Search results for: informal construction practices
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 8211

Search results for: informal construction practices

8031 In-Situ Redevelopment in Urban India: Two Case Studies from Delhi and Mumbai

Authors: Ashok Kumar, Anjali Sharma

Abstract:

As cities grow and expand spatially, redevelopment in urban India is beginning to emerge as a new mode of urban expansion sweeping low-income informal settlements. This paper examines the extent and nature of expanding urban frontier before examining implications for the families living in these settlements. Displacement of these families may appear to be an obvious consequence. However, we have conducted ethnographic studies over the past several months in a Delhi slum named Kathputli Colony, Delhi. In depth analysis of the study for this slum appears to present a variegated set of consequences for the residents of informal settlements including loss of livelihoods, dismantling of family ties, and general anxiety arising out of uncertainty about resettlement. Apart from Delhi case study, we also compare and contrast another redevelopment case from Mumbai located at Bhendi Bazar. These examples from the two mega cities of Mumbai and Delhi are analysed to understand and explore expanding urban frontiers and their consequences for informing future public policy.

Keywords: informal settlements, policy, redevelopment, urban

Procedia PDF Downloads 311
8030 Suicide Attempts and Gender: A Qualitative Analysis in Cuba

Authors: Alejandro Arnaldo Barroso Martinez

Abstract:

Unlike sex, which is constituted by anatomic-physiological differences, gender is a social construction. Our thoughts and behaviors as females and males are not etched in stone by our biology but rather from how society expects us to think and behave based on our sex assignment in the womb. Social expectations, values, and roles are taken on by individuals and shape the ways considered acceptable and linked to our bodies, feelings, and interpersonal relationships. Furthermore, these evolve into dire consequences for those who do not meet these disciplinary, economic, and cultural standards. Then, the social learning of gender identity implies the individual’s psychological sense of being, and it might be highly linked to a sense of life and suicide attempts. As a result, suicide has been considered a gender issue with differences in the rates and means used by men and women worldwide. Nevertheless, there has been a misunderstanding of the meaning of being male or female in a particular context and how it becomes a risk process for suicide attempts. For this reason, the general objective of the current research is to explain how this process occurs in Cuba. From a Critical Sociology and Social Psychology, a qualitative methodology was developed through six case studies and qualitative in-depth interviews. The analysis is focused on the sequence and interplay between two dimensions of meaning: signifiers and voices. Findings show that the risk process of suicide attempts in Cuba means some patriarchal beliefs and practices as part of informal educational models and some positivist practices in mental health attention. Findings also show that community relations create a sense of belonging, and it is a protection against suicide attempts in Cuba. Those frames of signifiers and voices explain in both males and females but differently when and how they are suffering from isolation, violence, the normalization of emotional awareness, and emotional distress expression. Suicide prevention programs should take gender learning into account as a cultural process.

Keywords: social constructions, gender identity, meanings, suicide attempt

Procedia PDF Downloads 204
8029 Construction Project Planning Using Fuzzy Critical Path Approach

Authors: Omar M. Aldenali

Abstract:

Planning is one of the most important phases of the management science and network planning, which represents the project activities relationship. Critical path is one of the project management techniques used to plan and control the execution of a project activities. The objective of this paper is to implement a fuzzy logic approach to arrange network planning on construction projects. This method is used to finding out critical path in the fuzzy construction project network. The trapezoidal fuzzy numbers are used to represent the activity construction project times. A numerical example that represents a house construction project is introduced. The critical path method is implemented on the fuzzy construction network activities, and the results showed that this method significantly affects the completion time of the construction projects.

Keywords: construction project, critical path, fuzzy network project, planning

Procedia PDF Downloads 128
8028 Using Wearable Technology to Monitor Workers’ Stress for Construction Safety: A Conceptual Framework

Authors: Namhun Lee, Seong Jin Kim

Abstract:

The construction industry represents one of the largest industries in the United States, yet it continues to face several occupational health and safety challenges. Many workers on construction sites are suffering from extended exposure to stressful situations such as poor and hazardous work environments and task complexity. Stress can be commonly defined as a feeling of emotional or physical tension, which can easily impact construction safety and result in a higher rate of job-related injuries in the construction industry. Physiological signals transmitted from wearable biosensors can be used to detect excessive stress. Therefore, workers’ stress should be detected and mitigated to prevent any type of serious incident or accident proactively. By doing this, construction productivity, as well as job satisfaction, would also be improved in the construction industry. To establish a foundation in this field of research, a conceptual framework for using wearable technology for construction safety has been developed for continuous and automatic monitoring of worker’s stress. The conceptual framework will serve as a foothold in future studies on the application of wearable technology for construction safety.

Keywords: construction safety, occupational stress, stress monitoring, wearable biosensors

Procedia PDF Downloads 147
8027 Uptake of Off-Site Construction: Benefit and Future Application

Authors: Faisal Alazzaz, Andrew Whyte

Abstract:

Off-site construction methods have played an important role in the construction sector in the past few decades. It is increasingly becoming a major alternative technique and strategic direction compared to traditional in-situ method. It produces a significant amount of value for the construction industry and the economy more generally. To date, an impressive number of studies have been lunched on the perceived perception of off-site construction. However, it seems that a quantifying benefit on the offsite construction area is lacking. Therefore, this paper examines the recent research literature on the benefits of off- site construction and provides future direction. In the beginning, this paper provides a brief history and current value of the off-site construction followed by a detailed discussion on the benefit of off-site construction. These benefits include but not limited to time saving, quality improvement, relieving skills shortages, cost reduction and productivity improvement. Toward this end, off-site construction should learn from other productive industry similar to services or manufacturing industry by applying operational management tools and techniques with extensive focus on employee empowerment will shed the light on future uptake of Off-site construction. This study is of value in providing scholars have a clear picture of perceived benefit of off-site construction research and give an opportunities for future uptake of off-site method.

Keywords: building projects, employer empowerment, off-site construction benefits, productivity

Procedia PDF Downloads 419
8026 Labour-saving Construction Using Buildability Framework through Strengthening Designers in Delivering More Buildable Designs

Authors: Muhammad Lawal A., Abdullateef Abdulkarim Jimoh

Abstract:

This study is to appraise the labour-saving construction methods achievable using a buildability framework through an improved design system. Adoption of labour-efficient technology and construction techniques will be necessary to supplement good buildable designs. Increased usage of prefabricated, modular, and standardized construction components, simplicity in the design, and the number of integrated elements all work to advance buildable design. The objectives of the study include `determining a more efficient buildability framework for designers to achieve labour-saving construction’. 20 completed building projects in Birnin Kebbi, Nigeria, is used as a case study to buttress the proposition that `a more buildable design using buildability frame result in labour-saving in construction adopting a Singapore study approach.

Keywords: buildability framework, buildable designs, construction, labour-saving construction

Procedia PDF Downloads 84
8025 Identifying & Exploring Top 10 sustainable, Systemic Leadership Practices Of a School Leader To Improve School Leadership and Student Learning Outcomes

Authors: Sapana Pankaj Purandare

Abstract:

The world is changing and so is the School Leadership. We are entering in the era of 21st century and we need to modify our school leadership accordingly and the School Leader would be the one impacting the system too. As we implemented LEAD project on the field we realized that 67 practices are a lot and impractical for any school leader to implement. So through this project the researcher intends to roll out a questionnaire with the KEF partner school leaders as well as other school leaders working in the same context, to identify the practices that would help them improve school leadership as well as SLO and the practices that they find relevant in the current situation as well as the ones that they perceive and think important in the preferred future. We used the Qualtrics tool to conduct the survey to find out which are the top 15 practices the respondents feel they would be crucial 10-15 years hence that will support them to better the SLO. We also conducted FGD’s and interviews to find out the reasons for which they are unable to follow these practices at their schools. The recommendations of top 15 practices would be helpful to design the scalable models for LEAD and pitch them at state level expansion. Practices with higher standard deviation and average score are more significant for future. Factors like age, gender and years of service shape the perceptions of practices and hence have people of same ratio.

Keywords: improving teaching learning practices, impacting student learning outcomes, school leadership practices, sustainable change

Procedia PDF Downloads 22
8024 Shifting Paradigms for Micro, Small, and Medium Enterprises in the Global Construction Market: The Crucial Roles of Technology and Sustainability

Authors: Sohrab Donyavi

Abstract:

The global construction market is experiencing significant shifts, particularly for micro, small, and medium enterprises (MSMEs), driven by the dual imperatives of technological advancement and sustainability. MSMEs play a crucial role in the construction industry, often being the backbone of economic development and fostering entrepreneurial skills. However, their dominance has also led to industry fragmentation and challenges such as technological lag and declining profit margins, which threaten their global competitiveness. This paper explores the integration of technology and sustainability in reshaping the paradigms for MSMEs in the construction sector. The adoption of advanced technologies, such as building information modeling (BIM) and AI, are pivotal for promoting sustainable construction practices. These tools enable MSMEs to design and construct environmentally responsible buildings, thereby contributing to the industry's sustainability goals. The research highlights that achieving sustainability in construction involves significant efforts in conservation, recycling, and the development of new materials and technologies. This approach aligns with the broader goal of integrating economic, environmental, and social aims into firm objectives to create long-term value while ensuring the protection of natural resources for future generations. Critical factors for implementing sustainable oriented innovation (SOI) practices in MSMEs include top management support, government initiatives, and financial resources. These factors are essential for fostering an environment conducive to innovation and sustainability. Furthermore, the empowerment of MSMEs through improved governance, market-oriented programs, sustainable productivity growth, and access to financing is vital. In developing regions like Indonesia, these strategies are crucial for enabling MSMEs to thrive in the face of globalization. The tendency of large firms to grow larger with the help of technology and globalization has led to the emergence of a high-technology oligopoly, posing a significant challenge to traditional construction practices. This shift necessitates that MSMEs adapt by leveraging technology and embracing sustainable practices to remain competitive. The research underscores the importance of integrating technology and sustainability not only as a competitive strategy but also as a means to contribute to the global effort of environmental conservation and sustainable development. This paper concludes that the successful integration of technology and sustainability in MSMEs requires a multifaceted approach. It involves the adoption of advanced technological tools, strong support from top management, proactive government policies, and access to financial resources. By addressing these factors, MSMEs can overcome the challenges of industry fragmentation, technological lag, and declining profit margins. Ultimately, this integration will enable MSMEs to play a pivotal role in driving the construction industry towards a more sustainable and technologically advanced future. The findings and recommendations are based on a comprehensive case study utilizing semi-structured interviews, observations, questionnaires, and document reviews.

Keywords: MSMEs, construction, technology, sustainability, innovation

Procedia PDF Downloads 13
8023 Innovation Ecosystems in Construction Industry

Authors: Cansu Gülser, Tuğce Ercan

Abstract:

The construction sector is a key driver of the global economy, contributing significantly to growth and employment through a diverse array of sub-sectors. However, it faces challenges due to its project-based nature, which often hampers long-term collaboration and broader incentives beyond individual projects. These limitations are frequently discussed in scientific literature as obstacles to innovation and industry-wide change. Traditional practices and unwritten rules further hinder the adoption of new processes within the construction industry. The disadvantages of the construction industry’s project-based structure in fostering innovation and long-term relationships include limited continuity, fragmented collaborations, and a focus on short-term goals, which collectively hinder the development of sustained partnerships, inhibit the sharing of knowledge and best practices, and reduce incentives for investing in innovative processes and technologies. This structure typically emphasizes specific projects, which restricts broader collaborations and incentives that extend beyond individual projects, thus impeding innovation and change. The temporal complexities inherent in project-based sectors like construction make it difficult to address societal challenges through collaborative efforts. Traditional management approaches are inadequate for scaling up innovations and adapting to significant changes. For systemic transformation in the construction sector, there is a need for more collaborative relationships and activities beyond traditional supply chains. This study delves into the concept of an innovation ecosystem within the construction sector, highlighting various research findings. It aims to explore key questions about the components that enhance innovation capacity, the relationship between a robust innovation ecosystem and this capacity, and the reasons why innovation is less prevalent and implemented in this sector compared to others. Additionally, it examines the main factors hindering innovation within companies and identifies strategies to improve these efforts, particularly in developing countries. The innovation ecosystem in the construction sector generates various outputs through interactions between business resources and external components. These outputs include innovative value creation, sustainable practices, robust collaborations, knowledge sharing, competitiveness, and advanced project management, all of which contribute significantly to company market performance and competitive advantage. This article offers insights and strategic recommendations for industry professionals, policymakers, and researchers interested in developing and sustaining innovation ecosystems in the construction sector. Future research should focus on broader samples for generalization, comparative sector analysis, and application-focused studies addressing real industry challenges. Additionally, studying the long-term impacts of innovation ecosystems, integrating advanced technologies like AI and machine learning into project management, and developing future application strategies and policies are also important.

Keywords: construction industry, innovation ecosystem, innovation ecosystem components, project management

Procedia PDF Downloads 5
8022 Factors Affecting Time Performance in Building Construction Projects

Authors: Ibraheem A. K. Mahameed

Abstract:

The aim of this study is to identify the risks affecting time performance of building construction projects in the West Bank in Palestine from contractors’ viewpoint. 38 risks that might affect time performance of building construction projects were defined through a detailed literature review. These risks have been classified into 6 groups: project, managerial, consultant, financial, external, and construction items. A questionnaire survey was performed to rank the considered risks in terms of severity and frequency. The analysis of the survey indicated that the top five risks affecting time performance of building construction projects in Palestine are: award project to the lowest price, political situation, poor communication and coordination between construction parties, change orders, and financial status of contractor.

Keywords: delay, time performance, construction, building

Procedia PDF Downloads 451
8021 Achieving Sustainable Rapid Construction Using Lean Principles

Authors: Muhamad Azani Yahya, Vikneswaran Munikanan, Mohammed Alias Yusof

Abstract:

There is the need to take the holistic approach in achieving sustainable construction for a contemporary practice. Sustainable construction is the practice that involved method of human preservation of the environment, whether economically or socially through responsibility, management of resources and maintenance utilizing support. This paper shows the correlation of achieving rapid construction with sustainable concepts using lean principles. Lean principles being used widely in the manufacturing industry, but this research will demonstrate the principles into building construction. Lean principle offers the benefits of stabilizing work flow and elimination of unnecessary work. Therefore, this principle contributes to time and waste reduction. The correlation shows that pulling factor provides the improvement of progress curve and stabilizing the time-quality relation. The finding shows the lean principles offer the elements of rapid construction synchronized with the elements of sustainability.

Keywords: sustainable construction, rapid construction, time reduction, lean construction

Procedia PDF Downloads 227
8020 Proposed Design Principles for Low-Income Housing in South Africa

Authors: Gerald Steyn

Abstract:

Despite the huge number of identical, tiny, boxy, freestanding houses built by the South African government after the advent of democracy in 1994, squatter camps continue to mushroom, and there is no evidence that the backlog is being reduced. Not only is the wasteful low-density detached-unit approach of the past being perpetuated, but the social, spatial, and economic marginalization is worse than before 1994. The situation is precarious since squatters are vulnerable to fires and flooding. At the same time, the occupants of the housing schemes are trapped far from employment opportunities or any public amenities. Despite these insecurities, the architectural, urban design, and city planning professions are puzzlingly quiet. Design projects address these issues only at the universities, albeit inevitably with somewhat Utopian notions. Geoffrey Payne, the renowned urban housing and urban development consultant and researcher focusing on issues in the Global South, once proclaimed that “we do not have a housing problem – we have a settlement problem.” This dictum was used as the guiding philosophy to conceptualize urban design and architectural principles that foreground the needs of low-income households and allow them to be fully integrated into the larger conurbation. Information was derived from intensive research over two decades, involving frequent visits to informal settlements, historic Black townships, and rural villages. Observations, measured site surveys, and interviews resulted in several scholarly articles from which a set of desirable urban and architectural criteria could be extracted. To formulate culturally appropriate design principles, existing vernacular and informal patterns were analyzed, reconciled with contemporary designs that align with the requirements for the envisaged settlement attributes, and reimagined as residential design principles. Five interrelated design principles are proposed, ranging in scale from (1) Integrating informal settlements into the city, (2) linear neighborhoods, (3) market streets as wards, (4) linear neighborhoods, and (5) typologies and densities for clustered and aggregated patios and courtyards. Each design principle is described, first in terms of its context and associated issues of concern, followed by a discussion of the patterns available to inform a possible solution, and finally, an explanation and graphic illustration of the proposed design. The approach is predominantly bottom-up since each of the five principles is unfolded from existing informal and vernacular practices studied in situ. They are, however, articulated and represented in terms of contemporary design language. Contrary to an idealized vision of housing for South Africa’s low-income urban households, this study proposes actual principles for critical assessment by peers in the tradition of architectural research in design.

Keywords: culturally appropriate design principles, informal settlements, South Africa’s housing backlog, squatter camps

Procedia PDF Downloads 34
8019 Causes and Effects of Delays in Construction Projects in Akure, Ondo State, South-West Nigeria

Authors: K.T Alade, A.F Lawal, A.A Omonori

Abstract:

Construction is an everlasting activity across the globe. Likewise, the problem of delay in the construction industry is a global phenomenon. Although there are several reasons that may be responsible for delay during construction, this may vary from place to place and can be reduced to the minimum when identified. This study considered the major causes and effects of delay in the execution of construction projects in Akure, Ondo State, Nigeria. Using literatures, a total number of 30 causes of construction delays were identified. The convenient sampling technique was used to select sixty respondents for a survey. The respondents comprise twenty-two (22) clients, eighteen consultants (18) and twenty (20) contractors. The analyses of the primary data revealed that the three most important causes of delay in construction projects in Akure, Ondo State Nigeria are poor site management and supervision, inadequate contractors experience and client’s financial difficulties. Based on the findings of this study, recommendations were given on how the causes and effects of delay in construction can be mitigated.

Keywords: Akure, causes, construction projects, delay, effects

Procedia PDF Downloads 497
8018 Hybrid Concrete Construction (HCC) for Sustainable Infrastructure Development in Nigeria

Authors: Muhammad Bello Ibrahim, M. Auwal Zakari, Aliyu Usman

Abstract:

Hybrid concrete construction (HCC) combines all the benefits of pre-casting with the advantages of cast in-situ construction. Merging the two, as a hybrid structure, results in even greater construction speed, value, and the overall economy. Its variety of uses has gained popularity in the United States and in Europe due to its distinctive benefits. However, the increase of its application in some countries (including Nigeria) has been relatively slow. Several researches have shown that hybrid construction offers an ultra-high performance concrete that offers superior strength, durability and aesthetics with design flexibility and within sustainability credentials, based on the available and economically visible technologies. This paper examines and documents the criterion that will help inform the process of deciding whether or not to adopt hybrid concrete construction (HCC) technology rather than more traditional alternatives. It also the present situation of design, construction and research on hybrid structures.

Keywords: hybrid concrete construction, Nigeria, sustainable infrastructure development, design flexibility

Procedia PDF Downloads 538
8017 Major Causes of Delay in Construction Projects

Authors: Y. Gholipour, E. Rezazadeh

Abstract:

Delay is one of the most serious and common problems of construction project that can affect project delivery unfavorably. This research presents the most important causes of delay in large dam projects based on a survey on some executed dam construction in Iran. In this survey a randomly selected samples of owners, consultants and contractors have been involved. The outcome of this survey revealed that scheduled payments, site management, shop drawing review process, unforeseen ground conditions and contractor experience as the most important factors affecting on delay in dam construction projects.

Keywords: delay, dam construction, project management, Iran

Procedia PDF Downloads 430
8016 Use of Technology Based Intervention for Continuous Professional Development of Teachers in Pakistan

Authors: Rabia Aslam

Abstract:

Overwhelming evidence from all around the world suggests that high-quality teacher professional development facilitates the improvement of teaching practices which in turn could improve student learning outcomes. The new Continuous Professional Development (CPD) model for primary school teachers in Punjab uses a blended approach in which pedagogical content knowledge is delivered through technology (high-quality instructional videos and lesson plans delivered to school tablets or mobile phones) with face-to-face support by Assistant Education Officers (AEOs). The model also develops Communities of Practice operationalized through formal meetings led by the AEOs and informal interactions through social media groups to provide opportunities for teachers to engage with each other and share their ideas, reflect on learning, and come up with solutions to issues they experience. Using Kirkpatrick’s 4 levels of the learning evaluation model, this paper investigates how school tablets and teacher mobile phones may act as transformational cultural tools to potentially expand perceptions and access to teaching and learning resources and explore some of the affordances of social media (Facebook, WhatsApp groups) in learning in an informal context. The results will be used to inform policy-level decisions on what shape could CPD of all teachers take in the context of a developing country like Pakistan.

Keywords: CPD, teaching & learning, blended learning, learning technologies

Procedia PDF Downloads 69
8015 A Case Study of Open Source Development Practices within a Large Company Setting

Authors: Alma Orucevic-Alagic, Martin Höst

Abstract:

Open source communities have demonstrated that complex and enterprise grade software can be produced, supported, and maintained by self-organizing groups of developers using primarily electronic form of communication. Due to the inherent nature of open source development, a specific set of open source software development practices has evolved. While there is an ongoing research on the topic of applicability of open source development practices within a company setting, still little is known about their benefits and challenges. The objective of this research is to understand if and to what degree open source development practices observed within a mature open source community are aligned with development practices within a large software and hardware company setting. For the purpose of this case study a set of open source development practices that are present in a mature open source community has been identified. Then, development practices of a large, international, hardware and software company based in Sweden were assessed and compared to the identified open source community practices. It is shown that there are many similarities between a mature open source community and a large company setting in regard to software development practices. We also identify practices that exist in open source communities and that are not standard within a company setting, but whose implementation can result in an improved software development efficiency within the company setting.

Keywords: development practices, open source software, innersource, closed open source

Procedia PDF Downloads 542
8014 Development of Construction Cost Optimization System Using Genetic Algorithm Method

Authors: Hyeon-Seung Kim, Young-Hwan Kim, Sang-Mi Park, Min-Seo Kim, Jong-Myeung Shin, Leen-Seok Kang

Abstract:

The project budget at the planned stage might be changed by the insufficient government budget or the design change. There are many cases more especially in the case of a project performed for a long period of time. If the actual construction budget is insufficient comparing with the planned budget, the construction schedule should also be changed to match the changed budget. In that case, most project managers change the planned construction schedule by a heuristic approach without a reasonable consideration on the work priority. This study suggests an optimized methodology to modify the construction schedule according to the changed budget. The genetic algorithm was used to optimize the modified construction schedule within the changed budget. And a simulation system of construction cost histogram in accordance with the construction schedule was developed in the BIM (Building Information Modeling) environment.

Keywords: 5D, BIM, GA, cost optimization

Procedia PDF Downloads 580
8013 A Review of Digital Twins to Reduce Emission in the Construction Industry

Authors: Zichao Zhang, Yifan Zhao, Samuel Court

Abstract:

The carbon emission problem of the traditional construction industry has long been a pressing issue. With the growing emphasis on environmental protection and advancement of science and technology, the organic integration of digital technology and emission reduction has gradually become a mainstream solution. Among various sophisticated digital technologies, digital twins, which involve creating virtual replicas of physical systems or objects, have gained enormous attention in recent years as tools to improve productivity, optimize management and reduce carbon emissions. However, the relatively high implementation costs including finances, time, and manpower associated with digital twins have limited their widespread adoption. As a result, most of the current applications are primarily concentrated within a few industries. In addition, the creation of digital twins relies on a large amount of data and requires designers to possess exceptional skills in information collection, organization, and analysis. Unfortunately, these capabilities are often lacking in the traditional construction industry. Furthermore, as a relatively new concept, digital twins have different expressions and usage methods across different industries. This lack of standardized practices poses a challenge in creating a high-quality digital twin framework for construction. This paper firstly reviews the current academic studies and industrial practices focused on reducing greenhouse gas emissions in the construction industry using digital twins. Additionally, it identifies the challenges that may be encountered during the design and implementation of a digital twin framework specific to this industry and proposes potential directions for future research. This study shows that digital twins possess substantial potential and significance in enhancing the working environment within the traditional construction industry, particularly in their ability to support decision-making processes. It proves that digital twins can improve the work efficiency and energy utilization of related machinery while helping this industry save energy and reduce emissions. This work will help scholars in this field to better understand the relationship between digital twins and energy conservation and emission reduction, and it also serves as a conceptual reference for practitioners to implement related technologies.

Keywords: digital twins, emission reduction, construction industry, energy saving, life cycle, sustainability

Procedia PDF Downloads 77
8012 Impact of Flexibility on Residential Buildings in Egypt

Authors: Aly Mohamed El Husseiny, Azza Ezz Abdelkader

Abstract:

There is a critical thin line between freedom of choice and randomness. The distance between imagination and perception and between perception and execution varies depending on numerous factors. While in developed areas residents have the opportunity and abilities to build flexible homes, residents in developing areas create their own dwellings in informal settlements, even though none of them is comfortable at home in the long run. This paper explores three factors: What residents really need, what they do with limited flexibility, and what they do when there are no limits, as in the case of informal settlements. This paper studies alteration to residential buildings and how they connect to the changes in people’s lifecycle in all past cases. This study also examines all approaches to flexibility, focusing on a social approach. The results of this study are based on three practical studies: Interviews with residents in an informal settlement (Eshash Mahfouz in Minya in Egypt), a civil study of buildings in a middle-class district, and a survey of residents from many countries, including Egypt, and interviews with a number of them to determine residents’ needs and the extent of renovations they made or would like to make to their homes.

Keywords: flexibility, housing, freedom of choice, social, changes, residents

Procedia PDF Downloads 285
8011 Tourism Development and Planning in Rwanda

Authors: Ntachobazi bosco

Abstract:

Tourism Development and Planning in Rwanda: Rwanda, a small landlocked country located in the heart of Africa, has experienced significant growth in its tourism industry in recent years. The country’s stunning natural beauty, rich cultural heritage, and warm hospitality have made it an attractive destination for travelers from around the world. However, to ensure sustainable tourism development and planning, the Rwandan government has implemented various strategies and policies to promote responsible tourism practices. Infrastructure Development: To support the growth of the tourism industry, the Rwandan government has invested heavily in infrastructure development. This includes the construction of new hotels, resorts, and lodges, as well as the upgrading of existing facilities. The government has also improved the country’s transportation network, including the construction of new airports and the upgrading of existing ones. Conservation Efforts: Rwanda is home to several national parks and reserves, including the famous Volcanoes National Park, which is known for its mountain gorilla populations. To protect these natural wonders, the Rwandan government has implemented conservation efforts, such as the establishment of protected areas and the development of sustainable tourism practices. Community-Based Tourism: Community-based tourism is a key component of Rwanda’s tourism development strategy. The government has established several community-based tourism programs, which aim to involve local communities in the tourism industry and provide them with economic benefits. These programs include homestays, village tours, and cultural performances. Sustainable Tourism Practices: To promote sustainable tourism practices, the Rwandan government has implemented several initiatives, such as the use of eco-friendly accommodations and the promotion of responsible wildlife viewing practices. The government has also established the Rwanda Tourism Board, which is responsible for promoting and regulating the tourism industry. Challenges and Opportunities: Despite the growth of the tourism industry in Rwanda, several challenges need to be addressed, such as the lack of skilled labor and the need for more infrastructure development. However, there are also several opportunities for the industry, such as the potential for ecotourism and the growth of the meetings, incentives, conventions, and exhibitions (MICE) market.

Keywords: tourism, in rwanda, developent, in africa

Procedia PDF Downloads 53
8010 Trust: The Enabler of Knowledge-Sharing Culture in an Informal Setting

Authors: Emmanuel Ukpe, S. M. F. D. Syed Mustapha

Abstract:

Trust in an organization has been perceived as one of the key factors behind knowledge sharing, mainly in an unstructured work environment. In an informal working environment, to instill trust among individuals is a challenge and even more in the virtual environment. The study has contributed in developing the framework for building trust in an unstructured organization in performing knowledge sharing in a virtual environment. The artifact called KAPE (Knowledge Acquisition, Processing, and Exchange) was developed for knowledge sharing for the informal organization where the framework was incorporated. It applies to Cassava farmers to facilitate knowledge sharing using web-based platform. A survey was conducted; data were collected from 382 farmers from 21 farm communities. Multiple regression technique, Cronbach’s Alpha reliability test; Tukey’s Honestly significant difference (HSD) analysis; one way Analysis of Variance (ANOVA), and all trust acceptable measures (TAM) were used to test the hypothesis and to determine noteworthy relationships. The results show a significant difference when there is a trust in knowledge sharing between farmers, the ones who have high in trust acceptable factors found in the model (M = 3.66 SD = .93) and the ones who have low on trust acceptable factors (M = 2.08 SD = .28), (t (48) = 5.69, p = .00). Furthermore, when applying Cognitive Expectancy Theory, the farmers with cognitive-consonance show higher level of trust and satisfaction with knowledge and information from KAPE, as compared with a low level of cognitive-dissonance. These results imply that the adopted trust model KAPE positively improved knowledge sharing activities in an informal environment amongst rural farmers.

Keywords: trust, knowledge, sharing, knowledge acquisition, processing and exchange, KAPE

Procedia PDF Downloads 104
8009 Cooperation and Conflict in Child Rearing Practices among Parents in Indian Context

Authors: Jilly John

Abstract:

The paper reports one of the study conducted to explore the dimensions of child rearing practice and effects of power difference among parents on child rearing practices adopted in the families. The first objective investigated dimensions of child rearing practices (a) overprotection (b) disciplinarian, (c) esteem building, (d) normal, (e) harsh (f) ridicule, and (g) rejection. The second objective investigated difference among father and mother on child rearing practices. The results of the study revealed that dimensions of child rearing practices are crucial variables which resulted in form of major deviations in distribution of parents in the seven dimensions. Analysis of objective two revealed that harsh and ridicule dimensions of child rearing practices are significantly different among father and mother. The dimensions are also different when the parents are employed and according to the type of families. Thus the results of the study present the possibility of changed child rearing practices among Indian families in relation to prevalent sociodemographic changes and indicate the necessity to re-examine culture-based explanations on child rearing practices.

Keywords: child rearing practices, dimensions of child rearing, difference among parents, Indian families

Procedia PDF Downloads 389
8008 The Eco-Efficient Construction: A Review of Embodied Energy in Building Materials

Authors: Francesca Scalisi, Cesare Sposito

Abstract:

The building construction industry consumes a large amount of resources and energy, both during construction (embodied energy) and during the operational phase (operating energy). This paper presents a review of the literature on low carbon and low embodied energy materials in buildings. The embodied energy comprises the energy consumed during the extraction, processing, transportation, construction, and demolition of building materials. While designing a nearly zero energy building, it is necessary to choose and use materials, components, and technologies that allow to reduce the consumption of energy and also to reduce the emissions in the atmosphere during all the Life Cycle Assessment phases. The appropriate choice of building materials can contribute decisively to reduce the energy consumption of the building sector. The increasing worries for the environmental impact of construction materials are witnessed by a lot of studies. The mentioned worries have brought again the attention towards natural materials. The use of more sustainable construction materials and construction techniques represent a major contribution to the eco-efficiency of the construction industry and thus to a more sustainable development.

Keywords: embodied energy, embodied carbon, life cycle assessment, architecture, sustainability, material construction

Procedia PDF Downloads 329
8007 The Human Resource Management Systems and Practices of Multinational Companies in Their Nigerian Subsidiaries

Authors: Suwaiba Sabiu Bako, Yaw Debrah

Abstract:

In spite of the extensive literature available on the human resource management (HRM) systems and practices of multinational companies (MNCs) from developed countries, there are gaps concerning emerging countries’ multinational companies’ (EMNCs) HRM systems and practices. This study examines the transfer of HRM practices in Nigerian subsidiaries of MNCs from South Africa. It reveals that South MNCs hybridise their recruitment and selection processes and localise their compensation and employee relations. It also proves that performance appraisal, talent management and code of conduct practices are largely transferred to subsidiaries with minimal adaptation.

Keywords: EMNCs, HRM practices, HRM systems, Nigeria, South Africa

Procedia PDF Downloads 97
8006 Methodology of Construction Equipment Optimization for Earthwork

Authors: Jaehyun Choi, Hyunjung Kim, Namho Kim

Abstract:

Earthwork is one of the critical civil construction operations that require large-quantities of resources due to its intensive dependency upon construction equipment. Therefore, efficient construction equipment management can highly contribute to productivity improvements and cost savings. Earthwork operation utilizes various combinations of construction equipment in order to meet project requirements such as time and cost. Identification of site condition and construction methods should be performed in advance in order to develop a proper execution plan. The factors to be considered include capacity of equipment assigned, the method of construction, the size of the site, and the surrounding condition. In addition, optimal combination of various construction equipment should be selected. However, in real world practice, equipment utilization plan is performed based on experience and intuition of management. The researchers evaluated the efficiency of various alternatives of construction equipment combinations by utilizing the process simulation model, validated the model from a case study project, and presented a methodology to find optimized plan among alternatives.

Keywords: earthwork operation, construction equipment, process simulation, optimization

Procedia PDF Downloads 413
8005 Evolution of Classroom Languaging over the Years: Prospects for Teaching Mathematics Differently

Authors: Jabulani Sibanda, Clemence Chikiwa

Abstract:

This paper traces diverse language practices representative of equally diverse conceptions of language. To be dynamic with languaging practices, one needs to appreciate nuanced languaging practices, their challenges, prospects, and opportunities. The paper presents what we envision as three major conceptions of language that give impetus to diverse language practices. It examines theoretical models of the bilingual mental lexicon and how they inform language practices. The paper explores classroom languaging practices that have been promulgated and experimented with. The paper advocates the deployment of multisensory semiotic systems to complement linguistic classroom communication and the acknowledgement of learners’ linguistic and semiotic resources as valid in the learning enterprise. It recommends the enactment of specific clauses on language in education policies and curriculum documents that empower classroom interactants to exercise discretion in languaging practices.

Keywords: languaging, monolingual, multilingual, semiotic and linguistic repertoire

Procedia PDF Downloads 55
8004 Knowledge Spillovers from Patent Citations: Evidence from Swiss Manufacturing Industry

Authors: Racha Khairallah, Lamia Ben Hamida

Abstract:

Our paper attempts to examine how Swiss manufacturing firms manage to learn from patent citations to improve their innovation performance. We argue that the assessment of these effects needs a detailed analysis of spillovers according to the source of knowledge with respect to formal and informal patent citations made in European and internal search, the horizontal and vertical mechanisms by which knowledge spillovers take place, and the technological characteristics of innovative firms that able them to absorb external knowledge and integrate it in their existing innovation process. We use OECD data and find evidence that knowledge spillovers occur only from horizontal and backward linkages. The importance of these effects depends on the type of citation, in which the references to non-patent literature (informal citations made in European and international searches) have a greater impact. In addition, only firms with high technological capacities benefit from knowledge spillovers from formal and informal citations. Low-technology firms fail to catch up and efficiently learn external knowledge from patent citations.

Keywords: innovation performance, patent citation, absorptive capacity, knowledge spillover mechanisms

Procedia PDF Downloads 90
8003 Identifying Project Delay Factors in the Australian Construction Industry

Authors: Syed Sohaib Bin Hasib, Hiyam Al-Kilidar

Abstract:

Meeting project deadlines is a major challenge for most construction projects. In this study, perceptions of contractors, clients, and consultants are compared relative to a list of factors derived from the review of the extant literature on project delay. 59 causes (categorized into 8 groups) of project delays were identified from the literature. A survey was devised to get insights and ranking of these factors from clients, consultants & contractors in the Australian construction industry. Findings showed that project delays in the Australian construction industry are mainly the result of skill shortages, interference in execution, and poor coordination and communication between the project stakeholders.

Keywords: construction, delay factors, time delay, australian construction industry

Procedia PDF Downloads 164
8002 Abating the Barriers to the Deployment of RFID for Construction Project Delivery in South Africa

Authors: Matthew O. Ikuabe, Ayodeji E. Oke, Clinton O. Aigbavboa, Douglas O. Aghimien

Abstract:

The use of technological innovations have been touted to be beneficial in the delivery of construction projects. Particularly, Radio Frequency Identification (RFID) technology is widely regarded to be of immense advantage for the management of construction projects. This study focused on evaluating the barriers to the use of Radio Frequency Identification (RFID) technology for the delivery of construction projects. Using Gauteng Provincein South Africa as the study area, questionnaire was used in eliciting responses from construction professionals, which made up the population of the study. Retrieved data was analysed using Mean Item Score and One-Sample t-test. Findings from the study showed that the most significant barriers to the deployment of RFID for construction project delivery are high cost and lack of awareness. Conclusively, the study made recommendations that would aid in the abatement of the barriers to the use of RFID technology for construction project delivery.

Keywords: barriers, construction, project delivery, RFID

Procedia PDF Downloads 188