Search results for: Malaysian construction firms
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 4803

Search results for: Malaysian construction firms

4593 Multi-Criteria Bid/No Bid Decision Support Framework for General Contractors: A Case of Pakistan

Authors: Nida Iftikhar, Jamaluddin Thaheem, Bilal Iftikhar

Abstract:

In the construction industry, adequate and effective decision-making can mean the difference between success and failure. Bidding is the most important element of the construction business since it is a mean by which contractors obtain work. This is probably the only option for any contractor firm to sustain in the market and achieve its objective of earning the profits by winning tenders. The capability to select most appropriate ventures not only defines the success and wellbeing of contractor firms but also their survival and sustainability in the industry. The construction practitioners are usually on their own when it comes to deciding on bidding for a project or not. Usually, experience-based solutions are offered where a lot of subjectivity is involved. This research has been opted considering the local construction industry of Pakistan in order to examine the critical success factors from contractors’ perspective while making bidding decisions, listing and evaluating critical factors in order of their importance, categorization of these factors into decision support & decision oppose groups and to develop a framework to help contractors in the decision-making process. Literature review, questionnaires, and structured interviews are used for identification and quantification of factors affecting bid/no bid decision-making. Statistical methods of ranking analysis and analytical hierarchy process of multi-criteria decision-making method are used for analysis. It is found that profitability, need for work and financial health of client are the most decisive factors in bid/no bid decision-making while project size, project type, fulfilling the tender conditions imposed by the client and relationship, identity & reputation of the client are least impact factors in bid/no bid decision-making. Further, to verify the developed framework, case studies have been conducted to evaluate the bid/no bid decision-making in building procurement. This is the first of its nature study in the context of the local construction industry and recommends using a holistic decision-making framework for such business-critical deliberations.

Keywords: bidding, bid decision-making, construction procurement, contractor

Procedia PDF Downloads 159
4592 Factors Affecting Time Performance in Building Construction Projects

Authors: Ibraheem A. K. Mahameed

Abstract:

The aim of this study is to identify the risks affecting time performance of building construction projects in the West Bank in Palestine from contractors’ viewpoint. 38 risks that might affect time performance of building construction projects were defined through a detailed literature review. These risks have been classified into 6 groups: project, managerial, consultant, financial, external, and construction items. A questionnaire survey was performed to rank the considered risks in terms of severity and frequency. The analysis of the survey indicated that the top five risks affecting time performance of building construction projects in Palestine are: award project to the lowest price, political situation, poor communication and coordination between construction parties, change orders, and financial status of contractor.

Keywords: delay, time performance, construction, building

Procedia PDF Downloads 439
4591 Effects of Financial and Non-Financial Accounting Information Reports on Corporate Credibility and Image of the Listed-Firms in Thailand

Authors: Anocha Rojanapanich

Abstract:

This research investigates the effect of financial accounting information and non-financial accounting reports on corporate credibility via strength of board of directors and market environment volatility as moderating effect. Data in this research is collected by questionnaire form non-financial companies listed on the Stock Exchange of Thailand. Multiple regression statistic technique is used for analyzing the data. Results find that firms with greater financial accounting information reports and non-financial accounting information reports will gain greater corporate credibility. Therefore, the corporate reporting has the value for the firms. Moreover, the strength of board of directors will positively moderate the financial and non-financial accounting information reports and corporate credibility relationship. And market environment volatility will negatively moderate the financial and nonfinancial accounting information reports and corporate credibility relationship and the contribution of accounting information reports on corporate credibility is generated to the corporate image. That is the corporate image has affected by corporate credibility.

Keywords: corporate credibility, financial and non-financial reports, firms performance, corporate image

Procedia PDF Downloads 271
4590 Achieving Sustainable Rapid Construction Using Lean Principles

Authors: Muhamad Azani Yahya, Vikneswaran Munikanan, Mohammed Alias Yusof

Abstract:

There is the need to take the holistic approach in achieving sustainable construction for a contemporary practice. Sustainable construction is the practice that involved method of human preservation of the environment, whether economically or socially through responsibility, management of resources and maintenance utilizing support. This paper shows the correlation of achieving rapid construction with sustainable concepts using lean principles. Lean principles being used widely in the manufacturing industry, but this research will demonstrate the principles into building construction. Lean principle offers the benefits of stabilizing work flow and elimination of unnecessary work. Therefore, this principle contributes to time and waste reduction. The correlation shows that pulling factor provides the improvement of progress curve and stabilizing the time-quality relation. The finding shows the lean principles offer the elements of rapid construction synchronized with the elements of sustainability.

Keywords: sustainable construction, rapid construction, time reduction, lean construction

Procedia PDF Downloads 214
4589 Enabling Exporting in Cameroon Using Export Promotion Programs

Authors: Morfaw Bernice Njinju

Abstract:

The contribution of exporting and small businesses to an economy cannot be overemphasized. However, small firms in developing economies are characterized by resource deficiencies, which hinders their exporting abilities. As a result, export promotion programs are designed by the government as external resources that small firms can access to overcome export barriers and improve their exporting. Nevertheless, doubts still exist as to whether firms are aware of these programs and the extent to which they are utilizing it. To analyse the level of awareness and usage of these programs, the questionnaire was developed from the review of the literature. A pilot study was conducted to determine the ease of completing the questionnaire by respondent before incorporating feedback to produce the final questionnaire. Data were collected from 200 small businesses in Cameroon in the manufacturing and agricultural sector through random sampling and analysed using regression analysis. The results indicated that different programs had different levels of awareness than others. Programs to provide training to improve product quality was found to have the highest level of awareness while those providing findings had low levels of awareness. Despite these different levels of awareness, usage was very low, as firms do not want to open up to government scrutiny of their business. Implications to policy, practice, and direction for further research are also discussed.

Keywords: export promotion programs, exporting, small businesses, Cameroon

Procedia PDF Downloads 86
4588 The Impact Of Environmental Management System ISO 14001 Adoption on Firm Performance

Authors: Raymond Treacy, Paul Humphreys, Ronan McIvor, Trevor Cadden, Alan McKittrick

Abstract:

This study employed event study methodology to examine the role of institutions, resources and dynamic capabilities in the relationship between the Environmental Management System ISO 14001 adoption and firm performance. Utilising financial data from 140 ISO 14001 certified firms and 320 non-certified firms, the results of the study suggested that the UK and Irish manufacturers were not implementing ISO 14001 solely to gain legitimacy. In contrast, the results demonstrated that firms were fully integrating the ISO 14001 standard within their operations as certified firms were able to improve both financial and operating performance when compared to non-certified firms. However, while there were significant and long lasting improvements for employee productivity, manufacturing cost efficiency, return on assets and sales turnover, the sample firms operating cycle and fixed asset efficiency displayed evidence of diminishing returns in the long-run, underlying the observation that no operating advantage based on incremental improvements can be everlasting. Hence, there is an argument for investing in dynamic capabilities which help renew and refresh the resource base and help the firm adapt to changing environments. Indeed, the results of the regression analysis suggest that dynamic capabilities for innovation acted as a moderator in the relationship between ISO 14001 certification and firm performance. This, in turn, will have a significant and symbiotic influence on sustainability practices within the participating organisations. The study not only provides new and original insights, but demonstrates pragmatically how firms can take advantage of environmental management systems as a moderator to significantly enhance firm performance. However, while it was shown that firm innovation aided both short term and long term ROA performance, adaptive market capabilities only aided firms in the short-term at the marketing strategy deployment stage. Finally, the results have important implications for firms operating in an economic recession as the results suggest that firms should scale back investment in R&D while operating in an economic downturn. Conversely, under normal trading conditions, consistent and long term investments in R&D was found to moderate the relationship between ISO 14001 certification and firm performance. Hence, the results of the study have important implications for academics and management alike.

Keywords: supply chain management, environmental management systems, quality management, sustainability, firm performance

Procedia PDF Downloads 288
4587 Multi-Stakeholder Involvement in Construction and Challenges of Building Information Modeling Implementation

Authors: Zeynep Yazicioglu

Abstract:

Project development is a complex process where many stakeholders work together. Employers and main contractors are the base stakeholders, whereas designers, engineers, sub-contractors, suppliers, supervisors, and consultants are other stakeholders. A combination of the complexity of the building process with a large number of stakeholders often leads to time and cost overruns and irregular resource utilization. Failure to comply with the work schedule and inefficient use of resources in the construction processes indicate that it is necessary to accelerate production and increase productivity. The development of computer software called Building Information Modeling, abbreviated as BIM, is a major technological breakthrough in this area. The use of BIM enables architectural, structural, mechanical, and electrical projects to be drawn in coordination. BIM is a tool that should be considered by every stakeholder with the opportunities it offers, such as minimizing construction errors, reducing construction time, forecasting, and determination of the final construction cost. It is a process spreading over the years, enabling all stakeholders associated with the project and construction to use it. The main goal of this paper is to explore the problems associated with the adoption of BIM in multi-stakeholder projects. The paper is a conceptual study, summarizing the author’s practical experience with design offices and construction firms working with BIM. In the transition period to BIM, three of the challenges will be examined in this paper: 1. The compatibility of supplier companies with BIM, 2. The need for two-dimensional drawings, 3. Contractual issues related to BIM. The paper reviews the literature on BIM usage and reviews the challenges in the transition stage to BIM. Even on an international scale, the supplier that can work in harmony with BIM is not very common, which means that BIM's transition is continuing. In parallel, employers, local approval authorities, and material suppliers still need a 2-D drawing. In the BIM environment, different stakeholders can work on the same project simultaneously, giving rise to design ownership issues. Practical applications and problems encountered are also discussed, providing a number of suggestions for the future.

Keywords: BIM opportunities, collaboration, contract issues about BIM, stakeholders of project

Procedia PDF Downloads 92
4586 Causes and Effects of Delays in Construction Projects in Akure, Ondo State, South-West Nigeria

Authors: K.T Alade, A.F Lawal, A.A Omonori

Abstract:

Construction is an everlasting activity across the globe. Likewise, the problem of delay in the construction industry is a global phenomenon. Although there are several reasons that may be responsible for delay during construction, this may vary from place to place and can be reduced to the minimum when identified. This study considered the major causes and effects of delay in the execution of construction projects in Akure, Ondo State, Nigeria. Using literatures, a total number of 30 causes of construction delays were identified. The convenient sampling technique was used to select sixty respondents for a survey. The respondents comprise twenty-two (22) clients, eighteen consultants (18) and twenty (20) contractors. The analyses of the primary data revealed that the three most important causes of delay in construction projects in Akure, Ondo State Nigeria are poor site management and supervision, inadequate contractors experience and client’s financial difficulties. Based on the findings of this study, recommendations were given on how the causes and effects of delay in construction can be mitigated.

Keywords: Akure, causes, construction projects, delay, effects

Procedia PDF Downloads 481
4585 Measurement of Project Success in Construction Using Performance Indices

Authors: Annette Joseph

Abstract:

Background: The construction industry is dynamic in nature owing to the increasing uncertainties in technology, budgets, and development processes making projects more complex. Thus, predicting project performance and chances of its likely success has become difficult. The goal of all parties involved in construction projects is to successfully complete it on schedule, within planned budget and with the highest quality and in the safest manner. However, the concept of project success has remained ambiguously defined in the mind of the construction professionals. Purpose: This paper aims to study the analysis of a project in terms of its performance and measure the success. Methodology: The parameters for evaluating project success and the indices to measure success/performance of a project are identified through literature study. Through questionnaire surveys aimed at the stakeholders in the projects, data is collected from two live case studies (an ongoing and completed project) on the overall performance in terms of its success/failure. Finally, with the help of SPSS tool, the data collected from the surveys are analyzed and applied on the selected performance indices. Findings: The score calculated by using the indices and models helps in assessing the overall performance of the project and interpreting it to find out whether the project will be a success or failure. This study acts as a reference for firms to carry out performance evaluation and success measurement on a regular basis helping projects to identify the areas which are performing well and those that require improvement. Originality & Value: The study signifies that by measuring project performance; a project’s deviation towards success/failure can be assessed thus helping in suggesting early remedial measures to bring it on track ensuring that a project will be completed successfully.

Keywords: project, performance, indices, success

Procedia PDF Downloads 165
4584 Hybrid Concrete Construction (HCC) for Sustainable Infrastructure Development in Nigeria

Authors: Muhammad Bello Ibrahim, M. Auwal Zakari, Aliyu Usman

Abstract:

Hybrid concrete construction (HCC) combines all the benefits of pre-casting with the advantages of cast in-situ construction. Merging the two, as a hybrid structure, results in even greater construction speed, value, and the overall economy. Its variety of uses has gained popularity in the United States and in Europe due to its distinctive benefits. However, the increase of its application in some countries (including Nigeria) has been relatively slow. Several researches have shown that hybrid construction offers an ultra-high performance concrete that offers superior strength, durability and aesthetics with design flexibility and within sustainability credentials, based on the available and economically visible technologies. This paper examines and documents the criterion that will help inform the process of deciding whether or not to adopt hybrid concrete construction (HCC) technology rather than more traditional alternatives. It also the present situation of design, construction and research on hybrid structures.

Keywords: hybrid concrete construction, Nigeria, sustainable infrastructure development, design flexibility

Procedia PDF Downloads 528
4583 Major Causes of Delay in Construction Projects

Authors: Y. Gholipour, E. Rezazadeh

Abstract:

Delay is one of the most serious and common problems of construction project that can affect project delivery unfavorably. This research presents the most important causes of delay in large dam projects based on a survey on some executed dam construction in Iran. In this survey a randomly selected samples of owners, consultants and contractors have been involved. The outcome of this survey revealed that scheduled payments, site management, shop drawing review process, unforeseen ground conditions and contractor experience as the most important factors affecting on delay in dam construction projects.

Keywords: delay, dam construction, project management, Iran

Procedia PDF Downloads 418
4582 Determinants of Profitability in Indian Pharmaceutical Firms in the New Intellectual Property Rights Regime

Authors: Shilpi Tyagi, D. K. Nauriyal

Abstract:

This study investigates the firm level determinants of profitability of Indian drug and pharmaceutical industry. The study uses inflation adjusted panel data for a period 2000-2013 and applies OLS regression model with Driscoll-Kraay standard errors. It has been found that export intensity, A&M intensity, firm’s market power and stronger patent regime dummy have exercised positive influence on profitability. The negative and statistically significant influence of R&D intensity and raw material import intensity points to the need for firms to adopt suitable investment strategies. The study suggests that firms are required to pay far more attention to optimize their operating expenditures, advertisement and marketing expenditures and improve their export orientation, as part of the long term strategy.

Keywords: Indian pharmaceutical industry, profits, TRIPS, performance

Procedia PDF Downloads 416
4581 Development of Construction Cost Optimization System Using Genetic Algorithm Method

Authors: Hyeon-Seung Kim, Young-Hwan Kim, Sang-Mi Park, Min-Seo Kim, Jong-Myeung Shin, Leen-Seok Kang

Abstract:

The project budget at the planned stage might be changed by the insufficient government budget or the design change. There are many cases more especially in the case of a project performed for a long period of time. If the actual construction budget is insufficient comparing with the planned budget, the construction schedule should also be changed to match the changed budget. In that case, most project managers change the planned construction schedule by a heuristic approach without a reasonable consideration on the work priority. This study suggests an optimized methodology to modify the construction schedule according to the changed budget. The genetic algorithm was used to optimize the modified construction schedule within the changed budget. And a simulation system of construction cost histogram in accordance with the construction schedule was developed in the BIM (Building Information Modeling) environment.

Keywords: 5D, BIM, GA, cost optimization

Procedia PDF Downloads 569
4580 The Impact of Iso 9001 Certification on Brazilian Firms’ Performance: Insights from Multiple Case Studies

Authors: Matheus Borges Carneiro, Fabiane Leticia Lizarelli, José Carlos De Toledo

Abstract:

The evolution of quality management by companies was strongly enabled by, among others, ISO 9001 certification, which is considered a crucial requirement for several customers. Likewise, performance measurement provides useful insights for companies to identify the reflection of their decision-making process on their improvement. One of the most used performance measurement models is the balanced scorecard (BSC), which uses four perspectives to address a firm’s performance: financial, internal process, customer satisfaction, and learning and growth. Studies related to ISO 9001 and business performance have mostly adopted a quantitative approach to identify the standard’s causal effect on a firm’s performance. However, to verify how this influence may occur, an in-depth analysis within a qualitative approach is required. Therefore, this paper aims to verify the impact of ISO 9001:2015 on Brazilian firms’ performance based on the balanced scorecard perspective. Hence, nine certified companies located in the Southeast region of Brazil were studied through a multiple case study approach. Within this study, it was possible to identify the positive impact of ISO 9001 on firms’ overall performance, and four Critical Success Factors (CSFs) were identified as relevant on the linkage among ISO 9001 and firms’ performance: employee involvement, top management, process management, and customer focus. Due to the COVID-19 pandemic, the number of interviews was limited to the quality manager specialist, and the sample was limited since several companies were closed during the period of the study. This study presents an in-depth analysis of how the relationship between ISO 9001 certification and firms’ performance in a developing country is.

Keywords: balanced scorecard, Brazilian firms’ performance, critical success factors, ISO 9001 certification, performance measurement

Procedia PDF Downloads 169
4579 Identification of Successful Criteria for Measuring Large Infrastructure Projects Performance in Malaysia

Authors: M. A. N. Masrom, M. H. I. A. Rahim, G. K. Chen, S. Mohamed

Abstract:

Large infrastructure project is one of significant category in the development of Malaysian construction industry. This type of project has been recognized as a high complexity project with numerous construction risks, large cost involvement, highly technical requirements and divers of resources. Besides, the development of large infrastructure such as highway, railway, Mass Rapid Transit (MRT) and airport are also needed a large investment of public and private sector. To accomplish the development successfully, several challenges has to be determined prior the project commencement. To date, a comprehensive assessment of key success criteria particularly for large infrastructure in developing country such as Malaysia, is still not systematically defined and therefore, it needs further investigation. This paper aims to explore the potential success criteria that would be useful in gauging overall performance of large infrastructure implementation particularly in developing country. Previous successful criteria studies were used to develop a conceptual framework that possibly suitable for measuring large infrastructure performance. The findings show that successful criteria of infrastructure projects implementation could be grouped according to several key elements as it seems significant to the participants in prioritizing project challenges more systematically.

Keywords: successful criteria, performance, large infrastructure, Malaysia

Procedia PDF Downloads 382
4578 Corporate Governance and Share Prices: Firm Level Review in Turkey

Authors: Raif Parlakkaya, Ahmet Diken, Erkan Kara

Abstract:

This paper examines the relationship between corporate governance rating and stock prices of 26 Turkish firms listed in Turkish stock exchange (Borsa Istanbul) by using panel data analysis over five-year period. The paper also investigates the stock performance of firms with governance rating with regards to the market portfolio (i.e. BIST 100 Index) both prior and after governance scoring began. The empirical results show that there is no relation between corporate governance rating and stock prices when using panel data for annual variation in both rating score and stock prices. Further analysis indicates surprising results that while the selected firms outperform the market significantly prior to rating, the same performance does not continue afterwards.

Keywords: corporate governance, stock price, performance, panel data analysis

Procedia PDF Downloads 369
4577 The Impact of Voluntary Disclosure Level on the Cost of Equity Capital in Tunisian's Listed Firms

Authors: Nouha Ben Salah, Mohamed Ali Omri

Abstract:

This paper treats the association between disclosure level and the cost of equity capital in Tunisian’slisted firms. This relation is tested by using two models. The first is used for testing this relation directly by regressing firm specific estimates of cost of equity capital on market beta, firm size and a measure of disclosure level. The second model is used for testing this relation by introducing information asymmetry as mediator variable. This model is suggested by Baron and Kenny (1986) to demonstrate the role of mediator variable in general. Based on a sample of 21 non-financial Tunisian’s listed firms over a period from 2000 to 2004, the results prove that greater disclosure is associated with a lower cost of equity capital. However, the results of indirect relationship indicate a significant positive association between the level of voluntary disclosure and information asymmetry and a significant negative association between information asymmetry and cost of equity capital in contradiction with our previsions. Perhaps this result is due to the biases of measure of information asymmetry.

Keywords: cost of equity capital, voluntary disclosure, information asymmetry, and Tunisian’s listed non-financial firms

Procedia PDF Downloads 492
4576 The Eco-Efficient Construction: A Review of Embodied Energy in Building Materials

Authors: Francesca Scalisi, Cesare Sposito

Abstract:

The building construction industry consumes a large amount of resources and energy, both during construction (embodied energy) and during the operational phase (operating energy). This paper presents a review of the literature on low carbon and low embodied energy materials in buildings. The embodied energy comprises the energy consumed during the extraction, processing, transportation, construction, and demolition of building materials. While designing a nearly zero energy building, it is necessary to choose and use materials, components, and technologies that allow to reduce the consumption of energy and also to reduce the emissions in the atmosphere during all the Life Cycle Assessment phases. The appropriate choice of building materials can contribute decisively to reduce the energy consumption of the building sector. The increasing worries for the environmental impact of construction materials are witnessed by a lot of studies. The mentioned worries have brought again the attention towards natural materials. The use of more sustainable construction materials and construction techniques represent a major contribution to the eco-efficiency of the construction industry and thus to a more sustainable development.

Keywords: embodied energy, embodied carbon, life cycle assessment, architecture, sustainability, material construction

Procedia PDF Downloads 311
4575 Contesting Blind Obedience in Islam within the Malay-Language Media: Case Study of 'I Want to Touch a Dog' Event

Authors: Aisya Zaharin

Abstract:

The reporting of Islam in the Malaysian government-controlled press is complicated and occurs almost daily. This is due to the Islamisation process that has been heavily politicized in recent years. This article analyses media representations of Islam in the Malaysian media through the social responsibility theory. A provocative case study of media reporting on the “I want to touch a dog” event was analysed since dog’s saliva is ritually considered unhygienic by Muslims. This paper will not question the Islamic ruling on the dog’s issue. Instead, it calls for discussions in relation to openness and maturity in religious discourse with respect to the dog’s saliva dialogue in 1937. It applies Hage’s “minor and major reality” to explain the increasing percentage of Muslim who define their own understandings of Islam vs the government’s dogmatic versions. This paper employs Alatas’s method of “sociological investigation in Southeast Asia” by using ethnographic examination on selected mass media. Through Asiacentricity approach, this paper revisited the local framework of Alatas’s New Man encouraging Muslims to engage in knowledge and to appreciate diversities in Islamic jurisprudences. Despite government’s control, findings showed that non-Malay languages and online media are more comprehensive in reporting the news about Islam. Clearly, there has to be a re-conceptualization of Islamic discourses in the Malay-language media.

Keywords: dog, Fiqh, Islamic jurisprudence, Malaysian media, New Man, social responsibility

Procedia PDF Downloads 298
4574 The Relationship between Resource Sharing and Economic Resilience: An Empirical Analysis of Firms’ Resilience from the Perspective of Resource Dependence Theory

Authors: Alfredo R. Roa-Henriquez

Abstract:

This paper is about organizational-level resilience and decision-making in the face of natural hazards. Research on resilience emerged to explain systems’ ability to absorb and recover in the midst of adversity and uncertainty from natural disasters, crises, and other disruptive events. While interest in resilience has accelerated, research multiplied, and the number of policies and implementations of resilience to natural hazards has increased over the last several years, mainly at the level of communities and regions, there has been a dearth of empirical work on resilience at the level of the firm. This paper uses empirical data and a sample selection model to test some hypotheses related to the firm’s dependence on critical resources, the sharing of resources and its economic resilience. The objective is to understand how the sharing of resources among organizations is related to economic resilience. Empirical results that are obtained from a sample of firms affected by Superstorm Sandy and Hurricane Harvey indicate that there is unobserved heterogeneity that explains the strategic behavior of firms in the post-disaster and that those firms that are more likely to resource share are also the ones that exhibit higher economic resilience. The impact of property damage on the sharing of resources and economic resilience is explored.

Keywords: economic resilience, resource sharing, critical resources, strategic management

Procedia PDF Downloads 121
4573 Ownership, Management Responsibility and Corporate Performance of the Listed Firms in Kazakhstan

Authors: Gulnara Moldasheva

Abstract:

The research explores the relationship between management responsibility and corporate governance of listed companies in Kazakhstan. This research employs firm level data of randomly selected listed non-financial firms and firm level data “operational” financial sector, consisted from banking sector, insurance companies and accumulated pension funds using multivariate regression analysis under fixed effect model approach. Ownership structure includes institutional ownership, managerial ownership and private investor’s ownership. Management responsibility of the firm is expressed by the decision of the firm on amount of leverage. Results of the cross sectional panel study for non-financial firms showed that only institutional shareholding is significantly negatively correlated with debt to equity ratio. Findings from “operational” financial sector show that leverage is significantly affected only by the CEO/Chair duality and the size of financial institutions, and insignificantly affected by ownership structure. Also, the findings show, that there is a significant negative relationship between profitability and the debt to equity ratio for non-financial firms, which is consistent with pecking order theory. Generally, the found results suggest that corporate governance and a management responsibility play important role in corporate performance of listed firms in Kazakhstan.

Keywords: ownership, corporate governance, debt to equity ratio, corporate performance

Procedia PDF Downloads 320
4572 Methodology of Construction Equipment Optimization for Earthwork

Authors: Jaehyun Choi, Hyunjung Kim, Namho Kim

Abstract:

Earthwork is one of the critical civil construction operations that require large-quantities of resources due to its intensive dependency upon construction equipment. Therefore, efficient construction equipment management can highly contribute to productivity improvements and cost savings. Earthwork operation utilizes various combinations of construction equipment in order to meet project requirements such as time and cost. Identification of site condition and construction methods should be performed in advance in order to develop a proper execution plan. The factors to be considered include capacity of equipment assigned, the method of construction, the size of the site, and the surrounding condition. In addition, optimal combination of various construction equipment should be selected. However, in real world practice, equipment utilization plan is performed based on experience and intuition of management. The researchers evaluated the efficiency of various alternatives of construction equipment combinations by utilizing the process simulation model, validated the model from a case study project, and presented a methodology to find optimized plan among alternatives.

Keywords: earthwork operation, construction equipment, process simulation, optimization

Procedia PDF Downloads 403
4571 Firm Performance and Evolving Corporate Governance: An Empirical Study from Pakistan

Authors: Mohammed Nishat, Ahmad Ghazali

Abstract:

This study empirically examines the corporate governance and firm performance, and tries to evaluate the governance, ownership and control related variables which are hypothesized to affect on firms performance. This study tries to evaluate the effectiveness of corporate governance mechanism to achieve high level performance among companies listed on the Karachi Stock Exchange (KSE) over the period from 2005 to 2008. To measure the firm performance level this research uses three measures of performance; Return on assets (ROA), Return on Equity (ROE) and Tobin’s Q. To link the performance of firms with the corporate governance three categories of corporate governance variables are tested which includes governance, ownership and control related variables. Fixed effect regression model is used to test the link between corporate governance and firm performance for 267 KSE listed Pakistani firms. The result shows that corporate governance variables such as percentage block holding by individuals have positive impact on firm performance. When CEO is also the chairperson of board then it is found that firm performance is adversely affected. Also negative relationship is found between share held by insiders and performance of firm. Leverage has negative impact on the performance of the firm and firm size is positively related with the firms performance.

Keywords: corporate governance, performance, agency cost, Karachi stock market

Procedia PDF Downloads 325
4570 Ownership Structure and Portfolio Performance: Pre- and Post-Crisis Evidence from the Amman Stock Exchange

Authors: Mohammad Q. M. Momani

Abstract:

The objective of this study is to examine whether the value relevance of ownership structure changed as the Amman Stock Exchange market conditions changed. Using data from 2005 to 2014, the study finds that the performance of portfolios that contain firms with concentrated ownership structure declines significantly during the post-crisis period. These portfolios exhibit poor performance relative to portfolios that contain firms with dispersed ownership structure during the post-crisis period. The results argue that uninspired performance of the Amman Stock Exchange during the post-crisis period, increased the incentives for controlling shareholders to expropriate. Investors recognized these incentives and discounted firms that were more likely to expropriate.

Keywords: value relevance, ownership structure, portfolio performance, Jordan, ASE

Procedia PDF Downloads 100
4569 The Initiation of Privatization, Market Structure, and Free Entry with Vertically Related Markets

Authors: Hung-Yi Chen, Shih-Jye Wu

Abstract:

The existing literature provides little discussion on why a public monopolist gives up its market dominant position and allows private firms entering the market. We argue that the privatization of a public monopolist under a vertically related market may induce the entry of private firms. We develop a model of a mixed oligopoly with vertically related markets to explain the change in the market from a public monopolist to a mixed oligopoly and examine issues on privatizing the downstream public enterprise both in the short run and long run in the vertically related markets. We first show that the welfare-maximizing public monopoly firm is suboptimal in the vertically related markets. This is due to the fact that the privatization will reduce the input price charged by the upstream foreign monopolist. Further, the privatization will induce the entry of private firms since input price will decrease after privatization. Third, we demonstrate that the complete privatizing the public firm becomes a possible solution if the entry cost of private firm is low. Finally, we indicate that the public firm should partially privatize if the free-entry of private firms is allowed. JEL classification: F12, F14, L32, L33

Keywords: free entry, mixed oligopoly, public monopoly, the initiation of privatization, vertically related markets, mixed oligopoly

Procedia PDF Downloads 108
4568 Analyzing the Value of Brand Engagement on Social Media for B2B Firms: Evidence from China

Authors: Shuai Yang, Bin Li, Sixing Chen

Abstract:

Engaging and co-creating value with buyers (i.e., the buying organizations) have rapidly become a rising trend for sellers (i.e., the selling organizations) within Business-to-Business (B2B) environments, through which buyers can interact more with sellers and be better informed about products. One important way to achieve this is through engaging with buyers on social media, termed as brand engagement on social media, which provides a platform for sellers to interact with customers. This study addresses the research gap by answering the following questions: (1) Are B2B firms’ brand engagement on social media related to their firm value? (2) To what extent do analyst stock recommendations channel B2B firms’ brand engagement on social media’s possible impact on firm value? To answer the research questions, this study collected data merged from multiple sources. The results show that there is a positive association between seller-initiated engagement and B2B sellers’ firm value. Besides, analyst stock recommendations mediate the positive relationships between seller-initiated engagement and firm value. However, this study reveals buyer-initiated engagement has a counterintuitive and negative relationship with firm value, which shows a dark side of buyer-initiated engagement on social media for B2B sellers.

Keywords: brand engagement, B2B firms, firm value, social media, stock recommendations

Procedia PDF Downloads 291
4567 Identifying Project Delay Factors in the Australian Construction Industry

Authors: Syed Sohaib Bin Hasib, Hiyam Al-Kilidar

Abstract:

Meeting project deadlines is a major challenge for most construction projects. In this study, perceptions of contractors, clients, and consultants are compared relative to a list of factors derived from the review of the extant literature on project delay. 59 causes (categorized into 8 groups) of project delays were identified from the literature. A survey was devised to get insights and ranking of these factors from clients, consultants & contractors in the Australian construction industry. Findings showed that project delays in the Australian construction industry are mainly the result of skill shortages, interference in execution, and poor coordination and communication between the project stakeholders.

Keywords: construction, delay factors, time delay, australian construction industry

Procedia PDF Downloads 147
4566 A Risk-Based Modeling Approach for Successful Adoption of CAATTs in Audits: An Exploratory Study Applied to Israeli Accountancy Firms

Authors: Alon Cohen, Jeffrey Kantor, Shalom Levy

Abstract:

Technology adoption models are extensively used in the literature to explore drivers and inhibitors affecting the adoption of Computer Assisted Audit Techniques and Tools (CAATTs). Further studies from recent years suggested additional factors that may affect technology adoption by CPA firms. However, the adoption of CAATTs by financial auditors differs from the adoption of technologies in other industries. This is a result of the unique characteristics of the auditing process, which are expressed in the audit risk elements and the risk-based auditing approach, as encoded in the auditing standards. Since these audit risk factors are not part of the existing models that are used to explain technology adoption, these models do not fully correspond to the specific needs and requirements of the auditing domain. The overarching objective of this qualitative research is to fill the gap in the literature, which exists as a result of using generic technology adoption models. Followed by a pretest and based on semi-structured in-depth interviews with 16 Israeli CPA firms of different sizes, this study aims to reveal determinants related to audit risk factors that influence the adoption of CAATTs in audits and proposes a new modeling approach for the successful adoption of CAATTs. The findings emphasize several important aspects: (1) while large CPA firms developed their own inner guidelines to assess the audit risk components, other CPA firms do not follow a formal and validated methodology to evaluate these risks; (2) large firms incorporate a variety of CAATTs, including self-developed advanced tools. On the other hand, small and mid-sized CPA firms incorporate standard CAATTs and still need to catch up to better understand what CAATTs can offer and how they can contribute to the quality of the audit; (3) the top management of mid-sized and small CPA firms should be more proactive and updated about CAATTs capabilities and contributions to audits; and (4) All CPA firms consider professionalism as a major challenge that must be constantly managed to ensure an optimal CAATTs operation. The study extends the existing knowledge of CAATTs adoption by looking at it from a risk-based auditing approach. It suggests a new model for CAATTs adoption by incorporating influencing audit risk factors that auditors should examine when considering CAATTs adoption. Since the model can be used in various audited scenarios and supports strategic, risk-based decisions, it maximizes the great potential of CAATTs on the quality of the audits. The results and insights can be useful to CPA firms, internal auditors, CAATTs developers and regulators. Moreover, it may motivate audit standard-setters to issue updated guidelines regarding CAATTs adoption in audits.

Keywords: audit risk, CAATTs, financial auditing, information technology, technology adoption models

Procedia PDF Downloads 46
4565 Abating the Barriers to the Deployment of RFID for Construction Project Delivery in South Africa

Authors: Matthew O. Ikuabe, Ayodeji E. Oke, Clinton O. Aigbavboa, Douglas O. Aghimien

Abstract:

The use of technological innovations have been touted to be beneficial in the delivery of construction projects. Particularly, Radio Frequency Identification (RFID) technology is widely regarded to be of immense advantage for the management of construction projects. This study focused on evaluating the barriers to the use of Radio Frequency Identification (RFID) technology for the delivery of construction projects. Using Gauteng Provincein South Africa as the study area, questionnaire was used in eliciting responses from construction professionals, which made up the population of the study. Retrieved data was analysed using Mean Item Score and One-Sample t-test. Findings from the study showed that the most significant barriers to the deployment of RFID for construction project delivery are high cost and lack of awareness. Conclusively, the study made recommendations that would aid in the abatement of the barriers to the use of RFID technology for construction project delivery.

Keywords: barriers, construction, project delivery, RFID

Procedia PDF Downloads 172
4564 Development of Risk Assessment and Occupational Safety Management Model for Building Construction Projects

Authors: Preeda Sansakorn, Min An

Abstract:

In order to be capable of dealing with uncertainties, subjectivities, including vagueness arising in building construction projects, the application of fuzzy reasoning technique based on fuzzy set theory is proposed. This study contributes significantly to the development of a fuzzy reasoning safety risk assessment model for building construction projects that could be employed to assess the risk magnitude of each hazardous event identified during construction, and a third parameter of probability of consequence is incorporated in the model. By using the proposed safety risk analysis methodology, more reliable and less ambiguities, which provide the safety risk management project team for decision-making purposes.

Keywords: safety risk assessment, building construction safety, fuzzy reasoning, construction risk assessment model, building construction projects

Procedia PDF Downloads 460