstract:

Depression is known to be the second most frequently occurring comorbid mental illness among patients suffering from chronic physical conditions. Around the world, depression is associated with chronic liver diseases as one of the dominant symptoms. This evidence brings attention to the research about various predictors for short life expectancy and poor quality of life in patients suffering from comorbid depression and CLD. Following are the objectives of this study i) measure the occurrence rate of comorbid depression among patients with CLD and ii) find the frequency of risk factors between patients with and without depression comorbid with CLD. This is a quantitative study with a cross-sectional design. The research data was collected through a measure called Hamilton Depression Rating Scale (HDRS) with a demographic Performa from 100 patients who visited the Department of Psychiatry for consultation at Mayo Hospital Lahore with a diagnosed CLD from the last four years. There were (42%) patients with CLD who had comorbid depression. Among depressed and non-depressed patients, significant differences were found (p<0.05) for unemployment in 25 (59.5%) males and 20 (34.5%) female patients, for co-morbidity in 25 (59.5%) males and 18 (31.0%) female patients, for illiteracy in 18 (42.9%) males and 13 (22.4%) female patients, for the history of CLD for more than the last 2years in 41 (97.6%) males and 47 (81.0%) female patients, for severity of CLD in 26 (61.9%) males and 20 (34.5%) female patients. This concludes that depression frequently occurs among patients with CLD. This study recommends considerable attention to plan preventative measures in the future and develop such intervention protocols that consider the management of risk factors that significantly influence comorbid depression with CLD.

Keywords: psychiatry, comorbid, health, quality of life

Procedia PDF Downloads 172
5565 Hybrid Bee Ant Colony Algorithm for Effective Load Balancing and Job Scheduling in Cloud Computing

Authors: Thomas Yeboah

Abstract:

Cloud Computing is newly paradigm in computing that promises a delivery of computing as a service rather than a product, whereby shared resources, software, and information are provided to computers and other devices as a utility (like the electricity grid) over a network (typically the Internet). As Cloud Computing is a newly style of computing on the internet. It has many merits along with some crucial issues that need to be resolved in order to improve reliability of cloud environment. These issues are related with the load balancing, fault tolerance and different security issues in cloud environment.In this paper the main concern is to develop an effective load balancing algorithm that gives satisfactory performance to both, cloud users and providers. This proposed algorithm (hybrid Bee Ant Colony algorithm) is a combination of two dynamic algorithms: Ant Colony Optimization and Bees Life algorithm. Ant Colony algorithm is used in this hybrid Bee Ant Colony algorithm to solve load balancing issues whiles the Bees Life algorithm is used for optimization of job scheduling in cloud environment. The results of the proposed algorithm shows that the hybrid Bee Ant Colony algorithm outperforms the performances of both Ant Colony algorithm and Bees Life algorithm when evaluated the proposed algorithm performances in terms of Waiting time and Response time on a simulator called CloudSim.

Keywords: ant colony optimization algorithm, bees life algorithm, scheduling algorithm, performance, cloud computing, load balancing

Procedia PDF Downloads 596