9340 A Study of Factors Affecting the Elapsed Time of Housing Renewal Project Implementation in Seoul

Authors: In Su Na, Gunwon Lee, Seiyong Kim

Abstract:

This study analyzed the effect of area variables and economic variables on the length of each period of the project in order to analyze the effect of agreement rate on project implementation in housing renewal projects. In conclusion, as can be seen from these results, a low agreement rate may not translate into project promotion, and a higher agreement rate may not translate into project delay. The expectation of the policy is that the lower the agreement rate, the more projects would be promoted, but that is not the actual effect. From a policy consistency viewpoint, changing the agreement rate frequently, depending on the decision of the public, is not reasonable. The policy of using agreement rate as a necessary condition for project implementation should be reconsidered.

Keywords: Area and Economic Variables, Elapsed time, Housing Renewal Project

Procedia PDF Downloads 442
9339 The Effect of Patient Positioning on Pleth Variability Index during Surgery

Authors: Omid Azimaraghi, Noushin Khazaei

Abstract:

Background: Fluid therapy is an important aspect of the perioperative period and a major challenge for anesthesiologists. To authors best knowledge, there is a lack of strong guidance and evidence regarding the optimal approach to fluid therapy. Therefore a variety of medical devices have been introduced to help physicians. In this study, we aimed to evaluate the effectiveness of pleth variability index in guiding fluid therapy in different patient positions. Materials and Methods: Inclusion criteria consisted of patients aged 18-50 years old and classified as American Society of Anesthesiologists physical status I and II, who were candidates for elective thyroidectomy surgery. In total, 36 patients meeting the inclusion criteria were enrolled in the study. After induction of anesthesia and start of mechanical ventilation Pleth variability index was measured in the supine position, then patients were placed in Trendelenburg and reverse Trendelenburg position (30 degrees, 5 minutes); Pleth Variability Index has measured again in the mentioned positions. Results: Mean PVI (Pleth Variability Index) in the supine position was 14.3 ± 3.7 in comparison to 21.5 ± 4.3 in the reverse Trendelenburg position. The mean PVI in Trendelenburg position was 9.1 ± 2.0 in Trendelenburg position (p < 0.05). Conclusion: In conclusion, we found that Pleth Variability Index varies with patient position and this should be taken into account when using this index during fluid therapy.

Keywords: fluid therapy, Pleth Variability Index, position, surgery

Procedia PDF Downloads 147
9338 Neighborhood Sustainability Assessment in the New Developments of Tabriz: A Case Study for Roshdieh

Authors: Melisa Yazdan Panahi

Abstract:

Since, today in most countries around the world much attention is paid to planning the smallest unit in the city i.e. the residential neighborhoods to achieve sustainable urban development goals, a variety of assessment tools have been developed to assess and monitor the sustainability of new developments. One of the most reliable and widely used assessment tools is LEED-ND rating system. This paper whit the aim of assessing sustainability level of Roshdieh neighborhood in Tabriz, has introduced this rating system and applied it in the study area. The results indicate that Roshdieh has the potential of achieving the standards of sustainable neighborhoods, but the present situation is far from the ideal point.

Keywords: LEED-ND, sustainable neighborhood, new developments, Tabriz

Procedia PDF Downloads 385
9337 Refractometric Optical Sensing by Using Photonics Mach–Zehnder Interferometer

Authors: Gong Zhang, Hong Cai, Bin Dong, Jifang Tao, Aiqun Liu, Dim-Lee Kwong, Yuandong Gu

Abstract:

An on-chip refractive index sensor with high sensitivity and large measurement range is demonstrated in this paper. The sensing structures are based on Mach-Zehnder interferometer configuration, built on the SOI substrate. The wavelength sensitivity of the sensor is estimated to be 3129 nm/RIU. Meanwhile, according to the interference pattern period changes, the measured period sensitivities are 2.9 nm/RIU (TE mode) and 4.21 nm/RIU (TM mode), respectively. As such, the wavelength shift and the period shift can be used for fine index change detection and larger index change detection, respectively. Therefore, the sensor design provides an approach for large index change measurement with high sensitivity.

Keywords: Mach-Zehnder interferometer, nanotechnology, refractive index sensing, sensors

Procedia PDF Downloads 431
9336 Performance Evaluation of Construction Projects by Earned Value Management Method, Using Primavera P6 – A Case Study in Istanbul, Turkey

Authors: Mohammad Lemar Zalmai, Osman Hurol Turkakin, Cemil Akcay, Ekrem Manisali

Abstract:

Most of the construction projects are exposed to time and cost overruns due to various factors and this is a major problem. As a solution to this, the Earned Value Management (EVM) method is considered. EVM is a powerful and well-known method used in monitoring and controlling the project. EVM is a technique that project managers use to track the performance of their project against project baselines. EVM gives an early indication that either project is delayed or not, and the project is either over budget or under budget at any particular day by tracking it. Thus, it helps to improve the management control system of a construction project, to detect and control the problems in potential risk areas and to suggest the importance and purpose of monitoring the construction work. This paper explains the main parameters of the EVM system involved in the calculation of time and cost for construction projects. In this study, the project management software Primavera P6 is used to deals with the project monitoring process of a seven-storeyed (G+6) faculty building whose construction is in progress at Istanbul, Turkey. A comparison between the planned progress of construction activities and actual progress is performed, and the analysis results are interpreted. This case study justifies the benefits of using EVM for project cash flow analysis and forecasting.

Keywords: earned value management (EVM), construction cost management, construction planning, primavera P6, project management, project scheduling

Procedia PDF Downloads 205
9335 The Effect of Critical Activity on Critical Path and Project Duration in Precedence Diagram Method

Authors: J. Nisar, S. Halim

Abstract:

The additional relationships i.e., start-to-start, finish-to-finish, and start-to-finish, between activity in Precedence Diagram Method (PDM) provides a more flexible schedule than traditional Critical Path Method (CPM). But, changing the duration of critical activities in the PDM network will have an anomalous effect on the critical path and the project completion date. In this study, we classified the critical activities in two groups i.e., 1. activity on single critical path and 2. activity on multi-critical paths, and six classes i.e., normal, reverse, neutral, perverse, decrease-reverse and increase-normal, based on their effects on project duration in PDM. Furthermore, we determined the maximum float of time by which the duration each type of critical activities can be changed without effecting the project duration. This study would help the project manager to clearly understand the behavior of each critical activity on critical path, and he/she would be able to change the project duration by shortening or lengthening activities based on project budget and project deadline.

Keywords: construction management, critical path method, project scheduling network, precedence diagram method

Procedia PDF Downloads 202
9334 Project Management Framework and Influencing Factors

Authors: Mehrnoosh Askarizadeh

Abstract:

The increasing variations of the business world correspond with a high diversity of theoretical perspectives used in project management research. This diversity is reflected by a variety of influencing factors, which have been the subject of empirical studies. This article aims to systemize the different streams of research on the basis of a literature review and at developing a research framework influencing factors. We will identify fundamental elements of a project management theory. The framework consists of three dimensions: design, context, and goal. Its purpose is to support the combination of different perspectives and the development of strategies for further research.

Keywords: project, goal, project management, influencing factors

Procedia PDF Downloads 522
9333 Sustainability of High-Rise Affordable Housing: Critical Issues in Applying Green Building Rating Tools

Authors: Poh Im. Lim, Hillary Yee Qin. Tan

Abstract:

Nowadays, going green has become a trend, and being emphasized in the construction industry. In Malaysia, there are several green rating tools available in the industry and among these, GBI and GreenRE are considered as the most common tools adopted for residential buildings. However, being green is not equal to or making something sustainable. Being sustainable is to take economic, environmental and social aspects into consideration. This is particularly essential in the affordable housing sector as the end-users belong to lower-income and places importance on many socio-economic needs beyond the environmental criteria. This paper discusses the arguments in proposing a sustainability framework that is tailor-made for high-rise affordable housing. In-depth interviews and observation mapping methods were used in gathering inputs from the end-users, non-governmental organisations (NGOs) as well as the professionals. ‘Bottom-up’ approach was applied in this research to show the significance of participation from the local community in the decision-making process. The proposed sustainability framework illustrates the discrepancies between user priorities and what the industry is providing. The outcome of this research suggests that integrating sustainability into high-rise affordable housing is achievable and beneficial to the industry, society, and the environment.

Keywords: green building rating tools, high-rise affordable housing, sustainability framework, sustainable development

Procedia PDF Downloads 117
9332 Three Phase PWM Inverter for Low Rating Energy Efficient Systems

Authors: Nelson Lujara

Abstract:

The paper presents a practical three-phase PWM inverter suitable for low voltage, low rating energy efficient systems. The work in the paper is conducted with the view to establishing the significance of the loss contribution from the PWM inverter in the determination of the complete losses of a photovoltaic (PV) array-powered induction motor drive water pumping system. Losses investigated include; conduction and switching loss of the devices and gate drive losses. It is found that the PWM inverter operates at a reasonable variable efficiency that does not fall below 92% depending on the load. The results between the simulated and experimental results for the system with or without a maximum power tracker (MPT) compares very well, within an acceptable range of 2% margin.

Keywords: energy, inverter, losses, photovoltaic

Procedia PDF Downloads 619
9331 Co-Integration Model for Predicting Inflation Movement in Nigeria

Authors: Salako Rotimi, Oshungade Stephen, Ojewoye Opeyemi

Abstract:

The maintenance of price stability is one of the macroeconomic challenges facing Nigeria as a nation. This paper attempts to build a co-integration multivariate time series model for inflation movement in Nigeria using data extracted from the abstract of statistics of the Central Bank of Nigeria (CBN) from 2008 to 2017. The Johansen cointegration test suggests at least one co-integration vector describing the long run relationship between Consumer Price Index (CPI), Food Price Index (FPI) and Non-Food Price Index (NFPI). All three series show increasing pattern, which indicates a sign of non-stationary in each of the series. Furthermore, model predictability was established with root-mean-square-error, mean absolute error, mean average percentage error, and Theil’s unbiased statistics for n-step forecasting. The result depicts that the long run coefficient of a consumer price index (CPI) has a positive long-run relationship with the food price index (FPI) and non-food price index (NFPI).

Keywords: economic, inflation, model, series

Procedia PDF Downloads 225
9330 Quality Management in Construction Project

Authors: Harsh Panchal, Saurabh Amrutkar

Abstract:

Quality management is an essential part of any project that has directly related to the performance of a project. Quality management is depended on multiple factors at different stages in a project, right from time management to construction logistics. A project is a mixture of various components that include iternary management, health and safety, crew productivity, and many more. From the survey conducted, we came to the conclusion that advancement in technology and indigenous approach to any project will result in maximum quality standards and better project performance. In this paper, we discuss various components of the factors above that lead to compromise the quality of a project and how it can be controlled in order to achieve maximum quality assurance using quality planning and total quality management. The paper also focuses on limitations and problems faced in each factor responsible for quality management and to tackle them using techniques and processes based on activities and identifying the sequence, approaching critical path, and duration. The project management concept that deals with the sequence of scope cost time give us an overview regarding the ongoing quality management, in a nutshell, giving us hints to regulate the current procedure for maximum achievable quality. It also deals with the problems faced by engineers that make the mundane work process slow, reducing the quality outcome drastically.

Keywords: management, performance, project, quality

Procedia PDF Downloads 143
9329 Effect of Transit-Oriented Development on Air Quality in Neighborhoods of Delhi

Authors: Smriti Bhatnagar

Abstract:

This study aims to find if the Transit-oriented planning and development approach benefit the quality of air in neighborhoods of New Delhi. Two methodologies, namely the land use regression analysis and the Transit-oriented development index analysis, are being used to explore this relationship. Land Use Regression Analysis makes use of urban form characteristics as obtained for 33 neighborhoods in Delhi. These comprise road lengths, land use areas, population and household densities, number of amenities and distance between amenities. Regressions are run to establish the relationship between urban form variables and air quality parameters (dependent variables). For the Transit-oriented development index analysis, the Transit-oriented Development index is developed as a composite index comprising 29 urban form indicators. This index is developed by assigning weights to each of the 29 urban form data points. Regressions are run to establish the relationship between the Transit-oriented development index and air quality parameters. The thesis finds that elements of Transit-oriented development if incorporated in planning approach, have a positive effect on air quality. Roads suited for non-motorized transport, well connected civic amenities in neighbourhoods, for instance, have a directly proportional relationship with air quality. Transit-oriented development index, however, is not found to have a consistent relationship with air quality parameters. The reason could this, however, be in the way that the index has been constructed.

Keywords: air quality, land use regression, mixed-use planning, transit-oriented development index, New Delhi

Procedia PDF Downloads 249
9328 The Urban Project and the Urban Improvement to the Test of the Participation, Case: Project of Modernization of Constantine

Authors: Mouhoubi Nedjima, Sassi Boudemagh Souad

Abstract:

In the framework of the modernization of the city of Constantine, and in order to restore its status as a regional metropolis and introduce it into the network of cities international metropolises, a major urban project was launched: project of modernization and of metropolitanization of the city of Constantine (PMMC). Our research project focuses on the management of the project for the modernization of the city of Constantine (PMMC) focusing on the management of some aspects of the urban project whose participation, with the objective assessment of the managerial approach business. Among the cases revealing taken into account in our research work on the question of participation of actors and their organizations, the operation relating to "the urban improvement in the city of the Brothers FERRAD in the district of Zouaghi". This operation with the objective of improving the living conditions of citizens has faced several challenges and obstacles that have been in major part the factors of its failure. Through this study, we examine the management process and the mode of organization of the actors of the project as well as the level of participation of the citizen to finally propose managerial solutions to conflict situations observed.

Keywords: the urban project, the urban improvement, participation, Constantine

Procedia PDF Downloads 384
9327 Student Attribute and the Effectiveness of Classroom Response System in Teaching Economics

Authors: Raymond Li

Abstract:

In this project a web-based classroom response system (CRS) was used in the teaching an intermediate level economics course. This system allows the instructor to post a question on the screen and students to answer questions using their own electronic mobile devices. The questions and the results summarizing student responses can be shown to students simultaneously and the instructor can make timely feedback to students in class. CRS gives students a chance to respond to the instructor’s question privately, encouraging students who might not typically speak up in class to express their thoughts and opinions. There is a vast literature on the advantages and challenges of using CRS. However, empirical evidence on the student attributes that increase the effectiveness of CRS in improving student learning outcomes is sparse. The purpose of this project is to (1) find out if the use of CRS is beneficial to students taking economics, and (2) discover key student attributes that will likely make CRS more effective. Students’ performance in examinations and an end-of-semester questionnaire were used to assess the effectiveness of CRS in this project. Comparing the examination scores of the CRS treatment group and control group, the treatment group performed considerably better and statistically significant differences were found basing on paired t-tests on the differences. According to the questionnaire results, around 75% of the students in the treatment group generally agreed that CRS allowed them to express their views more freely. We also observed that students who prefer to use instant messaging rather than making conversations are generally more positive towards CRS. The use of CRS also benefits the instructor – students’ rating of the instructor in the teaching evaluation was significantly higher for the CRS treatment group.

Keywords: education technology, classroom response system, student attributes, economics education

Procedia PDF Downloads 113
9326 Detecting Financial Bubbles Using Gap between Common Stocks and Preferred Stocks

Authors: Changju Lee, Seungmo Ku, Sondo Kim, Woojin Chang

Abstract:

How to detecting financial bubble? Addressing this simple question has been the focus of a vast amount of empirical research spanning almost half a century. However, financial bubble is hard to observe and varying over the time; there needs to be more research on this area. In this paper, we used abnormal difference between common stocks price and those preferred stocks price to explain financial bubble. First, we proposed the ‘W-index’ which indicates spread between common stocks and those preferred stocks in stock market. Second, to prove that this ‘W-index’ is valid for measuring financial bubble, we showed that there is an inverse relationship between this ‘W-index’ and S&P500 rate of return. Specifically, our hypothesis is that when ‘W-index’ is comparably higher than other periods, financial bubbles are added up in stock market and vice versa; according to our hypothesis, if investors made long term investments when ‘W-index’ is high, they would have negative rate of return; however, if investors made long term investments when ‘W-index’ is low, they would have positive rate of return. By comparing correlation values and adjusted R-squared values of between W-index and S&P500 return, VIX index and S&P500 return, and TED index and S&P500 return, we showed only W-index has significant relationship between S&P500 rate of return. In addition, we figured out how long investors should hold their investment position regard the effect of financial bubble. Using this W-index, investors could measure financial bubble in the market and invest with low risk.

Keywords: financial bubble detection, future return, forecasting, pairs trading, preferred stocks

Procedia PDF Downloads 350
9325 Government (Big) Data Ecosystem: Definition, Classification of Actors, and Their Roles

Authors: Syed Iftikhar Hussain Shah, Vasilis Peristeras, Ioannis Magnisalis

Abstract:

Organizations, including governments, generate (big) data that are high in volume, velocity, veracity, and come from a variety of sources. Public Administrations are using (big) data, implementing base registries, and enforcing data sharing within the entire government to deliver (big) data related integrated services, provision of insights to users, and for good governance. Government (Big) data ecosystem actors represent distinct entities that provide data, consume data, manipulate data to offer paid services, and extend data services like data storage, hosting services to other actors. In this research work, we perform a systematic literature review. The key objectives of this paper are to propose a robust definition of government (big) data ecosystem and a classification of government (big) data ecosystem actors and their roles. We showcase a graphical view of actors, roles, and their relationship in the government (big) data ecosystem. We also discuss our research findings. We did not find too much published research articles about the government (big) data ecosystem, including its definition and classification of actors and their roles. Therefore, we lent ideas for the government (big) data ecosystem from numerous areas that include scientific research data, humanitarian data, open government data, industry data, in the literature.

Keywords: big data, big data ecosystem, classification of big data actors, big data actors roles, definition of government (big) data ecosystem, data-driven government, eGovernment, gaps in data ecosystems, government (big) data, public administration, systematic literature review

Procedia PDF Downloads 142
9324 Determination of Relationship among Shape Indexes Used for Land Consolidation

Authors: Firat Arslan, Hasan Degirmenci, Serife Tulin Akkaya Aslan

Abstract:

The aim of the current experiment was to determine the relationship among shape indexes which are used by the researchers in many fields to evaluate parcel shapes which is very important for farming even if these indexes are controversial. In the current study, land consolidation project of Halitaga village in Mersin province in Turkey which has 278 parcel and cover 894.4 ha, was taken as a material. Commonly used indicators such as fractal dimension (FD), shape index (SI), form factor (FORM), areal form factor (AFF) and two distinct area-perimeter ratio (APR-1 and APR2) in land consolidation are used to measure agricultural plot’s shape. FD was positively correlated with SI, APR-1 and APR-2 whereas it was negatively correlated with FORM and AFF. SI was positively correlated with APR-1 and APR-2 whereas it was negatively correlated with FORM and AFF. As a conclusion, it is likely that these indexes involved may be used interchangeably due to high correlations among them.

Keywords: GIS, land consolidation, parcel shape, shape index

Procedia PDF Downloads 168
9323 An Improved Heat Transfer Prediction Model for Film Condensation inside a Tube with Interphacial Shear Effect

Authors: V. G. Rifert, V. V. Gorin, V. V. Sereda, V. V. Treputnev

Abstract:

The analysis of heat transfer design methods in condensing inside plain tubes under existing influence of shear stress is presented in this paper. The existing discrepancy in more than 30-50% between rating heat transfer coefficients and experimental data has been noted. The analysis of existing theoretical and semi-empirical methods of heat transfer prediction is given. The influence of a precise definition concerning boundaries of phase flow (it is especially important in condensing inside horizontal tubes), shear stress (friction coefficient) and heat flux on design of heat transfer is shown. The substantiation of boundary conditions of the values of parameters, influencing accuracy of rated relationships, is given. More correct relationships for heat transfer prediction, which showed good convergence with experiments made by different authors, are substantiated in this work.

Keywords: film condensation, heat transfer, plain tube, shear stress

Procedia PDF Downloads 229
9322 Application of Agile Project Management to Construction Projects: Case Study

Authors: Ran Etgar, Sarit Freund

Abstract:

Agile project management (APM) has been developed originally for software development project. Construction projects seemed to be more apt to traditional water-fall approach than to APM. However, Construction project suffers from similar problems that necessitated the invention of APM, mainly the need to break down the project structure to small increments, thus minimizing the needed managerial planning and design. Since the classical structure of APM is not applicable the way it is to construction project, a modified version of APM was devised. This method, nicknamed 'The anchor method', exploits the fundamentals of APM (i.e., iterations, or sprints of short time frames or timeboxes, cross-functional teams, risk reduction and adaptation to changes) and adjust them to the construction world. The projects had to be structured appropriately to proactively and quickly adapt to change. The method aims to encompass human behavior and lean towards adaptivity rather than predictability. To enable smooth application of the method, a special project management software was developed, so as to provide solid administrational help and accurate data. The method is tested on a bunch of construction projects and some key performance indicators (KPIs) are collected. According to preliminary results the method is indeed very advantageous and with proper assimilation can radically change the construction project management paradigm.

Keywords: agile project management, construction, information systems, project management

Procedia PDF Downloads 113
9321 Computing Some Topological Descriptors of Single-Walled Carbon Nanotubes

Authors: Amir Bahrami

Abstract:

In the fields of chemical graph theory, molecular topology, and mathematical chemistry, a topological index or a descriptor index also known as a connectivity index is a type of a molecular descriptor that is calculated based on the molecular graph of a chemical compound. Topological indices are numerical parameters of a graph which characterize its topology and are usually graph invariant. Topological indices are used for example in the development of quantitative structure-activity relationships (QSARs) in which the biological activity or other properties of molecules are correlated with their chemical structure. In this paper some descriptor index (descriptor index) of single-walled carbon nanotubes, is determined.

Keywords: chemical graph theory, molecular topology, molecular descriptor, single-walled carbon nanotubes

Procedia PDF Downloads 312
9320 An Association between Stock Index and Macro Economic Variables in Bangladesh

Authors: Shamil Mardi Al Islam, Zaima Ahmed

Abstract:

The aim of this article is to explore whether certain macroeconomic variables such as industrial index, inflation, broad money, exchange rate and deposit rate as a proxy for interest rate are interlinked with Dhaka stock price index (DSEX index) precisely after the introduction of new index by Dhaka Stock Exchange (DSE) since January 2013. Bangladesh stock market has experienced rapid growth since its inception. It might not be a very well-developed capital market as compared to its neighboring counterparts but has been a strong avenue for investment and resource mobilization. The data set considered consists of monthly observations, for a period of four years from January 2013 to June 2018. Findings from cointegration analysis suggest that DSEX and macroeconomic variables have a significant long-run relationship. VAR decomposition based on VAR estimated indicates that money supply explains a significant portion of variation of stock index whereas, inflation is found to have the least impact. Impact of industrial index is found to have a low impact compared to the exchange rate and deposit rate. Policies should there aim to increase industrial production in order to enhance stock market performance. Further reasonable money supply should be ensured by authorities to stimulate stock market performance.

Keywords: deposit rate, DSEX, industrial index, VAR

Procedia PDF Downloads 143
9319 Conceptualising Project Complexity in Ghana’s Construction Industry: A Qualitative Study

Authors: Kwasi Dartey-Baah, Mias De Klerk

Abstract:

Project complexity has been cited as one of the essential areas of project management. It can be observed from environmental, social, technological, and organisational viewpoints, and its handling is critical to project success. Conceptualised in varied industries, this paper seeks to ascertain the meaning and understanding of project complexity within the Ghanaian construction industry based on the three dimensions of complexities (faith, fact, and interaction) using experts' opinions. Taking the form of a focus group discussion, the paper sought to gain an in-depth understanding of project complexity issues in Ghana’s construction industry. The method use obtained data from experts (a purposely selected group) comprising project leaders and project management academics. The findings indicated that the experts broadly agreed with the complexity items but offered varied reasons for their agreement. In the composite assessment of the complexity dimensions of (faith, fact, and interaction), it emerged that there was some agreement with the complexity dimensions of fact and interaction within Ghana’s construction industry. On the other hand, with the dimension for complexity by faith, it was noted that the experts in Ghana’s construction construed complexity by faith, not as the absence of evidence but the evidence that hinges on at least a member of the project team. It is expected that other researches on project complexity will focus on other industries to enhance the knowledge of the same within the field of project management.

Keywords: project complexity, complexity by faith, complexity by fact, complexity by interaction, construction industry, Ghana

Procedia PDF Downloads 141
9318 A Method to Identify the Critical Delay Factors for Building Maintenance Projects of Institutional Buildings: Case Study of Eastern India

Authors: Shankha Pratim Bhattacharya

Abstract:

In general building repair and renovation projects are minor in nature. It requires less attention as the primary cost involvement is relatively small. Although the building repair and maintenance projects look simple, it involves much complexity during execution. Many of the present research indicate that few uncertain situations are usually linked with maintenance projects. Those may not be read properly in the planning stage of the projects, and finally, lead to time overrun. Building repair and maintenance become essential and periodical after commissioning of the building. In Institutional buildings, the regular maintenance projects also include addition –alteration, modification activities. Increase in the student admission, new departments, and sections, new laboratories and workshops, up gradation of existing laboratories are very common in the institutional buildings in the developing nations like India. The project becomes very critical because it undergoes space problem, architectural design issues, structural modification, etc. One of the prime factors in the institutional building maintenance and modification project is the time constraint. Mostly it required being executed a specific non-work time period. The present research considered only the institutional buildings of the Eastern part of India to analyse the repair and maintenance project delay. A general survey was conducted among the technical institutes to find the causes and corresponding nature of construction delay factors. Five technical institutes are considered in the present study with repair, renovation, modification and extension type of projects. Construction delay factors are categorically subdivided into four groups namely, material, manpower (works), Contract and Site. The survey data are collected for the nature of delay responsible for a specific project and the absolute amount of delay through proposed and actual duration of work. In the first stage of the paper, a relative importance index (RII) is proposed for the delay factors. The occurrence of the delay factors is also judged by its frequency-severity nature. Finally, the delay factors are then rated and linked with the type of work. In the second stage, a regression analysis is executed to establish an empirical relationship between the actual time of a project and the percentage of delay. It also indicates the impact of the factors for delay responsibility. Ultimately, the present paper makes an effort to identify the critical delay factors for the repair and renovation type project in the Eastern Indian Institutional building.

Keywords: delay factor, institutional building, maintenance, relative importance index, regression analysis, repair

Procedia PDF Downloads 236
9317 Assessing Artificial Neural Network Models on Forecasting the Return of Stock Market Index

Authors: Hamid Rostami Jaz, Kamran Ameri Siahooei

Abstract:

Up to now different methods have been used to forecast the index returns and the index rate. Artificial intelligence and artificial neural networks have been one of the methods of index returns forecasting. This study attempts to carry out a comparative study on the performance of different Radial Base Neural Network and Feed-Forward Perceptron Neural Network to forecast investment returns on the index. To achieve this goal, the return on investment in Tehran Stock Exchange index is evaluated and the performance of Radial Base Neural Network and Feed-Forward Perceptron Neural Network are compared. Neural networks performance test is applied based on the least square error in two approaches of in-sample and out-of-sample. The research results show the superiority of the radial base neural network in the in-sample approach and the superiority of perceptron neural network in the out-of-sample approach.

Keywords: exchange index, forecasting, perceptron neural network, Tehran stock exchange

Procedia PDF Downloads 437
9316 Critical Success Factors Influencing Construction Project Performance for Different Objectives: Procurement Phase

Authors: Samart Homthong, Wutthipong Moungnoi

Abstract:

Critical success factors (CSFs) and the criteria to measure project success have received much attention over the decades and are among the most widely researched topics in the context of project management. However, although there have been extensive studies on the subject by different researchers, to date, there has been little agreement on the CSFs. The aim of this study is to identify the CSFs that influence the performance of construction projects, and determine their relative importance for different objectives across five stages in the project life cycle. A considerable literature review was conducted that resulted in the identification of 179 individual factors. These factors were then grouped into nine major categories. A questionnaire survey was used to collect data from three groups of respondents: client representatives, consultants, and contractors. Out of 164 questionnaires distributed, 93 were returned, yielding a response rate of 56.7%. Using the mean score, relative importance index, and weighted average method, the top 10 critical factors for each category were identified. The agreement of survey respondents on those categorised factors were analysed using Spearman’s rank correlation. A one-way analysis of variance was then performed to determine whether the mean scores among the various groups of respondents were statistically significant. The findings indicate the most CSFs in each category in procurement phase are: proper procurement programming of materials (time), stability in the price of materials (cost), and determining quality in the construction (quality). They are then followed by safety equipment acquisition and maintenance (health and safety), budgeting allowed in a contractual arrangement for implementing environmental management activities (environment), completeness of drawing documents (productivity), accurate measurement and pricing of bill of quantities (risk management), adequate communication among the project team (human resource), and adequate cost control measures (client satisfaction). An understanding of CSFs would help all interested parties in the construction industry to improve project performance. Furthermore, the results of this study would help construction professionals and practitioners take proactive measures for effective project management.

Keywords: critical success factors, procurement phase, project life cycle, project performance

Procedia PDF Downloads 169
9315 Prediction of Index-Mechanical Properties of Pyroclastic Rock Utilizing Electrical Resistivity Method

Authors: İsmail İnce

Abstract:

The aim of this study is to determine index and mechanical properties of pyroclastic rock in a practical way by means of electrical resistivity method. For this purpose, electrical resistivity, uniaxial compressive strength, point load strength, P-wave velocity, density and porosity values of 10 different pyroclastic rocks were measured in the laboratory. A simple regression analysis was made among the index-mechanical properties of the samples compatible with electrical resistivity values. A strong exponentially relation was found between index-mechanical properties and electrical resistivity values. The electrical resistivity method can be used to assess the engineering properties of the rock from which it is difficult to obtain regular shaped samples as a non-destructive method.

Keywords: electrical resistivity, index-mechanical properties, pyroclastic rocks, regression analysis

Procedia PDF Downloads 450
9314 Research on Ice Fixed-Abrasive Polishing Mechanism and Technology for High-Definition Display Panel Glass

Authors: Y. L. Sun, L. Shao, Y. Zhao, H. X. Zhou, W. Z. Lu, J. Li, D. W. Zuo

Abstract:

This study introduces an ice fixed-abrasive polishing (IFAP) technology. Using silica solution IFAP pad and Al2O3 IFAP pad, orthogonal tests were performed on polishing high-definition display panel glass, respectively. The results show that the polishing efficiency and effect polished with silica solution IFAP pad are better than those polished with Al2O3 IFAP pad. The optimized silica solution IFAP parameters are: polishing pressure 0.1MPa, polishing time 40min, table velocity 80r/min, and the ratio of accelerator and slurry 1:10. Finally, the IFAP mechanism was studied and it suggests by complicated analysis that IFAP is comprehensive effect of mechanical removal and microchemical reaction, combined with fixed abrasive polishing and free abrasive polishing.

Keywords: ice fixed-abrasive polishing, high-definition display panel glass, material removal rate, surface roughness

Procedia PDF Downloads 371
9313 From the Recursive Definition of Refutability to the Invalidity of Gödel’s 1931 Incompleteness

Authors: Paola Cattabriga

Abstract:

According to Gödel’s first incompleteness argument it is possible to construct a formally undecidable proposition in Principia mathematica, a statement that, although true, turns out to be neither provable nor refutable for the system, making therefore incomplete any formal system suitable for the arithmetic of integers. Its features and limitation effects are today widespread basics throughout whole scientific thought. This article brings Gödel’s achievement into question by the definition of the refutability predicate as a number-theoretical statement. We develop proof of invalidity of Theorem VI in Gödel’s 1931, the so-called Gödel’s first incompleteness theorem, in two steps: defining refutability within the same recursive status as provability and showing that as a consequence propositions (15) and (16), derived from definition 8.1 in Gödel’s 1931, are false and unacceptable for the system. The achievement of their falsity blocks the derivation of Theorem VI, which turns out to be therefore invalid, together with all the depending theorems. This article opens up thus new perspectives for mathematical research and for the overall scientific reasoning.

Keywords: Gödel numbering, incompleteness, provability predicate, refutability predicate

Procedia PDF Downloads 174
9312 A Predictive Analytics Approach to Project Management: Reducing Project Failures in Web and Software Development Projects

Authors: Tazeen Fatima

Abstract:

Use of project management in web & software development projects is very significant. It has been observed that even with the application of effective project management, projects usually do not complete their lifecycle and fail. To minimize these failures, key performance indicators have been introduced in previous studies to counter project failures. However, there are always gaps and problems in the KPIs identified. Despite of incessant efforts at technical and managerial levels, projects still fail. There is no substantial approach to identify and avoid these failures in the very beginning of the project lifecycle. In this study, we aim to answer these research problems by analyzing the concept of predictive analytics which is a specialized technology and is very easy to use in this era of computation. Project organizations can use data gathering, compute power, and modern tools to render efficient Predictions. The research aims to identify such a predictive analytics approach. The core objective of the study was to reduce failures and introduce effective implementation of project management principles. Existing predictive analytics methodologies, tools and solution providers were also analyzed. Relevant data was gathered from projects and was analyzed via predictive techniques to make predictions well advance in time to render effective project management in web & software development industry.

Keywords: project management, predictive analytics, predictive analytics methodology, project failures

Procedia PDF Downloads 321
9311 Combining Patients Pain Scores Reports with Functionality Scales in Chronic Low Back Pain Patients

Authors: Ivana Knezevic, Kenneth D. Candido, N. Nick Knezevic

Abstract:

Background: While pain intensity scales remain generally accepted assessment tool, and the numeric pain rating score is highly subjective, we nevertheless rely on them to make a judgment about treatment effects. Misinterpretation of pain can lead practitioners to underestimate or overestimate the patient’s medical condition. The purpose of this study was to analyze how the numeric rating pain scores given by patients with low back pain correlate with their functional activity levels. Methods: We included 100 consecutive patients with radicular low back pain (LBP) after the Institutional Review Board (IRB) approval. Pain scores, numeric rating scale (NRS) responses at rest and in the movement,Oswestry Disability Index (ODI) questionnaire answers were collected 10 times through 12 months. The ODI questionnaire is targeting a patient’s activities and physical limitations as well as a patient’s ability to manage stationary everyday duties. Statistical analysis was performed by using SPSS Software version 20. Results: The average duration of LBP was 14±22 months at the beginning of the study. All patients included in the study were between 24 and 78 years old (average 48.85±14); 56% women and 44% men. Differences between ODI and pain scores in the range from -10% to +10% were considered “normal”. Discrepancies in pain scores were graded as mild between -30% and -11% or +11% and +30%; moderate between -50% and -31% and +31% and +50% and severe if differences were more than -50% or +50%. Our data showed that pain scores at rest correlate well with ODI in 65% of patients. In 30% of patients mild discrepancies were present (negative in 21% and positive in 9%), 4% of patients had moderate and 1% severe discrepancies. “Negative discrepancy” means that patients graded their pain scores much higher than their functional ability, and most likely exaggerated their pain. “Positive discrepancy” means that patients graded their pain scores much lower than their functional ability, and most likely underrated their pain. Comparisons between ODI and pain scores during movement showed normal correlation in only 39% of patients. Mild discrepancies were present in 42% (negative in 39% and positive in 3%); moderate in 14% (all negative), and severe in 5% (all negative) of patients. A 58% unknowingly exaggerated their pain during movement. Inconsistencies were equal in male and female patients (p=0.606 and p=0.928).Our results showed that there was a negative correlation between patients’ satisfaction and the degree of reporting pain inconsistency. Furthermore, patients talking opioids showed more discrepancies in reporting pain intensity scores than did patients taking non-opioid analgesics or not taking medications for LBP (p=0.038). There was a highly statistically significant correlation between morphine equivalents doses and the level of discrepancy (p<0.0001). Conclusion: We have put emphasis on the patient education in pain evaluation as a vital step in accurate pain level reporting. We have showed a direct correlation with patients’ satisfaction. Furthermore, we must identify other parameters in defining our patients’ chronic pain conditions, such as functionality scales, quality of life questionnaires, etc., and should move away from an overly simplistic subjective rating scale.

Keywords: pain score, functionality scales, low back pain, lumbar

Procedia PDF Downloads 216